Page 1: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

संचार एवं सूचना �ौद्यो�गक ंंाा् दरू संचार �वभा�

MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS

संचार ाेखा �न्ंंग

पि�च बं�ाा प�र ंडा गयागाता

CONTROLLER OF COMMUNICATION ACCOUNTS WEST BENGAL CIRCLE

KOLKATA

वा�षरग �रपयोर ANNUAL REPORT

2010-2011

Page 2: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired
Page 3: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired
Page 4: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Sd/- K. Panda

Contents

1 Introduction

1-3

2 Resources of the Office and Infrastructures

4-6

3 Functions

7

4 Revenue Collections and Other Receipts

8-9

5 Settlement and Payment of Terminal Benefits

10-13

6 USO: Settlement of Subsidy Claims

14-16

7 Cash Flow Management

17-18

8 Audit, Inspection and Legal Matter

19-20

Page 5: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

9 Events and Initiatives

21

10 RTI Cases

22

Page 6: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER I : INTRODUCTION

The Office of controller of communication Accounts, West Bengal Circle which came into existence with effect of 01.10.2000 is one of the 26 such field level attached offices under Department of Telecommunications. Thus it has completed more than ten years of its existence by close of 31.3.2011. As such in pursuance to the letter of headquarter, it has started compiling Annual Reports starting with the financial year 2006-07 for internal circulations. The report contains in nutshell all the areas of activities, the jurisdiction, functions and performance of the office. It also contains resources, infrastructure, man power etc. with which the office functions. The report has been compiled to the extent possible in the sections as per the guidelines issued by the head quarters in this regard.

The jurisdiction of the office covers six circles of BSNL as regards settlement retirement benefits of BSNL employees and USO activities of west Bengal and sikkim. Besides, the office is also entrusted with the collection of license fee from the telecom license holder and spectrum charges from mobile service providers in the west Bengal service area. 1 A Jurisdiction as regards retirement benefits: The office of CCA,WBC is entrusted to settle the retirement benefits, pension matters of following six BSNL Circles:

1. West Bengal Telecom Circle (WBTC) covering the states of west Bengal and sikkim.

2. Eastern Telecom project(ETP) having 7 units located at

Kolkata,Patna,Bhubaneswar and Ranchi.

3. Eastern Telecom Region(ETR) and 9 units located at Kolkata,

Bhubaneswar, Ranchi, Patna, Shillong, Guwahati and Siliguri 4. Telegraph Check office(TCO

5. Telecom Stores(TS) having 6 units located at Kolkata, Jabalpur, Chenai,

Mumbai and new Delhi 6. Telecom factory(TS)having 3 units located at Kolkata, Gopalpur and

kharagpur.

-1-

Page 7: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Telecom License Holders for providing Telecom Services : 

There are  fifteen numbers of license holders for providing telecom services within the West Bengal Telecom Circle  

Sl  Operator  Category of License 

Service Area Prescribed % of License Fee 

1(a)  BSNL,  A & N Circle  Basic  Andman & Nicobar  6.00      CMTS  Andman & Nicobar  8.001(b)  BSNL, CTD, Kolkata  Basic  Kolkata Metro City  8.001(c)  BSNL,  W. B. T.  Circle  Basic  West Bengal & Sikkim  8.00      CMTS  West Bengal & Sikkim  8.001(f)  BSNL, TCO, Kolkata  Basic  WB & Sikkim  8.531(g)  BSNL, TS, Kolkata  Basic  All India  8.531(h)  BSNL,TF, Kolkata  Basic  All India   8.532  Bharti Airtel Ltd  UASL  West Bengal  8.003  Vodafone Essar South Ltd  UASL  West Bengal  8.004  Reliance Communication  UASL‐DT  West Bengal  8.005  Reliance Telecom Ltd  CMTS  West Bengal  8.006  Sistema Shayam Ltd  UASL  West Bengal  8.007  Dishnet Wireless Ltd  UASL  West Bengal  8.008  Idea Cellular Ltd  UASL  West Bengal  8.009  Tata Teleservices Ltd.  UASL‐DT  West Bengal  8.0010  Unitech Wireless Ltd.  UASL  West Bengal  8.0011  Videocon Telecommn Ltd  UASL  West Bengal  8.0013  Alliance Broadband Ltd  ISP‐IT  West Bengal  6.0014  Descon Ltd  ISP‐IT  West Bengal  6.00

15  WBSEDCL  C VSAT  West Bengal  Fixed Amount 

Note: The stipulated percentage of license fee applicable is in on AGR of the USPs. 

2  

Page 8: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Licensees Paying  Spectrum Charges for providing wireless services :‐ 

There are eleven spectrum holders providing wireless services withinWest  Bengal Telecom Circle 

Sl  Operator  Category of License Service Area  Prescribed % of Spectrum Fee 

1  BSNL,  A & N Circle  Basic  Andman & Nicobar  3.00      CMTS  Andman & Nicobar  2.00

2  BSNL,  W. B. T.  Circle  Basic West Bengal & Sikkim  3.00

      CMTS West Bengal & Sikkim  2.00

3  Bharti Airtel Ltd  UASL West Bengal & Sikkim  4.00

4  Vodafone Essar South Ltd  UASL West Bengal & Sikkim  4.00

5  Reliance Communication  UASL‐DT West Bengal & Sikkim  3.00

6  Reliance Telecom Ltd  CMTS West Bengal & Sikkim  4.00

7  Sistema Shayam Ltd  UASL West Bengal & Sikkim  2.00

8  Dishnet Wireless Ltd  UASL West Bengal & Sikkim  3.00

9  Idea Cellular Ltd  UASL West Bengal & Sikkim  2.00

10 Tata Teleservices Ltd.(CDMA)  UASL‐DT 

West Bengal & Sikkim  3.00

   Tata Teleservices Ltd.(GSM)  UASL‐DT West Bengal & Sikkim  4.00

11  Unitech Wireless Ltd.  UASL West Bengal & Sikkim  3.00

12 Videocon Telecommunication Ltd  UASL 

West Bengal & Sikkim  3.00

Page 9: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Licensees Providing internet service under O/o‐the CCA, W.B. Circle : 

Sl  Name of Operator  Agreement No  B. G. Amount 1  Descon Ltd  820‐439/08‐LR dt. 20.03.2008 

48000002  Descon Ltd  820‐996/08‐LR dt. 20.03.2008 3  Alliance Broadband Service Pvt Ltd  820‐737/2004‐LR dt. 12.04.2005  36800004  Siliguri Internet Cable TV Pvt Ltd  820‐1077/09‐LR dt 04.05.2010  21000005  Orange Networks(P) Ltd  820‐758/03‐LR DT. 07.06.2004  3000006  PCM Netwings Communication Ltd  820‐714/2003‐LR DT. 24.06.2003  3000007  Cable Combine Communication   820‐730/2003‐LR DT. 12.09.2003  300000

8 Versatile Darjeeling Broadband (P) Ltd 

820‐874/05‐LR dt. 02.01.2006     300000

3  

Page 10: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER II: RESOURCE OF THE OFFICE ANDINFRASTRUCTURE AVAILABLE

1. LOCATION OF THE OFFICE AND SPACE AVAILABLE

This Office is presently functioning from two places:

i) In the CPWD Building at 8,Esplanade (EAST) in 2nd,3rd and 4th Floors, Kolkata -700 069 occupying approximately 10000 above square feet.

ii) In the TCO Building (Ground Floor and First Floor) 33,BBD Bag (South), Kolkata 700 001 occupying approximately 2500 square feet.

The Administration, Accounts sections of the office and Division-II, III, V and VI dealing with settlement of pension cases of ETP, ETR, Telecom Stores and Telecom Factories respectively functions at 8, Esplanade East, Kolkata – 700 069 and Division-I and IV dealing with settlement of pension cases of WBTC and TCO functions at 33, BBD Bag (South), Kolkata – 700 001.

2. Manpower (As on 31.03.2011)

The cadre wise sanctioned strength and working strength of the office as on 31.03.2011 is shown in the table below:

Cadre Sanctioned

Strength

Actual

no of

persons

working

Group

A

9 4

Group

B

26 12

Group

C

103 66

Group

D

23 09

Page 11: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Total 161 91

4

LIST OF OFFICERS WITH THEIR CONTACT NUMBERS

Sl. No.

