The list of the Members who attended the meeting is appended.
Agend
a Item Brief Description of the Issue Decision of the Committee
1 Confirmation of the Minutes of the previous Meeting
held on 17/03/2016
SLC confirmed the minutes of the previous
meeting held on 17/03/2016
2 Follow up action on the minutes of the previous Meeting
held on 17/03/2016
Noted.
3
IIPP 2005-10& IIPP 2010-15 schemes – Sanction of
reimbursement of stamp duty, reimbursement of land
cost purchased in IEs/IDAs, reimbursement of power
cost and sanction of reimbursement of sales tax -
Regarding.
*****
The Verification / Scrutiny Committee meetings
held on 04/06/2016 & 14/06/2016 has verified /
Scrutinized ( 02 ) claim application of reimbursement of
Stamp duty (08 ) claim application of reimbursement of
Sales Tax and (125) claim applications of reimbursement
of power cost as per the Guidelines under respective
schemes and recommended for sanction/rejection of
eligible Incentives / Concessions to the units. The
Minutes of Verification / Scrutiny Committee of Sales
Tax and Power cost are appended as Annexures.
ABSTRACT
S No
General Incentives
No of claims
as per
seriatum
( website)
No of units
Amount
(in Rupees )
1 Stamp Duty 2 2 Rs.34,15,398
2 Sales Tax 12 12 Rs.22,31,29,689
3 Power Cost 115 76 Rs.128,69,69,561
4 Deffered by SVC 11 11 0
GRAND TOTAL 150 101 Rs.151,35,14,648
The Verification / Scrutiny Committee of
Investment Subsidy and Sales Tax have
recommended for sanction / rejection of eligible
Incentives/concessions to the units as mentioned
below.
SLC has examined the recommendations of the
Verification / Scrutiny Committee and decided
to sanction eligible incentives / concessions to
the industrial units as mentioned below under
various schemes:
ABSTRACT
S No
General Incentives
No of
claims as
per
seriatum
( website)
No of
units
Amount
(in Rupees )
1 Stamp Duty 2 2 Rs.34,15,398
2
Sales Tax
12
12
Rs.22,31,29,689
3 Power Cost 115 76 Rs.128,69,69,561
4 Deffered by SLC 11 11 0
GRAND TOTAL 150 101 Rs.151,35,14,648
DETAILS
1. Reimbursment of Stamp duty Sanctioned
reimbursement of stamp duty to (02) units
under IIPP and the list is appended as in
Annexure – I
2. Reimbursment of Sales tax sanctioned to
reimbursement of sales tax (12) units under
IIPP and the list is appended as Annexure
– II
3. Reimbursment of Power cost Sanctioned
reimbursement of power cost to (115) units
under IIPP and the list is appended as in
Annexure – III.
:: 2 ::
1. SANCTION OF REIMBURSEMENT OF
STAMP DUTY
S
No
Date of
received
claim
Meeting
date &
seriol
no
Agenda Decision
1 14/09/20
15
18,
4/06/20
16
The Claim
application of M/s
Maruthi Ispat &
Energy Pvt. Ltd.,
Sy.No. 167,
Madhavaram (V),
Mantralayam
reimbursmenrt of
stamp duty under
IIPP 2010-15
SVC examined the claim and recommended for
sanction of Rs.28,923/- (Rupees twenty eighty
thousand nine hundred and twenty three only)
towards stamp duty reimbursement subject to
submission of the following shortfall
information:1) IEM Part-B 2)Certification of
Incorporation 3) Board resolution on
authorization to sign the claim application 4)
Approved plan from Factories Department 5)
Land Conversion Certificate 6) project report 7)
CA certificate on share holding 8) Valid CFO
from APPCB 9) Approved Plans
from Grampanchayath 10) Minutes of the
District Level Pre-scrutiny Committee 11)
Certification of the Banker on Plant &
Machinery as per guidelines.
2 15/09/20
15
25,
4/06/20
16
The Claim
application of M/s
South India
Krishna Oil and
Fats Pvt. Ltd.,
Sy.No. 275, 279,
280 & 281, Epuru
Bit-IB,
Pantapalem
Muthukur
(V&M), SPSR
Nellore District
sanction of
reimbursement of
Stamp Duty
under IIPP 2005-
10
SVC examined the claim and recommended for
sanction of Rs.33,86,475/- (Rupees thirty three
lakhs eighty six thousand four hundred and
seventy five only) towards sanction of
reimbursement of Stamp Duty under IIPP 2005-
10 subject to submission of the following
shortfall information:1) IEM Part-B 2)Certificate
of Incorporation 3) Board resolution on
authorization to sign the claim application 4)
Approved Plans form Factories Department 5)
Land Conversion Certificate 6) Project report 7)
CA certificate on share holding 8) Minutes of the
District Level Pre-scrutiny Committee 9) Banker
certificate on Plant & Machinery as per
guidelines .
II. SANCTION OF REIMBURSEMENT OF
SALES TAX.
S No
Date of
received
claim
Meeting
date &
seriol no
Agenda Decision
:: 3 ::
1 8/9/2015
15,
4/06/201
6
The Claim application of
M/s Regen Powertech
Pvt. Ltd., Sy. No. 182 to
188, APIIC, Industrial
Park, Mambattu (V), Tada
(M), Nellore District for
saction of sales tax in
respect of 2013-14 under
IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.11,35,89,444/- (Rupees
eleven crores thirty five lakhs
eighty nine thousand four
hundred and forty four only)
towards sales tax
reimbursement for the year
2013-14 subject to submission
of the following shortfall
information:1) Land Sale Deed
or Lease Deed 2)
Certificate of Incorporation 3)
Board resolution on
authorization to sign the claim
application 4) Approved Plan
from Gram Panchayath, 5)
Approved Plans from Factories
Department, 6) Approved
Plans from IALA 7) Boiler’s
Certificate 8) Land conversion
certificate 9) Bank sanctioned
letter 10) Civil Engineer
certificate 11) Approved
project report 12) Power
release certificate.
2 14/9/2015
19,
4/06/201
6
The Claim application of
M/s Sree Jayajyothi
Cements Limaited,
Yanakandla (V),
Banaganpalli (M),
Kurnool District
reimbursement of sales
tax in respect of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.1,64,88,816/- (Rupees one
crore sixty four lakhs eighty
eight thousand eight hundred
and sixteen only) towards sales
tax reimbursement subject to
submission of the following
shortfall information:1) Land
Sale Deed / Lease Deed 2)
Certificate of Incorporation 3)
Board resolution on
authorization to sign the claim
application 4) Approval
Plans from Grampanchayath
5) Approved Plans from
Factories Department 6)
Approved Plans from T&CP 7)
Land Conversion Certificate 8)
CFO issued by APPCB 9)
Bank Statement Letter on Plant
& Machinery 10) Civil
Engineer Certificate 11)
Power Release Certificate
12)Project Report 13) CA
certificate on Share holding
14) Statement of Accounts
from Financial Institution.
3 15/9/2015
24,
4/06/201
6
The Claim application of
M/s A S Jute Product Pvt
Ltd (Existing) Sy No:
20/2 & 21,
Nerallavalasa(V),
Padmanabam (m),
Visakhapatnam for
sanction of
reimbursement of sales
tax in respect of 2014-15
under IIPP 2010-15
SVC examined the claim and
recommended for sanction of
Rs.17,94,255/- (Rupees
seventeen lakhs ninety four
thousand two hundred and fifty
five only) towards sanction of
reimbursement of sales tax in
respect of 2014-15 under IIPP
2010-15 subject to submission
of shortfall document - Civil
Engineer Certificate
:: 4 ::
4 26/10/2015
36,
4/06/201
6
The Claim application of
M/s.Jaypee Balaji Cement
Plant, Rs No: 99,
Budawada, Jaggaiahpet
(M), Krisna Dist sanction
of reimbursement of sales
tax in respect of 2014-15
under IIPP 2010-15
SVC examined the claim and
recommended for sanction of
Rs.8,22,63,860/- (Rupees eight
crores twenty two lakhs sixty
three thousand eighty hundred
and sixty only) towards
sanction of reimbursement of
sales tax in respect of 2014-15
under IIPP 2010-15 subject to
submission of the following
shortfall information:1) Land
sale deed / lease deed 2)
Certificate of Incorporation 3)
Board resolution on
authorization to sign the claim
application 4) CFO from
APPCB, 6) Certification of
Plant & Machinery as per
guidelines 7) Project
report 8) Chartered Accountant
Certificate on share holding
5 30/10/2015
37,
4/06/201
6
The Claim application of
M/s Net Matrix Limited,
Plot No: 15&15A,
APSEZ, Atchuthapuram,
Visakhapatnam sanction
of reimbursement of sales
tax in respect of 2014-15
under IIPP 2010-15
SVC examined the claim and
recommended for sanction of
Rs.23,70,000/- (Rupees
Twenty three lakhs seventy
thousand only) towards
sanction of reimbursement of
Sales Tax in respect of 2014-
15 under IIPP 2010-15 subject
to submission of the following
shortfall information:1) Land
Sale Deed / Lease Deed 2)
Board resolution on
authorization to sign the claim
application 3) Chartered
Accountant Certificate on
shareholding.
6 31/10/2015
42,
4/06/201
6
The Claim application of
M/s.Rajapalayam Mills
Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna
Dist sanction of
reimbursement of sales
tax in respect of 2014-15
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.3,23,470/- (Rupees three
lakhs twenty three thousand
four hundred and seventy only)
towards sanction of
reimbursement of sales tax in
respect of 2014-15 under IIPP
2005-10
7 31/10/2015
48,
4/06/201
6
The Claim application of
M/s.Sudarshanam
Spinning Mills
Tirumalagiri (V),
Jaggaiahpet (M), Krishna
Dist sanction of
reimbursement of sales
tax in respect of 2014-15
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.16,48,050/- (Rupees sixteen
lakhs forty eight thousand and
fifty only) towards sanction of
reimbursement of sales tax in
respect of 2014-15 under IIPP
2005-10
8 26/11/2015
2,
14/06/20
6
The Claim application of
M/s Parag Milk Foods
Private Limited,
Samudrapalli(V),
Pengaragunta(PO),
Palamaner(M), Chittoor
District sanction of
reimbursement of sales
tax in respect 2014-15
under Industrial
Investment Promotion
Policy 2010-158
SVC verified the claim and
recommended for sanction of
Rs.21,75,294/- (Rupees twenty
one lakhs seventy five
thousand two hundred ninety
four only) towards
reimbursement of sales tax for
the year of 2014-15 under
IIPP 2010-15 subject to
submission of the following
shortfall information:1) Valid
CFO from APPCB 2.Form –
A Certificate with round seal
of the CT department .
:: 5 ::
9 31/10/2015
45,
4/06/201
6
The Claim application of
M/s.Sri Harini Textiles
Limited, Tirumalagiri (V),
Jaggaiahpet (M), Krishna
Dist sanction of
reimbursement of sales
tax in respect of 2014-15
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.88,370/- (Rupees eighty
eight thousand three hundred
and seventy only) towards
sanction of reimbursement of
sales tax in respect of 2014-15
under IIPP 2005-10
10 31/10/2015
46,
4/06/201
6
The Claim application of
M/s.Sri Vishnu Shankar
Mills Limited,
Gopinenipalem (V),
Vatsavai (M), Krishna
Dist sanction of
reimbursement of sales
tax in respect of 2014-15
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.5,59,040/- (Rupees five
lakhs fifty nine thousand and
forty only) towards sanction of
reimbursement of sales tax in
respect of 2014-15 under IIPP
2005-10
11 31/10/2015
47,
4/06/201
6
The Claim application of
M/s.Sandhya Spinning
Mill Ltd., Gopinenipalem
(V), Vatsavai (M),
Krishna Dist sanction of
reimbursement of sales
tax in respect of 2014-15
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.4,19,720/- (Rupees four
lakhs nineteen thousand seven
hundred and twenty only)
towards sanction of
reimbursement of sales tax in
respect of 2014-15 under IIPP
2005-10
12 29-12-
2015
62,
14/06/20
6
The Claim application of
M/s Worington Nitin
Cylinders Ltd, VSEZ,
Duvvada(V&M),
Visakhapatnam sanction
of reimbursement of sales
tax in respect 2012-13
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.14,09,370/- ( Rupees
fourteen lakhs nine thousand
three hundred and seventy
only) towards sanction of
reimbursement of Sales tax in
respect of 2012-13 under IIPP
2010-15 subject to submission
of the following shortfall
information: 1. BIS certificate
2.Valid CFO from APPCB
III.REIMBURSEMENT OF POWER COST
S
N
o
Date of
received
claim
Meeting date
& seriol no Agenda Decision
1 02/08/20
15
1,
4/06/2016
The Claim application of
M/s Shri Govindaraja
Textiles Ltd, 708,
Peddarangapuram (V),
Pulivendala (M), Kadapa
for sanction of
reimbursement of power
cost sanctioned from
DCP to 1st quarter as per
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and decided
to consider the proposal under IIPP
2005-10, since the Government have
not issued the G.O on the MOU to
consider it as Mega Project, hence
recommended for sanction of
Rs.4,20,75,189/- (Rupees four crores
twenty lakhs seventy five thousand
one hundred and eighty nine only)
towards present claim of 1st quarter
of 2015-16 with recomputed amount
of the earlier claims as per Industrial
Investment Promotion Policy 2005-
2010.
2 28/08/20
15
2,
4/06/2016
The Claim application of
M/s Sakku Spinning
Mills Ltd, (existing)
Chinakondrupadu (V),
Prathipadu (M), Guntur
for sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.48,56,200/- (Rupees forty eight
lakhs fifty six thousand and two
hundred only) towards power cost
reimbursement for 1st quarter of
2015-16 under IIPP 2005-10, subject
to submission of the following
shortfall information:1) Land
conversion certificate 2)Valid CFO
from APPCB 3) Approved
Project Report 4) CA certificate on
Board resolution authorizing person
signing the claim application for 1st
quarter of 2015-16. 6)
Approved Plans from Gram
Panchayath, T&CP, and Factories
Department 7) Bank sanction letter.
:: 6 ::
3 28/08/20
15
3,
4/06/2016
The Claim application of
M/s Gajavalli Spinning
Mils (P) Ltd, Narakoduru
(V), Chebrolu (V) & (M),
Guntur Dist for sanction
of reimbursement of
power cost in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-2010.
The Scrutiny Verification Committee
discussed the issue and decided to fix
Base Power Consumption as average
of preceding three years (highest as
per Operational Guidelines) and
recommended for sanction of
Rs.54,58,825/- (Rupees fifty four
lakhs fifty eight thousand eight
hundred and twenty five only)
towards power cost reimbursement
for 1st quarter of 2015-16 under
Industrial Investment Promotion
Policy 2005-2010, subject to
submission of the following shortfall
information:1) Valid CFO from
APPCB 2) Land conversion
certificate 3) Approved Plans from
Gram panchayat, Factories Dept &
T&CP 4) CA certificate on
percentage of share holding
4 28/08/20
15
4,
4/06/2016
The Claim application of
M/s Kallam Spinning
Mils (Open End unit)
Chowdavaram (V),
Guntur Dist for
sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
2010.
SVC verified the claim and
recommended for sanction of
Rs.34,95,350/- (Rupees thirty four
lakhs ninety five thousand three
hundred and fifty only) towards
power cost reimbursement for 1st
quarter of 2015-16 subject to
submission of the following shortfall
information:1) Board resolution, 2)
Approved Plans from T&CP,
Factories, Gram panchyath 3) Land
conversion certificate 4)Valid CFO
from APPCB 5) CA certificate on
percentage of share holding.
5 28/08/20
15
5,
4/06/2016
M/s Sri Venkata Siva
Parvathi Spinning Mill
(P) Ltd, (2nd Exp) GBC
Road, Chebrolu (V&M),
Guntur Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
The Scrutiny Verification Committee
has examined the claims from DCP
and confirmed that an excess amount
of Rs.80,09,324/- sanctioned
in earlier claims by the SLC and
recommended for adjustment of the
same amount in the 1st quarter of
2015-16 that is worked out for an
amount of Rs.46,66,353/- and the
balance amount of Rs.33,42,971/-
in future claims. However,
SVC recommedation is subject to
furnishing the shortfalls:1) Land
documents 2) Valid CFO from
APPCB 3) Approved project report
4) Land conversion certificate 5)
Company incorporation 6) Approved
Plans from GP, T&CP Factories Dept
7) Certification on Plant &
Machinery as per guidelines 8) CA
certificate on percentage of share
holding.
6 29/08/20
15
7,
4/06/2016
The Claim application of
M/s Ranganayaka
Spinning Mills (P) Ltd,
Boyapalem (V),
Edlapaldu (M), sanction
of reimbursement of
power cost in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
The Scrutiny Verification Committee
examined the proposal and
recommended to fix the Base Power
Consumption units by adding Plant
& Machinery installed before one
year from DCP. Hence, SVC
recommended for sanction of total
amount of Rs.53,67,331/- (Rupees
fifty three lakhs sixty seven thousand
three hundred and thirty one only)
towards power cost reimbursement
for 1st quarter of 2015-16 and re-
computed amount of the earlier
claims as per revised Base Power
Consumption. However, SVC
recommendation is subject to
furnishing the shortfalls:1) Board
resolution on authorization to sign the
claim application. 2) GP approval 3)
Land conversion certificate 4) CFO
from APPCB 5) Bank sanctioned
letter 6) Approved project report 7)
CA certificate on percentage of
share holding.
7 29/08/20
15
8,
4/06/2016
The Claim application of
M/s Ranganayaka
Spinning Mills (P) Ltd,
(Exp) Boyapalem (V),
Edlapaldu (M), sanction
of reimbursement of
power cost in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC examined the claim and
recommended for sanction of
Rs.10,05,181/-(Rupees ten lakhs five
thousand one hundred and eighty one
only) towards power cost
reimbursement for 1st quarter of
2015-16 duly adjusting the excess
amount of Rs.13,85,823/- sanctioned
earlier as per the revised base power
consumption.However, SVC
recommendation is subject to
furnishing the shortfalls: 1) Approved
Plans from GP, T&CP, Factories
Department 2) Land conversion
certificate 3) Valid CFO from
APPCB, 4) CE Certificate 5)
Approved project report 6) CA
certificate on percentage of share
holding.
:: 7 ::
8 29/08/20
15
9,
4/06/2016
The Claim application of
M/s Pavan Cotton
Products (P) Ltd (Exx-1)
Pulladigunta(V),
Vatticherukur (M),
Guntur sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC examined the claim and
recommended for sanction of Rs.
16,02,752/- (Rupees sixteen lakhs
two thousand seven hundred fifty two
only) towards power cost
reimbursement for 1st quarter of
2015-16 duly adjusting the excess
amount of Rs.6,02,930/- sanctioned
in earlier claims.However, SVC
recommendation is subject to
furnishing the shortfalls: land
documents 2) Valid CFO from
APPCB, 3) Land conversion
certificate 4) Approved project
report 5) T&C approval plan 6) CA
certificate on percentage share
holding
9 29/08/20
15
11,
4/06/2016
The Claim application of
M/s Sri Venkata Lakshmi
Narasimha spinning Mills
,(Exp) Sy No: 176/4,
GBC, Road, Chebrolu (V
&M), Guntur for
sanction of
reimbursement of power
cost under Industrial
Investment Promotion
Policy 2010-15
SVC examined the claim and
deferred due to the following
shortfalls (1st claim):1) Land
documents 2) Company
incorporation certificate 3) Board
resolution on authorization to sign the
claim application 4) VGTUDA Plan
Approval 5)Factories Plan approval
6) Land conversion certificate7) CA
certificate on power consumptions on
preceding three years.
