    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    MATERIAL REQUIRED FOR CONSTRUCTION OF SLUICE

    S.

    N

    O.

    ITEM QTY MOO

    RUM

    M

    STONE

    SAND CEM

    ENT

    METAL RUBBLE P

    STONE

    HUME

    PIPE

    SLUICE

    GATE

    IRON

    ROD

    1 Filing Foundation 1:4:8 C.C. Work40 mm metal

    2 R.C.C. Work 1:2:4 work with 20mm metal

    3 Stone masonary work 1:4 C.R.masonary

    4 C.C. work with 20 mm metal

    5 15 mm Thick in cm 1:3

    6 Sluice Gate

    7 Pipe 1' Dia

    8 R.C.C. Work 1:2:4 work with 20

    mm metal

    9 Grouted Pitching 1:6

    1

    0

    TOTAL

    Transporting of Material

    S.

    N

    o.

    Item Km QTY Rate Per Amount C.S.R. Item

    No.

    1 Moorum

    2 M Stone

    3 Metal

    4 Sand

    5 Cement

    6 Rubble

    7 P. Stone

    8 Pipe

    9 Sluice Gate

    10 Iron Rod

    11 Water for C.C. Masonary

    Transporting Total

    Labour Only Total

    Collection of Material Total

    Grand Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    2/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    MATERIAL REQUIRED FOR CONSTRUCTION OF Waste Weir

    S.

    NO.

    ITEM QTY MOO

    RUM

    M

    STONE

    SAND CEM

    ENT

    METAL RUBBLE P

    STONE

    HUME

    PIPE

    SLUICE

    GATE

    IRON

    ROD

    1 Filing Foundation 1:4:8 C.C.Work 40 mm metal

    2 R.C.C. Work 1:2:4 work with 20mm metal

    3 Stone masonary work 1:4 C.R.masonary

    4 C.C. work with 20 mm metal

    5 15 mm Thick in cm 1:3

    6 Sluice Gate

    7 Pipe 1' Dia

    8 R.C.C. Work 1:2:4 work with 20mm metal

    9 Grouted Pitching 1:6

    10

    TOTAL

    Transporting of Material

    S.

    No.

    Item Km QTY Rate Per Amount C.S.R. Item

    No.

    1 Moorum

    2 M Stone

    3 Metal

    4 Sand5 Cement

    6 Rubble

    7 P. Stone

    8 Pipe

    9 Sluice Gate

    10 Iron Rod

    11 Water for C.C.

    Masonary

    Transporting Total

    Labour Only TotalCollection of Material Total

    Grand Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    3/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT OF SHOWING TH COST OF Waste Weir

    S.

    No.

    C.S.R. Item

    No.

    item of Work QTY Rate Unit Amount

    1 Excavation of Earthwork in Hard

    Moorum Foundation

    P/Cum

    2 Filling Foundation C.C. 1:4:8

    Work With 40 mm Metal

    P/Cum

    3 C.C. Work 1:2:4 With 20 mm

    Metal

    P/Cum

    4 C.R. Masonary Work With 1:4

    cm

    P/Cum

    5 Cuping work with 1:2;4 20 mm

    Metal

    P/Cum

    6 Plastering Work with 1:3 cm P/sqm7 1:6 Stone pitching Grouted P/sqm

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    4/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    COLLECTION OF MATERIAL FORWaste Weir

    S.No Name of Material C.S.R. item No. Qty Unit Rate Amount1 Good Clay

    2 Pitching Stone

    3 Masonary Stone

    4 Rubble Stone

    5 40 mm Metal

    6 20 mm Metal

    7 Sand

    8 Cement

    9 Moorum

    10 Sluice Gate

    11 Hume Pipe

    12 Water for Compaction13 Water for pudding

    14 Water for C.C. Work

    15 Water for Masonry Work

    16 Stone Chips

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    5/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    COLLECTION OF MATERIAL FORSluice Gate

    S.No Name of Material C.S.R. item No. Qty Unit Rate Amount

    1 Good Clay

    2 Pitching Stone

    3 Masonary Stone

    4 Rubble Stone

    5 40 mm Metal

    6 20 mm Metal

    7 Sand

    8 Cement

    9 Moorum

    10 Sluice Gate

    11 Hume Pipe

    12 Water for Compaction

    13 Water for puddling14 Water for C.C. Work

    15 Water for Masonry Work

    16 Stone Chips

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    6/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    "L" EARTH WORK (Abstract)

    S.

    No.

    C.S.R. item

    No.

    Item of Work QTY Rate Unit Amount

    1 Ordinary shrub Jungle Clearance

    involving the removal of grass & crop i/c

    rooting out2 Dagbelling double spader shaped

    (100mm) deep.

