middle east district active and future program … · 2. mission. the transatlantic middle east...

26
MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM OPPORTUNITIES Date: 17 June 2020

Upload: others

Post on 11-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM OPPORTUNITIESDate: 17 June 2020

Page 2: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

2

MISSIONThe Transatlantic Middle East District (TAM) provides design, construction execution, and related services and support tomission partners in the CENTCOM area of responsibility (AOR) to increase regional security and stability in support of enduringU.S. interests; on order, supports contingency operations.

UNCLASSIFIED / FOUO

$0 B $1 B $2 B $3 B $4 B

UAE

Saudi Arabia

Qatar

Kuwait

Jordan

Iraq

Egypt

Bahrain

US Dollars in Billions

Cou

ntry

MIDDLE EAST DISTRICT PROGRAM SUMMARY

ACTIVE CONSTRUCTION

PRE AWD

FUTURE

Current126

Projects$5.18B

Future46

Projects$3.76B

Q1| 19Q3| 04

Q2| 05Q4| 01

FY20 Delivery29/$1.02B

Q1| 12Q3| 03

Q2| 02Q4| 08

FY20 Contracts25/$0.933B

Page 3: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

3

8ActiveCountries

Annual Payroll$25,731,813Annual Budget$83,218,979

* 1/0/1/3 @ 1 site

* 0/0/11/0 @ 3 sites

KUWAIT

JORDAN

IRAQ

EGYPT

BAHRAIN

QATAR

UAESAUDI ARABIA

* MIL / CIV / FSN / CPSS (KTR) @ # LOCATIONS

* 3/12/4/2 @ 5 sites

* 1/6/0/13 @ 7 sites

* 0/0/0/0/0

* 1/4/6/0 @ 1 site

* 0/7/13/0 @ 6 sites

* 0/4/3/0 @ 1 site

TEAM TAM MIL DAC FSN TOTALCONUS 9 322 0 331

OCONUS 6 33 39 7815 355 39 409

PEOPLE

UNCLASSIFIED / FOUO

Page 4: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

4

JOSEPH L. ZARASZCZAK, PMPPPMD BRANCH CHIEFKUWAIT, IRAQ, LEBANON, PAKISTAN, AFGHANISTAN (RB)

Page 5: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

5

Kuwait Program OverviewCURRENT PROGRAM: $1.4B

Active Construction Contracts: $309.3M Design: $1.1B (This it total PA/case

value. ECC will be less.)

POTENTIAL FUTURE PROGRAM: $3.2B

FMS Program: $2.4B DCA-K Program: $625M MCA / O&M Program: $138.4M

NOTES: New Job Order Contracting (JOC)

contract awarded 30Apr20 with a $75M capacity and up to $2M task orders.

Project listings to the right do not include the JOC program which has $16.3M in active projects.

Apache O&M contract under acquisition with $5M capacity.

In third year of $250M Kuwait MATOC. In fourth year of $7.9M O&M contract for

KMOD.

SYNOPSIS and CHALLENGES Significant movement during CY20 in construction contract awards and new planning and design starts in all programs. These new projects continue to present significant near-term and long-term opportunities for TAM A-Es and construction contractors. USACE is dependent on our contractor community for success in our planning, design and construction efforts with our U.S. stakeholders and the Kuwait Ministry of Defence in

support of this important strategic relationship with Kuwait, based on friendship and cooperation for more than 50 years. COVID-19 pandemic has slowed construction program while the planning and design programs have been able to continue forward.