1
0
29/08/20
15
12,
4/06/2016
The Claim application of
M/s Krishna Murthy
Spinning Mills (P) Ltd,
NH-5, Thimmapuram
(V), Edladpau (M),
Guntur Dist in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-2010.
SVC examined the claim and
recommended for sanction of
Rs.36,82,550/- towards power cost
reimbursement for 1st quarter of
2015-16 subject to submission of the
following shortfall information:1)
Approved Plans from
Grampanchyath, T&CP, Factories
2) Valid CFO from APPCB 3) Land
Conversion certificate 3) Bank
sanction letter 4) Approved project
report
1
1
05/09/20
15
14,
4/06/2016
The Claim application of
M/s YSR spinning &
weaving Mills (P) Ltd
(3rd Exp) D No: 265 7A,
Gangavaram (V),
Nadendla (M), Guntur
Dist for sanction of
reimbursment of power
cost in respect 1st half
year 2012-13 to 2nd half
year of 2014-15 under
Industrial Investment
Promotion Policy 2010-
2015.
SVC examined the claim and
recommended for sanction of
Rs.10,75,860/- (Rupees ten lakhs
seventy five thousand eight hundred
and sixty only) towards power cost
reimbursement for 1st half year 2012-
13 to 2nd half year of 2014-15
subject to submission of the
following shortfall information:1)
Land documents 2) Board resolution
on authorization to sign the claim
application 3) Approved Plan from
Grampanchayath, 4)Approved Plan
from T&CP Department 5)
Approved Plan from Factories
Department
1
2
10/09/20
15
16,
4/06/2016
The Claim application of
M/s.The KCP Limited
(KCP Cement Unit-
II)Muktyala, Jaggaiapeta
(M) Krishna Dist for
sanction of
reimbursement of power
cost in respect of 1st
quarter of 2015-16 under
IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.81,97,460/- (Rupees eighty one
lakhs ninety seven thousand four
hundred and sixty only) towards
power cost reimbursement for 1st
quarter of 2015-16 Subject to
submission of the following shortfall
information:1) Certification of
Incorporation 2) Board resolution on
authorization to sign the claim
application 3) Approved Plans from
DT&CP / UDA 4) Valid CFO /
Acknowledgment from APPCB 5)
Project report 6) CA certificate for
shareholding 7) Land Conversion
Certificate.
1
3
11/09/20
15
17,
4/06/2016
The Claim application of
M/s Sri Lakshmi
Narasimha Spinning Mill
(India) Pvt Ltd,
Veppalavaripalem (M),
Prakasam Dist sanction
of reimbursement of
power cost in respect of
1st quarter of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of Rs.
56,61,810/- (Rupees Fifty six lakhs
sixty one thousand eight hundred and
ten only) towards power cost
reimbursement for 1st quarter of
2015-16 Subject to submission of the
following shortfall information:1)
Approved Plan from T&CP 2) Valid
CFO / Acknowledgment from
APPCB 3) Approved
Plan from Grampanchayth 4)
Land Conversion Certificate.
:: 8 ::
1
4
15/09/20
15
20,
4/06/2016
The Claim application of
M/s Sai Global Yarntex
(India) Pvt LTd, Sy No:
103/a, 107,133,143/1,
142/2, Vellampalli (V),
Maddipadu (M),
Prakasam Dist sanction
of reimbursement of
power cost in respect of
1st quarter of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.5,55,930/- (Rupees five lakhs fifty
five thousand nine hundred and thirty
only) towards power cost
reimbursement for 1st quarter of
2015-16 subject to submission of the
following shortfall information:1)
Land Sale Deed / Lease Deed
2) Approved Plans from
Grampancyath 3) Approved Plans
from T&CP 4) Approved Plans from
Factories Department 5) Land
Conversion Certificate 6) Civil
Engineer Certificate 7) Approved
Project Report .
1
5
15/09/20
15
21,
4/06/2016
The Claim application of
M/s NSL Textiles Ltd, D
No: 6/275-1, Inkollu ,
Prakasam Dist for
sanction of
reimbursement of power
cost
The Scrutiny Verification Committee
examined the claim and
recommended for sanction of
Rs.3,49,06,296/- towards power cost
reimbursement for 4th quarter of
2014-15 under IIPP 2005-10 as
against Rs.6,74,79,356/- duly
deducting the excess sanctioned
amount of Rs.3,25,73,060/- in earlier
claims towards reimbursement of
Power cost (computation of power
cost reimbursement was done @ 0.75
per unit beyond ‘5’ years period
under Mega Project Category).
However, SVC recommendation is
subject to submission of the
following shortfall documents: 1)
IEM Part-B 2) Approved plans from
Factories Department 3) Land
conversion certificate 4) Project
Report 5) Valid CFO from APPCB
6) Approved Plans from DT& CP 7)
Base Power Consumption units of
preceding three years from Chartered
Accountant 8) Statement of
Accounts and Certification of Plant &
Machinery as per Guidelines Further,
SVC has taken a view to seek the
clarification from the Government on
the extension of Mega Project status
beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.
1
6
15/09/20
15
22,
4/06/2016
The Claim application of
M/s NSL Textiles Ltd, Sy
No: 371 to 382,
Kunchalavaripalem (V)
Cherukupalli (M), Guntur
Dist for sanction of
reimbursement of power
cost
The Scrutiny Verification Committee
has examined the claim and
recommended for sanction of
Rs.2,67,09,007/- towards power cost
reimbursement for 1st quarter of
2015-16 under IIPP 2005-10
including re-computed power cost
reimbursement of earlier claims @
0.75 per unit beyond ‘5’ years period
under Mega Project Category.
However, SVC recommendation is
subject to submission of the
following shortfalls: 1) Approved
plans from Factories Department 2)
Land conversion certificate 3) Project
Report 4) Valid CFO from APPCB
5) Approved Plans from DT& CP
6) Approved Plans from
Grampanchayat 7) Land Sale
Deed / Lease Deed.Further, SVC has
taken a view to seek the clarification
from the Government on the
extension of Mega Project status
beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.
1
7
15/09/20
15
23,
4/06/2016
The Claim application of
M/s A S Jute Product Pvt
Ltd (Exp) Sy No: 20/2 &
21, Nerallavalasa(V),
Padmanabam (m),
Visakhapatnam for
sanction of
reimbursement of power
cost in respect of 1st &
2nd half years of 2014-15
under IIPP 2010-15
SVC examined the claim and
recommended for sanction of Rs.
9,19,148/- (Rupees nine lakhs
nineteen thousand one hundred and
forty eighty only) towards power
cost reimbursement for 1st & 2nd half
years of 2014-15 subject to
submission of the following shortfall
information:
:: 9 ::
1
8
16/09/20
15
26,
4/06/2016
The Claim application of
M/s Sree Jayajyothi
Cements Limaited,
Yanakandla (V),
Banaganpalli (M),
Kurnool District sanction
of reimbursement of
power cost in respect of
1st quarters of 2015-16
IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.11,36,28,130/- (Rupees eleven
crores thirty six lakhs twenty eighty
thousand one hundred and thirty
only) towards sanction of
reimbursement of power cost in
respect of 1st quarters of 2015-16
IIPP 2010-15 subject to submission
of the following shortfall
information:1) Land Conversion
Certificate 2) Plant & Machinery
Statement certified by the Financial
Institution as per guideline 3)
Project report 4) Charted
Accountant Certificate on share
holding 5 ) Sale Deed 6) Board
resolution on authorization to sign the
claim application.
1
9
18/09/20
15
27,
4/06/2016
The Claim application of
The Claim application of
M/s NSL Textiles Ltd,
(Mega Project) Edlapadu
(V), & (M), Guntur Dist
sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16 under
IIPP 2005-10
The Scrutiny Verification Committee
examined the claim and
recommended for sanction of Rs
1,59,96,232/- (Rupees one crore fifty
nine lakhs ninety six thousand two
hundred and thirty two only) towards
power cost reimbursement for 1st
quarter of 2015-16 as against
Rs.5,01,89,804/- by deducting
Rs.3,41,93,572/- on considering the
reimbursement of power cost @ 0.75
per unit beyond the period under
Mega Project Category as indicated
in G.O., subject to submission of the
following shortfall information:1)
Land Sale Deed / Lease Deed 2)
Land Conversion Certificate 3) Valid
CFO from APPCB 4) Project Report
5) CA certificate on share holding 6)
Approved Plans from Gram
Panchayat 7) Approved Plans from
T&CP 8) Approved Plans from
Factories Department. Further, SVC
has taken a view to seek the
clarification from the Government on
the extension of Mega Project status
beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.
2
0
21/09/20
15
28,
4/06/2016
The Claim application of
M/s.NSL Textiles Ltd.,
Veeravalli (V),
Bapulapadu (M), Krishna
Dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16 under
IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.2,80,76,307/- (Rupees two crores
eighty lakhs seventy six thousand
three hundred and seven only)
towards sanction of reimbursement of
power cost in respect of 1st quarters
of 2015-16 under IIPP 2005-10 as
against Rs.3,05,10,947/- on deducting
Rs.24,34,640/- by considering
reimbursement of power cost @ 0.75
per unit beyond ‘5’ years period
under Mega Project
Category.Further, SVC opined that
seek the clarification from the
Government on the extension of
Mega Project status beyond 5 years
i.e. 8 years as per extended the IIPP
2005-10.
2
1
26/09/20
15
29,
4/06/2016
The Claim application of
The Claim application of
M/s.Paramesu Biotech
Private Limited, sanction
of reimbursement of
power cost in respect of
2nd half year of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.7,21,700/- (Rupees seven lakhs
twenty one thousand and seven
hundred only) towards sanction of
reimbursement of power cost in
respect of 2nd half year of 2015-16
under IIPP 2005-10 subject to
submission of the following shortfall
information:1) Project Report 2) IEM
Part-B 3) Approved plans from
Grampanchyath 4) Approved plan
from Factories Department 5)
Approved plans of T&CP
Department 6) Power Release
Certificate duly incorporating power
load.
2
2
28/09/20
15
30,
4/06/2016
The Claim application of
M/s Vasantha Spinners
Ltd, (Exp-I) NH-5,
Thimmapuram (V),
Edlapadu (M), Guntur
Dist sanction of
reimbursement of power
cost in respect
The Scrutiny Verification Committee
examined the claim and decided to
defer for next meeting for re-
computation by taking proper Base
Consumption calculation prior to
expansion.
2
3
09/10/20
15
31,
4/06/2016
The Claim application of
M/s Lohiya Edible Oils
Pvt. Ltd., (Unit-II)
(Existing), Plot No.25,
IDA, Vakalapudi (V),
Kakinada Rural Mandal,
East Godavari District
sanction of
reimbursement of power
Rejected as the claim, since the
eligibility period of 5 years from
DCP is completed by 06/03/2015.
:: 10 ::
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
2
4
17/10/20
15
32,
4/06/2016
The Claim application of
M/s Emami Biotech
Limited, Sy.No. 501 to
510, Krishnapatnam Port
Zero Point, Pantapalem
(V), Muthukuru (M),
SPSR Nellore District
sanction of
reimbursement of power
cost in respect of 2nd
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.65,55,470/- (Rupees sixty five
lakhs fifty five thousand four hundred
and seventy only) towards sanction of
reimbursement of power cost in
respect of 2nd quarters of 2015-16
under IIPP 2005-10 Subject to
submission of the following shortfall
information:1) Meeseva receipt for
the 1st quarter of 2015-16 2) Date of
receipt of application at DIC not
available for the 2nd claim 3) IEM,
Partnership form B, unattested 4)
Gram Panchayth, Factories , T&CP
Dept approved plans 5) M/c
statement not as per guidelines 6)
project report 7) Board resolution
authorizing the person not singed 8)
Land conversion certificate
2
5
17/10/20
15
33,
4/06/2016
The Claim application of
M/s Sree Rayalaseema
Alkalies and Allied
Chemicals Ltd.,
Gondiparla (V), Kurnool
sanction of
reimbursement of power
cost in respect of 2nd
quarters of 2015-16 under
IIPP 2005-10
SVC verified the claim and
recommended for sanction of
Rs.11,82,39,540/- (Rupees eleven
crores eighty two lakhs thirty nine
thousand five hundred and forty only)
towards sanction of reimbursement of
power cost in respect of 2nd quarters
of 2015-16 under IIPP 2005-10
subject to submission of the
following shortfall information:1)
IEM Part-B 2) Land Sale Deed /
Lease Deed 3) Certificate of
Incorporation 4) Board resolution on
authorization to sign the claim
application 5) Approved Plan from
Factories Department 6) Valid Boiler
Certificate 7) Certification of Plant
and Machinery as per operational
guidelines 8) Civil Engineer
Certificate 9) Project Report 10)
Chartered Accountant Certificate on
shareholding 11) Land Conversion
Certificate 12) CA certificate for
consumption of power for previous
period for fix base 12) CFO
certificate not attested 13) Gram
Panchayth approval not furnished 15)
Power release certificate not attested
& Payment proof for the power bills.
2
6
26/10/20
15
34,
4/06/2016
The Claim application of
M/s Sri Anantha Lakshmi
Spinning Mills (P) Ltd,
(Exp-1) 59/1, Boyapalem
(V), Edlapadu (M),
Guntur Dist sanction of
reimbursement of power
cost in respect of 2nd
quarters of 2015-16
under IIPP 2015-16
SVC examined the claim and
recommended for sanction of
Rs.66,04,160/- (Rupees sixty six
lakhs four thousand one hundred and
sixty only) towards sanction of
reimbursement of power cost in
respect of 2nd quarters of 2015-16
under IIPP 2015-20 (as per option
given by the unit) subject to
submission of the shortfall document
- Land conversion certificate
2
7
26/10/20
15
35,
4/06/2016
The Claim application of
M/s.Jaypee Balaji
Cement Plant, Rs No: 99,
Budawada, Jaggaiahpet
(M), Krisna Dist sanction
of reimbursement of
power cost in respect of
1st & 2nd quarters of
2014-15 under IIPP
2010-15
SVC examined the claim and
recommended for sanction of
Rs.6,09,63,560/- (Rupees six crores
nine lakh sixty three thousand five
hundred and sixty only) towards
sanction of reimbursement of power
cost in respect of 1st & 2nd quarters
of 2014-15 under IIPP 2010-15
subject to submission of the
following shortfall information:1)
Land sale deed / lease deed 2)
Certificate of Incorporation 3) Board
resolution on authorization to sign the
claim application 4) CFO from
APPCB 5) Certification of Plant &
Machinery as per guideline by GM
DIC 7) Project Report 8) Chartered
Accountant Certificate on share
holding
2
8
30/10/20
15
38,
4/06/2016
The Claim application of
M/s Net Matrix Limited,
Plot No: 15&15A,
APSEZ, Atchuthapuram,
Visakhapatnam sanction
of reimbursement of
power cost in respect of
1st & 2nd quarters of
2014-15 under IIPP
2010-15
SVC examined the claim and
recommended for sanction of
Rs.16,89,180/- (Rupees sixteen lakhs
eighty nine thousand one hundred
and eighty only) towards sanction of
reimbursement of power cost in
respect of 1st & 2nd quarters of
2014-15 under IIPP 2010-15 Subject
to submission of the following
shortfall information:1) Land Sale
Deed / Lease Deed 2) Board
resolution on authorization to sign the
claim application 3) Chartered
Accountant Certificate for
investment & share holding.
:: 11 ::
2
9
31/10/20
15
39,
4/06/2016
The Claim application of
M/s.Sudarshnam
Spinning Mills Ltd.,
Rs.52&53, Tirumalagiri
(V), Jaggaipet (M)
Krishna Dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16 under
IIPP 2005-
SVC examined the claim and
recommended for sanction of
Rs.38,26,440/- (Rupees thirty eight
lakhs twenty six thousand four
hundred and forty only) towards
sanction of reimbursement of power
cost in respect of 1st quarters of
2015-16 under IIPP 2005-10
3
0
31/10/20
15
40,
4/06/2016
The Claim application of
M/s.Sri Harini Textiles
Limited, Rs.No:47,48 &
49, Tirumalagiri (V),
Jaggaiahpet (M), Krishna
Dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.36,63,940/- (Rupees thirty six
lakhs sixty three thousand nine
hundred and forty only) towards
sanction of reimbursement of power
cost in respect of 1st quarters of
2015-16 under IIPP 2005-10
3
1
31/10/20
15
41,
4/06/2016
The Claim application of
M/s.Sandhya Spinning
Mill Ltd., Gopinenipalem
(V), Vatsavi (M), Krishna
Dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.42,67,010/- (Rupees forty two
lakhs sixty seven thousand and ten
only) towards sanction of
reimbursement of power cost in
respect of 1st quarters of 2015-16
under IIPP 2005-10
3
2
31/10/20
15
43,
4/06/2016
The Claim application of
M/s.Rajapalayam Mills
Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna
Dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.47,32,410/- (Rupees forty seven
lakhs thirty two thousand four
hundred and ten only) towards
sanction of reimbursement of power
cost in respect of 1st quarters of
2015-16 under IIPP 2005-10
3
3
31/10/20
15
44,
4/06/2016
The Claim application of
M/s.Sri Vishnu Shankar
Mill Ltd. Gopinenipalem
(V), Vatsavai (M),
Krishna Dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.45,04,810/- (Rupees forty five
lakhs four thousand eight hundred
and ten only) towards sanction of
reimbursement of power cost in
respect of 1st quarters of 2015-16
under IIPP 2005-10
3
4
01/11/20
15
49,
4/06/2016
The Claim application of
M/s Bala Rama krishna
Spinning Mills (P) Ltd,
(Exp-1) Chowdavaram
(V), Guntur sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.20,30,212/- (Rupees twenty lakhs
thirty thousand two hundred and
twelve only) subject to submission of
the following shortfall information:1)
IEM Part -B for confirmation of DCP
2) Approved Plans from T &CP
Department 3) Valid CFO from
APPCB 4) Bank Statement
Certification 5) Civil Engineer
Certificate 6) Approved project
report 7) Land Sale Deed /
Lease Deed 8) Approved Plans from
Factories Department
3
5
02/11/20
15
50,
4/06/2016
The Claim application of
M/s Bhavya Cements
Ltd, Tangeda (V),
Dachepalli (M), Guntur
Dist sanction of
reimbursement of power
cost in respect of 2nd
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.5,37,74,480/- (Rupees five crore
thirty seven lakhs seventy four
thousand four hundred and eighty
only) towards sanction of
reimbursement of power cost in
respect of 2nd quarters of 2015-16
under IIPP 2005-10
3
6
03/11/20
15
52,
4/06/2016
The Claim application of
M/s J C Bio Tech (P) Ltd,
Plot No: 548 to 550, IGC,
Gundlapalli (V),
Maddipadu (M),
Prakasam Dist sanction
of reimbursement of
power cost in respect of
1st half year of 2015-16
under IIPP 2010-15
SVC examined the claim and
recommended for sanction of
Rs.25,76,700/- (Rupees twenty five
lakhs seventy six thousand and seven
hundred only) towards sanction of
reimbursement of power cost in
respect of 1st half year of 2015-16
under IIPP 2010-15 subject to
submission of the following shortfall
information:1) Land Conversion
Certificate 2) Valid CFO from
APPCB 3) Approved Plans from
Factories Department 4) Plant &
Machinery Statement from Financial
Institution as per guidelines
:: 12 ::
3
7
04/11/20
15
53,
4/06/2016
The Claim application of
The Claim application of
M/s Amaravathi Textiles
(P) Ltd (4th Exp) Martur
(V&M), Prakasam Dist
sanction of
reimbursement of power
cost in respect of 2nd
quarter of 2015-16
under IIPP 2010-15
The Scrutiny Verification Committee
examined the issue and recommended
for sanction of Rs.1,33,85,866/-
(Rupees one crore thirty three lakhs
eighty five thousand eight hundred
sixty six only) towards
reimbursement of power cost for
2nd quarter 2015-16 claim as against
Rs.2,88,16,757/- by deducting
Rs.1,54,30,891/- on considering
reimbursement of power cost @ 0.75
per unit beyond ‘5’ years period
under Mega Project
Category.Further, SVC opined that
seek the clarification from the
Government on the extension of
Mega Project status beyond 5 years
i.e. 8 years as per extended the IIPP
2005-10.
