  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    1/626

    MINNESOTA

    DEPARTMENT OF TRANSPORTATION

    ST. PAUL, MINNESOTA

    STANDARD

    SPECIFICATIONSFOR

    CONSTRUCTION

    2014 EDITION

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    2/626

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    3/626

    i

    DIVISIONI

    GENERAL REQUIREMENTS ANDCOVENANT

    PAGE

    1101 WORDING OF SPECIFICATIONS.................................................................................................................... 1

    1102 ABBREVIATIONS AND MEASUREMENT UNITS............................................................................................. 1

    1102.1 GLOSSARY OF ACRONYMS AND ABBREVIATIONS........................................................................................ 1

    1102.2 UNITS OF SIZE AND MEASUREMENT

    ........................................................................................................... 4

    1103 DEFINITIONS................................................................................................................................................

    5

    BIDDING REQUIREMENTS ANDCONDITIONS

    1201 PREQUALIFICATION OF BIDDERS............................................................................................................... 16

    1202 CONTENTS OF PROPOSAL PACAGE.......................................................................................................... 16

    1203 ACCESS TO PROPOSAL PACAGE............................................................................................................... 16

    1204 INTERPRETATION OF QUANTITIES IN BID SC!EDULE

    ................................................................................ 16

    1205 E"AMINATION OF PROPOSAL PACAGE AND SITE OF WOR................................................................... 16

    1205.1 PROPOSAL PACAGE AND SITE OF WOR................................................................................................. 16

    1205.2 ADDITIONAL INFORMATION

    ...................................................................................................................... 1#

    1206 PREPARATION OF PROPOSAL

    .................................................................................................................... 1#1206.1 PREPARATION

    ............................................................................................................................................ 1#1206.2 ALLOWABLE

    SUBSTITUTIONS.....................................................................................................................1$

    1206.3 ALTERATIONS

    ............................................................................................................................................. 1$

    120# IRREGULARPROPOSALS.............................................................................................................................

    1$120$ PROPOSAL

    GUARANTY...............................................................................................................................

    1%120% DELIVERY OF PROPOSALS

    .......................................................................................................................... 1%1210 REVISION OF PROPOSAL PACAGE OR WIT!DRAWAL OF PROPOSALS

    ..................................................... 1%

    1211 CONDITIONAL PROPOSALS........................................................................................................................ 20

    1212 OPENING OF PROPOSALS.......................................................................................................................... 20

    1213 DISQUALIFICATION OF BIDDERS

    ................................................................................................................ 20

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    4/626

    i

    BIDDING REQUIREMENTS ANDCOVENANTS

    1301 CONSIDERATION OFPROPOSALS............................................................................................................... 21

    1302 AWARD OF CONTRACT

    .............................................................................................................................. 21

    1303 CANCELLATION OF AWARD....................................................................................................................... 21

    1304 RETURN OF PROPOSAL GUARANTY........................................................................................................... 21

    1305 REQUIREMENT OF CONTRACT BOND

    ........................................................................................................ 21

    1306 E"ECUTION AND APPROVAL OF CONTRACT.............................................................................................. 21

    130# FAILURE TO E"ECUTE CONTRACT.............................................................................................................. 22

    SCOPE OFWORK

    1401 INTENT OF CONTRACT

    ............................................................................................................................... 231402 CONTRACT REVISIONS

    ............................................................................................................................... 231402.1 GENERAL

    ..................................................................................................................................................

    ..23

    1402.2 DIFFERING SITECONDITIONS..................................................................................................................... 24

    1402.3 SIGNIFICANT C!ANGES TO T!E C!ARACTER OF WOR............................................................................ 241402.4 SUSPENSIONS OF WOR ORDERED BY T!E

    ENGINEER.............................................................................. 241402.5 E"TRA WOR

    ............................................................................................................................................. 251402.6 ELIMINATED ITEMS

    .................................................................................................................................... 251403 NOTIFICATION FOR CONTRACT REVISIONS

    ............................................................................................... 261403.1 GENERAL

    ..................................................................................................................................................

    ..26

    1403.2 FIRST NOTICE& BY CONTRACTOR................................................................................................................ 26

    1403.3 WRITTEN NOTICE& BYCONTRACTOR.......................................................................................................... 26

    1403.4 WRITTEN ACNOWLEDGEMENT& BY ENGINEER

    ........................................................................................ 261403.5 FINAL WRITTEN RESPONSE& BY

    ENGINEER................................................................................................. 26

    1403.6 CONTRACTOR'SRECOURSE........................................................................................................................ 26

    1404 MAINTENANCE OFTRAFFIC....................................................................................................................... 2#

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    5/626

    ii

    1404.1 GENERAL..................................................................................................................................................

    ..2#1404.2 PLANNED DETOURS

    ................................................................................................................................... 2#

    1404.3 CONTRACTOR'S REQUEST FOR DETOUR

    .................................................................................................... 2#1404.4 CONTRACTOR'S REQUEST FOR TEMPORARY BY(PASSES

    ........................................................................... 2#1404.5 MAINTENANCE DIRECTED BY T!E ENGINEER

    ............................................................................................ 2#

    1404.6 CONTRACTOR)S USE OF CROSSOVERS....................................................................................................... 2#

    1404.# WINTER SUSPENSION................................................................................................................................ 2#

    1405 USE OF MATERIALS FOUND ON T!E PRO*ECT........................................................................................... 2$

    1406 PRESERVATION OF !ISTORICAL OB*ECTS

    .................................................................................................. 2$

    140# FINALCLEANUP...................................................................................................................................