Name Designation Office Tele. No FAX No

1 Sri Kamalakanta Panda

CCA

2213-5316 2213-5318

2 Sri Dipankar Mahto Jt. CCA (USOF)

2213-7043 2213-7044

3 Sri R.K. Chattopadhyay

Jt. CCA(Admn)

2231-8965 2231-5456

4 Sri Barun Kr. Kundu Com.A.O(Admn & Accounts)

2231-6318 2231-6488

5 Sri Gopinath Chandra

Com.A.O(Pen &GPF)

Div-II,III,V,VI

2231-6369 -

6 Sri Debashis Roy Com.A.O(LF/USOF)

2213-5315 -

7 Sri Debajyoti Bhattacharyya

Com.A.O(TA, Medical,Pay Bill)

2231-6316 -

Page 12: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

8 Smt Panchali Paul Com.A.O(Pen)Div-I

2231-5457 2231-5254

9 Sri Pulak Sinha Com.A.O(GPF/LSPC)

2242-1224 2231-5488

10 Sri S.P.Banerjee Com.A.O(Div_I)

2242-1224 2231-5488

11 Sri T.K. Dutta Asstt Com A.O(GPF/LSPC)

2231-5457

12 Sri S.K. Hait Asstt Com A.O( Cash &A/C)

2231-6320

Page 13: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER III : FUNCTIONS

The following are the main functions in a nutshell performed by this office:

1) Collection of License Fee (LF) from the Telecom License holders.

2) Collection of Spectrum Charges (SC) from the mobile service providers in West Bengal and Sikkim.

3) Realization & Accounting of Revenue of Captive VSAT License Fee.

4) Maintenance and keeping custody of Financial Bank Guarantees.

5) AGR Verification allowing deductions in Revenue Statements filed by them for assessment of License Fee.

6) Settlement of Subsidy under USO. 7) Inspections of Village Public Telephones, Rural Community Phones and RDELs.

8) Collection of Pension Contribution and Leave Salary contributions from BSNL Units. 9) Settlement of Retirement Benefits and Pension Cases.

10) Audit of Pension Vouchers. 11) Collection of GPF contribution & recoveries and Maintenance of GPF Broad Sheets.

12) Reimbursement of payments made by BSNL in respect of GPF advances and withdrawal to

the employees every month.

13) Accounting and Budgetary control of Wireless Monitoring Organization and Vigilance Telecom Monitoring Cell, West Bengal.

14) Legal , RTI, Arbitration and other functions.

7

Page 14: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

  CHAPTER‐IV: REVENUE COLLECTION  (A) Collection of Licence Fee(LF) 

During the year 2009‐10 License Fee collected from BSNL and other Private Basic/Cellular Operators stood at Rs. 250.76 Crores. During the current year 2010‐11 amount collected is Rs. 272.65  Crores.  Party wise collection of LF during the last two years is given below :‐ Sl  Operator  Category 

of License 

Amount Collected during the FY 2010‐11 

Amount Collected during the FY 2009‐10 

1  i)BSNL, WB & AN Circle  Basic  394373752  504501643      CMTS  213404190  2374942472  Bharti Airtel Ltd  UASL  638555651  5603562113  Vodafone Essar South Ltd  UASL  904652533  7463368354  Reliance Communication  UASL‐DT  85657274  978642865  Reliance Telecom Ltd  CMTS  97718274  1142378126  Sistema Shayam Ltd  UASL  52891000  165280007  Dishnet Wireless Ltd  UASL  131289059  1013456138  Idea Cellular Ltd  UASL  44027394  64571319  Tata Teleservices Ltd.  UASL‐DT  132112816  120292363

10  Unitech Wireless Ltd.  UASL  29626385  112281811  Videocon Telecommn Ltd  UASL  206994  012  WBSEB  VSAT  0  870000

13  Alliance Broadband Ltd  ISP‐IT  1823225 

Under O/o‐the Pr.CCA, 

Kolkata Circle

14  Descon Ltd  ISP‐IT  222206 

Under O/o‐the Pr.CCA, 

Kolkata Circle

Page 15: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

15  IKF Technologies Ltd  ISP‐IT Under O/o‐the Pr.CCA, Kolkata 

Circle 288232

   Total     2726560753  2507695191

8  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 16: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 (B) Collection of Spectrum Charges(SC) Spectrum Charges collected from BSNL and othr Private Cellular Operators in 2010‐11 was Rs.99.90(approx.)Crores as against Rs.92.70(approx.)Crores collected in 2009‐10. Party wise               collection of Spectrum Charges in last two years are given below :‐ Sl  Operator  Category 

of License 

Amount Collected during the FY 2010‐11 

Amount Collected during the FY 2009‐10 

1  BSNL, WB   GSM  132000000 130940000    CDMA  5787000 2893000 2  BSNL, A &N Circle  GSM  16441327 8756866 

   CDMA  480070 322549 3  Bharti Airtel Ltd  GSM  263137883 265653031 

4 Vodafone Essar South Ltd  GSM  368490794 352452588 

5 Reliance Communication  CDMA  32916603 29858823 

6  Reliance Telecom Ltd  GSM  58386073 47751062 7  Sistema Shayam Ltd  CDMA  22287000 3953000 8  Dishnet Wireless Ltd  GSM  34426278 33391940 9  Idea Cellular Ltd  GSM  12756297 1985531 

10  Tata Teleservices Ltd.  GSM  18238501 2309628    Tata Teleservices Ltd.  CDMA  22486444 46330165 11  Unitech Wireless Ltd.  GSM  11076082 393492 

12 Videocon Telecommn Ltd  GSM  89431   

   Total     998999783 926991675 

9  

 

Page 17: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

 

 

 

 

 

 

Page 18: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

C) Collection of Pension and Leave Salary Contribution

Pension Contribution

(Amount in Rupees)

Sl. No.

Unit Amount of Collection in the FY 09-10

Amount of Collection in the FY 10-11

1 Division I: WBC 459563306 611454093

2 Division II: ETP 41005580 42025771

3 Division III: ETR 114608928 112157277

4 Division IV: TCO 3649972 11679189

5 Division V: TS 16331330 31474676

6 Division VI: TF 42616771 47427409

Total 677775887 856218415

Leave Salary Contribution (Amount in Rupees)

Sl. No.

Unit Amount of Collection in the FY 09-10

Amount of Collection in the FY 10-11

1 Division I: WBC 2686577 2372848

2 Division II: ETP 579812 635787

3 Division III: ETR 773280 965882

4 Division IV: TCO - -

5 Division V: TS 82496 87840

6 Division VI: TF 981162 214707

Total 5103327 4277064

D) Receipt of GPF Contribution and Recoveries

Sl. Division / Office No of Accounts Amount Collected Closing Balance

Page 19: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

No. in FY 2010-11

1 West Bengal Circle (Div – I) 7385 799660076 Not yet received

2 ETP (Div – II) 807 75257393 317390966

3 ETR (Div – III) 2122 217610670 930580121

4 TCO (Div – IV) 119 15501699 77613874

5 T. Store (Div. – V) 300 38390146 141061881

6 T. Factory (Div – VI) 1188 109645237 109895237

7 CCA, WBC & WMO//IWMS/ WMS/VTM 92 9241866 54109941

Total 12013 1265307087 1630652020

10

Page 20: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

E) Maintenance and custody of Bank Guarantee.

The office has received Bank guarantees from the private telecom license holders aggregating to ` 234.17 crores. Operator – wise detail of Bank Guarantees being maintained as on 31.03.2011 is given in the table below:

Sl.No. Name of the Company Bank Guarantee No Validity up- to BG Amount

( ` )

1 Tata Teleservices Ltd. 49580IGL0003005 30.11.11 3,83,46,225

0006BG00061807 31.05.11 3,69,64,498

2 Reliance Communications Ltd.

003GM0106G08130 23.01.12 72,00,000

003GM0106G08131 16.01.12 3,19,00,000

3034206BG0600090 18.07.11 3,61,00,000

0999511BG0000444 21.02.12 1,32,00,000

3 Vodafone Essar South Ltd.

FNGBOM070164 12.02.12 23,36,44,687

FNGBOM040290 18.03.12 10,28,71,417

No. 171020220425 19.11.11 11,29,67,089

4 Bharti Airtel Ltd.

FNGNDH050007 08.02.12 2,50,00,000

0007BG00079406 09.08.12 20,76,82,839

003GT01081370003 15.05.11 9,40,51,625

5 Reliance Telecom Ltd. 2005004IBGF0080 18.04.12 5,07,50,000

2175ILG031508 18.04.12 2,27,85,921

6 Dishnet Wireless Ltd. 0999909BG0000286 18.04.12 7,04,03,129

Page 21: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

7 WB State Electricity Dist. Co.

SL-III/KOL/05/03 04.09.11 30,00,000

8. Descon Ltd.

14/2010 03.03.12 1,00,000

011/2009 31.03.12 3,00,000

15/2010 03.03.12 20,00,000

002/2008 31.03.12 1,00,000

16/2010 31.03.12 20,00,000

9. Unitech Wireless (East) Ltd.

0999609BG0002916 09.01.12 25,00,00,000

10. Idea Cellular Ltd. 07BG219 09.01.12 25,00,00,000

11. Sistema Shyam Teleservices Ltd.

0007BG00004411 09.08.11 25,00,00,000

12. Loop Telecom Ltd. 0999608BG0000129 09.01.12 25,00,00,000

13. Versatile Darjeeling Broad Band Pvt. Ltd.

34/1 24.08.11 3,00,000

11

Page 22: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Sl.No. Name of the Company Bank Guarantee No Validity up- to BG Amount

(Rs.)

