VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
MATERIAL REQUIRED FOR CONSTRUCTION OF SLUICE
S.
N
O.
ITEM QTY MOO
RUM
M
STONE
SAND CEM
ENT
METAL RUBBLE P
STONE
HUME
PIPE
SLUICE
GATE
IRON
ROD
1 Filing Foundation 1:4:8 C.C. Work40 mm metal
2 R.C.C. Work 1:2:4 work with 20mm metal
3 Stone masonary work 1:4 C.R.masonary
4 C.C. work with 20 mm metal
5 15 mm Thick in cm 1:3
6 Sluice Gate
7 Pipe 1' Dia
8 R.C.C. Work 1:2:4 work with 20
mm metal
9 Grouted Pitching 1:6
1
0
TOTAL
Transporting of Material
S.
N
o.
Item Km QTY Rate Per Amount C.S.R. Item
No.
1 Moorum
2 M Stone
3 Metal
4 Sand
5 Cement
6 Rubble
7 P. Stone
8 Pipe
9 Sluice Gate
10 Iron Rod
11 Water for C.C. Masonary
Transporting Total
Labour Only Total
Collection of Material Total
Grand Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
2/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
MATERIAL REQUIRED FOR CONSTRUCTION OF Waste Weir
S.
NO.
ITEM QTY MOO
RUM
M
STONE
SAND CEM
ENT
METAL RUBBLE P
STONE
HUME
PIPE
SLUICE
GATE
IRON
ROD
1 Filing Foundation 1:4:8 C.C.Work 40 mm metal
2 R.C.C. Work 1:2:4 work with 20mm metal
3 Stone masonary work 1:4 C.R.masonary
4 C.C. work with 20 mm metal
5 15 mm Thick in cm 1:3
6 Sluice Gate
7 Pipe 1' Dia
8 R.C.C. Work 1:2:4 work with 20mm metal
9 Grouted Pitching 1:6
10
TOTAL
Transporting of Material
S.
No.
Item Km QTY Rate Per Amount C.S.R. Item
No.
1 Moorum
2 M Stone
3 Metal
4 Sand5 Cement
6 Rubble
7 P. Stone
8 Pipe
9 Sluice Gate
10 Iron Rod
11 Water for C.C.
Masonary
Transporting Total
Labour Only TotalCollection of Material Total
Grand Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
3/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT OF SHOWING TH COST OF Waste Weir
S.
No.
C.S.R. Item
No.
item of Work QTY Rate Unit Amount
1 Excavation of Earthwork in Hard
Moorum Foundation
P/Cum
2 Filling Foundation C.C. 1:4:8
Work With 40 mm Metal
P/Cum
3 C.C. Work 1:2:4 With 20 mm
Metal
P/Cum
4 C.R. Masonary Work With 1:4
cm
P/Cum
5 Cuping work with 1:2;4 20 mm
Metal
P/Cum
6 Plastering Work with 1:3 cm P/sqm7 1:6 Stone pitching Grouted P/sqm
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
4/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
COLLECTION OF MATERIAL FORWaste Weir
S.No Name of Material C.S.R. item No. Qty Unit Rate Amount1 Good Clay
2 Pitching Stone
3 Masonary Stone
4 Rubble Stone
5 40 mm Metal
6 20 mm Metal
7 Sand
8 Cement
9 Moorum
10 Sluice Gate
11 Hume Pipe
12 Water for Compaction13 Water for pudding
14 Water for C.C. Work
15 Water for Masonry Work
16 Stone Chips
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
5/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
COLLECTION OF MATERIAL FORSluice Gate
S.No Name of Material C.S.R. item No. Qty Unit Rate Amount
1 Good Clay
2 Pitching Stone
3 Masonary Stone
4 Rubble Stone
5 40 mm Metal
6 20 mm Metal
7 Sand
8 Cement
9 Moorum
10 Sluice Gate
11 Hume Pipe
12 Water for Compaction
13 Water for puddling14 Water for C.C. Work
15 Water for Masonry Work
16 Stone Chips
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
6/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
"L" EARTH WORK (Abstract)
S.
No.
C.S.R. item
No.
Item of Work QTY Rate Unit Amount
1 Ordinary shrub Jungle Clearance
involving the removal of grass & crop i/c
rooting out2 Dagbelling double spader shaped
(100mm) deep.
