Road Sector SMTDP 2014-2017
MINISTRY OF ROADS & HIGHWAYS
SECTOR MEDIUM-TERM DEVELOPMENT PLAN (SMTDP): 2014-2017
DRAFT
July, 2014
Min of Roads and Highways MTDP 2014-2017.doc
i
TABLE OF CONTENTS Page
TABLE OF CONTENTS Page ...................................................................................................... i
LIST OF TABLES ...................................................................................................................................... ii
List of figures .......................................................................................................................................... ii
ABBREVIATIONS AND ACRONYMS ................................................................................................. iii
EXECUTIVE SUMMARY ......................................................................................................................... 1
CHAPTER ONE ......................................................................................................................................... 3 1 PROFILE AND CURRENT SITUATION .....................................................................................................3
1.1 Background............................................................................................................................................................. 3 1.2 Sector Governance ............................................................................................................................................... 3 1.3 Review of Sector Policy Objectives and performance as linked to GSGDA Thematic Areas . 4 1.4 Road Sector Profile ........................................................................................................................................... 18
Network coverage and condition .......................................................................................................................... 18 Institutional capacity .................................................................................................................................................. 19 Sector Financing ........................................................................................................................................................... 22 Programmes with other Sectors ............................................................................................................................ 27 Pro-Poor programmes ............................................................................................................................................... 29 Cross Cutting Issues .................................................................................................................................................... 30 Sector Challenges/Issues .......................................................................................................................................... 31 Status of Indicators ...................................................................................................................................................... 33 Status of Key Development Projects .................................................................................................................... 35
CHAPTER TWO ..................................................................................................................................... 38 2 Development Issues ................................................................................................................................. 38
2.1 Thematic Area 2: Enhancing Competitiveness of Ghana's Private Sector ................................. 38 2.2 Thematic Area 5: Infrastructure and Human Settlement Development .................................... 38 2.3 Thematic Area 6: Human Resource Development, Productivity and Employment .............. 39 2.4 Thematic Area 7: Transparent and Accountable Governance ........................................................ 40
CHAPTER THREE ................................................................................................................................. 45 3 Development Goals and Programmes ............................................................................................... 45
3.1 Development Priorities .................................................................................................................................. 45 3.2 SWOT of Development Programmes ........................................................................................................ 47 3.3 Development Projections 2014-2017 ...................................................................................................... 53 3.4 Sources of Funding ........................................................................................................................................... 57 3.5 Indicative Financial Cost ................................................................................................................................ 58 3.6 Controlling Expenditure ................................................................................................................................. 59
CHAPTER FOUR .................................................................................................................................... 61 4 IMPLEMENTATION OF ANNUAL ACTION PLAN ............................................................................... 61
CHAPTER FIVE ...................................................................................................................................... 74 5 Monitoring and Evaluation Plan .......................................................................................................... 74
5.1 Review of the Monitoring and Evaluation System in the Road Transport sector .................. 74 5.2 Strengthening of the Current M&E System under the Sector Plan ............................................... 75 5.3 Monitoring indicators ..................................................................................................................................... 75
CHAPTER SIX ......................................................................................................................................... 79 6 COMMUNICATION STRATEGY ............................................................................................................... 79
Min of Roads and Highways MTDP 2014-2017.doc
ii
6.1 Media Strategy .................................................................................................................................................... 79 6.2 Facility Visits ....................................................................................................................................................... 80 6.3 Workshop/Seminars ....................................................................................................................................... 80 6.4 Feedback Mechanism ...................................................................................................................................... 80
LIST OF TABLES
Table 1-1 Linkages of Sector Objectives with GSGDA Thematic Areas ...................................................... 4 Table 1-2 Number and Category of Staff Trained in the Road Sector 2010-2013 ....................................... 8 Table 1-3 Annual Road Fund allocation for maintenace (GH¢M) ............................................................... 9 Table 1-4 Performance of Road Sector 2010-2013 ................................................................................ 10 Table 1-5 Road network size and condition 2010-2013 .......................................................................... 19 Table 1-6 Road Sector Personnel ......................................................................................................... 21 Table 1-7 Development Partner's Programmes in the Road Sector ......................................................... 22
Table 1-8 Budgetary Allocation and application of funds 2010-2013 (GH¢M) .......................................... 24
Table 1-9 Sector Challenges 2010-2013 ............................................................................................... 31 Table 1-10 Status of indicators 2010-2013 ........................................................................................... 34 Table 2-1 Sector issues and strategies ................................................................................................. 41 Table 3-1 SWOT of development programmes 2014-2017 ..................................................................... 48 Table 3-2 Projected Expenditure per Activity per Agency (GH'000) ......................................................... 55 Table 3-3 Projected Secured Funds (GH'000)........................................................................................ 57 Table 3-4 Total Projected Secured funds (GH'000) ................................................................................ 57 Table 3-5: Financial Outlay – Road Sector SMTDP 2014-2017 ................................................................ 58 Table 4-1 Programme of Activities for Road sector SMTDP 2014-2017 ................................................... 62 Table 5-1 Monitoring and Evaluation Matrix .......................................................................................... 77
List of figures
Figure 1-1 total road network coverage ................................................................................................ 18 Figure 1-2 Organogram of Road Sector ................................................................................................ 20
Min of Roads and Highways MTDP 2014-2017.doc
iii
ABBREVIATIONS AND ACRONYMS
ADT - Average Daily Traffic AFD - Agence Francaise de Development
AfDB - African Development Bank AO - Area Office
ASR - Ashanti Region AUC - African Union Commission
BADEA - Arab Bank for Economic Development in Africa
BAR - Brong Ahafo Region BDP - Bridge Development Project
BOG - Bank of Ghana BOT - Build, Operate and Transfer
BPEMS - Budgeting and Public Expenditure Management Systems
CBD - Central Business District CDF - Comprehensive Development Framework
CR - Central Region DFR - Department of Feeder Roads
DANIDA - Danish International Development Agency DA - District Assemblies
DFID - Department for International Development
DKK - Danish Kroner DUR - Department of Urban Roads
DVLA - Drivers and Vehicle Licensing Authority DWD - District Works Department
EC - European Commission
ECOWAS - Economic Community of West African States EI - Environmental Impact
EIA - Environmental Impact Assessment EPA - Environmental Protection Authority
ERP - Economic Recovery Programme
EU - European Union FTA - Federal Transport Authority
GAPTE - Greater Accra Passenger Transport Executive GET - Global Environmental Fund
GHA - Ghana Highway Authority GPRS - Ghana Poverty Reduction Strategy
GOG - Government of Ghana
GPRTU - Ghana Private Road Transport Unit GTZ - German Technical Co-operation
HDM - Highway Design Model HIPC - Highly Indebted Poor Country
HoSG - Heads of State and Government
HSIP - Highway Sector Investment Programme ICB - International Competitive Bidding
IDA - International Development Association ITP - Integrated Transport Plan
IRI - International Roughness Index JBIC - Japan Bank for International Co-operation
JBP - Joint Border Post
JICA - Japan International Co-operation Agency KfW - Kreditanstalt fur Wiederaufbau
KNUST - Kwame Nkrumah University of Science and Technology KM - Kilometer
Min of Roads and Highways MTDP 2014-2017.doc
iv
LAD - Liquidated and Ascertained Damages LBT - Labour Based Technology
LVB - Land Valuation Board
MDA - Ministry, Department and Agency MFA - Ministry of Food and Agriculture
MLGRD - Ministry of Local Government and Rural Development MoE - Ministry of Energy
MoF - Ministry of Finance
MoH - Ministry of Health MOT - Ministry of Transport
MPBS - Maintenance Performance Budgeting System MRH - Ministry of Roads and Highways
MTEF - Medium Term Expenditure Framework MTTD - Motor Traffic and Transport Department
NCB - National Competitive Bidding
NDPC - National Development Planning Commission NEPAD - New Partnership for African Development
NMT - Non-Motorised Transport NR - Northern Region
NRSC - National Road Safety Commission
NRTTFC - National Road Transit and Transport Facilitation Committee ODICT-P - Organisational Development and In-Country Training Programme
PLWD - People Living with Disability RFP - Request for Proposal
RFS - Road Fund Secretariat
RFB - Road Fund Board RMI - Road Management Initiative
RPM - Road Prioritisation Methodology RPDC - Road Programme and Donors’ Co-ordination
RSDP - Road Sector Development Programme ROW - Right of Way
ROT - Rehabilitate-Operate-Transfer
SEA - Strategic Environment Assessment SIC - State Insurance Company
SMTDP - Sector Medium Term Development Plan SSATP - Sub-Saharan African Transport Policy
TOR - Terms of Reference
TSDP - Transport Sector Development Programme TSP - Transport Sector Project
UER - Upper East Region US$M - United States Dollar – Million
UTWG - Urban Transport Working Group VIP - Village Infrastructure Project
VPD - Vehicles per Day
WAEMU - West African Economic Monetary Union WR - Western Region
WB - World Bank
1
EXECUTIVE SUMMARY
The Transport Sector has over the years been guided by Government policies and various strategies that are
aimed at effectively providing efficient transportation services that serve as a catalyst for economic growth. The
vision of the transport sector of Ghana is to provide “An integrated, efficient, cost-effective and sustainable
transportation system responsive to the needs of society, supporting growth and poverty reduction and capable
of establishing and maintaining Ghana as a transportation hub of West Africa”. The sector draws guidance from
the National Transport Policy, Integrated Transport plan and National Medium Term Plans rolled out by the
Government every four years towards the achievement of the Government’s Agenda.
In order to realize the vision of the transport sector, the road sector has a mission to “Provide leadership and an
enabling environment for the development and maintenance of Ghana’s road transportation system through
effective policy formulation, market regulation, asset management and service provision”.
The mandate of the Ministry of Roads and Highways is: policy formulation, sector coordination and oversight, and
sector performance monitoring and evaluation of the following broad areas:
Road Infrastructure development and maintenance
Road Maintenance Financing
The agencies operating under the roads Ministry are;
Ghana Highway Authority (GHA)
Department of Feeder Roads (DFR)
Department of Urban Roads (DUR)
Koforidua Training Centre (KTC)
Ghana Road Fund Secretariat
The road sector currently has a network size of about 71,063km across the country. The paved network is 30%
while the rest are unpaved. Feeder roads make up about 60% of the network whiles trunk road and urban roads
have an even share of about 20% each.
The Ghana Shared Growth and Development Agenda (GSGDA) 2010-2013 which is has been reviewed in this
document provided the direction of Government’s development agenda for the period 2010-2013. The Road Sector
Medium Term Development Plan (SMTDP) 2010-2013 was developed based on the themes provided by this
national plan as well as lessons drawn from the sector programmes based on the previous National Plan. With
guidance from the next National Medium term Development Plan ( NMTDP 2014-2017), the sector has developed
this SMTDP (2014-2017) along the same principles as the previous one, taking cognisance of the challenges faced
and drawing lessons to improve performance.
In developing this document, direct and indirect inputs have been made by the agencies under the Ministry, the
NDPC, other Ministry and private stake holders. Several meetings and two major workshops were held to discuss
the data and projections made in this document.
The NMTDP 2014-2017 has seven thematic areas which are the same as the GSGDA 2010-2013 thematic areas.
These areas give the guidelines to the programmes for the sector for the period. The sector identified four out of
the seven areas for which it aligned its programmes. These four areas are;
Thematic area2: Enhancing Competitiveness of Ghana Private Sector
Thematic Area 5: Infrastructure and Human Settlement Development
Thematic Area 6: Human Resource Development, productivity and employment
Thematic Area 7: Transparent and Accountable Governance
A performance review of the sector medium term development plan for the period 2010-2013 shows that although
the sector made strides to improve the network to the level of 60% good, 20%fair and 20% poor, this could not
2
be achieved due to a myriad of reasons among which is inadequate funding and low capacity. The sector however
managed to continuously maintain the road network to an appreciable level and rehabilitated some poor roads
with funds from the Consolidated Fund and Development Partners. The status of some key projects is listed.
The inadequate funds for the sector during the 2010-2013 period has resulted in a backlog of payment arrears
owed to contractors and consultants. This debt is being carried forward to be paid as part of the planned budget
for this 2014-2017 medium term programme.
The development goals, programmes and issues in the road sector and their alignment or otherwise with these
thematic areas of NMTDP 2014-2017 has been thoroughly discussed. Strategies to be adopted to address these
issues are also highlighted. The sector has outlined 22 programmes within the four identified thematic areas of
the NMTDP 2014-2017. In implementing its programmes, priority will be given to nine major areas first among
these is asset preservation. A detailed SWOT analysis of the sector’s programmes has been outlined to guide the
implementation of this medium term programme
The budget for the four year period have been critically analysed and the projections have also been made to
ensure that the programme is achievable. The table below show the summary of the indicative budget for the
period 2014-2017
FINANCIAL OUTLAY (GH'000)
2014 2015 2016 2017 TOTAL
% of
total
Prog
MRH 10,333.64 11,510.65 11,902.01 12,497.11 46,243.41 1%
GHA 1,464,186.42 739,452.80 795,598.39 835,378.31 3,834,615.92 50%
DFR 746,257.56 305,584.36 322,498.80 338,623.74 1,712,964.45 23%
DUR 885,829.33 353,092.39 377,279.51 396,143.49 2,012,344.73 26%
TOTAL 3,106,606.95 1,409,640.20 1,507,278.71 1,582,642.65 7,606,168.51 100%
TOTAL SECURED
FUNDS 1,019,646.75 775,278.01 804,109.20 834,385.36
3,433,419.32 45%
FUNDING GAP 2,086,960.20 634,362.19 703,169.51 748,257.29 4,172,749.19 55%
% GAP 67.18% 45.00% 46.65% 47.28% 54.86%
As indicated in the above table, a funding gap of GH¢4,173million needs to be filled to ensure the execution of
the programmes and projects in the SMTDP. The following strategies will be deployed to close the funding gap:
Continuous dialogue with Ministry of Finance to increase annual allocation to the road sector
Continuous dialogue with transport sector development partners for additional funds to support
maintenance of the road network which is currently funded mainly by the road fund.
Identifying new and potential development partners, outside the traditional transport sector development
partners, for funds to reduce funding gap
Public-private partnership (PPP) arrangements to secure funding from the private sector for infrastructure
development
In the unlikely event that the above strategies do not yield adequate funds to fill the funding gap, the Ministry
would re-prioritise (review downwards) the programmes and projects under the SMTDP to a level that can be
accommodated by the available (secured) funds.
3
CHAPTER ONE
1 PROFILE AND CURRENT SITUATION
1.1 Background
The road transport sector has over the years been guided by Government policies and various strategies that are
aimed at effectively providing efficient transportation services that serve as a catalyst for economic growth. The
sector draws guidance from the National Transport Policy, Integrated Transport plan and National Medium Term
Plans rolled out by the Government every four years towards the achievement of the Government’s Agenda.
The Ghana Shared Growth and Development Agenda (GSGDA) 2010-2013 which is under review provided the
direction of Government’s development agenda for the period 2010-2013. The Road Sector Medium Term
Development Plan (SMTDP) 2010-2013 was developed based on the themes provided by this national plan as well
as lessons drawn from the sector programmes based on the previous National Plan, GPRS II. The plan also included
the recommendations of the Integrated Transport Plan (ITP) 2011-2015 including the areas of strengthening the
capacity of the road sector in the delivery of road infrastructure. In addition, the SMTDP discussed a number of
cross-cutting issues addressed in GSGDA relating to sustainable development, and operation and management of
the road network asset.
With guidance from the next National Medium term Development Plan ( NMTDP 2014-2017), the sector is
developing the SMTDP (2014-2017) along the same principles as the previous one, taking cognisance of the
challenges faced and drawing lessons to improve performance.
1.2 Sector Governance
Vision The vision of the transport sector of Ghana is to provide “An integrated, efficient, cost-effective and sustainable
transportation system responsive to the needs of society, supporting growth and poverty reduction and capable
of establishing and maintaining Ghana as a transportation hub of West Africa”.
Mission
In order to realize the above vision the Ministry’s mission is to “Provide leadership and an enabling environment
for the development and maintenance of Ghana’s road transportation system through effective policy formulation,
market regulation, asset management and service provision”.
Governance Structure
The mandate of the Ministry of Roads and Highways is: policy formulation, sector coordination and oversight, and
sector performance monitoring and evaluation of the following broad areas:
Road Infrastructure development and maintenance
Road Maintenance Financing
The Departments, Agencies and Units that operate under the direct ambit of the Ministry are:
Road Infrastructure:
Ghana Highway Authority (GHA)
Department of Feeder Roads (DFR)
Department of Urban Roads (DUR)
Road Transport Training:
Koforidua Training Centre (KTC)
Road Maintenance and Financing:
Road Fund Secretariat
The functions performed by the road infrastructure and support Agencies are as follows:
4
Ghana Highway Authority is responsible for the administration, planning, control, development and
maintenance of trunk roads and related facilities in the country.
Department of Feeder Roads (DFR) is responsible for the administration, planning, control, development
and maintenance of feeder roads and related facilities in the country.
Department of Urban Roads (DUR) is responsible for the administration, planning, control, development
and maintenance of urban roads and related facilities in the country.
Koforidua Training Institute is a centre for the training of professionals (engineers, contractors,
consultants, administrator staff, etc.) in the road transport sector.
Road Fund Secretariat was established by Act 536 (1997) to finance the following activities:
Routine and Periodic Maintenance of road and related facilities.
Upgrading and rehabilitation of Roads. Road Safety Activities.
Selected Road Safety projects.
And such other relevant matters as may be determined by the Board.
1.3 Review of Sector Policy Objectives and performance as linked to GSGDA Thematic Areas
The principal objective of the transport sector is to ensure the provision of an integrated, well managed and
sustainable transport infrastructure and services that meet national and international standards. The road sector
policy objectives drawn from the National Transport Policy are directly linked to four out of the seven GSGDA
thematic areas as shown in Table 1.1 below:
Table 1-1 Linkages of Sector Objectives with GSGDA Thematic Areas
Ghana Shared Growth and
Development Agenda Thematic Areas
Sectors Objectives
Thematic area2: Enhancing
Competitiveness of Ghana Private Sector
Sector goal 4: Create a vibrant investment and performance-based
management environment that maximizes benefits for public and private sector investors
Thematic Area 5: Infrastructure and
Human Settlement Development
Sector Goal 1: Establish Ghana as a Transportation Hub for the West
African Sub-Region
Sector Goal 2: Create a sustainable, accessible, affordable, reliable,
effective and efficient transport system that meets user needs
Sector Goal 3: Integrate land use, transport planning, development planning and service provision
Sector Goal 6: Ensure Sustainable Development in the Transport Sector
Thematic Area 6: Human Resource
Development, productivity and employment
Sector goal 7: Develop adequate Human Resources and apply new
Technology
Thematic Area 7: Transparent and Accountable Governance
Sector goal 4: Create a vibrant investment and performance-based management environment that maximizes benefits for public and private
sector investors Sector Goal 5: Develop and implement comprehensive and integrated
Policy, Governance and Institutional Frameworks
5
This linkage shows that the sector’s objectives contribute significantly to the achievement of the overall
government’s agenda.
The sector performance during the period 2010-2013 has been assessed and under the sector objectives and
GSGDA thematic areas as follows:
Thematic Area 2: Enhancing Competitiveness of Ghana’s Private sector
Sector goal 4: Create a vibrant investment and performance-based management environment
that maximizes benefits for public and private sector investors
The Ministry of Finance has developed the Public Private Partnership (PPP) policy which provides
the guidelines for a clear and consistent process for Government to partner the private sector and
utilise their resources to deliver efficient public infrastructure and services for economic growth.
The road sector has been working with the Public Investment Division (PID) of the Ministry of
Finance to initiate projects which can be procured through the PPP process. Government is,
however, yet to pass the legislation and regulations for PPP arrangements.
During the period 2010-2013, the road sector engaged with a number of private sector entities to
finance major road projects to support the development of the sector. Although only one of the
projects has actually taken off, the process has been advanced considerably, as shown in the PPP
programme in Table 1.4.
The participation of the private sector in providing transport services is being regulated under the
Ghana Urban Transport Project which began in the year 2007. The project has set up the GAPTE
which will be the body to regulate and license the private sector groups to provide mass transport
services in the Greater Accra Metropolitan Area.