14. Cable Combine Communication Pvt. Ltd.

28/5 25.07.11

3,00,000

15. Lalco 2003/1 14.09.11 3,00,000

16. Orange Networks (P) Ltd.

014GT01083000135 12.11.11

3,00,000

17. PCM Netwings Communications Pvt. Ltd.

0412608BG0000163

08.04.12 3,00,000

18. Alliance Broadband Services Pvt. Ltd.

1600138/03 18.09.12 10,00,000

11210000706 20.05.11 2,00,000

BG112110000107 20.05.11 69,000

40241FIBG100004 14.07.11 1,00,000

40241PEBG100002 14.07.12 20,00,000

11210000308 20.05.11 48,000

40241F1BG100002 25.05.11 2,50,000

40241F1BG100007 25.05.11 13,000

19.

New Age Satellite Services Pvt. Ltd.

(Formerly Investwell Merchants Pvt. Ltd.)

CBG 200800311 15.04.12 30,00,000

CBG 200800312 25.10.11 50,00,000

CBG 200800313 25.04.12 10,00,000

20. Videocon 0999608BG0000019 09.01.12 25,00,00,000

Page 23: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Telecommunications Ltd.

21. Siliguri Internet and Cable TV P. Ltd.

34-06 29.03.12 1,00,000

34-07 29.03.12 20,00,000

Total 2,34,17,44,301

12

Page 24: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CGEGIS – 80 284964 ‐ ‐ ‐ ‐ ‐

GPF (Final Payment)

157082116 14673344 47806226 6334740 15399717 34092603

GPF (Transfer) 38019608 9462053 30389723 1512785 4003130 13052078

      

 

                                                                         13 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

Page 25: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER‐VI:     UNIVERSAL SERVICE OBLIGATIN ACTIVITIES       

 

        Break‐up of Subsidy Payment made to USPs  

 

Financial Year Operator Front Loaded O&M Total

2006‐07

BSNL 490955250 239883153 730838403

RCL 54328638 2337244 56665882

Total 545283888 242220397 78,75,04,285

2007‐08

BSNL 91993378 60401709 152395087

RCL 100134864 4506136 104641000

Total 192128242 64907845 25,70,36,087

2008‐09

BSNL 400242 65540408 65940650

RCL 42979546 12935055 55914601

Total 43379788 78475463 121855251

2009‐10

BSNL 20031560 117639300 137670860

RCL 33485194 17733996 51219190

Total 53516754 135373296 188890050

2010‐11

BSNL 15589270 58247807 73837077

RCL ‐ ‐ ‐

VESL ‐ 973406 973406

Total 15589270 59221213 74810483

 

 

              Activity‐wise Disbursement of Subsidy Claims in 2010‐2011 

Page 26: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

Sl. No

Activity USP Amount Disbursed

Break up of Disbursement

West Bengal Sikkim

1 OPEX BSNL 4264095 4242595 21500

2 MARR‐B  BSNL 167234 167234 ‐

3 MARR‐A      BSNL 24380314 24310489 69825

4 RCP BSNL/RCL 113350 113350 ‐

5 Uncovered  Ph‐II

 BSNL 7710408 7243151 467257

6 RDEL‐B BSNL/RCL 51973 51973 ‐

7 RDEL‐A BSN/RCLL 149663 149663 ‐

8 RDEL‐Ext BSNL/RCL 906896 906896 ‐

9 Mobile Infrastr. BSNL/VODAFONE

14871654 13898248 973406

10 Broadband BSNL 22194896 22025302 169594

Total 74810483 73108901 1701582

 

                                                                                            14   

 

 

Page 27: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

INSPECTION CONDUCTED DURING 2010‐11 

Sl. No. Dates of

Inspection

Category of connection

covered Name of Operator SSA/District/SDCAs covered

1 19.04.2010 Tower BSNL North 24 pgs.

2 25.05.10

to 26.05.10

VPT BSNL Kolkata/Howrah & Hooghly

3 26.05.2010 VPT BSNL Kolkata/24 Pgs.(N)

4 27.05.10

to 30.05.10

VPT BSNL Malda, Raiganj and Coochbehar SSA

5 31.05.10

to 02.06.10

VPT BSNL Kharagpur SSA

6  01.06.2006 VPT BSNL Kolkata/24 Pgs. (S)

7 02.06.10

to 04.06.10

VPT BSNL Asansol/Burdwan and Suri SSA

8 02.06.10

to 03.06.10

VPT BSNL Bankura SSA

9 03.06.10

to 04.06.10

VPT BSNL Behampore/Murshidabad

10 03.06.10

to 04.06.10

VPT BSNL Purulia SSA

11 23.06.2010 Broadband BSNL Kolkata/Hooghly/Chapadanga

12

Page 28: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

    A.  CASH FLOWS 

 

ITEMS  FLOWS IN YEAR             2009‐2010 

FLOWS IN YEAR 2010‐2011 

A. Cash Inflows     i)Dues from BSNL  ‐  ‐ ii) License Fees  2507695191  2726560747 iii) Spectrum Charges  1009245602  901206484 iv) Other Receipt(Receipt under       USO) 

   ‐ 

12288 

Total of A  3516940793  3627779519    B. Cash Outflows 

 

i) Retirement Benefits  791757557  958233384 ii)Payment to BSNL      ‐           ‐ iii)Subsidy Payment under USO. 

196722808  74810483 

iv)Administrative Expenses  52029826  65958178 v) Other Payments  ‐  ‐ Total of B  1040510191  1099002045 Net Flow: A‐B  2476430602  2528777474 

 

 

   18 

 

 

 

 

 

 

   

 

 

 

Page 29: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

     

CHAPTER VIII:AUDIT, INSPECTION AND LEGAL MATTERS 

         AUDIT OF PENSION PAYMENT  VOUCHERS 

 

      Audit of pension vouchers was taken up for the first time in West Bengal  in March, 2006. To begin with audit of pension paid vouchers received from banks  and  HPO were taken up after  preparation of check Registers. Number of cases over payment with amounts detected up to March “11 and amount realized is shown below: 

 

UNIT  NO OF CASES INVOLVED 

AMOUNT INVOLVED 

AMOUNT SO FAR REALISED 

 AMOUNT YET TO BE REALISED 

BANK  143  4933697 2979253 1954444HPO  38  710832 454532 256300  181  5644529 3433785 2210744

   

      CONDUNCT OF AUDIT BY P&T AUDIT 

 

YEAR  OPENING Balance Added during the year 

Settled during the year 

Closing Balance

2008‐09 

26  9 9 26

2009‐10 

26  5 13 18

2010‐11 

N.A  N.A N.A. N.A

 

                                                                             19                     

Page 30: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

  LEGAL CASES(2010‐2011) 

Sl. No. 

Case No  Subject Matter  Court  Status 

1  TA 20 of 2009  Sri Purna Chandra Paul vs UOI & Ors 

CAT,Cal.Bench  Under Process 

2  WPNo.21389(W) of 2009 

Sri Kanak Kanti Chakraborty & Ors‐Vs‐UOI&Ors 

Hon’ble High Court,Kolkata 

Transferred to CAT. 

