mining plan with progressive mines...

34
1 MINING PLAN WITH PROGRESSIVE MINES CLOSURE PLAN OF GUJARAT MINOR MINERAL CONCESSION (AMENDMENT) RULES, 2015 JABUGAM ORDINARY SAND AREA SURVEY NO. ORSANG RIVER ADJOING 284/A, NEAR VILLAGE - JABUGAM, TALUKA – BODELI, DISTRICT- CHHOTAUDEPUR, STATE - GUJARAT APPLIED AREA 07.95.00 HECTARE (NON FOREST) Period of Mining Plan – 03 year (SUBMITTED UNDER RULE GMMCR(A), 2015) APPLICANT ARVINDKUMAR THAKORDAS KAYASTHA VILLAGE - UDHNAGAM, TALUKA - CHORYASI, DISTRICT - SURAT. -: PREPARED BY :- PATEL JITUBHAI HATHIBHAI 504, ABHISHEK COMPLEX, OPP.HOTEL HAVELI, SECTOR - 11, GANDHINAGAR, GUJARAT RQP/UPD/379/2014/A, VALID UP TO : 16/11/2024

Upload: hoangthien

Post on 29-Jul-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

1

MINING PLAN

WITH PROGRESSIVE MINES CLOSURE PLAN

OF GUJARAT MINOR MINERAL CONCESSION

(AMENDMENT) RULES, 2015

JABUGAM ORDINARY SAND AREA

SURVEY NO. ORSANG RIVER ADJOING 284/A,

NEAR VILLAGE - JABUGAM, TALUKA – BODELI,

DISTRICT- CHHOTAUDEPUR, STATE - GUJARAT

APPLIED AREA 07.95.00 HECTARE (NON FOREST)

Period of Mining Plan – 03 year

(SUBMITTED UNDER RULE GMMCR(A), 2015)

APPLICANT ARVINDKUMAR THAKORDAS KAYASTHA

VILLAGE - UDHNAGAM, TALUKA - CHORYASI, DISTRICT - SURAT.

-: PREPARED BY :- PATEL JITUBHAI HATHIBHAI

504, ABHISHEK COMPLEX, OPP.HOTEL HAVELI, SECTOR - 11, GANDHINAGAR, GUJARAT

RQP/UPD/379/2014/A, VALID UP TO : 16/11/2024

Page 2: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

2

C O N T E N T S

CHAPTER HEADING PAGE

NO.

INTRODUCTION 3

1 GENERAL 4

2 LOCATION & ACCESIBILITY 5

3 DETAILS OF APPROVED MINING PLAN/SCHEME 6

PART - A

1 GEOLOGY & EXPLORATION 7 to 11

2 MINING 12 to 16

3 MINES DRAINAGE 17 to 18

4 STACKING OF MINERAL REJECTS/SUB GRADE MATERIAL

AND DISPOSAL OF WATES

19

5 USE OF MINERAL AND MINERAL REJECT 20

6 PROCESSING OF ROM AND MINERAL REJECT 21

7 OTHER 22

8 PROGRESSIVE MINES CLOSURE PLAN 23 to 29

PART - B

9 CERTIFICATE/UNDERTAKING/CONSENTS 30 to 31

10 LIST OF THE PLANS AND SECTION SUBMITTED 32

11 LIST OF DOCUMENTS ANNEXED 32

12 LEASE AREA PHOTO 33 to 34

Page 3: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

3

I N T R O D U C T I O N

The Mining Plan of Jabugam Ordinary Sand deposit (Survey No. Orsang River

Adjoing 284/A, area 07-95-00 Hect.) has been prepared on the request of Minerals Ordinary

Sand Village - Jabugam, Taluka - Bodeli, District - Chhotaudepur, State Gujarat of

Arvindkumar Thakordas Kayastha, Village - Udhnagam, Taluka - Choryasi, District - Surat,

State Gujarat.

The letter of intent is for mineral Ordinary Sand in Village - Jabugam, Taluka -

Bodeli, District - Chhotaudepur, (Gujarat) in favor of Shri Patel Jitubhai Hathibhai, 504,

Abhisek Complex, Opp.Hotel Haveli, Sector No.11, Gandhinagar by Gujarat Government.

The Environment Clarence by GPCB by vide order no.

SEIAA/GUJ/EC/1(a)/126/2015 of date-25/03/2015

Page 4: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

4

1.0 GENERAL

a) Name of the lessee Arvindkumar Thakordas Kayastha

Address Village - Udhnagam, Taluka - Choryasi

District Surat

State Gujarat

Pin code 394210

Phone No

Fax No

Mobile No 9825666371

E-Mail Id No

b) Status of Lessee Arvindkumar Thakordas Kayastha is

aIndividualAuthorised signatory.

Private Individual Government

Public limited Company -

Public Sector Undertaking -

Other (Please specify) Government

c)Mineral (s) which are including in the

prospecting license (for fresh grant)

Ordinary Sand

d)Mineral (s) which are included in the letter

of Intent/lease deed

Ordinary Sand

e)Mineral (s) which are included in the letter

of intent/lease deed

Ordinary Sand

f)Name & address of RQP under rule 22C of

MCR, 1960 or a person employed under

clause (c) of sub rule (1) of rule 42 of

MCDR, 1988 (Application for Scheme of

mining Only) Preparing mining plan.

Patel Jitubhai Hathibhai. RQP/UPD/379/

2014/A

Valid up to 16.11.2024 RQP Certificate

attached. Following two Key persons are

authorized prepare the SOM.

Address : 504, Abhisek Complex, Opp.Hotel

Haveli, Sector No.11, Gandhinagar.

Phone No

Fax No

Mobile No. +91-9909718109/9898858183

E-Mail ID [email protected]

Registration No. RQP/UPD/379/2014/A

Date of grant / renewal Valid up to 16.11.2024

Page 5: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

5

2.0 LOCATION AND ACCESSIBILITY. a) Lease Details (Existing Mines)

Name of Mines Jabugam Ordinary Sand Mines

Lat/long of any boundary point Corner latitude and longitudes of lease area. Sr. No. LATITUDE LONGITUDE

1 2464220.28 372641.95

2 2464262.65 372737.55

3 2464287.84 372758.97

4 2464316.03 372903.05

5 2464301.86 373041.15

6 2464092.09 373036.59

7 2464099.13 372907.70

8 2464085.18 372794.08

9 2464041.99 372675.72

Date of grant of lease The mining was executed which has been granted

was executed on 29.12.06 for a period of 03 years.