Data Date: 15-June-2020 / Zaraszczak

CURRENT PROGRAM: Active Construction Contracts (Contract Values), $309.3M: FMS Air Defense Improvements ($47.4M) DCA-K Breakwater and Cargo Pier, KNB ($49.4M) FMS Maritime Traffic Coordination Center (MTCC) ($55.2M) FMS Artillery Camp Upgrades ($16.3M) OMAF DFAC Facility Repair and UMMCAF Addition, AASAB ($5.28M) DCA-K Unaccompanied Officers Quarters, Arifjan ($22.2M) DCA-K APS-5 Warehouses, Arifjan ($21.96M) DCA-K 20 MW Power Substations, Arifjan ($12.45M) DCA-K Repair Runway (Asphalt Only), AASAB ($3.4M) FMS, Mobilization, Ras Al Ard (RAA) ($12.25M) MILCON Care & Preservation Facility, Arifjan ($25.3M) UMMCA, Construct Electrical Lines, Buehring ($2.2M) DCA-K Repair Runway (Concrete)/Taxiways, AASAB ($3.8M) OMA B550S Renovations, Arifjan ($8.8M) DCA-K Sewer Treatment Systems, AASAB ($2.468M) DCA-K Construct BAK-12, AASAB ($3.5M)

Design (Programmed Amounts), $1.1B: DCA-K Marine Construction and Repairs, KNB FMS Construct Vehicle Maint and Admin Facility FMS KMOD HQ FMS Construct Logistics Warehouses FMS Construct Logistics Station (Seaside), RAA OMA Weather Shelters, Buehring OMA Brownstones Barracks, Buehring UMMCA ARCENT Forward HQ, Arifjan DCA-K Multi-purpose Spiritual Center, Arifjan OMA, Renovate B505, Arifjan OMAF, Repair Airfield Lighting, S. Runway, AASAB OMAF, Repair Airfield Lighting, N.Runway, AASAB OMAF, Construct Airfield Signs, AASAB

POTENTIAL FUTURE PROGRAM: FMS Program ($2.4B): KU-B-HBE, Al Mubarak Airbase KU-B-HBF, Blanket Construction Case SOF Center of Excellence KNB New Waterway and Harbor Basin Armored Brigade KU-P-LDA KNB Fixed Dive Recompression

Chamber KU-B-UMP, Apache Support Facilities MTCC, Location 2 THAAD Support Facilities Logistics Station (Landside), RAA Officers Club Marina

DCA-K Program (21 projects, $625M): Aprons, Ramps, Cargo Pads ($356M) Munitions Storage, Hangars ($79.9M) Utilities Projects ($57.1M) DFACs and Dorms ($132M)

MCA / O&M Program ($138.4M): FY22, ERCIP, Zone 4, Arifjan FY23, ERCIP, Arifjan FY23, Dining Facility, Buehring FY24, Dining Facility, Arifjan FY25, Unaccompanied Personnel Housing,

Arifjan FY26, Unaccompanied Personnel Housing,

Buehring

FMS, F/A-18 E/F Super Hornet: Pckg 1: Base Infrastructure Pckg 2: CALA/QRA Pckg 3: Gen Purp Warehouse Pckg 4: Parking Apron & Shelters Pckg 5: Org Level Maint Hangar Pckg 6: Aircrew Training Facility Pckg 7: Intermed Level Engines Shop Pckg 8: Intermed Level Airframes Shop Pckg 9: Squadron Operations Facility Pckg 10: High Voltage Elec

Transmission (Off Base)

FMS DCA-K MILCON / O&M

Page 6: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

6

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

KU-B-HBE, Al Mubarak Airbase

$100M to $250M KMOD DesignConsortium with

USACE peer review

Underway Full & Open FY21 / Q4

KU-B-HBF, Blanket Construction Case

$100M to $250M(multiple smaller

contracts)

- USACE in-house and A-E

- Projects not identified at this time

FY21 / Q1 To be determined after identification of size and complexity of projects is know.

FY21 / Q4

KU-P-LDA KNB Fixed Dive Recompression Chamber

$1M to $5M TBD FY21 / Q1 Kuwait MATOC FY22 / Q2

KU-B-UMP, Apache Support Facilities

$100M to $250M(multiple smaller

contracts)