Case disposed off on 24.01.2011 

3  Titl Appeal No.25/2008 arising out of TS No.117/2001 

Mst Sahanara Begum (Biswas)vs. UOI &Ors 

Ld. Addl.Dist.Judge Court at Kalna,Burdwan,WB 

Pending 

4  WPCT 43/2010  Sri Arabindra Mohanty, GM, BSNL, Kharagpur 

Hon’ble High Court,Kolkata 

Judgment given on 28.07.10 

5  OA No.418/09  Sri Palak Dhari vs UOI& Ors 

CAT,Cal.Bench  Pending 

6  WP NO.16342/09  Sri Saikh Abu Siddik vs UOI & Ors 

Hon’ble High Court,Kolkata 

Pending 

7  OA No.605/09  Sri Samar Kumar Bose vs UOI & Ors 

CAT,Cal.Bench  Pending 

8  OA No.669/09  Sri Subrata Kumar Das,DGM,BSNL, vs UOI&Ors 

CAT,Cal.Bench  Pending 

9  OA No.1019/09  Sri S.N Senapati & Ors vs UOI &Ors 

CAT,Cal.Bench  Pending 

10  WP NO.1316/09 converted to WP No.3150 (W)/10 

Sri Iftekar Ahmed Khan vs The Chairman,BSNL &Ors 

Hon’ble High Court,Kolkata 

Pending 

11  OA No.862 of 2010  Sri Dwaipion Basu  CAT, Kolkata  Case disposed off 

12  Wp No. 337(W) of 2010 

Sri Susanta  Nayak  High Court,Kolkata  Pending 

13  WP NO.4830(W) of 2010 

Sri Prvanjan Krishna Dutta 

High Court,Kolkata  Case disposed off on 21.07.10 

Page 31: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

14  OA No.1243/09  Sri S.K. Narnoli vs.UOI &Ors. 

CAT,Cal.Bench  Judgment pending 

15  TA NO.40/2009  Sri Bindyachal Prasad & Ors 

CAT,Cal.Bench  Pending 

16  OA No.1359/2010  Sri Avijit Basak  CAT,Cal.Bench  Pending 

17  OA No.1390/2010  Sri Sheo Sankar Das  CAT,Cal.Bench  Disposed off on10.01.11 

18  OA No.1938/2010  Sri Ratan Kr. Singh &Ors  CAT,Cal.Bench  Pending 

19  OA No.2349/2010  Sri Babul Chandra Dey  CAT,Cal.Bench  Pending 

20   OA No.2050/2010  Smt Arati Mukherjee  CAT,Cal.Bench  Pending 

21  OA No.188/11  Sri P.K. Sinha  CAT,Cal.Bench  Pending 

22  OA No.633 of 2006  Sri Vivek Sharma  CAT, Bench  Pending 

 

20 

 

 

 

 

 

Page 32: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

EVENTS AND INITIATIVES  

(I) Celebration of Hindi Fortnight: 

  The Hindi Fortnight  for  the year 2010‐11 was  celebrated  in  the O/o  the CCA, WBC  from 14.10.2010  to 28.09.2010. Various programme where organized  like Recitation of Hindi Poem, Drafting and noting  in Hindi  , Hindi Essay writing  , Extempore  speech  etc,  during  the  fortnight.  The  fortnight  celebration  was inaugurated by Smt. Urmimala Singh, CCA, and West Bengal Circle on 14.09.2010 and the closing ceremony held on 28.09.2010 was graced by Sri P.K. Sinha, Chief Vigilance Officer, Damodar Valley Corporation, Kolkata who gave away the prizes and certificates to the winners of various competitions. He encouraged all to use Hindi in their day to day office works. 

II)  Meeting with BSNL for USO: 

  A meeting of BSNL with CCA was held on 12th April, 2010  to discuss and sort out  the  common problems encountered on  settling  the  cases pertaining  to BSNL.  

III) Meetings with IPs and USPs: 

  On  the occasion of  the visit of Smt. Archana G. Gulati,  Jt. Administrator, USOF, New Delhi to the office of CCA, West Bengal Circle a meeting was held on 29.06.2010  with  the  representatives  from  BSNL, WB  Circle  (IP  and  USP),   M/s Vodafone  (IP and USP), and M/s Reliance Telecom  (USP)  to  review  the  status of implementation of the Mobile Infrastructure Phase I scheme and sort out various pending issues between the IP and the USPs.      

 

 

  21   

Page 33: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

      CHAPTER X :  RTI CASES 

 

Sl. No. 

Subject Matter   Information seek by  Receive Date  Status 

1  Payment of 10% gratuity 

Smt Puspa Nema, Jabalpur‐482 002 

07.06.10  Reply furnished 

2  Officers working in CCA, WBC from Pr. CCA downwords. 

A. Nelson Koildoss, Chennai ‐600 089 

11.06.10  Reply furnished 

3  USOF matter  Sri S.K. Sharma,Secretary, forwarded by Dy.Admin(F),USOF Dot/Hq New Delhi. 

30.09.10 Forwarded by DOT/Hq vide letter dt.12.10.10 

Reply furnished 

4  Permanent absorption in DOT as a one time measure 

Sri Prem Singh,Chandigarh forwarded by Director(SEA) & CPIO,DOT/Hq 

21.09.10 forwarded  by  Dot/Hq vide letter dt 08.10.10 

Reply furnished 

5  Permanent absorption in DOT as a one time measure 

Sri Surinder Kumar, Haryana forwarded by Director(SEA) & CPIO,DOT/Hq 

16.09.10 forwarded by DOT/ Hq vide letter dt 08.10.10 

Reply furnished 

6  The subject matter was not legible & hence returned to DOT/Hq. 

Sri N. Lal, Rajasthan.  01.10.10 forwarded by Director(SEA) & CPIO on 20.10.10 

Reply furnished 

7  USOF Matter  Sri Manoj Arya, New Delhi.  12.10.10 forwarded by Dy Admin. Finance USOF on 29.10.10 

Reply furnished 

Page 34: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

8  Permanent absorption in DOT as a one time measure 

Sri Om Prakash, Chandigarh  06.11.10 forwarded by  Director (SEA)& CPIO on 07.12.10 

Reply furnished 

9  Permanent absorption matter 

Sri Durga Rao,  Hyderabad,A.P 

25.11.10 forwarded by Director (SEA) & CPIO on 07.12.10 

Reply furnished 

10  Permanent absorption matter 

Sri Prabir Ganguly ,Kolkata  13.12.10 forwarded by Director (SEA) &CPIO on 30.12.10  

Reply furnished 

11  Pension matters of Gr. B officers absorbed in BSNL 

Sri A. Venkataraman,Ex‐AGM(Admn),Bangalore 

07.01.11 forwarded by Director (Fin)/ CPIO on 08.02.11 

Reply furnished 

 

 

      22 

 

 

 

Page 35: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

C) Collection of Pension and Leave Salary Contribution

Pension Contribution

(Amount in Rupees)

Sl. No.

Unit Amount of Collection in the FY 09-10

Amount of Collection in the FY 10-11

1 Division I: WBC 459563306 611454093

2 Division II: ETP 41005580 42025771

3 Division III: ETR 114608928 112157277

4 Division IV: TCO 3649972 11679189

5 Division V: TS 16331330 31474676

6 Division VI: TF 42616771 47427409

Total 677775887 856218415

Leave Salary Contribution (Amount in Rupees)

Sl. No.

Unit Amount of Collection in the FY 09-10

Amount of Collection in the FY 10-11

1 Division I: WBC 2686577 2372848

2 Division II: ETP 579812 635787

3 Division III: ETR 773280 965882

4 Division IV: TCO - -

5 Division V: TS 82496 87840

6 Division VI: TF 981162 214707

Total 5103327 4277064

D) Receipt of GPF Contribution and Recoveries

Sl. Division / Office No of Accounts Amount Collected Closing Balance

Page 36: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

No. in FY 2010-11

1 West Bengal Circle (Div – I) 7385 799660076 Not yet received

2 ETP (Div – II) 807 75257393 317390966

3 ETR (Div – III) 2122 217610670 930580121

4 TCO (Div – IV) 119 15501699 77613874

5 T. Store (Div. – V) 300 38390146 141061881

6 T. Factory (Div – VI) 1188 109645237 109895237

7 CCA, WBC & WMO//IWMS/ WMS/VTM 92 9241866 54109941

Total 12013 1265307087 1630652020

10

Page 37: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

E) Maintenance and custody of Bank Guarantee.