    .......2$140$ VALUE ENGINEERING

    INCENTIVE............................................................................................................... 2%

    CONTROL OFWORK

    1501 AUT!ORITY OF T!E ENGINEER.................................................................................................................. 31

    1501.1 DECIDING QUESTIONS............................................................................................................................... 31

    1501.2 SUSPENDING

    WOR................................................................................................................................... 31

    1501.3 BASIS OF DECISION.................................................................................................................................... 31

    1502 PLANS AND WORING DRAWINGS............................................................................................................ 31

    1503 CONFORMITY WIT! CONTRACT DOCUMENTS

    .......................................................................................... 32

    1504 COORDINATION OF CONTRACT DOCUMENTS........................................................................................... 33

    1505 COOPERATION BY CONTRACTORS............................................................................................................. 33

    1506 SUPERVISION BY CONTRACTOR................................................................................................................. 33

    1506.1 COMPETENT SUPERINTENDENT

    ................................................................................................................ 341506.2 COMPETENT INDIVIDUAL

    .......................................................................................................................... 34150# UTILITY PROPERTY AND SERVICE

    ............................................................................................................... 34150#.1 GENERAL

    ....................................................................................................................................................34

    150#.2

    NOTIFICATION............................................................................................................................

    ................35

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    6/626

    ii

    150#.3 LIABILITY..................................................................................................................................................

    ..35150$ CONSTRUCTION STAES& LINES& AND GRADES

    .......................................................................................... 35150% +BLAN,

    ......................................................................................................................................................36

    1510 AUT!ORITY AND DUTIES OF T!E INSPECTOR............................................................................................ 36

    1511 INSPECTION OF WOR............................................................................................................................... 36

    1512 UNACCEPTABLE AND UNAUT!ORIZED WOR........................................................................................... 3#

    1512.1 UNACCEPTABLE WOR

    .............................................................................................................................. 3#

    1512.2 UNAUT!ORIZED WOR............................................................................................................................. 3#

    1512.3 NON(COMPLIANCE

    .................................................................................................................................... 3#1513 RESTRICTIONS ON MOVEMENT AND STORAGE OF !EAVY LOADS ANDEQUIPMENT............................... 3$

    1514 MAINTENANCE DURING

    CONSTRUCTION.................................................................................................. 3%

    1515 CONTROL OF !AUL ROADS........................................................................................................................ 3%

    1516 ACCEPTANCE..............................................................................................................................................

    3%1516.1 PARTIAL ACCEPTANCE

    ............................................................................................................................... 40

    1516.2 PRO*ECT ACCEPTANCE

    ............................................................................................................................... 401516.3 COMPLETION OF T!E WOR..................................................................................................................... 40

    1516.4 FINAL CONTRACT ACCEPTANCE................................................................................................................. 40

    151# CLAIMS FOR COMPENSATION AD*USTMENT

    ............................................................................................ 40

    151#.1NOTIFICATION............................................................................................................................

    ................40151#.2 CLAIM SUBMITTALS

    ................................................................................................................................... 41151#.3 REQUIRED CERTIFICATION OF CLAIMS

    ...................................................................................................... 41151#.4 REVIEW OF CLAIM SUBMITTALS

    ................................................................................................................ 42

    CONTROL OFMATERIAL

    1601 SOURCE OF SUPPLY AND QUALITY............................................................................................................ 43

    1602 NATURAL MATERIAL SOURCES.................................................................................................................. 431603 MATERIALS- SPECIFICATIONS& SAMPLES& TESTS& AND ACCEPTANCE

    ......................................................... 44

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    7/626

    iii

    1604 PLANT INSPECTION COMMERCIAL FACILITY......................................................................................... 44

    1605 SUBSTITUTE MATERIALS............................................................................................................................ 44

    1606 STORAGE OF MATERIALS........................................................................................................................... 44

    160# !ANDLING MATERIALS.............................................................................................................................. 44

    160$ UNACCEPTABLE MATERIALS

    ...................................................................................................................... 44

    160% DEPARTMENT(PROVIDED MATERIAL......................................................................................................... 44

    LEGAL RELATIONS AND RESPONSIBILITYTO THE PUBLIC

    1#01 LAWS TO BE OBSERVED............................................................................................................................. 45

    1#01.1 DATA PRACTICES........................................................................................................................................ 45

    1#01.2 WORER CONDUCT

    ................................................................................................................................... 451#01.3 FALSE CLAIMS ACT

    ..................................................................................................................................... 451#02 PERMITS& LICENSES& ANDTA"ES

    ................................................................................................................ 451#03 PATENTED DEVICES& MATERIALS& AND PROCESSES................................................................................... 461#04 RESTORATION OF SURFACE OPENED BY PERMIT

    ...................................................................................... 46

    1#05 FEDERAL(AID PROVISIONS......................................................................................................................... 46

    1#06 EMPLOYEE !EALT! ANDWELFARE............................................................................................................ 46

    1#0# PUBLIC CONVENIENCE AND SAFETY.......................................................................................................... 4#

    1#0$ RAILROAD !IG!WAY

    PROVISIONS............................................................................................................. 4#

    1#0$.1 GENERAL REQUIREMENTS......................................................................................................................... 4#

    1#0$.2 STRUCTURAL PLANS AND CONSTRUCTION MET!ODS.............................................................................. 4$

    1#0$.3 LIABILITY

    INSURANCE................................................................................................................................