Thematic Area 5: Infrastructure and Human Settlement Development
Sector Goal 1: Establish Ghana as a Transportation Hub for the West African Sub-Region
According to the transport sector policy, transport corridors will be developed to improve trade
opportunities within the country and with our neighbouring countries. The road sector has been
consistent with this objective by annually budgeting to develop the international road corridors to
enhance trade opportunities for the country. Apart from the Western corridor which will be
planned for in the next four years, there are on-going works on the Central, Eastern, and Coastal
corridors. Refer to Table 1.4 for details of the Corridor Development Programme.
The sector has also been collaborating with ECOWAS and the AUC on the development of the
ECOWAS and the Trans-African highways which includes Ghana’s Coastal and Central corridors.
The sector is also collaborating with ECOWAS to develop Joint Border Posts at Elubo with Ivory
Coast, Noepe with Togo and Paga with Burkina Faso to enhance the movement of persons and
goods.
Apart from infrastructure development, the sector also chairs the NRTTFC which is an inter-
sectoral body set up by ECOWAS Decision A/Dec 9/01/05 of 2005 to facilitate the trade and
transport between Ghana and the neighbouring countries. The Committee has membership from
GPHA, GRA – Customs Division, SIC, Ministry of Trade, Freight forwarders, Transport operators,
ECOWAS Brown card insurance Bureau, GHA, Ministry of Transport etc. The Committee during
6
the period has held several workshops and seminars on sensitisation and education for various
actors in the transport and trade facilitation business.
Sector Goal 2: Create a sustainable, accessible, affordable, reliable, effective and efficient
transport system that meets user needs
The road sector continues to prioritise the maintenance of the existing network to protect the
investment and control its deterioration. To this end, the sector during the last three years
did not expand the network but rather focused on maintaining and protecting the existing
road network which fairly covers the country and connects to its neighbours.
Some of the on-going programmes targeted at achieving this goal are the road maintenance
programme and the axle load control programme which details are given in Table 1.4. Major
and minor rehabilitation works were undertaken during the period to improve service and
expand capacity. The sector has trained officers in the use of planning tools such as the HDM
IV to effectively plan and programme maintenance works.
The Road maintenance programme also seeks to inject capital into rural economies by
adopting the labour-based methodology for feeder road construction to create employment
for the rural folks. During the period, the sector trained labour-based contractors and awarded
some maintenance contracts for execution.
The Urban transport project aims at reducing congestion and travel time in the city by
introducing the bus rapid transit on some routes in Accra. The project is being funded by the
World Bank and the Government of Ghana. Civil works for the pilot routes will be completed
in 2014 and it is envisaged that the system will be fully functional by 2015. The pilot project
will be replicated in Kumasi in the medium term.
The sector is also developing schemes to ensure that there is access to non-motorised
transport facilities in the urban areas across the country. Provision has been made for NMT
master plans for major cities and footbridges at major crossing points. It has also included
guidelines for accessibility for PLWDs and other vulnerable groups in the road traffic
regulations to guide road designers in their work. The enforcement of these is also being
pursued with the collaboration with other relevant agencies. In line with the Road Safety
Decade of Action strategy, which is directed at making the road environment forgiving to
errors of users, the sector is developing schemes to make the roadways safer by building self-
enforcing crossing and walking facilities to reduce accidents and to encourage walking and
cycling.
Sector Goal 3: Integrate land use, transport planning, development planning and service
provision
Some of the challenges faced by the road sector over the years have been due to lack of an
integrated approach to transport planning. In recent years, the sector has developed the
Integrated Transport Plan (ITP) which established a process for planning for the sector. The
sector is collaborating with other sectors to ensure that road development goes hand in hand
with other infrastructure and service provision in the country. Although the Committee
envisaged to have been established to facilitate the updating of the ITP has not been done,
the sector has made contributions to the formulation of the National Infrastructure Plan (NIP)
being coordinated by the NDPC.
7
The sector is embarking on a programme to protect the right of way of existing road corridors
from encroachment and also properly acquire the Right-of-way for road works and protect
them to avoid the payment of compensation during road works.
The sector is working to formulate legislation on the application of the utility manual to help
eliminate the destruction of the road asset by utility companies and rationalise the location of
utilities within the road corridor. The utility manual has been developed and revised but the
guidelines are not being adhered to as expected. The sector will continue to collaborate with
the service providers to harmonise plans whiles pursuing the passage of the legislation.
Sector Goal 6: Ensure Sustainable Development in the Transport Sector
The protection of the environment is of importance to the road sector. The construction of
roads sometimes leads to the destruction of vegetation, farms and even pollution of the
environment. The sector has, over the years, subjected all its policies and plans to SEA to
ensure that they are environmentally sustainable. During the project phase, EIAs are
conducted in accordance with the EPA guidelines. Environmental Management Plans (EMP)
are developed and monitored in close collaboration with the EPAs in the Regions through the
project cycle to help mitigate/minimize negative environmental impacts.
The sector plans to establish an Environmental unit at the Ministry to coordinate the efforts of
the units in the respective Agencies.
The development and enforcement of the Health and Safety Manual for Road Construction
Sites will be completed in the medium term. The sector continuously conducts HIV/AIDS and
malaria education and sensitisation campaigns along the corridors of major infrastructure
projects to create awareness and reduce infections.
Thematic Area 6: Human Resource Development, productivity and employment
Sector goal 7: Develop adequate Human Resources and apply new Technology
The sector has conducted a thorough needs assessment and has programmed various training
programmes to enhance the capacity of staff. However, the sector could not complete the
development of the multi-disciplinary human resource strategy within the period. Annual training
programmes planned were effectively carried through in the various relevant areas. The sector
continued its support to KNUST through the World Bank funded TSP to train staff to acquire MSc
in road engineering.
The Koforidua training centre was also utilised over the period to train staff in procurement and
other practical courses relevant to their area of work. The road contractors also benefitted from
training organised by the sector.
The sector completed some research into the use of local materials to make construction more
affordable. The use of these new technologies will be rolled out soon. The sector however could
not complete the research strategy to guide its efforts.
8
Table 1-2 Number and Category of Staff Trained in the Road Sector 2010-2013
Year Agency Male Female <30 30 - 40
40 - 50
50 - 60
>60
Total Trained
20
10
MRH 18 15 3 12 7 11 - 33
GHA 254 51 44 93 81 87 - 305
DUR 129 25 72 63 10 9 154
DFR 62 7 37 25 7 - 69
GRF 2 1 - 2 - 1 - 3
Total 465 99 47 144 113 106 564
20
11
MRH 21 20 5 15 11 10 - 41
GHA 236 83 69 118 85 47 - 319
DUR 169 33 77 85 34 6 - 202
DFR 46 6 - 36 10 6 - 52
GRF 1 - - - 1 - - 1
Total 473 142 74 169 107 63 0 615
20
12
MRH 16 21 8 11 14 4 - 37
GHA 188 62 40 99 81 30 250
DUR 49 19 32 28 8 - 68
DFR 45 7 - 22 25 5 52
GRF 3 1 - 2 1 1 4
Total 301 110 80 162 129 40 411
20
13
MRH 20 10 5 14 4 7 - 30
GHA 298 55 33 122 126 72 353
DUR 62 21 32 35 14 2 83
DFR 71 7 - 36 31 11 78
GRF - - - - - - - -
Total 451 93 70 207 175 92 544
Thematic Area 7: Transparent and Accountable Governance
Sector goal 4: Create a vibrant investment and performance-based management
environment that maximizes benefits for public and private sector investors
The sector is developing data storage and retrieval systems as part of an information management system
for effective management of reports and records and interaction with the public. The Ministry’s website is
being redesigned to provide requisite information to the public and for better functionalities. The Transport
Indicator Database is published annually to show the current trends of key indicators in the transport
sector.
In accordance with the Road Fund Law, the Road Fund Board is exploring alternative means of funds to
increase the revenue base of the road fund for maintenance financing. During the period, road
maintenance was mostly funded by the Road Fund which could cover averagely about45% of the
maintenance needs of the network. Table 1.3 shows the revenues raised and allocations to road agencies
over the period.
9
Table 1-3 Annual Road Fund allocation for maintenace (GH¢M) Road Fund 2010 2011 2012 2013
Budgeted Expended Budgeted Expended Budgeted Expended Budgeted Expended
Revenue 163.66 205.24 195.02 296.89 204.82 261.12 229.74 272.31
Allocation to GHA 34.32 80.08 33.19 97.60 44.90 104.94 68.50 88.53
Allocation to DUR 31.06 48.36 30.11 51.00 40.70 99.78 60.80 124.02
Allocation to DFR 31.68 42.91 30.69 89.84 41.50 42.42 61.80 39.05
Total allocation to
Agencies for maintenance
97.06 171.35 93.99 257.95 127.1 280.96 191.1 251.60
Actual Revenue to
Road Fund 268.41 209.38 240.55 302.35
%of revenue used
for maintenance 92.6 123.2 116.4 83.21
The sector has started efforts to adopt a financial management system which will reduce the signatories
required to approve payments for work done. This will help to reduce interest payments due to delay in
payments.
Performance based contracts will also be rolled out to ensure value for money in maintenance contracting
in the sector.
Sector Goal 5: Develop and implement comprehensive and integrated Policy, Governance
and Institutional Frameworks
The road sector has conducted a couple of institutional reform studies to enable it restructure its Agencies
to play its role more effectively in the development of the country. Although the sector has not fully
implemented the recommendations of these studies, a needs assessment has been carried out to ascertain
the capacity of the sector to roll out these reforms.
The sector is adhering to Government’s decentralisation agenda. In consultation with the Local
Government Service (LGS) and the Ministry of Local Government and Rural Development (MLGRD), the
Departments of Urban Roads and Feeder Roads are to be repositioned to be responsible for some classes
of the urban and feeder roads network to ensure that the mandate of the Ministry of Roads and Highways
can be met within the decentralization process. Table 1.4 shows the summary of the status of the sector
programmes executed from 2010 till date.
10
Table 1-4 Performance of Road Sector 2010-2013
Ghana Shared
Growth and Development
Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013
Thematic area2: Enhancing
Competitiveness of
Ghana Private Sector
Sector goal 4: Create a vibrant investment and
performance-based management
environment that maximizes benefits for public and
private sector investors
PPP initiatives for road
infrastructure development
Dualisation of Accra –Kumasi road
The services of a
Transaction advisor is being procured
Rehabilitation of Accra – Takoradi
WB PPP. Consultant invited to submit bids.
Rehabilitation and expansion of Accra-
Tema motorway
Transaction Advisor being
procured.
Rehabilitation of Elubo-Accra road
Project to be constructed
under PPP initiative.
Construction of Bridge over Accra-
Tema Motorway at Teshie link
Detailed design of bridge is
on-going. Construction will commence in 2013
Ghana Urban Transport Programme
Establish independent body to regulate transport services Pre-GAPTE established
Thematic Area
5: Infrastructure and Human Settlement
Development
Sector Goal 1:
Establish Ghana as a Transportation Hub for the West African
Sub-Region
International Road Corridors Development
Programme
Complete Rehabilitation of central
corridor by 2013
Achimota-Ofankor Completed in 2012
Nsawam- Apedwa
Ongoing, will be completed by 2015 major challenge: funding from GoG
Kumasi – Techiman completed in 2011
Techiman – Kintampo completed in 2012
Kintampo-Buipe
Private firms have expressed interest in
financing the construction
Buipe-Tamale
Ongoing, will be completed
by June 2014
Tamale-Paga
Not started: challenge:
funding
Complete Rehabilitation of Coastal
corridor by 2013
Sogakope-Akatsi Completed in 2011
Akatsi-Dzodze-Akanu Completed in 2011
Akatsi-Aflao Completed in 2011
Tetteh Quarshie-Mallam Completed in 2011
Takoradi-Agona Juction Completed in 2010
Agona Junction-Elubo On-going, will be completed by 2015
Complete Rehabilitation of Eastern Corridor by 2013
Asikuma Junction-Hohoe On-going, will be completed by 2015
11
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013
Dodo-Pepesu-Nkwanta
On-going, will be completed
by 2016
Nkwanta-Oti-Damanko
On-going, will be completed
by 2017
Feasibility Study of
Yendi-Bawku On-going
Joint Border Post
Programme
Complete construction of joint border
posts by 2013
Elubo/Noe Border post
Designs completed.
challenge: funding
Akanu border post
On-going, to be completed
by 2014
Paga border post
Has not started. Challenge:
funding
Thematic Area 5: Infrastructure
and Human Settlement
Development
Sector Goal 2:
Create a sustainable, accessible,
affordable, reliable,
effective and efficient transport
system that meets user needs
Axle load Control
Programme
Harmonize road traffic regulations
with subregional standards to facilitate trade by 2012
ECOWAS supplementary act on axle load included
RTR and passed by parliament in 2012 completed
Overloading of trucks checked to conform with permissble axle loads to reduce damage to road corridors
by 2013
Annual reduction in general overloading
along road corridors achieved
Collaboration with GPHA, Ghana police and other stakeholders to enforce axle load limits
Improvement of axle
load weighing stations and continuous
education and sensitisation workshops held across the country on-going
Road maintenance Programme
Annual improvement in Road
Condition
Condition improved from 40%good, 22% fair and
38%poor in 2006 to 60%good, 20%fair and
20%poor by 2013
43% Good 28% Fair
29% Poor
42% Good 28% Fair
30% Poor
42% Good 28% Fair
30% Poor
42% Good 28% Fair
30% Poor
on-going
Annual Coverage of routine
maintenance
100% of routine
maintenance undertaken on feeder and trunk roads and 80% on
urban roads
GHA 98% DFR 32%
DUR 40%
GHA70% DFR38%
DUR47%
GHA70% DFR30.1%
DUR55%
GHA 89% DFR 10%
DUR 73%
Annual Coverage of periodic maintenance
Annual increment in periodic maintenance coverage
GHA
231.13km DFR 293.3km DUR 700km
GHA
126.61km DFR
394.9km DUR 351km
GHA 158.79km DFR 1285km DUR1671
GHA59.1km DFR530.12km DUR 480km
Coverage of Minor Improvement works
Annual increment in
minor maintenance coverage
GHA 96.22km
DFR262.2km DUR 77km
GHA
59.26km DFR 303km
GHA 35.5km
DFR 1325km DUR14km
GHA 43.17km
DFR360.75km DUR 117km-
12
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013 DUR -20km
Coverage of maintenance of drainage
structures
100% of drainage defects repaired
annually
GHA DFR -15No.
DUR
GHA DFR 17No.
DUR
GHA DFR -16No.
DUR -
GHA DFR -21No.
DUR -
Annual maintenance Coverage of traffic management devices
100% of traffic
management devices maintained annually
Major Roads Development
Programme
GIS maps produced existing transport routes, population,
production and tourist centres
Develop an integrated GIS map for the road sector on national,
regional and district bases to determine gaps
in accessibility by 2013
Annual Coverage of major road development and bridge infrastructure works
Execute major development works,
…km trunk roads, …m bridges, …km urban roads…
62km of trunk road
developed, 8 bridges and
77km of urban roads rehab. and upgrade
106.2km of
trunk roads developed, 8bridge
constructed, 7km of
urban roads upgraded from gravel
146.35km of trunk roads developed, 12
bridges constructed,
6km of urban roads upgraded from gravel
103.2km of trunk roads developed, 13
bridges constructed,
18km of urban roads developed
Planning tools such as HDM IV installed and used by road agencies
Train selected officers in
the use of HDM iV and procure and install
software for all agencies by 2013 completed
Labour based road
construction and maintenance programm
Use of labour based technology for road works reinstated by 2013
Train labour based contractor and classify
them. Carry out …km of feeder roads routine maintenance works
using labour based methods On-going
Ghana Urban Transport Programme Pilot BRT operational by 2013.
Completed road works on pilot BRT route and begin operations by
2013
Construction of Bridges on Graphic Road
Completed
Lots 2 & 3 on the Kasoa –
Accra corridors will not be
undertaking by world Bank
due inadequate budget.
Amasaman-Accra, Adenta-
Accra Type B routes to be
improved
Studies conducted for BRT in Kumasi
Feasibility Study
completed for pilot BRT in Kumasi by 2013 No feasibility was done
13
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013
Improved traffic management schemes for Accra and Kumasi by 2013
Implement area wide
traffic management control for Kumasi and Accra by 2013
Commence the
Design Works
Draft Final
Design
Completed
Draft Final Design Complete
for Accra
Non-Motorised Transport Programme
(NMT)
Cycle paths, parking areas and walkways rehabilitated and
maintained in Accra and Tamale
rehabilitate 20km of cycle paths annually and
free NMT facilities from encroachment in Accra
and Tamale by 2013
No Achievement was
recorded
Awareness schemes and promotions conducted for institutions and farming communities for the use of
NMT
Hold workshops and
prepare awareness materials for dissemination to
institutions. No achievement recorded
Criteria and standards established to ensure road transport facilities are easily accessible to women, children,
the aged and people living with disability. (RTR??)
Criteria and guidelines included in road traffic regulations. No Achievement recorded
Guidelines included in
design manuals, educate and enforce minimum accessibility standards No achievement recorded
Thematic Area 5: Infrastructure
and Human Settlement
Development
Sector Goal 3: Integrate land use, transport planning,
development planning and service
provision
Integrated Transport
Planning
Land use and spatial planning integrated by 2013
Establish sitting committees between
transport sector MDAs and other stakeholders
to harmonise plans to ensure land use and spatial planning are
integrated with transport planning
Achieved under the Urban
Transport Project over the
review period
Management, financing and
regulation of local transport infrastructure and services decentralised by 2013
Establish urban transport advisory
committee. completed
Support MMDAs and the
private sector to acquire lands, design, build and
manage lorry parks and terminals
Lands for transport infrastructure properly acquired and protected by 2013
Coordinate with lands commission to properly acquire project lands,
Pay compensation for PAPs, demarcate ROW,
publicise in media and update land acquisition manual
Achieved under the under
various project but land
acquisition manual yet to be
updated
14
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013
Legislation passed to enhance the
application of utility manual by 2013
forward utility manual to
Attorney general's office to draft legislative instrument to be passed
by parliament Not achieved
Sector Goal 6:
Ensure Sustainable Development in the
Transport Sector
Environmental, health and safety programme
SEA is conducted on all sector
Policies, plans and programmes
liaise with EPA to build capacity of staff to
conduct SEA 65% 70% 75% 75%
Environmental, social, health and safety standards included and
enforced in all road infrastructure projects
Health and safety management plan developed for use on all
projects 55% 65% 75% 70%
Training in assessment,
monitoring and evaluation of
environmental issues organised for officers in the sector 25% 27% 30% 35%
HIV/AIDS and malaria
awareness campaigns organised to sensitize
contractor staff and communities along project corridors 50% 60% 70% 75%
Safety audits are carried out and implemented at all stages of roads by
2013 10% 12% 12% 15%
Environmental units established and resources in the head offices to
coordinate environmental activities in the sector
Environmental units set
up and resources at the ministry and head
offices of road agencies by 2013 55% 65% 65% 70%
Thematic Area
6: Human Resource
Development, productivity and
employment
Sector goal 7: Develop adequate Human Resources
and apply new Technology
Human Resource Develoment
Programme
A multi-discplinary human resource development strategy developed by
2013
Needs assessment for sector personnel
conducted
Nil Nil Nil Nil needs assessment to be undertaken in 2014.