Period/Expiry Date Quarry lease will expire on Deed. (Renewal)

Name of lease holder Arvindkumar Thakordas Kayastha

Postal Address Village - Udhnagam, Taluka - Choryasi

Telephone No

Fax No

Email ID No

Mobile No. 9825666371

b) Details of applied / lease area with location

map (Fresh area / Mines)

Forest Non-forest Non forest Government land

Forest (specify) Area (ha) NA

(i) Waste land 07-95-00 Hect.

(ii) Grazing land 0

(iii) Agriculture land 0

(iv) Others (Specify) -

Area (ha) 07-95-00 Hect.

Total lease area / applied area 07-95-00 Hect.

District & State Chhotaudepur & Gujarat

Taluka Bodeli

Village Jabugam

Whether the area falls under Coastal Regulation

Zone (CRZ) ?

No, The Mines area does not fall under Coastal

regulation zone.

If yes, Details therefore -

Existence of public road/railway line, if any

nearby & approximate distance

Highway - SH 11 -04.70 km.

Railway - Bodeli -05.02 km.

Airport - Vadodara -56.30 km.

Toposheet No. with Latitude and Longitude of

all corner boundary point/pillar

Topo sheet No.45 F/3,09 Boundary Pillar,

c) Location & Key plan attached? Yes

(Attach a general location map showing area

and access routes. It is preferred that the area be

marked on a Survey of India topographical map

or a cadastral map or forest map as the case

may be. However, if none of these are available,

the area may be shown on an administrative

map.)

It is attached Plate No.1

Page 6: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

6

3.0 DETAILS OF APPROVED MINING PLAN / SCHEME OF

MINING (IF ANY)

3.1 Date and reference of earlier approved MP/SOM :-

Not Applicable

3.2 Details of last modification if any (for the

previous approved period) of approved

MP/SOM, indicating date of approval, reason

for modification

:-

3.3 Give review of earlier approved proposal (if

any) in respect of exploration, excavation,

reclamation etc.

:-

3.4 Give status of compliance of violations pointed

out by IBM :-

3.5 Indicate and give details of any

suspension/closure/ prohibitory order issued by

any Government agency under any rule or Court

of law.

:-

3.6 In case the MP/SOM is submitted under rules 9

and 10 of the MCDR'88 or under rule 22(6) of

the MCR'1960 for approval of modification,

specify reason and justification under these

rules.

:-

Page 7: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

7

PART - A

1.0 GEOLOGY AND EXPLORATION. (a) Brief description of the topography, general geology and local geology of the

Mineral deposit including drainage pattern.

Topography & Drainage pattern.

The Mines area falls in ToposheetNo.45 F/3. The Ordinary Sand outcrops occur as flat

terrian. The highest and lowest point of the applied area is 84.98 and 80.17 meters

respectively. The area falls on the slope of the hill, with 20 degree average inclination towards

N-S.

The Mines is fully Government land, which is flat terrain.

River bed exists within the area, Rain water flows through river slope towards North to south,

during rainy season.

Vegetation

The area is in Chhotaudepur which falls under arid climate. Consequently, it is characterized

bysandy plain, more of less barren of vegetation expect in rainy season when multitudes of

ephemeral come un and transform the bare land into a green carpet, These ephemeral

complete their life cycle before the advent of summer heat and bulk of the area is once more

transformed into open sandy and stony plane, desolate and barren.

In general the vegetation in arid region is sparse. Plants with xerophytes adaptation are able

to establish themselves. The bulk of vegetation at the study area consists of stunted, thorny or

prickly shrubs or perennial herbs capable of brought resistance, distantly scattered trees of

stunted growth are found in this part of the country. Such vegetation is known as desert scrub.

The dominant tree species are Neem, Baval, Sagvan, Pipal, Mango, Banyan tree etc.

Climate conditions

The climate is moderate and temperature ranges from 26-430C during summer to about 12

0C

during winter. The average annual rain fall is 400 to 500 mm which received during monsoon

season from June to September. Predominant wind direction is SE-NE. Generally wind blows

with a velocity of 12-12 Km/hr in all seasons. Relative humidity varies from 23% to 83%.

(b) Brief description of Regional Geology with reference to location of lease/applied

area. Regional Geology:

The Chhotaudepurs district forms the north-eastern part of the Gujarat State. It is bounded by

the Sabarkantha district of Gujarat and the Banswara district of Rajasthan in the north, and by the

Jhabua district of Madhya Pradesh to the west. The district occupies an area of 8,866 km and has a

population of 29,56,456 people, Bodeli, Sant Rampur, JhalodShehera, Godhra, Limkheda, Dahod,

KalolDevgarhBaria, Halol and Jambughoda are the 11 talukas. Excepting the western plain part, the

entire district has hills of low altitude. The only exception being the Pavagadh hill. The Mahiriver is

the most Prominent river along with its tributaries like the Karod, the Mesri, the Goma and the

Panam. The avarage annual rainfall of the district is 90 cm. The district is well connected by roads

and rails.

Page 8: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

8

The Archaean (?) crystallines, exposed to the southeast of DevgadhBaria, Comprising granite

gneiss and biotite gneiss are presumed to e oldest rocks in the area, Major part of the hilly terrain of

the district is occupied by the intensely flowed Aravalli Super group of rocks, comprising lithounits

belonging to the udaipur, Bodeli and the Champaner Groups. The Udaipur Group of rocks is exposed

in the east of Santrampur as a narrow belt and comprisephyllite, mica schist, metasubgraywacke

chlorite schist, phyllitic quartzite, protoquartizite and minor bands of dolomite. The Champaner

Group of rocks, restricted to the southern part of the district, has been subdivided into six formatics,

mainly due to interfomational conglomerate horizons.

Loamy and clayey soils occur in the piedmont plains, hilly terrain and plains. Bouger Gravity

anomaly varies form 30 to 50 mgals. The entire district falls in the moderate risk zone of the

seismicity. hot springs are present at Tuca, Nimbod and RathMoti. The main geomorphic units in the

district are alluvial plains, metasedimentary and granitic pediplains. sedimentarypediplain and alluvial

plain are excellent acquifers.

GEOLOGY AND MINERALS : Litho logy Formation Group Supergroup Age

Flood plain and channel-fill deposits Katpur Formation Holocene

Mottied clay and sandstone PanduMewasa

Formation

Pliocene

Rhyolite

Basalt

Deccan

Volcanics

Cretaceous

to Eocene

A. Limestone, shale, sandstone and

conglomerate with mrine fossils

B. Limestone, sandstone and conglomerate

with fresh water fossils.