    .4%

    1#0$.4 FLAGGING& PROTECTIVE SERVICES& AND DEVICES..................................................................................... 4%

    1#0% NAVIGABLE WATERWAYS.......................................................................................................................... 50

    1#10 TRAFFIC CONTROL DEVICES....................................................................................................................... 50

    1#10.1 GENERAL

    ..................................................................................................................................................

    ..50

    1#10.2 PROVIDE& MAINTAIN& AND REMOVE......................................................................................................... 51

    1#10.3 PLANNED DETOURS................................................................................................................................... 51

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    8/626

    iv

    1#10.4 +BLAN,..................................................................................................................................................

    ....511#10.5 TEMPORARY BY(

    PASSES............................................................................................................................. 51

    1#10.6 CONTRACTOR'S RESPONSIBILITY

    ............................................................................................................... 511#10.# ENGINEER'S AUT!ORITY

    ............................................................................................................................ 511#10.$ +BLAN,

    ..................................................................................................................................................

    ....51

    1#11 USE OF E"PLOSIVES................................................................................................................................... 52

    1#12 PROTECTION AND RESTORATION OF PROPERTY....................................................................................... 52

    1#12.1 PROPERTY..................................................................................................................................................

    52

    1#12.2 ADVANCE NOTICE...................................................................................................................................... 52

    1#12.3 +BLAN,..................................................................................................................................................

    ....521#12.4 GENERAL LIABILITY

    .................................................................................................................................... 521#13 FOREST PROTECTION

    ................................................................................................................................. 531#14 RESPONSIBILITY FOR DAMAGE CLAIMS/ INSURANCE

    ................................................................................ 53

    1#14.1 GENERAL..................................................................................................................................................

    ..531#14.2 WORERS' COMPENSATION INSURANCE

    .................................................................................................. 531#14.3 COMMERCIAL GENERAL LIABILITY INSURANCE

    ......................................................................................... 54

    1#14.4 AUTOMOBILE LIABILITY INSURANCE......................................................................................................... 54

    1#14.5 UMBRELLA OR E"CESS LIABILITYINSURANCE............................................................................................ 54

    1#14.6 ADDITIONAL CONDITIONS......................................................................................................................... 55

    1#14.# NOTICE TO T!E CONTRACTOR

    ................................................................................................................... 55

    1#15 OPENING SECTIONS OF T!E ROADWAY TO TRAFFIC BEFORE COMPLETION OF T!EPRO*ECT.................55

    1#16 CONTRACTOR'S RESPONSIBILITY FOR WOR............................................................................................ 56

    1#1# AIR& LAND& AND WATER POLLUTION

    ......................................................................................................... 56

    1#1#.1 GENERAL..................................................................................................................................................

    ..561#1#.2 STORMWATER MANAGEMENT AND EROSION CONTROL

    ......................................................................... 5#

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    9/626

    v

    1#1$ FURNIS!ING RIG!T OFWAY...................................................................................................................... 5%

    1#1% PERSONAL LIABILITY OF PUBLIC

    OFFICIALS................................................................................................ 5%

    1#20 NO WAIVER OF LEGAL RIG!TS................................................................................................................... 5%

    1#21 AUDITS..................................................................................................................................................

    .....5%

    PROSECUTION ANDPROGRESS

    1$01 SUBLETTING OF CONTRACT....................................................................................................................... 60

    1$02 QUALIFICATIONS OF WORERS

    ................................................................................................................. 60

    1$03 PROGRESSSC!EDULES...............................................................................................................................

    611$03.1 ALL SC!EDULES

    .......................................................................................................................................... 611$03.2 BAR C!ART SC!EDULES

    ............................................................................................................................. 621$03.3 CRITICAL PAT! MET!OD +CPM, SC!EDULES

    ............................................................................................. 64

    1$03.4 PROSECUTIONCONTROL............................................................................................................................ #1

    1$03.5 LIMITATION OF OPERATIONS..................................................................................................................... #1

    1$03.6 TEMPORARYSUSPENSIONS........................................................................................................................

    #11$04 FAILURE TO MAINTAIN SATISFACTORY

    PROGRESS.................................................................................... #21$05 MET!ODS AND EQUIPMENT

    ..................................................................................................................... #21$06 DETERMINATION AND E"TENSION OF CONTRACTTIME...........................................................................#3

    1$06.1 GENERAL

    ..................................................................................................................................................

    ..#3

    1$06.2 TYPES OF DELAYS....................................................................................................................................... #4

    1$06.3 DETERMINATION OF C!ARGES ON WORING DAY CONTRACTS.............................................................. #5

    1$06.4 E"TENSION OF CONTRACT TIME DUE TO WEAT!ER ON CALENDAR DAY AND

    COMPLETION DATE CONTRACTS...............................................................................................................................................#6

    1$0# FAILURE TO COMPLETE T!E WOR ONTIME............................................................................................ #6

    1$0#.1 ASSESSMENT OF LIQUIDATED DAMAGES.................................................................................................. ##

    1$0#.2 WAIVER OF LIQUIDATED DAMAGES.......................................................................................................... ##

    1$0$ DEFAULT OF

    CONTRACTOR........................................................................................................................

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    10/626

    vi

    ##

    1$0% TERMINATION OFCONTRACT.................................................................................................................... #$

    MEASUREMENT ANDPAYMENT

    1%01 MEASUREMENT OF QUANTITIES

    ............................................................................................................... $01%01.1 P QUANTITIES

    ......................................................................................................................................... $01%01.2 AREAS

    ........................................................................................................................................................$1

    1%01.3 STRUCTURES

    ..............................................................................................................................................