- USACE in-house and A-E

- Projects not identified at this time

FY21 / Q2 Kuwait JOC, MATOC and Full & Open FY22 / Q4

Logistics Station (Landside), RAA

$25M to $100M Country-directed sole source

FY21 / Q3 Country-directed sole source FY23 / Q3

KNB New Waterway and Harbor Basin

$100M to $250M Country-directed sole source

FY22 / Q2 Country-directed sole source FY24 / Q2

MTCC, Location 2 $25M to $100M TBD FY22 / Q1 Full & Open Long Range

THAAD Support Facilities $100M to $250M TBD FY23 / Q1 Full & Open Long Range

Page 7: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

7

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

SOF Center of Excellence $100M to $250M TBD FY24 / Q1 Full & Open Long Range

Officers Club Marina $25M to $100M TBD FY24 / Q1 Full & Open Long Range

Armored Brigade $250M to $500M TBD FY25 / Q1 Full & Open Long Range

FY22, ERCIP, Zone 4, Arifjan $5M to $10M TBD FY21 / Q1 MATOC FY21 / Q4

FY23, ERCIP, Arifjan $5M to $10M TBD FY22 / Q1 MATOC FY22 / Q4

FY23, Dining Facility, Buehring

$5M to $10M TBD FY21 / Q4 MATOC FY22 / Q4

FY24, Dining Facility, Arifjan $5M to $10M TBD FY22 / Q4 MATOC FY23 / Q4

FY25, Unaccompanied Personnel Housing, Arifjan

$25M to $100M TBD FY23 / Q4 Full & Open FY24 / Q4

FY26, Unaccompanied Personnel Housing, Buehring

$25M to $100M TBD FY24 / Q4 Full & Open FY25 / Q4

FMS Construct Logistics Warehouses

$25M to $100M KMOD/USACE Complete Full & Open Complete

FMS Construct Vehicle Maint and Admin Facility

$10M to $25M USACE Complete MATOC (may change to Full & Open) FY20 / Q4

Page 8: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

8

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

OMA Weather Shelters, Buehring

$1M to $5M A-E Complete Kuwait JOC FY20 / Q4

OMA Brownstones Barracks, Buehring

$10M to $25M USACE Underway TBD (Kuwait MATOC or Full & Open) FY20 / Q4

DCA-K Marine Construction and Repairs, KNB

$10M to $25M USACE Underway TBD (Kuwait MATOC or Full & Open) FY21 / Q1

FMS Construct Logistics Station (Seaside), RAA

$25M to $100M Country-directed sole source

Underway Country-directed sole source FY21 / Q2

FMS KMOD HQ $250M to $500M Country-directed sole source

Underway Full & Open unless otherwise directed by KMOD FY22 / Q1

OMAF Repair Airfield Lighting, S. Runway, AASAB

$5M to $10M A-E FY20 / Q3 Full & Open FY20 / Q3OMAF Repair Airfield Lighting, N. Runway, AASAB

OMAF Construct Airfield Signs, AASAB

UMMCA ARCENT Forward HQ, Arifjan

$5M to $10M A-E FY21 / Q2 TBD (Kuwait MATOC or Full & Open) FY22 / Q3

OMA, Renovate B505, Arifjan

$1M to $5M USACE FY21 / Q2 Kuwait MATOC FY22 / Q4

DCA-K Multi-purpose Spiritual Center, Arifjan

$1M to $5M TBD FY21 / Q3 Kuwait MATOC FY23 / Q2

Page 9: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

9

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

FMS, F/A-18 E/F Super Hornet:

Pckg 1: Base Infrastructure

$25M to $100M A-E Underway Full & Open FY21 / Q1

Pckg 2: CALA/QRA $10M to $25M A-E Underway Kuwait MATOC FY21 / Q2

Pckg 3: Gen Purp Warehouse

$10M to $25M A-E Underway Kuwait MATOC FY20 / Q4

Pckg 4: Parking Apron & Shelters

$25M to $100M A-E Underway Full & Open FY21 / Q3

Pckg 5: Org Level Maint Hangar

$25M to $100M A-E Underway Full & Open FY21 / Q2

Pckg 6: Aircrew Training Facility

$5M to $10M A-E Underway Kuwait JOC FY20 / Q4

Pckg 7: Intermed Level Engines Shop

$10M to $25M A-E Underway Full & Open FY21 / Q1

Pckg 8: Intermed Level Airframes Shop

$5M to $10M A-E Underway Kuwait MATOC FY21 / Q1

Pckg 9: Squadron Operations Facility

$5M to $10M A-E FY20 / Q4 Kuwait MATOC FY21 / Q3

Pckg 10: High Voltage Elec Transmission (Off-Base)