3
8
06/11/20
15
54,
4/06/2016
The Claim application of
M/s.PVR Spinning and
Weaving Mills
(Expansion),RSNo.110/2,
108/2,3,4,, Kondaipalem
road, Tetali village,
Tanuku (M), West
Godavari District for
sanction of
reimbursement of power
cost
SVC examined the claim and
recommended for sanction of
Rs.14,68,326/-(Rupees fourteen lakhs
sixty eight thousand three hundred
and twenty six only) towards sanction
of reimbursement of power cost in
respect of 1st half year of 2015-16
duly adjusting the excess amount of
Rs.16,14,540 sanctioned earlier under
IIPP 2010-15 by correcting the base
power consumption, subject to
submission of shortfall documents: 1)
IEM Part-B for expansion project
2) Approved Plans from T&CP
Department 3) Valid CFO From
APPCB 4 ) Project Report
3
9
07/11/20
15
55,
4/06/2016
The Claim application of
M/s Ajantha Spintex
Limited, Kakani (V),
Narasaopet(M) Guntur
sanction of
reimbursement of power
cost in respect of 1st half
year of 2015-16 under
IIPP 2010-15
SVC examined the claim and
recommended for sanction of
Rs.38,52,320/-(Rupees thirty eight
lakhs fifty two thousand three
hundred and twenty only) towards
sanction of reimbursement of power
cost in respect of 1st half year of
2015-16 under IIPP 2010-15 Subject
to submission of the following
shortfall information:1)Approved
Plans from Gram Panchayath 2)
Land Conversion Certificate 3) Valid
CFO from APPCB 4) Approved
Plans from T&CP Department 5)
Approved Plans from Factories
Department 6) Bank sanction letter
4
0
13/11/20
15
57,
4/06/2016
The Claim application of
M/s Teamec Chorate
Limited, Plot No: 558 &
559, IGC, Gundlapalli
(V), Maddi padu (M)
Prakasam Dist sanction
of reimbursement of
power cost in respect of
1st half year of 2015-16
under IIPP 2010-15
SVC examined the claim and
recommended for sanction of
Rs.1,22,20,900/- (Rupees one crore
twenty two lakhs twenty thousand
and nine hounded only) towards
sanction of reimbursement of power
cost in respect of 1st half year of
2015-16 under IIPP 2010-15 subject
to submission of the following
shortfall information:1) Valid CFO
from APPCB 2) Justification whether
new unit or expansion as per IEM
3) Certification of Plant & Machinery
as per operational guidelines.
4
1
16/11/20
15
58,
4/06/2016
The Claim application of
M/s Idupulapadu Cotton
Mils Pvt Ltd , Jonnatali
(V), Martur (M),
Prakasam Dist sanction
of reimbursement of
power cost in respect of
2nd quarter of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.3,16,80,240/- (Rupees three crore
sixteen lakhs eighty thousand two
hundred and forty only) towards
sanction of reimbursement of power
cost in respect of 2nd quarter of
2015-16 under IIPP 2005-10.
4
1
18/11/20
15
60,
4/06/2016
The Claim application of
M/s.NSL Textiles Ltd.,
Near JNTU, APIIC,
Pulivendula, YSR
Kadapa dist sanction of
reimbursement of power
cost in respect of 1st
quarters of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.1,49,97,650/- (Rupees one crore
forty nine lakhs ninety seven
thousand six hundred and fifty only)
towards sanction of reimbursement of
power cost in respect of 1st quarters
of 2015-16 under IIPP 2005-10
4
2
20/11/20
15
61,
4/06/2016
The Claim application of
M/s Kallam Spinning
Mils Ltd, G T Road,
Martur (V&M),
Prakasam Dist sanction
of reimbursement of
power cost in respect of
1st half year of 2014-15
& 1st half year of 2015-
16 under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.1,03,30,060/- (Rupees one crore
three lakhs thirty thousand and sixty
only) towards sanction of
reimbursement of power cost in
respect of 1st half year of 2014-15 &
1st half year of 2015-16 under IIPP
2005-10 Subject to submission of
shortfall document - Certification of
Plant & Machinery as per operational
guidelines.
:: 13 ::
4
3
23/11/20
15
63,
4/06/2016
The Claim application of
M/s.Ravali Spinners Pvt
Ltd., (Exp-1), Khandavali
(V), Peravalli (M) West
Godavari Dist for
sanction of
reimbursement of power
cost
SVC examined the claim and
recommended for sanction of
Rs.1,95,93,928/- (Rupees one crore
ninety five lakhs ninety three
thousand nine hundred and twenty
eight only) towards sanction of
reimbursement of power cost in
respect of 2nd quarter of 2015-16
under IIPP 2005-10, including re-
computed amount of Rs.1,48,65,466/-
as per the revised Base Power
Consumption by considering 75% of
installed capacity utilized (highest as
per operational guidelines), subject to
following shortfalls:1) Meeseva
Receipt conformation form the GM,
DIC 2) Valid CFO from APPCB, 3)
Project report 4) Chartered
Accountant certification on
shareholding 5) Certificate of
Incorporation 6) Board resolution on
authorization to sign the claim
application 7) Statements of
Accounts 8) IEM Part-B 9) Land Sale
Deed / Lease Deed 10) Land
Conversion Certificate 11) Plant &
Machinery statement of the Financial
Institution as per operational
guidelines 12) Civil Engineer
Certificate 13) Chartered Accountant
Certificate for fixing the base units
14) Difference in power load w.r.t.
DCP 15) Approved Plans from Gram
Panchayat 16) Approved Plans from
DT&CP with attestation
17)Approved Plans from Factories
Department with attestation.
4
4
24/11/20
15
64,
4/06/2016
The Claim application of
M/s.The KCP
Limited(KCP Cement
Unit-II), Muktyala,
Jaggaiahpeta (M) Krishna
Dist sanction of
reimbursement of power
cost in respect of 2nd
quarter of 2015-16 under
IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.66,12,650/- (Rupees sixty six
lakhs twelve thousand six hundred
and fifty only) towards sanction of
reimbursement of power cost in
respect of 2nd quarter of 2015-16
under IIPP 2005-10
4
5
24/11/20
15
65,
4/06/2016
The Claim application of
M/s. Mandava Cotton
Mills Pvt Ltd., Sy No:
92/4, Ampapuram (V),
Bapulapadu (M), Krishna
Dist for sanction of
reimbursement of power
cost
SVC examined the claim and
observed that the connected load is
11KV as on DCP, later converted to
33KV after 1 ½ years from DCP.
Hence, no change on Base Power
Consumption units. Hence, the SVC
recommended for sanction of
Rs.64,03,280/- (Rupees sixty four
lakhs three thousand two hundred and
eighty only) towards sanction of
reimbursement of power cost in
respect 1st quarter of 2015-16 under
IIPP 2005-10 subject to submission
the following shortfalls:1) Valid CFO
from APPCB, 2) Bank sanction letter
3) Project report 4) Chartered
Accountant Certification on
shareholding 5) Reasons for
decrease of KVA from 2000 to 1650
and clarification on connection load.
4
6
26/11/20
15
66,
4/06/2016
The Claim application of
M/s.Sri Vishnu Shankar
Mill Ltd. Gopinenipalem
(V), Vatsavai (M),
Krishna Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.47,36,821/- (Rupees forty seven
lakhs thirty six thousand eight
hundred and twenty one only)
towards sanction of reimbursement of
power cost in respect 2nd quarter of
2015-16 under IIPP 2005-10,
including difference amount of
Rs1,66,161/-, by correcting the base
rate of power.
4
7
26/11/20
15
67,
4/06/2016
The Claim application of
M/s.Rajapalayam Mills
Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna
Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.49,83,559/- (Rupees forty nine
lakhs eight three thousand five
hundred and fifty nine only) towards
sanction of reimbursement of power
cost in respect 2nd quarter of 2015-
16 under IIPP 2005-10 including
difference amount of Rs2,26,118/-,
by correcting the base rate of power.
4
8
26/11/20
15
68,
4/06/2016
The Claim application of
M/s.Sandhya Spinning
Mill Ltd., Gopinenipalem
(V), Vatsavai (M),
Krishna Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.47,81,223/- (Rupees forty seven
lakhs eighty one thousand two
hundred and twenty three only)
towards sanction of reimbursement of
power cost in respect 2nd quarter of
2015-16 under IIPP 2005-10
including difference amount of Rs
1,37,243/- by correcting the base rate
of power.
:: 14 ::
4
9
26/11/20
15
69,
4/06/2016
The Claim application of
M/s.Sri Harini Textiles
Limited, Rs.No:47,48 &
49, Tirumalagiri (V),
Jaggaiahpet (M), Krishna
Dist sanction of
reimbursement of power
cost in respect 1st
quarter of of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.44,85,360/- (Rupees forty four
lakhs eighty five thousand three
hundred and sixty only)towards
sanction of reimbursement of power
cost in respect 2nd quarter of 2015-
16 under IIPP 2005-10 including
difference amount of Rs 6,44,270/-
by correcting the base rate of power.
5
0
26/11/20
15
70,
4/06/2016
The Claim application of
M/s.Sudarshanam
Spinning Mills Rs No: 52
& 53 Tirumalagiri (V),
Jaggaiahpet (M), Krishna
Dist sanction of
reimbursement of power
cost in respect 1st
quarter of of 2015-16
under IIPP 2005-10
SVC examined the claim and
recommended for sanction of
Rs.41,19,245/- (Rupees forty one
lakhs nineteen thousand two hundred
and forty five only) towards sanction
of reimbursement of power cost in
respect 2nd quarter of 2015-16 under
IIPP 2005-10 including difference
amount of Rs1,40,645/- by correcting
the base rate of power.
5
1
26/11/20
15
1,
14/06/206
The Claim application of
M/s.Vennar Ceramics
Ltd, Perikigudem,
Mandavalli (M), Krishna
Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of
Rs.28,99,800/- (Rupees twenty eight
lakhs ninety nine thousand and eight
hundred only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information:1)
Board resolution for authorizing
persons to sign the claim. 2) Project
report 3) CA certificate for share
holding.
5
2
26/11/20
15
3,
14/06/206
The Claim application of
M/s Parag Milk Foods
Private Limited,
Samudrapalli(V),
Pengaragunta(PO),
Palamaner(M), Chittoor
District sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of
Rs.21,75,294/- (Rupees twenty one
lakhs seventy five thousand two
hundred ninety four only) towards
reimbursement of sales tax for the
year of 2014-15 under IIPP 2010-15
subject to submission of the
following shortfall information:1)
Valid CFO from APPCB 2.Form – A
Certificate with round seal of the CT
department .
5
3
27/11/20
15
4,
14/06/206
The Claim application of
M/s.Silica Ceramica Pvt
Ltd., Narayanapuram (V),
Unguturu (M), W G Dist.
sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.79,07,950/- (Rupees seventy nine
lakhs seven thousand nine hundred
and fifty only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 and
Rs.3,69,180/- (Rupees three lakhs
Sixty nine thousand and one hundred
and eighty only) for a period 1st and
2nd quarter of 2015-16 for their
gasifies plant total an amount of
Rs.82,77,130/- (Rupees eighty two
lakhs seventy seven thousand one
hundred and thirty only) under IIPP
2005-10, subject to submission of the
following shortfall information:1.
Land sale deed or lease deed 2.
Company incorporation certificate, 3.
Project report 4. Valid CFO from
APPCB, 5. CA certificate for share
holding, 6. Machinery statement as
per guidelines 7.Factories Dept
approval with plans 8) Land
conversion certificate 9.Board
resolution for authorizing the person
to sign the claim 10.Bank sanction
letter 11. Statement of Account with
attestation.
:: 15 ::
5
4
27/11/20
15
5,
14/06/206
The Claim application of
M/s.Sri Srinivasa Spintex
(India) Limited
(Expansion-I),
Pedatadepalli (V),
Tadapalligudem (M),
W.G Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.41,38,086/- (Rupees Forty one
lakhs thirty eight thousand and eighty
six only) towards reimbursement of
power cost for 1st half year of 2015-
16 under IIPP 2010-15, including re-
computed amount of Rs.18,54,797/-
as per the revised Base Power
Consumption by considering 75% of
installed capacity utilized (highest as
per operational guidelines), subject to
submission of the following shortfall
information:1. Land lease or sale
deed, 2. Company incorporation
certificate, 3. Board resolution, 4.
5.Valid CFO, 6.Statement of
Accounts, 7.Machinery statement as
per guidelines, 8. Civil Engineer
certificate, 9. Power release
certificate, 10.C.A. Certificate for
expansion project. 11.Grampanchyath
approval 12. Land conversion
certificate 13.Bank term loan
sanction letter 14. Project report 15.
CA certificate for shareholding 16.
DT&CP approval 17. Factories Dept
approved plans.
5
5
27/11/20
15
6,
14/06/206
The Claim application of
M/s.Sri Srinivasa Spintex
Private Limited.
(existing), Pedatadepalli
(V), Tadapalligudem
(M), W.G Dist sanction
of reimbursement of
power cost in respect 1st
half year of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.58,48,780/- (Rupees fifty eight
lakhs forty eight thousand seven
hundred and eighty only) towards
reimbursement of power cost for 1st
quarter of 2015-16 under IIPP 2005-
10, subject to submission of the
following shortfall information1.
Grampanchyath approval 2. Land
conversion certificate 3.Bank term
loan sanction letter 4. Project report
5. CA certificate for shareholding 6.
DT&CP approval 7. Factories Dept
approved plans 8. Justification for
increase in power load.
5
6
27/11/20
15
7,
14/06/206
The Claim application of
M/s.Sri Srinivasa Spintex
Private Limited
(existing), Pedatadepalli
(V), Tadapalligudem
(M), W.G Dist sanction
of reimbursement of
power cost in respect 1st
and 2nd quarter of 2015 -
16 under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
60,34,790/- (Rupees sixty lakhs thirty
four thousand seven hundred and
ninety only) towards reimbursement
of power cost for 2nd quarter of
2015-16 under IIPP 2005-10 subject
to submission of the following
shortfall information1.
Grampanchyath approval 2. Land
conversion certificate 3.Bank term
loan sanction letter 4. Project report
5. CA certificate for shareholding 6.
DT&CP approval 7. Factories Dept
approved plans 8. Justification for
increase in power load.
5
7
27/11/20
15
8,
14/06/206
The Claim application of
M/s.SVR Spinning Mills
Private Limited,
Malleswaram (V),
Peravalli (M), W G Dist
sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15.
SVC verified the claim and
recommended for sanction of Rs.
21,44,430/- (Rupees twenty one
lakhs forty four thousand four
hundred and thirty only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information: 1.
Board resolution 2. Valid CFO from
APPCB, 3.Civil Engineer certificate
4. Project report 5.CA certificate for
share holding 6. Reason for increase
in power load from 750KVA to 1501
KVA
5
8
27/11/20
15
9,
14/06/206
The Claim application of
M/s.Sri Srinivasa Spintex
(India) Limited (Exp-2),
Pedatadepalli (V),
Tadapalligudem (M),
W.G Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of Rs.
32,56,942/- (Rupees thirty eight lakhs
fifty six thousand nine hundred and
forty two only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15 duly adjusting the excess
amount of Rs.32,93,015/- sanctioned
earlier under IIPP 2010-15 by
correcting the Base Power
Consumption by considering 75% of
installed capacity utilized (highest as
per operational guidelines), subject to
submission of the following shortfall
information: 1. IEM part-B, 2. Land
sale deed or lease deed 3. Gram
Panchayath approval 4. DT&CP
approval/ UDA approval 5.
Machinery statement duly certified as
per guidelines 6. Company
incorporation certificate 7. Board
authorization 8. Land conversion 9.
Civil engineer certificate 10.CA
certificate.
:: 16 ::
5
9
02/12/20
15
10,
14/06/206
The Claim application of
M/s Bhavanam Spinning
Mills (P) Ltd, (Exp),
Bhimenenivaripalem,
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.32,88,840/-( Rupees Thirty two
lakhs eighty eight thousand eight
hundred and forty only) towards
reimbursement of power for 2nd
quarter of 2015-16 under IIPP 2005-
10.
6
0
02/12/20
15
11,
14/06/206
The Claim application of
M/s Sree Veerabramedra
Swamy Spinning Mills,
Lingam gutta (V),
Chilakalurpeta (M),
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.43,89,500/- (Rupees Forty three
lakh eighty nine thousand five
hundred only) towards
reimbursement of power cost for2nd
quarter of 2015-16 under IIPP 2005-
10.
6
1
02/12/20
15
12,
14/06/206
M/s Sakku Spinning
Mills Ltd,
(existing)Chinakondrupa
du (V), Prathipadu (M),
Guntur sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.36,50,100/- (Rupees thirty six
lakhs fifty thousand and one hundred
only) towards reimbursement of
power cost for 2nd quarter of 2015-
16 under IIPP 2010-15 subject to
submission of the following shortfall
information:1. Land conversion
certificate 2. Valid CFO from
APPCB 3. Approved project port
4.CA certificate 5. Board resolution
for person to sign in claim
application. 6. Gram Panchyath,
T&CP and Factories Dept approval 7.
Bank sanctioned letter.
6
2
02/12/20
15
13,
14/06/206
The Claim application of
M/s Sri Lakshmi
Godavari Spinning Mills
(P) Ltd, (Existing) S.No:
113, Chebrolu (V) &
(M), Guntur Dist sanction
of reimbursement of
power cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.59,26,440/- (Rupees fifty nine
lakhs twenty six thousand four
hundred and forty only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP 2005-
10 subject to submission of the
following shortfall information: 1.
Confirmation of the GM, DIC on
installation of additional machinery
due to increase in power load from
650 kva to 4950 kva
6
3
02/12/20
15
14,
14/06/206
M/s Bhavanam Spinning
Mills (P) Ltd, (Exp -2,)
Bhimenenivaripalem,
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.88,95,970/- (Rupees eighty eight
lakhs ninety five thousand nine
hundred and seventy only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP
2005-10.
6
4
02/12/20
15
15,
14/06/206
M/s Sakku Spinning
Mills Ltd,
(Exp)Chinakondrupadu
(V), Prathipadu (M),
Guntur sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15.
SVC verified the claim and
recommended for sanction of
Rs.76,84,160/- (Rupees seventy six
lakhs eighty four thousand one
hundred and sixty only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information:
1. Board resolution 2.
Grampanchayath, T&CP Dept,
Factories Dept plan approval for
expansion 3. Land conversion
certificate 4.Valid CFO from APPCB
5. Approved project report 6. Reason
for increase the power load.