3 Benching the seat of embankment to an
average depth of 15 cm & cross slope of
1:12 i/c earth work removing the rubbis
up to a distance of 50 mtr i/c dressing
4 Excavation puddle tranch for moorum
soil inbankment to proper side slope &
bed grade i/c sharing where ever
necessary dressing 50 mtr lead 1.5mtr
lift upto 3mtr.
5 Puddle filling of good clay i/c lead upto
50mtr mixing Watering &kneeding by
Tamping raming and laying etc.
6 Collection of puddle earth
7 Transportation of black cotton soil fall
puddle lead upto 50 mtr.
8 Carting of water for puddle work lead 3
km.
9 Main bund, excavation of earth work in
moorum soil for main bund with
dressing i/c 50mtr free lead & 1.5 mtr
free lift
10 Compaction of earth work
11 Extra lead of earth work for main bund12 Excavation of earth work in moorum soil
for toe wall
13 Stone pitching u/s on main bund labour
only
14 Transportation of p/Stone with loading
& unloading
15 Pitching work with labour Charges
16 Transportation of water for compaction
main bund
17 Stone chips work
18 Collection of stone chips
19 Collection P/stone with Stocking
20 Transpatation of stone chips
21 housing work for pitching
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
7/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
GENRAL ABSTRACTS.
NO.
SUB HEAD AMOUNT
1 'A' Prelimenary
2 'B' Land (Govt. Land)
3 'C' Masonary
4 'K' Building
5 'L' Earth Work
6 'M' Plantion
7 'O' Miscellaneous
8 Total Rs.
9
10 Added 3% for Contingencies Supervision of works and
drinking water supply etc.
11 Grand TotalSAY
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
8/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'A' PreliminaryS. No.
C.S.R. No.
Item of work QTY Rate Unit Amount
1 Chain & Campus Survey of basin
2 Levelling Survey of basin
3 Catchment survey chaining
4 Levelling survey of catchment
5 Chaining &campas survey of commond area
6 Levelling survey of commoand area
7 Fixing of bench mark & fix double levelling
survey
8 Stationary & photocopy
9 Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
9/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'B' LandS. No. Sub Head QTY Rate Amount
1 Area under the scheme is govt. land
2 Private Land
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
10/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
Unit 1 Head Work 'C' Masonary workS.
No.
Particulars QTY Rate Per Amount
1 Construction of sluice gate as per detailed
attached
2 Construction of waste weir as per detailed
attached
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
11/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'O' Miscellaneous AbstractS. No. Item of work QTY Rate Amount
1 Fixation of chainage stone
2 Provision for temporary hutment
3 provision of medical first aid box
4 Provision of store room for
cement & survey Instrument
5 provision of drinking water
6 Sing board
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
12/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'P' MaintenanceS. No. Sub Head Amount % Amount
1 'C' Masonary
2 'L' Earth Work
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
13/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'A' Preliminary DetailsS.
no.
Item of Work Details Running
Mtr.
QTY
1 Dam Seat & Basin Survey
(i) Chaining
(ii) Levelling
2 Catchment Survey
(i) Chaining
(ii) Levelling
3 Commond area Survey
(i) Chaining
(ii) Levelling
4 Fly Levelling
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
14/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING DETAILS WORK FOR SLUICE GATE
SLUICE GATES.
No.
Sub Head Measurement QTY
No. L. W. D/H
1 Excavation of earth worth in moorum soil for
foundation
(i) Wing wall ABCD Head Structure
EF Head Structure
Toe wall U/S
D/S
For U/S Pitching
(ii) Excavation of earth work inmoorum soil for pipe supports pilar
(iii) Pipe joint level of pipe lineTotal
2 Filling foundation C.C. 1:4:8 Work With 40 mm
Metal
(i) Head structure(ii) Wing wall(iii) Return bar(iv) pillar for pipe line(v) Toe wall(vi) Apron
Total
3 Filling foundation with 1:5:8
4 Super Structure of masonary work in 1:6 cm
(i) Head structure(ii) Wing wall(iii) Return Wall(iv) Toe wall Structure
Total
R.C.C. Work 1:2:4 with 20 mm Metal(i) Head structure
(ii) Wing wall Step
Total
5 C.C. 1:2:4 cooping work
(i) Wing wall(ii) Return Wall(iii) Head structure
Total
6 25 mm thick 1:3 cm plaster work on stone
(i) Wing wall(ii) Return Wall(iii) D/S Structure
Total7 providing one sluice gate
8 Providing hume Pipe 1' dia 2.5 mtr. leanth
9 Stone pitching U/S R/S & L/S of sluice gate
10 Grouted stone pitching D/S 1.6 cm
U/S 1.6 cm
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
15/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
'C' Masonary Waste WeirS.