$10M to $25M A-E FY20 / Q4 Full & Open FY21 / Q3

Page 10: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

10

MATTHEW S. REAGANPPMD BRANCH CHIEFBAHRAIN, SAUDI ARABIA, YEMEN

Page 11: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

11

Saudi Program OverviewCURRENT PROGRAM_PA~$1.842B Active Construction Contracts:

$237.2.7M Design: $1.6B (This it total PA/case

value. ECC will be less.)

LOA Development (FY20) ~$740M

POTENTIAL FUTURE PROGRAM ~$2.15B

NOTES: Not reflected in these numbers are the

potential for two MILCON and one FMS Master Planning efforts as well as one JOC in Saudi

Global oil prices may affect future FMS cases

CURRENT PROGRAM: $1.842BActive Construction Contracts (Contract Values, $237.2M) SR-B-WAL DB Land Forces Aviation AH-64

Upgrades Phase 1 $66.7M SR-P-SBU DBB RSNF MH-60R Base Upgrades &

Master Planning $93.7 SR-B-WAL DB Land Forces Artillery

Corps $34.8M SR-B-ZAG CH-47 Facilities PH1

$42M+ case-in design

On-Going-Design/Acquisition (Programmed Amounts, $1.604B) SR-B-WAL DB Land Forces Aviation AH-64

Upgrades Phase 2A-2 SR-B-HEV GDMW New Case HEV (Technical

Support) SR-I-WIB THAAD Missile Program-(FY 18 LOA-

FY 19 +AWD) SR-P-SBV MMSC Ships (FY19 AWD)

Case implemented-in planning/design SR-B-HEY Royal Saudi Navy UCC Renovation

(FY19 AWD) SR-B-SAJ Aerostat program. In-house

studies-no construction effort. SR-B-WAL DB Al Kharj Warehouse

Re-Award SR-B-WAL DB Simulator Al Qassim

Re-Award SR-B-WAL DB Simulator Facility Kahmis

Re-Award• MILCON Eskan DTAC $2M

LOA Development (FY20-21)FMS Program ~$740M SNMP Fixed Wing Recon-Base Upgrades SR-B-WAL Amendment 5 (FY20LOA AM, FY21

AWD) SR-B-XXX-Fast Patrol Vessels SR-P-SBU AM 3- additional facilities and

infrastructure in development (MH 60 PH 2).

POTENTIAL FUTURE PROGRAM:FMS Program ~$2.15B USG compound F&I: Design/Construct (5

years) Missile Sites - Pending amendments Aerostat program-on-going technical assistance RSLFAC Rotary Wing (WAL follow on case) –

Value and timing TBD MOD Project XXXX OPM-SANG Airbase Artillery School

POTENTIAL FUTURE PROGRAM:MILCON-$1.6-2B USMTM USG Compound Force Protection

Studies Cost TBD (2020-21) AFCENT PSAB Modular Billeting (2021-22) 2022-2030 PSAB

SYNOPSISWith the THAAD and MMSC in design, the Saudi PMO is going to grow significantly within the next couple of years.

FMS Other MILCONData Date: 28-May-2020 / Reagan

Page 12: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

12

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

SR-I-WIB, THAAD Missile Program

$500M+(multiple

contracts)

A-E FY20 / Q4 THAAD MATOC – Limited Competition FY22 / Q2

SR-P-SBV, MMSC Ships $250M to $500M A-E Underway Saudi MATOC FY21 / Q3

SR-B-HEY, Royal Saudi Navy UCC Renovation

$10M to $25M A-E Complete Saudi MATOC FY20 / Q4

SR-B-SAJ, Aerostat Program (Studies – no construction)

