mill and overlay (superior bowen contract) phase 1 … · terminal b mill and overlay (others) bern...
TRANSCRIPT
MADRID AVE.
L
O
N
D
O
N
A
V
E
.
N
A
S
S
A
U
C
I
R
C
L
E
BO
GO
TA
S
T.
PA
RIS
S
T.
C
O
O
K
I
N
G
H
A
M
D
R
I
V
E
BRASILIA AVE.
BE
RN
S
T.
OTTAWA AVE.
KCMO WATERLINE PROJECTON BOGATA, PARIS, BRASILIA,MEXICO CITY AND BERN ST
BRASILIA MILL AND OVERLAY(OTHERS)
PARIS STREET MILLAND OVERLAY W/ APWA(SUPERIOR BOWEN)
FULL DEPTH PAVEMENTPATCHES (SUPERIORBOWEN) (TYP.)
PARIS STREET MILLAND OVERLAY(SUPERIOR BOWEN)
FULL DEPTH PAVEMENTPATCHES (SUPERIORBOWEN) (TYP.)
INTERNATIONAL CIRCLEFULL DEPTH REPLACEMENT(SUPERIOR BOWEN)
COOKINGHAM FULLDEPTH REPLACEMENT(SUPERIOR BOWEN)(TO BE REMOVED FROMCONTRACT)
BERN STREET MILLAND OVERLAY W/ SMA(SUPERIOR BOWEN)
TERMINAL B MILLAND OVERLAY(OTHERS)
BERN STREET MILLAND OVERLAY W/ SMA(SUPERIOR BOWEN)
BERLIN
RESERVOIR
PHASE 2 NEWTERMINAL WORK
PHASE 1 NEWTERMINAL WORK
MEXICO CITY AVE.
NEW TERMINALPLAN (TYP.)
LEGEND:MILL AND OVERLAY (SUPERIOR BOWEN CONTRACT)
FULL DEPTH PAVEMENT REPLACEMENT (SUPERIOR BOWEN CONTRA
PHASE 1 NEW TERMINAL WORK (07/10/19-09/23/19)
PHASE 2 NEW TERMINAL WORK (09/24/19-11/22/19)
NEW WATERLINE PROJECT
MILL AND OVERLAY (OTHER CONTRACT)
2018-04-11OVERALL 2019 CONSTRUCTION