Annual planned training
programme for personnel carried out
100% of planned
carried out with additional
22 unbudgeted training
100% of planned
carried out with
additional 19
70% of planned
carried out with additional 27
unbudgeted training
100% plus remaining 30%
of 2012 planned carried
out with additional 21
15
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013 unbudgeted training
unbudgeted training
HR programmes implemented using KTC and other local training
facilities
Organisation of Works
Procurement Course for Engineers & Qty
Surveyors
Organisation of Works
Procurement Course for Engineers &
Qty Surveyors
Overseas training programmes for officers
carried out annually
100% carried
out
100%
carried out 70% carried out
100% plus remaining 30%
of 2012 carried out
Local institutions supported to
provide training for sector personnel
Support to KNUST
postgraduate course in road management
shuttle bus
procured to support the
RTEP by the Ministry
Support to KTC to carry out training for officers
and contractors in the sector
bus procured by the Ministry to
KTC & GTTC
Processes for KTC's affiliation to a tertiary
institution initiated
Role of women in transport promoted Sector provides training
on gender to officers and segregates data
when reporting
Thematic Area
6: Human Resource
Development,
productivity and employment
Sector goal 7:
Develop adequate Human Resources
and apply new Technology
Research Development programme
Develop Research strategy
Consultant engaged to develop research
strategy for sector Not achieved
complete on-going
research on otta seal and apply to feeder roads by 2013 completed
Stock sector library with relevant research
materials and literature
Allocation of
room is done
Sponsor selected staff to
research into relevant areas of operations
16
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013
Thematic Area 7: Transparent
and Accountable Governance
Sector goal 4:
Create a vibrant investment and
performance-based management
environment that maximizes benefits
for public and
private sector investors
Road Maintenance Funding
Adequate revenue raised for effective maintenance of road infrastructure
fuel levy increased from the current levy of
6.5cents to 9.5cent/litre Not achieved
Percentage of road fund
revenue disbursed for road maintenance
road user charges revised to appreciable
levels to resource the road fund
Road and bridge tolls, vehicle
licensing and international
transit fees increased
Contract collection of
road user charges to private sector
Road and bridge tolls
collection on contract
Development of local contractors and
consultants
Local contractors are properly
classified and trained review classification
procedures and documentations Review in progress
Sustainable
maintenance programme
develop a sustainable maintenance programme
Programme for annual maintenance activities
using HDM IV Not achieved
Road condition survey,
traffic and road inventory are
undertaken as programmed to monitor network
Condition
survey on trunk road network
Condition
survey on trunk road network
Condition survey on trunk road network
Condition
survey on trunk road network
Computer based reporting system developed to link all
stations to head offices Not achieved
Roll out use of performance based contract for road maintenance works
Performance standards developed and
incorporated into contract documentation for road works Not achieved
17
Ghana Shared Growth and
Development Agenda
Thematic Areas
Sectors Objectives
Programme output/indicator Target
level of achievement Remarks
2010 2011 2012 2013
Development of information
management system
effective financial management system strengthened to minimise
delays in payments and waste of public funds
reduced number of
signatories for payments
Signatories reduced for
AfDB projects
Indicators developed to monitor sector performance
Annual transport indicator data base
report published
Report
published
Report
published
National
Transport household survey
conducted
Information management system
established for the sector
Appropriate storage and retrieval systems developed for reports
and studies using a computerised system
and a physical library
Transport GIS system to be
procured in 2014
Sector Goal 5:
Develop and implement
comprehensive and integrated Policy, Governance and
Institutional Frameworks
Institutional reform programme
enhanced policy formulation and coordinating capacity in the sector
carry out capacity needs assessment of policy
and planning unit and provide required support Not achieved
18
1.4 Road Sector Profile
Network coverage and condition
Roads are the dominant means of transportation in Ghana. The sector therefore is key to the development of
other sectors and in achieving Government’s poverty reduction agenda. The road sector has the core mandate to
develop, maintain and manage the road infrastructure asset within the country. Roads are categorised into three
in the sector; trunk roads, urban roads and feeder roads. Trunk roads are roads that run through the country
connecting the regions and linking Ghana to its neighbours. The feeder roads connect from the towns and villages
into the main trunk roads whiles the urban roads are the roads within the cities and major towns. Currently there
are about 71,063 kilometres of roads. This is made up of 42,190 km of feeder roads, 14,000km of urban roads
and 14,873 km of trunk roads. Figure 1 – 1 indicates a spread of the network.
Figure 1-1 total road network coverage
19
The network is comprehensive, connecting to neighbouring countries, linking all regions, districts, farming and
tourist centres within the country. Currently, 45% of the road network is in good condition, 25% is in fair condition
and 30% is in poor condition. The paved section of the network is only about 30%. The sector as a policy has
prioritised maintenance of the existing network over expansion hence the network size has remained fairly the
same over the past years. Maintenance coverage is targeted to increase annually to ensure a good condition. The
table 1-5 below shows the trend of the network size and condition for the past three years
Table 1-5 Road network size and condition 2010-2013 2010 2011 2012 2013
Network
size (km)
Condition Network
size (km)
Condition Network
size (km)
Condition Network
size(km)
Condition
GHA
12,840
29% Good
44% Fair
27% Poor
13,263
34% Good
28% Fair
38% Poor
13,477
46% Good
33% Fair
21% Poor
14,873
52% Good
34% Fair
14% Poor
DUR
12,400
68% Good
4% Fair
28% Poor
12,400
54% Good
3% Fair
43% Poor
12,400
54% Good
3% Fair
43% Poor
14,000
49% Good
32% Fair
19% Poor
DFR
42,210
39% Good
30% Fair
31% Poor
42,190
39% Good
30% Fair
31% Poor
42,190
39% Good
30% Fair
31% Poor
42,190
30% Good
38% Fair
32% Poor
TOTAL
67,450
43% Good
28% Fair
29% Poor
67,853
42% Good
28% Fair
30% Poor
68,067
42% Good
28% Fair
30% Poor
71,063
45% Good
25% Fair
30% Poor
Institutional capacity
The Ministry of roads and highways is the sector ministry responsible for managing the road sector with three
agencies, DFR, DUR and GHA managing the day to day affairs of the respective categories of roads. The
administrative structure of the Ministry and agencies is as shown in the Figure 1-1. The Agencies have offices in
all 10 regions of the country and are coordinated by their head offices in Accra. The sector also has a road fund
which was set up to raise funds for mainly road maintenance as well as a training school for the training of staff
and contractors in the sector. The sector’s human capital is expressed in a total of 2,816 staff comprising, 317
engineers, 105 quantity surveyors, 7 planners, 2 economists, 229 Accountants, 228 administrators, 314 Drivers
and other supporting staff. The category and number of staff is shown in Table 1- 6.
Again the sector has totally registered about 4,358 local contractors with about 1,853 in operation as at December,
2013. Projects in the sector are opened to these local contractors and other foreign contractors. Currently,
supervision of road works is mostly given to private consultants who could be local or foreign depending on the
condition specific to the contracts.
As the main means of transportation in the country, the sector coordinates with other sector to ensure adequate
access is provided to schools, health centres, farm gates, tourist centres and other social and recreational facilities
across the country to improve mobility as a means of reducing poverty.
20
MINISTER
MRH
DY. MINISTER
MRH
CHIEF DIRECTOR MRH
6 MRH DIRECTORS CEO GHA
DY. CEO
ADMINISTRATION
SEVEN DIRECTORS
DY. CEO
DEVELOPMENT
SIX DIRECTORS
DY. CEO MAINTENANCE
TEN REGIONAL HEADS
DIRECTOR OF DUR
3 DEPUTY DIRECTORS
46 ROAD UNIT HEADS
DIRECTOR OF DFR
DY. DIR PLANNINGDY. DIR
MAINTENANCE
TEN REGIONAL DIRECTORS.
DY. DIR DEVELOPMENT
DIRECTOR
GHANA ROAD FUND
HEAD
KOFORIDUA TRAINING CENTRE
LEGAL OFFICER AUDITOR
Figure 1-2 Organogram of Road Sector
21
Table 1-6 Road Sector Personnel Staff Category M F <30 30-40 40-50 50-60 >60 TOTAL
MRH 58 43 15 24 25 37 - 101
Directors 7 2 - - - 9 - 9
Engineers 9 2 2 7 1 1 - 11
Quantity Surveyors 3 - 2 - 1 - - 3
Planners 1 1 - - 1 1 - 2
Accountants 14 6 4 4 5 7 - 20
Administrators 11 29 5 10 9 16 - 40
Drivers 6 - - - 4 2 - 6
Others 7 3 2 3 4 1 - 10
GHA 1501 351 247 351 256 998 - 1852
Directors 30 2 - - 7 25 - 32
Engineers 139 16 41 37 30 47 - 155
Quantity Surveyors 22 2 1 8 6 9 - 24
Economists 1 1 - 1 - 1 - 2
Technicians 155 11 18 48 17 83 - 166
Planners (Valuers) 4 - - 2 - 2 - 4
Accountants 115 35 2 15 15 118 - 150
Administrators 28 69 7 10 11 69 - 97
Drivers 206 0 5 48 42 111 - 206
Others 801 215 173 182 128 533 1016
DFR 240 56 0 63 102 44 - 296
Directors 4 0 4 - 4
Engineers 69 3 25 18 - 72
Quantity Surveyors 51 1 32 20 - 52
Economists - - - - - - - 0
Technicians - - - - - - - 0
Planners 1 0 - 1 - 1
Accountants 20 6 - 4 18 4 - 26
Administrators 12 4 - - 6 10 - 16
Drivers 65 - - 40 25 - 65
Others 18 42 - 2 - - - 60
DUR 410 95 49 205 151 100 - 505
Directors 4 - - - - 4 - 4
Engineers 67 7 19 25 23 7 - 74
Quantity Surveyors 17 9 6 14 4 2 - 26
Economists - - - - - - -
Technicians 210 10 13 102 82 23 - 220
Planners 1 - - 1 - - - 1
Accountants 20 9 2 9 11 7 - 29
Administrators 15 60 6 35 17 17 - 75
Drivers 37 - 3 13 10 11 - 37
Others 39 - - 6 4 29 - 39
GRF 13 5 - 10 2 6 - 18
Directors 2 - - - - 2 - 2
Engineers 3 - - 1 2 - - 3
Accountants 2 - 2 - - - 2
Others 6 5 - 7 - 4 - 11
KTC 38 6 1 1 - 3 - 44
Directors 1 - - - - 1 - 1
Engineers 2 - - - - 2 - 2
Accountants 2 - 1 1 - - - 2
Others 33 6 - - - - - 39
TOTAL 2260 556 320 670 553 1186 - 2816
22
The sector currently does not have the full complement of staff. It has made efforts to justify for recruitment
annually to increase the staff numbers to be able to function efficiently. It also contracts some staff specifically on
projects for the project period with the agreement of the funding agency for the project.
Sector Financing
The road sector is financed mainly through the Government of Ghana Budget with support from development
partners in the form of concessionary loans and grants. The sector has over the years received support from both
bilateral and multilateral partners for major road infrastructure and bridge works. These partners however expects
the government of Ghana to fund compensation for project affected persons and properties affected during such
projects. The government also wholly funds maintenance of the roads through the consolidated fund and the road
fund. The Table 1-7 below shows the current on-going and proposed DP supported projects/programmes
Table 1-7 Development Partner's Programmes in the Road Sector Development Partner
Project/Programme Type of funds
Status
World Bank (IDA) Transport Sector Project Loan The project involves Support to
MRH, Support to Road Sector and Educational Entities,
Improvement of Trunk Roads, Improvement of Urban Roads and
Infrastructure, Improvement of
Feeder Roads and Support to MOT. Total Disbursement stands
at 29% though total commitment is about 63% of total project
funds.
World Bank (IDA) West Africa Transport and transit Facilitation Project
Loan Strengthening of Buipe-Tamale road, construction of truck
satellite village for ports, funding for training and sensitisation
workshops for stakeholders in
trade facilitation- ongoing. Road project about 92% completion.
World Bank (IDA) Abidjan – Lagos Trade and Transport
facilitation Project
Loan Reconstruction of Agona junction-
Elubo road, funding for training and sensitisation workshops for
stakeholders in trade facilitation- ongoing.
World Bank (IDA) Urban Transport Project Loan/Grant ……
European Union Support for Transport sector development programme
Grant Reconstruction of Tarkwa-Bogosu-Ayamfuri, funding for
sector transport indicator
database, axle load control programme; on-going.
European Union Road Construction Grant Rehabilitation of Dodo Pepesu- Nkwanta road project- ongoing.
BADEA Road construction Loan Rehabilitation of Madina-Pantang
road project – on going.
AFD Road Construction Loan Rehabilitation of Awoshie-Pokuase road project (co-
financing with AfDB) – on going.
AFD Road Construction Loan Kumasi……completed
AfDB Road construction and community
development works
Loan Rehabilitation of Awoshie-
Pokuase road project (co-
23
Development
Partner
Project/Programme Type of
funds
Status
financing with AfD), improvement
of schools, hospitals, water
supply along the project corridor – on going.
AfDB Road construction and community development works
Grant Rehabilitation of Fufulso-Sawla road project, improvement of
schools, hospitals, water supply
along the project corridor – on going.
AfDB Road Construction Loan Rehabilitation of Akatsi-Aflao road
project- on going.
AfDB Road Construction Loan Rehabilitation of Akatsi-Akanu
road project- completed.
AfDB Road Construction Loan Construction of Nsawam By-Pass - Completed
AfDB Road Construction Loan Rehabilitation of Techiman –
Kintampo road project - Completed
AfDB Proposed Road construction Loan Construction of Asutuare junction-Asikuma- detailed design
stage.
Brazil Interchange Development Loan Kwame Nkrumah circle interchange-ongoing.
Brazil Proposed Road construction Loan Construction of Road Oti-
Damanko-Nakpanduri (103Km).
JICA Proposed Bridge works Loan Construction of cable bridge over the Volta Lake on the eastern
corridor – feasibility completed.
KFW Road Improvement Works Loan 97% complete
Dutch
Government
Supply of Steel Bridges Loan 100% complete
Spanish Government
Supply of Steel Bridges Loan 100% complete
U.S. A –Acrow Supply of Steel bridges Loan 63%complete
Austria Bridges -
CBD Road works Loan From procurement, signing of
contract to supervision of works is
99% complete.
The sector coordinates with the Development Partners on the supervision and monitoring of these projects through
quarterly meetings and planned mission visits from the funding agencies. The road sector has over the years
attracted a lot of interest from the Development Partners because of the critical role the sector plays in the
development of the country and the ability of the sector to manage funds and requirements of the Partners.
The sector is allocated about 4.6% of government’s annual budget but it has a backlog of arrears due to be paid
to contractors for work done over the years. The Table 1-8 shows the sector’s budget over the years.
24
Table 1-8 Budgetary Allocation and application of funds 2010-2013 (GH¢M)
Budgetary Allocation To MDA for 2010-2013 2010 2011 2012 2013
GOG Donor GOG Donor GOG Donor GOG Donor
Allocation to MRH(GH₵)M 10.82 1.65 8.76 1.65 12.17 1.0 35.79 1.96
Allocation to GHA (GH₵)M 135.05 109.0 87.45 133.65 89.31 262.69 148.41 130.10
Allocation to DFR (GH₵)M 97.39 29.71 88.24 46.40 126.90 81.20 95.95 29.38
Allocation to DUR (GH₵)M 125.95 23.98 201.80 16.60 235.54 47.93 53.40 152.10
Sub- Total 369.21 164.34 386.25 198.30 463.92 392.82 333.55 313.54
Total 533.55 584.55 856.74 647.09
Expenditure by DFR (GH₵M)
ITEM 2010 2011 2012 2013
GoG IGF RoadFund Donors GoG IGF RoadFund Donors GoG IGF RoadFund Donors GoG IGF RoadFund Donors
Personnel Emolument
3.83 - - 4.67
-
-
7.52
-
- 5.05
Administration 0.20 - - 0.20
-
-
0.02 0.06 0.01
-
- 0.01
Services 0.05 0.01 - 0.05 0.03
-
-
- - 0.01
Investment 16.65 - 98.52 15.70 47.24 0.00 24.26 24.24 23.47 0.00 59.32 27.36 26.01 - 10.06 14.48
Sub-Totals 20.74 0.01 98.52 15.70 52.16 0.03 24.26 24.26 31.04 0.01 59.32 27.36 31.07 0.01 10.06 14.48
GRAND TOTAL 134.97 100.71 117.73 55.60
25
EXPENDITURE OF FUNDS GHA(GH₵M)
ITEM
2010 2011 2012 2013
GoG IGF
Road Fund
Donors GoG IGF
Road Fund
Donors GoG IGF Road Fund
Donors GoG IGF
Road Fund
Donors
Personnel Emolument
10.66 10.66 0.17
22.69 18.27
Administration 0.84 0.2 0.89 0.14
Services 0.20 563.5 65.1 398.43
Investment 234.04 91.90 134.39 344.0 90.03 172.89 357.84 107.83 319.45
Sub-Totals 245.74
91.90
134.39
574.53
65.1 398.43
367.58
90.03
172.89
376.25
107.83 319.45
GRAND TOTAL 472.03 1,038.06 630.50 803.53
EXPENDITURE OF FUNDS DUR(GH₵M)
ITEM 2010 2011 2012 2013
GoG IGF RoadFund
Donors GoG IGF RoadFund
Donors GoG IGF RoadFund
Donors GoG IGF RoadFund
Donors
Personnel Emolument
2.93
0.01
21.11
2.69 0.01
51.00 6.87
3.08
Administration
0.22 0.02
0.03
0.01 0.00
Services 0.05 0.01
0.02 0.01
Investment 70.86
48.36 203.15 15.71 128.35 99.75 99.75 74.85 74.25 5.33
Sub-Totals 74.06 0.01
48.36
21.11
205.87 0.01
51.00 15.71
135.25 0.01 99.75 99.75
-
77.93 0.02
74.25
5.34
GRAND TOTAL
143.54 272.59 334.76 157.54
26
THE ROAD SECTOR EXPENDITURE (GH₵M)
ITEM
2010 2011 2012 2013
GoG IGF Road Fund
Donors
GoG IGF Road Fund
Donors GoG IGF
Road Fund
Donors GoG IGF
Road Fund
Donors
Personnel Emolument
17.42 0.01 18.02 0.39
37.08 26.4
Administration 1.26 0.26 0.02 0.98 0.
02 0.15
Services 0.3 0.01 813.89 0.04 105.04 438.37 0.03
0.01
Investment 321.55 238.78 171.2 495.82 249.1 300 458.7 192.14 339.26
Sub-Totals 340.53
0.02
238.78
171.2
832.56
0.04 105.04 438.39
533.88
0.02
249.1 300
485.25
0.03
192.14
339.27
GRAND TOTAL 750.53 1,376.03 1,083 1,016.69
27
The road sector is also actively engaging with the private sector to fund some major road and bridge
projects. The sector through the guidelines provided by the MoF is considering both solicited and
unsolicited proposal from the private sectors for financing road works. The PPP Unit in the Ministry has
been examining proposals and registering potential PPP projects in line with the PPP Policy. Technical
experts from the Ministry of Finance and Ministry of Justice are normally co-opted to work with the PPP
Unit. Currently the sector is procuring the services of Transaction Advisors to assist in the preparation
of feasibility studies and the Request for Proposals for these initiatives.
Programmes with other Sectors
The road sector collaborates with other sectors to enhance its effort at optimum performance and
nation-wide delivery of services. The following are some on-going initiatives the sector is engaged in:
Collaboration with the Ministry of Transport
To ensure a well-integrated transport system the road sector considers its sister ministry, the Ministry
of Transport as a primary partner in the development and execution of programmes and activities.
Partnerships have been ongoing and has been heightened by the development of the Integrated
Transport Plan (ITP) which was completed in June 2010. In the ITP, transport sector investments has
been targeted at inter and multi-modal solutions most suited to achieving the strategic development
objectives for the country. The ITP continues to guide the SMTDPs for the two Ministries.
In a $225million IDA funded project, the Transport Sector Project (TSP), the two Ministries have
collaborated strongly to ensure that the project’s objective is realised encompassing development of
trunk roads, urban roads, rural roads, lake transport, rail transport and air transport.
The two Ministries also work hand-in-hand in the publication of the Statistical and Analytical Report,
the National Household Survey Report and the Inland Water Transport Survey Report. The Statistical
and Analytical Report serves as a basis for providing relevant, reliable, timely and accurate transport
data and indicators for policy planning, formulation, monitoring and evaluation purposes annually. The
National Household Survey Report seeks to establish a reliable, multi-sectorial database of transport-
related indicators covering all modes of transport in Ghana with particular emphasis on time travel,
market use and access to schools and hospitals.
Trade and Transit facilitation Programme
The Ministry of Roads and Highways and the Ministry of Transport co-chair the National Road Transport
and Transit Facilitation Committee (NFC) which has membership of about 23 from both the public and
private sectors. The main aim of the Committee is to engage sector players to improve the movement
of goods and services through the road corridors to facilitate trade. The Committee has held
sensitization and education workshop across the country to educate policemen on the subject of trade
facilitation; including the role of Customs, shippers, freight forwarder, the National Guarantor-SIC, the
ECOWAS brown card insurance scheme and the ECOWAS protocols governing movement of people and
services in the sub region. One other objective of these workshops was to sensitize the police MTTD to
help reduce the number of roadblocks on road transit corridors.