The office has received Bank guarantees from the private telecom license holders aggregating to ` 234.17 crores. Operator – wise detail of Bank Guarantees being maintained as on 31.03.2011 is given in the table below:

Sl.No. Name of the Company Bank Guarantee No Validity up- to BG Amount

( ` )

1 Tata Teleservices Ltd. 49580IGL0003005 30.11.11 3,83,46,225

0006BG00061807 31.05.11 3,69,64,498

2 Reliance Communications Ltd.

003GM0106G08130 23.01.12 72,00,000

003GM0106G08131 16.01.12 3,19,00,000

3034206BG0600090 18.07.11 3,61,00,000

0999511BG0000444 21.02.12 1,32,00,000

3 Vodafone Essar South Ltd.

FNGBOM070164 12.02.12 23,36,44,687

FNGBOM040290 18.03.12 10,28,71,417

No. 171020220425 19.11.11 11,29,67,089

4 Bharti Airtel Ltd.

FNGNDH050007 08.02.12 2,50,00,000

0007BG00079406 09.08.12 20,76,82,839

003GT01081370003 15.05.11 9,40,51,625

5 Reliance Telecom Ltd. 2005004IBGF0080 18.04.12 5,07,50,000

2175ILG031508 18.04.12 2,27,85,921

6 Dishnet Wireless Ltd. 0999909BG0000286 18.04.12 7,04,03,129

Page 38: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

7 WB State Electricity Dist. Co.

SL-III/KOL/05/03 04.09.11 30,00,000

8. Descon Ltd.

14/2010 03.03.12 1,00,000

011/2009 31.03.12 3,00,000

15/2010 03.03.12 20,00,000

002/2008 31.03.12 1,00,000

16/2010 31.03.12 20,00,000

9. Unitech Wireless (East) Ltd.

0999609BG0002916 09.01.12 25,00,00,000

10. Idea Cellular Ltd. 07BG219 09.01.12 25,00,00,000

11. Sistema Shyam Teleservices Ltd.

0007BG00004411 09.08.11 25,00,00,000

12. Loop Telecom Ltd. 0999608BG0000129 09.01.12 25,00,00,000

13. Versatile Darjeeling Broad Band Pvt. Ltd.

34/1 24.08.11 3,00,000

11

Page 39: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Sl.No. Name of the Company Bank Guarantee No Validity up- to BG Amount

(Rs.)

14. Cable Combine Communication Pvt. Ltd.

28/5 25.07.11

3,00,000

15. Lalco 2003/1 14.09.11 3,00,000

16. Orange Networks (P) Ltd.

014GT01083000135 12.11.11

3,00,000

17. PCM Netwings Communications Pvt. Ltd.

0412608BG0000163

08.04.12 3,00,000

18. Alliance Broadband Services Pvt. Ltd.

1600138/03 18.09.12 10,00,000

11210000706 20.05.11 2,00,000

BG112110000107 20.05.11 69,000

40241FIBG100004 14.07.11 1,00,000

40241PEBG100002 14.07.12 20,00,000

11210000308 20.05.11 48,000

40241F1BG100002 25.05.11 2,50,000

40241F1BG100007 25.05.11 13,000

19.

New Age Satellite Services Pvt. Ltd.

(Formerly Investwell Merchants Pvt. Ltd.)

CBG 200800311 15.04.12 30,00,000

CBG 200800312 25.10.11 50,00,000

CBG 200800313 25.04.12 10,00,000

20. Videocon 0999608BG0000019 09.01.12 25,00,00,000

Page 40: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Telecommunications Ltd.

21. Siliguri Internet and Cable TV P. Ltd.

34-06 29.03.12 1,00,000

34-07 29.03.12 20,00,000

Total 2,34,17,44,301

12

Page 41: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER – V:    SETTLEMENT  AND PAYMENT OF TERMINAL BENEFITS 

   NO OF PENSION CASES SETTLED IN THE YEAR OF 2010‐2011 

Circle Settlement of Retirement Benefits (No. of cases)

Pension

Family Pension Commu

tation

Leave Encashment

DCRG

CGEGIS

GPF (Final Payment)

GPF (Transfer)

WBC 361 51 361 01 412 03 430 38

ETP 16 3 16 ‐ 19 ‐ 19 29

ETR 101 12 101 ‐ 101 ‐ 101 79

TCO 09 ‐ 09 ‐ 09 ‐ 10 03

T. Stores 20 02 20 ‐ 21 ‐ 23 13

T. Factory

56 28 56 ‐ 84 ‐ 81 11

Total 563 96 563 01 646 03 664 173

  SETTLEMENT OF PENSION AND RETIREMENT BENEFIT CLAIMS 

Amount paid in the Yr 2010‐11

Item WBC ETP ETR TCO TS TF

Superannuation Pension

4436781 ‐ 614070 91915 373242 293161

Commuted Value of Pension

152333544 9427501 51622545 3624873 8196929 24328297

Gratuities 205878068 10820727 32124314 4131945 10085756 33333298

Family Pension 473890 ‐ ‐ ‐ ‐ ‐

Leave Salary Encashment

567523 ‐ ‐ ‐ ‐ ‐

Page 42: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CGEGIS – 80 284964 ‐ ‐ ‐ ‐ ‐

GPF (Final Payment)

157082116 14673344 47806226 6334740 15399717 34092603

GPF (Transfer) 38019608 9462053 30389723 1512785 4003130 13052078

      

 

                                                                         13 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

Page 43: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER‐VI:     UNIVERSAL SERVICE OBLIGATIN ACTIVITIES       

 

        Break‐up of Subsidy Payment made to USPs  

 

Financial Year Operator Front Loaded O&M Total

2006‐07

BSNL 490955250 239883153 730838403

RCL 54328638 2337244 56665882

Total 545283888 242220397 78,75,04,285

2007‐08

BSNL 91993378 60401709 152395087

RCL 100134864 4506136 104641000

Total 192128242 64907845 25,70,36,087

2008‐09

BSNL 400242 65540408 65940650

RCL 42979546 12935055 55914601

Total 43379788 78475463 121855251

2009‐10

BSNL 20031560 117639300 137670860

RCL 33485194 17733996 51219190

Total 53516754 135373296 188890050

2010‐11

BSNL 15589270 58247807 73837077

RCL ‐ ‐ ‐

VESL ‐ 973406 973406

Total 15589270 59221213 74810483

 

 

              Activity‐wise Disbursement of Subsidy Claims in 2010‐2011 

Page 44: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

Sl. No

Activity USP Amount Disbursed

Break up of Disbursement

West Bengal Sikkim

1 OPEX BSNL 4264095 4242595 21500

2 MARR‐B  BSNL 167234 167234 ‐

3 MARR‐A      BSNL 24380314 24310489 69825

4 RCP BSNL/RCL 113350 113350 ‐

5 Uncovered  Ph‐II

 BSNL 7710408 7243151 467257

6 RDEL‐B BSNL/RCL 51973 51973 ‐

7 RDEL‐A BSN/RCLL 149663 149663 ‐

8 RDEL‐Ext BSNL/RCL 906896 906896 ‐

9 Mobile Infrastr. BSNL/VODAFONE

14871654 13898248 973406

10 Broadband BSNL 22194896 22025302 169594

Total 74810483 73108901 1701582

 

                                                                                            14   

 

 

Page 45: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

INSPECTION CONDUCTED DURING 2010‐11 

Sl. No. Dates of

Inspection

Category of connection

covered Name of Operator SSA/District/SDCAs covered

1 19.04.2010 Tower BSNL North 24 pgs.

2 25.05.10

to 26.05.10

VPT BSNL Kolkata/Howrah & Hooghly

3 26.05.2010 VPT BSNL Kolkata/24 Pgs.(N)

4 27.05.10

to 30.05.10

VPT BSNL Malda, Raiganj and Coochbehar SSA

5 31.05.10

to 02.06.10

VPT BSNL Kharagpur SSA

6  01.06.2006 VPT BSNL Kolkata/24 Pgs. (S)

7 02.06.10

to 04.06.10

VPT BSNL Asansol/Burdwan and Suri SSA

8 02.06.10

to 03.06.10

VPT BSNL Bankura SSA

9 03.06.10

to 04.06.10

VPT BSNL Behampore/Murshidabad

10 03.06.10

to 04.06.10

VPT BSNL Purulia SSA

11 23.06.2010 Broadband BSNL Kolkata/Hooghly/Chapadanga

12  28.06.2010 Tower BSNL Kolkata/Howrah/Jungle Sufi

13 28.06.2010 Broadband BSNL Kolkata/Howrah/Jagatballabhpur

Page 46: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

14  29.06.2010 Broadband BSNL Kolkata/Howrah/Jagatballabhpur

15 15.07.2010 Tower BSNL Siliguri SSA

16 16.07.2010

Tower BSNL Jalpaiguri SSA

17 06.08.2010 RDEL‐X  R.COM  Islampur SDCA under Raiganj SSA

18 01.09.10 

to 11.09.10 

RDEL‐X  R.COM  Islampur SDCA 

19 01.09.10 

to 05.09.10 

RDEL‐X  R.COM  Adra and Jhalda SDCA 

20 01.09.10 

to 09.09.10 

RDEL‐X  R.COM  Bankura SDCA 

21 01.09.10 

to 10.09.10 

RDEL‐X  R.COM  Khatra & Bankura SDCA 

22 01.09.10 

to 10.09.10 

RDEL‐X  R.COM  Purulia SDCA 

23 01.09.10

to 06.09.10

RDEL‐X  R.COM  Malda SDCA 

24 01.09.10

to 06.09.10

RDEL‐X  R.COM  Malda SDCA 

25 04.10.10 

to 06.10.10 

RDEL‐X  R.COM  Khatra SDCA

26  06.10.2010 Tower BSNL Bankura SSA

15

Construction of Towers and provision of connections under Rural Mobile Scheme in  West Bengal and Sikkim 

Page 47: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Cluster No. Name of IP District

No. of Towers to be installed

No. of Towers installed by 31.03.2011

66 Vodafone (VESL) East Sikkim 2 2

West Sikkim 4 480 BSNL Bardhaman 6 6

Birbhum 11 11 Murshidabad 14 14 Uttar Dinajpur 13 13 Dakshin Dinajpur 10 10 Nadia 10 10 Malda 10 10

Darjeeling 3 2

Jalpaiguri 1 1

81 BSNL Haora 1 1

Hugli 1 1

North 24 Pgs. 10 10

South 24 Pgs. 19 18

Medinipur 37 35 Bankura 11 11 Purulia 10 10Note : * 1 site dropped in cluster 80 & ** 3 sites dropped in cluster‐81. 