< $1M TAM in-house N/A N/A

SR-B-WAL, DB Al Kharj Warehouse Re-Award

$5M to $10M TAM in-house N/A Limited Competition N/A

SR-B-WAL, DB Simulator Al Qassim Re-Award

$5M to $10M TAM in-house N/A Limited Competition N/A

SR-B-WAL, DB Simulator Kahmis Re-Award

$5M to $10M TAM in-house N/A Limited Competition N/A

MILCON, Eskan DTAC $1M to $5M A-E Underway Sole Source or LPTA FY20 / Q3

SR-B-WAL, Amendment 5 $25M to $100M Long range; not determined

FY21 / QX Long range; not determined Long Range

Page 13: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

13

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

SNMP Fixed Wing Recon –Base Upgrades

$100M to $250M Long range; not determined

FY22 / QX Long range; not determined Long Range

SR-B-XXX, Fast Patrol Vessels

$100M to $250M Long range; not determined

FY22 / QX Long range; not determined Long Range

SR-P-SBU AM 3- additional facilities and infrastructure in development (MH-60 PH 2)

$250M to $500M Long range; not determined

FY22 / QX Long range; not determined Long Range

USG Compound F&I: Design/Construct

$500M+ Long range; not determined

TBD Long range; not determined Long Range

Missile Sites - Pending amendments

$250M to $500M Long range; not determined

TBD Long range; not determined Long Range

Aerostat program-on-going technical assistance

Long range; not determined

TBD Long range; not determined Long Range

RSLFAC Blackhawk F&I $100M to $250M Long range; not determined

TBD Long range; not determined Long Range

RSLFAC Apache (WAL follow on case)

TBD Long range; not determined

TBD Long range; not determined Long Range

MOD Project XXXX $1B+ Long range; not determined

TBD Long range; not determined Long Range

OPM-SANG Hasa Airbase $100M to $250M Long range; not determined

TBD Long range; not determined Long Range

THAAD Artillery School $100M to $250M Long range; not determined

TBD Long range; not determined Long Range

Page 14: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

14

JOHN G. PLUMMERPPMD BRANCH CHIEFQATAR, UAE, JORDAN, OMAN

Page 15: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

15

QATAR PROGRAM OVERVIEW

Data Date: June 2020

CURRENT PROGRAM: $1.716B

MILCON / O&M Program7 Air Force Project totaling $173.6M

FMS Program3 Cases Totaling $1.53B

POTENTIAL FUTURE PROGRAM: $100M

MILCONNone planned thru FY26

FMS1 Cases totaling $100M

Host Nation Construction of US FacilitiesDorms and other supporting Facilities$350M-$2BNo funding source/ color of money currently exists to allow USACE to support Construction Surveillance

CURRENT PROGRAM

MILCON Program• MILCON / O&M

7 Projects totaling $173.6M

Pre-Award (Design) FY19 Logistics Facility (MPO) FY19 Personnel Deployment Center FY19 Flight Line Support Facilities FY20 Cargo Marshalling Yard FY19 AFCENT O&M Design Support FY19 AFCENT O&M Design Support

Construction FY 19 Consolidated Squad. Ops. Fac.

FMS Program3 Cases Totaling $1.5B

Pre-Award (Design)F-15 Program

Construction Falcon 3 Apache PH I - Falcon 3 Apache PH II - SHIELD 5 Program -

POTENTIAL FUTURE PROGRAM: $100M

MILCONNone planned thru FY26

FMS1 Cases Totaling $100.0M

Host Nation Construction of US FacilitiesDorms and other supporting Facilities$350M-$2BNo funding source/ color of money currently exists to allow USACE to support Construction Surveillance

SYNOPSIS The bulk of the Qatar MILCON Program is being executed in the next two years with nothing planned thru FY26 Qatar FMS program has potential for an additional case totaling $100M USACE will continue to plan resources to manage growing program to ensure we are ready to meet customer

demands and expectations. FMS Other MILCON

Presenter
Presentation Notes
USACE has an active FMS program in Kuwait in support of weapons systems purchases by the Kuwait Ministry of Defence (KMOD). USACE is also the design and construction agent for the U.S. Army Central Command (ARCENT), with MILCON work, mainly at Camp Arifjan, and for the U.S. Air Force Central Command (AFCENT) with MILCON work mainly at Ali Al-Salem Air Base but a large program anticipated at Al Jaber AB in FY16. TEMF – Tactical Equipment Maintenance Facility
Page 16: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