6
5
02/12/20
15
16,
14/06/206
M/s Vasantha Spinners
Ltd, (Exp-I) NH-5,
Thimmapuram (V),
Edlapadu (M), Guntur
Dist sanction of
reimbursement of power
cost in respect 1st & 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.96,64,822/- (Rupees Ninety six
lakhs sixty four thousand eight
hundred and twenty two only)
towards reimbursement of power cost
for 1st & 2nd quarters of 2015-16
under IIPP 2005-10 including re-
computed amount of Rs.51,33,912/-
as per the revised Base Power
Consumption as per operational
guidelines.
Subject to submission of the
following shortfall information: 1.
land documents 2. Board resolution
authorizing person to sign to claim 3.
Grama panchayath, Factories Dept,
T&CP dept approved plan 4.
Approved project report 5. Land
conversion certificate 6. Bank
sanctioned letter 7. CA certificate
:: 17 ::
indicating Investments
6
6
02/12/20
15
18,
14/06/206
The Claim application of
M/s Sri Venkata Siva
Parvathi Spinning Mill
(P) Ltd, (2nd Exp) GBC
Road, Chebrolu (V&M),
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
11,49,700/- (Rupees Eleven lakhs
forty nine thousand seven hundred
only) towards reimbursement of
power cost for 2nd quarter of 2015-
16 under IIPP 2005-10, duly
deducting the deference amount of
Rs.33,42,621/- as per decision of
SVC in its meeting held on
04.06.2016.
6
7
02/12/20
15
19,
14/06/206
The Claim application of
M/s Sri Sai Balaji
Spintex (P) Ltd,
Unnava(V), Edlapadu
(M), Gutnur sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15.
SVC verified the claim and
recommended for sanction of
Rs.84,58,286/- (Rupees Eighty four
lakhs fifty eight thousand two
hundred and eighty six only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information:1.
T&CP, Factories Dept approval 2.
Valid CFO from APPCB..
6
8
02/12/20
15
20,
14/06/206
The Claim application of
M/s.Usha Spincoat Pvt
Ltd, Chikkavaram ,
Gannavaram (M),
Krishna Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.83,73,470/- (Rupees eighty three
lakhs Seventy three thousand four
hundred and seventy only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP
2010-15.
6
9
02/12/20
15
21,
14/06/206
The Claim application of
M/s Lanco Industries(2nd
Expansion),
Rachagunneri(V),
Srikalahasthi(M),
Chittoor Districtsanction
of reimbursement of sales
tax in respect 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC examine the G.O Ms No: 30
Inds & Com (IP) Dept Dt: 1/4/2011,
where in orders were issued duly
extending 50% VAT / CST or SGST
reimbursement to the unit for a period
of 5 year from the DCP for the Mega
Project with an investment of Rs.
369.00 Cr in a phased manner
provided employment to 1000
persons. The SVC observed that there
is an ambiguity in the G.O whether it
is applicable for the 1st expansion or
for the second expansion or for both.
Therefore the SVC decided to
recommend the sanction the eligible
amount of Rs.2,55,92,425/- (Rupees
two crores fifty five lakhs ninety two
thousand four hundred and twenty
five only) towards reimbursement of
sales tax for the year 2013-14.
Subject to clarification and
conformation of the Mega status and
applicability of GO for 1st expansion
from the Government and also
subject to submission of short fall
information 1. Land sale deed or
lease deed 2. Company incorporation
certificate,3.Grama Panchayat
approval, 4.Town and country
planning approval 5. Land conversion
certificate 6.Power release certificate
7. Valid CFO issued by APPCB 8.
Board resolution authorizing the
person to sign the claim applications
9. Project report. 10.CA certificate
for shareholding 10.GM, DIC, has
not mentioned the line of activity in
his recommendation.
7
0
04/12/20
15
22,
14/06/206
The Claim application of
M/s Vasantha Spinners
Ltd, (Exp-II) NH-5,
Thimmapuram (V),
Edlapadu (M), Guntur
Dist sanction of
reimbursement of power
cost in respect 1st & 2nd
SVC verified the claim and
recommended for sanction of
Rs.2,71,82,699/-(Rupees two crores
Seventy one lakhs eighty two
thousand six hundred and ninety nine
only) towards power cost
reimbursement for 1st and 2nd
quarter of 2015-16 under IIIPP 2005-
:: 18 ::
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
2010 duly adjusting the excess
amount of Rs 27,61,576/- sanctioned
earlier under IIPP 2010-15 as per
revised base power consumption,
subject to submission of the
following shortfall information: 1.
Land documents 2. Valid CFO from
APPCB, 3. Company incorporation
certificate 4. Board resolution
authorising to sing on claim
application 5, GP, T&CP Factories
Dept approval 6. Land conversion
certificate 7. Bank sanction letter 8.
CA Certificate 9. Reason for increase
power load 10. GM to clarify the
name of the unit is M/s Vasantha
Industries Ltd as per power bill claim
is preferred in the name of M/s
Vasantha spinners Ltd.
7
1
04/12/20
15
23,
14/06/206
The Claim application of
M/s Viswateja Spinning
Mills Ltd (Exp-2) D No:
219, Boyapalem (V),
Edlapadu (M), Guntur
sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
1,46,19,330/-( Rupees one crore forty
six lakhs nineteen thousand three
hundred and thirty only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP 2005-
10.
7
2
04/12/20
15
24,
14/06/206
The Claim application of
M/s Gajavalli Spinning
Mils (P) Ltd, Narakoduru
(V), Chebrolu (V) & (M),
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.54,85,380/- (Rupees fifty four
lakhs eighty five thousand three
hundred and eighty only) towards
reimbursement of power cost for2nd
quarter of 2015-16 under IIPP 2010-
15.
7
3
04/12/20
15
25,
14/06/206
The Claim application of
M/s Kallam Spinning
Mils (Open End unit)
Chowdavaram (V),
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.41,43,680/- ( Rupees forty one
lakh forty three thousand six hundred
and eighty only) towards
reimbursement of power cost for2nd
half year of 2015-16 under IIPP
2005-10, subject to submission of the
following shortfall information:
1.Board resolution 2. T&CP dept GP
Factories Dept plan approval 3. Land
conversion certificate 4. Valid CFO
from APPCB 5.CA certificate
indicating share holding
7
3
04/12/20
15
26,
14/06/206
The Claim application of
M/s Ranganayaka
Spinning Mills (P) Ltd,
Boyapalem (V),
Edlapaldu (M), sanction
of reimbursement of
power cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.45,81,930/-( Rupees forty five
lakh eighty one thousand nine
hundred and thirty only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP 2005-
10, subject to submission of the
following shortfall information: 1. D
T&CP dept GP Factories Dept plan
approval 2. Land conversion
certificate 3. CE certificate 4.
Approved project report 5.CA
certificate for share holding
7
4
04/12/20
15
27,
14/06/206
The Claim application of
M/s Ranganayaka
Spinning Mills (P) Ltd,
(Exp) Boyapalem (V),
Edlapaldu (M), sanction
of reimbursement of
power cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
25,37,360/- (Rupees twenty five
lakhs thirty seven thousand three
hundred and sixty only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP 2010-
15 subject to submission of the
following shortfall information:. 1)
Gram panchayath plan approval 2.
Land conversion certificate 3. Board
resolution 4. Valid CFO from
APPCB 5.Bank sanctioned letter 6.
Approved project report 7. CA
certificate for share holding.
7
5
04/12/20
15
28,
14/06/206
The Claim application of
M/s Idupulapadu Cotton
Mills (Exp-5)
Ganapavaram (V),
Nadendla(M), Guntur
sanction of
reimbursement of power
cost in respect 3rd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.63,97,810/- (Rupees sixty three
lakhs ninety seven thousand eight
hundred and ten only) towards
reimbursement of power cost for3rd
quarter of 2015-16 under IIPP 2005-
10
:: 19 ::
7
6
04/12/20
15
29,
14/06/206
The Claim application of
M/s Sri Ravi Chandra
Textiles, Ponnekalu (V),
Tadikonda (M), Guntur
sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of
Rs.31,76,730/-(Rupees thirty one
lakh seventy six thousand seven
hundred and thirty only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15.
7
7
04/12/20
15
30,
14/06/206
The Claim application of
M/s Mittpalli Spinners
Ltd, Chinaturakapalem
(V), Narasaropeta (M),
Guntur Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of
Rs.78,33,476/- (Rupees Seventy eight
lakh thirty three thousand four
hundred and seventy six only)
towards reimbursement of power cost
for1st half year of 2015-16 under
IIPP 2010-15 subject to submission
of the following shortfall
information: 1) Board resolution 2)
DT&CP approval 3) Factories Dept
approval 3) valid CFO from APPCB
4) Land conversion certificate 5) List
of Plant & Machinery as per
operational guidelines.
7
8
04/12/20
15
31,
14/06/206
The Claim application of
M/s Pavan Cotton
Products (P) Ltd (Exx-1)
Pulladigunta(V),
Vatticherukur (M),
Guntur sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
26,98,750/-(Rupees twenty six lakhs
ninety eight thousand seven hundred
and fifty only) towards
reimbursement of power cost for2nd
quarter of 2015-16 under IIPP 2005-
10, subject to submission of the
following shortfall information: 1.
Land documents 2. Valid CFO from
APPCB 3. Land conversion
certificate 4. Approved project report
5. DT&CP approval plan 6. CA
certificate indicating % of share
holding
7
9
04/12/20
15
32,
14/06/206
The Claim application of
M/s Nandhivardana
Textiels Milsl LTd, NH-
5, Thimmapuram (V0,
Edlapadu (M) Guntur
Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim, suggested for
recalculation and after recalculation
recommended for sanction of
Rs.24,33,774/- (Rupees twenty four
lakhs thirty three thousand seven
hundred and seventy four only)
towards reimbursement of power cost
for1st half years of 2015-16 under
IIPP 2010-15, subject to submission
of the following shortfall
information: 1. Land documents 2.
Board resolution authorized to sign
on claim application 3. T&CP, GP,
Factories Dept approved plans 4.
Valid CFO from APPCB 5. Land
conversion.6. Bank sanction letter.
8
0
04/12/20
15
33,
14/06/206
The Claim application of
M/s Sree Lalitha
Parameswari Spinning
Mills (P) Ltd, Guntur
sanction of
reimbursement of power
cost in respect 1st & 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.1,65,96,163/- (Rupees One crore
sixty five lakh ninety six thousand
one hundred and sixty three only)
towards reimbursement of power cost
for1st and 2nd half years of 2015-
16 under IIPP 2010-15, subject to
submission of the following shortfall
information: 1. Land documents 2.
Board resolution authorizing sing on
claim application 3. T&CP, GP,
Factories Dept approved plans 4.
Valid CFO from APPCB 5. Land
conversion.
8
1
04/12/20
15
34,
14/06/206
The Claim application of
M/s Krishna Ganga
Spinning(P) Ltd, Guntur
Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim, suggested for
recalculation from DCP i.e
05.01.20118 and after recalculation,
recommended for sanction of Rs.
1,10,63,200 /- (Rupees one crore ten
lakhs sixty three thousand two
hundred only) towards
reimbursement of power cost for 4th
quarter of 2010-11 to 2nd quarter of
2015-16 under IIPP 2010-15, subject
to submission of the following
shortfall information: 1. Land
documents 2.. T&CP, GP, Factories
Dept approved plans 3. Valid CFO
from APPCB 5. Land conversion.6.
Approved project report 7.Reason for
increase of power load 8. Plant and
Machinery statement attestation on
documents.
:: 20 ::
8
2
04/12/20
15
35,
14/06/206
The Claim application of
M/s Sriven Spincot Pvt
Ltd , D No: 8-87,
Karuchela Road,
Edlapadu (V&M), Guntur
sanction of
reimbursement of power
cost in respect 1st half
year 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of
Rs.36,93,750/- (Rupees thirty six
lakhs ninety three thousand seven
hundred and fifty only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information: T&
CP plan 2. Land conversion
certificate 3. Valid CFO from
APPCB.
8
3
04/12/20
15
36,
14/06/206
The Claim application of
M/s Sri Lakshmi
Godavari Spinniner,
(EXP-I) S.No: 113,
Chebrolu (V) & (M),
Guntur Dist sanction of
reimbursement of power
cost in respect 1st & 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
he Scrutiny Verification Committee
has verified the claims from DCP and
observed that an excess amount of
Rs.1,44,63,271/- sanctioned in
earlier claims by the SLC as per the
revised calculation and recommended
for adjustment of the same amount in
the 1st & 2nd quarter of 2015-16 in
the claim of 1st expansion which is
worked out an amount of
Rs.1,01,53,480/- and the balance
amount of Rs.43,09,792/- may be
adjusted in the present claim of 2nd
expansion of 1st half year of 2015-16
under IIPP 2005-10, subject to
submission of the following shortfall
information: 1. Land documents 2.
Board resolution 3. T&CP , Factories,
Gram panchayath approved plan 4.
Valid CFO from APPCB, 5. Land
conversion certificate.
8
4
04/12/20
15
37,
14/06/206
The Claim application of
M/s Sri Venkata Lakshmi
Narasimha spinning Mills
,(Exp) Sy No: 176/4,
GBC, Road, Chebrolu (V
&M), Guntur sanction of
reimbursement of power
cost in respect 2nd half
year of 2014-15 and 1st
half year of 2015-16
under Industrial
Investment Promotion
Policy 2010-15
SVC verified the claim and
recommended for sanction of
Rs.27,83,900/-(Rupees Twenty seven
lakhs eighty three thousand nine
hundred only) towards
reimbursement of power cost for 2nd
half year of 2014-15 and 1st half
year of 2015-16 under IIPP 2010-15,
subject to submission of the
following shortfall information: 1.
IEM Part -B 2.DT&CP , Factories,
Gram panchayath approved plan 3.
Land conversion 4. CA certificate in
original 5. Reason for increase of
power load.
8
5
04/12/20
15
38,
14/06/206
The Claim application of
M/s Sri Venkata Uma
Sankara Spintex (P) Ltd,
Sy No: 33, 35/1,
Vemavaram,
Phirangipuram(M),
Guntur Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.50,66,890/-(Rupees fifty lakhs
sixty six thousand eight hundred and
ninety only) towards reimbursement
of power cost for1st half year of
2015-16 under IIPP 2010-15 subject
to submission of the following
shortfall information:1. DT&CP,
Factories Dept approved plan 2. Land
conversion certificate 3. Valid CFO
from APPCB 4. Statement of
Account 5. Bank sanction letter. .
8
6
04/12/20
15
39,
14/06/206
The Claim application of
M/s Thatavarthi Apparels
Ltd, (Spinning Division),
Kavuru (V),
Chilakaluriperta (M),
Guntur Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.60,40,819 /- (Rupees sixty lakhs
forty thousand eight hundred and
nineteen only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information: 1
GP, Factories , DT&CP plan
approval 2.Valid CFO from APPCB
3. CE Certificate 4. Approved project
report 4. Machinery statement as per
guidelines
8
7
04/12/20
15
40,
14/06/206
The Claim application of
M/s Veera Assosicates,
(Exp-1), NH-5,
Ganapavaram (V),
Nadendla (M), Guntur
Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
This unit has falls under MSME
category. Hence this file to be
returned to GM, DIC, Guntur for take
further necessary action
8
8
04/12/20
15
41,
14/06/206
The Claim application of
M/s Sai Manasa Spintex
(India) Ltd , Martur
(V&M) Guntur sanction
of reimbursement of
power cost in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.4,20,333/- (Rupees four lakhs
twenty thousand three hundred and
thirty three only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information1:1.
DT&CP and Factories approved plan
2, Valid CFO 3. Land conversion 4.
M/c list as per guideline
:: 21 ::
8
9
04/12/20
15
42,
14/06/2016
The Claim application of
M/s Gajavalli spinning
(P) Ltd (Exp), Chebrolu
(V&M) Guntur sanction
of reimbursement of
power cost in respect 2nd
half year of 2014-15 &
1st half year of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
99,43,150/-( Rupees ninety nine lakhs
forty three thousand one hundred and
fifty only) towards reimbursement of
power cost for 2nd half year of
2014-15 and first half year of 2015-
16 under IIPP 2010-15, subject to
submission of the following shortfall
information:1. Company
Incorporation 2 T&CP plan
3.Factories Dept approved plan for
expansion 4. Land conversion
certificate, 5. Valid CFO 6. Bank
sanctioned letter 7. CE certificate 8.
Approved project report
9
0
04/12/20
15
43,
14/06/2016
The Claim application of
M/s Supriya Spinning
Mills Pvt Ltd (Exp),
Boyapalem, Edlapadu
(M), Guntur Dist sanction
of reimbursement of
power cost in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC examined the claim and decided
to defer the issue for recalculate the
eligible amount for reimbursement of
power cost.
9
1
04/12/20
15
44,
14/06/2016
The Claim application of
M/s Lakshmi Godavari
Spinning Mills Ltd (2nd
Exp), Guntur sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of Rs.
1,27,41,314/- (Rupees one crore
twenty seven lakhs forty one
thousand three hundred and fourteen
only) towards reimbursement of
power cost for1st half year of 2015-
16 under IIPP 2010-15, subject to
submission of the following shortfall
information:1. Land documents 2.
Land conversion certificate 3.Valid
CFO from APPCB 4. CA Certificate
for share holdings
9
2
04/12/20
15
45,
14/06/2016
The Claim application of
M/s Kalpataru Spinnning
Mills (Exp), Sy NO: 210,
211/a, Thimmapuram
(V), Edlapadu (M)
Guntur Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of Rs.
42,84,913/-(Rupees forty two lakh
eighty four thousand nine hundred
and thirteen only ) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information: 1.
IEM Part-B, 2,DT&CP , Factories
Dept approval 3, Valid CFO from
APPCB
9
3
04/12/20
15
46,
14/06/2016
The Claim application of
M/s Sri Venkata Siva
Parvathi Spinning Mills
(P) Ltd (unit -II),
Cherbrolu (V&M),
Guntur sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of Rs.
58,79,240/- ( Rupees fifty eight lakhs
seventy nine thousand two hundred
and forty only) towards
reimbursement of power cost for 1st
half year of 2015-16 under IIPP
2010-15, subject to submission of the
following shortfall information: 1.
DT& CP , Factories Dept plan 2
Valid CFO from APPCB 3, Land
conversion 4. Statement of Accounts
in original.
9
4
04/12/20
15
47,
14/06/2016
The Claim application of
M/s Krishna Murty
Spinning Mills (P) Ltd,
NH-5, Thimmapuram
(V), Edlapadu (M)
Guntur Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.39,19,130/- (Rupees thirty nine
lakhs nineteen thousand one hundred
and thirty only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP 2010-
15 subject to submission of the
following shortfall information:1.GP,
Factories, 2. DT&CP Dept approval
3. Valid CFO from APPCB 4. Land
conversion certificate 5. Bank
sanctioned letter 6.Approved project
report
9
5
07/12/20
15
48,
14/06/2016
The Claim application of
The Claim application of
M/s NSL Textiles Ltd,
(Mega Project) Edlapadu
(V), & (M), Guntur
DistSanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
The Scrutiny Verification Committee
examined the claim and
recommended for sanction of Rs.
4,88,71,500/-(Rupees four crores
eighty eight lakhs seventy one
thousand fifty only) under IIPP
2005-10, subject to submission of the
following shortfall documents: 1)
IEM Part-B 2) Approved plans from
Factories Department 3) Land
conversion certificate 4) Project
Report 5) Valid CFO from APPCB
6) Approved Plans from DT& CP 7)
Base Power Consumption units of
preceding three years from Chartered
Accountant 8) Statement of
Accounts and Certification of Plant &
Machinery as per Guidelines.