Bagh/Lameta

Group

Upper

Cretaceous

A. Granite B. Granodiorite Godhra

Granite

Upper

Proterzoic

Phyllite, slate and mica schist with

intercalations of limestone, subgraywacke

and quartzite

Rajgarh Formation

Champaner

Group

Phyllite and manganiferousphyllite, quartzite

and dolomitic limestone

Shivrajpur

Formation

Phyllite, Metaconglomerate, quartzite and

metaconglomerate

Jaban Formation

AravalliSupergroup Lower

Proterozoic

Quartzite, phyllite and metaconglomerate Narukot Formation

Quartzite, quart-biotite schist, dolomitic

limestone, phyllite, metasubgraywacke,

metaconglomerate

Khandia

Formation

Quarzite, mica schist, metasubgraywacke,

conglomerate and migmatite

Lambia Formation

A.Phyllite, mica schist, metasubgraywacke

and chlorite schist B.quartzite and phyllitic

quartzite C.quartzite mica schist,

protoquartziteD.dolomite

Bodeli Group

Phyllite, mica schist and quartzite BalichaForamtion Udaipur

Group

Granite gneiss, biotite gneiss Archaean (?)

(c) Detailed description of Geology of the lease area (Such as Shape and size of the

Mineral/Ore Deposit, disposition Variouslitho-units indicating structural

features if any etc.)

Brief Description of the area is as

Alluvium - Recent

Ordinary Sand - Recent

Ordinary Sand:-

- It is mainly used in the building construction, roads and walls etc.

Page 9: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

9

(d) DETAILS OF LESSEE

(i) Name of Prospecting/exploration agency Arvindkumar Thakordas Kayastha

(ii) Address Village - Udhnagam,Taluka - Choryasi

(iii) E mail Address No

(iv) phone No. No

(v) Fax No

(vi) Mobile No. 9825666371

(e) Details of the exploration already carried out.

The area is explored by digging within the area and can find out the thickness of

Ordinary Sand, quantity and quality of the Ordinary Sand.

(f) Surface Plans.

Surface plan of the area has been prepared on a scale of 1:1000 with 2 m Contour

interval (Please see plate No.2A)

(g) Geological Plans.

Geological plan of the area has been prepared on a scale of 1:1000 with 2 m Contour

interval (Please see plate No.2B).

(h) Geological Section.

A Geological section passing through the pits has been drawn on a scale of 1:1000

(horizontal) & 1:200 (vertical) (plate No.2B)

(i) Year wise Future Program of Exploration.

No need of future program of exploration, because part of the area has been explored

up to a depth of 3m. Even though, when we will go to depth side we can find out the

quality and quantity of the Ordinary Sand position

Page 10: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

10

(j) Reserves and Resources as per UNFC with respect to the threshold value notified

by IBM may be furnished in a tabular from as given below:

Although the Ordinary Sand bed has been exposed fully in the whole area and also seen

in the bottom of pit which has gone to 3m deep. The quality of Ordinary Sand position

is improved in the deep portion. So we calculate the reserve of Ordinary Sand depends

upon the position which may vary from level to level & lateral wise. The occurrence of

uniforms & massive reserves. As per Geological Plan with section A’-A’’, B’-B’’ & C’-

C’’.

Proved Reserves (111)

The proved reserves can be estimated taking 2m interval continuity around the pits i.e.

about 07-95-00 sqm. & the depth is considered up to the 3m i.e. 5m below the actual

depth of the because by drilling. It is proved that Ordinary Sand is continuing in depth

& quality is also improved.

Probable Reserves (121 & 122)

An additional depth of 1.5m from the horizon of proved reserves have been taken under

probable reserves. The area of influence some change i.e. 07-95-00Sqm.

Possible Reserves (222)

A further addition depth of 1.5m from the horizon of probable reserves has been taken

under possible reserves. The area of influence some change i.e07-95-00Sqm.

Classification Code Quantity in tonnes Grade

Total Mineral Resources (A+B)

-

A. Mineral Reserve

1. Proved Mineral Reserves 111 620100

2. Probable Mineral Reserves 121 & 122 310050

B. Remaining Resources

1. Feasibility Mineral Reserves 211

2. Prefeasibility Mineral Reserves 221 & 222 310050

3. Measured Mineral Reserves 331

4. Indicated Mineral Reserves 332

5. Inferred Mineral Reserves 333

6. Reconnaissance Mineral Reserves 334

(k) Furnish detailed calculation of reserves /resources section wise.

As Above.

Page 11: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

11

(l) Mineral Reserves/Resources

Level of Exploration Resources in tons Grade

G1 Detailed Exploration - -

G2 General Exploration - -

G3 Prospecting - -

G4 Reconnaissance - -

As the mineral reserves estimated as per mining plan was based mainly on Open pit in mines

area and on geological consideration. The details of mineral reserves estimation as per UNFC

Guidelines has to be furnished with the justification of rewarding codes of Economic axis,

Feasibility axis and Geological axis under various categories. The reference to prescribed

threshold values of mineral is to be made for computation of reserves.

Classification Code Quantity in tonnes Grade

Total Mineral Resources (A+B)

-

A. Mineral Reserve

1. Proved Mineral Reserves 111 620100

2. Probable Mineral Reserves 121 & 122 310050

B. Remaining Resources

1. Feasibility Mineral Reserves 211

2. Prefeasibility Mineral Reserves 221 & 222 310050

3. Measured Mineral Reserves 331

4. Indicated Mineral Reserves 332

5. Inferred Mineral Reserves 333

6. Reconnaissance Mineral Reserves 334

Total Reserves + Resources 1240200

Life of mine

Life of mine at the planned rate of production at 57876 TPA Shall be 1 years (as per present

reserves) Life of mines 13 years.

Reserves estimated can be carried out based on exploration proposed.

Page 12: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

12

2.0 MINING

A. OPEN CAST MINING

(a) Brief description of the existing as well as proposed method for excavation with

alldesign parameters indicating on plans / sections.

(i) Existing method for excavation: Design Parameters:

The deposit is in form of flat surface. So far of mining, Ordinary Sand exposed in

applied lease area, opencast is the only method which can be followed to work the

deposits.

The Mines plan is designed to use the existing natural parameter optimally for the

recovery of Ordinary Sand. The bench height has been kept at 8meters to make it

convenient for easy handling of primary and for safety purpose

(ii) Proposed method for excavation design parameters:

No change in method of mining is proposed.