16

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

Logistics facility $25M to $100M A-E Underway Full & Open FY21 / Q1

Personnel Deployment Center

$25M to $100M A-E Underway Full & Open FY20 / Q4

Flight Line Support Facilities

$25M to $100M A-E Underway Full & Open FY20 / Q4

Cargo Marshalling Yard $25M to $100M A-E Underway Full & Open FY21 / Q2

THAAD Infrastructure $25M to $100M A-E FY22/Q2 Full & Open FY23 / Q4

Page 17: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

17

CURRENT PROGRAM: $550.6M

MILCON / O&M Program1 Air Force Project totaling $35M1 Navy Project totaling $32M

Host Nation Funded Construction USDA Program(US Development Area)2 Projects totaling $483.6M

FMS ProgramNone

POTENTIAL FUTURE PROGRAM: $785M

MILCONNone

Host Nation Funded USDA Program(US Development Area)6 Projects totaling $785M

FMSNone

CURRENT PROGRAM

MILCON / O&M Program2 Projects totaling $67M

Pre-Award (Design) None

Construction FY17 LG Aircraft Maint. Fac. (USAF) FY13 P-960 Triton (Navy)

Host Nation Funded Construction USDA Program(US Development Area)2 Projects totaling $483.6M

Pre-Award (Design) FY18 USDA T.O #2 $386.3M(Refueler/ISR Hangars/Support Fac’s. MOTown, Fighter Ramp

Construction FY19 USDA T.O #1 (Flight line Grading & Refueler Ramp Paving & Fuels)

FMS ProgramNone

POTENTIAL FUTURE PROGRAM: $785M

MILCON None

Host Nation Funded Construction USDA Program $785M(US Development Area)

FMS None

SYNOPSIS

The active UAE projects make up a robust $550.6M program. The future program is projected to grow by an additional $785M over the next five years.

Data date: June 2020

UAE PROGRAM OVERVIEW

FMS Other MILCON

Page 18: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

18

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude of

Design EffortDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

USDA T.O #3 $10M to $20M A-E FY21 / Q2 Host nation Construction N/A

USDA T.O #4 $4M to $10M A-E FY21 / Q2 Host Nation Construction N/A

USDA T.O #5 $1M to 4M A-E FY22 / Q2 Host Nation Construction N/A

USDA T.O #6 $4M to $10M A-E FY23 / Q2 Host Nation Construction N/A

USDA T.O #7 $4M to $10M A-E FY23 / Q2 Host Nation Construction N/A

USDA T.O #8 $1M to $4M A-E FY24 / Q2 Host Nation Construction N/A

NOTE: The entire USDA Program is a design only effort. All construction will be completed by the Host Nation.

Page 19: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

19

DATA DATE: May 2020

CURRENT PROGRAM: $333.3M

MILCON / O&M Program10 Air Force Projects totaling $314M

FMS Program1 Case totaling $2.5M

POTENTIAL FUTURE PROGRAM: $160.5M

MILCON4 Projects totaling $72M

FMS1 Projects totaling $32M

CURRENT PROGRAM

MILCON Program• MILCON / O&M

10 Projects totaling $314M

Pre-Award (Design) FY20 Munitions Storage Area, FY20 Air Traffic Control Tower, FY22 Bulk POL Storage, FY22 Fuel Cell & MX Hangars, FY22 Fuel Oil Distribution, FY22 Fighter Expansion Apron,

Construction Runway 13/31 Repairs (O&M) FY18 LSA (Package #1) FY18 Aprons (Package #2) FY18 – Dormitory (Package #3)

FMS Program1 Case Totaling

Pre-Award (Design)None

Construction HIMARS Missile Storage

POTENTIAL FUTURE PROGRAM: $160.5M

MILCONProjects totaling $72M

FMS1 Projects totaling $32M

SYNOPSIS

The active Jordan projects make up a robust $314M program. The future program is projected to grow by significantly over the next four years.

