![Page 1: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/1.jpg)
MILLENNIUM SCIENCE COMPLEX AE SENIOR THESIS: IPD/BIM (2010-2011)
![Page 2: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/2.jpg)
Paul Kuehnel | Structural Mike Lucas | Electrical/Lighting Sara Pace | Mechancial Jon Brangan | Construction Management
The Pennsylvania State University Millennium Science Complex
Paul Kuehnel: Structural
Jon Brangan: Construction Management
Sara Pace: Mechanical
Mike Lucas: Electrical & Lighting
![Page 3: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/3.jpg)
Building Overview IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection
Building Overview
• Location: University Park, PA • Construction Dates: June 2008 – June 2011 • Estimated Cost: $230 Million budgeted • Project Delivery Method: Design-Bid-Build • Size: 275,600 Square Feet • Type of Use: Science Complex
![Page 4: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/4.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
Integrated Project Delivery
• Weekly Meetings
• Project Work Spaces
• Essential Communication Tools
![Page 5: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/5.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
What is BIM?
![Page 6: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/6.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
• 4D Modeling
• Sequencing
• Site Utilization
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
What is BIM? Planning with BIM
![Page 7: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/7.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
• 3D Trade Coordination
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
What is BIM? Construction & Coordination
![Page 8: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/8.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
• 3D Trade Coordination
• Clash Detection “Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
What is BIM? Construction & Coordination
![Page 9: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/9.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
• 3D Trade Coordination
• Clash Detection
• Verifying Model Accuracy “Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
What is BIM? Construction & Coordination
![Page 10: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/10.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
• Primary use of BIM Post-Construction
What is BIM? Facilities Management
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
![Page 11: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/11.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
What is BIM? Facilities Management Family Product Information
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
• Primary use of BIM Post-Construction
• F.M. Model Contains:
– Manufacturer Information
– Model Numbers
– Website Link
![Page 12: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/12.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
What is BIM? Facilities Management Family Product Information
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
• Primary use of BIM Post-Construction
• F.M. Model Contains:
– Design Information
![Page 13: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/13.jpg)
IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Reflection Building Overview
What is BIM? Facilities Management Family Product Information
“Building Information Modeling is the process of generating and managing building data during it’s life cycle.” - Lee, Sacks and Eastman (2006)
• Primary use of BIM Post-Construction
• F.M. Model Contains:
– Design Information
– Quantities
– Engineering Information
![Page 14: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/14.jpg)
Design Goals IPD/BIM Thesis Cantilever Design Façade Design Energy Modeling Reflection Building Overview
• Areas of Focus
• BIM Project Execution Plan
– BIM/Project Goals
– BIM Uses
• Identify Metrics of Success
PRIORITY (HIGH/
MED/ LOW) GOAL DESCRIPTION POTENTIAL BIM USES
H Assess Cost Associated with Design
Changes Cost Estimation, Existing Conditions Modeling
H Increase Effectiveness of Design Design Authoring, Design Reviews, 3D Coordination, Engineering Analysis, Existing Conditions Modeling
H Interdisciplinary Design Coordination Design Reviews, 3D Coordination
M Increase Effectiveness of Sustainable
Goals Engineering Analysis, Daylight Integration
M Improve On-Site Coordination and
Efficiency Site Utilization Planning, 4D Modeling
PRIORITY (HIGH/ MED/
LOW) GOAL DESCRIPTION POTENTIAL BIM USES
H Assess Cost Associated with
Design Changes Cost Estimation, Existing Conditions
Modeling
H Increase Effectiveness of
Design
Design Authoring, Design Reviews, 3D Coordination, Engineering Analysis,
Existing Conditions Modeling
H Interdisciplinary Design
Coordination Design Reviews, 3D Coordination
Building Stimulus Design Goals
![Page 15: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/15.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Building Stimulus Cantilever Overview
• Main architectural feature of the building
• Intersection of Materials Sciences and Life Sciences
• Occupiable and Non-Occupiable space on 3rd and 4th floors (Mech. Penthouse)
• Features a 3 bay x 3 bay opening
• 3 isolated quiet labs below plaza
150 feet
![Page 16: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/16.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Building Stimulus Cantilever Design Goals
• Structure: Reduce steel and increase load path efficiency
• Lighting: Create an Inviting Entrance
• Construction: Increase Productivity
• Alternative Energy
![Page 17: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/17.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Building Stimulus Cantilever Structural Redesign
• SAP 2000 used to model the structural system of the cantilever
• Existing Conditions modeled and checked for:
– Member strength
– Overall Deflection
– Stiffness
![Page 18: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/18.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Building Stimulus Cantilever Structural Redesign
• SAP 2000 used to model the structural system of the cantilever
• Existing Conditions modeled and checked for:
– Member strength
– Overall Deflection
– Stiffness
Switch Braces to Tension
Increase in Deflection and Inefficiency of Load Path
Do not continue with Tension iteration, continue with Compression
![Page 19: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/19.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Frame Section Station P V2 V3 M2 M3 L K KL in Kip Kip Kip Kip-in Kip-in in
Frame 2.8 W14X257 341.104 -
1882.07 8.275 4.529 -999.241 -832.527 341.104 0.8 22.74
Frame 2.8 0 -
1898.65 -11.997 4.529 545.488 -1467.19
Pr Pc Pr/Pc Mr2 Mr3 px103 bxx103 byx103 Interaction
Eqn.