Further, SVC has taken a view to
seek the clarification from the
:: 22 ::
Government on the extension of
Mega Project status beyond 5 years
i.e. 8 years as per extended the IIPP
2005-10.
9
6
07/12/20
15
49,
14/06/2016
The Claim application of
M/s NSL Textiles LTd
(Garments Division) Sy
nO: 253, Budampadu
(V), Guntur Dist sanction
of reimbursement of
power cost in respect 1st
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.5,99,640/- (Rupees five lakhs
ninety nine thousand six hundred and
forty only) towards reimbursement of
power cost for 2nd quarter of 2015-
16 under IIPP 2005-10, subject to
submission of the following shortfall
information: 1.Company
incorporation certificate 2, Board
resolution 3. GP Factories Dept
approved plan 4.Land conversion
certificate 5. Valid CFO from
APPCB 6 Statement of Accounts 6.
Machinery list not as per guideline 7.
CE certificate.
9
7
07/12/20
15
50,
14/06/2016
The Claim application of
M/s NSL Textiles Ltd, Sy
No: 371 to 382,
Kunchalavaripalem (V)
Cherukupalli (M), Guntur
Dist sanction of
reimbursement of power
cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
The Scrutiny Verification Committee
examined the claim and
recommended for sanction of
Rs.2,00,04,500/- (Rupees two crores
four thousand five hundred only)
towards reimbursement of power cost
for2nd quarter of 2015-16 under
IIPP 2005-10 subject to submission
of the following shortfall
information: 1) Approved plans from
Factories Department 2) Land
conversion certificate 3) Project
Report 4) Valid CFO from APPCB
5) Approved Plans from DT& CP , 6)
Approved Plans from Grampanchayat
7) Land Sale Deed / Lease Deed.
Further, SVC has taken a view to
seek the clarification from the
Government on the extension of
Mega Project status beyond 5 years
i.e. 8 years as per extended the IIPP
2005-10.
9
8
07/12/20
15
51,
14/06/2016
The Claim application of
M/s.Ravali Spinners Pvt
Ltd., (Expansion),
Khandavalli (V), Peravali
(M), W G Dist sanction
of reimbursement of
power cost in respect 1st
half year of 2015 -16
under Industrial
Investment Promotion
Policy 2010-15.
SVC verified the claim and
recommended for sanction of
Rs.67,17,811/- (Rupees Sixty seven
lakhs seventeen thousand eight
hundred and eleven only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15 duly adjusting the excess
amount of Rs.54,67,703/- sanctioned
earlier as per the revised base power
consumption, subject to submission
of the following shortfall
information: 1.DT&CP approval 2.
Land conversion certificate 3. Valid
CFO from APPCB 4. List of Plant &
Machinery as per guidelines
9
9
07/12/20
15
52,
14/06/2016
The Claim application of
M/s.Avanthi Feeds,
Kovvuru, W G Dist
sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15
SVC verified the claim and
recommended for sanction of
Rs.41,82,026/- (Rupees forty one
lakhs eighty two thousand and twenty
six only) towards reimbursement of
power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to
submission of valid CFO from
APPCB
1
0
0
07/12/20
15
53,
14/06/2016
The Claim application of
M/s.Paramesu Biotech
Private Limited,
Devarapalli (V & M), W
G Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of Rs.
25,47,370/- (Rupees twenty five
lakhs forty seven thousand three
hundred and seventy only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information:1
Project report 2 IEM part-B 3.
Gramapanchayath, Factories Dept
and T&CP approved plans 4.Power
release certificate
1
0
1
14/12/20
15
55,
14/06/2016
The Claim application of
M/s Sudha Agro Oil &
Chemical Industries
Ltd.(Spinning Division),
Valuthimmapuram(V),
Peddapuram(M), East
Godavari District
sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of Rs.
30,32,660/- (Rupees thirty lakhs
thirty two thousand six hundred and
sixty only) towards reimbursement of
power cost for 1st half year of 2015-
16 under IIPP 2010-15 subject to
submission of the following shortfall
information:
1) Land documents 2. Board
resolution 3.Machinery statement as
per guideline 4. T&CP approved plan
5. Valid CFO from APPCB 6.CE
certificate 7.Power release certificate.
:: 23 ::
1
0
2
15/12/20
15
56,
14/06/206
The Claim application of
M/s.Balabalajee Textiles
Limited (Exp-I), Tanuku
(V&M), W G Dist
sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.96,57,257/- (Rupees ninety six
lakhs fifty seven thousand two
hundred and fifty seven only)
towards reimbursement of power cost
for 1st half year of 2015-16 under
IIPP 2010-15, subject to submission
of the following shortfall
information:
1. Land sale/lease deed 2. Board
resolution 3.Company incorporation
4. DT&CP & Factories Department
approved plan 5. Valid CFO from
APPCB 6.Bank TL sanctioned letter
7.Project report.
1
0
3
16/12/20
15
57,
14/06/206
The Claim application of
M/s Jagadguru Textiels
(P) Ltd (Exp) , Prakasam
sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.19,22,061/- ( Rupees nineteen
lakhs twenty two thousand and sixty
one only) towards reimbursement of
power cost for1st half year of 2015-
16 under IIPP 2005-10 subject to
submission of the following shortfall
information:
1. Board resolution 2Lanbd
conversion certificate 3 Valid CFO
from APPCB 4. Approved project
report 5.CA certificate
1
0
4
18/12/20
15
58,
14/06/206
The Claim application of
M/s NSL Textiles Ltd, D
No: 6/275-1, Inkollu ,
Prakasam Dist sanction
of reimbursement of
power cost in respect 2nd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
The Scrutiny Verification Committee
examined the claim and
recommended for sanction of Rs.
3,60,36,270/- (Rupees three crore
sixty lakhs thirty six thousand two
hundred and twenty only) towards
reimbursement of power cost for 2nd
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information:
1. IEM Part-B,2. Factories Dept
approved plans 3.Land conversion 4.
Approved project report 5. Valid
CFO from APPCB 6. Factories,
T&CP approved plan 7. List of Plant
and machinery and statement of
account.
Further, SVC has taken a view to
seek the clarification from the
Government on the extension of
Mega Project status beyond 5 years
i.e. 8 years as per extended the IIPP
2005-10.
1
0
5
18/12/20
15
59,
14/06/206
The Claim application of
M/s.Shri Govindaraja
Textiles Pvt Ltd,
(Existing)
Peddaragapuram (V),
Pulivendula (M), YSR
Kadapa Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.1,03,68,386/- (Rupees one crores
three lakhs sixty eight thousand three
hundred and eighty six only) towards
present claim of 2nd quarter of 2015-
16 under IIPP2005-10, subject to the
following short fall information:
1. Gram panchayat approval, 2. Land
conversion.
1
0
6
18/12/20
15
60,
14/06/206
The Claim application of
M/s.Shri Govindaraja
Textiles
(Expansion)Peddaragapur
am (V), Pulivendula (M),
YSR Kadapa Dist
sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
The Scrutiny Verification Committee
examined the claim and
recommended for sanction of
Rs.2,75,92,413- (Rupees one crores
sixty six lakhs eighty five thousand
six hundred and seventy only)
towards reimbursement of power cost
for1st half year of 2015-16 under
IIPP 2010-15 including an amount of
Rs 5,81,367 /- as per revised base
power consumption, subject to
submission of the following shortfall
information: 1. Gram panchayat
approval , 2. Land conversion.3.
Valid CFO from APPCB, 4.
Approved Project report 5. Form B
not properly filed
1
0
7
28/12/20
15
61,
14/06/206
The Claim application of
M/s Bhavya Cements
Ltd, Tangeda (V),
Dachepalli (M), Guntur
Dist sanction of
reimbursement of power
cost in respect 3rd
quarter of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of
Rs.2,42,05,540/-/- (Rupees two crore
forty two lakhs five thousand five
hundred and forty only) towards
reimbursement of power cost for3rd
quarter of 2015-16 under IIPP 2010-
15
:: 24 ::
1
0
8
31/12/20
15
63,
14/06/206
The Claim application of
M/s RBA Textiles Private
Limited Firm. Ltd.,
Krishnagiri Road, Foood
Processing Industrial
Park, Kuppam(M),
Chittoor sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
The Scrutiny Verification Committee
has verified the claims from DCP and
observed that an excess amount of
Rs.2,27,62,502/- sanctioned in
earlier claims by the SLC as per the
revised base power consumption
basing on CA certificate, hence
recommended for adjustment of the
same amount in the current claims of
existing/expansion unit.
Hence, SVC has recommended that
the eligible amount of the present
claim of the existing unit is computed
as zero, subject to submission of the
short fall documents/information.
1. Company Incorporation 2)
Grampanchyath , Factories Dept and
T&CP approval plans 3) Valid CFO
from APPCB 4) Bank sanctioned
letter 5) Plant and Machinery
statement as per guideline 6) Project
report 9) CA certificate for sharing 7)
Reasons for increasing the power
load
SVC further recommended that the
balance excess amount of
Rs.40,39,307/- from the existing
claim after adjustment as detailed
above is to be adjusted in the current
claim of expansion proposal. .
1
0
9
31/12/20
15
64,
14/06/206
The Claim application of
M/s RBA Textiles Private
Limited Firm. Ltd.,
Krishnagiri Road, Foood
Processing Industrial
Park, Kuppam(M),
Chittoor sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and observed
that an amount of Rs1,93,44,069/-
was sanctioned less by SLC in earlier
claims and payable to the unit as per
revised base power consumption
units basing on the CA certificate.
After adjusting the excess amount of
Rs.40,39,307/- sanctioned by the
SLC in the current claim of the
existing unit from the recomputed
amount of Rs.1,93,44,069/-, SVC
recommended to sanction an amount
of Rs. 1,87,85,917/- (Rupees one
crore eighty seven lakhs eighty five
thousand nine hundred and seventeen
only) by considering the present
claim of Rs.34,81,156/- of the
expansion unit for 1st half year of
2015-16, Subject to conditions 1.
Land sale deed 2) Company
incorporation 3) Board resolution
authorizing. 4) Grampanchayath,
T&CP dept approval 5) Land
conversion approval 6) valid CFO
issued APPCB 8) Project report 9)
CA certificate 10) Reasons for
increasing the power
1
1
0
04/01/20
16
65,
14/06/206
The Claim application of
M/s.The Gowthami
Solvent Oils Ltd.,
Mortha, Undrajavaram
(M), W G Dist sanction
of reimbursement of
power cost in respect 1st
half year of 2015 -16
under Industrial
Investment Promotion
Policy 2005-10.
SVC verified the claim and
recommended for sanction of Rs.
42,03,780 ( Rupees forty two lakhs
three thousand seven hundred and
eighty only) towards reimbursement
of power cost for1st half year of
2015-16 under IIPP 2010-15 subject
to submission of the following
shortfall information: 1) IEM Part-B2
) Land documents 3) Certificate of
Incorporation 4) Board resolution 5)
GP, Factories and DT&CP approval
6) Land conversion 7) CFO from
APPCB 8) Bank sanctioned letter 9)
Statement of Accounts as per
guidelines 9) M/c statement as per
guidelines 10) CE certificate 11)
Project report 12) Power release
certificate
1
1
1
04/01/20
16
66,
14/06/206
The Claim application of
M/s.Gowthami Spintex
(India) Limited,
Duvva(V), Tanuku (M),
W G Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.38,74,100/- (Rupees thirty eight
lakhs seventy four thousand one
hundred only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information: 1)
IEM Part-B 2) Land documents 3)
Memorandum of Articles 4) GP,
Factories T&CP dept approved plan s
5) Valid CFO from APPCB 6)
Statement of Accounts 7) List of M/c
as per guidelines 8) CE certificate 9)
Project report
:: 25 ::
1
1
2
04/01/20
16
67,
14/06/206
The Claim application of
M/s.The Gowthami
Solvent Oils Limited,
Tetali (V), Tanuku (M),
W G Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.1,91,42,536/- (Rupees one crore
ninety one lakhs forty two thousand
and five hounded and thirty six only)
towards reimbursement of power cost
for1st and 2nd quarter of 2015-16
under IIPP 2005-10 including re-
computed amount of Rs.27,76,480/-
as per the revised Base Power rate as
Rs.2.60 per unit, subject to
submission of the following shortfall
information 1) IEM part -B, 2) Land
documents 3) Certificate of
Incorporation 4) Board resolution 5)
Grampanchayat, Factories dept and
T&CP planning approved plans 6)
Land conversion certificate 7) CFO
from APPCB, 10) Bank term loan
sanctioned letter 11) Statement of
Accounts issued by the Financing
bank 12) Plant & Machinery as per
guide lines 13) CE certificate 14)
Project report 15) Power release
certificate.
1
1
3
04/01/20
16
70,
14/06/206
The Claim application of
M/s.Praveen Spinners
(India) Pvt Ltd.,
Ravicherla (V), Nuzivid
(M), Krishna Dist
sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of Rs.
50,28,740/- (Rupees fifty lakhs
twenty eight thousand seven hundred
and forty only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information: 1)
Company incorporation 2) Land
conversion 3) Valid CFO from
APPCB
1
1
4
05/01/20
16
72,
14/06/206
The Claim application of
M/s.Amoda Spintex Ltd.,
Ravikampadu (V),
Jaggaipeta (M)Krishna
Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of Rs.
45,68,550/- ( Rupees forty five lakhs
sixty eight thousand five hundred and
fifty only) towards reimbursement of
power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to
submission of the following shortfall
information: valid CFO issued by
APPCB, 2) Bank term loan
sanctioned letter 3) Project report 4)
CA certificate for share holding
1
1
5
05/01/20
16
73,
14/06/206
The Claim application of
M/s.Mohan Spintex India
Limited (Unit-II),
Remalle (V), Bapulapadu
(M), Krishan Dist
sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.3,14,20,658/-( Rupees three
crores fourteen lakhs ninety three
thousand four hundred and eighteen
only) after adjustment of excess
amount of Rs.6,72,760/- sanctioned
by the SLCs for 2nd quarter of 2015-
16 under IIPP 2005-10, subject to
submission of the following shortfall
information:
1) Land sale deed 2) Reason for
increase Power 4000 to 5000KVA 3)
T& CP planning Dept 4) Board
resolution 5) Land conversion 6)
Grampanchayath approved plans 7)
CFO from APPCB
1
1
6
05/01/20
16
74,
14/06/206
The Claim application of
M/s.Mohan Spintex India
Ltd., (Expansion),
Vattgudipadu(V),
Agripalli (M) Krishna
Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.87,39,910/- (Rupees eighty seven
lakhs thirty nine thousand nine
hundred and ten only) towards
reimbursement of power cost for 2nd
quarter of 2015-16 under IIPP 2005-
10 subject to submission of the
following shortfall information:1)
Mee seva receipt 2) Land sale deed 2)
Bank sanctioned letter4) Project
report 5) T&CP dept approval 6)
Statement of Accounts 7) Plant &
M/c statement as per guidelines 8)
Status of original unit and no
correlation between IEM of original
and expansion project 9) IEM Part -
B indicated only DCP of expansion
project and does not indicates the
capacity of original unit to decided
the eligibility and IEM is not clear
10) claim application is not
completely filled in leaving blank the
capacity of original unit. However
earlier claims are sanctioned 11)
Variation in line of activity to be
clarified by GM DIC 12) T&CP ,
Grampanchayath approval 13) Land
conversion approval 14) CFO from
APPCB
:: 26 ::
1
1
7
05/01/20
16
75,
14/06/206
The Claim application of
M/s.Zuari Cement
Limited (Expansion)
Krishna Nager,
Yerraguntla (M), YSR
Kadapa Dist sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and it is
observed that the unit has not availed
reimbursement of power cost from
DCP to 4th quarter of 2013-14 and
some of the claims are rejected by the
SLC, since the base consumption
recommended for sanction of Rs.
34,96,183/- (Rupees Thirty Four
lakhs Ninety Six thousand one
hundred and eighty three only)
towards reimbursement of power cost
for1st, 2nd & 3rd quarters of 2014-15
under IIPP 2005 -10 subject to
submission of the following shortfall
information:1) land sale deed or lease
deed 2) company incorporation 3)
Grampanchayath and T&CP and
Factories approval 4) Boiler
certificate 5) Land conversion
certificate 6) Bank sanctioned letter
9) Project report 10) CA certificate
for share holding 11) Statement of
Accounts and Plant & Machinery as
per operational guidelines.
1
1
8
07/01/20
16
77,
14/06/206
The Claim application of
M/s.Swarnalatha Spintex
Pvt Ltd.,
Serinarasannapalem (V),
Bapulapadu (M), Krishna
Dist sanction of
reimbursement of power
cost in respect 1st half
year of 2015 -16 under
Industrial Investment
Promotion Policy 2010-
15.
SVC verified the claim and
recommended for sanction of
Rs.77,08,390./- ( Rupees seventy
seven lakhs eight thousand three
hundred and ninety only) towards
reimbursement of power cost for1st
half year of 2015-16 under IIPP
2010-15 subject to submission of the
following shortfall information:1)
Land conversion certificate 2) CFO
from APPCB
1
1
9
08/01/20
16
78,
14/06/206
The Claim application of
M/s South India Krishna
Oil and Fats Pvt. Ltd.,
Sy.No. 275, 279, 280 &
281, Epuru Bit-IB,
Pantapalem Muthukur
(V&M), SPSR Nellore
District sanction of
reimbursement of power
cost in respect 1st quarter
of 2015 -16 under
Industrial Investment
Promotion Policy 2005-
10.
SVC verified the claim and
recommended for sanction of
Rs.45,74,890/- (Rupees forty five
lakhs seventy four thousand eight
hundred and ninety only) towards
reimbursement of power cost for1st
and 2nd quarter of 2015-16 under
IIPP 2005-10 and deferred the
quarter claim as the required
documents i. e 4th Power bill of
January 2015 not furnished to prepare
appraisal for 4th quarter of 2014-15,
subject to submission of the
following shortfall information:1)
T&CP approval plan 2) Boiler
certificate 3) Land conversion
certificate 4) GM, DIC has
certificated the activity in claim
refined oil and not in his covering
letter 5) Person signing the claim has
not indicated name of the person to
verify the board resolution
Authorization 6) Factories Dept
approval 7) Boiler certificate 8) land
conversion certificate 9) Statement of
Accounts not certified by GM DIC
10) Machinery statement as per
guideline 11) reason for increase the
power load 12) Original DCP
27/09/2011 Additional power has
given 07/12/2013as per Form-B13)
Power bill for Jan 2015 is not
finishing and hence we may consider
duly 3rd quarter of 2014-15 which
works out to Rs23,78,800/- for
placing in SVC.
4 STATUS NOTE ON RELEASE OF SANCTIONED
INCENTIVE / CONCESSIONS OF TO THE
INDUSTRIEAL UNITS UNDER IIPP 2005-10 &
IIPP 2010-15
General Budget:
Government have allocated budget of Rs.272.91 Crores
for the year 2016-17 towards incentives for industrial
promotion under single head of account, instead of three
head of accounts issued separately for General incentives
(excluding power and Pavala vaddi), Reimbursement of
power cost, Reimbursement of Interest subsidy under
Noted.
:: 27 ::
pavalavaddi scheme.
The details of the sanctioned cases pending for releases
are as detailed below: Nature of Incentive Sanctioned as on
date 15.06.2016
Releases
made
Pending for
releases
No. of
cases
Amount
Rs in Cr
No.
of
case
s
Amo
unt
in
Cr
No Amount
Rs.in Cr
General Incentives
Investment subsidy
319 168.28 0 0 319 168.28
100% Reimbursement of Stamp
Duty
100% Reimbursement of
Mortgage Duty
25% Reimbursement of Land
Cost
Quality certification
Land Conversion charges
Reimbursement of Sales tax
Reimbursement of Power Cost (General)
The details of sanctioned cases pending for releases is as
follows.
