Qualifications & Services

Architura Corporation

Architecture

Planning

Design

Creation

5 5 M o n u m e n t C i r c l e

S u i t e 1 2 1 2

I n d i a n a p o l i s , I N 4 6 2 0 4

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 1

Firm LocationSection 1

Architura is a commercial, institutional and historic

architectural design. Our design practice is client focused

allowing our experienced principal architects to off er

hands-on client service in architecture and planning and

interior design.

Our fi rm uses state of the art computer design technology to

implement both design and production eff orts. We remain

focused on architectural design and rely on the special skills

of civil, mechanical, electrical and structural engineers to

team with us as consultants.

Architura has been in practice for 20 years. Our partner

principals have a combined experience of 80 years and are

assisted by ten staff members including licensed architects

and an interior designer.

Architura is located in the 1929 art deco Circle Tower Building

overlooking beautiful Monument Circle in the heart of

downtown Indianapolis, Indiana. Selected examples of

architectural design’s are briefl y described in the following.

Circle Tower Building

55 Monument Circle

Suite 1212

Indianapolis, Indiana 46204

317.348.1000 phone

317.951.1213 fax

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 2

Section 2

Terre Haute Federal Court House & Post Offi ce

New Home of Indiana State University School of Business

Phase I:

Architura has completed historic renovations and extensive design work to refurbish the

entire exterior, stone corridors, lighting, landscaping and entrances. This design of the

public gallery lobby and interior corridors posed unique challenges to restore and match

the colors of the walls, ceilings, cornices and friezes on the interior to its original historic

look.

Phase II:

Architura is monitoring the design and construction administration of Schmidt and

Associates architectural fi rm on behalf of the General Services Administration as a third

party administrator.

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 3

Section 2

E. Ross Adair Federal Building & Court House, Ft. Wayne, IN

Architura has been commissioned various projects in the above mentioned building.

Those projects include, but are not limited to:

• The creation of a new First Floor entrance and lobby which include the renovation of the existing space, adapting it to court security standards and ADA compliance. The work involved historic reconfi guration of custom frosted glazing, custom cast aluminum door frames and head moldings as well as hardware conversion to comply with ADA requirements.

• Complete interior renovation of the building to meet code requirements, design and installation of a new fi re alarm system throughout the 80,000 +/_ square foot building. Special design and coordination eff orts had to be placed considering the Historic value of the existing ceilings, walls and molds.

• Renovation and preservation study in the Bankruptcy Court Room.

• Restoration and replacement where needed to cork fl ooring in Court Room. This study, and the work that followed was accomplished with the

E. Ross Adair Federal Building - First Floor Plan

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 4

Section 2

Posey County Courthouse and Government Center Renovation

Architura was hired in 2003 to conduct a CFF grant study to convert a historic courthouse

to qualify for ADA and Life Safety issues while maintaining historic character.

A second contract to create a county government master plan is nearly complete.

Components of the master plan include analyzing best spaces, uses, growth and

modifi cations for all county government offi ces including Circuit Court, Superior Court,

clerks, auditor, Treasurer, Recorder, Assessor, Commissioners, Prosecutor, Jail, emergency

operations and all public records storage for current and archive use.

A detailed Architectural &

Engineering plan is underway to

renovate the 25,000 SF courthouse

and site. To meet current court

security and accessibility needs along

with upgrading historic interiors

and adding secure holding cells,

sheriff ’s sally port, secure circulation

systems separated from public and

government circulation areas.

Posey County Courthouse - First Floor Plan

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 5

Section 2

Damar Services, Camby, IN

Architura is proud to assist Damar in our “full service” architectural and engineering

design and construction administration of its beautiful campus carefully developed in

a surrounding wooded area to provide a safe and comfortable setting that inspires staff

and residence alike to “value dreams and encourage success”. The 14 building, 50 acre

residential facility for the treatment of developmentally challenged children is a product

of Architura’s long term relationship with Damar Services.