The Committee is also involved in the development of the Joint Border Posts (JBP) programme. This is
a programme to facilitate the free movement of goods and services at the borders with neighbouring
countries in the sub region. The programme is assisted by the European Union in collaboration with
ECOWAS and WAEMU, under the 9th European Development Fund (EDF). Under the programme, seven
28
(7) Joint Border Posts (JBPs) are to be established in the sub region to facilitate efficient cross border
movements. Three of such JBPs are being established on Ghana’s borders with its neighbouring
countries.
Construction of a Joint Border Post (JBP) at Noepe for Ghana and Togo is on-going and scheduled for
completion in 2014. The National Road Transport and Transit Facilitation Committee visited the site
together with all border agencies to create the platform for discussions on the operations and
recommendations for a smooth operation.
Axle load Control and Management Programme
Axle load control and management is a critical issue for all the countries in the sub-region since
excessive loading of trucks is one of the causes of early deterioration of the roads. The Supplementary
Act Act/SP.17/02/12 relating to the Harmonisation of Standards and Procedures for the Control of
Dimensions, Weigh and Axle Load of Goods Vehicle within Member States of the Economic Community
of West African States was approved by the HoSG in Abuja 16-17 February 2012. Ghana commenced
its program in earnest in June 2009 as part of an agreement with WAEMU countries. The sector has
been implementing the Axle Load Control and management in accordance with the Road Traffic Act
683 and the Road traffic Regulations 2012 (LI 2180) which has incorporated sections of the ECOWAS
Supplementary Act. Intensive education and sensitization on the new regulation has been undertaken.
Key stakeholders such as Freight Forwarders, Haulers, Truckers, Ports, Private Weighbridge Station
Operators have been involved in this sensitization programme under the Axle Load Working group
chaired by the Ministry of Roads and Highways.
COCOBOD Funded Programme
The COCOBOD is currently funding three programmes in the six cocoa producing regions, namely;
Eastern, Volta, Western, Central, Ashanti and Brong Ahafo Regions respectively. The programmes are;
the Cocoa Roads Improvement Projects (CRIP) and the COCOBOD Funded Roads Improvement Project
(C-FRIP) which involves reshaping/Spot Improvement contracts and covers all the regions. Under CRIP,
COCOBOD has made provision for US$100million for the surfacing of 600km of cocoa roads in the six
cocoa producing regions in the country namely: Eastern, Ashanti, Brong Ahafo, Central, Volta, and
Western regions. These projects are on-going. The cumulative length executed since the start of the
programme is 436.64km. Under CFRIP, the Ministry of Roads and Highways has received an amount
of money from the COCOBOD syndicated loan for the maintenance, rehabilitation and upgrading of
Cocoa Roads. The collaboration has now been expanded to deal with the full mandate of COCOBOD
which covers cocoa, coffee and sheanuts.
Export Marketing and Quality Awareness Project (EMQAP)
The Ministry of Food and Agriculture with financial support from the African Development Bank is
implementing a five year Export Marketing and Quality Awareness Project (EMQAP). The programme’s
objective is to increase the income of horticulture and tuber (cassava) crop farmers and exporters. The
project begun in 2006 and is being implemented in three (3) phases covering twenty (20) districts. The
feeder roads component involves the improvement of 407km of feeder roads through spot
improvement, rehabilitation and bitumen surfacing.
Oil and Gas Sector
This is a project aimed at providing access roads and linkages from Gas and Oil processing facilities to
Major Highways, especially in the Western Region. It also seeks to improve roads in communities in the
oil enclave area to boost economic activity and tourism. Some of the roads include; Mpataba-Ekpu-New
Town road (71km), Tikobo No.1-Atuabo-Alabokazo (35.7km) and Yebikrom-Pumpuni Road (6km).
29
Eastern corridor multi-modal
The project is being funded by the China Development Bank. The aim of the project is to link water
transport services to market centres off the Volta Lake via road transport to promote socio-economic
activities along that corridor. Phases 1 and 2 contracts have been awarded and documents signed.
Possessions of sites are yet to be given to the various contractors for the works to commence.
Pro-Poor programmes
The Ministry’s Pro-poor programmes aim at providing the opportunity for communities to engage in
sustainable income generating activities that previous to the improvement in road access were unavailable. The major pro-poor programmes that are being executed in the road sector include Labour
based work programmes, Non-motorised transport access interventions and Community Improvement
Programmes.
Labour Based Technology (LBT) for Road Construction and Maintenance Programme
The Labour-Based Technology (LBT) for road construction has been identified as a cost effective and
appropriate method of improving rural transportation, whilst addressing issues of economic
development and poverty reduction.
The sector has revamped the LBT to improve upon the livelihood of rural Ghanaians by creating
employment opportunities and facilitating access of the rural population, which is predominately poor,
to markets, economic and social centres. This is in furtherance of the Government policy on job creation.
Two Refresher Training Courses for DFR Engineers and Contractors’ Supervisors were completed at
Koforidua Training Centre (KTC) in 2010 and 2011, respectively. Tenders have been received from
trained labour-based contractors to start work using this approach. Contracts awarded are on-going
in all regions and are at various stages of completion.
Poverty Focused Rural Transport Programme
This programme is funded by Kreditanstalt für Wiederaufbau (KfW) of Germany with an amount of Euro
8.2million. It forms part of MOFA’s Rural Access Programme, creating access roads to food producing
areas to enhance access to market thereby reducing post-harvest losses. The programme involves the
rehabilitation of 300km of feeder roads. It covers six (6) districts in the Ashanti and Brong-Ahafo
regions. Site works for the 87Km contracts have been awarded under Phase 1.
Non-motorised transport access
Improving road accessibility by upgrading roads in poor condition and the construction of gravel road
from earth tracks provides the opportunity for communities to establish non-motorised transport
services to transport passengers and farm produce. NMT enable rural communities to reach markets
and social services that previously could not be reached easily on foot or by pack animals. Improved
access provides the incentive to increase farm production surpluses to trade at markets were higher
prices can be obtained and where inputs and consumer goods can be obtained at lower prices.
As part of the Urban Transport Project being funded by the WorldBank, an NMT master plan is being
developed for Tema Municipal Assembly to increase accessibility and encourage the use of bicycles and
walking and reduce motorised transport use when necessary. This could go a long way to support
Ministry of Health’s programme of encouraging healthy lifestyle including walking as an exercise to
reduce the incidence of diseases which are resulting from sedentary lifestyles. The bicycle and
pedestrian walkway is also being implemented on the on-going Awoshie Pokuase community
improvement project.
30
Community Improvement Programme
The transport sector has begun packaging road projects to include community improvement
programmes as support for communities along the road corridors under rehabilitation. The sector
collaborates with MoE to rehabilitate and build schools, MoH to rehabilitate hospitals, provide boreholes
for water supply as well as support for local indigenous business along the road corridors. Currently
two of such projects are on-going with support from the African Development Bank. These are the
Awoshie –Pokuase Road and Community Improvement project and the Fufulso-Sawla road and Ancillary
works projects.
Under these projects the sector has conducted consultative meetings with the communities together
with the Bank to arrive at the support projects for the corridors. This provides a total development of
the corridor at the end of the project instead of just an improved access. Under these two projects,
markets, boreholes, schools buildings, accident units at hospitals, bus terminals and other utilities are
being provided for the communities along the corridor.
The road sector is anticipating that other financiers will agree to package projects in this manner to
accelerate the development of the country.
Cross Cutting Issues
Environmental and Social Protection
Environment and social protection issues are incorporated in all development and maintenance projects.
This includes the conduct of EIAs for all projects and monitoring during implementation to ensure that
recommendations are carried out to safeguard the environment.
The road sector prioritizes environmental health and safety on road programmes to protect the
environment, staff and the communities within the project corridors. Currently, all sector policies and
plans have been subjected to Strategic Environmental Assessment and all projects also go through the
required Environmental Impact Assessment processes. The sector includes HIV/AIDS sensitisation
campaigns on all major road projects to create awareness and reduces infections among workers and
beneficiary communities.
The sector is also putting together its strategy towards mitigation and adaptation to the effects of
climate change. It is taking steps to include climate change mitigation and adaption into its plans and
programmes. During road construction Project affected persons are adequately compensated and
resettled where necessary to ensure that road projects do not result in adverse impact on some
members of the society. Steps are underway to identify, acquire and secure the right of way of the
road network to avoid excessive compensation payments and consequent delays to projects.
Gender Mainstreaming, Accessibility for People living with Disability (PLWD), Children
and the Aged
Despite the fact that the majority of the workforce in the road sector is male, there is a policy to ensure
the inclusion of females in all its programmes. Accordingly all data including; staff, contractors etc are
segregated to study trends of both gender and their participation programmes. There has been training
programmes for gender desk officers to be able to respond to issues as they arise. With regards to the
construction industry, the sector has made recommendations to include female workers from the
communities to help promote the wellbeing of households.
31
The sector is making efforts to ensure that maintenance and development projects provide adequate
accessibility and safety of PLWD, children and the aged. Current Standards and Specifications include
safety treatments and furniture for school crossing areas, pedestrian walkway and signalised pedestrian
crossings for very busy roads to afford PLWD and the aged to use the road network safely.
Road safety
The issue of road safety is very important to the sector. The sector works closely with the NRSC in
implementing the new strategy III. This strategy is based on the UN Global Decade of Action for road
safety (2011-2020). The underlying principle for the Decade of Action is hinged on a safe system
approach. The approach aims at developing a road transport system that is better able to accommodate
human error. The system shifts the major share of the responsibility from road users to the road
infrastructure and managers. In accordance with this, the sector has developed road safety action plans
to tie in with the National Road Safety Strategy III for the achievement of this global goal which is to
reduce deaths or accidents by 50% by 2020.
Sector Challenges/Issues
The road sector has many challenges which adversely affect efficiency of its service delivery. Many
efforts have been made to address these issues with the lessons from previous programmes and
projects as well as support from various interest groups for specific interventions. Various interventions
and strategies were adopted during 2010-2013 period. Although they have not been clearly eliminated,
the sector has made considerable progress in addressing them. Table 1-9 shows the challenges
identified and the sector’s response.
Table 1-9 Sector Challenges 2010-2013
Issues Causes Remarks/response Inadequate Project Preparation
1. Inadequate time to prepare
projects for implementation.
1. A guideline for checking
and evaluating engineering design is been prepared to
enhance effective project preparation.
2. Attention will be given to road safety audit at the
feasibility stage of projects. 2. Inadequate Capacity of Agency Staff and Consulting
Firms.
1. Agency Staff have been trained in project preparation
and contract administration. 2. Staff of Agencies and
Consulting Firms are being
encouraged to utilise design software which offer more
predictive accuracy and adequate representation of
project conditions. Shortfall in Contract Administration
1.Non adherence to Conditions of Contract
1. Improvements of contract administration with contractors
and consultants in order to improve performance, reducing
costs and delays. 2.Inexperience of Agency Staff
32
Issues Causes Remarks/response 3.Lapses in documentation
during contract execution.
2. The capacity of agency staff
to manage contracts is continuously been improved
under various capacity building activities.
Delays in Execution of Works 1.Scarcity of construction
materials 1. Research into new and
readily accessible materials for construction.
2.Inadequate capacity of
Contractors
2.Intensified locally delivered
training for the supervisory personnel of contractors and
Road Agencies at KTC. 3.Capability constraints of
Contractors.
Ineffective Supervision and
Monitoring of Works Large number of on-going
projects. Inadequate capacity of Agency
Staff. Capability constraints of Staff
Logistics constraints.
Lack of Basic Laboratory Facilities at District and
Regional level.
1. Termination non-
performing project contracts. 2. Priority has been given to
maintenance of existing roads.
Delay Payment for Works Infrequent Monthly Submission
of Invoice by Contractors
1. Supervisors of road projects
to closely monitor contractors to bring to their attention several
important activities they have to
do including monthly invoices and effective reporting on
project activities.
Delays in Certification of works.
Streamlining the process for certification of works through
improved communication and
transfer of certificates between regions or agencies who do final
certification. Inadequate funds to pay completed works.
MOF to make early release of counterpart funding for
development projects.
Inadequate revenue raised to
cover maintenance costs Proposals have been prepared
to increase the revenue of the Road Fund which is used for
road maintenance activities.
Over commitment of road
projects in excess of approved
budget
Preparation of procurement
plans by sector agencies
according to approved budget. Inconsistent prioritisation of
maintenance investments Utilisation of more evidence-
based decision making tools
such as HDM-IV for prioritising development and maintenance
activities.
33
Status of Indicators
The SMTDP 2010-2013 outlined key sector and national indicators and targets to monitor sector
progress. These were reported on annually in the APR by the NDPC. The sector although did not fully
achieve all its targets, the progress made during the period is very commendable considering the human
resource and institutional challenges it encountered. Table 1-10 below gives a summary of the annual
targets and achievements for the period.
34
Table 1-10 Status of indicators 2010-2013
Indicator Target 2013 2009 Baselin
e Indicator Status in 2010
Indicator Status in 2011
Indicator Status in 2012
Indicator Status 2013
1. Proportion of transit corridor highways that are in good condition
Length: (2,499km)
Length: (2,499km)
Length: (2,499km)
Length:(2,499km
Length:(2,606km)
Length (2,606m)
Good:52%, (1307km) Fair:42%(1049.8km) Poor: 20% (508.8km)
Good:38%, (940.4km) Fair:42%(1049.8km) Poor: 20% (508.8km)
Good: 38%(940km) Fair:42% (1050km) Poor: 20% (509km)
Good: 38%(940km) Fair:42%(1050km Poor: 20% (509km)
Good:60%(1552.5), Fair:26%(677km), Poor: 14% (376.5km). Increase due to dual carriage
Good: 55%(1432.64), Fair: 39%(1017.86), Poor:6%(155.51)
2. Total funds disbursed for routine maintenance, periodic maintenance, relative to the maintenance needs of each modal network
70% 54% 66% 56% 55% 65%
3. Proportion of roads maintained/rehabilitated
65% 35% 50% 57% 45% 45%
Trunk Roads (km)
Routine maintenance 10,674 6,949 12,526.70 9,678 10,674
12,166
Periodic maintenance 43 285 231 149 159.23 59
Minor rehabilitation and upgrading
44 324 96 66.08 35.5 43
Urban Roads (km)
Routine maintenance 2,648 2213 1,680 3,042 3,520 3,554
Periodic maintenance 582 416 700 1,126 852 363
Minor rehabilitation and upgrading
60 119 71 89 89 117
Feeder Roads (km)
Routine maintenance 16,000 9517 6,200 16,000 12,686 15,400
Periodic maintenance 1,000 788 293 470 1,285 530
Minor rehabilitation and upgrading
1,395 781 262.2 361 1,325
360.8
4. Annual road crashes*
12,299* 11,506* 10,887* 14,914* 12,870
- Fatal accidents 1,790 1,686 1,738 2,249 2,095
- Casualties 18,496 16,904 16,219 14,914 14,390
- Fatalities 2,237 1,986 2,199 2,249 2,095
5. Road condition mix: 50% Good, 30% Fair, 20% Poor
40% Good, 29% Fair, 31% Poor
43% Good, 28% Fair, 29% Poor
42% Good, 28% Fair, 30% Poor
42% Good, 28% Fair, 30% Poor
45% Good, 25% Fair, 30% Poor
Total Network 67,450 km 67,450 km 67,450 km 67,853 km 68,067 km 71,0639km
Trunk Roads 12,840 km 12,840 km 12,840 km 13,263 km 13,477 km 14,873km
Ur ban Roads 12,400 km 12,400 km 12,400 km 12,400 km 12,400 km 14,000km
Feeder Roads 42,210 km 42,210 km 42,210 km 42,190 km 42,190 km 42,190km
35
Status of Key Development Projects
Over the period the sector continued to improve major road corridors to promote trade and economic activities. Some of the projects at various stages of completion are listed below:
•Central Corridor: Nsawam By Pass ( 98%), Kwafokrom – Apedwa (62%), Techiman-Kintampo (100%), Buipe – Tamale 84%%), Construction of Sunyani Road in Kumasi ( 80%) Fulfulso-
Sawla 42zz5).
•Eastern Corridor: Asikuma Junction – Kpeve 4.4%), Dodo-Pepesu to Nkwanta road project38.14% ), Nkwanta – Oti Damanko 7.5%).
•Coastal Corridor: Agona Junction to Elubo Road ProjectLot1(26.08%), lot2(27.92%) and lot3(14.29)
•Accra East Corridor: Accra East corridor roads - Lot1: Reconstruction of Giffard road 66.32%, Lot2: Construction of Burma Camp Road1,65.60% and Lot3: Construction of Burma Camp Road
2, 70.03%
Also over the same period the following activities were undertaken in Metropolitan and Municipal Cities to ensure reduced travel time for commuters :
1.Overhaul of Traffic Signals (GOG): Traffic signals in most major urban centres have been
overhauled to reduce intersection bottlenecks. To ensure uninterrupted operation and reduced
energy consumption, 48-hour power backups and Light Emitting Diodes (LED) technology were introduced for the traffic signals nationwide. This has reduced the incidence of vehicular conflict
at key intersections and improved the safety of pedestrians at the junction crossings.
2.Urban Transport Project (IDA/AFD/GEF): Works on Lot 1 involving the expansion of the Odaw bridge and construction of flyover bridges are substantially completed and has been opened to
traffic.
The Type B routes namely the Amasaman and Adenta routes have been selected by the UTAC
(Urban Transport Advisory Committee) for implementation. ITP, the Consultant reviewing the bus priority and infrastructure measures has submitted the Survey and implementation Study
and is yet to submit the Business Case report by middle of November 2013. After the study,
Consultants are to be procured to undertake detailed engineering design and supervision of the works for implementation and completion by December 2014.
3.Awoshie-Pokuase Road and Community Development Project (AFD/AfDB): The project is
being implemented in two (2) sections; Section I from Awoshie to Anyaa (financed by AFD) is
79% complete while Section II from Anyaa to Pokuase (financed by AfDB) is 76% complete. The payment of compensation to project affected persons (PAPs) is ongoing and has been
completed for 1,595 persons out of 1792. Under the Community Development component of the project, procurement is in progress for
14 schools, 2 hospitals and the Anyaa market.
4.Transport Sector Project (IDA): The works involve the construction of Giffard and Burma
Camp roads (Lots 1, 2 and 3). The Contracts were signed in May 2012 and Contractors have begun active work on site. The contract duration for each Lot is 18 calendar months. The three
Lots are on average, about 48% completed.
5.Kumasi Road and Urban Development project (AFD) –Work on this project involved the
reconstruction of the Oforikrom-Asokwa bypass (including an Interchange at Timber Gardens) and the Lake road. The project has been completed and its defects liability period ended in
June 2013.
36
6.Construction of Sunyani road in Kumasi (Okomfo-Anokye Teaching Hospital to Abuakwa)
(GOG) – This project suffered long delays due to delay in payment to both the Contractor and Project Affected Persons (PAPs). The works resumed in August 2011 as a result of
supplementary funding from GOG. The physical progress of works to date is recorded at 80% (including the interchange) and the works are expected to be completed by December 2014.
7.Works on the Kpeshie (Bush) road (GOG) – Contract on the project was terminated and re-awarded and works are progressing.
8.Construction of Kwame Nkrumah Interchange (Brazilian Government)
The Government has signed an agreement with the Brazilian Government to construct 3-tier vehicular interchange at the Kwame Nkrumah Circle. The first flyover will carry traffic from Ring
road central to Ring Road West. The second flyover connects the Akasanoma Road and the
Ring Road West. Facilities for pedestrians, cyclists and persons with disabilities will also be provided. A key component of the interchange is the provision of green strips and verges to
serve as noise barriers that reduce the level of noise pollution from vehicle, as a carbon sink and also for aesthetics. GOG has made budgetary provision for compensation payments to
affected properties within the project vicinity. Construction of the works has commenced for a
duration of 24 months.