(b) Year wise tentative Excavation in m3 indicated development, ROM, pit wise as in

table below.

Inset Tentative Excavation

Year Pit No. Total

tentative

Excavation

(sqm)

Topsoil

(cum)

OB/SB/IB

(cum)

ROM (cum) Mineral

reject Ore

Ratio

(cum)

Mineral

reject

Ratio

(cum)

2016-17 - 15900 0 0 22260 -- --

2017-18 - 15900 0 0 22260

2018-19 - 15900 0 0 22260

2019-20 - 15900 0 0 22260

2020-21 - 15900 0 0 22260

Total 111300 -- --

Page 13: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

13

Estimated available material (cum)

Dump

Identification/No

Year wise handling

(cum)

Estimated recovery of

saleable material (cum)

Reject (cum)

No dump existing

'A' Category Mines Yes

Individual year wise development plans and

sections showing pit layouts, dumps, stacks of

Mineral reject attached?

Yes

'B' Category Mines No

Composite development plans showing pit

layouts, dumps, stacks of Mineral, reject, if any

etc. and year wise sections attached?

No

(c) Brief description giving salient features of the proposed method of working

indicating category of Mines.

It is proposed to adopt the semi-mechanized open cast method of mining by using

Excavator. As stated earlier the Ordinary Sand mining is entirely different from

conventional type of mining. The bench parameters have been Mineral, 1.5m height

& width.

The Mining suggested is semi mechanized at present and subsequently based on

market it is planned to improvement to mechanized operations.

(d) Brief description of the layout of Mines working, pit road layout, the layout of

faces and sites for disposal of O/B, waste along with ground preparation prior to

disposal of waste, reject etc. A reference to the plans and sections may be given.

UPL or ultimate size of the pit is to be shown for identification of the suitable

dumping site.

Area is devoid of over burden so no Development works will be proposed. Bench

height will be 3m and targeted production will be 289380 tones Five year (with

Mineral reject) Details of year wise bench wise production is given in the tables

below.

First Year (2016-17)

During the first year the production from this applied lease area will be 57876 tones. During

the first year entire production of Ordinary Sand.The likely positions of the benches, roads &

plantation etc. In this Mines are at the end of first year are shown in the plate no.3.

Surface area in Sq.m. Avg. Height of bench

in m

Volume in cu.m. Tonnage

15900 1.4 22260 57876

22260 57876

Page 14: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

14

Second Year (2017-18)

During the Second year the production from this applied lease area will be 57876 tones.

During the Second year entire production of the likely positions of the benches, roads &

plantation etc. In this Mines are at the end of first year are shown in the plate no 3.

Surface area in Sq.m. Avg. Height of bench

in m

Volume in cu.m. Tonnage

15900 1.4 22260 57876

22260 57876

Third Year (2018-19)

During the third year the production from this applied lease area will be 57876 tones (with

Mineral reject).During the third year entire production of Ordinary Sand.The likely positions

of the benches, roads & plantation etc. In this Mines are at the end of first year are shown in

the plate no 3.

Surface area in Sq.m. Avg. Height of bench

in m

Volume in cu.m. Tonnage

15900 1.4 22260 57876

22260 57876

Fourth Year (2019-20)

During the fourth year the production from this applied lease area will be 57876 tones(with

Mineral reject). During the fourth year entire production of Ordinary Sand.The likely

positions of the benches, roads & plantation etc. In this Mines are at the end of first year are

shown in the plate no.3.

Surface area in Sq.m. Avg. Height of bench

in m

Volume in cu.m. Tonnage

15900 1.4 22260 57876

22260 57876

Fifth Year (2020-21)

During the fifth year the production from this applied lease area will be 57876 tones(with

Mineral reject). During the fifth year entire production of Ordinary Sand.The likely positions

of the benches, roads & plantation etc. In this Mines are at the end of first year are shown in

the plate no3.

Surface area in Sq.m. Avg. Height of bench

in m

Volume in cu.m. Tonnage

15900 1.4 22260 57876

22260 57876

(e) Conceptual Mines planning up to the end of lease period taking into consideration the

present available reserves and resources describing the excavation, recovery of ROM,

Disposal of waste, Backfilling of voids, reclamation and rehabilitation showing on a

plan with few relevant sections.

Page 15: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

15

Exploration:

Massive deposit of Ordinary Sand occurs is in the form of a lose, having exposure of all

sides up to bottom of River bed. The huge quantity of material to sustain production more

than 13 years is visible under proved category. Therefore further exploration is not

required.

Mines development:

As such very nominal development work for proposed road making work will be required

to start production from this area. The proposed mining has been selected along strike

direction covering maximum width up to ultimate depth. Therefore, the development &

production plan have been described.

Optimum Exploitation and utilization of Mineral:

Ordinary Sand Mineral in the lease area has been excavated up to 7.5 m statutory barrier

all along the lease boundary with the restriction of mining width; under the present

scenario mining cannot proceed below 80.17mRL.

Lessee should apply to DGMS for mining in 7.5 barrier.

In the present pit design final pit slope is considered at 450. In the fifth year of mining the

present reserves are likely to exhaust, hence company can approach DGMS for steeper

final slope of the pit and recover the blocked Mineral to possible maximum limit.

Disposal of Waste

0% waste of ROM from Ordinary Sand will be generated during mining. Total 111300

cum tone & 0 swelled wastes will be generated. Initially during scheme of mining (1st to

5th

year) waste will be dumped on ground level as shown in plate no.3.

During the proposed five years period year wise barbed wire fencing will be done around

the plantation area wire fencing will prevent any inadvertent entry. Year Waste in cum

2016-17 --

2017-18 --

2018-19 --

2019-20 --

2020-21 --

Total --

Environmental Aspects:

Due to mining, envies Jabugam land degradation will be in the form of open pit and area

covered will be about 6.3706 hectares out of 7.9500 hectares. By the end of life of Mines

1.5794 ha. will be developed as green belt along the statutory barrier.

Machinery in use at the Mines will generate dust and noise and all preventive measures as

per consent to operate will be strictly implemented. Negative impact on land degradation

will be reduced by way of green belt along the lease boundary. Air pollution will be

controlled by way of providing fully automatic drilling machine from where continuous

supply of water during drilling flows down to suppress any dust generated during drilling.

Sprinkling of water over haul roads, loading and unloading points will be provided. Dusts

masks will be provided to workers engage Jabugam in drilling and working in dusty

environment. No Mineral beneficiation is proposed hence, no water treatment is required.