Planning for the fi rst major expansion of Damar’s campus began in 1997 by adding

3 major buildings to expand their client’s services to society. The creation of Damar

Services buildings, master plan and campus exemplifi es a specialty child care design

for the treatment of emotionally, mentally and developmentally challenged children,

including secure care facilities. The organized campus plan features a perimeter vehicle

circulation “ring road” around a totally pedestrian campus. This design of the campus

plan and buildings contribute signifi cantly to the overall wellbeing of the residents and

staff . It is being constructed in several major phases expecting to near completion in

2008.

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 6

Section 2

Delta Faucet Company Headquarters

Carmel, Indiana

This is the Worldwide headquarters for administrative sales, marketing, product design,

research, testing and invention of new product design. Sales, customer service and

training are conducted at this location.

175,000 square foot building.

Delta Faucet has been a client of Michael Conly since 1980.

Delta Faucet - First Floor Plan

Adesa Auto Auction, Atlanta, GA

Adesa Auto Auction, Atlanta, Georgia comprised a 190,000 square foot, 7 building

campus for servicing, reconditioning and vehicle auction resale. Architura’s goal was to

maximize the value of owners design budget. Design budgets were strictly adhered to

throughout the development of the project and construction was achieved in a twelve

month period thereby adding to the profi tability of the project to the owner.

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 7

Section 2

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 8

Section 2

The Indiana School For The Deaf, Indianapolis, IN

Dixon House

Independent Living Skills Residence

Architura was commissioned to design a new building while keeping the overall feel and

look of the surrounding buildings.

The new living and teaching house contains 5 sleeping rooms with the capacity for two

students in each room. The house also includes living areas, entertainment areas and a

large teaching kitchen to allow students the opportunity to prepare meals and instruct

others in residential settings.

This building was recognized by the ICMA (Indiana Concrete Masonry Association) for the

beautiful arch design and given the “2006 Residential Clay Design Award of Excellence”

Indiana School for the Deaf, Independent Living Skills Residence - Floor Plan

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 9

Section 2

Laboratory Building Design Summary

Architura’s Partner/Principal Michael Conly was a signifi cant role player as architectural

designer, design coordinator and project manager for the following projects that are

representative of his extensive experiences of laboratory design and planning gained

over a 10-year period of time.

Roche diagnostics Research and Development buildingRoche diagnostics campus in Indianapolis, IN

Laboratory building plus all laboratory equipment planning and construction

coordination. Includes a major BSL3 lab with suit-up and cleaning facilities,

electron microscope lab, cold labs, an animal lab, tissue culture lab and standard

test development labs. Planning was conducted with the assistance of Jacobs

engineering in Cincinnati, OH

Project cost: $5,000,000

Building area: 25,000 SF

Date completed: Phase I , 1995

Roche Diagnostics Research and Development Lab Phase IIIndianapolis, IN

Expanded electronics lab, large bio safety workstation for large-scale mock-up

tests. Expanded services include safe tank farm for gases and chemical protection.

Increased and protected delivery and expanded testing labs.

Project cost: $6,000,000

Building area: 25,000 SF

Date completed: Phase II, 1996

All work on the Roche projects included laboratory equipment design and purchase.

Contact Walt Kenyon at Roche diagnostics for reference.

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 10

Section 2

IUPUI School of Dentistry - Digital Electron Microscope FacilityIndianapolis, IN.

This porject encompasses 10,000 SF of new construction in a historic structure located in

the heart of Indiana University Purdue University Indianapolis and houses laboratories,

classrooms, offi ces, and digital electron microscopes. The microscopes are capable of

imaging surface microstructures and mapping micro-chemical characteristics of a wide

variety of biological and solid material speimens.

Architura Corporation

Project Experience

Qualifi cations & Services / Architecture. Planning. Design. Creation Page 11

Section 2

Methodist Hospital, Indianapolis, IN

Projects for patient wings and MRI and CT scan treatment rooms.

Architura’s Partner/Principal, Michael Conly acted as project architect and manager for

several projects at Methodist hospital including:

• Renovation of patient wing for surgery beds in the old section of Methodist

hospital. Careful coordination with facilities staff , engineers and very tight spaces

was required during design and construction.

