mini portfolio
DESCRIPTION
Athletic Facility Construction DocTRANSCRIPT
Massing Model Built I& Rendered iN Maya. Boolean Merged for the geometries
DIGITAL sketch
TECHNOLOGIES:Autocad
illustratorphotoshop
print 12 x 46
T h e r e s a - P a u l i n U n i v e r s i t y o f C i n c i n n a t i
natureself
Ceasar Creek State Park
Digital Sketch of Entrance Facade
Man
Storage
OutdoorTraining Circuit
Peninsula Site Provides A Protected Swim “Cove”
to l
ake
Pool
Ground Floor Planparking
cafe
Athletics
library
host
el
Entrance point radiates through both the structure & envelope directing views through the building masses
Retreat in the WoodsDraws in Non-Athletesusing the Park
Hospitality
Triathlon Facility
V e r s u s
Interior Training CircuitAllows for full training circuit (Swim-T1-Bike-T2-Run) to be completed Seamlessly. The Architecture provides connection to the Adjacent lake and serves as an icon to those using the park
The PlungeRichmond, California
Design Build and Historic RestorationConstruction Documentation and AdministrationTodd Jersey Architecture
This Historic Natatorium is undergoing reconstruction and will bill itself as the “Healthiest Pool in America” due to its new green technology of water irradiation. Todd Jersey Architecture was brought in to restore and rebuild the Plunge after being closed in 2001 due seismic hazards. This hollow core tile structure is being replaced in portions with wood frame construction and reinforced through historical portion with shear walls.
DESIGN BUILD construction
Richmond Plunge
Design Build & RestorationConstruction DocumentationTodd Jersey Architecturefull set as independent project
T h e r e s a - P a u l i n
Todd Jersey Architecture