    $1

    1%01.4 LENGT!..................................................................................................................................................

    ....$11%01.5

    VOLUME.....................................................................................................................................................$1

    1%01.6 +BLAN,

    ..................................................................................................................................................

    ....$1

    1%01.# +BLAN,..................................................................................................................................................

    ....$11%01.$ MASS

    ........................................................................................................................................................$1

    1%01.% BITUMINOUS MATERIALS.......................................................................................................................... $3

    1%01.10 +BLAN,..................................................................................................................................................

    ....$3

    1%01.11 OT!ER BASIS OF MEASUREMENT.............................................................................................................. $4

    1%01.12 +BLAN,..................................................................................................................................................

    ....$41%01.13 TIMBER AND

    LUMBER................................................................................................................................ $4

    1%01.14 LUMP SUM.................................................................................................................................................

    $4

    1%01.15 INDIVIDUAL UNIT OREAC!........................................................................................................................ $4

    1%01.16 RENTALEQUIPMENT................................................................................................................................

    ..$41%01.1# STANDARDS AND TOLERANCES 1503

    1603............................................................................................ $4

    1%02 SCOPE OF PAYMENT.................................................................................................................................. $4

    1%03 COMPENSATION FOR ALTERED QUANTITIES............................................................................................. $4

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    11/626

    vi

    1%04 COMPENSATION FOR CONTRACT REVISIONS............................................................................................ $5

    1%04.1 GENERAL

    ..................................................................................................................................................

    ..$5

    1%04.2 CONTRACT UNIT PRICES

    ............................................................................................................................ $51%04.3 NEGOTIATED PRICES.................................................................................................................................. $5

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    12/626

    vi

    1%04.4 FORCE ACCOUNT....................................................................................................................................... $5

    1%04.5 NON(ALLOWABLE C!ARGES...................................................................................................................... $$

    1%04.6 COMPENSATION FOR DELAY

    ..................................................................................................................... $$

    1%05 COMPENSATION FOR ELIMINATEDITEMS................................................................................................. %01%06 PARTIAL PAYMENTS

    ................................................................................................................................... %01%06.1 GENERAL

    ....................................................................................................................................................%0

    1%06.2 MATERIAL ON

    !AND.................................................................................................................................. %1

    1%0# PAYMENT FOR SURPLUS MATERIAL.......................................................................................................... %11%0$ FINAL ESTIMATE AND PAYMENT CONDITIONS AND PROCESS

    ............................................................... %2

    1%0$.1 GENERAL....................................................................................................................................................%2

    1%0$.2 SEMI(FINAL ESTIMATE FOLLOWING PRO*ECT ACCEPTANCE

    ..................................................................... %2

    1%0$.3 FINAL ESTIMATE FOLLOWING COMPLETION OF WOR............................................................................ %2

    1%0% ASSIGNMENT OF PAYMENTS..................................................................................................................... %3

    1%10 COST ESCALATION

    ..................................................................................................................................... %3

    1%11 +BLAN,..................................................................................................................................................

    ....%3

    DIVISIONII

    CONSTRUCTIONDETAILSGENERAL

    2021 MOBILIZATION

    ........................................................................................................................................... %5

    2021.1 DESCRIPTION

    ............................................................................................................................................. %5

    2021.2 MATERIALS +BLAN,.............................................................................................................................. %5

    2021.3 CONSTRUCTION REQUIREMENTS

    +BLAN,............................................................................................ %52021.4 MET!OD OF MEASUREMENT

    +BLAN,.................................................................................................. %52021.5 BASIS OF

    PAYMENT...................................................................................................................................

    .%5

    2031 FIELD OFFICE AND LABORATORY............................................................................................................... %6

    2031.1 DESCRIPTION............................................................................................................................................. %6

    2031.2MATERIALS................................................................................................................................

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    13/626

    ix

    .................%62031.3 CONSTRUCTION REQUIREMENTS

    .............................................................................................................. %6

    2031.4 MET!OD OF MEASUREMENT.................................................................................................................... %%

    2031.5 BASIS OFPAYMENT...................................................................................................................................

    .%%2051 MAINTENANCE AND RESTORATION OF !AUL ROADS

    .............................................................................100

    2051.1 DESCRIPTION........................................................................................................................................... 100

    2051.2 DEFINITIONS............................................................................................................................................

    1002051.3 DESIGNATION AND USE OF !AUL

    ROADS................................................................................................1002051.4 MAINTENANCE AND RESTORATION

    ........................................................................................................ 101

    2051.5 BASIS OFPAYMENT..................................................................................................................................

    101

    GRADI

    NG

    2101 CLEARING AND GRUBBING......................................................................................................................103

    2101.1 DESCRIPTION........................................................................................................................................... 103

    2101.2 +BLAN,..................................................................................................................................................

    ..1032101.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 1032101.4 MET!OD OF MEASUREMENT

    ..................................................................................................................1052101.5 BASIS OF

    PAYMENT..................................................................................................................................106

    2102 PAVEMENT MARING

    REMOVAL............................................................................................................. 106

    2102.1 DESCRIPTION........................................................................................................................................... 106

    2102.2 MATERIALS +BLAN,............................................................................................................................106

    2102.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 1062102.4 MET!OD OF MEASUREMENT

    ..................................................................................................................106

    2102.5 BASIS OFPAYMENT..................................................................................................................................

    10#2103 BUILDING REMOVAL

    ................................................................................................................................10#2103.1 DESCRIPTION

    ........................................................................................................................................... 10#2103.2 BLAN

    ..................................................................................................................................................