Nature of Incentive
Sanctioned as on date
15.06.2016 Releases made
Pending for
releases
No. of
cases
Amount
Rs in Cr
No. of
cases
Amou
nt in
Cr
No Amount
Rs.in Cr
Power cost
reimbursement 1295 301.19 0 0 1295 310.44
Reimbursement of Pavala Vaddi (General)
The details of sanctioned cases pending for releases is as
follows
Nature of Incentive
Sanctioned as on date
15.06.2016 Releases made
Pending for
releases
No. of
cases
Amount Rs
in Cr
No. of
cases
Amount
in Cr No
Amou
nt
Rs.in
Cr
Interest subsidy 584 39.75 0 0 584 39.75
TOTAL CASES:
Nature of Incentive
Sanctioned as on date
15.06.2016 Releases made
Pending for
releases
No. of
cases
Amount Rs
in Cr
No. of
cases
Amou
nt in
Cr
No
Amou
nt
Rs.in
Cr
State Level sanctions by
SLC 2198 518.47 0 0 2198
518.4
7
District level sanctioned
by DLC 122.00 0 0
122.0
0
TOTAL
640.47 0 0
640.4
7
Budget released for the year 2016-17 – Rs 272.51
Crores
Net demand to clear all pending sanctioned cases =
:: 28 ::
Rs 640.47Crores – Rs 272.51 Crores =
Rs 367.96 Crs.
5 STATUS REPORT ON THE PROPOSALS SENT
TO THE GOVERNMENT AS ON:03/06/2016
Sl. No
Date of
SLC
Meetin
g
SLC Decision Statues of the issue
1 01/03/1
3
IIPP 2005-10 – M/s. Visaka Industries Limited – RS
No. 385,386, jujjuru, Veerullapadu (M), Krishna
District – Sanction of reimbursement of power cost –
regarding.
The SLC has examined the issue on the following
points:
G.O. Ms. No.108, Industries & Commerce (IP)
Department, dt.20/05/1996 pertains to Target – 2000
Scheme – New Industrial Policy 1995 and policy
period is from 15.11.1995 to 31.03.2000, in which
line of activity “Mangalore Tiles / Asbestos
Products” is listed at Sl. No.49 in the ineligible
industrial activities.
In this regard vide G.O. Ms. No.196, Industries &
Commerce (IP) Department, dt.11.06.1998 an
amendment was issued that words “Asbestos
Products” occurring against item 49 in the list of
ineligible industries annexed to G.O. Ms. No.108,
Industries & Commerce (IP) Department,
dt.20/05/1996 shall be deleted”.
While issuing the G.O. Ms. No.178, Industries &
Commerce (IP) Department, dt. 21-06-2005, the
Government has not taken the order issued for
amendment to the G.O. Ms. No.108, Industries &
Commerce (IP) Department, dt.20/05/1996. They
have taken only ineligible list annexure with the
G.O.Ms.9 Industries & Commerce (IP) Department,
dt. 05-01-2001.
M/s. Visaka Industries Limited – RS No. 385,386,
jujjuru, Veerullapadu (M), Krishna District were also
processed for sanction of incentives under IIPP
2005-2010 and sanctioned in various SLCs an
amount of Rs.30,18,270/- and also an amount of
Rs.13,05,190/- were released pertaining to
reimbursement of power cost.
In view of the above circumstances, the SLC has
decided to recommend the issue to the Government
for making eligible for the line of activity of
“Asbestos Products” and issue amendment
accordingly to the G.O. Ms. No.178, Industries &
Commerce (IP) Department, dt. 21/06/2005, since
the same line of activity are eligible under IIPP
2010-15 schemes.
Accordingly, the proposals were recommended to the
Government vide letter No. 10/3/2007/0568,
dt.21/03/2013.
Government
Orders are awaited.
2. 20/05/1
5
IIPP 2010-15 – Sanction of Investment Subsidy –
M/s. MNR Complex Sy.No.189/2 , Nandyal Road,
Banaganapalli post and mandal, Kurnool District –
sanctioned by DIPC – release of incentives –
regarding
The SLC discussed the issue in detail and
decided to send the proposal of extending incentives
to differently able persons, to Government for the
issue of appropriate orders on the operational
guidelines in respect of G.O.Ms.No.188 Industries
and Commerce (IP) Department dated 20.12.2013.
Accordingly, the proposals were
recommended to the Government vide letter No. Lr.
No. 30/1/15/0288, dated 18/06/2015.
Government
Orders are awaited.
3. 20/05/1
5
IIPP 2005-2010 and 2010-15- claim applications
revised for reimbursement of sales tax – clarification
– regarding.
The SLC discussed the issue in detail and
decided to seek clarification from the Government
regarding the reimbursement of sales tax paid by the
unit in the united state of Andhra Pradesh when the
physical location of the unit is in residual Andhra
Pradesh. In view of the above Sales Tax
reimbursement is sanctioned to all such units subject
to outcome of Government orders.
Accordingly, the proposals were recommended
to the Government vide letter No. Lr. No.
30/1/14/0288/0288/ID, dated 23/05/2015
Government
Orders are awaited.
11 17/03/1
6
IIPP 2010-15 – Claim application for sanction of
reimbursement of power cost – M/s My Home
Industries Ltd., unit II Mulakalapalli Village,
Yelamanchi Mandal, Visakhapatnam District -
Government
Orders are awaited.
Noted.
:: 29 ::
proposals for ascertaining the status of Unit II as new
Unit or expansion project - Regarding.
SLC discussed the following issues in detail:
1. Common Power
Members from FAPSIA and AP Chamber of
Commerce and Industry expressed to seek a
clarification from APEPDCL as why a
separate meter was not installed instead of
erecting the submeter and sealing it, due to
sealing of the submeter, the total units
consumed by Unit-I and Unit-II are recorded
in the main meter.
2. Common Railway Track:
Standing Scrutiny Committee has pointed
that the raw material unloading system
through rail is common for both Unit-I and
Unit-II. Further, Unit-I and Unit-II were
using common rail loading system for
Cement transportation. After detailed
discussions, State Level Committee has taken
a view that the unit should ensure that the
premises of common railway transport or
loading system should be notified as the
public property in accordance with relevant
Railway Acts. for considering the proposal as
separate identifiable investment.
3. Stock transfer from sister concerned unit
Standing Scrutiny Committee has pointed
that the main Raw material i.e., Clinker to
Unit-II is through a stock transfer from its
parent unit i.e., M/s My Home Industries
Ltd., located in Nalgonda district, Telangana
State and whereas the company was paying
the Central Excise on the Clinker by the
Parent unit at Nalgonda. During the
discussions in the SLC meeting, three views
are emerged:
View – I.
The representatives from the Commercial
Taxes Department have stated that the Stock
transfer is permissible and it is common for
the industries/dealers for effecting Sales
Transaction across various places.
Representative of FAPSIA has confirmed that
it is common procedure being allowed by
Sales Tax Department for effecting Sale
Transaction beyond the production point
across other places/States.Hence, sales tax
reimbursement may be allowed on 100% sale
value of cement manufactured through
clinker grinding at unit – II.
View – II.
By considering the Transfer of clinker, a
major Raw Material, from parent unit of My
Home Industries Ltd., Nalgonda District,
Telangana State to unit – II through sale
transaction, the eligibility of Sales Tax
reimbursement will net sale value of
diference between cement and clinker. In the
manufacturing process of cement major
process is upto clinker and cement is simply
the result of grinding of clinker with gypsum
and other aditives as the case may be.
View – III.
The Sales Tax reimbursement on the cement
sales at unit-II will be on 100% sale value of
the cement if the clinker from parent unit of
Nalgonda District, Telangana State is
considered as clinker supplied on free of cost
by stock transfer.
Since, the proposal of the unit-II of My
Home Industries Ltd is to consider it as a
separate identifiable investment and in view
of the financial implications, clarification
from Government on stock transfer of clinker
from parent unit in view of the above.
4. Machinery Bills
Standing Scrutiny Committee has pointed
that machinery invoices are not in the name
of Unit-II and they are in the name of M/s My
Home Industries Ltd., but they were showing
the expenditure in the books of accounts of
Unit-II as Machinery purchased.
During the discussions in the SLC, the
representatives from APSFC and FAPCCI
have given their views that the expenditure
:: 30 ::
for the machinery should be booked under
new identity, Unit-II separately by having
invoices of such plant and machinery only in
the name of unit-II. That is, the procedure of
invoices for plant & machinery in the name
of main company My Home Industries Ltd
and booking expenditure to unit – II will not
come under the category of “Separate Books
of Accounts”.
5. Statutory Approvals
Standing Scrutiny Committee (SSC) has
pointed that the originally approved the plan
by VUDA, Factories, CFO and found that
they are initially taken approvals under
expansion and later modified as Unit-II.
Representative of APPCB stated that the
unit – I & II of My Home Industries Ltd. is
running with single CFO.
The SLC decided to verify the CFE and CFO
obtained for both the units.
6. Remaining Items under common usage
The SLC examined the remaining items of
common usage pointed out by the Standing
Scrutiny Committee and taken a view that
they are not of major nature in view of
investment made in unit – II vis-à-vis the
investment in the remaining items of common
usage and independent production line.
Hence, the remaining items of common
utilities may be exempted from the ambit of
common utilities as per operational
guidelines under IIPP 2010-15.
Accordingly, the above issue has been place before
SLC meeting held on 17/03/2016 and decision of the
SLC, the issue referred to the Government with the
observations of the State Level Committee vide Lr.
No. 30/1/14/22105, dated 26/03/2016.
6
IIPP – 2005-10 – Claim application of M/s.P.V.R.
Spinning and Weaving Ltd. (Expansion), R.S.No.110/2,
108/2,3,4, Kondayapalem Road, Tetali (V), Tanuku (M),
West Godavari District for sanction of reimbursement of
power cost – Regarding.
*****
The General Manager, District Industries Centre,
West Godavari District has recommended the claim
proposal M/s. P.V.R. Spinning and Weaving Ltd.
(Expansion), R.S.No.110/2, 108/2,3,4, Kondayapalem
Road, Tetali (V), Tanuku (M), West Godavari District for
sanction of reimbursement of power cost for the 1st half
year of 2015-16. The unit has taken up expansion
programme for the line of activity of “Cotton Spinning in
Mills” and obtained IEM bearing No.996/IIM/Prod/2007,
Dated:28/05/2007. The unit has commenced commercial
production w.e.f.27/08/2010 under expansion.
The unit has been sanctioned reimbursement of
power cost over & above base consumption fixed as
694189 and also 612433 units per month under IIPP
2010-15 in different stages. It is observed that the
following deviations for sanctioning the reimbursement
of power cost:
As per the operational guidelines para No. 5.4.7
under IIPP 2010-15 us as follows:
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.14,68,326/-(Rupees fourteen lakhs sixty eight
thousand three hundred and twenty six only)
towards reimbursement of power cost in respect
of 1st half year of 2015-16 duly adjusting the
excess amount of Rs.16,14,540 sanctioned earlier
under IIPP 2010-15 by correcting the base power
consumption, subject to submission of shortfall
documents:
1.IEM Part-B for expansion project
2) Approved Plans from T&CP
Department
3) Valid CFO From APPCB
4 ) Project Report”
:: 31 ::
“The base annual consumption will be
either average annual power
consumption of previous three
financial years of the
Expansion/Diversification project as
certified by Chartered Accountant or
power consumption for 75% of
installed capacity utilization of the
original industrial enterprise,
whichever is higher. Power consumed
over and above the base consumption
will be eligible for reimbursement of
power cost. If the Enterprise/Industry
taken up expansion/diversification in
the same year, the base power
consumption will be calculated
proportionately.”
As per C.A. Certificate, the units consumed for
the last 3 years from the DCP of the expansion project:
Year No of units 33KV – the unit is eligible @Rs.0.75 per unit
2007-08 5301146 (July to
March)
Existing unit – DCP – 26/05/2007
2008-09 8311059 Expansion unit – DCP – 27/08/2010
2009-2010 8435381
2007-08 is not a full year and hence 2 years have beenn.
A: Average of 2 years : 8373220 units per year –
8373220/12= 697768 units per month.
Monthly base may be fixed as 8373220/12= 697768 units
per month instead of 694189 or 612433.
By duly revising the base power consumption
units the detailed computation is done and same is
appended as Annexure – I:
Earlier base power consumption was fixed taking
75% of average units instead of 75% of annual higher
consumption of previous years. Further, earlier
consumption was done without any relevance with
respect to fixing base power consumption.
The detailed computation is prepared from DCP and
variations are as follows:
SLC Wise sanctioned and Eligible cost
SLC Sanctioned Eligible Excess Amount sanctioned
90 4886890 4854680 32210
94 2149140 2133033 16107
96 1157530 1157535 -5
98 366330 -17670 384000
100 1306670 976453 330217
102 3466570 3082568 384002
3 2391040 2307033 84007
:: 32 ::
7 3676570 3292568 384002
Total 19400740 17786200 1614540
Amount Eligible from DCP to 2nd half year of 2014-15 17786200
Amount sanctioned from DCP to 2nd half year of 2014-15 19400740
Differential amount (i.e. excess amount sanctioned) 1614540
Differential amount may be adjusted in 1st half year of
2015-16 Rs. 16,14,540/-
Amount computed for 1st half year of 2015-16
Rs. 30,82,868/-
Total amount to be considered for 1st half year of 2015-
16 Rs. 14,68,326/-
The unit is eligible for sanction of reimbursement
of power cost to a tune of Rs.14,68,326/- for 1st half year
of 2015-16 after deducting the excess amount of
Rs.16,14,540/- sanctioned earlier duly fixing the base
consumption as 694189 or 612433 units per month
instead of 697768 units per month.
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
“SVC examined the claim and recommended
for sanction of Rs.14,68,326/-(Rupees fourteen
lakhs sixty eight thousand three hundred and
twenty six only) towards sanction of
reimbursement of power cost in respect of 1st half
year of 2015-16 duly adjusting the excess amount
of Rs.16,14,540 sanctioned earlier under IIPP 2010-
15 by correcting the base power consumption,
subject to submission of shortfall documents:
1) IEM Part-B for expansion project
2) Approved Plans from T&CP
Department 3) Valid CFO From
APPCB 4 ) Project Report”
SLC may take a view
7 IIPP 2005-10 - Claim application of M/s. NSL Textiles
Ltd., Veeravalli (V), Bapulapadu (M), Krishna District
for the sanction of reimbursement of power cost under
IIPP 2005-10 - Regarding.
M/s. NSL Textiles Ltd. has established the unit at
Veeravalli (V), Bapulapadu (M), Krishna District for the
line of activity of “Cotton Spinning”, obtained IEM
bearing No.165/SIA/IMO/2007, dated.01/12/2007 from
the Government of India and commenced commercial
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.2,80,76,307/- (Rupees two crores eighty lakhs
seventy six thousand three hundred and seven
only) towards reimbursement of power cost in
respect of 1st quarters of 2015-16 under IIPP
2005-10 as against Rs.3,05,10,947/- duly
deducting Rs.24,34,640/- by considering
reimbursement of power cost @ 0.75 per unit
beyond ‘5’ years period under Mega Project
:: 33 ::
production w.e.f.01/01/2009.
As per the G.O.Ms. No.684 Industries &
Commerce (IP) Department, dated:27/10/2006,
Government has offered the following incentives to the
above unit treating as “Mega Project”:
1. Reimbursement of power cost by keeping
the power cost at Rs.1/- below the rate as on
01/04/2005 for a period of 5 years from the
date of commercial production.
2. Additional tax reimbursement at the rate of
25% of VAT paid during first five years to
be done from 2nd to 6th year, 50% of the
VAT paid 6th and 7th year in the 7th and 8th
year of commercial production respectively.
3. 50% of the cost of infrastructure from IIDF
with a ceiling of Rs.1.00 crore as per IIPP
2005-10.
4. Right of way for discharge pipeline along
drains / roads from processing plant site to
sea.
5. Other benefits applicable as per the Textile
and Apparel Promotion Policy 2005-10.
Accordingly, the reimbursement of power cost
Rs.1/- per unit was sanctioned for the period from
January, 2009 to March, 2015 as against eligible
period upto 31/12/2014.
Further, Government of Andhra Pradesh
extended the eligibility period for spinning mills
commissioned during IIPP 2005-10 period by another 3
years making total eligibility period as 8 years vide
G.O.Ms. No.42 Industries & Commerce (IP) Department,
dated:05/05/2011 and the captioned unit is falling under
IIPP 2005-10.
As per the G.O.Ms. No.684 Industries &
Commerce (IP) Department, dated:27/10/2006, the unit is
eligible for sanctioned of reimbursement of power cost @
Rs.1/- per unit for a period of 5 years i.e. upto
31/12/2014 as “Mega Project”.
The extended the eligibility period for spinning
mills commissioned during IIPP 2005-10 period by
another 3 years, the unit is not eligible for sanctioned of
Category.
Further, SLC decided to seek the clarification
from the Government on the extension of Mega
Project status beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.
:: 34 ::
reimbursement of power cost without any amendment to
the above G.O. and it is eligible @ Rs.0.75 i.e. per IIPP
2005-10 only from 01/01/2015 onwards.
The General Manager, District Industries Centre,
Krishna District has recommended the claim application
for sanction of reimbursement of power cost for the
period of 1st quarter of 2015-16 by considering Rs.1/- per
unit towards power cost reimbursement.
The revised calculation is appended at
Annexure.
ABSTRACT
From 4th Quarter of 2014-15 in Rupees 4th quarter of 2014-15 already sanctioned by SLC 1st quarter of 2015-16 to be sanctioned
As per Mega Project As per IIPP
2005-10
Deference As per Mega
Project
As per
IIPP 2005-
10
Defe
rence
32579348 30144710 -2434638 33152817 30510947 -2641870
Total amount to be sanctioned including 1st quarter of 2015-16
As mega project As per IIPP 2005-10
Rs.3,31,52,817/- Rs.2,80,76,307/-
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
“SVC examined the claim and
recommended for sanction of
Rs.2,80,76,307/- (Rupees two crores
eighty lakhs seventy six thousand three
hundred and seven only) towards
sanction of reimbursement of power cost
in respect of 1st quarters of 2015-16
under IIPP 2005-10 as against
Rs.3,05,10,947/- on deducting
Rs.24,34,640/- by considering
reimbursement of power cost @ 0.75 per
unit beyond ‘5’ years period under Mega
Project Category.
Further, SVC opined that seek the
clarification from the Government on
the extension of Mega Project status
beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.”
:: 35 ::
SLC may take a view.
8 IIPP – 2005-10 – Claim application of M/s. Ravali
Spinners Pvt. Ltd. (Expansion-1), Khandavali, Peravali
(M), West Godavari District for sanction of
reimbursement of power cost – Regarding.
*****
The General Manager, District Industries Centre,
West Godavari District has recommended the claim
proposal M/s. Ravali Spinners Pvt. Ltd. (Expansion-1),
Khandavali, Peravali (M), West Godavari District for
sanction of reimbursement of power cost for the 2nd
quarter of 2015-16. The unit has taken up 1st expansion
programme for the line of activity of “Cotton Yarn” and
obtained IEM bearing No.4667/SIA/IMO/2005,
Dated:03/10/2005. The unit has commenced commercial
production w.e.f.01/01/2009 under 1st expansion.