    3 Benching the seat of embankment to an

    average depth of 15 cm & cross slope of

    1:12 i/c earth work removing the rubbis

    up to a distance of 50 mtr i/c dressing

    4 Excavation puddle tranch for moorum

    soil inbankment to proper side slope &

    bed grade i/c sharing where ever

    necessary dressing 50 mtr lead 1.5mtr

    lift upto 3mtr.

    5 Puddle filling of good clay i/c lead upto

    50mtr mixing Watering &kneeding by

    Tamping raming and laying etc.

    6 Collection of puddle earth

    7 Transportation of black cotton soil fall

    puddle lead upto 50 mtr.

    8 Carting of water for puddle work lead 3

    km.

    9 Main bund, excavation of earth work in

    moorum soil for main bund with

    dressing i/c 50mtr free lead & 1.5 mtr

    free lift

    10 Compaction of earth work

    11 Extra lead of earth work for main bund12 Excavation of earth work in moorum soil

    for toe wall

    13 Stone pitching u/s on main bund labour

    only

    14 Transportation of p/Stone with loading

    & unloading

    15 Pitching work with labour Charges

    16 Transportation of water for compaction

    main bund

    17 Stone chips work

    18 Collection of stone chips

    19 Collection P/stone with Stocking

    20 Transpatation of stone chips

    21 housing work for pitching

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    7/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    GENRAL ABSTRACTS.

    NO.

    SUB HEAD AMOUNT

    1 'A' Prelimenary

    2 'B' Land (Govt. Land)

    3 'C' Masonary

    4 'K' Building

    5 'L' Earth Work

    6 'M' Plantion

    7 'O' Miscellaneous

    8 Total Rs.

    9

    10 Added 3% for Contingencies Supervision of works and

    drinking water supply etc.

    11 Grand TotalSAY

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    8/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    'A' PreliminaryS. No.

    C.S.R. No.

    Item of work QTY Rate Unit Amount

    1 Chain & Campus Survey of basin

    2 Levelling Survey of basin

    3 Catchment survey chaining

    4 Levelling survey of catchment

    5 Chaining &campas survey of commond area

    6 Levelling survey of commoand area

    7 Fixing of bench mark & fix double levelling

    survey

    8 Stationary & photocopy

    9 Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    9/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    'B' LandS. No. Sub Head QTY Rate Amount

    1 Area under the scheme is govt. land

    2 Private Land

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    10/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    Unit 1 Head Work 'C' Masonary workS.

    No.

    Particulars QTY Rate Per Amount

    1 Construction of sluice gate as per detailed

    attached

    2 Construction of waste weir as per detailed

    attached

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    11/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    'O' Miscellaneous AbstractS. No. Item of work QTY Rate Amount

    1 Fixation of chainage stone

    2 Provision for temporary hutment

    3 provision of medical first aid box

    4 Provision of store room for

    cement & survey Instrument

    5 provision of drinking water

    6 Sing board

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    12/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    'P' MaintenanceS. No. Sub Head Amount % Amount

    1 'C' Masonary

    2 'L' Earth Work

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    13/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    'A' Preliminary DetailsS.

    no.

    Item of Work Details Running

    Mtr.

    QTY

    1 Dam Seat & Basin Survey

    (i) Chaining

    (ii) Levelling

    2 Catchment Survey

    (i) Chaining

    (ii) Levelling

    3 Commond area Survey

    (i) Chaining

    (ii) Levelling

    4 Fly Levelling

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    14/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT SHOWING DETAILS WORK FOR SLUICE GATE

    SLUICE GATES.

    No.

    Sub Head Measurement QTY

    No. L. W. D/H

    1 Excavation of earth worth in moorum soil for

    foundation

    (i) Wing wall ABCD Head Structure

    EF Head Structure

    Toe wall U/S

    D/S

    For U/S Pitching

    (ii) Excavation of earth work inmoorum soil for pipe supports pilar

    (iii) Pipe joint level of pipe lineTotal

    2 Filling foundation C.C. 1:4:8 Work With 40 mm

    Metal

    (i) Head structure(ii) Wing wall(iii) Return bar(iv) pillar for pipe line(v) Toe wall(vi) Apron

    Total

    3 Filling foundation with 1:5:8

    4 Super Structure of masonary work in 1:6 cm

    (i) Head structure(ii) Wing wall(iii) Return Wall(iv) Toe wall Structure

    Total

    R.C.C. Work 1:2:4 with 20 mm Metal(i) Head structure

    (ii) Wing wall Step

    Total

    5 C.C. 1:2:4 cooping work

    (i) Wing wall(ii) Return Wall(iii) Head structure

    Total

    6 25 mm thick 1:3 cm plaster work on stone

    (i) Wing wall(ii) Return Wall(iii) D/S Structure

    Total7 providing one sluice gate

    8 Providing hume Pipe 1' dia 2.5 mtr. leanth

    9 Stone pitching U/S R/S & L/S of sluice gate

    10 Grouted stone pitching D/S 1.6 cm

    U/S 1.6 cm

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    15/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    'C' Masonary Waste WeirS.