• Design of the plans for one of the fi rst area MRI suites was carefully assembled

to eliminate all ferrous metals and plan for patient comfort in this challenging

testing atmosphere.

• The completion of the design for a CT scanner was a project that required intense

coordination with the technical team from the GE scanner machine to make

certain that all space requirements for its installation and isolated power, sound

control and environmental controls were as perfect as possible. Because the CT

scan room was located in the heart of the older part of the hospital the need to

run wiring circuits for hundreds of feet were often the case due to limited access

to utilities.

• The completion of these projects required careful coordination and complete

communication with all team members to follow design work though the

construction and addressed needed changes and clarifi cations along the way.

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 12

Section 3 Project Team’s Experience

Michael Conly, AIA, Principal in Charge

Design Architect

Architura Corporation

PROFESSIONAL SUMMARY

Michael Conly was born in Indianapolis, Indiana in 1945. In 1969 Mr. Conly received

his Bachelor of Architecture degree from the School of Architecture at the University of

Cincinnati. He has been a practicing architect for thirty-four years. His professional focus

has been on institutional, governmental and corporate architecture. His new work is best

represented by the Indiana Historical Society, located in Indianapolis, Indiana, as well as

the Federal Courthouse in Terre Haute, Indiana. He has won awards for his work from

the American Institute of Architects. Mr. Conly is a member of the American Institute of

Architects.

RELATED EXPERIENCE

Academic Background

Harvard University, Cambridge, MAHarvard University, Cambridge, MA

Graduate School of Design, Graduate School of Design,

Summer Courses, 1993 Summer Courses, 1993

University of Cincinnati,University of Cincinnati,

Cincinnati, OH Cincinnati, OH

Bachelor of Science, Bachelor of Science,

Architecture, 1969 Architecture, 1969

Registration/Certifi cations

Registered ArchitectRegistered Architect

– IN, MI, MD, NJ, IL – IN, MI, MD, NJ, IL

Professional Associations

American Institute of Architects

National Council of Architectural

Registration Boards

Historic Landmarks Foundation of

Indiana

Indiana Historical Society

[email protected]

Roche Diagnostics - Indianapolis, IN.

Design and Construction

Administration for Master Plan and

Eight Buildings.

Eli Lilly & Co. - Clinton, IN.

Design and Construction

Administration for Clinton Indiana

Labs.

American Red Cross - St. Paul, MN.

Design for North Central Regional

Blood Center Master Plan.

Terre Haute Federal Court House - Terre Haute, IN. Design and

Construction Administration for

interior and exterior Renovation.

Damar Services - Camby, IN. Design

and Construction Administration

for Campus Master Plan and Eight

Buildings.

Talecris Plasma Center - Indianapolis,

IN. Design and Construction

Administration for remodel of existing

interview rooms, new training facility

& offi ces.

Indiana School for the Deaf - Indianapolis, IN. Design and

Construction Administration for

Recreation Center and Central

Dormitories, Independent Living

Center.

Methodist Hospital Medical Offi ces - Indianapolis, IN. Design.

Indiana Boys School - Plainfi eld, IN.

Design for Master Plan.

Anderson University - Anderson, IN.

Design for Master Plan.

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 13

Section 3 Project Team’s Experience

Charles Kotterman, AIA, Principal

Project Architect

Architura Corporation

PROFESSIONAL SUMMARY

Charles A. Kotterman (Chuck) was born in Indiana in 1954. In 1979 he received his

Bachelor of Architecture degree from Ball State University’s College of Architecture and

Planning . Mr. Kotterman has been a practicing architect for 23 years. Currently he is

project manager for multiple interior and exterior projects at the Emmett J. Bean Center

for the General Services Administration. A diverse project variety in his career includes

institutional, governmental, commercial, educational, industrial and residential. Mr.

Kotterman has won awards for his work from the Masonry Institute and Associated

Builders and Contractors. He is a member of the American Institute of Architects.