Kip-ft Kip-ft
-1898.652 2472.32 0.768 H1-1a -83.27 -122.27 0.404 0.508 0.964 0.9103 <1.0 OK
Building Stimulus Cantilever Structural Redesign
• SAP 2000 used to model the structural system of the cantilever
• Existing Conditions modeled and checked for:
– Member strength
– Overall Deflection
– Stiffness
Members Upsized Members Downsized
New Member
![Page 20: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/20.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Building Stimulus Cantilever Structural Redesign
• SAP 2000 used to model the structural system of the cantilever
• Existing Conditions modeled and checked for:
– Member strength
– Overall Deflection
– Stiffness
Existing Redesign
Frame 2 5 2 5
P 1000 1000 1000 1000
U 11.5141 12.8985 12.9544 11.7441
K 0.011514 0.012899 0.012954 0.011744
% diff 11.34 9.80
• Redesigned trusses to have similar
stiffness for load sharing • Result: percent difference in
stiffness less than 10%
![Page 21: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/21.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View
![Page 22: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/22.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View
![Page 23: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/23.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View
![Page 24: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/24.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View
![Page 25: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/25.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View
![Page 26: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/26.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View Color Rendering
![Page 27: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/27.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Exterior Plaza Lighting Design Plan View Section View Pseudo Color Rendering
![Page 28: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/28.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Wind Turbine Analysis
Z-Plane : 0.5 m Z-Plane : 24 m
Model
• Domain Size: 900 x 900 x 100 m
• Standard K-ε Chen Model
• Hybrid Scheme
Simulation Results
• Grid Size: 107 x 108 x 20
• Iterations: 5000
• Duration: 4 hrs. 22 min
• % Mass Residual: 0.0906%
![Page 29: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/29.jpg)
Cantilever Design IPD/BIM Thesis Design Goals Façade Design Energy Modeling Reflection Building Overview
Wind Turbine Analysis
Z-Plane : 30 m
Grid Size: 123 x 134 x 22 Iterations: 3000 Duration: 4 hrs. 48 min Mass Residual: 0.166%
• Start-up Speed: 3.58 m/s
• 1200 kWh/year at 5 m/s
• Spacing Requirements: 22 ft
Cascade Swift Wind Turbine
• 18 turbines
• Total Array: 21,600 kWh/year
• Cost: $8,500/unit
• Total savings: $1,624
Final Results
![Page 30: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/30.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Increase Thermal Efficiency
• Reduce Precast Panel Weight
• Create Efficient Construction Process
• Daylighting Integration& User Comfort
Building Stimulus Façade Design Goals
![Page 31: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/31.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Two Glazing Configurations
• Large Cavity Space
– Thermal Barrier
– Daylighting Integration
Double Skin Facade
![Page 32: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/32.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
Daylighting Integration Building Orientation
N
Double Skin Facade
Single Skin Facade
Double Skin Shading System Shading Control
• Girasol System
• Requires No Electricity
![Page 33: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/33.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
Daylighting Integration Building Orientation
N
Double Skin Facade
Single Skin Facade
Double Skin Shading System
![Page 34: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/34.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
Daylighting Integration Building Orientation
N
Double Skin Facade
Single Skin Facade
Student Study Area & Corridor Layout Pseudo Color Rendering – 6.21 10AM
![Page 35: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/35.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
Daylighting Integration Building Orientation
N
Double Skin Facade
Single Skin Facade
Student Study Area & Corridor Layout Color Rendering – 6.21 10AM
![Page 36: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/36.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
0 100,000 200,000 300,000 400,000 500,000
New Façade
Original
Heat Gain (BTU/hr)
Solar Heat Gain from Glass
Energy Performance
N
Double Skin Facade
Single Skin Facade
![Page 37: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/37.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
660,000 665,000 670,000 675,000 680,000 685,000 690,000
New Façade
Original
Electricity (kWh)
Electricity Consumption
Energy Performance
N
Double Skin Facade
Single Skin Facade
![Page 38: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/38.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000
New Façade
Original
Energy (MBTU)
Third Floor Energy Consumption
Building
Source
Energy Performance
N
Double Skin Facade
Single Skin Facade
