2.13737 CATHARINE 010 MINING LANDS SECTION 2.1373 •7 w VLF-EM 6 MAGNETOMETER SURVEYS CATHARINE 6 SKEAD TOWNSHIPS, ONTARIO BY R.A. MacGregor, P. Eng. December 3, 1990

Upload: others

Post on 07-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

2.13737 CATHARINE010

MINING LANDS SECTION

2.1373 •7w

VLF-EM 6 MAGNETOMETER SURVEYS

CATHARINE 6 SKEAD TOWNSHIPS, ONTARIO

BY

R.A. MacGregor, P. Eng.

December 3, 1990

Page 2: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

R. A. MAcQREQOR. P.ENO. PAGE N0-

I. INTRODUCTION

Magnetometer and VLF-EM surveys were carried out over

cut lines during 1990,

II. LOCATION, ACCESS AND OWNERSHIP

The property is located in the east central part of

Catharine Township Lots l to 3, Concession 4, Larder Lake Mining

Division, District of Temiskaming, Ontario. The claims are

numbered L1049761 to 1049768 inclusive and L1111217 to 1111226

inclusive. They are recorded in the name of Skead Holdings Ltd.,

c/o P.O. Box 1110, Sault Ste. Marie, Ontario.

Highway 624, a paved secondary highway passes through

the centre of the claims. The claims are about 10 miles south

of Larder Lake on Highway 66.

III. PREVIOUS EXPLORATION

Some stripping and trenching has been carried out on

one small outcrop near the north boundary. Most of the claims

appear to be drift covered.

IV. TOPOGRAPHY

Nearly all of the property is covered by Pleistocene,

sand, gravel or swamp. In the sandy areas which cover a large

part of the property, forest cover consists of jackpine, spruce

and some poplar and labrador tea. The swampy areas are covered

with black spruce, alder, willow and some poplar. There is a

small pond near the north east corner.

V. MAPPING PROCEDURE

A grid of picket lines were cut in a north-northeast

west-south-west direction from a base line cut north-north-west.

Crosslines were cut approximately every 400 feet from the

baseline. The picket lines were chained and picketed every 100

feet.

Page 3: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

R. A. MACGREGOR. P.ENQ. PAGE NO

Mapping Procedure (continued)

Magnetometer readings were taken with a Sharpe MF-1

Fluxgate Magnetometer at 100-foot intervals. The looping method

was used for control of variation. In this method a base station

is selected, and readings taken along lines describing a loop,

arriving back at the starting base station in less than two hours.

A second loop is then started using either the same base station

or another which is tied to the previous loop. Readings are

then corrected for diurnal variation by assuming the time between

readings is the same and distributing any variation equally among

the intervening readings. No correction was applied less than

the accuracy of the base station readings.

A VLF-EM survey was run with a Phoenix VLF-2 instrument

set to the signal from Cutler, Maine (24.0 KHz). Readings were

taken at 100-foot intervals along all the lines, using the

procedure outlined in Appendix 1. The looping method was used

for control of variation as in the magnetometer survey.

VII. DISCUSSION OF RESULTS

Magnetometer

The magnetometer survey is incomplete due to equipment

failure before completion of the survey. Only the north west

part of the property was covered. No particular trends can be

determined from the survey.

VLF-EM

Cross-overs are fairly weak with two on the west part

of the claims and one in the north east part. They may represent

topographical features.

Respectfully submitted

December 3, 1990 R.A. MacGregor, P. Eng.

Page 4: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

R. A. MACGREGOR. P.ENG. PAGE NO.

CERTIFICATE

I, Robert A. MacGregor, Certify:

1. I am a Mining Engineer residing at 28 Ford Street,Sault Ste. Marie, Ontario. I have worked as a mining engineer and geologist for the past 20 years.

2. I am a member of the Association of Professional Engineers of the Province of Ontario and a member of the Canadian Institute of Mining and Metallurgy.

3. I attended Queen's University for two years in the Mining Geology course.

4. I am the recorded holder of the mining claims in thisreport and have personal knowledge of the work performed.

/^ ^Date

Page 5: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

Ontario3iMi 3Nwaa0i 2.13737 CATHARINE

900

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

Type of Survey(s).

Township or Area.

Claim Holder(s) .

M&GMBTGMBTER * VLP-EM

Skead t Catherine Townships

Skead Holdings Ltd.

Colex Exploration Inc

R. A. MacGregor,Survey Company

Author of Report.

Address of Author

Covering Dates of Survey 1/06/90 to Dec. 3/90(linecutting to office)

Total Miles of Line Cut^—————^—^-^-^—————^

P.O. Box 1110, Sault Ste. Marie, Oi t

SPECIAL PROVISIONSCREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.