However any water flowing from the Mines to outside will be circulated through the

sumps and settlers, so arrest any silt. Sumps and settlers will be periodically cleaned.

Page 16: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

16

Regular Air, water and noise quality will be monitored as per the guide lines from SPCB.

SPM level of 500 ug/m3in ambient air will be achieved. Standard of 600 ug/m

3 will be

applicable within 3-10 m of any equipment.

Day time noise level shall be kept below 75d B A (Leq) and night time at 70 dB A

(Leq)

Other conditions as per consent operate will be followed

Plantation :

Plantation will be carried out along the lease boundary over 7.5 m statutory barrier

(1.5794 hectares) by the end of SOM period.

Year wise plantation program for the SOM period is given below.

SN Site Area 15-16 16-17 17-18 18-19 19-20

1 Green

belt

along

statutory

barrier

1.5794

(25 No. of Plant)

25 28 28 28 28

Species to be planted:

Neem, Sagwan, Banyan, Pilu, Baval etc.

Expected rate of Survival : Expected rate of survival is anticipated at 80 %

Proper care maintenance will be done as proposed in the chapter on environment

management in the SOM.

Post Mining land use:

The applied lease area at the end of mining when Mineral will be fully exhausted will be

backfilled by waste from ROM generated during mining and remaining mine out will be

used for rain water storage. However at the end of lease period total plantation area will

be 1.5794 hectares. This will enhance the aesthetic beauty of the area. This work should

be taken up in consultation with Horticulturist and landscape designers.

Reclamation &Rehabilitation:

At the end of mining plan period, about 6.3706 hectares area will be cover under mining

up to depth 80.17 m RL. Ordinary Sand Mineral will continue in strike for further mining.

Thus no reclamation is proposed at this plan period. The plantation will be done along

lease boundary in next five years. At the end of mining plan period total 1.5794 hectares

area will be planted.

Backfilling has proposed in next five year plan period. Nonetone of waste will be

generated from Ordinary Sand, total waste will be generated during plan period will be

dumped on the ground level.

(f) System of Drilling & Blasting

Not Applicable

(g) Under Ground Mining

Not Applicable

Page 17: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

17

3.0 MINES DRAINAGE

(a) Minimum and maximum depth of water table based on observation from rear by

wells and water bodies.

Minimum depth of

water table

Maximum depth of

water table

Source Remark

61.12 mRL 71.12 mRL - -

(b) Indicate maximum and minimum depth of workings.

Year Maximum depth of working Minimum depth of working

2016-17 81.12 mRL 82.52 mRL

2017-18 81.12 mRL 82.52 mRL

2018-19 81.12 mRL 82.52 mRL

2019-20 81.12 mRL 82.52 mRL

2020-21 81.12 mRL 82.52 mRL

(c) Quantity and quality likely to be encountered, the pumping arrangements and

places where the Mines water is finally proposed to be discarnate.

Year Quantity of

water likely to

be encountered

Quality of water likely

to be encountered

pumping

arrangements

Final place

of discharge

of Mines

water

Remark

Not applicable Ordinary Sand is

nontoxic and hence no

chemical treatment of

Mines water is required.

Periodical quality

monitoring will be

carried out and reports

submitted to concerned

authorities.

Any excess water

will be pumped out

after passing

through settlers and

sump.

Used for

plantation

purpose.

Page 18: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

18

Surface water Quality:

The rainwater shall accumulate in working pit. No mining activities shall be carried

out during rainy season.

Though the pits are on ground level, there is always some accumulation of water

during rainy season in the pits. So it proposed to use 5 Hp diesel engine operated

pump rainy season to dewater the pits, as and used for plantation.

(d) Description of regional and local drainage pattern indicating annual rain fall,

catchments area, and likely quantity of rain water to flow through the lease area,

arrangement for arresting solid wash off etc.

The average annual rainfall is 400 to 500 mm which received during monsoon season

from June to September. There are no nalla exist within lease area.

Orsang river is nearer to Mines site approximate 100m.

Page 19: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

19

4.0 STACKING OF MINERAL REJECT/SUB GRADE

MATERIAL AND DISPOSAL OF WASTE

(a) Brief description of the nature and quantity of top soil, overburden/waste and

Mineral reject to be disposed of.

No Generated waste during the mining Scheme period.

(b) Location of proposed dumping ground within the lease area weather proved for

presence or absence of Mineral and be outside the UPL unless simultaneous back

filling is proposed or purely temporary dumping for a short period is proposed

in Mineralized area with technical constrains & justification.

No Generated waste during the mining Scheme period.

(c) Note indicating the manner of disposal of waste, configuration and sequence of

year wise buildup of dumps along with the proposals for protective measured.

Total 0 tones waste will be generated.

Page 20: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

20

5.0 USE OF MINERAL AND MINERAL REJECT

(a) Brief description of the requirement of end use industry specifically in terms of

physical & chemical composition.

Ordinary sand is mainly used in the building construction, roads and walls. Ordinary

Sand is used in water harvesting, bore well, water filtration systems, landscaping

projects, custom concrete mixes, interlocks for good compaction, drainage to all

concrete projects, building roads in making concrete etc.

(b) Brief description of requirement of intermediate industry involved in up

gradation of Mineral before its end use.

The Ordinary Sand Jabugam extracted from lease area will be directly used in next

five year.

(c) Details of requirements for other industries, captive consumption, export,

associated industrial use etc.

Ordinary Sand find extensive use for Building Construction, Buildup road and other

major industries.

(d) Precise physical and chemical specification stipulated by buyers.

100% Of ROM will be produced. Therefore, 100% ROM will be sold to buyers.

(e) Details of processes adopted to upgrade the ROM to suit the use requirements.

Ordinary Sand not further processed after mining.

Page 21: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

21

6.0 PROCESSING OF ROM AND MINERAL

REJECT

(a) If processing / beneficiation of the ROM of Mineral Reject are planned to be

conducted briefly description of nature of processing / beneficiation, indicating

size and grade of feed material and concentrate, recovery etc.

No Generated waste during the mining Scheme period.

(b) Material balance chart with a flow sheet of schematic diagram of the processing

producer indicating feed, product, recovery, and its grade at each stage of

processing.

No Generated waste during the mining Scheme period.

(c) Disposal method for tailing or reject from the processing plant.

Not applicable

(d) Quantity and quality of tailing / rejecting proposed to be disposed, size and

capacity of tailing pond, toxic effect of such tailing , if any with process adopted

to neutralize any such effect before their disposal and dealing of excess water

from the tailing dam.