![Page 39: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/39.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
2,350,000 2,450,000 2,550,000 2,650,000 2,750,000
New Façade
Original
lbm/year
HVAC Associated CO2 Emissions
Energy Performance
N
Double Skin Facade
Single Skin Facade
![Page 40: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/40.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
$0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000
New Façade
Original
Cost
Yearly Utility Cost for Third Floor
Electricity
Chilled Water
Steam
Energy Performance
N
Double Skin Facade
Single Skin Facade
![Page 41: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/41.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Existing Precast Panel Panel Material Research
![Page 42: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/42.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Precast Panel Iterations
SW
SW
![Page 43: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/43.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Precast Panel Final Design
• f’c = 5000 psi
• fr = 353.55 psi with FOS = 1.5 (PCI p363)
• Slab Thickness = 6 in
• End Rib Dimensions = 6 in x 12 in
• Mid Rib Dimensions = 8 in x 12 in
![Page 44: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/44.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Precast Panel Final Design
![Page 45: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/45.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Precast Panel Final Design – Constructability
• Steel stud perimeter wall
• Interior Wall
• Insulation
• Vapor Barrier
• Interior Glazing
• Precast Panel
• Exterior Glazing
![Page 46: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/46.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Original Panel Installation Sequence
![Page 47: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/47.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Precast Panel Design Design Goals/Tolerances Original Panel Installation Sequence Double Skin Panel Installation Sequence
![Page 48: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/48.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
Precast Panel Design Design Goals/Tolerances
4D Model
Double Skin Panel Installation Sequence
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
![Page 49: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/49.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
System Total Proposed Original Difference
Panels $ 5,629,240 $ 6,007,802 $ (378,562)
Insulation $ 842,792 $ 741,948 $ 100,844
Caulking $ 204,081 $ 168,917 $ 35,164
Louvers $ 123,200 $ 366,600 $ (243,400)
Windows $ 3,277,210 $ 2,719,570 $ 557,640
Total $ 15,429,539 $ 15,357,852 $ 71,687
Precast Panel Design Design Goals/Tolerances Panel Design Cost Enclosure System Cost
• Reduce weight of panel
• 24 in. air gap between inner face of precast panel and outer face of interior wall.
• Maintain continuous vertical air gap
• No cracking under transportation, construction, or service loads
Redesign Original Difference
Panel Design $ 5,034,645 $ 5,492,340 $ (457,695)
Connections $ 181,250 $ 150,000 $ 31,250
Total $ 5,629,240 $ 6,007,802 $ (378,562)
![Page 50: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/50.jpg)
Façade Design IPD/BIM Thesis Design Goals Cantilever Design Energy Modeling Reflection Building Overview
• Reduce Energy Consumption
• Lighting and Mechanical Integration
• Simulate a More Realistic Energy Profile
Building Stimulus Energy Modeling Design Goals
![Page 51: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/51.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
MEP Information Exchange
![Page 52: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/52.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beams
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
![Page 53: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/53.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beams
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
![Page 54: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/54.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beams
7,618
7,441
12,431
12,235
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000
Original
Chilled Beams
Energy Consumption (MBtu)
Energy Consumption for Third Floor
Source
Building
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
![Page 55: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/55.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beams
684,280
666,682
650,000 660,000 670,000 680,000 690,000
Original
Chilled Beam
Electricity (kWh)
Electricity Consumption for Third Floor
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
![Page 56: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/56.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beams
$51,437
$50,115
$52,530
$40,809
$19,778
$17,101
$0 $15,000 $30,000 $45,000 $60,000
Original
Chilled Beam
Utility Cost
Yearly Utility Cost for Third Floor
Purchased Steam
Purchased Chilled Water
Electricity
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
![Page 57: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/57.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beam Luminaire Integration Private Office Floorplan Color Render Chilled Beam Luminaire