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    14/626

    x

    ....10#

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    15/626

    xi

    2103.3 REMOVAL REQUIREMENTS......................................................................................................................10#

    2103.4 MET!OD OF MEASUREMENT

    ..................................................................................................................10$

    2103.5 BASIS OFPAYMENT..................................................................................................................................

    10$2104 REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES................................................................. 10%

    2104.1 DESCRIPTION........................................................................................................................................... 10%

    2104.2 MATERIALS +BLAN,

    ............................................................................................................................10%

    2104.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 10%

    2104.4 MET!OD OF MEASUREMENT..................................................................................................................110

    2104.5 BASIS OFPAYMENT..................................................................................................................................

    1112105 E"CAVATION AND

    EMBANMENT........................................................................................................... 112

    2111 TEST ROLLING.......................................................................................................................................... 112

    2112 SUBGRADE PREPARATION.......................................................................................................................112

    211$ AGGREGATE SURFACING

    .........................................................................................................................112

    2123 EQUIPMENTRENTAL................................................................................................................................112

    2123.1 DESCRIPTION........................................................................................................................................... 112

    2123.2 GENERAL REQUIREMENTS.......................................................................................................................1122123.3 SPECIFIC REQUIREMENTS

    ........................................................................................................................112

    2123.4 MET!OD OF MEASUREMENT..................................................................................................................114

    2123.5 BASIS OFPAYMENT..................................................................................................................................

    1152130 APPLICATION OF WATER FOR DUST

    CONTROL........................................................................................1152130.1 DESCRIPTION

    ........................................................................................................................................... 115

    2130.2MATERIALS...............................................................................................................................................115

    2130.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 116

    2130.4 MET!OD OF MEASUREMENT

    ..................................................................................................................116

    2130.5 BASIS OFPAYMENT..................................................................................................................................

    1162131 APPLICATION OF CALCIUM C!LORIDE

    ..................................................................................................... 116

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    16/626

    xi

    BASECONSTRUCTION

    2211 AGGREGATE BASE.................................................................................................................................... 11#

    2212 DRAINABLE AGGREGATEBASE.................................................................................................................11#

    2215 FULL DEPT! RECLAMATION +FDR,

    ........................................................................................................... 11#2221 S!OULDER BASE AGGREGATE

    .................................................................................................................11#2231 BITUMINOUS SURFACE RECONDITIONING

    ..............................................................................................11#2232 MILL PAVEMENT

    SURFACE.......................................................................................................................11#

    PAVEMENTCONSTRUCTION

    2301 CONCRETE PAVEMENT............................................................................................................................11$

    2353 ULTRAT!IN BONDED WEARING COURSE +UTBWC,

    .................................................................................11$2354 MICRO(SURFACING.................................................................................................................................. 11$

    2355 BITUMINOUS FOG SEAL...........................................................................................................................11$

    2356 BITUMINOUS SEAL COAT.........................................................................................................................11$

    235# BITUMINOUS TAC COAT

    ........................................................................................................................11$

    235$ BITUMINOUS PRIME COAT......................................................................................................................11$

    2360 PLANT MI"ED ASP!ALT PAVEMENT........................................................................................................ 11$

    2363 PERMEABLE ASP!ALT STABILIZED STRESS RELIEF COURSE +PASSRC, ANDPERMEABLE ASP!ALT

    STABILIZED BASE+PASB,...........................................................................................................................11$

    2365 STONE MATRI" ASP!ALT (( SMA............................................................................................................. 11$

    23%% PAVEMENT SURFACE SMOOT!NESS....................................................................................................... 11$

    BRIDGES ANDSTRUCTURES

    2401 CONCRETE BRIDGE CONSTRUCTION........................................................................................................ 11%

    2401.1 DESCRIPTION

    ........................................................................................................................................... 11%2401.2

    MATERIALS...............................................................................................................................................11%

    2401.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 11%

    2401.4 MET!OD OF MEASUREMENT..................................................................................................................13%

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    17/626

    vii

    2401.5 BASIS OFPAYMENT.................................................................................................................................. 1402402 STEEL BRIDGE CONSTRUCTION................................................................................................................1402402.1 DESCRIPTION

    ........................................................................................................................................... 1402402.2

    MATERIALS................................................................................................................................

    ...............140

    2402.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1412402.4 MET!OD OF MEASUREMENT..................................................................................................................14$2402.5 BASIS OFPAYMENT.................................................................................................................................. 14%2403 TIMBER BRIDGE

    CONSTRUCTION............................................................................................................. 150

    2403.1 DESCRIPTION........................................................................................................................................... 1502403.2MATERIALS...............................................................................................................................................1502403.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1512403.4 MET!OD OF MEASUREMENT

    ..................................................................................................................154

    2403.5 BASIS OFPAYMENT.................................................................................................................................. 1542404 CONCRETE WEARING COURSE FOR BRIDGES

    ..........................................................................................1542404.1 DESCRIPTION

    ........................................................................................................................................... 154

    2404.2MATERIALS...............................................................................................................................................1542404.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1552404.4 MET!OD OF MEASUREMENT..................................................................................................................15%2404.5 BASIS OF

    PAYMENT..................................................................................................................................

    15%

    2405 PRESTRESSED CONCRETE BEAMS............................................................................................................ 15%2406 BRIDGE APPROAC! PANELS.....................................................................................................................15%2406.1 DESCRIPTION........................................................................................................................................... 15%2406.2

    MATERIALS................................................................................................................................