The unit has been sanctioned reimbursement of
power cost over & above base consumption of 623776
units per month. Further, the unit has gone into 2nd
expansion and commenced commercial production w.e.f.
20/11/2010. Hence, the 1st expansion unit is eligible for
availing reimbursement of power cost over & above the
base consumption and below the base consumption of 2nd
expansion project.
It is observed that the following deviations for
sanctioning the reimbursement of power cost:
The units consumed for the last 3 years from the DCP of
the 2nd expansion:
Year No of units 33KV – Rate as on April, 2005 =
Rs.3.35
2007-08 7485315 Expn-I – DCP – 01/01/2009
2008-09 11103361 Expn-II – DCP – 20/11/2010
2009-2010 19870021
A: Average of 3 years : 12819566 units –
12819566/12= 1068297 units per month.
B: 75% of highest consumption : 75% x19870021
= 14902516 units per year.
B: Criteria is highest of A and B
Monthly base is fixed as 14902516/12
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.1,95,93,928/-
(Rupees one crore ninety five lakhs ninety three
thousand nine hundred and twenty eight only)
towards reimbursement of power cost in respect
of 2nd quarter of 2015-16 under IIPP 2005-10,
including re-computed amount of Rs.1,48,65,466/-
as per the revised Base Power Consumption by
considering 75% of installed capacity utilized
(highest as per operational guidelines), subject to
following shortfalls:
1) Meeseva Receipt conformation form the GM,
DIC 2) Valid CFO from APPCB, 3) Project
report 4) Chartered Accountant certification on
shareholding 5) Certificate of Incorporation
6) Board resolution on authorization to sign the
claim application 7) Statements of Accounts 8)
IEM Part-B 9) Land Sale Deed / Lease Deed 10)
Land Conversion Certificate 11) Plant &
Machinery statement of the Financial Institution
as per operational guidelines 12) Civil Engineer
Certificate 13) Chartered Accountant Certificate
for fixing the base units 14) Difference in power
load w.r.t. DCP 15) Approved Plans from Gram
Panchayat 16) Approved Plans from DT&CP
with attestation 17)Approved Plans from
Factories Department with attestation.”
:: 36 ::
= 1241876 units per month.
Power cost reimbursement of 2nd quarter of 2015-16 of M/s Ravali Spinners Pvt Ltd.( 1st
Expansion)
Month Yr
El
ig
ib
le
ba
se
base
alre
ady
fixe
d
Base of
1st
Expn.
Units
eligib
le
rate
b
as
e
e
li
g
i
b
l
e
r
a
t
e
Amt
eligible
July 2015
12
41
87
6
106
829
7
623776
.4
6180
99.6 5.15
2.
6
2
.
5
5 1576154
August 2015
12
41
87
6
106
829
7
623776
.4
6180
99.6 5.15
2.
6
2
.
5
5 1576154
Septe
mber 2015
12
41
87
6
106
829
7
623776
.4
6180
99.6 5.15
2.
6
2
.
5
5 1576154
4728462
By duly revising the base power consumption
units the detailed computation is done at – Annexure and
details are as follows:
The detailed computation is prepared from
SLC Wise sanctioned and Eligible cost
SL
C Sanctioned Eligible Differential Amount
96
962360
(Dec.20010) 401765
–
560595
97 5827660 8103286 2275626
98 4720800 6564218 1843418
10
0 6363972 4822661 -1541311
10
1 837248 5006607 4169359
10
2 3600610 5006607 1405997
2 3067190 4264887 1197697
3 3067190 4264887 1197697
5 3067190 4264887 1197697
6 3067190 4264887 1197697
7 3067190 4264887 1197697
9 3289450 4573937 1284487
Tot
al 40938050 55803516 14865466
Amount Eligible from 3rd qtr of 2009-2010 to 1st qtr of 2015-16 55803516
Amount sanctioned from 3rd qtr of 2009-2010 to 1st qtr of 2015-16 40938050
Differential amount (less amount sanctioned) 14865466
:: 37 ::
Differential amount to be sanctioned as upto 1st qtr of
2015-16 Rs. 1,48,65,466/-
Amount computed for 2nd quarter of 2015-16
Rs. 47,28,462/-
Total amount to be considered as on 2nd quarter of 2015-
16 Rs. 1,95,93,928/-
As per the operational guidelines para No. 5.4.7
under IIPP 2010-15 us as follows:
“The base annual consumption will be
either average annual power
consumption of previous three financial
years of the Expansion/Diversification
project as certified by Chartered
Accountant or power consumption for
75% of installed capacity utilization of
the original industrial enterprise,
whichever is higher. Power consumed
over and above the base consumption
will be eligible for reimbursement of
power cost. If the Enterprise/Industry
taken up expansion/diversification in
the same year, the base power
consumption will be calculated
proportionately.”
I. If the base consumption for the 2nd expansion
project fixed as 12819566 units per year –
12819566/12= 1068297 units per month duly
taking the average power consumption of the
last three years prior to 2nd expansion, the 1st
expansion unit is eligible for sanction of
reimbursement of power cost is arrived
Rs.32,89,450/- for 2nd quarter of 2015-16.
II. If the base consumption for the 2nd expansion
project fixed as 14902516 units per year –
14902516/12 = 1241876 units per month duly
taking the 75% of highest consumption of the
last three years prior to 2nd expansion, the 1st
expansion unit is eligible for sanction of
reimbursement of power cost is arrived Rs.
47,28,462/- for 2nd quarter of 2015-16 and Rs.
1,48,65,466/- of differential amount totaling an
amount of Rs.1,95,93,928/- is eligible.
:: 38 ::
The issue has been placed before SVC Meeting
held on 04/06/2016 and the decision of SVC is as
follows:
“SVC examined the claim and recommended
for sanction of Rs.1,95,93,928/- (Rupees one
crore ninety five lakhs ninety three thousand
nine hundred and twenty eight only)
towards sanction of reimbursement of power
cost in respect of 2nd quarter of 2015-16
under IIPP 2005-10, including re-computed
amount of Rs.1,48,65,466/- as per the revised
Base Power Consumption by considering
75% of installed capacity utilized (highest as
per operational guidelines), subject to
following shortfalls:
1) Meeseva Receipt conformation form the
GM, DIC 2) Valid CFO from APPCB, 3)
Project report 4) Chartered Accountant
certification on shareholding 5)
Certificate of Incorporation 6) Board
resolution on authorization to sign the claim
application 7) Statements of Accounts 8)
IEM Part-B 9) Land Sale Deed / Lease Deed
10) Land Conversion Certificate 11) Plant &
Machinery statement of the Financial
Institution as per operational guidelines 12)
Civil Engineer Certificate 13) Chartered
Accountant Certificate for fixing the base
units 14) Difference in power load w.r.t. DCP
15) Approved Plans from Gram Panchayat
16) Approved Plans from DT&CP with
attestation 17)Approved Plans from Factories
Department with attestation.”
SLC may take a view
9 IIPP – 2005-10 – Claim application of M/s.Rajapalayam
Mills Ltd., Gopinenipalem (V), Vatsavai (M), Krishna
District for sanction of reimbursement of power cost –
Regarding.
*****
The General Manager, District Industries Centre,
Krishna District has recommended the claim proposal
M/s.Rajapalayam Mills Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna District for sanction of
reimbursement of power cost for the 2nd quarter of 2015-
16. The line of activity of the unit is “Cotton Yarn,
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.49,83,559/- (Rupees forty nine lakhs eight
three thousand five hundred and fifty nine only)
towards reimbursement of power cost in respect
of 2nd quarter of 2015-16 under IIPP 2005-10
including difference amount of Rs2,26,118/-, by
correcting the base rate of power.
:: 39 ::
Synthetic Yarn” and obtained IEM bearing
No.1977/IIM/PROD/2009, Dated:29/01/2009. The unit
has commenced commercial production
w.e.f.07/12/2008.
The unit has been sanctioned reimbursement of
power cost duly fixing the base rate as Rs.2.65 instead of
Rs.2.60 per unit from April, 2010 to September, 2011.
The details are as follows:
Power connected load to the unit as
on DCP
33 KV
Power rate as on 1st April, 2005 Rs.3.35 per
unit
Base rate should be fixed for
sanction of reimbursement of
power cost
Rs.2.60 per
unit
(3.35 –
0.75)
The detailed computation from April, 2010 to
September, 2011 variations is appended as Annexure.
ABSTRACT
SLC Wise sanctioned and Eligible cost
SL
C Sanctioned Eligible
Less Amount
sanctioned
90 1623010 1772160 -149150
91 923520 1000488 -76968
To
tal 2546530 2772648 -226118
Amount Eligible from April, 2010 to September, 2011 2772648
Amount sanctioned from April, 2010 to September, 2011 2546530
Differential amount (i.e. less amount sanctioned) 226118
Amount computed for 2nd quarter of 2015-16
Rs. 47,57,440/-
Differential amount to be sanctioned
Rs. 2,26,118/-
Total amount to be considered for 1st half year of 2015-
16 Rs. 49,83,558/-
The unit is eligible for sanction of reimbursement
of power cost to a tune of Rs.49,83,558/- for 2nd quarter
of 2015-16 duly considering the deferential amount of
:: 40 ::
Rs. 2,26,118/- sanctioned earlier duly fixing the base rate
as Rs.2.65 per unit instead of Rs.2.60 per unit.
The issue has been placed before SVC Meeting
held on 04/06/2016 and the decision of SVC is as
follows:
“SVC examined the claim and
recommended for sanction of
Rs.49,83,559/- (Rupees forty nine
lakhs eight three thousand five
hundred and fifty nine only)
towards sanction of reimbursement
of power cost in respect 2nd
quarter of 2015-16 under IIPP
2005-10 including difference
amount of Rs2,26,118/-, by
correcting the base rate of power.”
SLC may take a view
10 IIPP – 2005-10 – Claim application of M/s.Sandhya
Spinning Mills Ltd., Gopinenipalem (V), Vatsavai (M),
Krishna District for sanction of reimbursement of power
cost – Regarding.
*****
The General Manager, District Industries Centre,
Krishna District has recommended the claim proposal
M/s.Sandhya Spinning Mills Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna District for sanction of
reimbursement of power cost for the 2nd quarter of 2015-
16. The line of activity of the unit is “Cotton Yarn,
Synthetic Yarn” and obtained IEM bearing
No.2345/SIA/IMO/2007, Dated:17/08/2007. The unit has
commenced commercial production w.e.f.01/05/2009.
The unit has been sanctioned reimbursement of
power cost duly fixing the base rate as Rs.2.65 instead of
Rs.2.60 per unit from April, 2010 to September, 2011.
The details are as follows:
Power connected load to the unit as on DCP 33 KV
Power rate as on 1st April, 2005 Rs.3.35 per unit
Base rate should be fixed for sanction of reimbursement of
power cost
Rs.2.60 per unit
(3.35 – 0.75)
The detailed computation from April, 2010 to
September, 2011 variations is appended as Annexure.
ABSTRACT
SLC Wise sanctioned and Eligible cost
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.47,81,223/- (Rupees forty seven lakhs eighty
one thousand two hundred and twenty three only)
towards reimbursement of power cost in respect
of 2nd quarter of 2015-16 under IIPP 2005-10
including difference amount of Rs 1,37,243/- by
correcting the base rate of power.
:: 41 ::
SLC Sanctioned Eligible Less Amount sanctioned
90 1095080 1171615 -76535
91 728460 789168 -60708
Tota
l 1823540 1960783 -137243
Amount Eligible from April, 2010 to September, 2011 1960783
Amount sanctioned from April, 2010 to September, 2011 1823540
Differential amount (i.e. less amount sanctioned) 137243
Amount computed for 2nd quarter of 2015-16
Rs. 46,43,980/-
Differential amount to be sanctioned
Rs. 1,37,243/-
Total amount to be considered for 1st half year of 2015-
16 Rs. 47,81,223/-
The unit is eligible for sanction of reimbursement
of power cost to a tune of Rs.47,81,223/- for 2nd quarter
of 2015-16 duly considering the deferential amount of
Rs. 1,37,243/- sanctioned earlier duly fixing the base
rate as Rs.2.65 per unit instead of Rs.2.60 per unit.
The issue has been placed before SVC Meeting
held on 04/06/2016 and the decision of SVC is as
follows:
“SVC examined the claim and
recommended for sanction of Rs.47,81,223/-
(Rupees forty seven lakhs eighty one thousand
two hundred and twenty three only) towards
sanction of reimbursement of power cost in
respect 2nd quarter of 2015-16 under IIPP
2005-10 including difference amount of Rs
1,37,243/- by correcting the base rate of
power.”
SLC may take a view.
11 IIPP – 2005-10 – Claim application of M/s.Sri
Harini Textiles Ltd., R.S.No.47, 48 & 49,
Tirumalagiri (V), Jaggaiahpet (M), Krishna District
for sanction of reimbursement of power cost –
Regarding.
*****
The General Manager, District Industries
Centre, Krishna District has recommended the claim
proposal M/s.Sri Harini Textiles Ltd., R.S.No.47, 48
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of
Rs.44,85,360/- (Rupees forty four lakhs
eighty five thousand three hundred and sixty
only) towards reimbursement of power cost
in respect of 2nd quarter of 2015-16 under
IIPP 2005-10 including difference amount
of Rs 6,44,270/- by correcting the base rate
of power.
:: 42 ::
& 49, Tirumalagiri (V), Jaggaiahpet (M), Krishna
District for sanction of reimbursement of power cost
for the 2nd quarter of 2015-16. The line of activity
of the unit is “Cotton Yarn” and obtained IEM
bearing No.1664/IIM/Prod/2008, Dated:15/07/2008.
The unit has commenced commercial production
w.e.f.12/06/2005.
The unit has been sanctioned reimbursement
of power cost duly fixing the base rate as Rs.2.65
instead of Rs.2.60 per unit from DCP to March,
2012. The details are as follows:
Power connected load to the unit as on DCP 33 KV
Power rate as on 1st April, 2005 Rs.3.35 per unit
Base rate should be fixed for sanction of reimbursement of
power cost
Rs.2.60 per unit
(3.35 – 0.75)
The detailed computation from DCP to
March, 2012 & variations is appended as Annexure.
ABSTRACT
SLC Wise sanctioned and Eligible cost
SLC Sanctioned Eligible Less Amount sanctioned
80 1770760 2032812 -262052
85 821790 958755 -136965
90 1304010 1423470 -119460
91 642730 696297 -53567
93 866690 938917 -72227
Tot
al 5405980 6050251 -644271
Amount Eligible from April, 2010 to September, 2011 6050251
Amount sanctioned from April, 2010 to September, 2011 5405980
Differential amount (i.e. less amount sanctioned) 644270
Amount computed for 2nd quarter of 2015-16
Rs. 38,41,090/-
Differential amount to be sanctioned
Rs. 6,44,270/-
Total amount to be considered for 1st half year of
2015-16 Rs. 44,85,360/-
The unit is eligible for sanction of
:: 43 ::
reimbursement of power cost to a tune of
Rs.44,85,360/- for 2nd quarter of 2015-16 duly
considering the deferential amount of Rs. 6,44,270/-
sanctioned earlier duly fixing the base rate as
Rs.2.65 per unit instead of Rs.2.60 per unit.
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
“SVC examined the claim and
recommended for sanction of
Rs.44,85,360/- (Rupees forty four
lakhs eighty five thousand three
hundred and sixty only)towards
sanction of reimbursement of
power cost in respect 2nd quarter
of 2015-16 under IIPP 2005-10
including difference amount of Rs
6,44,270/- by correcting the base
rate of power.”
SLC may take a view.
12 IIPP – 2005-10 – Claim application of M/s.Sudarsanam
Spinning Mills Ltd., R.S.No.52 & 53. Tirumalagiri (V),
Jaggaiahpet (M), Krishna District for sanction of
reimbursement of power cost – Regarding.
*****
The General Manager, District Industries Centre,
Krishna District has recommended the claim proposal
M/s.Sudarsanam Spinning Mills Ltd., R.S.No.52 & 53.
Tirumalagiri (V), Jaggaiahpet (M), Krishna District for
sanction of reimbursement of power cost for the 2nd
quarter of 2015-16. The line of activity of the unit is
“Cotton Yarn” and obtained IEM bearing
No.5876/SIA/IMO/2006, Dated:24/11/2006. The unit has
commenced commercial production w.e.f.26/08/2008.
The unit has been sanctioned reimbursement of
power cost duly fixing the base rate as Rs.2.65 instead of
Rs.2.60 per unit from April, 2010 to September, 2011.
The details are as follows:
Power connected load to the unit as on DCP 33 KV
Power rate as on 1st April, 2005 Rs.3.35 per unit
Base should be fixed for sanction of reimbursement of power
cost
Rs.2.60 per unit
(3.35 – 0.75)
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.41,19,245/- (Rupees forty one lakhs nineteen
thousand two hundred and forty five only)
towards reimbursement of power cost in respect
of 2nd quarter of 2015-16 under IIPP 2005-10
including difference amount of Rs1,40,645/- by
correcting the base rate of power.
:: 44 ::
The detailed computation from April, 2010 to
September, 2011 variations is appended as Annexure.
ABSTRACT
SLC Wise sanctioned and Eligible cost
SL
C Sanctioned Eligible
Less Amount
sanctioned
90 1068380 1159433 -91053
91 595010 644602 -49592
Tot
al
1804035 -140645
Amount Eligible from April, 2010 to September, 2011 1804035
Amount sanctioned from April, 2010 to September, 2011 1663390
Differential amount (i.e. lessess amount sanctioned) 140645
Amount computed for 2nd quarter of 2015-16
Rs. 39,78,600/-
Differential amount to be sanctioned
Rs. 1,40,645/-
Total amount to be considered for 1st half year of 2015-
16 Rs. 41,19,245/-
The unit is eligible for sanction of reimbursement of
power cost to a tune of Rs. 41,19,245/- for 2nd quarter of
2015-16 duly considering the deferential amount of
Rs.1,40,645/- sanctioned earlier duly fixing the base
rate as Rs.2.65 per unit instead of Rs.2.60 per unit.
The issue has been placed before SVC Meeting
held on 04/06/2016 and the decision of SVC is as
follows:
“SVC examined the claim and
recommended for sanction of
Rs.41,19,245/- (Rupees forty one lakhs
nineteen thousand two hundred and
forty five only) towards sanction of
reimbursement of power cost in
respect 2nd quarter of 2015-16 under
IIPP 2005-10 including difference
amount of Rs1,40,645/- by correcting
the base rate of power.”
SLC may take a view.
13 IIPP – 2005-10 – Claim application of M/s.Sri Vishnu
Shankar Mills Ltd., Gopineni Palem (V), Valsavai (M),
Krishna District for sanction of reimbursement of power
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.47,36,821/- (Rupees forty seven lakhs thirty
six thousand eight hundred and twenty one only)
:: 45 ::
cost – Regarding.
*****
The General Manager, District Industries Centre,
Krishna District has recommended the claim proposal
M/s.Sri Vishnu Shankar Mills Ltd., Gopineni Palem (V),
Valsavai (M), Krishna District for sanction of
reimbursement of power cost for the 2nd quarter of 2015-
16. The line of activity of the unit is “Cotton Yarn,
Synthetic Yarn, Synthetic Yarn” and obtained IEM
bearing No.2344/IMO/SIA/2007, Dated:17/08/2007. The
unit has commenced commercial production
w.e.f.12/03/2009.