9.Traffic Management. The following projects have been initiated to improve traffic flow in Accra.
i.Spintex road-Polo ground by-pass: current progress is 85% complete
ii.Gulf house – Gimpa by-pass: Project commenced in November 2011 and is currently 95%
complete. iii.Boundary road (American house-Madina): Project commenced in November 2011 and is
currently 75% complete.
To provide mobility and access to rural communities the Sector undertook the following projects:
Bridge Development Programme
The Department of Feeder Roads under its Bridge Development Programme identified 5,000 water crossing points that hamper the provision of basic access to rural communities.
Out of this number 1,200 sites have been classified as critical for the effective functioning of the rural road network.
The Department with assistance of some Development Partners such as Japan
International Corporation Agency (JICA), Department for International Development
(DFID) of United Kingdom, Agence Francais de Development (AFD) (France), ACROW Corporation of United States of America (USA), Spanish Government and the Government
of the Royal Netherlands have been able to construct about 170 bridges and major box culverts so far out of the 1,200 critical river crossing points.
The Bridge Development Programme forms part of the Ministry’s programme under the Ghana Poverty Reduction Strategy which aims at improving the socio-economic life of the
rural dwellers. The provision of the bridges has facilitated the safe and more economical movement of people, goods and services in the rural communities due to the elimination
of long detours and making the network more coherent and efficient.
Feeder Roads Improvement Component of the Transport Sector
Programme
The feeder roads component of the programme consists of; the first year and the second year components. The first year component involves feeder roads rehabilitation
and spot improvement of 680km of roads and the objective is to consolidate the
37
achievements made under the RSDP. Eighty one (81) out of eighty four (84) contracts
awarded have been completed.
For the second year project, eighteen (18) lots totaling 136.4km have been awarded and this consists of 12.85km of spot improvement, 64.8km of rehabilitation and 58.7km
of bitumen surfacing.
38
CHAPTER TWO
2 DEVELOPMENT ISSUES
Though the SMTDP (2010 – 2013) was also meant to address major issues and mitigate several
problems in the transport sector, some of them still persist while new ones have emerged. The
development issues identified under SMTDP (2010 -2013) which are still being addressed, will be rolled
over to the NMTDPF (2014 -2017). The development issues captured under the thematic areas in the
NMTDPF are as summarised in table 2-1 and discussed below:
2.1 Thematic Area 2: Enhancing Competitiveness of Ghana's Private Sector
This thematic area in the NMTDPF seeks to empower and increase private sector participation in the
delivery of public goods and services. The transport sector has an important role to play by creating a
vibrant investment and performance-based management environment that appeals to and maximizes
benefit from the private sector.
The road sector is funded mostly from the Central Government, bilateral and multilateral development
organisations. These sources have not been able to adequately build and maintain the roads and
services as required. There is the opportunity to partner the private secure to finance and maintain
roads through various PPP arrangements. The Ministry of Finance has issued a policy framework for
engaging in public-private-partnerships. Although the enabling legislation is yet to be provided to
facilitate its implementation, the sector has already initiated some projects with the private sector. the
solicited proposal advertised received good response from the private sector, creating competition that
gives the sector the opportunity to get value for money.
As a policy, the road sector engages the private sector to provide consultancy services for design and
supervision of major road works and maintenance. Private consultants are also invited to provide
technical assistance where needed and services such as toll collection, education and sensitisation
compaigns on projects corridors, assessment of project impacts, data collection as well as supply of
goods and equipment.
2.2 Thematic Area 5: Infrastructure and Human Settlement Development
The road sector is aware of the importance of road infrastructure in propelling economic growth and
has been focusing on creating a sustainable, accessible, affordable, reliable, effective and efficient
transport system that meets user needs. As such considerable inroads have been made at developing
and maintaining major corridors and community roads whiles paying attention to the integration of
land-use and transport needs.
The challenge of insufficient funds to cover road maintenance needs hampers the sector’s performance.
Funds released relative to the maintenance needs for 2010 and 2011 were at a level of 66% and 56%
respectively and these could only cover about 50% and 57% of the road network over the period.
Strategies will be adopted to ensure that there is adequate funding to meet maintenance needs through
identifying and optimising all possible avenues of generating capital and ensuring that monies are
properly and effectively allocated for maintenance through evidence based decision making.
The poor condition of the road network can be attributed to many factors, notable among these is
excessive loading. Although the sector is making efforts to preserve the road network by checking axle
39
loads, some of the axle load control stations are not fully equipped and sensitization programmes to
various stakeholders have not been far reaching enough.
The sector will continue to adopt strategies to improve the existing road infrastructure and provide new
ones to reach key centres of population, production or tourism, enhancing mobility and accessibility as
a contribution to poverty reduction. The axle load control programme will continue in earnest to reduce
the abuse of the road ways. Efforts will be made to solicit for funding to continue resourcing the axle
weighbridge stations and extend the sensitisation workshops throughout the country to engage
stakeholders and roads users on the importance of reducing excessive loads on the roads ways.
Activities towards improvement of the major corridors which facilitate transit and trade will be
intensified. Strategies towards reducing all non-physical barriers to trade along these corridors through
harmonisation of traffic laws and standards with neighbouring countries, and sensitisation programmes
with key stakeholders will be further pursued.
Great efforts will be made at integrating transport provision with land-use and ensure that transport
planning is done in collaboration with key stakeholders in other sectors and beneficiary communities.
This will be seen in an increase in the number of consultative meetings with various stakeholders. Also
there will be a rigorous pursuit of the decentralisation of the management, financing and maintenance
of road infrastructure.
In providing transport infrastructure mostly for vehicles to meet higher economic demands, the
transport needs of non-motor road users, people living with disabilities, aged, women and children will
not be ignored. Plans have been made to provide and improve facilities for Non-Motor Traffic such as
bicycle paths and pedestrians walkways beginning with educational institutions and public areas.
Meeting higher economic demand for transport infrastructure will be done giving due consideration to
environmental sustainability. Environmental units will be established to monitor the application of
standards and requirements for SEA/EIA and health and safety standards for transport infrastructure
projects.
2.3 Thematic Area 6: Human Resource Development, Productivity and Employment
The acquisition and application of knowledge and skills for problem solving in the transport sector was
pursued to a large extent under the SMTDP 201-2013. Annual training programmes planned were
carried through for officers in the sector as well as supporting training institutions to run programmes
for the sector. This will be continued and further collaboration with other sectors and institution will be
sort to improve upon the capacity and skills of officers in the sector.
The sector could not complete the development of the multi-disciplinary human resource strategy within
the period. Also planned programmes to update officers in the area of procurement, contract
administration and management to ensure efficient project procurement and supervision was realised
only to a small extent. While attempts have been made at training staff on negotiating of public private
partnerships, none has been fully engaged to manage any transaction of such a manner.
These programmes have therefore been marked out for this period to ensure the sector adequately
trains and benefits from the knowledge acquired from these programmes
Contractors and consultants will be reclassified to enhance delivery to the sector. Continuous support
will be given to the Koforidua Training Centre to develop new courses for MDA staff as well as
40
contractors and consultants. The support to KNUST in training staff in transport engineering will
continue.
The sector is pursuing a research strategy to ensure research work is translated to enhance the
performance of the activities in the sector. One of the completed researches into the use of local
materials to make construction more affordable has not received a research strategy to guide its
implementation.
2.4 Thematic Area 7: Transparent and Accountable Governance
Under this thematic area the transport sector rolled out programmes such as Ensuring cost recovery in
road financing, Ensuring a sustainable maintenance programme and the development of an information
management system. However the implementation of these programmes was not without issues and
challenges. Though plans were prepared for policy and planning integration within the sector and other
MDAs, the collaboration and coordination between the sector and key stakeholders is not very smooth.
Also policy formulation and coordination of policies to solve transport problems through evidence based
decision making tools is not the best since there is insufficient data due to lack of an efficient data
management system.
The development of an effective information management system is being pursued to enable the sector
make informed decisions. The sector is developing data storage and retrieval systems to be able to
store various report and studies conducted in the sector to avoid repetitions and loss of public funds.
The Transport Indicator Database is published annually to show the current trends in the transport
sector. Efforts are being made to adopt a financial management system which will reduce the
signatories for payments raised for road works done, which will help to reduce interests paid for delayed
payments.
Currently, a consultant is being procured to develop an integrated GIS data based system, the
consultant will collect data and build up a GIS data base for the transport sector to enable it properly
make decisions and monitor infrastructure development and maintenance activities.
The sector is still scouting for other means of raising funds to increase the revenue base of the road
fund for maintenance financing. There will be an increased appeal to central government to increase
the fuel levy. This will be supported with relevant data of threats and opportunities. Studies on
Legislations on User Charging, reclassification of road Contractors and Consultants, migration from BOQ
contracts to PBC will are measures that will be exploited to ensure value for money in the sector.
41
Table 2-1 Sector issues and strategies
Thematic Area Sector Objectives Issues Strategies
Thematic area2: Enhancing
Competitiveness of Ghana's
Private Sector
Sector goal 4: Create a
vibrant investment and
performance-based
management
environment that
maximizes benefits for
public and private sector
investors
1. Over-reliance on public funding for
road infrastructure
2. Poor and inadequate regulatory
framework for developing PPP
1. Explore PPP and Concession options for investment in transport infrastructure and
services (single and multi-modal options)
2. Government will provide alternative financing mechanisms including bonds and tax
incentives for investors in transport infrastructure and services
3. Apply the principles of market regulation to transport services by an independent
body
Thematic Area 5: Infrastructure
and Human Settlement
Development
Sector Goal 1: Establish
Ghana as a
Transportation Hub for
the West African Sub-
Region
Sector Goal 2: Create a
sustainable, accessible,
affordable, reliable,
effective and efficient
transport system that
meets user needs
Sector Goal 3: Integrate
land use, transport
planning, development
planning and service
provision
1. Inadequate funding for maintenance,
upgrading and rehabilitation of existing
infrastructure, and management for all
modes of transport.
2. Pre-mature deterioration due to
extensive use of road network
3. Unbearable congestion of roads in our
urban areas
4. Uneven access to transportation
leading to post-harvest losses
5. Failure to apply EIA to all projects
irrespective of funding agency
6. Increase in road traffic accidents.
7. Poor linkages between land use and
transport planning
8. Inadequate facilities for Non-
Motorized Transport
9. The physically challenged are not
adequately provided for in the current
transport system
1. Harmonize Transport and Traffic laws and standards with Ghana’s neighbours to
reduce non-physical barriers to trade
2. Prioritise the maintenance of existing road infrastructure to reduce vehicle
operating costs (VOC) and future rehabilitation costs
3. Improve accessibility by determining key centres of population, production and
tourism, identifying strategic areas of development and necessary expansion
including accessibility indicators
4. Develop and use decision making tools to ensure development investments satisfy
strategic gaps in the transport network
5. Reinstate labour-based methods of road construction and maintenance to improve
rural roads and maximise employment opportunities
6. Implement urban transport projects such as the Ghana Urban Transport Project
(GUTP) including Bus Rapid Transit (BRT) and school bus schemes
7. Rehabilitate and free from encroachment existing NMT routes
8. Raise awareness of benefits of NMT especially the use of bicycles and pedestrian
safety, starting with schools and other educational institutions.
9. Ensure that schools, universities and shops provide facilities for parking of
bicycles and other NMT vehicles
10. Set up credit schemes to allow students to purchase and maintain bicycles at
affordable prices.
42
Thematic Area Sector Objectives Issues Strategies
Sector Goal 6: Ensure
Sustainable Development
in the Transport Sector
11. Establish consultation mechanisms between Transport Sector MDAs, with
MLGRD, MMDAs and other Sector Ministries to implement: a. Integrated Land use
and spatial planning, b. Decentralised Management, Financing and Maintenance of
local transport infrastructure and services; c. Urban Transport Policy
12. Produce practical guidelines for development and transport planning to facilitate
effective integration.
13. Ensure proper acquisition and protection of land for transport
14. Incorporate into master plans of cities, provision of inter-and intra-modal and
'break-bulk' facilities to improve the transfer of goods and passengers from one mode
to another.
15. In collaboration with MMDAs, ensure the provision of independently managed
lorry parks and other transport interchange facilities to encourage competition and
improved customer service.
16. Ensure consistent application of the 'Road Utility Coordination Manual' by
passing appropriate legislations'.
17. Implement existing recommendations for institutional reform and strengthening
in the Transport Sector
18.Develop institutional regulatory arrangements for ensuring the most effective and
efficient movement of freight and passengers from, to and within Ghana
19. Government (as client of infrastructure projects) will include the requirement for
EIA and health and safety standards in contract documentation for infrastructure
projects
20. Create enforcement mechanism to ensure EIA mitigation measures are
implemented and under performance is sanctioned
21. Provide STI, HIV/AIDS and Malaria awareness programmes for all operatives
and on all infrastructure construction sites and adjoining communities.
22.Ensure mechanisms are implemented to improve safety standards in areas such as:
1)Construction Site Safety 2)Occupational Health 3) Standards of training and
certification of seafarers.
23. Incorporate safety auditing to all transport modes.
43
Thematic Area Sector Objectives Issues Strategies
Thematic Area 6: Human
Resource Development,
productivity and employment
Sector goal 7: Develop
adequate Human
Resources and apply new
Technology
1. Limited technical skills needed for
infrastructure construction and
maintenance
2. Inadequate personnel for the
monitoring of policies and programmes
3. Lack of requisite equipment and
technology for operations 4.
Inadequate attention to research into
transport operations 5.
Inadequate attention to health and safety
issues at construction sites
1. Develop a multi-disciplinary transport sector HRD strategy and implementation
plan reflecting the need for greater appreciation of private sector requirements and the
continuous training of existing personnel
2. Increase the range of professional and managerial courses available at tertiary
institutions. 3.
Increase the range of vocational training course to transport personnel in Ghana
4. Promote the role of women in the transport sector as providers of services,
professionals and managers. 5.
Develop a comprehensive research strategy for the transport sector aiding policy
formulation in infrastructure. 6.
Develop a research strategy for advanced vehicle and fuel technologies integrating
transport, energy, and scientific research stakeholders 7.
Make research available to improve the development and maintenance of road
infrastructure and road transport services. 8.
Research the use of modern ICT to improve the development and maintenance of
transport infrastructure and delivery of transport services.
44
Thematic Area Sector Objectives Issues Strategies
Thematic Area 7: Transparent
and Accountable Governance
Sector goal 4: Create a
vibrant investment and
performance-based
management
environment that
maximizes benefits for
public and private sector
investors
Sector Goal 5: Develop
and implement
comprehensive and
integrated Policy,
Governance and
Institutional Frameworks
1. Poor co-ordination and co-operation
among relevant institutions
2. Poor fiscal management caused by
unplanned prioritization of investment,
low construction capacity, weak financial
and management practices
3.Un-integrated approach to transport
planning and development
4. Inadequate enforcement of road
transport regulations 5.
Inadequate response to traffic accidents
and poor trauma care facilities
6. Inadequate evidence-based analysis
and comparison of social, environmental
and economic impacts of modal solutions
1. Apply'user charges' to transport users to fully cover the cost of infrastructure
maintenance, market regulation and administration
2. Ensure adequate revenue is raised to cover infrastructure maintenance costs
3. Increase fuel levy, as one of the user charges, to ensure adequate revenue is raised
to cover all road maintenance and associated administrative costs
4. Increase charges and penalties on road users in line with the damage done and
benefit derived by users.
5. Apply subsidies in a transparent manner, targeting the most vulnerable and
excluded groups.
6. Ensure equity in funding transport infrastructure and services for all modes
7. Develop criteria for modally and geographically equitable development of
infrastructure
8. Encourage performance-led, standards based competition between providers of
infrastructure and services including MDAs to reduce unit cost for transport
development and maintenance.
9. Contract and license the private sector where possible
10. Build capacity of local contractors and consultants and ensure their proper
classification and use
11. Streamline procurement and payment processes for contractor services and pay
on time.
12. Develop a sustainable maintenance management system for transport
infrastructure
13. Move from a BOQ form of contract to performance based contract for road
maintenance
14. Employ effective financial management to maximise utilisation of public funds
15. Collect data to allow critical analysis, monitoring, evaluation and reporting of
sector performance in relation to user needs.
16. Develop indicators to monitor and evaluate sector performance in pursuit of
strategic objectives
17. Ensure collection of transport statistical data to support planning, monitoring,
evaluation and reporting
18. Ensure proper information management and retention of reports and studies from
the Sector
19. Enhance policy formulation and coordination capacity to embrace the wider
policy framework
20. Engage Sector Stakeholders in Transport Sector policy formulation and
implementation.
45 Road Sector SMTDP 2014-2017
CHAPTER THREE
3 DEVELOPMENT GOALS AND PROGRAMMES
The National Medium Term Development Policy Framework (NMTDPF 2014-2017) is the new guideline
document for the period 2014-2017. It requires that the sector adopts and aligns its programmes to the relevant thematic goals set out by this document. The thematic areas of the NMTDPF 2014-2017
are:
Ensuring and sustaining macroeconomic stability
Enhanced competitiveness of Ghana’s private sector
Accelerated agricultural modernisation and natural resource management
Oil and Gas development
Infrastructure, energy and human settlement development
Human development, employment and productivity
Transparent and accountable Governance
These themes however are the same as the previous medium term government framework, the GSGDA
2010-2013. The sector therefore will adopt the same four thematic areas it worked with and roll over all its on-going programmes and targets into the next medium term. These four themes are;
Thematic area 2: Enhanced competitiveness of Ghana’s private sector
Thematic area 5; Infrastructure, energy and human settlement development
Thematic area 6: Human development, employment and productivity
Thematic area 7: Transparent and accountable Governance
These thematic areas have been aligned with the road sector policy objectives and strategies as in
Table 2.1.
3.1 Development Priorities
In order to achieve goals, objectives and strategies set in the NMTDP (2014 – 2017) several development programmes and sub programmes have been adopted. Some of these programmes are
new and others are at various stages of implementation under the SMTDP ( 2010-2013).
The sector’s development priorities, as set out in the transport sector policy objectives, have been
formulated to address a wide range of issues affecting the sector. These issues were identified through
extensive public consultation and strategic review in the policy formulation process. These priorities will
ensure that the sector improves accessibility and mobility as a contribution to poverty reduction in the
country. These priorities would still be pursued during the 2014-2017 medium term;
1. Asset preservation
2. Major road rehabilitation and international corridor development
3. Financing and Cost recovery
4. Use of tools for planning and budgeting
5. Improvement in Road Management
6. Capacity Building
7. Mainstreaming of crosscutting issues
8. Pro-poor Programmes
9. Collaboration with other sectors
46 Road Sector SMTDP 2014-2017
Asset preservation
This remains a major concern for the sector since inability to maintain and preserve existing road
network could lead to further early high levels of deteriorations which can only be remedied by
reconstruction or rehabilitation at very high cost. The poor road condition has very telling effect on the
economic cost of moving people and goods from one place to the other. As such programmes targeted
towards asset preservation include; the Road Maintenance Programme, the Axle Load Control
Programme and the Sustainable Maintenance Programme.
Major road rehabilitation and international corridor development
The sector has as part of its national policy; to make Ghana a transport hub. This involves budgeting
to develop the international road corridors to enhance trade opportunities for the country. Apart from
the Western corridor which has not seen great development, there are on-going works on the central,
eastern, and coastal corridors. Also the sector has been collaborating with ECOWAS and the AUC on
the development of the ECOWAS and the Trans-African highways which includes Ghana’s coastal and
central corridors. In the ensuing years the sector will focus on efficiently managing projects on these
corridors to ensure deliverables are realised early to support trade and economic activity.
Financing and Cost recovery
Financing of both maintenance and development activities remain a challenge to the sector considering
the fact that there is inadequate funds to meet road maintenance needs and several development
projects have stalled because there are inadequate matching funds or unavailable funds for payment
of works done. To raise and sustain a desirable funding base for the sector’s activities, programmes to
be pursued include PPP initiatives for road infrastructure development, negotiating for an increase in
sector revenue component of the fuel levy and applying user-charging principles to road users.
Use of tools for planning and budgeting
Much more attention will be given to the use of modern and state of the art decision making tools for
planning and budgeting to ensure better accountability of capital investments made. Activities have
already being on-going to adopt such tools. Nonetheless, further attention will be given through the
allocation of more resources into programmes like; Development of Information management system,
Institutional Reform Programme and the Human Resource Development Programme.