    ...............15%

    2406.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1602406.4 MET!OD OF MEASUREMENT

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    18/626

    vii

    ..................................................................................................................1632406.5 BASIS OF

    PAYMENT..................................................................................................................................

    163

    2411 MINOR CONCRETE STRUCTURES............................................................................................................. 1632411.1 DESCRIPTION........................................................................................................................................... 1632411.2MATERIALS...............................................................................................................................................1632411.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 163

    2411.4 MET!OD OF MEASUREMENT..................................................................................................................1642411.5 BASIS OFPAYMENT.................................................................................................................................. 1642412 PRECAST CONCRETE BO" CULVERTS

    ....................................................................................................... 165

    2412.1 DESCRIPTION........................................................................................................................................... 1652412.2MATERIALS...............................................................................................................................................1652412.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1652412.4 MET!OD OF MEASUREMENT

    ..................................................................................................................166

    2412.5 BASIS OFPAYMENT.................................................................................................................................. 1662422 CRIB WALLS.............................................................................................................................................. 16#2433 STRUCTURE RENOVATION.......................................................................................................................16#2433.1 DESCRIPTION

    ........................................................................................................................................... 16#

    2433.2MATERIALS...............................................................................................................................................16#2433.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 16#2433.4 MET!OD OF MEASUREMENT

    ..................................................................................................................16%

    2433.5 BASIS OFPAYMENT.................................................................................................................................. 16%2442 REMOVAL OF E"ISTING BRIDGES............................................................................................................. 1#02442.1 DESCRIPTION........................................................................................................................................... 1#02442.2

    MATERIALS................................................................................................................................

    ...............1#0

    2442.3 CONSTRUCTION REQUIREMENTS

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    19/626

    vii

    ............................................................................................................ 1#02442.4 MET!OD OF MEASUREMENT..................................................................................................................1#12442.5 BASIS OFPAYMENT.................................................................................................................................. 1#12451 STRUCTURE E"CAVATIONS AND BACFILLS

    ............................................................................................1#22451.1 DESCRIPTION........................................................................................................................................... 1#2

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    20/626

    viii

    2451.2MATERIALS...............................................................................................................................................1#22451.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1#22451.4 MET!OD OF MEASUREMENT

    ..................................................................................................................1#62451.5 BASIS OFPAYMENT.................................................................................................................................. 1##2452 PILING......................................................................................................................................................1#$2452.1 DESCRIPTION........................................................................................................................................... 1#$

    2452.2MATERIALS...............................................................................................................................................1#$2452.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1#%

    2452.4 MET!OD OF MEASUREMENT..................................................................................................................1$%2452.5 BASIS OF

    PAYMENT..................................................................................................................................

    1%0

    2461 STRUCTURALCONCRETE..........................................................................................................................1%224#1 STRUCTURAL METALS..............................................................................................................................1%224#1.1 DESCRIPTION

    ........................................................................................................................................... 1%2

    24#1.2MATERIALS................................................................................................................................

    ...............1%224#1.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 1%424#1.4 MET!OD OF MEASUREMENT 2402......................................................................................................... 20%24#1.5 BASIS OF PAYMENT 2402

    .........................................................................................................................20%

    24#2 METAL REINFORCEMENT.........................................................................................................................20%24#2.1 DESCRIPTION........................................................................................................................................... 20%24#2.2MATERIALS................................................................................................................................

    ...............20%24#2.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 20%

    24#2.4 MET!OD OF MEASUREMENT..................................................................................................................21224#2.5 BASIS OFPAYMENT.................................................................................................................................. 21324#$ ORGANIC ZINC(RIC! PAINT SYSTEM

    ........................................................................................................ 213

    24#$.1 DESCRIPTION

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    21/626

    ix

    ........................................................................................................................................... 21324#$.2MATERIALS...............................................................................................................................................21524#$.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 215

    24#$.4 MET!OD OF MEASUREMENT..................................................................................................................221

    24#$.5 BASIS OFPAYMENT.................................................................................................................................. 22224#% INORGANIC ZINC(RIC! PAINT SYSTEM.................................................................................................... 22224#%.1 DESCRIPTION........................................................................................................................................... 22224#%.2

    MATERIALS................................................................................................................................

    ...............223

    24#%.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 22424#%.4 MET!OD OF MEASUREMENT

    ..................................................................................................................23024#%.5 BASIS OF

    PAYMENT..................................................................................................................................

    230

    24$1 WATERPROOFING.................................................................................................................................... 23024$1.1 DESCRIPTION........................................................................................................................................... 23024$1.2MATERIALS...............................................................................................................................................230

    24$1.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 231

    24$1.4 MET!OD OF MEASUREMENT..................................................................................................................23124$1.5 BASIS OFPAYMENT.................................................................................................................................. 2322501 PIPE CULVERTS

    ......................................................................................................................................... 233

    2501.1 DESCRIPTION........................................................................................................................................... 2332501.2MATERIALS................................................................................................................................

    ...............2332501.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 2342501.4 MET!OD OF MEASUREMENT

    ..................................................................................................................23#

    2501.5 BASIS OFPAYMENT.................................................................................................................................. 23#2502 SUBSURFACE DRAINS...............................................................................................................................23%2502.1 DESCRIPTION........................................................................................................................................... 23%

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    22/626

    x

    2502.2

    MATERIALS................................................................................................................................

    ...............23%

    2502.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 23%2502.4 MET!OD OF MEASUREMENT

    ..................................................................................................................2462502.5 BASIS OF

    PAYMENT..................................................................................................................................