![Page 58: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/58.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beam Luminaire Integration Private Office Floorplan Color Render Illuminance Pseudo Color
![Page 59: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/59.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Chilled Beam Luminaire Integration Private Office Floorplan Color Render Illuminance Pseudo Color
![Page 60: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/60.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads
![Page 61: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/61.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads Modeling Electrical Information In Revit
Exporting to Trace
Existing Panel Schedule
![Page 62: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/62.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads Modeling Electrical Information In Revit
Existing Panel Schedule
0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000
Original
New Plug Loads
kBTU/yr
Receptacle Energy Consumption (3rd Floor)
![Page 63: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/63.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads Modeling Electrical Information In Revit
0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000
Original
New Plug Loads
kBTU/yr
Receptacle Energy Consumption (3rd Floor)
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
![Page 64: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/64.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads
0 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000
Original
New Plug Loads
kBTU/yr
Receptacle Energy Consumption (3rd Floor)
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
0 5,000,000 10,000,000 15,000,000 20,000,000
Base Model
Progress Model 1
Progress Model 2
Final Model
kWh
Electricity Consumption for Building
![Page 65: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/65.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads
0 5,000,000 10,000,000 15,000,000 20,000,000
Base Model
Progress Model 1
Progress Model 2
Final Model
kWh
Electricity Consumption for Building
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
15,720,000 15,740,000 15,760,000 15,780,000 15,800,000 15,820,000
Base Model
Final Model
kWh
Electricity Consumption for Building
![Page 66: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/66.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
41,800,000 42,200,000 42,600,000 43,000,000
Base Model
Final Model
lbm/year
Building CO2 Emissions
15,720,000 15,740,000 15,760,000 15,780,000 15,800,000 15,820,000
Base Model
Final Model
kWh
Electricity Consumption for Building
![Page 67: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/67.jpg)
Energy Modeling IPD/BIM Thesis Design Goals Cantilever Design Façade Design Reflection Building Overview
Determining Existing Plug Loads
• ASHRAE LPD’s
• ASHRAE MPD’s
• Existing Systems
Base Model
• Preliminary Façade
• Preliminary Daylighting
Progress Model 1
• Final Facade
• Chilled Beam Addition
Progress Model 2
• Electrical Loads
Final Model
$2,000,000 $2,100,000 $2,200,000 $2,300,000
Base Model
Final Model
Total Building Utility Costs
41,800,000 42,200,000 42,600,000 43,000,000
Base Model
Final Model
lbm/year
Building CO2 Emissions
![Page 68: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/68.jpg)
Reflection IPD/BIM Thesis Design Goals Cantilever Design Façade Design Energy Modeling Building Overview
• Primary Energy Use Reduction (MBtu/yr)
• Reduced Life Cycle Cost
• Meet ASHRAE Lighting Power Densities
• Alternative Energy Implemented
• Steel Tonnage Reduced
• Truss Design Efficiency Increased
• Lighting Design
– Emphasize Architectural Features and Entrance
• Peak Envelope Loads Reduction – Cooling Load
– Heating Load
• Reduce Panel Weight
• Daylight Integration – Improve Visual Comfort
– Improve Overall Appearance
– Reduce Solar Heat Gain
• Minimize Constructability Issues
Metrics of Success and Reflection Façade Redesign Cantilever Redesign Energy Usage
![Page 69: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/69.jpg)
• Thorton Tomasetti Engineers • Rafael Viñoly Architects • Flak & Kurtz • Bob Biter Electric • Whiting Turner • Eric Mitchel (Mechanical P.M. - Flak & Kurtz) • Josh Miller (B.I.M. Coordinator at Gilbane) • Chris Dolan (Whiting Turner) • Adam Fry (Electrical P.M. at Mueller Associates) • Stephanie Hill (M.E.at Mueller Associates) • Matthew Danowski (M.E.at Mueller Associates)
The Pennsylvania State University Millennium Science Complex
• Randy Phillips Central Regional Manager, Semco Flaktwoods
• John Jackson (HOK) • Corey Wilkinson for quick and successful responses to
countless computer issues. • Members of BIMCeption • Members of K.G.B. Maser • Last but not least, all friends and family
![Page 70: MILLENNIUM SCIENCE COMPLEX...and 4th floors (Mech. Penthouse) •Features a 3 bay x 3 bay opening •3 isolated quiet labs below plaza 150 ... Student Study Area & Corridor Layout](https://reader036.vdocuments.net/reader036/viewer/2022062602/5edee678ad6a402d666a4220/html5/thumbnails/70.jpg)
QUESTIONS & COMMENTS AE SENIOR THESIS: IPD/BIM (2010-2011)