Improvement in Road Management
In the management of contracts and supervision of road works efforts will be made to ensure efficiency
in procurement, monitoring and evaluation. Contractors and Consultants will be properly reclassified
and also trained to improve the quality of delivery in road infrastructure and services as part of this
strategic programme. Other programmes which will be considered are the Labour based road
construction and maintenance programme and also adequate training of sector staff in procurement,
contract administration and management to ensure efficient project procurement and supervision.
Capacity Building
The transport sector has identified a few human capacity gaps that need to be filled through adequate training. As such in its development programme, there will be continuous updating of officers in the
area of procurement, contract administration and management to ensure efficient project procurement and supervision. The sector will also continue to build capacity in the area of PPP and set up a unit to
identify, prepare and manage private financing projects.
The road sector will ensure that the Koforidua Training School is adequately resourced to develop
courses to train contractors and their staff to improve upon their delivery.
47 Road Sector SMTDP 2014-2017
Mainstreaming of crosscutting issues
Mainstreaming of cross-cutting issues such as Environmental and Social Protection, Road Safety,
Gender Mainstreaming, accessibility for PLWD, Children and the Aged will be given priority in the development programme. This will see programmes such as the Environmental, social, health and
safety programme and Non-motorised Transport Programme further pursued though having been
implemented to an advanced stage.
Pro-poor Programmes Pro-poor and Community Improvement Programmes such as the Poverty Focused Rural Transport
Programme, Export Marketing and Quality Awareness Project and the Northern Rural Growth Programme will be pursued to ensure that the livelihoods of people are improved and also deprived
communities are able to have access to safe and affordable transport. There will also be the promotion
of private sector participation in the use of labour intensive methods through the Labour Intensive Public Works (LIPW) advocacy and training as under the Ghana Social Opportunity Project (GSOP).
Collaboration with other Sectors
The sector remains one of whose activities greatly impact on several other sectors. Its activities
significantly impact on trade, health, tourism, agriculture, education, security etc. As such the sector is in constant interaction with agencies which operate under the aforementioned sectors. To enhance
integration with other sectors, the sector will focus on creating awareness on its policies and programmes. Transport sector data captured which impact on other sectors will also be made available
to them. In appraising the cost and benefit of transport projects much attention will be given to adequately quantifying both negative and positive impacts on other sectors.
3.2 SWOT of Development Programmes
In all 22 programmes have been prepared with definite strategies developed towards the attainment of national goals in the NMTDP. Table 3-1 shows the strategies developed for the programmes and
analyses of the strengths, weaknesses, opportunities and threats (SWOT) of these programmes. In the table analyses is made of the sector’s areas of risk and threats and if possible where mitigation
measures could be developed and applied to successfully execute these programmes.
In these analyses, Strengths are identified as factors; advantages and resources within the sector which
can be utilised to implement the programmes and sub-programmes of the sector. Weaknesses refer to internal disadvantages or negative factors within the sector that inhibits its ability to implement
programmes and sub-programmes. Also Opportunities identified here refer to external factors or resources that can be harnessed or utilised for the implementation of programmes and sub-
programmes. Threats largely refer to external factors or obstacles beyond the control of the sector that
can hamper the sector’s ability to implement programmes and sub-programmes.
48 Road Sector SMTDP 2014-2017
Table 3-1 SWOT of development programmes 2014-2017 STRATEGY PROGRAMME STRENGTHS WEAKNESSES OPPORTUNITIES THREATS
Explore PPP and Concession options for investment in transport infrastructure and services (single and multi-modal options)
PPP initiatives for road infrastructure development
Championing of PPP by Central Government, through the Ministry of Finance formulation of policies and guidelines for procuring PPPs by MDAs
Staff with inadaquate skills in arranging PPPs
Willingness of Development Partners to fund feasibility studies to determine economic and financial viability of potential PPP
Ability to fully achieve value for money
Implement urban transport projects such as the Ghana Urban Transport Project (GUTP) including Bus Rapid Transit (BRT) and school busing schemes
Ghana Urban Transport Programme
Availability of Public Transport Master Plans by MMDAs, Inclusion of BRT options in design of major travel demand corridors and setup of GUTPE offices likely to facilitate provision and management of urban transport facilities
1. Synchronisation of provision of infrastructure with operations of BRT
World Bank is funding existing implementation of the programme in a few areas and other Development partners might join implement for other areas when current one is successful
1. Smoothly facing out existing means of urban and public transport.
2. Poor collaboration between MMDAs implementation agencies
2. Effective implementation in collaboration with MMDAs
Harmonise Transport Traffic laws and standards with Ghana's neighbours to reduce non-physical barriers to trade
International Road Corridors Development Programme
Funding is available for most of the projects under programme with most of the projects currently ongoing
Unavailability of GOG component of project funds likely to stall progress
Development partners have funded feasibility studies on some of the new road corridors with the hope of making investment if feasible
Over-run of projects cost due to poorly done feasiblity studies
Joint Border Post Programme
Number and locations for Border Post already identified
1. Unreasonably high cost of acquiring land from local communities
Considerable comittment from neighbouring countries involved to ensure it is successful
Ensuring that control and operation is integrated across countries.
2. lack of funding for
constructing some of the border post
49 Road Sector SMTDP 2014-2017
STRATEGY PROGRAMME STRENGTHS WEAKNESSES OPPORTUNITIES THREATS
Axle Load Control Programme
1. A lot of equipment acquired for weighing for both permanent and in-motion weighing.
Lack of effective and efficient service by Management Firms and civil works contractors
Acceptance and installation of weighing equipment by ports and other platforms generating traffic cargo likely to help drop percentage in overloading
1. Equipment break down.
2. Laws provided to regulate loading of vehicles.
2. Accurate and reliable data from weighbridge
3. Campaign ongoing on avoiding overloading of vehicles
Improve accessiblity by determining key centres of population, production and tourist centres
Cocoa Roads Programme Funding is available for most of the projects under programme with most of the projects currently ongoing
Funding agencies and industries initiating and determining transport component of projects without consulting relevant transport sector agencies
Successful implementation apart from directly impacting on poverty reduction will encourage funding agencies and industries dealing with mass transport of goods to partner well with the transport sector agencies to deliver the necessary infrastructure and maintain them
Road works contracts going behind schedules
Poverty Focused Rural Transport Programme
Export Marketing and Quality Awareness Project
Northern Rural Growth Programme
Prioritise the maintenance of existing road infrastructure to reduce vehicle
operating costs (VOC) and future rehabilitation costs
Road Maintenance Programme
MDAs have maintained fairly the same total
amount of road network with more focus on
1. Inadequate funds to cover maintenance
needs.
Effective supervision of contractors likely to
achieve value for money in maintenance works
Adverse weather conditions likely to
cause further
50 Road Sector SMTDP 2014-2017
STRATEGY PROGRAMME STRENGTHS WEAKNESSES OPPORTUNITIES THREATS
preservation of existing network
2. Inadequate know-how to design measures against deteriorations caused by climate change
deterioration of roads
Road Maintenance Funding Support from the Ministry
of Finance through absorption of arrears of Fund and also consideration of increase in component of Fund in fuel levy likely to release stress on fund for maintenance activities
1. Inadequate funds to
cover maintenance needs
Current initiatives on the
use of technological decision making tool for maintenance prioritization through HDM IV likely to ensure effective and efficient dispersion of funds for maintenance
Award of
maintenance contracts in excess of available Funds
2. Diversion of Funds for maintenance to upgrade or development activities
Improve accessibility by determining key centres of population, production and tourism, identifying strategic areas of development and necessary expansion including accessibility indicators
Major Roads Development Programme
Most of the roads have been identified, prioritized and feasibility studies have been carried on them
Inadequate funding to cover resettlement of project affected persons and acquire right of way
Right packaging of development projects likely to attract funds from both private sector, development partners, other stakeholder MDAs
Some initiated projects likely to stall leading worse condition than previous due to inadequate cash inflow
Reinstate labour-based methods of road construction and maintenance to improve rural roads and maximise employment opportunities
Labour based road construction and maintenance programme
Government having high interest in the programme since it is directly in line with poverty reduction agenda and job creation strategy
Availability of labour through out construction period
Programme to be better enhanced if government set aside readily available funds for payments
Non timely payment of labourers likely to cause low incentive for working
Raise awareness of benefits of NMT especially the use of bicycles and pedestrian safety, starting with schools and other educational institutions.
Non-Motorised Transport Programme (NMT)
1. MDA in the road sector refocusing on integration of NMT considerations in design
Insufficient protection of NMT users leading to frequent accidents
Calls for climate change adaptations and use of green transport likely to encourage funding for
Poor preservation of routes and areas earmarked for NMT facilities
51 Road Sector SMTDP 2014-2017
STRATEGY PROGRAMME STRENGTHS WEAKNESSES OPPORTUNITIES THREATS
2. Some MMDAs already have NMT master plans or preparing studies
NMT facilities by development partners
Establish consultation mechanisms between Transport Sector MDAs, with MOLGRDE and MMDAs to implement: -Integrated Land use and spatial planning, · - Decentralised Management, Financing and Maintenance of local transport infrastructure
Integrated Transport Planning
Master plans for integrated transport management and provision of facilities already prepared
Poor integration between MDAs and MMDAs
Increase in consultative meetings and proper identification of various stakeholder likely to speed integration programme
Acceptability and uniform implementation of plan across MMDAs
Government (as client of infrastructure projects) will include the requirement for EIA and health and safety standards in contract documentation for infrastructure projects
Environmental, health and safety programme
Policies and guidelines for EIAs have been prepared in conjunction with EPA. Safety audit is becoming a regular requirement before and during stages of civil works
Lack of resources and Inadequate staff dedicated to effectively monitor environmental activities
Establishment and resourcing of environmental units in MDAs to make programme effective
Poor budgetory allocation likely to impede and demotivate staff managing environmental issues
Develop a multi-disciplinary transport-sector HRD strategy and implementation plan reflecting the need for greater appreciation of private sector requirements and the continuous training of existing personnel
Human Resource Development Programme
The ministry is associated with several training institutions and often send staff on training in these institutions.
Inability to determine a comprehensive training needs assessment of staff
Effective collaboration with training institutions, especially those outside the country can reduce the marginal cost of training a staff or invitation of facilitators for training
Loss of developed human capacity
Develop a research strategy for advanced vehicle and fuel technologies
integrating transport, energy, and scientific research stakeholders
Research Development Programme
The ministry is associated with several training
institutions and often send staff on training in these
1.Unavailability of data for research due to poor
records keeping.
Private research institutions acquire and
utilise data collected from MDAs which makes it
Research outputs not implemented
52 Road Sector SMTDP 2014-2017
STRATEGY PROGRAMME STRENGTHS WEAKNESSES OPPORTUNITIES THREATS
institutions. MDAs have laboratories and existing data useful for research
2. Inadequate support to research in terms of staff motivation and provision of state of the art testing equipment
possible to effectively collaborate with them to do research for the Ministry
Build capacity of local contractors and consultants and ensure their proper classification and use
Development of local contractors and consultants
A few training schools and laboratories available to train consultants and
contractors.
Poor motivation for existing traineers and also training centres
poorly equipped
Effective collaboration with association of contractors and
consultants likely to raise enough money to meet financing needs
Ineffective classification of contractors and
consultants making it difficult to identify training needs
Develop a sustainable maintenance management system for transport infrastructure
Sustainable maintenance programme
Staff of MDAs well trained in maintenance planning and operations
1. Inadequate funds to cover maintenance needs.
Regular inventory and condition survey as well as calibration of softwares for maintenance decision making likely to help packaging of
maintenance activities
Poor budgetory allocation likely to impede and demotivate staff involved in maintenance planning
2. Poor application of maintenance decision making tools such as
HDM IV
Ensure proper information management and retention of reports and studies from the Sector
Development of information management system
Implement existing recommendations for institutional reform and strengthening in the Transport Sector
Institutional reform programme
53 Road Sector SMTDP 2014-2017
In summary, the major strengths of the programmes is that most are on-going with funding available
and expended to some extent. Also for other programmes feasibility studies have been done and the
necessary framework for execution has been prepared.
However the main weaknesses to the execution of the programmes include inadequate funding to deliver
full scope of programmes and at required time lines. There is inadequate staff with adequate capacity to
handle some areas of programmes requiring high expertise and technical know-how. There is an attempt
however to deal with this problem through training of staff and recruitment of new ones. Thorough
consideration would have to be given to the timing for training and recruitment to make them relevant
to the specific programmes.
Likely threats identified for most of the programmes is the lack of interest from other beneficiary or
affected stakeholders, inadequate cash flow to continue project execution, lack of maintenance and
preservation of acquired programme assets and adverse climatic conditions.
Having identified the strengths, weaknesses and threats of the programmes, opportunities are available
for successfully achieving programme goals and targets with the possibility of continuing the programme
with a new scope and a new set of indicators. Better still replicating it in other areas or sectors is possible.
Early benefits to stakeholders of some of the programme deliverables are likely to trigger more allocation
of resources from funding sources. Also, once hurdles at the early stages of the programmes which
require a lot of negotiation, compensation of affected persons and buy-in from various stakeholders are
overcome, there is the likelihood of the programme being sped up to completion.
3.3 Development Projections 2014-2017
The development programmes components have been linked with the main programmes in the
Expenditure by Budget Programme (BP) and Economic Classification as prescribed in the MTEF. All
development programme activities which have similar characteristics have been placed under four main
categories and costed under selected Budget Programmes. As such the main programme budget
headings applied for the sector under the programme based budgeting include; General Administration
and Management, Road Construction, Rehabilitation and Maintenance and Road Safety and Environment.
General Administration and Management (BP1) This covers the planning, development and administration of the Road network. It entails policy
formulation, coordination and oversight, performance monitoring and evaluation of the sector. The sub
programmes under this budget programme include:
General Administration (BSP1.1)
Finance (BSP1.2)
Human Resource (BSP1.3)
Policy, Planning, Monitoring and Evaluation (BSP1.4)
Research Statistics and Information Management (BSP1.5)
Road Construction (BP2)
This programme involves feasibility studies, design, the right of way acquisition and construction of roads
to improve accessibility and mobility of people, goods and services. Operations under this programme
include major improvement and development works.
Improvements include; Major Rehabilitation and Upgrading. While Development Works involve
Reconstruction, Construction, Interchanges, Bridges, Consultancy, Right of way acquisition and
Compensation to project affected persons.
Rehabilitation and Maintenance (BP3)
54 Road Sector SMTDP 2014-2017
Activities under this budget programme includes; Shoulder Maintenance, Rehabilitation of Drainage
Structures, Vegetation control, Pothole patching, Grading and Desilting. All with the aim of preserving
initial cost of road construction while minimising vehicle operating cost and providing rider comfort. Sub
programmes under this budget programme are;
Routine Maintenance (BSP 3.1)
Periodic Maintenance (BSP 3.2)
Minor Rehabilitation (BSP 3.3)
Road Safety and Environment (BP4)
The Road Safety and Environment Programme is responsible for the following:
Timely identification of road hazards;
Speedy response to complaints from communities on road hazards;
Effective road safety audit involving the inspection and analysis of road hazards and prescription
of measures to abate hazard;
Enforcement of axle load limits;
Control of adverse social and environmental impacts.
Installation and Maintenance of Road Furniture (Road signs, crash barriers etc)
Road line Marking
Provision of Speed Calming Measures
Tables 3.2 to 3.5 shows the projected budgets for the sector agencies for the 2014-2017 period.
Table 3-2 Projected Expenditure for Road Sector (2014-2017)
Road Sector Projected Expenditure (GH¢'000)
EXPENDITURE BY
BUDGET PROGRAM 2014 2015 2016 2017 TOTAL
%
BP1: MANAGEMENT AND
ADMINISTRATION 49,010.95 54,593.34 56,474.22 59,297.93 219,376.43
2.88
BP2: ROAD
CONSTRUCTION 1,544,601.31 958,598.90 1,015,339.78 1,066,106.77 4,584,646.76
60.27
BP3: ROAD
REHABILITATION AND
MAINTENANCE
1,436,484.27 354,504.05 367,431.97 385,803.57 2,544,223.85
33.45
BP4: ROAD SAFETY AND
ENVIRONMENT 76,510.38 41,941.73 68,063.79 71,466.98 257,982.87
3.39
TOTAL PROGRAMME
EXPENDITURE 3,106,606.91 1,409,638.02 1,507,309.75 1,582,675.24 7,606,229.92
100.00
EXPENDITURE BY
ECONOMIC
CLASSIFICATION
2014 2015 2016 2017 TOTAL
COMPENSATION OF
EMPLOYEES 40,401.11 46,256.01 48,076.49 50,480.32 185,213.93
2.44
GOODS AND SERVICES 15,543.26 17,532.94 17,990.57 18,890.10 69,956.88 0.92
ASSETS 3,050,662.54 1,345,849.06 1,441,242.68 1,513,304.82 7,351,059.11 96.65
TOTAL EXPENDITURE
BY ECONOMIC
CLASSIFICATION
3,106,606.91 1,409,638.02 1,507,309.75 1,582,675.24 7,606,229.92
100.00
EXPENDITURE BY
FUNDING SOURCES 2014 2015 2016 2017 TOTAL
CONSOLIDATED FUND 1,764,285.44 890,416.88 971,091.96 1,019,646.56 4,645,440.83 61.07
55 Road Sector SMTDP 2014-2017
DONOR FUND 321,706.26 258,139.60 264,983.79 278,232.98 1,123,062.64 14.77
ROAD FUND 1,019,225.21 259,483.04 269,587.55 283,066.92 1,831,362.72 24.08
IGF 1,390.00 1,598.50 1,646.46 1,728.78 6,363.73 0.08
TOTAL EXPENDITURE
BY FUNDING SOURCES 3,106,606.91 1,409,638.02 1,507,309.75 1,582,675.24 7,606,229.92
100.00
The projected expenditure for the medium term 2014-2017 includes the arrears owed to contractors for road construction and maintenance works executed in the previous years. These arrears are included in
the 2014 expenditure figures and budgeted to be paid from the cosolidated fund and the road fund for the same year, hence the rather high budget for that year. If this projection is unfufilled, the arrears will
spill-over to the subsequent years changing the outlook of this planned budget.
The sector budget is mainly expended on the road assets, for road construction and maintenance. Table
3-3 below shows the planned budgets for the various activities for each agency.
Table 3-2 Projected Expenditure per Activity per Agency (GH'000)
AGENCY 2014 2015 2016 2017 TOTAL
Headquarters
PGM1: Management and Administration 10,333.64 11,510.65 11,902.01 12,497.11 46,243.41
PGM2: Road Construction
PGM3.1: Routine Maintenance
PGM3.2: Periodic Maintenance
PGM3.3: Minor Rehabilitation
PGM4: Road Safety and Environment
Sub-total (Headquarters) 10,333.64 11,510.65 11,902.01 12,497.11 46,243.41
Ghana Highway Authority
-
PGM1: Management and Administration
25,893.18
28,842.41
29,834.59
31,326.32
115,896.51
PGM2: Road Construction
910,248.63
564,900.30
598,336.75
628,253.58
2,701,739.26
PGM3.1: Routine Maintenance
156,884.08
38,718.99
40,128.36
42,134.78
277,866.21
PGM3.2: Periodic Maintenance
171,156.04
42,241.31
43,778.89
45,967.84
303,144.08
PGM3.3: Minor Rehabilitation
148,947.16
36,760.16
38,098.23
40,003.14
263,808.69
PGM4: Road Safety and Environment
51,057.33
27,989.63
45,421.57
47,692.65
172,161.17
Sub-total (GHA)
1,464,186.42
739,452.80
795,598.39
835,378.31
3,834,615.92
Department of Feeder Roads
PGM1: Management and Administration
6,500.00
7,240.35
7,489.42
7,863.89
29,093.66
PGM2: Road Construction
306,009.80
189,909.68
201,150.44
211,207.96
908,277.89
56 Road Sector SMTDP 2014-2017
AGENCY 2014 2015 2016 2017 TOTAL
PGM3.1: Routine Maintenance
147,936.05
36,510.62
37,839.60
39,731.58
262,017.86
PGM3.2: Periodic Maintenance
141,814.99
34,999.94
36,273.94
38,087.63
251,176.50
PGM3.3: Minor Rehabilitation
139,400.23
34,403.98
35,656.28
37,439.10
246,899.59
PGM4: Road Safety and Environment
4,596.48
2,519.79
4,089.12
4,293.57
15,498.96
Sub-total (DFR)
746,257.56
305,584.36
322,498.80
338,623.74
1,712,964.45
Department of Urban Roads
PGM1: Management and Administration
6,284.13
6,999.89
7,240.69
7,602.72
28,127.43
PGM2: Road Construction
328,342.89
203,769.59
215,830.72
226,622.25
974,565.45
PGM3.1: Routine Maintenance
160,430.07
39,594.14
41,035.37
43,087.14
284,146.72
PGM3.2: Periodic Maintenance
163,260.43
40,292.67
41,759.33
43,847.29
289,159.73
PGM3.3: Minor Rehabilitation
206,655.24
51,002.51
52,859.00
55,501.95
366,018.71
PGM4: Road Safety and Environment
20,856.58
11,433.58
18,554.41
19,482.13
70,326.69
Sub-total (DUR)
885,829.33
353,092.39
377,279.51
396,143.49
2,012,344.73
GRAND TOTAL
3,106,606.95
1,409,640.20
1,507,278.71
1,582,642.65
7,606,168.51
The above projections are the annual requirement by the road agencies to cover the payment of arrears
and improve the network to the target road condition of 60%good, 20%fair and 20%poor by the end of the 2017.