    246

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    23/626

    ix

    2503 PIPE SEWERS............................................................................................................................................ 24#2503.1 DESCRIPTION........................................................................................................................................... 24#2503.2MATERIALS................................................................................................................................

    ...............24#2503.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 24$

    2503.4 MET!OD OF MEASUREMENT..................................................................................................................2502503.5 BASIS OFPAYMENT.................................................................................................................................. 2512506 MAN!OLES AND CATC!BASINS.............................................................................................................. 2522506.1 DESCRIPTION

    ........................................................................................................................................... 252

    2506.2

    MATERIALS...............................................................................................................................................2522506.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 2532506.4 MET!OD OF MEASUREMENT..................................................................................................................2552506.5 BASIS OF

    PAYMENT..................................................................................................................................

    256

    250# CULVERT LINER........................................................................................................................................ 25#250#.1 DESCRIPTION........................................................................................................................................... 25#

    250#.2MATERIALS................................................................................................................................

    ...............25#

    250#.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 25#250#.4 MET!OD OF MEASUREMENT..................................................................................................................25$250#.5 BASIS OFPAYMENT.................................................................................................................................. 25%2511 RIPRAP

    .................................................................................................................................................

    ....25%

    2511.1 DESCRIPTION........................................................................................................................................... 25%2511.2MATERIALS...............................................................................................................................................25%2511.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 25%2511.4 MET!OD OF MEASUREMENT

    ..................................................................................................................261

    2511.5 BASIS OFPAYMENT.................................................................................................................................. 261

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    24/626

    x

    2512 GABIONS AND REVET MATTRESSES......................................................................................................... 2622512.1 DESCRIPTION

    ........................................................................................................................................... 262

    2512.2MATERIALS...............................................................................................................................................2622512.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 2622512.4 MET!OD OF MEASUREMENT..................................................................................................................2642512.5 BASIS OF

    PAYMENT..................................................................................................................................

    264

    2514 SLOPE PAVING......................................................................................................................................... 2642514.1 DESCRIPTION........................................................................................................................................... 2642514.2

    MATERIALS................................................................................................................................

    ...............264

    2514.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 2652514.4 MET!OD OF MEASUREMENT..................................................................................................................2662514.5 BASIS OFPAYMENT.................................................................................................................................. 2662515 REVETMENT SYSTEMS

    .............................................................................................................................266

    2515.1 DESCRIPTION........................................................................................................................................... 2662515.2MATERIALS...............................................................................................................................................2662515.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 26#2515.4 MET!OD OF MEASUREMENT

    ..................................................................................................................26$

    2515.5 BASIS OFPAYMENT.................................................................................................................................. 26$251% CELLULAR CONCRETE GROUT CONTROLLED LOW STRENGT! MATERIAL +CLSM,................................26$2520 LEAN MI"

    BACFILL..................................................................................................................................

    26$

    2521 WALS......................................................................................................................................................26$2531 CONCRETE CURBING................................................................................................................................26%2533 CONCRETE MEDIANBARRIERS.................................................................................................................26%2535 BITUMINOUS

    CURB.................................................................................................................................. 26%

    2545 ELECTRIC LIG!TING SYSTEMS

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    25/626

    xi

    ..................................................................................................................26%2545.1 DESCRIPTION........................................................................................................................................... 26%2545.2MATERIALS...............................................................................................................................................26%2545.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 2#22545.4 MET!OD OF MEASUREMENT..................................................................................................................2$0

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    26/626

    xi

    2545.5 BASIS OFPAYMENT.................................................................................................................................. 2$22550 TRAFFIC MANAGEMENT SYSTEM............................................................................................................ 2$42550.1 DESCRIPTION

    ........................................................................................................................................... 2$42550.2

    MATERIALS................................................................................................................................

    ...............2$4

    2550.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 2$52550.4 MET!OD OF MEASUREMENT..................................................................................................................2$$2550.5 BASIS OFPAYMENT.................................................................................................................................. 2$$2554 TRAFFIC BARRIERS

    ................................................................................................................................... 2$%

    2554.1 DESCRIPTION........................................................................................................................................... 2$%2554.2MATERIALS...............................................................................................................................................2$%2554.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 2%02554.4 MET!OD OF MEASUREMENT

    ..................................................................................................................2%1

    2554.5 BASIS OFPAYMENT.................................................................................................................................. 2%2255#

    FENCING...................................................................................................................................................2%2255#.1 DESCRIPTION

    ........................................................................................................................................... 2%2

    255#.2MATERIALS...............................................................................................................................................2%2255#.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 2%3255#.4 MET!OD OF MEASUREMENT..................................................................................................................2%6255#.5 BASIS OF

    PAYMENT.................................................................................................................................. 2%6

    2564 TRAFFIC SIGNS AND DEVICES...................................................................................................................2%#2564.1 DESCRIPTION........................................................................................................................................... 2%#2564.2MATERIALS...............................................................................................................................................2%#2564.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 2%%

    2564.4 MET!OD OF MEASUREMENT

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    27/626

    xi

    ..................................................................................................................30#2564.5 BASIS OFPAYMENT.................................................................................................................................. 30%2565 TRAFFIC CONTROL SIGNALS

    .....................................................................................................................312

    2565.1 DESCRIPTION........................................................................................................................................... 3122565.2MATERIALS...............................................................................................................................................3122565.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 3162565.4 MET!OD OF MEASUREMENT

    ..................................................................................................................332

    2565.5 BASIS OFPAYMENT.................................................................................................................................. 33225#1 PLANT INSTALLATION AND ESTABLIS!MENT..........................................................................................33225#1.1 DESCRIPTION........................................................................................................................................... 332

    25#1.2MATERIALS...............................................................................................................................................33225#1.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 33425#1.4 MET!OD OF MEASUREMENT..................................................................................................................34125#1.5 BASIS OF

    PAYMENT..................................................................................................................................