No.
Particulars No. L W D/H QTY
1 Excavation of earth work in moorum soil
for foundation
Wing wall U/S
D/S
Pitching U/S
D/S
Total
2 Filling foundation with 40 mm metal
1:4:8 C.C. work
Head Wall
Wing wall
Total
3 Filling foundation with 20 mm metal
1:2:4 C.C. Work
Total
4 C.R. Masonry work in 1;4 cm
Head Wall
Wing wall
Total
5 Cooping work 1:2:4 with 20 mm metal
Head Wall
Wing wall
Total
6 Plastering in 1:4 cm
Head Wall
Wing wall
Total7 Grouted Pitching U/S
D/S
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
16/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
TOTAL REQUIRED OF MATERIAL
S.
NO.
Particular MOO
RUM
CEMENT SAND METAL 40
MM
METAL 20
MM
SIZE
STONE
IRON ROD HUME
PIPE&
COLUM
P STONE SLUICE
GATE
1 Sluice Gate
2 Waste Weir
TOTAL
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
17/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING DETIALS WORK FOR THE
BENCHING WORKS. no. Change width of
bund
SUM Mean Lenth Area in
Sqft
Avg. depth
in inch
QTY
1 0
2 1003 200
4 300
5 400
6 500
7 600
8 700
9 800
10 900
11 1000
12 1100
13 1200
14 1300
15 140016 1500
17 1600
18 1700
19 1800
20 1900
21 2000
22 2100
23 2200
24 2300
25 2400
26 2500
27 2600
28 2700
29 2800
30 2900
31 3000
32 3100
33 3200
34 3300
35 3400
36 3500
37 3600
38 3700
Total
1- Site Clearance...................................................................................................................2- Dag belling.................................................................................................................. ......
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
18/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING THE EARTH WORK FOR MAIN BUND
S. no. Change C.S. AREA SUM Mean Lenth QTY
1 0
2 100
3 2004 300
5 400
6 500
7 600
8 700
9 800
10 900
11 1000
12 1100
13 1200
14 1300
15 1400
16 150017 1600
18 1700
19 1800
20 1900
21 2000
22 2100
23 2200
24 2300
25 2400
26 2500
27 2600
28 2700
29 2800
30 2900
31 3000
32 3100
33 3200
34 3300
35 3400
36 3500
37 3600
38 3700
Total
Extra E/W due to filling to benching......................................................................................... .....
Puddle Core (-) ............................................................................................................................. .
Due to W.W. E/W (-) ............................................................................................................. ........
Net E/W Required for main bund............................................................................................... ...
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
19/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING THE EARTH WORK FOR PUDDLES. no. Change C.S. AREA SUM Mean Lenth QTY
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1718
19
20
Total
1 Excavation of work in moorum soil for puddle trench................................................................
2 Earth work for Puddle Core................................................................................................. ........
3 Puddle filling with good clay soil with puddle core....................................................................
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
20/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING THE QUANTITY OF PITCHING STONE
S. no. Change width of
bund
SUM Mean Lenth depth in
inch
QTY
1
23
4
5
6
7
8
9
10
11
12
13
14
15Total
1- Excavation of E/W in moorumsoil for toe wall..........................................................................2- Toe wall pitching ........................................................................................................... .............3- Pitching in main bund............................................................................................... ..................
Total -----------------------------------------------------------
4- Pitching work L X W................................................................................................................... .5- Housing work for main bund .....................................................................................................6- Total Qty of stone .......................................................................................................... ............7- Stone Chips ...............................................................................................................................
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
21/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
"L" EARTH WORK
EXTRA LEAD CALCULATION
Length of bund -....................
Total Earth Work-..................
A Calculation for free lead up 50 mtr.
L X W X D
Free lead earth work -..............................
Total earth work -.....................................
Earth work for free lead -............................
Balance earth work-....................................
Lead earth work-.......................................
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
22/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
QUARRY CHART
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
23/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
DESIGN OF SLUICE
TAKING DUTY OF CANAL - Acre/Cusec.