57 Road Sector SMTDP 2014-2017
3.4 Sources of Funding
Sources of funding secured for the implementation of this SMTDP include GoG Funds, Road Fund,
Development Partners Funds and the Capital Market Loan. The tables below Table 3-4 indicates how
resources will be mobilised for the implementation of the programme activities.
Table 3-3 Projected Secured Funds (GH'000)
2014 2015 2016 2017 TOTAL
Headquarters
Consolidated Fund 1,784.86 900.82 982.43 1,071.44 4,739.56
Donor Funds
IGF
Road fund 14,760.00 3,763.80 3,876.71 3,993.02 26,393.53
Sub Total
16,544.86
4,664.62
4,859.15
5,064.46
31,133.09
Ghana Highway Authority
Consolidated Fund
107,279.65
54,144.04
59,049.49
64,399.37
284,872.54
Donor Funds
292,586.31
234,069.05
240,271.88
246,639.08
1,013,566.32
IGF
69,789.11
17,796.22
18488.49483
19207.69727
125,281.52
Road fund
80,880.00
93,012.00
95,802.36
98,676.43
368,370.79
Sub Total
550,535.06
399,021.31
413,612.22
428,922.58
1,792,091.16
Department of Feeder Roads
Consolidated Fund
39,916.33
20,145.77
21,970.98
23,961.55
105,994.63
Donor Funds
44,245.84
35,396.67
36,334.68
37,297.55
153,274.74
IGF
4,885.08
1,245.70 1294.153076 1344.49563
8,769.42
Road fund
72,960.00
83,904.00
86,421.12
89,013.75
332,298.87
Sub Total 162,007.25 140,692.14 146,020.93 151,617.35 600,337.67
Department of Urban Roads
Consolidated Fund 70,321.70 35,491.36 38,706.88 42,213.72 186,733.66
Donor Funds
137,639.95
110,111.96
113,029.93
116,025.22
476,807.06
IGF
10,827.93
2,761.12 2868.530978 2980.116833
19,437.71
Road fund
71,770.00
82,535.50
85,011.57
87,561.91
326,878.98
Sub Total
290,559.58
230,899.94
239,616.90
248,780.97
1,009,857.40
Grand Total
1,019,646.75
775,278.01
804,109.20
834,385.36
3,433,419.32
Table 3-4 Total Projected Secured funds (GH'000)
58 Road Sector SMTDP 2014-2017
Sources of
Funding 2014 2015 2016 2017 TOTAL
%
Contribution
Consolidated
Fund
219,302.54
110,681.99
120,709.78
131,646.08
582,340.39 17.0%
Donor Funds
474,472.10
379,577.68
389,636.49
399,961.85
1,643,648.11 47.9%
IGF
85,502.12
21,803.04
22,651.18
23,532.31
153,488.65 4.5%
Road fund
240,370.00
263,215.30
271,111.76
279,245.11
1,053,942.17 30.7%
TOTAL
1,019,646.75
775,278.01
804,109.20
834,385.36
3,433,419.32 100.0%
The secured funds are projected from the annual budget ceilings given to the sector from the consolidated fund and the road fund. The secured donor funds are funds that are already committed to on-going road
projects across the country.
It can be inferred from tables 3.2 and 3.5 that the consolidated fund allocated to the sector is woefully below the needs or expectation of the sector to achieve the set targets of this medium term programme.
There will be continuous dialogue with the Ministry of Finance to justify the increment to annual budget
allocation and payment of arrears to enable contractors and consultants continue to provide effective services to the sector thereby improving the network.
The Donor funds secured are adequate to cover the cost of the on-going projects committed for the
period and beyond. The road fund although accounts for 30% of the expected secured funds is below
the sector’s requirement to cover the maintenance needs of the network.
3.5 Indicative Financial Cost
Table 3.6 below indicates the financial outlay for the road sector medium term programme. An estimated
amount of GH¢4,172.75million is required for the programme implementation. Out of this amount GH¢ 3,433.42 million has been secured, representing about 45% of the estimated amount.
Table 3-5: Financial Outlay – Road Sector SMTDP 2014-2017
FINANCIAL OUTLAY (GH'000)
2014 2015 2016 2017 TOTAL
% of
total
Prog
MRH 10,333.64 11,510.65 11,902.01 12,497.11 46,243.41 1%
GHA 1,464,186.42 739,452.80 795,598.39 835,378.31 3,834,615.92 50%
DFR 746,257.56 305,584.36 322,498.80 338,623.74 1,712,964.45 23%
DUR 885,829.33 353,092.39 377,279.51 396,143.49 2,012,344.73 26%
TOTAL 3,106,606.95 1,409,640.20 1,507,278.71 1,582,642.65 7,606,168.51 100%
TOTAL SECURED
FUNDS 1,019,646.75 775,278.01 804,109.20 834,385.36
3,433,419.32 45%
FUNDING GAP 2,086,960.20 634,362.19 703,169.51 748,257.29 4,172,749.19 55%
% GAP 67.18% 45.00% 46.65% 47.28% 54.86%
The funding gap of 67% in the first year includes the arrears which are yet to be paid for road works and services provided to the sector in the past years. This was programmed to be paid under the consolidated
fund for the year 2014. However, the allocation to the sector as shown in table 3-5 for the year 2014
59 Road Sector SMTDP 2014-2017
shows that part of this debt will be carried into the following years. There may also be supplementary budget allocation to the sector from the consolidated fund during the period.
3.6 Controlling Expenditure
Section 21 of the Public Procurement Act 2003 (Act 663) demands that all ‘Entities’ prepare procurement
plans to support their approved programmes. The purpose of this is to ensure that they have realistic programmes which can be effectively executed to completion.
Preparation of procurement plans and their update, as required by law, would provide a valuable mechanism for controlling over commitment and over expenditure as reported consistently by road
agencies.
The following strategies would be deployed to control expenditure in the sector: 1. Agencies under Ministry would prepare procurement plans and adapt them based on approved
programmes. The plans would be updated at quarterly intervals as required by Act 663. When
implemented according to the Law, the procurement plan will provide an effective mechanism
for controlling costs and managing the programme of works including the request for variations
and additional work within budget limitations.
2. A procedure would be developed and applied by all road agencies for managing ‘unplanned’ or
‘non-programmed’ projects that are introduced mid-programme. The procedure should provide
a framework for assessing the comparative impact of the proposed project against projects
already approved in the programme, including sign-off and justification from the proposers of
the new projects.
3. Reporting on the status of procurement plans and their compliance with Act 663 should be made
a compulsory item in management reports and meeting agendas for all road agencies.
4. Agencies would identify and implement pilot projects to employ ‘term’ and ‘performance-based’
contracts as noted above.
5. The Ministry, in conjunction with the road agencies and contractor organisations, would develop
procurement and tendering guidelines for application on development, routine and periodic
maintenance contracts.
6. Implement budget approval procedures to comply with Act 536
7. With immediate effect, Agencies implement remedial measures to restore basic levels of good
management practice as follows:
Stop letting contracts for which funding has not been secured
Apportion a percentage of their budget to systematically eliminate the back log
Review their contractor lists and eliminate those contractors failing to comply with
requirements
Terminate contracts in which the contractor has failed to perform as required by the contract
– i.e. enforce the terms of contract.
Develop criteria for expansion of the road network based only on policy objectives
Implement Performance Agreements based on 5-year strategic plans prepared and
submitted by road agencies as proposed ISTS (2006) and IRWG (2007).
60 Road Sector SMTDP 2014-2017
Agencies under the Ministry would be expected to strictly abide by Section 12(1) of the Road Fund Act,
which states that: “There shall be prepared annually at least three months before the end of each financial
year, for the consideration and approval of the Board, an Annual Road Programme and Annual
Expenditure Programme in respect of the next financial year by the departments and bodies charged with
the implementation of the road policies of the Ministry”.
61 Road Sector SMTDP 2014-2017
CHAPTER FOUR
4 IMPLEMENTATION OF ANNUAL ACTION PLAN
Within the policy objectives set by the transport policy which are in line with the NMTDP (2014-2017),
the road sector has outlined programmes and projects that consist of measures:
- To provide road network infrastructure and services at minim cost throughout the country for accelerated economic growth especially in the agricultural, industrial, trade and services sectors
whiles ensuring cost recovery
- To identify and institute measures which provide private sector participation in the road sector - To institute standards to ensure safety, reliability and efficiency of the Country’s road network
systems to meet national and international requirements - To strengthen the institutional capacities in the management of the road network systems
- To progressively improve road network infrastructure and services in the deprived areas to increase employment opportunity and reduce the incidence poverty
- To develop and implement an equitable integrated transport network programme in support of
socioeconomic development of the nation - To ensure sustainable funding for road sector programmes
- To review existing and develop new policies, regulations and laws which conform to changing trends and the needs of road transport infrastructure users and transport service providers of
the nation.
The programme of activities, sector objectives, strategies, indicators, indicative cost are outlined in the TABLE 4-1.
Road Sector SMTDP 2014-2017
Table 4-1 Programme of Activities for Road sector SMTDP 2014-2017
NMTDPF
Thematic Areas
Sectors
Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Thematic area2:
Enhancing Competitiveness
of Ghana
Private Sector
Sector goal
4: Create a vibrant investment
and performance-based
management environment
that maximizes benefits for
public and private sector investors
PPP initiatives for road infrastructure
development
Dualisation of Accra –Kumasi
road
GHA MRH, MOFEP
Rehabilitation of Accra –
Takoradi
GHA MRH, MOFEP
Rehabilitation and expansion
of Accra-Tema motorway Prefeasibility &
feasibility studies on-
going
Procurement
of
concessionaire
Works to
commence
10% of
completion
statues
GHA MRH,MOFEP
Rehabilitation of Elubo-Agona road
70% 100%
GHA MRH, MOFEP
Construction of Bridge over Accra-Tema Motorway at
Teshie link
DUR MRH, MLGRD, MOFEP
Ghana Urban Transport Programme GAPTE Established
Establish independent body to regulate transport services
Independent body will be
in operation by the end
of first quarter
MOT MOT,MLGRD
Kintampo-Buipe
Complete Rehabilitation of
central corridor by 2017
GHA MRH,MOF
Min of Roads and Highways MTDP 2014-2017.doc
63
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Buipe-Tamale 84% 100%
GHA MRH,MOFEP
Tamale-Paga
GHA MRH,MOFEP
Takoradi-Agona Juction Complete Rehabilitation of
Coastal corridor by 2017
GHA MRH,MOFEP
Agona Junction-Elubo 22.76% 100%
GHA MRH,MOFEP
Asikuma Junction-Hohoe
Complete Rehabilitation of Eastern Corridor by 2017
20.7% 100%
GHA MRH,MOFEP
Dodo-Pepesu-Nkwanta 45% 70% 100%
GHA MRH,MOFEP
Nkwanta-Oti-Damanko 23% 50% 80% 100%
GHA MRH,MOFEP
Yendi-Oti Damango - Nakpanduri- Kulungugu
GHA MRH,MOFEP
Joint Border Post Programme
Elubo/Noi Boder post
Complete construction of joint border posts by 2017
Acquisition of land is
on-going Works to
commence Works completed
GHA MRH,MOFEP, GRA
Akanu border post To be completed by the
end of first quarter
GHA MRH,MOFEP,GRA
Paga border post Funding to be secured Works to
commence Works completed
GHA MRH,MOFEP,GRA
Min of Roads and Highways MTDP 2014-2017.doc
64
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Thematic Area 5:
Infrastructure and Human
Settlement Development
Sector Goal 2: Create a
sustainable, accessible, affordable,
reliable, effective and
efficient transport
system that
meets user needs
Axle load Control Programme
ECOWAS supplementary act on axle load included RTR
and passed by parliament in 2012
Harmonize road traffic regulations with subregional
standards to facilitate trade by 2017
GHA
MRH, MOJ&A-G, LAW
ENFORCEMENT AGENCIES, GRTCC
Annual reduction in general overloading along road
corridors
Overloading of trucks checked to conform with permissble axleloads to reduce damage
to road corridors by 2017 15 14 13 12
GHA
MRH, MOJ&A-G,
LAW ENFORCEMENT AGENCIES,
GRTCC
Improvement of axle load
weighing stations and continuous education and sensitisation workshops
held across the country
Collaboration with GPHA, Ghana police and other stakeholders to enforce
axleload limits IEC to be completed by
the end of second quarter
Stakeholders to be
educated with
implementation
challengers
Stakeholders to be
educated with
implementation
challengers
Stakeholders to
be educated with
implementation
challengers
GHA
MRH, MOJ&A-G, LAW ENFORCEMENT
AGENCIES, GRTCC
Road maintenance Programme
Condition improved from
42%good, 28% fair and 30%poor in 2012 to 60%good, 20%fair and
20%poor by 2017
Annual improvement in Road
Condition 45%good, 29%fair and
26%poor 50%good, 26%fair
and 24%poor
55%good,
23%fair and
22%poor
60%good,
20%fair and
20%poor
GHA, DUR,
DFR MRH
100% of routine maintenance undertaken on
feeder and trunk road roads and 80% on urban roads
Annual Coverage of routine maintenance
Trunk- 79%
Feeder – 60%
Urban – 40%
Trunk- 80%
Feeder – 70%
Urban – 60%
Trunk- 90%
Feeder – 80%
Urban – 80%
Trunk- 60%
Feeder – 55%
Urban – 45%
GHA, DUR,
DFR MRH, GRF
Min of Roads and Highways MTDP 2014-2017.doc
65
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Annual increment in periodic maintenance
coverage
Annual Coverage of periodic
maintenance
Trunk- 20%
Feeder – 18%
Urban – 11%
Trunk- 22%
Feeder – 23%
Urban – 14%
Trunk- 32%
Feeder – 41%
Urban – 19%
Trunk- 18%
Feeder – 12%
Urban – 9%
GHA, DUR, DFR
MRH,GRF
Annual increment in minor maintenance coverage
Coverage of Minor Improvement works
Trunk-65%
Feeder—45%
Urban-50%
Trunk-68%
Feeder-52%
Urban-60 %
Trunk-79%
Feeder-80%
Urban-85%
Trunk-60%
Feeder-60%
Urban-70
GHA, DUR, DFR
MRH,GRF
100% of drainage defects
repaired annually
Coverage of maintenance of
drainage structures
Trunk-80%
Feeder—65%
Urban-72%
Trunk-85%
Feeder-65%
Urban-75 %
Trunk-85%
Feeder-65%
Urban-75%
Trunk-62%
Feeder-48%
Urban-55%
GHA, DUR, DFR
MRH,GRF
100% of traffic management devices
maintained annually
Annual maintenance Coverage
of traffic management devices Trunk-92%
Urban-62%
Trunk-96%
Urban-65%
Trunk-96%
Urban-72%
Trunk-80%
Urban- 62%
GHA, DUR, MRH,GRF
Major Roads and Bridges
Development Programme
Develop an integrated GIS
map for the road sector on national, regional and district bases to determine
gaps in accessibility by 2017
GIS maps produced existing
transport routes, population, production and tourist centres
GIS map for the
road sector
developed by
December, 2015
GHA MRH
Execute major development
works, …km trunk roads, …m bridges, …km urban roads…
Annual Coverage of major road development and bridge infrstructure works 100km and 1no. bridge
150km and 1no.
bridge
200km and 1no.
bridge 90km
GHA, DUR, DFR
MRH
Implement the use of HDM
iV for planning and budgetting
Planning tools such as HDM IV
installed and used by road agencies
Officers trained will
commence budgeting
using HDM4 by mid-
year.
GHA, DUR, DFR
MRH
Min of Roads and Highways MTDP 2014-2017.doc
66
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Labour based road road construction
and maintenance programm
Train labour based contractor and classify
them. Carry out …km of feeder roads routine maintenace works using
labour based methods
Use of labour based
technology for road works
DFR MRH, KTC
Rural Roads in Cocoa Growing
Areas
Carryout Minor Improvement on 2,250km of feeder roads in cocoa
growing areas.
Use of equipment based
technology for road works 1000km 1000km 250km 50.0
DFR MRH,
COCOBOD,MOFA
Poverty Focused
Rural Transport
Carryout Routine Maintenance on 107km of feeder roads in Ashanti and
Brong Ahafo Regions
Use of labour and equipment based technologies for road
works 107km 0.65
DFR MRH,MOFA
Northern Rural Growth Programme
Carryout Minor Improvement on 546km of feeder roads and 200km of
Farm Tracks
Use of equipment based
technology for road works 100km 300km 200km 100km 17.0
DFR
Export Marketing
and Quality Awareness Project
Carryout Minor Improvement on 10km of
feeder roads Southern Horticultural Belt of Ghana
Use of equipment based
technology for road works
2.00 2.00
DFR MRH,MOFA
Ghana Urban Transport
Programme
Completed road works on pilot BRT route and begin operations by 2015 Pilot BRT operational by 2014
BRT route will start and
be completed this year
DUR MRH, MOT,
MLGRD, MMDA
Feasibility Study completed for pilot BRT in Kumasi by
2015
Studies conducted for BRT in
Kumasi Done
DUR MRH, MOT, MLGRD, MMDA
Min of Roads and Highways MTDP 2014-2017.doc
67
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Implement areawide traffic management control for
Kumasi and Accra by 2013
Improved traffic management schemes for Accra and
Kumasi by 2013
Evaluation and
Construction to
commence and
completed this year
DUR MRH, MLGRD, MMDA
Non-Motorised
Transport Programme (NMT)
rehabilitate 20km of cycle paths annually and free
NMT facilities from encroachment in Accra and Tamale by 2015
Cycle paths, parking areas
and walkways rehabilitaed and maintained in Accra and Tamale
DUR MRH, MLGRD, MMDA
Hold workshops and
prepare awareness materials for dessimination to institutions.
Awareness schemes and promotions conducted for
institutions and farming communities for the use of NMT
DUR,DFR, GHA
MRH, MLGRD, MMDA
Criteria and guidelines
included in road traffic regulations.