 

Page 48: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

    CHAPTER VII: CASH  FLOW  MANAGEMENT  

                           BUDGET ALLOTMENT AND EXPENDITURE 

Head of Accounts  Budget allotment 

during 2010‐2011 

Actual Expenditure during 2010‐

2011                                     A               B           C 

 34510009101

   

(01) Salaries  49354000 48820431(02) Wages  0 0(03)  OTA  0 0(04) Medical Treatment  161000 152176(05) Domestic Travel Expenses  855000 624680(06) Foreign Travel Expenses  0 0(07) Office Expenses  3318000 2954852(08)Rent, Rates & Taxes  0 0(09)  Publication  0 0(10) Other Administrative  Expenses  0 0(11) Advertisement and public  74000 73535(12) Professional Charges  13060000 13048660(13) Other Charges  0 0(14) Information Technology  343000 283844  TOTAL  67165000 65958178

                                             

                                                   BANK  RECONCILIATION 

                                     Cheques issued during the year 2010‐2011 

        Issued                        Cleared              Outstanding 

Total No. 

Total Amount 

Total No.  Total Amount  Total  No.  Total Amount 

3145  1821408838  3110  1816444408  35  4964430                                    Cheques  received during the year 2010‐2011 

 

Issued                      Cleared  Outstanding 

Total No. 

Total Amount 

Total No.  Total Amount  Total  No.  Total Amount 

989  6018615960  989  6018615960  0  0  

     17 

Page 49: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

    A.  CASH FLOWS 

 

ITEMS  FLOWS IN YEAR             2009‐2010 

FLOWS IN YEAR 2010‐2011 

A. Cash Inflows     i)Dues from BSNL  ‐  ‐ ii) License Fees  2507695191  2726560747 iii) Spectrum Charges  1009245602  901206484 iv) Other Receipt(Receipt under       USO) 

   ‐ 

12288 

Total of A  3516940793  3627779519    B. Cash Outflows 

 

i) Retirement Benefits  791757557  958233384 ii)Payment to BSNL      ‐           ‐ iii)Subsidy Payment under USO. 

196722808  74810483 

iv)Administrative Expenses  52029826  65958178 v) Other Payments  ‐  ‐ Total of B  1040510191  1099002045 Net Flow: A‐B  2476430602  2528777474 

 

 

   18 

 

 

 

 

 

 

   

 

 

 

Page 50: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 

     

CHAPTER VIII:AUDIT, INSPECTION AND LEGAL MATTERS 

         AUDIT OF PENSION PAYMENT  VOUCHERS 

 

      Audit of pension vouchers was taken up for the first time in West Bengal  in March, 2006. To begin with audit of pension paid vouchers received from banks  and  HPO were taken up after  preparation of check Registers. Number of cases over payment with amounts detected up to March “11 and amount realized is shown below: 

 

UNIT  NO OF CASES INVOLVED 

AMOUNT INVOLVED 

AMOUNT SO FAR REALISED 

 AMOUNT YET TO BE REALISED 

BANK  143  4933697 2979253 1954444HPO  38  710832 454532 256300  181  5644529 3433785 2210744

   

      CONDUNCT OF AUDIT BY P&T AUDIT 

 

YEAR  OPENING Balance Added during the year 

Settled during the year 

Closing Balance

2008‐09 

26  9 9 26

2009‐10 

26  5 13 18

2010‐11 

N.A  N.A N.A. N.A

 

                                                                             19                     

Page 51: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

  LEGAL CASES(2010‐2011) 

Sl. No. 

Case No  Subject Matter  Court  Status 

1  TA 20 of 2009  Sri Purna Chandra Paul vs UOI & Ors 

CAT,Cal.Bench  Under Process 

2  WPNo.21389(W) of 2009 

Sri Kanak Kanti Chakraborty & Ors‐Vs‐UOI&Ors 

Hon’ble High Court,Kolkata 

Transferred to CAT. 

Case disposed off on 24.01.2011 

3  Titl Appeal No.25/2008 arising out of TS No.117/2001 

Mst Sahanara Begum (Biswas)vs. UOI &Ors 

Ld. Addl.Dist.Judge Court at Kalna,Burdwan,WB 

Pending 

4  WPCT 43/2010  Sri Arabindra Mohanty, GM, BSNL, Kharagpur 

Hon’ble High Court,Kolkata 

Judgment given on 28.07.10 

5  OA No.418/09  Sri Palak Dhari vs UOI& Ors 

CAT,Cal.Bench  Pending 

6  WP NO.16342/09  Sri Saikh Abu Siddik vs UOI & Ors 

Hon’ble High Court,Kolkata 

Pending 

7  OA No.605/09  Sri Samar Kumar Bose vs UOI & Ors 

CAT,Cal.Bench  Pending 

8  OA No.669/09  Sri Subrata Kumar Das,DGM,BSNL, vs UOI&Ors 

CAT,Cal.Bench  Pending 

9  OA No.1019/09  Sri S.N Senapati & Ors vs UOI &Ors 

CAT,Cal.Bench  Pending 

10  WP NO.1316/09 converted to WP No.3150 (W)/10 

Sri Iftekar Ahmed Khan vs The Chairman,BSNL &Ors 

Hon’ble High Court,Kolkata 

Pending 

11  OA No.862 of 2010  Sri Dwaipion Basu  CAT, Kolkata  Case disposed off 

12  Wp No. 337(W) of 2010 

Sri Susanta  Nayak  High Court,Kolkata  Pending 

13  WP NO.4830(W) of 2010 

Sri Prvanjan Krishna Dutta 

High Court,Kolkata  Case disposed off on 21.07.10 

Page 52: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

14  OA No.1243/09  Sri S.K. Narnoli vs.UOI &Ors. 

CAT,Cal.Bench  Judgment pending 

15  TA NO.40/2009  Sri Bindyachal Prasad & Ors 

CAT,Cal.Bench  Pending 

16  OA No.1359/2010  Sri Avijit Basak  CAT,Cal.Bench  Pending 

17  OA No.1390/2010  Sri Sheo Sankar Das  CAT,Cal.Bench  Disposed off on10.01.11 

18  OA No.1938/2010  Sri Ratan Kr. Singh &Ors  CAT,Cal.Bench  Pending 

19  OA No.2349/2010  Sri Babul Chandra Dey  CAT,Cal.Bench  Pending 

20   OA No.2050/2010  Smt Arati Mukherjee  CAT,Cal.Bench  Pending 

21  OA No.188/11  Sri P.K. Sinha  CAT,Cal.Bench  Pending 

22  OA No.633 of 2006  Sri Vivek Sharma  CAT, Bench  Pending 

 

20 

 

 

 

 

 

Page 53: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

From CCA’s Desk

It gives me immense pleasure to release the Annual Report of the O/o

Controller of Communication Accounts, West Bengal Circle for the

financial year 2010-11. The Office has completed more than ten years of its

existence. During this decade all efforts have been made for maintaining

transparency and efficiency in its functioning and periodically come out

with detail reports on its functioning in various areas of activities. The

issue of Annual Reports is one such effort in that direction. Following the

guidelines issued by the DoT Headquarters, we tried our best to present the

reports in an organized way covering all areas of its functions including

updated statistical reports since inception of the office. Besides, attempts

have been made to include detail information pertaining to the circles

under jurisdiction of this office. Further, wherever it is felt desirable,

information and analytical reports have been presented with graphs and

diagrams in a precise way.

I take this opportunity to sincerely express my heartfelt gratitude to

the Officers and staff of this office for extending their sincere cooperation.