Not applicable

(e) Quantity and type of chemicals in any to be used in the processing plant.

Not applicable

(f) Specify quantity and type of chemicals to be stored on site / plant.

Not applicable

(g) Quantity (cum per day) of water required for mining and processing and sources

of supply of water, disposal of water and extent of recycling along with water

balance chart.

Not applicable

Page 22: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

22

7.0 OTHERS

Brief description of the following:

(a) Site Services

The site Services i.e. workshop, power supply, water supply, office, store fuel storage,

first aid station, canteen etc. Have been provided outside lease area, close to the

Mines.

Other infrastructure facilities are provided at the mining site.

There is no proposal for closure of Mines in the next five years, hence no

decommissioning of infrastructure is proposed. Building will be dismantled and

reusable material sold of used elsewhere. Transmission line will be de-energized and

dismantled. No live electric supply line will be left.

(b) Employment potential:

(i) Workers:

As stated earlier will be done by semi mechanized opencast method with drilling. The

Mines will work for only one shift during day time from 8 a.m. to 5 p.m. with one

hour recess. Considering 300 working days in a year excavation shall be as follows:

Year Rom (in

tones)

ROM (In

cum)

Daily

excavation (In

cum)

*Proposed labors

First 57876 22260 26 5

Second 57876 22260 26 5

Third 57876 22260 26 5

Fourth 57876 22260 26 5

Fifth 57876 22260 26 5

Total 289380 111300 26 (Average) 5 (Average)

Out of the total 8 manpower to be engage Jabugam in the Mines, one man will be

allocated for proper care and maintenance of plantation, one for office work shall be

employed. One tractor driver with helper shall also employ. One for JCB operator &

one drives for tipper, thus total labors/workers shall be 8.

(ii) One drivers for tipper, thus total labors/workers shall be 8.

A provision is made for employment of following statutory personnel

Mines Manager under MMR’ 1970 - 1

Mining Engineer part time Under MCDR’ 1988 - 1

Mining Geologist part time under MCDR’ 1988 - 1

Page 23: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

23

8.0 PROGRESSIVE MINES CLOSURE PLAN

UNDER RULE 23 OF MCDR’1988

8.1 Environment Base Line Information:

Topography & Drainage

The Mines area falls in ToposheetNo.45 F/3. The Ordinary Sand outcrops occur as

massive hillocks. The highest and lowest points of the applied area are 84.98 and

80.17 meters respectively. The area falls on the slope of the hill, with 20 degree

average inclination towards N-S.

The Mines is fully Government land, which is flat terrain.

River bed exists within the area, Rain water flows through river slope towards North

to south, during rainy season.

Existing Land use Pattern:

The lease area is a Government land of Orsang River Adjoing 284/A, which falls

under Jabugam Village. No agriculture land exist the lease area. (Refer plate No.2A) Activity Present In Hec At the end of plan Period In

Hec

Mining 0.0 6.3706

Pits/Activity

Mining Area

0.0 0.0

Dumps 0.0 0.0

Haul Road 0.0 0.0

Infrastructure 0.0 0.0

Mineral Stock 0.0 0.0

Plantation 0.0 1.5794

Remaining virgin

area

7.9500 0.0

7.9500 7.9500

(i) Water regime

Surface and Ground Bodies :

S.No. Name of the water Body Date of Sampling Sampling Location

1 Mining Site - -

(ii) Quality of air

The entire area is very calm and quiet and free form air pollution. The quality of air

level appears to be within permissible limits (No Survey has been conducted for the

preparation of mining plan of small area). The source of pollution as regard air area

the surrounding small Mines which contribute mainly for the pollution.

Page 24: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

24

(iii) Ambient noise level

The entire area is very calm and quiet and free from noise pollution. The quality of

ambient noise level appears to be within permissible limit (no survey has been

conducted for the preparation of mining plan of small area) the source of pollution as

regard noise area the surrounding small Mines which contribute mainly for the

pollution.

(iv) Flora and fauna

The area lies in Chhotaudepur, which falls under arid climate. Consequently, it is

characterized by sandy plain, more of less barren of vegetation except in rainy season

when multitudes of ephemeral come up and transform the bare land into a green

carpet. These ephemeral complete their life cycle before the advent of summer heat

and bulk of the area is once more transformed into open sandy and stony plane,

desolate and barren.

In general the vegetation in arid region is sparse. Plants with xerophytes adaptation

are able to establish themselves. The bulk of vegetation at the study area consists of

stunted, Thorny of prickly shrubs of perennial herbs capable of drought resistance.

Distantly scattered trees of stunted growth are found in this part of the country. Such

vegetation is known as desert scrub. The dominant tree species are neem, Baval,

Sagvan, Pipal, Mango, Banyan tree etc.

The terrestrial fauna of the region mainly comprises of domestic animals and burrow

dwellers. During the study period no endangered of rare species was found within the

study area.

(v) Climatic conditions

The climate is moderate and temperature ranges from 26-430C during summer to

about 120C during winter. The average annual rain fall is 400 to 500 mm which

received during monsoon season from June to September. Predominant wind direction

is SE-NE. Generally wind blows with a velocity of 12-12 Km/hr in all seasons.

Relative humidity varies from 23% to 83%.

(vi) Human settlements

There is no village within the lease area. Lease area is situated in the revenue

boundary of Jabugam, Jabugam village is situated in north direction of the lease area.

(vii) Public buildings, places of worship and monuments

Area is free from any public building and monuments. The lease area is free from sink

hole having any connection to any cave system and Perennial River is far away from

the lease area as such not going to affect any way.

(viii) Weather any Sanctuary is located in the vicinity of lease hold?

No any Sanctuary is located in the vicinity of lease hold area.

8.2 Impact Assessment:

The Mining operation will have some impact on the existing environment, both

adverse and beneficial. Considering the nature and scale of operation, on the other

hand impact on socio-economic will be largely beneficial. The possible impacts are

enumerated below:

Page 25: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

25

(i) Land Environment

At the end of five years, damage to the landscape in the form of pit & road etc., about

7.9500 hectares will be pit. The area influence of mining at the end of 5th

year & end

of the Mines life is given below:

Activity Present In Hec At the end of plan Period

In Hec

Mining 0.0 6.3706

Pits/Activity Mining

Area

0.0 0.0

Dumps 0.0 0.0

Haul Road 0.0 0.0

Infrastructure 0.0 0.0

Mineral Stock 0.0 0.0

Plantation 0.0 1.5794

Water Storage 0.0 0.0

Backfilled area 0.0 0.0

Remaining virgin

area

7.9500 0.0

7.9500 7.9500

(ii) Air Quality

Air quality gets affected due to mining, blasting and movement of earth moving

equipment etc.However, the impacts area localized and is not continuous. Overall

effect for mining of Ordinary Sand from this 7.9500 hect. Area is insignificant. To

reduce such impacts measures will be adopted from the inception by spraying water

all along the haul road. Further a forestation all along the lease boundary and haul

road will arrest a major quantity of dust. In blasting use of delay/non electric system

will result reduction of vibration as well as dust.