ENTER 20 days for each additional survey using same grid.

DAYS i-i Per claimGeophysical

FlTtr^magT-ti'- 20

P^j^tri,-

-Other

npo|ogiral

AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)

Magnetometer_____Electromagnetic _____ Radiometric ____

nATF Dec. 3/90 SIGNATURE:

(enter days per claim)

' Author of Report or Agent

Res. Geol. .Qualifications. K -

Previous Surveys File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

.Ji...lP.49.7.61.........""""(prefixi"' '

1049762(number)

1049763•10-49764—--—"--—""--

..10.497.6.15.......................................

..10.4.97.66....................................

.10.49.7.6.7..

.1A49.7.6A.

.111122,7.

.1111218.

1111219

1111220

1111221

1111222

1111223

1111224

1111225

1111226

TOTAL ri ATMS 18

837 (85/12)

Page 6: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

Ontario

Ministry olBrthern Development

'and Mines

Report of Work Mining Act (Geophysical, Geological and Geochemical Surveys)

Instructions- Pleas* type or print.- Refer to Section 77. the Mining Act tor assessment work requirements

and maximum credits allowed MLSurvey type.- H number of mining claims iJverddexceeds spM&or^Bs form,

attach a.,s. JL/& Cf ^O- Technical Reports and iirSVSHTi dupRcaiesnould be iBBmitted to

Mining Lands Section. Mineral Development and Lands Branch:Type of Surveys)

JUmmttlRecorded Hotder(s)

Mining Division Township or Area Skead Twp. 01

f ut* hurl no TontnBh ip

c/a P-QSurvey Company

Prospector's Licence No.

T-115CTelephone No.

949-5928

R*p1 orationdress ot Author (ol Geo-TeName and Address of Author (ol Gee-Technical Report)

*r r 28 Ford fi•redits Requested per Each Claim m Columns at right

Date of Survey (from t to)

"y 10" l 90

Special Provisions

Enter 40 days. (This includesline cutting)

For each additional survey:using the same grid.

Enter 20 days {for each)

Man Days

Complete reverse side and

Geophysical

- Electromagnetic

- Magnetometer

- Other

Geological

Geochemical— —— —— ——— — ———Geophysical

Days per Claim

20

20

Days per Claim

- Electromagneticenter tolallsl here i ——-———

Airborne Credit*

Note: Special provisionscredits do notapply to Airborne Surveys

- Magnetometer

- Other :

Geological

Geochemical ;

1 Days peri Claim

Electromagnetic '

Magnetometer i

Other

Total miles flown over claim(s).Date j Recorded 4*M*r or Agent (Signature)Oct. 22/90 l ^ ̂Ze*^^-*?- ——

Mining Claims Traversed (List in numerical sequence)Mining Claim

Prefix

L

Number

1049761

1049762

1049765

1049766104976710497681111217111121811112191111220

— 1111221—— 1111222 — 1111223—— 1111224

—— 1111225 — 1111226

Mining ClaimPrefix

— cvi

Number

ECEIVE

Mining ClaimPrefix

4-J

[iOV 26 194

MIMING LANDS SE

Number

JT;ONi

1

Total number of mining claims covered by this report of work

'

16Certification Verifying Report ot Work

l hereoy certify thai l have a personal and intimate knowledge ot the facts set forth in this Report ot Work, having performed the work or witnessed same during and/or after its completion and annexed report is trueName and Address of Person Certifying

R.A. MacGreqor, 28 Ford St., Sault Ste. Marie, Ontario P6A 4M4Telephone No j Date

.705-949-5928 Oct. 2 /9f3Received Sta

For Office Use Only

Total Days ' Date Recorded Cr. Recorded

LARDER LAKi MINING DIVISION

Od 2 9 1990

TIME

Page 7: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

untario

Ministry ofNorthern Developmentand Mines

Ministere du D6veloppement du Nord et des Mines

March 7, 1991

Mining Lands Section4th Floor, 159 Cedar StreetSudbury, OntarioP3E 6A5

Telephone: Fax:

Your File: Our File:

Mining RecorderMinistry of Northern Developmentand Mines4 Govenment Road EastKirkland Lake, OntarioP2N 1A2

(705) 670-7264 (705) 670-7262

W. 9008. 628 2. 13737

Dear Si r /Madam:

RE: Notice of Intent dated February l, 1991 for Geophysical(Electromagnetic) and Geophysical (Magnetometer) submitted on Mining Claims L. 1049761 et al in Skead 8t Catharine

Townships.

The assessment work credits, as listed with the above-mentioned Notice of Intent have been approved as of the above date.

Please inform the recorded holder of these mining claims and so indicate on your records.