JORDAN PROGRAM OVERVIEW

FMS Other MILCON

Page 20: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

20

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyDesign Start(FY / Quarter)

Construction Acquisition Strategy Advertise (FY / Quarter)

Munitions Storage Area $25M to $100M A-E Underway Full & Open FY20/ Q4

Air Traffic Control Tower $10M to $25M A-E Underway Full & Open FY20 / Q4

Bulk POL Storage $25M to $100M A-E Underway Full & Open FY21 / Q1

Fuel Cell & Maint Hangar $10M to $25M A-E Underway Full & Open FY21 / Q4

Fuel Oil Distribution $10M to $25M A-E Underway Full & Open FY21 / Q1

Fighter Expansion Apron $10M to $25M A-E Underway Full & Open FY21 / Q2

Airlift Apron $10M to $25M A-E FY21 / Q2 Full & Open FY22 / Q3

Dormitory #3 & 4 $10M to $25M A-E FY21 / Q2 Full & Open FY22 / Q3

Dormitory #5 & #6 $10M to $25M A-E FY22 / Q2 Full & Open FY23 / Q3

Dormitory #7 & 8 $10M to $25M A-E FY23 / Q2 Full & Open FY24 / Q3

Storage Warehouse $10M to $25M A-E FY21 / Q2 Full & Open FY22 / Q3

Page 21: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

21

LOUIS C. MARTINEZPPMD BRANCH CHIEFSERVICES AND PROCUREMENTS, EGYPT

Page 22: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

22

CURRENT PROGRAM (Less Egypt): $150M

POTENTIAL FUTURE PROGRAM (Less Egypt): $210M

FMS Program: $108M Services Contracts: $102M

SYNOPSIS Services and Procurements provide supportive capabilities to the TAD, TAA, and TAM missions and

customers. TAM Services and Procurements can provide a Total Package approach to our FMS Customers: Design-

Build-Sustain

Data Date: 28-MAY-2020/ Martinez

CURRENT PROGRAM: ACTIVE SERVICES: Afghan Personal Services (Cap

$85M/$15M Used) Option Period 3 through 15

Mar 2021 Afghan Critical Infrastructure BPAs –

PGEN (Cap $45M) WWTP (Cap $37.5M) WTP (Cap $37.5M) HVAC (Cap $37.5M)

Afghan National Defense and Security Forces O&M (Cap $245M; Used $180M)

Iraq Personal Services (Cap $25M) Kuwait MOD O&M (Cap $19M)

OY 2 Task Order ($1.7M) Kuwait/Qatar – GFEBS Support

Services to U.S. ARCENT ($1M) Kuwait – UFC Inspections for US

ARCENT – Option Year 2 ($1.7M) Afghan Generator Overhaul BPA (Cap

$35M/Used $15M) Egypt – See separate slide

POTENTIAL FUTURE PROGRAM: FMS Program: ~$108M Iraq:

Procure TOPCON Survey Equipment

Procure NOC Officer Trailers Procure 10 Modular Taji School

Trailers and Furnishings Jordan: LOA Development for -

Security Upgrades/Barriers Relocatable Stress Membrane

Structures Kuwait:

KMOD O&M

New Services Contract Effort:~$102M FY20 ANDSF O&M Re-Compete FY20 UFC Inspections

SERVICES AND PROCUREMENTS

FMS Other MILCON

Page 23: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

23

SERVICES AND PROCUREMENT OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyStart

(FY / Quarter)Acquisition Strategy Advertise

(FY / Quarter)ANSDF O&M Re-compete $25M to $100M N/A Underway Full and open Multi-year Firm Firmed Price

SATOCFY20 / Q3

Maintenance and Support Contract - Kuwait

$25M to $100M N/A FY20/Q4 Awaiting Country Direction – Multi-year Firm Fixed price SATOC