(iii) Water Quality

The mining excavation of which will never touch the ground water table. Hence no

question of ground water pollution arises.

(iv) Noise levels

Operation of equipment will emit noise. To have control on noise level within 80 db

adherence to strict schedule maintenance, monitoring of noise will be carried out.

Blasting-Noise & Vibration during blasting is momentary but needs proper planning

to reduce the same.

(v) Water regime

Unaffected

(vi) Acid Mines drainage

This is not applicable to the Ordinary Sand area.

Page 26: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

26

(vii) Surface subsidence

This is not applicable to the Ordinary Sand area.

(viii) Socio-economic environment

Mining in this lease area will gave more job opportunity to the local people

thus,Ordinary Sand mining will not create any adverse effect to the local people.

Ordinary Sand mining will not generate hazardous dust, which may cause health

problem to Mines workers. The nearest human settled village is Jabugam which is

nearby from lease area. Thus mining will not have any impact on the village human

settlement.

(ix) Historical monuments etc.

No Historical monument lies within the core and 5 Km. buffer zone.

8.3 Progressive reclamation plan:

8.3.1 Mine out land

Description of the proposals to be implemented for reclamation and rehabilitation of

Mine out land including the manner in which the actual site of the pit will be restored

for future use, supported with yearly plans and section depicting yearly progress in the

activities for land restoration/reclamation/rehabilitation, a forestation etc., called

“Reclamation plan”

Land use pattern at present and at the end of plan period is given above:

Reclamation & Rehabilitation

At the end of mining plan period, about 7.9500hectares area will be cover under

mining up to depth 80.17mRL. Ordinary Sand Mineral will continue is strike for

further mining after approved applet Authority. Thus no reclamation is proposed at

this exiting mining area. The plantation will be done along lease boundary in next five

year. At the end of mining plan period total 1.5794hectares area will be planted.

Plantation:

Plantation will be carried out along the lease boundary over 7.5 m statutory barrier

(1.5794 hectares) by the end of plan period.

Year wise plantation program for the SOM period is given below:

Year No.of plants Area (in Hect.,) Survival Rate

2016-17 10 0.31588 50%

2017-18 10 0.31588 50%

2018-19 10 0.31588 50%

2019-20 10 0.31588 50%

2020-21 10 0.31588 50%

Total 1.5794

Expected rate of survival: Expected rate of survival is anticipated at 80%

Proper care maintenance will be done as proposed in the chapter on Environment

management in the SOM.

Page 27: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

27

8.3.2 Top soil Management:

No top soil generated whatever top soil generated has been used for plantation.

8.3.3 Tailings Dam Management:

There is no tailing generation in the process of mining. Hence no tailing dam

management.

8.3.4 Acid Mines drainage, if any and its mitigative measures.

There is no acid drainage in this Mines of Ordinary Sand area, so no mitigative

measures are proposed.

8.3.5 Surface subsidence mitigation measures through backfilling of Mines voids or by

any other means and its monitoring mechanism.

The information on protective measures for reclamation and rehabilitation works year

wise may be provided as per the following table.

SUMMARY OF YEARWISE PROPOSAL FOR ITEM No.8.3

Items Details Proposed Actual Remarks

Dump management Area afforested (Ha) -- -- There is no

proposal for

dump plantation No. of saplings planted -- --

Cumulative no. of plants -- --

Cost including watch and

care during the year

-- --

Management of

worked out benches

Area available for

rehabilitation Ha

-- --

--DO--

Afforestation done Ha -- --

No. of saplings planted in

the year

-- --

Cumulative no. of plants

any other method of

rehabilitation (specify)

-- --

Cost including watch and

care during the year

-- --

Reclamation and

Rehabilitation by

backfilling

Void available for

Backfilling (LxBxD) pit

-- --

--DO--

Pit wise /Stoke wise -- --

Void filled by

waste/tailings

-- --

Afforestation on the

backfilled area

-- --

Rehabilitation by making

water reservoir

-- --

Any other means (specify) -- --

Rehabilitation of

waste land within

lease

Area Available Ha -- --

--DO-- Area rehabilitated -- --

Method of rehabilitation -- --

Others (specify) -- --DO--

Page 28: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

28

8.4 Disaster Management and Risk Assessment:

A major emergency in Mines is one which has potential to cause serious injury or loss

of life and cause damage to activities resulting in disruption to normal activities. The

emergency may be caused due to human failure, breakdown of machinery or natural

cause.

The disaster management plan prevents accidents, by systematic planning, operation,

maintenance of machinery and training of personal. Since absolute safety is not

achievable the essential part of hazard control is to be aimed at mitigating the effects

of all accident.

The measures include recognizing the possibilities of accidents, assessing

consequence, decide on steps to be implemented in case of emergency. The

emergency plan both offsite and onsite to be consistent with each other. The

objectives of emergency plan include:

To localize emergency and eliminate hazards

To minimize the effects on people and property

Elimination of hazards by local / supervisory personnel and minimizing effects

includes rendering first aid, evacuation, hospitalization, rehabilitation.

To seek help from outside sources if required.

Notice / information to authorities.

It is a hard rock area and as such no serious disaster is foreseen. However accidents

cannot be ruled out in the Mines. Following risks are anticipated:

Failure of benches.

Fall of machinery / person from benches.

Failure of transport machinery.

Heavy rainfall.

Accidents due to blasting / explosive

Accidents due to fire

The Onsite Emergency plan is already in place and will be followed strictly in case of

any emergency. If required help will be sought from district authorities and DGMS.

8.5 Care and maintenance during temporary discontinuance:

In case of any temporary discontinuance due to court order or due to statutory

requirement or any other unforeseen circumstance following measures for care and

maintenance and monitoring of status shall be taken.

Notice of temporary discontinuance of work in Mines shall be given to the controller

General, Controller of Mines and the Regional controller of Mines, IBM and DGMS

officials under Rule 24 of MCDR 1988 and Reg.6 of MMR 1961 respectively.