We also extend our sincere thanks to the senior officers of DoT for their

valuable guidance, cooperation and encouragement without which the

Annual Report would not have come out in the form as desired.

We invite suggestions, if any, for improvements in the subsequent

Report etc.

Page 54: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Sd/- K. Panda

Contents

1 Introduction

1-3

2 Resources of the Office and Infrastructures

4-6

3 Functions

7

4 Revenue Collections and Other Receipts

8-9

5 Settlement and Payment of Terminal Benefits

10-13

6 USO: Settlement of Subsidy Claims

14-16

7 Cash Flow Management

17-18

8 Audit, Inspection and Legal Matter

19-20

Page 55: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

9 Events and Initiatives

21

10 RTI Cases

22

Page 56: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER I : INTRODUCTION

The Office of controller of communication Accounts, West Bengal Circle which came into existence with effect of 01.10.2000 is one of the 26 such field level attached offices under Department of Telecommunications. Thus it has completed more than ten years of its existence by close of 31.3.2011. As such in pursuance to the letter of headquarter, it has started compiling Annual Reports starting with the financial year 2006-07 for internal circulations. The report contains in nutshell all the areas of activities, the jurisdiction, functions and performance of the office. It also contains resources, infrastructure, man power etc. with which the office functions. The report has been compiled to the extent possible in the sections as per the guidelines issued by the head quarters in this regard.

The jurisdiction of the office covers six circles of BSNL as regards settlement retirement benefits of BSNL employees and USO activities of west Bengal and sikkim. Besides, the office is also entrusted with the collection of license fee from the telecom license holder and spectrum charges from mobile service providers in the west Bengal service area. 1 A Jurisdiction as regards retirement benefits: The office of CCA,WBC is entrusted to settle the retirement benefits, pension matters of following six BSNL Circles:

1. West Bengal Telecom Circle (WBTC) covering the states of west Bengal and sikkim.

2. Eastern Telecom project(ETP) having 7 units located at

Kolkata,Patna,Bhubaneswar and Ranchi.

3. Eastern Telecom Region(ETR) and 9 units located at Kolkata,

Bhubaneswar, Ranchi, Patna, Shillong, Guwahati and Siliguri 4. Telegraph Check office(TCO

5. Telecom Stores(TS) having 6 units located at Kolkata, Jabalpur, Chenai,

Mumbai and new Delhi 6. Telecom factory(TS)having 3 units located at Kolkata, Gopalpur and

kharagpur.

-1-

Page 57: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Telecom License Holders for providing Telecom Services : 

There are  fifteen numbers of license holders for providing telecom services within the West Bengal Telecom Circle  

Sl  Operator  Category of License 

Service Area Prescribed % of License Fee 

1(a)  BSNL,  A & N Circle  Basic  Andman & Nicobar  6.00      CMTS  Andman & Nicobar  8.001(b)  BSNL, CTD, Kolkata  Basic  Kolkata Metro City  8.001(c)  BSNL,  W. B. T.  Circle  Basic  West Bengal & Sikkim  8.00      CMTS  West Bengal & Sikkim  8.001(f)  BSNL, TCO, Kolkata  Basic  WB & Sikkim  8.531(g)  BSNL, TS, Kolkata  Basic  All India  8.531(h)  BSNL,TF, Kolkata  Basic  All India   8.532  Bharti Airtel Ltd  UASL  West Bengal  8.003  Vodafone Essar South Ltd  UASL  West Bengal  8.004  Reliance Communication  UASL‐DT  West Bengal  8.005  Reliance Telecom Ltd  CMTS  West Bengal  8.006  Sistema Shayam Ltd  UASL  West Bengal  8.007  Dishnet Wireless Ltd  UASL  West Bengal  8.008  Idea Cellular Ltd  UASL  West Bengal  8.009  Tata Teleservices Ltd.  UASL‐DT  West Bengal  8.0010  Unitech Wireless Ltd.  UASL  West Bengal  8.0011  Videocon Telecommn Ltd  UASL  West Bengal  8.0013  Alliance Broadband Ltd  ISP‐IT  West Bengal  6.0014  Descon Ltd  ISP‐IT  West Bengal  6.00

15  WBSEDCL  C VSAT  West Bengal  Fixed Amount 

Note: The stipulated percentage of license fee applicable is in on AGR of the USPs. 

2  

Page 58: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Licensees Paying  Spectrum Charges for providing wireless services :‐ 

There are eleven spectrum holders providing wireless services withinWest  Bengal Telecom Circle 

Sl  Operator  Category of License Service Area  Prescribed % of Spectrum Fee 

1  BSNL,  A & N Circle  Basic  Andman & Nicobar  3.00      CMTS  Andman & Nicobar  2.00

2  BSNL,  W. B. T.  Circle  Basic West Bengal & Sikkim  3.00

      CMTS West Bengal & Sikkim  2.00

3  Bharti Airtel Ltd  UASL West Bengal & Sikkim  4.00

4  Vodafone Essar South Ltd  UASL West Bengal & Sikkim  4.00

5  Reliance Communication  UASL‐DT West Bengal & Sikkim  3.00

6  Reliance Telecom Ltd  CMTS West Bengal & Sikkim  4.00

7  Sistema Shayam Ltd  UASL West Bengal & Sikkim  2.00

8  Dishnet Wireless Ltd  UASL West Bengal & Sikkim  3.00

9  Idea Cellular Ltd  UASL West Bengal & Sikkim  2.00

10 Tata Teleservices Ltd.(CDMA)  UASL‐DT 

West Bengal & Sikkim  3.00

   Tata Teleservices Ltd.(GSM)  UASL‐DT West Bengal & Sikkim  4.00

11  Unitech Wireless Ltd.  UASL West Bengal & Sikkim  3.00

12 Videocon Telecommunication Ltd  UASL 

West Bengal & Sikkim  3.00

Page 59: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Licensees Providing internet service under O/o‐the CCA, W.B. Circle : 

Sl  Name of Operator  Agreement No  B. G. Amount 1  Descon Ltd  820‐439/08‐LR dt. 20.03.2008 

48000002  Descon Ltd  820‐996/08‐LR dt. 20.03.2008 3  Alliance Broadband Service Pvt Ltd  820‐737/2004‐LR dt. 12.04.2005  36800004  Siliguri Internet Cable TV Pvt Ltd  820‐1077/09‐LR dt 04.05.2010  21000005  Orange Networks(P) Ltd  820‐758/03‐LR DT. 07.06.2004  3000006  PCM Netwings Communication Ltd  820‐714/2003‐LR DT. 24.06.2003  3000007  Cable Combine Communication   820‐730/2003‐LR DT. 12.09.2003  300000

8 Versatile Darjeeling Broadband (P) Ltd 

820‐874/05‐LR dt. 02.01.2006     300000

3  

Page 60: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER II: RESOURCE OF THE OFFICE ANDINFRASTRUCTURE AVAILABLE

1. LOCATION OF THE OFFICE AND SPACE AVAILABLE

This Office is presently functioning from two places:

i) In the CPWD Building at 8,Esplanade (EAST) in 2nd,3rd and 4th Floors, Kolkata -700 069 occupying approximately 10000 above square feet.

ii) In the TCO Building (Ground Floor and First Floor) 33,BBD Bag (South), Kolkata 700 001 occupying approximately 2500 square feet.

The Administration, Accounts sections of the office and Division-II, III, V and VI dealing with settlement of pension cases of ETP, ETR, Telecom Stores and Telecom Factories respectively functions at 8, Esplanade East, Kolkata – 700 069 and Division-I and IV dealing with settlement of pension cases of WBTC and TCO functions at 33, BBD Bag (South), Kolkata – 700 001.

2. Manpower (As on 31.03.2011)

The cadre wise sanctioned strength and working strength of the office as on 31.03.2011 is shown in the table below:

Cadre Sanctioned

Strength

Actual

no of

persons

working

Group

A

9 4

Group

B

26 12

Group

C

103 66

Group

D

23 09

Page 61: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Total 161 91

4

LIST OF OFFICERS WITH THEIR CONTACT NUMBERS

Sl. No.