Yours sincerely,

on. C. Gashinski, Provincial Manager, Mining Lands Mines 4 Minerals Division

L J/j l Encl:

CC: Mr. W. D. TiernanMining and Lands CommissionerToronto, Ontario

Skead Holdings Ltd. Sault Ste. Marie, Ontario

R. A. MacGregorSault Ste. Marie, Ontario

Page 8: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

® MinMry of Technical Anas Northern Development uu^j. r*~*M** am) Mlnei WOIK CffMIIS

Ontario

tsmtnt "i* 2.13737

Dot* MlnlnaHeeordert Report Of

Feb. 1/91 W(T9"006.628

Recorded HolderSkead Holdings Ltd.

Township or Arae

Catharine Township ft Skead TownshipType o* survey and number of

Assessment day* eradh par dalmGeophysical

Electromagnetic ————————————————— dayi

Magnetomatar ———— 20 -——————————— -days

Radiometric ——————— i ————————————— dayi

O^^f •'•Y*

Section 77 (19) Sea "Mining aalm* Assessed" eohimn

Geological —————————————————— diys

Geochemical days

Man day* Q Airborne D

Q Credrti have been reduced bacalite of partial^ coverage of dal ma.

Q Cradltt rove been reduced becauM of correction* to work dates end figure* of applicant

L 1049762 1111217 - 223 1ncl.

Special credit* under section 77 (16) for the following mining dalira

5 days magnetic on L 1049761

No credits have been allowed for the following mining claimsHI not tufflciemly covered by the survey Q '"sufficient technical data filed

L 1049765 - 768 incl. 1111224 - 226 Incl.

The Mining Recorder may reduce the above credits if necetury in order that the total number of aooroved anaument dan recorded on each claim dom notexceed the maximum allowed as follows: Geophysical - W; Geologocel - 40; Geochemical - 40; Section 77(19) -60.

Page 9: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

© Ministry M Technical Assessment b* yfSZ*"*'"1' WorkCr*!.* 2.13737

Ontario •^•^P PJHinBWWQOfOi)!*^ MtpOfl ^f

Feb. 1/91 R9*00*b.628

A*cor**d Holder

Skead Holding*; LtdTownsnip or Area "

Skead A Catharine TownshipsType of survey and number of

Aafeetment days credit par dalmGeophysical

MeBnetometer ———————————————————— .days

Induced DOtarlzatlon diys

Other ——————————————————————— days

Section 77 (10) See "Mlnlnsj Claim Assessed" column

Geological —————————————————— days

Geochemical _________________ day*

Man days Q Airborne Q

Special provision Q Ground Q

Q Credrts have been reduced because of partialcovereBB of claim*

Q Credits have been reduced because of corrections to work dates end figures of applicant.

L 1049761 - 762 1049765 - 766 1049768 1111217 - 224 Incl. 1111226

Special credits under section 77 (16) for the following mining claims

15 days electromagnetic on L 1049767 and 1111225

No credit* have been allowed for the following mining claimsQ not sufficiently covered by the survey Q Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on each claim does notexcted the maximum allowed a* follow*: Geophyiieal - 60; Geologocal - 40; Geochemical - 40; Section 77(19) - 90.

1(81/12)

Page 10: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

MCELROY TP TO i* fl

FORESTRV OPERAH JAN 29 1991

..M. u LARDER LAKE MINING RECORDER'S QFFICF

12 V I I

k- — ft 104**1

r) s* \\ TI4999 |-*MtBi ^ "x*i\ - ——.-..-...

V Ns L L ^ ***. S,U** --*'-

vw l Z l r O B B O ov——f w *v o^ 4n^ MMV *-

— r ——;~

l A A ft B l

733496)783497 | 'f

L l L |~X?

69)1431193799 •4Mt^943334 BST^Oll733904 733509 ;7fe90UOe 799009 959117 9433311 99394.4

959129 j 859126 • 42r"l?"Z. L L 10348*1

VVr^W W|

f ^ l I04W4C

I0VMW I'wvwvvo — — f " \\^~ ~ ~•^^•PP* l kk

95*9*5 "l3039

T - I.. ~ -

IIBlWt i /l— -Ivil!.1!1^ I!x!S J

876

MARTER TP

4T*it'o*M'••••'M* *Wrti

4(0 mortar ^ ngMi i.* ieryj la.ves arr* t vers. ~. '

l .e -r.orcuu* *

r .