All the mining machinery shall be shifted to a safe place.

Competent persons shall inspect the area regularly.

Air, water and other environment monitoring shall be carried out.

Care and upkeep of plantation shall be carried out on regular basis.

Measures of care, maintenance and monitoring of status of unplanned, discontinued

mining operations shall be followed in case of any temporary discontinuance of

Mines.

Entrance to Mines working shall be properly fenced as per the DGMS circular.

No temporary discontinuance is anticipated during the closure plan period.

Page 29: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

29

8.6 Financial Assurance:

The lessee is required to submit the financial Assurance for the area to be put to use

for mining and allied activities at the end of scheme of mining period. Following table

shows the calculation as per the CCOM’s circular No. 4/2006.

S.

No

Item Area

put on

use at

Start of

plan

(Ha)

Additional

requirement

during plan

period (Ha) (B)

Total

(Ha) C

=

(A+B)

Area considered

as fully reclaimed

and rehabilitation

(Ha) (D)

Net area

considered

(Ha) E = (C-

D)

1 Area to be excavated 0 6.3706 6.3706 0 6.3706

2 Storage for topsoil 0 0 0 0 0

3 Overburden/dumps 0 0 0 0 0

4 Mineral storage 0 0 0 0 0

5 Infrastructure

(Workshop, Adm.

Building)

0 0 0 0 0

6 Haul Roads 0 0 0 0 0

7 Railways 0 0 0 0 0

8 Green belt 0 1.5794 1.5794 0 1.5794

9 Tailing pond 0 0 0 0 0

10 Effluent treatment

plan

0 0 0 0 0

11 Mineral separation

plan

0 0 0 0 0

12 Township area 0 0 0 0 0

13 Others (private land) 0 0 0 0 0

Total 0 7.9500 7.9500 0 7.9500

Proposed area to be put to use at the end of plan period is 7.9500 hectares. Financial

assurance for semi mechanized Mines are calculated at the rate of Rs.50,000/- per hectares

for area to be put to use. For 7.9500 hectares it works out to Rs.3,97,500/- But as per Rule

23F(1) minimum financial assurance for B category Mines is Rs.1,00,000/- FA in the form of

bank Guarantee will be submitted at the time of submission of five copies of the SOM.

Date :-

Place :- Gandhinagar.

(Patel Jitubhai Hathibhai)

RQP/UPD/379/2014/A

Valid up to 16.11.2024

Page 30: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

30

CONSENT LETTER / UNDERTAKING / CERTIFICATE

1. The Scheme of mining in respect of Jabugam Ordinary Sand mine, over an area of 7.9500

Ha in Village - Jabugam, Taluka - Bodeli, District - Chhotaudepur, State - Gujarat under

rule GMMCR (Amendment)-2015 has been prepared by Jitubhai Hathibhai Patel, RQP.

This is to request the CGM, Gandhinagar to make further correspondence regarding any

correction of the Scheme of Mining with the said recognized person at his address below:

Mr. Jitubhai Hathibhai Patel

RQP/UPD/379/2014/A (Valid up to 16.11.2024)

Office Address : 504, Abhisek Complex, Opp.Hotel Haveli, Sector No.11, Gandhinagar.

We hereby undertake that all modifications/updating as made in the said Scheme of

Mining by the said recognized person be deemed to have been made with our knowledge

and shall be acceptable to us and binding in all respects.

2. It is certified that CCOM circular no.2/2010 will be implemented and complied with

when an authorized agency is approved by the State Government.

3. It is certified that the Progressive Mine Closure Plan of Jabugam Ordinary Sand mine,

over an area of 7.9500 Ha complies with all Statutory rules, regulations, Orders made by

the Central or State Government, Statutory organizations, Court etc., which have been

taken into consideration and wherever any specific permission is required, the lessee will

approach the concerned authorities. The information furnished in the Progressive Mine

Closure Plan is true and correct to the best of our knowledge and records.

4. The provisions of Mines Act, Rules and Regulations made there under have been

observed in the Scheme of Mining over an area of 7.9500 Ha in Village -Jabugam, Taluka

- Bodeli, District - Chhotaudepur, State - Gujarat belonging to Jabugam Ordinary Sand

mine, and where specific permissions are required, the lessee will approach the D.G.M.S

Further, standards prescribed by D.G.M.S in respect of Miner's health will be strictly

implemented.

Place :

Date :

(Arvindkumar Thakordas Kayastha)

Village - Udhnagam, Taluka - Choryasi,

District - Surat

Page 31: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

31

CERTIFICATE FROM RQP

The Provision Of The Mineral Conservation and Development Rules 1988 Have Been

Observed In The Preparation Of Scheme Of Mining Under rule GMMCR(Amendment)-2015

for Jabugam Ordinary Sand Mine Over an area of 7.9500 Ha, Village - Jabugam, Taluka -

Bodeli, District - Chhotaudepur, Gujarat of Arvindkumar Thakordas Kayastha, Village -

Udhnagam, Taluka - Choryasi, District - Surat, Gujarat and Whenever Specific Permission

are Required, the Lessee Will approach the concerned authorities of Commissioner &

Commissioner ate of Geology and Mining, Gandhinagar, Gujarat.

The information furnished in the Scheme of Mining is true and correct to the best of our

Knowledge.

Date :-

Place :- Gandhinagar.

(Patel Jitubhai Hathibhai)

RQP/UPD/379/2014/A

Valid up to 16.11.2024

Page 32: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

32

LIST OF PLATE

S.no. Plates Plate

No. Scale

1 Location & Key Plan 1 1 : 1000

2 Surface Plan 2A 1 : 1000

3 Geological Plan & Sections 2B 1 : 1000

4 Five Years Development Plan and Section (2016-17 to 2020-

21)

3 1 : 1000

5 Conceptual Plan & Section 4 1 : 1000

6 Mine layout plan & section 5 1 : 1000

7 Environment Plan 6 1 : 5000

L I S T O F DOCUMENTS ANNEXED

S.no. Annexure Annexure

no.

1 RQP Certificate 1

2 Photo ID with Address Proof 2

3 Letter Of Intent 3

4 Lease Deed 4

5 Environment Clearance Application Letter 5

Page 33: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

33

Lease Area Photograph

Photo - 1

Photo - 2

Page 34: MINING PLAN WITH PROGRESSIVE MINES …environmentclearance.nic.in/writereaddata/FormB/TOR/MiningPlan/... · 1 mining plan with progressive mines closure plan of gujarat minor mineral

34

Photo - 3

Photo - 4