Discharge = Area/Duty = 75/72 = 1.04 CusecAdded 25% loss = 0.26
-----------------
1.30 Cusec
Added 15 % Further Expansion = 0.15/1.45 Cusec
Taking 1' Drive Head
Velocity V = C(2gh)
= 2/3 (2 X32.2 x 0.5)
= 2/3 (32.2)
= 3.74 ft/Cusec
Area of vent required = Q/V
=1.45/3.74
=0.38 Sqft
But provided gatr size 1'X1' = 1' size at pipe
2" diahume pipe for clear fluising
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
24/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
DESIGN OF WASTE WIER
Catchment area : --------------------------------------------------
Intensity of rain fall : 4"
Coefficient of run off : 0.40 Cum.
Q = CIA
=
=
= Cum/Sec.
Q = CLH 3/2
= 3.33 X ( ) 3/2 X L
= 3.33 X L X
L = /3.33 X
=
=
OR Say length of Waste Weir
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
25/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
CAPACITY TABLE
S.N
o
R.L. In
Mtr.
Area
between
to
Counter
Area of
each
Counter
Sum Mean Diff. Capacity Prog.
Capacity
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
26/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
Water planning
Catchment Area :
Type of catchment : Field
RAIN FALL
(A)Mean Annual = 48"(B)Mean Mansoon = 44.16
75% Dependable Annual = 36.24 (By Series)
(C)75% Dependable Mansoon = 33.24YIELD
(A)Mean Annual --------------------------------------------------MCF(B)75% Dependable Annual
-----------------------------------------= MCF(C)Mean Mansoon = MCFT
90% of Mean Annual
(D)75% Dependable Mansoon = MCFTDISTRIBUTION OF YIELD
S.
No.
Month % Mean Yield 75% Yield
Depenable
1 June2 July
3 Aug.
4 Sept.
Total
Fixation of Principle levels :-
L.S.L. :- 0.5 Acre height /sqmileof C.A. /Year for 50 X
Available at R.L. = ---------
Aviailable Capacity = ---------
Probable Kharif Irrigation
75 % depenablemansoon yield =
Water requirement of minor head =
Probable irrigation =
Proposed irrigation =
-
8/8/2019 Minor Irrigation Tank Scheme
27/28
REQUIREMENT OF WATER
Month Fort Night From
Jan
Requirement of
water in Inchs
Requirement in mcft
June
July
Aug.
Sept.
OCT.
Nov.
Total
WORKING TABLE
S.
No.
Month Carried
over
Yield Total Irrigation
Release
Evaporation
Losses
Balance
1 June
2 July
3 Aug.
4 Sept.
5 Oct.
6 Nov.
Live Storage of Kharif only is greater of following
1. Balance the end of august + 50% yield of September =2. Balance the end of september + 50% yield of October =3. 120% requirement of september +october+Nomber =It is live Storage
Gross storage of capacity is dead storage + live storage =
available at R.L. = ---------------- Available capacity = ----------------
L.S.L.R.L. = ---------------- F.T.L. R.L. = ----------------
M.W.L R.L. = ---------------- T.B.L. R.L. = ----------------
Dead Storage = ---------------- live storage = ----------------
Gross storage = ----------------
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)
-
8/8/2019 Minor Irrigation Tank Scheme
28/28
MINOR IRRIGATION TANK SCHEME
VILLAGE-------------------------------------P.C.NO.---------R.I.C. TILDA
BLOCK TILDA DISTRICT RAIPUR
STATEMENT SHOWING DETAIL COST OF SLUICE GATE
LABOUR ONLY
S.NO.
C.S.R. ITEMNO.
PARTICULAR QUNTITY RATE UNIT AMOUNT
1 Excavation of earth work in
hard moorum for foundation
50 mtr free lead & 1.5 mtr
free lift with dressing
2 Filling foundation C.C. 1:4:6
work with 40 mm metal
3 R.C.C. 1:2:4 with 20 mm
metal
4 C.R. masonry work in CM 1:4
with super struture
5 Coping work 1:2:4 C.C. with20 mm metal
6 20 mm thick
Plastering CM 1:3
7 providing 1 sluice gate
complete
8 Providing 1 dia pipe 2X M
lenth
9 Dry stone pitching
10 22 cm thick grouted stone
pitching with individual stone
22 cm depth & minimum size
0.014 cm in 1:6 cm
11 Transportation charges with
stacking, loading & unloading
Total
A.D.O. ASSISTANT SOIL CONSERVATION OFFICER
(Soil Conservation) Raipur (C.G)
Raipur (C.G.)