RELATED EXPERIENCE

Academic Background

Ball State UniversityBall State University

Bachelor of Architecture, 1979 Bachelor of Architecture, 1979

Bachelor of Science, 1978 Bachelor of Science, 1978

Registration/Certifi cations

Registered ArchitectRegistered Architect

– IN, AZ, CA, FL, IL, KS, MI, – IN, AZ, CA, FL, IL, KS, MI,

NH, WI NH, WI

Professional Associations

American Institute of Architects

National Council of Architectural

Registration Boards

[email protected]@archituracorp.com

Terre Haute Federal Court House - Terre Haute, IN. Design and

Construction Administration for

interior and exterior Renovation.

Talecris Plasma Center - Indianapolis, IN.

Construction Revisions & Redesign for

remodel of existing interview rooms,

new training facility & offi ces.

ADDITIONAL EXPERIENCE

Kendrick Memorial Hospital - Mooresville, IN. Facility Renovation

and Addition.

Bedford North Lawrence High School - Bedford, IN. Performing Arts Center

Addition and Renovation.

Cascade High School - Clayton, IN.

Auditorium Addition.

Emmett J. Bean Center General Services Administration

- Indianapoolis, IN. Interior & exterior

building renovation.

Adesa Auto Auctions - Belton, MO.

New auto auction facility with three

buildings.

University Auto Park - Urbana, IL.

New auto park with nine buildings.

DeMotte Library - DeMotte, IN. Library renovation &

expansion.

Morgan County Library - Martinsville, IN. Historic Carnegie

library renovation and addition.

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 14

Section 4 Organization Chart

Michael ConlyPrincipal In Charge

Design Architect

Loftus

Engineers

Karen S. Loftus

PrincipalSmith Roberts

Structural Engineering

Jeff Lunsford

Principal

Dorothy SmattInterior Designer

Charles KottermanProject Architect

Project ManagersEdward Peck, RA

Ken WrightJen Shockley

Blundall

Associates

Martyn R. Blundall

Principal

EXAMPLE

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 15

Project ManagementSection 5

A great endeavor requires the contribution and substantive eff ort of many who care deeply

for its success. They work diligently to assemble a talented and diverse team to provide a

detailed and comprehensive plan for the design, construction and implementation of your

project.

Project management involves the organization of a large fl ow of people associated by a

variety of backgrounds and areas of expertise where a common ground of ideas can fl ourish

through mutual acceptance of opinions, concepts and innovation. Through this process, a

bond is created with a strong sense of identity and professionalism.

The project manager defi nes distinct and individual functions for each member of the team

and provides a nourishing environment for the development of a unifi ed goal. Careful

attention to all team members who are involved in its production is essential, for without

their diligence, patience and sheer force of will, no success is possible.

Architura is a leader of the team that knows how to integrate and best utilize the talents

of the professionals to maximize benefi t. Our group of talented and experienced people

commit to involvement and interaction with each other at all levels and stages of the

project development.

Our project management philosophy is put into action with the clear identifi cation of which

the team members are and what their roles will be from the outset of the project to its

conclusion. We will utilize procedures that include the following.

1. Consistent written and spoken communication with team members to set

meetings and schedules is essential.

2. Checking frequently with key team members to make certain tasks are clearly

understood and any problems are resolved is critical.

3. The use of scheduling tools such as Microsoft project is helpful with large projects.

4. Scheduling weekly team meetings during critical project phases allows issues to

be resolved quickly so that the project can move forward with cooperation and

enthusiasm.

5. Using meeting notes from client meetings as well as design team meetings helps

keep participants well informed and helps them remembers task assignments and

responsibilities.

6. As project management continues into bidding and construction phase of the

work, the team members change but a consistent Architura leader will remain

the point of contact. All communication must go through one contact point at

Architura for project management to succeed.

7. Regular meetings with meeting notes, reports and project logs will be used during

the construction phase to track project success and resolve issues.

8. Celebration with the team at the conclusion of a successful project is good for team

moral.