FY21/Q2

UFC Inspection Contract $5M to $10M N/A Underway Existing A-E SATOC FY20/Q3

Page 24: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

24

CURRENT PROGRAM: $118M

POTENTIAL FUTURE PROGRAM ~$133M (through FY 22)

NOTES:

• COVID-19 Impacts: The Government of Egypt has severely restricted international commercial air traffic and instituted a curfew that originally was from 7:00 PM to 6:00 AM.; but now has been reduced to 9:00 PM to 6:00 AM. However, work is ongoing in country, and aside from the curfew’s impact, our work has continued. Some concern that equipment and material deliveries from outside Egypt will be impacted, but to date no major delays.

CURRENT PROGRAM: Active Construction Contracts (Contract Value $58M)

EG-D-QBH Pacer Forge Support Contract: $55M EG-D-QBR Pacer Forge Spare Parts: $2M EG-B-HBW Vehicle Warehouse Repairs: $1M

Active Procurements and Services (Contract Value: $60M) EG-B-HAU Synchrolift Inspections: $100K

EG-B-HBZ Tunnel Detection Support: $400K

EG-B-HCY Synchrolift Spare Parts and Equipment $500K

EG-B-HDB EAA Logistics Center Maintenance: $250K

EG-B-HDC Air Defense Facility Maintenance and Repairs: $500K

EG-B-HDF Egyptian Navy Fleet Sustainment Support: $7.5M

EG-B-HDG Border Support Equipment Spare Parts$400K

EG-B-HDH Procure Armored Construction Equipment: $48.5M

EG-B-HDI Construction Equipment Spare Parts: $2M

POTENTIAL FUTURE PROGRAM:FMS Program ~$133M (through FY 22)

Ship Simulator Facility:

Additional Border Security Detection Systems:

Additional Egyptian Navy Fleet Sustainment Support:

Additional Construction Equipment Spare Parts:

Plus continuation of active inspections, spare parts procurement, and maintenance and repair contracts:

All of this work is expected to be sole sourced

SYNOPSIS: There are a number of potential projects being considered, beyond FY 22, as the Egyptian Military begins to divest of its older programs and transition to newer systems. These systems are still under review, and it is unknown at this time as to which will be approved for procurement by the host nation. Some of these actions may require Corps of Engineers support to include construction, procurement and maintenance services contracts.

EGYPT PROGRAM OVERVIEW

FMS Other MILCON

Page 25: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

25

DESIGN AND CONSTRUCTION OPPORTUNITIESProject Name Magnitude

RangeDesign

StrategyStart

(FY / Quarter)Construction Acquisition Strategy Advertise

(FY / Quarter)Ship Simulator Facility $5M to $10M Not Determined Not Determined Sole Source Not Determined

Border Security Systems $1M to 5M N/A FY21/Q1 Sole Source FY20/Q4

Navy Fleet Sustainment Support (over a four year period)

$25M to $100M Task Driven FY21/Q1 Sole Source FY20/Q4

Construction Equipment Spare Parts

$1M to 5M N/A Not Determined Sole Source (Brand Name) Not Determined

Facility Maintenance Contracts

$1M to 5M N/A Not Determined Sole Source Not Determined

Page 26: MIDDLE EAST DISTRICT ACTIVE AND FUTURE PROGRAM … · 2. MISSION. The Transatlantic Middle East District (TAM)provides design, construction execution, and related services and support

26

LINK TO SLIDES:

HTTPS://WWW.TAM.USACE.ARMY.MIL/PORTALS/77/CURRENTANDFUTUREWORKOPPORTUNITIES.PDF

THE INFORMATION PROVIDED IS THE MOST CURRENT INFORMATION AS OF THE DATE OF THESE SLIDES. HOWEVER, THE INFORMATION IS SUBJECT TO CHANGE. THE GOVERNMENT IS NOT BOUND BY ANY OF THE INFORMATION CONTAINED IN THE SLIDES, SHOULD IT DIFFER FROM ANY GOVERNMENT-ISSUED SOLICITATION.