    341

    25#2 PROTECTION AND RESTORATION OF VEGETATION.................................................................................34325#2.1 DESCRIPTION........................................................................................................................................... 34325#2.2MATERIALS...............................................................................................................................................34325#2.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 344

    25#2.4 MET!OD OF MEASUREMENT..................................................................................................................34625#2.5 BASIS OFPAYMENT.................................................................................................................................. 34625#3 STORM WATER

    MANAGEMENT...............................................................................................................34#

    25#3.1 DESCRIPTION........................................................................................................................................... 34#25#3.2MATERIALS...............................................................................................................................................34#25#3.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 34#25#3.4 MET!OD OF MEASUREMENT

    ..................................................................................................................355

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    28/626

    xi

    25#3.5 BASIS OFPAYMENT.................................................................................................................................. 35625#4 SOIL PREPARATION.................................................................................................................................. 35$25#4.1 DESCRIPTION........................................................................................................................................... 35$

    25#4.2MATERIALS................................................................................................................................

    ...............35$

    25#4.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 35%

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    29/626

    x

    25#4.4 MET!OD OF MEASUREMENT..................................................................................................................361

    25#4.5 BASIS OFPAYMENT..................................................................................................................................

    36225#5 ESTABLIS!ING TURF AND CONTROLLING EROSION

    ................................................................................36225#5.1 DESCRIPTION

    ........................................................................................................................................... 36225#5.2

    MATERIALS...............................................................................................................................................362

    25#5.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 363

    25#5.4 MET!OD OF MEASUREMENT..................................................................................................................3#3

    25#5.5 BASIS OFPAYMENT..................................................................................................................................

    3#5

    25## SOIL BIOENGINEERED SYSTEMS...............................................................................................................3##

    25##.1 DESCRIPTION

    ........................................................................................................................................... 3##

    25##.2MATERIALS................................................................................................................................

    ...............3##25##.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 3##25##.4 MET!OD OF MEASUREMENT

    ..................................................................................................................3#%25##.5 BASIS OF

    PAYMENT..................................................................................................................................

    3#%25$1 REMOVABLE PREFORMED PAVEMENT MARINGTAPE

    .......................................................................... 3$025$1.1 DESCRIPTION

    ........................................................................................................................................... 3$025$1.2

    MATERIALS................................................................................................................................

    ...............3$0

    25$1.3 CONSTRUCTION REQUIREMENTS............................................................................................................ 3$0

    25$1.4 MET!OD OF MEASUREMENT..................................................................................................................3$0

    25$1.5 BASIS OF

    PAYMENT..................................................................................................................................3$0

    25$2 PERMANENT PAVEMENT MARINGS

    ...................................................................................................... 3$1

    25$2.1 DESCRIPTION........................................................................................................................................... 3$1

    25$2.2MATERIALS................................................................................................................................

    ...............3$125$2.3 CONSTRUCTION REQUIREMENTS

    ............................................................................................................ 3$1

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    30/626

    x

    25$2.4 MET!OD OF MEASUREMENT

    ..................................................................................................................3$2

    25$2.5 BASIS OFPAYMENT..................................................................................................................................

    3$3

    DIVISIONIII

    MATERIALSCEMENTINGMATERIALS

    3101 PORTLANDCEMENT.................................................................................................................................

    3$5

    3102 GROUND GRANULATED BLAST(FURNACE SLAG......................................................................................3$5

    3103 BLENDED !YDRAULICCEMENT................................................................................................................3$5

    3105 BAGGED PORTLAND CEMENT CONCRETE PATC!ING MI" GRADE3U1$.................................................3$5

    3106 !YDRATEDLIME.......................................................................................................................................

    3$5

    310# MASONRY MORTAR................................................................................................................................. 3$5

    3113 ADMI"TURES FOR CONCRETE..................................................................................................................3$5

    3115 FLY AS! FOR USE IN PORTLAND CEMENT CONCRETE.............................................................................3$5

    AGGREGA

    TES

    3126 FINE AGGREGATE FOR PORTLAND CEMENT

    CONCRETE.......................................................................... 3$5312# FINE AGGREGATE FOR BITUMINOUS SEAL COAT

    ....................................................................................3$5

    312$ AGGREGATE FOR USE IN MASONRY MORTAR.........................................................................................3$5

    3135 MODIFIED AGGREGATEBASES.................................................................................................................3$5

    3136 DRAINABLEBASES....................................................................................................................................

    3$6313# COARSE AGGREGATE FOR PORTLAND CEMENT CONCRETE

    .................................................................... 3$6

    313$ AGGREGATE FOR SURFACE AND BASE

    COURSES.....................................................................................3$6313% GRADED AGGREGATE FOR BITUMINOUSMI"TURES...............................................................................3$6

    3146 BINDER SOIL.............................................................................................................................................

    3$6314% GRANULAR MATERIAL

    .............................................................................................................................3$6

    BITUMINOUSMATERIAL

    3151 BITUMINOUS MATERIAL

  • 7/25/2019 MINNESOTA 2014 Std Spec for Construction

    31/626

    x

    ..........................................................................................................................3$6