AREAS WI1HDRAWN FROM DISPC vi HON

M.R.O. - MINING RIGHTS ONI Y

S.R.O. SURFACE RIGHTS CMLY

M.+ S. - MINING AND SURFACE RIGHTS

NOTICE OF FORESTRY ACTIVITYTHIS TOWNSNP l AREA FALLS WITNN THE ^^.TIMISKAMING MANAGEMENT UNITANlfMAY^E^^3fcrfoTORESfKY~dFE^ATS^ THE MNR UNIT FORESTER FOR THIS AREA CAN BE CONTACTED AT: P.O. BOX 129

SWASTIKA, ONT.POK ITO795-642,3222

r*-r-^MMWa*H^BM*^BMBBHIM^ , *MMMHBHMIW4MM^B^^M^^BBMMMW*M

LEGEND

PATENTED UNO ' f

PATENTED FOR SURFACE ftlO'ITS ONLY

L*\ ••"•"*? "' LICENSE OF OOi v'^ATK* ^T-"'

CROWN LAND SALES 'fi J A. ^

LOCATED I.AN9

CANCELLcD :

MINING PI5HTS ONI Y ,

SURFACE niGHTS ONLY

HIGHWAY f- ROUTE NU. ^

ROADS

TRAILS .' -V

RAILWAYS

POWEP LINES

MAFISI ORMUSKHQ ! '

MINtS ' tl

jsed only with fti-mmer. 'e*ort location* oi vvh*r *pMca la llmltec

TOWNSHIP OF

CATHARINE^ '

DISTRICT OFTIMISKAMING "

- , * r '

LARDER; LAKEMINING DIVISION

3JALF : 1 INCH - 40CHAINS^(1/2 Kn.LE)on.

"Jl.Y

31M13NW00®12.1 3737 C ATHARl NE 200

uliniairy of Mkibtry of\ Northern Oevelopmont

**S Resouf C83 arid Mines tniurio

Page 11: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

400* surface right! reservation along the shores of all lakes and rivers.

AM* MO MAVU. MTCftT NOMSO

MO APTUCMMN UMCK PUBLIC LAKH ACT

AREAS WITHDRAWN FROM STAKING

VSurface and Mining Rights Withdrawn from

, section 36/60 order No.

Surface and Mining Rights Withdrawn from

&S Stoking, section 36/80 order No.

Surface and Mining Rights Withdrawn from

^Staking, section 36/80 order No. ****PA*T Or ft* MOPCMO *t OMXN O-)*/**. NPV 90/00 FART QREOPENED IY ORDER NO. O-UO/89 NR (PART S?Q REOPENED BY ORDER 0-UI-90NER A

Surface and Mining Rights Withdrawn from

Staking, section 36/80 order No.PA*T Of M NCOPCNRO 91 OAK* 0-W/0M. MOV 10/0* PMT OP Q WOP(MO IT Oft** 0-rO/Ml NOV S0/U

'Surface and Mining Rights Withdrawn from

^Staking, section 36/80 order No. *.*-0*fbrf of R8 r*-oftrt*4 034 W, 039/16, 012/*TPART Of M RIOPIMP 9V O tT M Ml MAN lOJt**,

Surface and Mining Rights Withdrawn from

^Slaking, section 36/80 order No. war or M manna tv 04T/MI. NOV so/**

THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY IS NOT GUARANTEED. THOSE WISHING TO STAKE MIN-

3 1 Ml 3NW0001 2.13737 CATHARINE

LARDER LAKE MINING RECORDER'S OFFICE HEARST TP. M.354

to^lJfMo^el estM4l Bstots""" """

400701 1400TOt

I047I7J \I047I74

____ 1(167954, .Tm.!!*4^ i"^M5 i 1167946u ic----h--

I

rtrwr l myet

^^^ |^^ ^ __l -Q^ff^fJ^^m

K luTiC 5/ ^Anthony

COro

o: h-

o:

o:

l 8

BAYLY TP. M.323

12 "Mt

SHOWN HEREON. l

Page 12: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

-//..\ ' ' ,N *^ ^ J-- 1 '

\" t*v "* ^ hJpflfi ,.^-^ "^J.x i* S . (?

r^ v

G * V

^0

•Vf

BENSON

N

u 2. 1373?

o o o

31MI3N*Mei CATHARINE 220

instrument. Sharpe MF -l Contour interval 1 00 gamma*

MAGNLTOMETEFx SURVEY

Nf a SKEAD TWP'S

OAT t "

Page 13: MINING LANDS S 2 - Ontario · A VLF-EM survey was run with a Phoenix VLF-2 instrument set to the signal from Cutler, Maine (24.0 KHz). Readings were taken at 100-foot intervals along

. _. ;' v '^/-: .

' V \ - i. ^ ^

y-f f f

O rv

lnsrrgment. Crone Hodtm Stafion Curitr^Main* 24.0 K Hi Seole - l " - 40 0

2. 13737VLF-EM SURVEY

CATHARINL ft S KEAD TWP'S

GCAlt i "^

31M13NWQQQ12" 3737 CATHARINE