Name Designation Office Tele. No FAX No

1 Sri Kamalakanta Panda

CCA

2213-5316 2213-5318

2 Sri Dipankar Mahto Jt. CCA (USOF)

2213-7043 2213-7044

3 Sri R.K. Chattopadhyay

Jt. CCA(Admn)

2231-8965 2231-5456

4 Sri Barun Kr. Kundu Com.A.O(Admn & Accounts)

2231-6318 2231-6488

5 Sri Gopinath Chandra

Com.A.O(Pen &GPF)

Div-II,III,V,VI

2231-6369 -

6 Sri Debashis Roy Com.A.O(LF/USOF)

2213-5315 -

7 Sri Debajyoti Bhattacharyya

Com.A.O(TA, Medical,Pay Bill)

2231-6316 -

Page 62: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

8 Smt Panchali Paul Com.A.O(Pen)Div-I

2231-5457 2231-5254

9 Sri Pulak Sinha Com.A.O(GPF/LSPC)

2242-1224 2231-5488

10 Sri S.P.Banerjee Com.A.O(Div_I)

2242-1224 2231-5488

11 Sri T.K. Dutta Asstt Com A.O(GPF/LSPC)

2231-5457

12 Sri S.K. Hait Asstt Com A.O( Cash &A/C)

2231-6320

13 Sri S.K. Shee Asstt Com A.O(Admn)

2231-5255 2213-3666

14 Smt Sumita Roy JAO (Pen)( Div-I) 2242-1214

15 Sri Subhash Saha JAO (Pen) (Div-I) 2242-1214

16 Sri Dulal Bhadra JAO(GPF) (Div –I) 2230-9178

17 Sri Nirmal Sarkar JAO(Pen) ( Div-I) 2242-1214

18 Smt Sima Sarkar JAO(GPF)(Div –I) 2230-9178

5

Page 63: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

Training Programmes attended by the Officers and Staff (during FY 2010-2011)

Sl. No.

Name of Course Name of Participants Group Period

01 Workshop on Revenue Management in CCA Offices

Sri Debasis Roy,Com.A.O “B” 19.04.10 to 23.04.10

02 Workshop on USOF, APAR and RTI

No nomination 27.04.10 to 30.04.10

03 Terminal Benefits including pension Audit and NPS for IP&TAFS officers

Smt Panchalee Paul. Com.A.O

“B” 17.05.10 to21.05.10

04 Workshop on USOF for offices of CCAs

No nomination due to VPT inspections

01.06.10 to 04.06.10

05 In-service course on Office management, report writing and presentation skills for officers of CCAs

Sri Sridam Chandra Ghosh,Com. A.O

“B” 28.06.10 to 02.07.10

06 In –service course on “Terminal Benefits including pension Audit and NPS

Sri Gopinath Chandra, Com.A.O

“B” 21.07.10 to 23.07.10

07 Workshop on Right to Information

Sri Baun Kumar Kundu Com A.O

“B” 28.07.10 to 30.07.10

08 Workshop on Revenue Management

Smt Panchalee Paul. Com.A.O

Sri S.K. Shee,ACAO

Sri Ashis Ghosh,JA

Sri P.K.Modak,JA

“B”

&

“C”

06.09.10 to 08.09.10

08 In-service course on Office No nomination - 20.09.10 to

Page 64: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

management, 24.09.10

09 In-service course on “Effective handling of legal cases

Sri Debasis Roy,Com.A.O “B” 27.09.10 to

29.09.10

10 In –service course on Technology Familiarization

Sri Santanu Basu,Comm.A.O “B” 22.11.10 to24.11.10

11 Workshop on Revenue Management

In CCA Offices

No nomination “B” 29.11.10 to 01.12.10

12 In-service course for Gr.A & B Officers newly posted to CCa offices

No nomination “B” 29.11.10 to 07.12.10

13 In –service course on “Terminal Benefits

Sri Samir kr Hait,ACAO

(did not attend)

“B” 06.12.10 to 08.12.10

14 Training on COMPACT Sri S.Prasad, Jt.CCA

Sri B.K.Kundu, Com A.O

Sri Dipankar Basu,JA

“A”

“B”

“C”

10.01.11 to 12.01.11

15 Workshop on “Evaluation of Shared Mobile Infrastructure Scheme – A Pilot Study”

Sri Dipankar Mahato,Jt.CCA

“A”

03.02.11 to 05.02.11

16 Workshop on “Finance Advice & Redefined Charter of FAs”

Sri R.K. Chattopadhyay, Dy. CCA

“A” 21.02.11 to 25.02.11

17 In-service course on “Office Management & ISO for CCA/Postal Accounts Units”

Sri Gopinath Chandra,Com.A.O

“B” 07.03.11 to 11.03.11

6

Page 65: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

CHAPTER III : FUNCTIONS

The following are the main functions in a nutshell performed by this office:

1) Collection of License Fee (LF) from the Telecom License holders.

2) Collection of Spectrum Charges (SC) from the mobile service providers in West Bengal and Sikkim.

3) Realization & Accounting of Revenue of Captive VSAT License Fee.

4) Maintenance and keeping custody of Financial Bank Guarantees.

5) AGR Verification allowing deductions in Revenue Statements filed by them for assessment of License Fee.

6) Settlement of Subsidy under USO. 7) Inspections of Village Public Telephones, Rural Community Phones and RDELs.

8) Collection of Pension Contribution and Leave Salary contributions from BSNL Units. 9) Settlement of Retirement Benefits and Pension Cases.

10) Audit of Pension Vouchers. 11) Collection of GPF contribution & recoveries and Maintenance of GPF Broad Sheets.

12) Reimbursement of payments made by BSNL in respect of GPF advances and withdrawal to

the employees every month.

13) Accounting and Budgetary control of Wireless Monitoring Organization and Vigilance Telecom Monitoring Cell, West Bengal.

14) Legal , RTI, Arbitration and other functions.

7

Page 66: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

  CHAPTER‐IV: REVENUE COLLECTION  (A) Collection of Licence Fee(LF) 

During the year 2009‐10 License Fee collected from BSNL and other Private Basic/Cellular Operators stood at Rs. 250.76 Crores. During the current year 2010‐11 amount collected is Rs. 272.65  Crores.  Party wise collection of LF during the last two years is given below :‐ Sl  Operator  Category 

of License 

Amount Collected during the FY 2010‐11 

Amount Collected during the FY 2009‐10 

1  i)BSNL, WB & AN Circle  Basic  394373752  504501643      CMTS  213404190  2374942472  Bharti Airtel Ltd  UASL  638555651  5603562113  Vodafone Essar South Ltd  UASL  904652533  7463368354  Reliance Communication  UASL‐DT  85657274  978642865  Reliance Telecom Ltd  CMTS  97718274  1142378126  Sistema Shayam Ltd  UASL  52891000  165280007  Dishnet Wireless Ltd  UASL  131289059  1013456138  Idea Cellular Ltd  UASL  44027394  64571319  Tata Teleservices Ltd.  UASL‐DT  132112816  120292363

10  Unitech Wireless Ltd.  UASL  29626385  112281811  Videocon Telecommn Ltd  UASL  206994  012  WBSEB  VSAT  0  870000

13  Alliance Broadband Ltd  ISP‐IT  1823225 

Under O/o‐the Pr.CCA, 

Kolkata Circle

14  Descon Ltd  ISP‐IT  222206 

Under O/o‐the Pr.CCA, 

Kolkata Circle

Page 67: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

15  IKF Technologies Ltd  ISP‐IT Under O/o‐the Pr.CCA, Kolkata 

Circle 288232

   Total     2726560753  2507695191

8  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 68: MINISTRY OF COMMUNICATIONS & IT DEPARTMENT … · MINISTRY OF COMMUNICATIONS & IT DEPARTMENT OF TELECOMMUNICATIONS ... Annual Report would not have come out in the form as desired

 (B) Collection of Spectrum Charges(SC) Spectrum Charges collected from BSNL and othr Private Cellular Operators in 2010‐11 was Rs.99.90(approx.)Crores as against Rs.92.70(approx.)Crores collected in 2009‐10. Party wise               collection of Spectrum Charges in last two years are given below :‐ Sl  Operator  Category 

of License 

Amount Collected during the FY 2010‐11 

Amount Collected during the FY 2009‐10 

1  BSNL, WB   GSM  132000000 130940000    CDMA  5787000 2893000 2  BSNL, A &N Circle  GSM  16441327 8756866 

   CDMA  480070 322549 3  Bharti Airtel Ltd  GSM  263137883 265653031 

4 Vodafone Essar South Ltd  GSM  368490794 352452588 

5 Reliance Communication  CDMA  32916603 29858823 

6  Reliance Telecom Ltd  GSM  58386073 47751062 7  Sistema Shayam Ltd  CDMA  22287000 3953000 8  Dishnet Wireless Ltd  GSM  34426278 33391940 9  Idea Cellular Ltd  GSM  12756297 1985531 

10  Tata Teleservices Ltd.  GSM  18238501 2309628    Tata Teleservices Ltd.  CDMA  22486444 46330165 11  Unitech Wireless Ltd.  GSM  11076082 393492 

12 Videocon Telecommn Ltd  GSM  89431   

   Total     998999783 926991675 