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 16

Client ManagementSection 6

At Architura, client management is the commitment to the owner to create an atmosphere

of confi dence through listening and involvement. Listening to your needs, listening to your

challenges and problems, listening to what is being said between the lines and listening to

what wasn’t said. Action is implemented through listening and the prompt response of the

principal in charge which eliminates the risk of miscommunication.

Involvement is the desire to satisfy the owner under all circumstances. By becoming a client

advocate the architect initiates the ability to produce a quality product. To understand

and know Purdue’s needs is essential and absolute in the quest to execute and accomplish

exemplary projects.

Procedures we use to listen and communicate include the following.

1. We believe that our direct participation in both critical meetings and informal

meetings with you and your team members is very important.

2. We create meeting notes that we share with you after every meeting to let you know

what we think we heard and let you correct oversights we have made. We use these

notes to communicate with other team members involved with the project at that

time.

3. We make ourselves available to you as much as possible by mobile, email, telephone

to keep responsive communication moving.

4. We know that your time is valuable and we know how important it is to respond

with information in a timely manner. To help facilitate responsive communication

we include several team members from our A/E group in current communications

so that if one person cannot respond another can help get the answer to you right

away.

5. We take the time to discuss our performance with you at diff erent steps during

the planning and construction phases. Just because we do not hear a negative

comments does not mean you are completely comfortable with what we are doing.

It is important that we take nothing for granted and take the time to work out even

slight issues in a timely fashion.

6. Bidding and construction phases of the project can be very stressful times for owners,

especially if a challenging contractor is involved with the project. We make certain

that the lead people involved in our design phases are also involved in construction

phases to maintain continuity of quality and provide the attention needed.

7. An architect or engineer involved in the construction phase needs to have the

experience to know when a contractor is not performing adequately. Our principal

architects each have over 20 years experience on construction projects and have

learned many of the pitfalls that can happen. We acknowledge diffi culties quickly

and work hard to resolve errors rapidly to avoid a small problem becoming a bigger

issue.

8. We stay with you until you are satisfi ed with the fi nished project.

Architura CorporationQualifi cations & Services / Architecture. Planning. Design. Creation Page 17

Quality Control & Cost EstimatingSection 7

Expectations for a superior project design and completed constructed building are established

at the very outset of the project. When project budgets are set, certain parameters are given

to control the design scope and quality of the project. Intensive discussion should occur

early in the project to help establish accurate expectations for quality, scope and cost.

The best fi rst step to creating a good design that refl ects the proper function of the building

project and captures the architectural design needed to inspire visual organization and

character of the project is for us to understand your real goals and limits and take them

seriously.

We feel that the design of a project should refl ect the complete set of goals needed for your

project but allow possible project phasing in case budget challenges become a harsh reality.

It is better to design well to make the best use of space that fi ts the budget than wishfully

think that the construction bids might be good enough to get more volume from dollars

spent.

Control of project quality and cost is the result of our working with experienced professional

team members in all of the architectural and engineering design fi elds while at the same

time working with outside consults who specialize in cost estimating and construction

work. Nothing is better than sitting down with a real contractor during the early phases

of a project design to not only discuss what costs and materials may work best but to also

evaluate the means and methods of construction the can allow a better constructed project

to be built at a lower unit cost by effi ciently using trade contractors on the job.

We carefully develop our construction documents to be inclusive of the many details

that contractors need to take the mystery out of the building process. Ambiguity creates

opportunities for mistakes and change orders.

We employ the use of a Professional Cost Estimator and Quantity Surveyor who helps us

establish real cost expectations at the outset of the project during the schematic design

phase, at the completion of the design development phase and just before bidding the

project at the completion of the construction document phase.

Our specifi cations are constructed using “master spec” format to closely relate to drawing

details and make accurate references to current building standards and codes. We require

submittals and fi led samples to be carefully reviewed by our design team members before

a contractor is allowed to move forward.

The control of building quality and cost does not end until your building project is completely

constructed and the project is reviewed at the end of the warranty period.