    No.

    Particulars No. L W D/H QTY

    1 Excavation of earth work in moorum soil

    for foundation

    Wing wall U/S

    D/S

    Pitching U/S

    D/S

    Total

    2 Filling foundation with 40 mm metal

    1:4:8 C.C. work

    Head Wall

    Wing wall

    Total

    3 Filling foundation with 20 mm metal

    1:2:4 C.C. Work

    Total

    4 C.R. Masonry work in 1;4 cm

    Head Wall

    Wing wall

    Total

    5 Cooping work 1:2:4 with 20 mm metal

    Head Wall

    Wing wall

    Total

    6 Plastering in 1:4 cm

    Head Wall

    Wing wall

    Total7 Grouted Pitching U/S

    D/S

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    16/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    TOTAL REQUIRED OF MATERIAL

    S.

    NO.

    Particular MOO

    RUM

    CEMENT SAND METAL 40

    MM

    METAL 20

    MM

    SIZE

    STONE

    IRON ROD HUME

    PIPE&

    COLUM

    P STONE SLUICE

    GATE

    1 Sluice Gate

    2 Waste Weir

    TOTAL

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    17/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT SHOWING DETIALS WORK FOR THE

    BENCHING WORKS. no. Change width of

    bund

    SUM Mean Lenth Area in

    Sqft

    Avg. depth

    in inch

    QTY

    1 0

    2 1003 200

    4 300

    5 400

    6 500

    7 600

    8 700

    9 800

    10 900

    11 1000

    12 1100

    13 1200

    14 1300

    15 140016 1500

    17 1600

    18 1700

    19 1800

    20 1900

    21 2000

    22 2100

    23 2200

    24 2300

    25 2400

    26 2500

    27 2600

    28 2700

    29 2800

    30 2900

    31 3000

    32 3100

    33 3200

    34 3300

    35 3400

    36 3500

    37 3600

    38 3700

    Total

    1- Site Clearance...................................................................................................................2- Dag belling.................................................................................................................. ......

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    18/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT SHOWING THE EARTH WORK FOR MAIN BUND

    S. no. Change C.S. AREA SUM Mean Lenth QTY

    1 0

    2 100

    3 2004 300

    5 400

    6 500

    7 600

    8 700

    9 800

    10 900

    11 1000

    12 1100

    13 1200

    14 1300

    15 1400

    16 150017 1600

    18 1700

    19 1800

    20 1900

    21 2000

    22 2100

    23 2200

    24 2300

    25 2400

    26 2500

    27 2600

    28 2700

    29 2800

    30 2900

    31 3000

    32 3100

    33 3200

    34 3300

    35 3400

    36 3500

    37 3600

    38 3700

    Total

    Extra E/W due to filling to benching......................................................................................... .....

    Puddle Core (-) ............................................................................................................................. .

    Due to W.W. E/W (-) ............................................................................................................. ........

    Net E/W Required for main bund............................................................................................... ...

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    19/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT SHOWING THE EARTH WORK FOR PUDDLES. no. Change C.S. AREA SUM Mean Lenth QTY

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    1718

    19

    20

    Total

    1 Excavation of work in moorum soil for puddle trench................................................................

    2 Earth work for Puddle Core................................................................................................. ........

    3 Puddle filling with good clay soil with puddle core....................................................................

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    20/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT SHOWING THE QUANTITY OF PITCHING STONE

    S. no. Change width of

    bund

    SUM Mean Lenth depth in

    inch

    QTY

    1

    23

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15Total

    1- Excavation of E/W in moorumsoil for toe wall..........................................................................2- Toe wall pitching ........................................................................................................... .............3- Pitching in main bund............................................................................................... ..................

    Total -----------------------------------------------------------

    4- Pitching work L X W................................................................................................................... .5- Housing work for main bund .....................................................................................................6- Total Qty of stone .......................................................................................................... ............7- Stone Chips ...............................................................................................................................

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    21/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    "L" EARTH WORK

    EXTRA LEAD CALCULATION

    Length of bund -....................

    Total Earth Work-..................

    A Calculation for free lead up 50 mtr.

    L X W X D

    Free lead earth work -..............................

    Total earth work -.....................................

    Earth work for free lead -............................

    Balance earth work-....................................

    Lead earth work-.......................................

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER(Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    22/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    QUARRY CHART

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    23/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    DESIGN OF SLUICE

    TAKING DUTY OF CANAL - Acre/Cusec.