Criteria and standards established to ensure road
transport facilities are easily accessible to women, children, the aged and people living
with disability. )
DUR MRH, MLGRD,
MMDA
Guidelines included in design manuals, educate and enforce minimum
accesiblity standards
DUR,GHA,
DFR
MRH, MLGRD,
MMDA, National Disability Council
Thematic
Area 5: Infrastructure and Human
Settlement Development
Sector Goal 3: Integrate
land use, transport planning,
development planning and
service
provision
Integrated Transport Planning
Establish sitting committees between transport sector
MDAs and other stakeholders to harmonise plans to ensure land use
and spatial planning are integrated with transport planning
Land use and spatial planning integrated by 2013
GHA,DFR,DUR MRH,MOT,MLGRD, MMDAS
Min of Roads and Highways MTDP 2014-2017.doc
68
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Establish urban transport
advisory committes. Management, financing and
regulation of local transport infrastructure and services
decentralised by 2013
DUR MRH,MOT,MLGRD, MMDAS
Support MMDAs and the private sector to acquire lands, design, buld and
manage lorry parks and terminals
DUR MRH,MOT,MLGRD, MMDAS
Coordinate with lands
commission to properly acqure project lands, Pay compensation for PAPs,
demarcate ROW, publise in media and update land acquisition manual
Lands for transport
infrastructure properly acquired and protected by 2017
GHA, DUR MRH,MOT,MLGRD, MMDAS, LANDS COMMISSION
forward utility manual to
Attorney general's office to draft legislative instrument
to be passed by parliament
Legislation passed to enhance the application of utility
manual by 2015
GHA MRH,MOT,MLGRD, MMDAS, MOJ&A-G
Sector Goal 6: Ensure
Sustainable Development
in the Transport
Sector
Environmental, health and safety
programme
liase with EPA to build
capacity of staff to conduct SEA
SEA is conducted on all sector
Policies, plans and programmes 15% 25% 40% 65%
GHA, DUR,
DFR MRH, MSE,EPA
Health and safety manual developed for use at all construction sites by 2013
Environmental, social, health
and safety standards included and enforced in all road
infrastructure projects
34% 45% 55% 65%
GHA, DUR, DFR
MRH, MSE,EPA
Min of Roads and Highways MTDP 2014-2017.doc
69
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Training in assessment, monitoring and evaluation
of environmental issues organised for officers in the
sector 25% 35% 50% 70%
GHA, DUR, DFR
MRH, MSE,EPA
HIV/AIDS and malaria awarenes campaigns organised to sensitize
contractor staff and communities along project corridors 60% 80% 90% 100%
GHA, DUR, DFR
MRH, MSE,EPA
Safety audits are carried out and implemented at all stages of roads by 2013 30% 50% 70% 100%
GHA, DUR, DFR
MRH, MOT, NRSC
Environmental units set up
and resources at the ministry and head offices of road agencies by 2013
Environmental units established and resources in
the head offices to coordinate environmental activities in the sector 40% 60% 75% 100%
GHA, DUR, DFR
MRH, MSE,EPA
Thematic Area 6: Human
Resource Development,
productivity and
employment
Sector goal 7: Develop adequate
Human Resources and
apply new Technology
Human Resource
Develoment Programme
Needs assesment for sector personnel conducted
A multi-discplinary human
resource development strategy developed by 2015
Consultant to be procured to carry out
assessment
Commencement of
studies
Full implementation
of recommendations
$25,000 GHA, DUR,
DFR, MRH
Annual planned training programme for personnel
carried out
Number to be
increased to avoid excess spending for unbudgeted training
100% to be achieved
100% to be achieved
100% to be achieved
$120000 $400000 GHA, DUR, DFR,
MRH, KNUST, KTC
Min of Roads and Highways MTDP 2014-2017.doc
70
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
HR programmes implemented using KTC and other local training facilities
Three (3) group
training programmes to be organised
Two (2) group
training programmes to be organised
Two (2) group
training programmes to be organised
Two (2) group
training programmes to be organised
$100000 GHA, DUR, DFR,
MRH, KNUST, KTC
Overseas training programmes for officers carried out annually
100% to be achieved 100% to be
achieved
100% to be
achieved
100% to be
achieved $400000
GHA, DUR,
DFR, MRH
Support to KNUST postgraduate course in road management
Local institutions supported to
provide training for sector personnel
GHA, DUR, DFR,
MRH,KNUST
Support to KTC to carry out training for officers and
contractors in the sector
Recommendation by Committee for KTC's affiliation to a tertiary
institution to be implemented
Certificate courses to be run by the
institution
$50000 GHA, DUR,
DFR, MRH,KTC
Sector provides training on
gender to officers and seggregates data when reporting
Role of women in transport promoted
GHA, DUR, DFR,
MRH
Thematic
Area 6: Human Resource
Development,
productivity and employment
Sector goal 7: Develop
adequate Human
Resources and
apply new Technology
Research Development programme
Consultant engaged to
develop research strategy for sector
Develop Research strategy Procurement of Consultant
Consultant to
Develop Research Strategy for sector
Research to begin on Comparative
analyses of National
Transport Survey Data
Research to begin on VOC.
GHA, DUR, DFR
MRH
Stock sector librarywith relevant research materials and literature
Completion and Stocking of Library at MRH
Procurement of the services of a
librarian
Stock library with books and
reports
Stock library with books and
reports
GHA, DUR,
DFR, MRH
Completion and Stocking of Library at
KTC
Min of Roads and Highways MTDP 2014-2017.doc
71
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Sponsor selected staff to
research into relevant areas of operations
Recruit new staff with
research competences into research units
GHA, DUR,
DFR, MRH
Thematic Area 7: Transparent
and Accountable Governance
Sector goal 4: Create a
vibrant investment
and performance-
based
management environment
that
maximizes benefits for public and
private sector investors
Road Maintenance Funding
fuel levy increased from the
current levey of 6.5cents to 9.5cent/litre
Adequate revenue raised for effective maintenace of road
infrastructure
Increase by 4% Increase by 6% Increase by 8% Increase by 10%
MRH GRF, MOFEP
Percentage of road fund revenue disbursed for road
maintenance Increase by 62% Increase by 63% Increase by 64% Increase by 65%
MRH GRF, MOFEP
road user charges revised to appreciable levels to
resource the road fund
Road fund to identify additional revenue
source to fund
MRH GRF, MOFEP
Contract collection of road user charges to private
sector 24 no. 21no. 18no. 15n0.
GHA GRF, MRH
Development of local contractors
and consultants review classification procedures and
documentations
Local contractors are properly
classified and trained
Inspection of resources
of existing and applying
contractors
Use information
from inspection to
re-register and
publicise contractors
in good standing
Set-up further
regulations to
ensure that
contractors are
fully com pliant
with minimum
operational
requirement
Enforcement of
the setup
regulaton
MRH
Min of Roads and Highways MTDP 2014-2017.doc
72
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Sustainable
maintenance programme
Programme for annual maintenance activities using
HDM IV
develop a sustainable maintenance programme
GHA, DFR, DUR
MRH, GRF
Road condition survey, traffic and road inventory
are undertaken as programmed to monitor network DFR -
GHA, DFR, DUR
MRH, GRF
Computer based reporting system developed to link all stations to head offices
GHA MRH
Performance standards
developed and incorporated into contract documentation for road works
Roll out use of performance based contract for road
maintenance works
GHA, DFR, DUR
MRH
Development of
information management
system GIFIMS system in operatioin to reduced
number of signatories for payments
effective financial mangement
system strengthened to minise delays in payments and
waste of public funds
System in operation
GHA, DFR, DUR
MRH
Min of Roads and Highways MTDP 2014-2017.doc
73
NMTDPF Thematic
Areas
Sectors Objectives
Programme Activities/Projects output/indicator
Time Frame Indicative budget Implementing agencies
2014 2015 2016 2017 GoG IGF Donor lead Collaborating
Annual transport indicator
data base report published
Indicators developed to monitor sector performance
2013 report published
by first quarter
2014 report
published by first
quarter
2015 report
published by first
quarter
2016 report
published by first
quarter
GHA, DFR, DUR
MRH, MOT
Appropraite storage and retrieval systems develped for reports abd studies
using a computerised system and a physical library
Information management system established for the
sector
Library set up by
2016
GHA, DFR, DUR
MRH
Sector Goal 5: Develop
and implement comprehensive and integrated
Policy, Governance and
Institutional Frameworks Institutional reform
programme
carry out capacity needs assement of policy and plannign unit and provide
required support
enhanced policy formulation and coordinating capacity in
the sector
Annual Training for Staff involved in policy
and planning
MRH
74 Road Sector SMTDP 2014-2017
CHAPTER FIVE
5 MONITORING AND EVALUATION PLAN
It is generally recognized that monitoring and evaluation of the performance of the sectors programmes
and institutions helps to increase their effectiveness and provides increased accountability and transparency during programme implementation. It is a consistently demanded component of internationally funded
projects and programmes and the Ministry has, through various mechanisms increased its performance monitoring and evaluation activities to good effect. Monitoring and evaluation of the Sector’s activities
under the Sector Medium Term Development Plan will provide adequate, accurate and timely information
on activities by all the different stakeholders to ensure that the Plan achieves the desired objectives and/or that changes are made on time to ensure that the desired objectives are achieved.
The Ministry of Roads and Highways will conduct monitoring and evaluation at three levels namely Sector,
Programme and Activity Levels.
At the Sector level, the impact of the Road Sector Medium term plan as the catalyst to economic
growth in the area of agriculture, trade and industry, tourism and access to social amenities will
be assessed; At the programme level, the main monitoring indicators will be evaluated to ensure the
achievement of programme objectives and how these achievements can be sustained;
At the activity level, the performance of the implementing Agencies will be monitored closely
through efficient reporting, procurement management and supervision of the individual components.
5.1 Review of the Monitoring and Evaluation System in the Road Transport sector
In line with Section 12, sub-section 1(b) of the Civil Service Law, 1993, PNDC Law327, the Ministry has an
established Policy Planning, Monitoring and Evaluation Division(PPMED) headed by two (2) Directors to coordinate and monitor programmes of the Ministry.
The PPMED has oversight and support responsibilities at the sector level with the following roles:
i. undertake M&E needs assessment to support capacity building in the Road Agencies;
ii. develop baseline and sector-specific programme indicators and define the indicators for measuring change, especially on cross-cutting issues, gender, environment and social protection;
iii. receive from NDPC the National core indicators and data collection instruments; iv. establish the sector targets for all relevant objectives in the SMTDP;
v. establish a list of sector programmes/ projects to be carried out by the Road Agencies that will
contribute to the indicator achievement; vi. monitor progress of sector projects and programmes at regular intervals;
vii. evaluate the impact of the outputs and outcomes of the projects and programmes on the national economy;
viii. collect and collate relevant data on indicator achievement as the sector monitoring of indicators
demands; ix. collate and analyze sector data for reporting to NDPC;
x. undertake quarterly and annual performance review/ impact assessment of SMTDP policies, programmes and projects with sector stakeholders
The M & E Directorate of the Ministry of Roads and Highways is responsible for the overall monitoring and evaluation of activities of the Ministry at the sectoral, programme and project levels. This includes
monitoring of the implementation of road construction, rehabilitation and maintenance projects and
75 Road Sector SMTDP 2014-2017
programmes of the sector to ensure that work is done in accordance with the designated specifications and
completed within cost and time budgeted.
The outputs of M & E provide information on the strengths and weaknesses of the implementation process, including underlying causes which feed into future policy formulation and planning processes. Monitoring
and evaluation are done during the implementation of approved programmes and projects as well as the
completion of works. Impact evaluation is mainly carried out by external consultants on behalf of the Ministry.
In the course of monitoring the progress of work, projects with special problems which are identified are
selected for detailed monitoring and evaluation. The M & E Directorate also prepares contractors workload, reviews progress reports of projects and vets payments to contractors and consultants. The Directorate
also collaborates with the Policy and Planning Directorate in terms of the recommendations of monitoring
and evaluation as well as the Research, Statistics and Information Management Directorate in the mechanism for data collection and analysis.
It involves undertaking regular surveys as well as technical and financial audits through site visits as well
as desk review of inspection and progress reports. It collates and updates the Ministry’s register of all on-
going programmes and projects under both Government of Ghana and Donor funding. Data collection is done during site visits and through progress reports submitted by the Road Agencies from the regions and
cities.
In spite of the achievements made in the implementation of the Monitoring and Evaluation programmes within the sector, the department encounters a number of challenges. Notable amongst the challenges are
the following:
i. Weak capacity within the Directorate to undertake M&E activities
ii. Inadequate training of personnel in the relevant areas to effectively undertake its mandate.
5.2 Strengthening of the Current M&E System under the Sector Plan
As part of the steps being advanced to address the challenges with the current Monitoring and Evaluation System within the Transport Sector, the Ministry has contracted a consultant to develop and establish an
integrated and robust Monitoring and Evaluation System that will provide real-time information on transport services and their sustainability.
Specifically, the objectives of the assignment are to:
Develop the overall framework for project monitoring and evaluation including establishment of
baseline for all indicators;
Propose and develop a suitable and functional Monitoring and Evaluation system as part of the
overall project cycle for decision making; Develop the capacity of the departments/agencies under the transport sector to integrate into the
existing Geographic Information System(GIS) and
Assist to develop the capacity of the Agencies by providing training courses and preparation of
hand-outs and other training materials to institutionalise Monitoring and Evaluation.
When assignment is completed, it will ensure that transport data provided by the sector are relevant and
reliable and largely ensure that government’s policies on transport and its implementation are evaluated on the basis of evidence.
5.3 Monitoring indicators
The policy objectives of the Medium Term Development Policy Framework (2014-2017) will be achieved
through strengthening the capacity of transport institutions in planning, regulation, operations and
76 Road Sector SMTDP 2014-2017
maintenance, and through infrastructure investments. The achievements of the plan will be monitored
using a set of identified performance indicators to be achieved by the end of project.
It should also be noted that some specific projects have their own agreed indicators which are being
monitored or are to be monitored by the Ministry of Roads and Highways. Programmes such as the
Transport Sector Project (TSP) West African Trade and Transport Facilitation Project (WATTFP), Abidjan-
Lagos Transit and Transport Facilitation Project (ALTTFP) funded by the World Bank have some specific
indicators developed to be monitored. Other Development Partners such as AfDB and EU also have separate
indicators for their projects and has engaged M & E Consultants who are conducting the M&E on these
projects with collaboration from the M&E Directorate of the Ministry.
The Ministry and NDPC have also agreed on core national indicators which are appropriate for the transport
sector and based on those realistic and achievable targets have been set within the plan period. The
indicators relate directly to the SMTDP goals and objectives. The high level indicators to be monitored on annual basis are based on the indicators agreed with NDPC and the long term sector specific indicators.
Under the plan, 2013 information was used as the baseline. This was derived from various data collection
across the sector. In situations where data is not readily available, efforts will be made to fill the gaps
through further review of secondary data.
77 Road Sector SMTDP 2014-2017
Table 5-1 Monitoring and Evaluation Matrix Indicator Indicator
Type Baseline
2013 Targets 2014-2017 Data
Sources Monitoring Frequency
Responsibility
2014 2015 2016 2017
National Indicators
Proportion of transit corridor highways that are in good condition
Output Length: (2606km) Good:55% ( 1433km) Fair:39% (1016km) Poor: 6% (156km)
Length: (2606km) Good:57% (1485km) Fair: 39% (1016km) Poor: 4% (104km)
Length: (2606km) Good: 60% ( 1563km) Fair: 37% (964km) Poor: 3% (78km)
Length: (2606km) Good:65% ( 1694km) Fair: 32% (834km) Poor: 3% (78km)
Length: (2606km) Good:65% (1694km) Fair: 32% (834km) Poor: 3% (78km)
MRH, GHA Annually MRH
Total funds disbursed for routine maintenance, periodic
maintenance, , relative to the maintenance needs of each modal network
INPUT 61% 65% 68% 70% 70% MRH GHA DUR
DFR GRF
Annual MRH
Proportion of roads maintained/rehabilitated
OUTPUT 45% 50% 55% 60% 65% MRH GHA DUR DFR GRF
Annual MRH
Road condition mix:
National: Trunk Roads Urban Roads Feeder Roads
OUTCOME
42% Good 28% Fair
30% Poor 71,639km 14,873km 14,000 km 42,190 km
45% Good 29% Fair
26% Poor 71,639km 14,873km 14,000 km 42,190 km
50% Good 26% Fair
24% Poor 71,639km 14,873km 14,000 km 42,190 km
55% Good 23% Fair
22% Poor 71,639km 14,873km 14,000 km 42,190 km
60% Good 20% Fair
20% Poor 71,639km 14,873km 14,000 km 42,190 km
MRH GHA
DUR DFR
Annual MRH
78 Road Sector SMTDP 2014-2017
Indicator Indicator Type
Baseline 2013
Targets 2014-2017 Data Sources
Monitoring Frequency
Responsibility
2014 2015 2016 2017
Sector Specific Indicators
Total funds disbursed for routine maintenance, periodic maintenance, reconstruction and
upgrading works
Input $388.23 Million
MRH, Road Agencies, MOFEP
Annually MRH
No. of meetings held between transport sector stakeholders annually
Output 4 4 4 4 4 MRH Annually MRH, MOT
No. and value of PPP funded road projects
Input 0 0 2 4 4 MRH Annually MRH
% of road maintenance covered by road fund
Output 40% 40% 45% 50% 50% MRH GRF
Annually MRH
No. of Regions visited by sector monitoring team tp inspect
projects
Output 10 10 10 10 10
Sector performance indicators developed, analyzed and published
Output Yes Yes Yes Yes Yes MRH Annually MRH
Government spending on Road maintenance
Input $158.79m Annually MRH
Annual administrative costs of all agencies responsible for the road network increased
Input $46.52m Annually MRH
Number of staff trained relative to needs
assessment conducted
Input 544 100% 100% 100% 100% Annually MRH
Road Sector SMTDP 2014-2017
CHAPTER SIX
6 COMMUNICATION STRATEGY
The absence of a communication strategy or plan for the Ministry of Roads & Highways has resulted in
situations in which the Ministries and its Agencies are occasionally prompted to either react or explain
some concerns raised by the public, such as traffic congestion or bad road condition. This approach in public relations provides opportunities for the media to set the agenda for the Ministry.
It has become imperative for the Ministry and its Agencies to fashion out concrete programmes to create
public awareness on the activities of the sector so as to engender the needed support and appreciation on the opportunities, potentials, constraints and challenges as sector implements the SMTDP (2014 –
2017).
The communication strategy would, among others:
Disseminate sector policies, programmes, projects and progress reports to create awareness
/inform stakeholders
Promote dialogue and generate feedback on the performance of the Ministry
Promote access and manage expectations of the public concerning the services of the Ministry
and its Agencies
6.1 Media Strategy
For effective dissemination and awareness creation of the Ministry’ policies, programmes, projects and
progress, all available and affordable media platforms would be utilized. These would include internet,
Radio, Television, Newspapers, magazines, special features/articles by experts (engineers) as well as audio-visual documentaries, newsletters, etc
Audio-Visual Documentaries
The production of Audio-visual documentary and educational materials on activities of the Ministry for
2014-2017 would be done in collaboration with all agencies. An Audio-Visual Committee, made up of
representatives of all the Agencies, would be set up to prepare materials for dissemination to the public through audio-visual means.
Such audio-visual documentaries will provide the platform for the Ministry and its Agencies to project and
promote some of the major achievements and challenges of the road transport industry.
Special Radio/Television Programmes
Specific radio and television programmes both in English and Ghanaian languages such as Adult education
on Radio Ghana as well as GTV Breakfast Show; “Agenda” on TV3, ,“Front Page” on Joy FM ; and other talk shows on Peace FM and others would be identified and used for targeted audience.
All the Agencies would also appear on specific radio and television programmes to inform and educate
the public on their activities and answer questions and matters arising thereof.
Besides these planned weekly public education programmes on Radio and Television, the Ministry and its Agencies would appear on media platform (radio or TV) to address any emergency or unexpected issue
that might ensue in the course of the year.
80 Road Sector SMTDP 2014-2017
6.2 Facility Visits
Agencies, under the Ministry’s would be encouraged to organize facility visits for media personnel to project sites so as to avail the media the right information to enable them make informed commentary
or review the project and the sector.
Such visits would also provide the Agencies opportunities to explain policies, programmes or projects
being undertaken and demystify some technicalities and engineering processes associated with road designs and construction of road infrastructure.
6.3 Workshop/Seminars
Special workshops and seminars would also be organized for media practitioners, as and when the need
arises. Resource Persons at such workshops could explain peculiar engineering and project management issues to the media for dissemination to the public. The Ministry would also use such fora to present its
programmes, achievements and challenges over the period to the general public.
The Ministry would continue to participate in the “Meet The Press Series”, organized by the Ministry of
Information, to provide a broad overview of the government’s road sector policy and programmes to the general public.
6.4 Feedback Mechanism
The Ministry will also institutionalize a feedback system that will enable it receive feedback or comments,
from the public, on the performance of the sector. Such feedback arrangement would provide an
invaluable tool in assisting the Ministry fashion out policies and programmes to meet the expectations of the general public.
The Ministry’s website would be revamped to provide vital information to the public and receive feedback
from the public, as well.