milwaukee ii levee project - govlink
TRANSCRIPT
Earthen Levee and Flood Wall Levee Examples
Flood Wall Levee - Briscoe Reach 4 - Constructed in 2016
New Flood Wall Levee
New Earthen Levee
Earthen Levee – South Reach Levee -Constructed in 2016
Unique to Milwaukee II Levee
S. 259th Street Roadway Underpass at the Union Pacific Railroad
Green River Trail Missing Link between Foster Park and Horseshoe Bend Levee