    Discharge = Area/Duty = 75/72 = 1.04 CusecAdded 25% loss = 0.26

    -----------------

    1.30 Cusec

    Added 15 % Further Expansion = 0.15/1.45 Cusec

    Taking 1' Drive Head

    Velocity V = C(2gh)

    = 2/3 (2 X32.2 x 0.5)

    = 2/3 (32.2)

    = 3.74 ft/Cusec

    Area of vent required = Q/V

    =1.45/3.74

    =0.38 Sqft

    But provided gatr size 1'X1' = 1' size at pipe

    2" diahume pipe for clear fluising

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    24/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    DESIGN OF WASTE WIER

    Catchment area : --------------------------------------------------

    Intensity of rain fall : 4"

    Coefficient of run off : 0.40 Cum.

    Q = CIA

    =

    =

    = Cum/Sec.

    Q = CLH 3/2

    = 3.33 X ( ) 3/2 X L

    = 3.33 X L X

    L = /3.33 X

    =

    =

    OR Say length of Waste Weir

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    25/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    CAPACITY TABLE

    S.N

    o

    R.L. In

    Mtr.

    Area

    between

    to

    Counter

    Area of

    each

    Counter

    Sum Mean Diff. Capacity Prog.

    Capacity

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    26/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    Water planning

    Catchment Area :

    Type of catchment : Field

    RAIN FALL

    (A)Mean Annual = 48"(B)Mean Mansoon = 44.16

    75% Dependable Annual = 36.24 (By Series)

    (C)75% Dependable Mansoon = 33.24YIELD

    (A)Mean Annual --------------------------------------------------MCF(B)75% Dependable Annual

    -----------------------------------------= MCF(C)Mean Mansoon = MCFT

    90% of Mean Annual

    (D)75% Dependable Mansoon = MCFTDISTRIBUTION OF YIELD

    S.

    No.

    Month % Mean Yield 75% Yield

    Depenable

    1 June2 July

    3 Aug.

    4 Sept.

    Total

    Fixation of Principle levels :-

    L.S.L. :- 0.5 Acre height /sqmileof C.A. /Year for 50 X

    Available at R.L. = ---------

    Aviailable Capacity = ---------

    Probable Kharif Irrigation

    75 % depenablemansoon yield =

    Water requirement of minor head =

    Probable irrigation =

    Proposed irrigation =

  • 8/8/2019 Minor Irrigation Tank Scheme

    27/28

    REQUIREMENT OF WATER

    Month Fort Night From

    Jan

    Requirement of

    water in Inchs

    Requirement in mcft

    June

    July

    Aug.

    Sept.

    OCT.

    Nov.

    Total

    WORKING TABLE

    S.

    No.

    Month Carried

    over

    Yield Total Irrigation

    Release

    Evaporation

    Losses

    Balance

    1 June

    2 July

    3 Aug.

    4 Sept.

    5 Oct.

    6 Nov.

    Live Storage of Kharif only is greater of following

    1. Balance the end of august + 50% yield of September =2. Balance the end of september + 50% yield of October =3. 120% requirement of september +october+Nomber =It is live Storage

    Gross storage of capacity is dead storage + live storage =

    available at R.L. = ---------------- Available capacity = ----------------

    L.S.L.R.L. = ---------------- F.T.L. R.L. = ----------------

    M.W.L R.L. = ---------------- T.B.L. R.L. = ----------------

    Dead Storage = ---------------- live storage = ----------------

    Gross storage = ----------------

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)

  • 8/8/2019 Minor Irrigation Tank Scheme

    28/28

    MINOR IRRIGATION TANK SCHEME

    VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA

    BLOCK TILDA DISTRICT RAIPUR

    STATEMENT SHOWING DETAIL COST OF SLUICE GATE

    LABOUR ONLY

    S.NO.

    C.S.R. ITEMNO.

    PARTICULAR QUNTITY RATE UNIT AMOUNT

    1 Excavation of earth work in

    hard moorum for foundation

    50 mtr free lead & 1.5 mtr

    free lift with dressing

    2 Filling foundation C.C. 1:4:6

    work with 40 mm metal

    3 R.C.C. 1:2:4 with 20 mm

    metal

    4 C.R. masonry work in CM 1:4

    with super struture

    5 Coping work 1:2:4 C.C. with20 mm metal

    6 20 mm thick

    Plastering CM 1:3

    7 providing 1 sluice gate

    complete

    8 Providing 1 dia pipe 2X M

    lenth

    9 Dry stone pitching

    10 22 cm thick grouted stone

    pitching with individual stone

    22 cm depth & minimum size

    0.014 cm in 1:6 cm

    11 Transportation charges with

    stacking, loading & unloading

    Total

    A.D.O. ASSISTANT SOIL CONSERVATION OFFICER

    (Soil Conservation) Raipur (C.G)

    Raipur (C.G.)