The unit has been sanctioned reimbursement of
power cost duly fixing the base rate as Rs.2.65 instead of
Rs.2.60 per unit from April, 2010 to September, 2011.
The details are as follows:
Power connected load to the unit as on DCP 33 KV
Power rate as on 1st April, 2005 Rs.3.35 per unit
Base rate should be fixed for sanction of reimbursement of
power cost
Rs.2.60 per unit
(3.35 – 0.75)
The detailed computation from April, 2010 to
September, 2011 variations is appended as Annexure.
ABSTRACT
SLC Wise sanctioned and Eligible cost
SL
C Sanctioned Eligible
Less Amount
sanctioned
90 1195780 1302031 -106251
91 718890 778800 -59910
Tot
al 1914670 2080831 -166161
Amount Eligible from April, 2010 to September, 2011 2080831
Amount sanctioned from April, 2010 to September, 2011 1914670
Differential amount (i.e. less amount sanctioned) 166161
Amount computed for 2nd quarter of 2015-16
Rs. 45,70,660/-
Differential amount to be sanctioned
Rs. 1,66,161/-
Total amount to be considered for 1st half year of 2015-
16 Rs. 47,36,821/-
The unit is eligible for sanction of reimbursement
of power cost to a tune of Rs.45,70,660/- for 2nd quarter
of 2015-16 duly considering the deferential amount of
Rs. 1,66,161/- sanctioned earlier duly fixing the base
towards reimbursement of power cost in respect
of 2nd quarter of 2015-16 under IIPP 2005-10,
including difference amount of Rs1,66,161/-, by
correcting the base rate of power.
:: 46 ::
rate as Rs.2.65 per unit instead of Rs.2.60 per unit.
The issue has been placed before SVC Meeting
held on 04/06/2016 and the decision of SVC is as
follows:
“SVC examined the claim and
recommended for sanction of
Rs.47,36,821/- (Rupees forty seven
lakhs thirty six thousand eight
hundred and twenty one only)
towards sanction of reimbursement
of power cost in respect 2nd quarter
of 2015-16 under IIPP 2005-10,
including difference amount of
Rs1,66,161/-, by correcting the base
rate of power.”
SLC may take a view
14 IIPP 2005-10 – Claim application of M/s Gajavalli
Spinning Mills Pvt Ltd , Narakoduru Chebrolu (V&M)
Guntur Dist Guntur for sanction of reimbursement of
power cost under IIPP 2005-10 – Reg
The General Manager, Dist Industries Centre,
Guntur has recommended the claim proposal of M/s
Gajavalli Spinning Mills Pvt Ltd , Narakoduru Chebrolu
(V&M) Guntur Dist for sanction of 1st quarter of 2015-
16. The existing unit gone in to production on
21/04/2008 further the unit was gone in to expansion on
19/09/2011.
As per power release certificate, the total power
released as on 01/04/2008 is 1250KVA. Later, the unit
has gone in to expansion with DCP on 19/09/2011 and
working with power load of 1250KVA up to May 2010.
In June 2010, KVA in the power bill was changed from
1250KVA to 1160KVA. However the GM, DIC has
taken 1250 KVA as existing power and calculated base
units is follows.
1250KVA x 24 x 350 = 10500000/12 = 875000 units /
month
75% of monthly consumption taken as base units per
month i.e 0.75 x 875000 = 656250units/month
Accordingly, the unit has been
sanctioned reimbursement of power cost from Oct-2011
to Sep-2012 as per the above base. But, the GM, DIC has
furnished proposals from Oct-2012 by considering the
base units 609000 units / month by taking the power
connection 1160KVA
1160KVA x 24 x 350 = 9744000/12 = 812000 units /
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.54,58,825/-
(Rupees fifty four lakhs fifty eight thousand eight
hundred and twenty five only) towards power
cost reimbursement for 1st quarter of 2015-16
under Industrial Investment Promotion Policy
2005-2010, subject to submission of the following
shortfall information:
1) Valid CFO from APPCB 2) Land conversion
certificate 3) Approved Plans from Gram
panchayat, Factories Dept & T&CP 4) CA
certificate on percentage of share holding
:: 47 ::
month
75% of monthly consumption taken as base units per
month i.e 0.75 x 812000 = 609000 units/month
As on date 609000 units has taken as base unit
and sanction reimbursement of power cost accordingly
this office has sanction the amount towards power cost to
the unit
In view of the above, as per IIPP 2005-10 &
IIPP 2010-15 guidelines, the base is
recalculated as per power consumption units
certified by the CA as detailed below.
Base -I
AS per CA Certificate
Year units
2008-
09 6488200
2009-
10 7760000
2010-
11 7915000
Total
2216320
0
3 years average 7387733
Base per month 615644.4
Base-1
Base-II
AS per CA Certificate
2010-
11 7915000
75% of total consumption
(7915000x75/100) 5936250
Mont
h
Base 494687.5
Base-
II
Base-III
Power (KVA)
Ho
urs
per
day
No
of
days
in
one
year (axbxc)
75%
Install
ed
Capac
ity
Per
mon
th
Base
a b c d e f
1250 24 350
1050000
0
78750
00
6562
50
Base -
III
Base-IV
Power (KVA)
Ho
urs
per
day
No of
days
in one
year
(axbxc
)
75%
Install
ed
Capac
ity
Per
mon
th
Base
a b c d e f
1160 24 350
97440
00
73080
00
6090
00
Base -
IV
Total eligibility amount as per IIPP 2005-10
& IIPP 2010-15 to be sanction from expansion to 1st
quarter of 2015-16 with 4 bases ( Calculation are at
Annexure) for fix the base as per IIPP guidelines (
para no 5.3.6 of 2005-10 and, para 5.4.7 of IIPP
2010-15 operational guidelies)
The same issue was placed in SVC meeting
held on 04/06/2016 and decision is as follows
:: 48 ::
The Scrutiny Verification Committee discussed the issue
and decided to fix Base Power Consumption as average
of preceding three years (highest as per Operational
Guidelines) and recommended for sanction of
Rs.54,58,825/- (Rupees fifty four lakhs fifty eight
thousand eight hundred and twenty five only) towards
power cost reimbursement for 1st quarter of 2015-16
under Industrial Investment Promotion Policy 2005-
2010, subject to submission of the following shortfall
information:
1) Valid CFO from APPCB 2) Land conversion
certificate 3) Approved Plans from Gram panchayat,
Factories Dept & T&CP 4) CA certificate on
percentage of share holding
The SLC may take a view.
15 IIPP 2005-10 - Claim application of M/s. Shri
Govindaraja Textiles Ltd., 708, Peddarangapuram (V),
Pulivendala (M), Kadapa Dist for the sanction of
reimbursement of power cost under IIPP 2005-10 -
Regarding.
Background:
M/s. Shri Govindaraja Textiles Ltd. has established the
unit at 708, Peddarangapuram (V), Pulivendala (M),
Kadapa District for the line of activity of “Cotton Yarn
Spinning”, obtained IEM bearing
No.2145/SIA/IMO/2007 from the Government of India
and commenced commercial production
w.e.f.01/04/2008.
The unit has entered MoU with Government of
Andhra Pradesh on 16/11/2006. As per MoU, the
Government has offered the following incentives:
6. GoAP shall provide land measuring 100
acres to the proposed textile unit at
Peddarangapuram (V), Pulivendala (M),
Kadapa District, cost of which shall be the
actual cost of acquisition as mutually agreed
between GoAP/APIIC and SGT.
7. GoAP shall provide necessary infrastructure
facilities such as roads, electricity,
communication facilities and water at the
‘door step’ of the unit at the cost of the
GoAP.
8. The unit shall be exempted from any
SLC has examined the recommendation of the
verification /scruitiny committee and decided to
consider the proposal under IIPP 2005-10, since
the Government have not issued the G.O on the
MOU to consider it as Mega Project, hence
decided to sanction of Rs.4,20,75,189/- (Rupees
four crores twenty lakhs seventy five thousand
one hundred and eighty nine only) towards
present claim of 1st quarter of 2015-16 with
recomputed amount of the earlier claims as per
Industrial Investment Promotion Policy 2005-
2010.
:: 49 ::
statutory power cuts to ensure uninterrupted
production. A special concession of Rupee
One per unit unit on the power tariff as
prevailing on November, 1st 2006 shall be
provided to the unit for a minimum period of
5 years from the date of preferring the claim
for reimbursement of subsidy provided such
claims are preferred before 31st December
2010.
9. GoAP shall supply water to the doorstep of
the unit and the tariff for such water shall be
Rs.15/- per kiloliter, for a minimum period
of five years from the date of
commencement of commercial operations,
provided the unit commence production
before 31st December 2010.
10. GoAP shall provide an approach road
linking to the site of the unit.
11. GoAP shall provide the unit with an
additional tax reimbursement at the rate of
25% of VAT paid during first five years to
be done from 2nd to 6th year, 50% of the
VAT paid 6th and 7th years in the 7th and 8th
year of commercial production respectively.
12. GoAP shall provide incentive of Rs.5,000/-
for every person of the origin of AP trained
and employed by the unit, provided the
employee stays in the employment for a
period of at least one year.
13. GoAP shall declare the unit as Public Utility
Services and the women will be allowed to
work in all the three shifts in the units
subject to taking necessary safety and
welfare measures.
14. GoAP shall reimburse 100% stamp duty and
transfer duty related to transaction of land
between the Government and the unit, as per
the IIPP 2005-10.
15. GoAP shall provide all other incentives as
applicable under the relevant IIPP 2005-10.
:: 50 ::
The Government has not issued G.O. for the
above MoU. Only basing on the above MoU, the claims
are processed for reimbursement of power cost duly
fixing @ Rs. 1/- per unit as per 2005-06 power tariff and sanctioned duly following the pegged down as per
IIPP 2005-10 for the claims received up to December,
2010. From January, 2011, the claims are processed for
reimbursement of power cost duly fixing @ 0.75/- per
unit as per 2005-06 power tariff and sanctioned duly
following the pegged down as per IIPP 2005-10 upto
December, 2013. The pegged down eligibility from DCP
for various quarters are as detailed below:
For the year 2005-06 power tariff – Rs.3.35/- per unit
As per IIPP 2005-10, base price at the time of
DCP – 3.35 – 0.75 = 2.60
Eligibility as per MoU – Rs.1/-
DCP of the unit – 01/04/2008.
Period
Actual
Power
tariff
Pegge
d
down price
as per
policy
Eligi
ble
tariff
Tariff
considere
d for earlier
claims as
per MoU
2008-09 3.00 2.60 0.40 0.65
2009-10 2.95 2.60 0.35 0.60
2010-11
(upto July, 2010) 2.95 2.60 0.35 0.60
August & September, 2010 3.25 2.60 0.65 0.90
From October, 2010 to
March, 2011 3.25 2.60 0.65 0.65
2011-12 3.25 2.60 0.65 0.65
2012-13 4.37 2.60 1.77 1.77
2013-14 (upto December, 2013)
Not applied 0
January, 2014 5.30 2.60 2.70 1.00
February & March, 2014 4.90 2.60 2.30 1.00
2014-15 4.90 2.60 2.30 1.00
2015-16 (1st quarter) 5.15 2.60 2.55 2.55
From the above, it is clear that the Power Tariff
sanctioned is not either as per MoU or as per IIPP 2005-
10 for the period from April, 2008 to December, 2010.
However, Rs.1/- per unit was sanctioned for the period
from January, 2014 to March, 2015 is not as per IIPP
2005-10 under the provisions of G.O.Ms. No.42
Industries & Commerce (IP) Department,
dated:05/05/2011. MoU expires on 31/12/2010.
Further, Government of Andhra Pradesh
extended the eligibility period for spinning mills
commissioned during IIPP 2005-10 period by another 3
years making total eligibility period as 8 years vide
G.O.Ms. No.42 Industries & Commerce (IP) Department,
dated:05/05/2011 and the captioned unit is falling under
IIPP 2005-10.
Further it is observed that the claims from
January 2014 to March 2015 were processed and
:: 51 ::
sanctioned power cost reimbursement @Rs.1/- per unit
(upper sealing) without following the method of pegged
down by erroneously.
The captioned unit represented on 21/09/2015
that their claims are considered at the fixed power cost
Rs. 1/- per unit instead of Pegged down as per policy
applicable to their unit as per G.O.Ms.No. 42 Industries
& Commerce (IP) Department, dated: 05/05/2011 from
the claims from January 2014 to March 2015.
The General Manager, District Industries
Centre, YSR Kadapa District has recommended the claim
application for sanction of reimbursement of power cost
for the period of 1st quarter of 2015-16. The same has
been placed before Scrutiny/Verification Committee
(SVC) meeting held on 12/02/2016 and SLC Meeting
held on 17/03/2016 the decision of SLC is as follows:
“SLC examined the sanction of previous claims
and decided to recompute the eligible power cost
reimbursement from the Date of commencement
of Commercial Production as per operational
guidelines under Industrial Investment Promotion
Policy 2005-2010 issued vide G.O.Ms.No. 178
Industries and Commerce (IP) Department dated
21.06.2005 and operational guidelines issued
under IIPP 2010-15 vide G.O.Ms.No.42 Industries
and Commerce (IP) Department Dated
05.05.2011.
Further, SLC also directed the SVC
to put up the computation in a statement format
duly 1) as per MoU, 2) as per IIPP 2005-10, 3)
differential amounts for each claim by computing
with earlier sanctioned amounts for taking a
view”.
Issue for SLC:
Accordingly, detailed statement showing
eligible amount as per MoU, as per IIPP 2005-10 &
differential amount and appraisal for 1st Quarter of
2015-16 is appended as Annexure – I.
ABSTRACT
From DCP to 4th Quarter of 2014-15 in Rupees Eligible amount
Already
sanction
ed by
SLC
Deference to be
sanctioned
Eligible amount for
1st quarter of 2015-
16
As per
MoU
As per
IIPP
2005-10
Deferenc
e As per
MoU
As per
IIPP
2005-10
As per
MoU
As per
IIPP
2005-10
162219782
1410323
04
21187478
115395224
46824558
25637080
18073960
16438109
:: 52 ::
Total amount to be sanctioned including 1st quarter of 2015-16
As per MoU As per IIPP 2005-10
Rs.6,48,98,518/- Rs.4,20,75,189/-
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
“SVC verified the claim and decided to consider
the proposal under IIPP 2005-10, since the
Government have not issued the G.O on the MOU
to consider it as Mega Project, hence
recommended for sanction of Rs.4,20,75,189/-
(Rupees four crores twenty lakhs seventy five
thousand one hundred and eighty nine only)
towards present claim of 1st quarter of 2015-16
with recomputed amount of the earlier claims as
per Industrial Investment Promotion Policy 2005-
2010.
SLC may take a view.
16 IIPP 2005-10 – Claim application of M/s Kallam
Spinning Mills Ltd (Open End Unit), NH-5,
Chowdavaram (V), Guntur Dist for sanction of
reimbursement of power cost under IIPP 2005-10 –
Regarding.
The General Manager, Dist Industries
Centre, Guntur has recommended the claim proposal
of M/s Kallam Spinning Mills Ltd (Open End Unit),
NH-5, Chowdavaram (V), Guntur Dist for sanction
of reimbursement of power cost for 1st quarter of
2015-16 for the line of activity “ “Open end cotton
yarn manufacturing” and obtain IEM bearing no:
3184/SIA/IMO, 2008 dt: 10/01/2005. The unit has
commenced commercial production w.e.f
18/03/2010
The General Manager, Dist Industries Centre
Guntur has informed that approved capacity of unit
is 1248Rotores, But the unit has installed machinery
have a capacity 2080 Rotors ( 5 open end spinning
of 416 rotors each) The installed capacity of the unit
exceeds the approved capacity by 832 rotors.
Proportionate consumption of the excess ineligible
machinery is calculated as shown in GM’s Performa
Col No:5 is deducting while computing net eligible
consumption.
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.34,95,350/-
(Rupees thirty four lakhs ninety five
thousand three hundred and fifty only)
towards power cost reimbursement for 1st
quarter of 2015-16 subject to submission of
the following shortfall information:
1) Board resolution, 2) Approved Plans from
T&CP, Factories, Gram panchyath 3) Land
conversion certificate 4)Valid CFO from
APPCB 5) CA certificate on percentage of
share holding.
:: 53 ::
Statement is as follows.
Month
Consumption as per
installed capacity of
2080 spindles
Open
access
power
used
Net power used from
DISCOMs
Consumption as per approved
capacity of 1248 Spindles =
1248/2080*consumption for 2080
spindles
Eligible subsidy rate per
unit
Eligible amount
for reimbursement
Apr-15 208429 208429 125057 2.7 337655
Apr-15 304483 304483 182690 2.97 542589
May-15 728725
37452 691273 414764 2.97
1231848
Jun-15 776243 776243 465746 2.97 138326
5
Total 349535
7
Or say Rs.34,95,350/-
The issue of the unit above has been placed
before SVC meeting held on 04/06/2016 and
decision of the SVC is as follows:
SVC verified the claim and recommended
for sanction of Rs.34,95,350/- (Rupees thirty
four lakhs ninety five thousand three
hundred and fifty only) towards power cost
reimbursement for 1st quarter of 2015-16
subject to submission of the following
shortfall information:
1) Board resolution, 2) Approved
Plans from T&CP, Factories, Gram
panchyath 3) Land conversion certificate
4)Valid CFO from APPCB 5) CA certificate
on percentage of share holding.
The SLC may take a view.
17 IIPP 2005 -10 – M/s. Srikalahasthi Pipes Limited
(formerly M/s. Lanco Industries Limited),
Rachagunneri (V), Srikalahasthi (M), Chittoor
district – Sanction of reimbursement of Sales Tax
for Expansion – I & II – Regarding.
M/s. Srikalahasthi Pipes Limited (formerly
M/s. Lanco Industries Limited) is an existing
industry for manufacture of Ductile Iron Pipes with
capacity of 60,000 M.Ts per annum at Rachagunneri
(V), Srikalahasthi (M), Chittoor district. The unit has
expanded their capacity from 60,000 M.Ts to
1,20,000 M.Ts per annum (1st Expansion) and gone
into commercial production on 25/03/2007.
The unit again expanded their capacity from
1,20,000 M.Ts to 1,80,000 M.Ts per annum (2nd
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to defer the issue for the next meeting.
:: 54 ::
Expansion) and gone in production on 01/02/2009.
The SLC meeting held on 05/03/2010 has
sanctioned 25% reimbursement of Sales Tax
Rs.1,06,21,830/- for the 1st Expansion to M/s. Lanco
Industries Limited for the year 2008-09 and released
the amount to the unit. Further, the SLC meeting
held on 05/08/2010 has sanctioned 25%
reimbursement of Sales Tax of Rs.1,14,25,670/- for
1st Expansion and same to release to the unit.
The unit vide its letter
No.LIL/HYD/FI/291/304, Dated:17.05.2007
addressed to the Hon’be Chief Minister, has
informed that the company has planned for an
additional investment of Rs 360.00 crores in II phase
during the period 2005-2009 period to increase its
productivity and economic scale of DI pipes to make
the unit complete not only in the domestic and
international producers of Ductile iron pipes in
terms of both volumes and cost.
The unit have requested among other
incentives, 100% of the sale tax reimbursement for a
period of 10 years commencing from 2005 onwards
and hence covers all the phases of expansion
including the I phase.
Government vide G.O. Ms. No. 30 Industries
& Commerce (IP) Dept., dated 01/04/2011 issued
orders duly extending 50% VAT/CST or SGST
reimbursement to the unit for a period of 5 years
from the date of commercial production for their
Mega Project with an investment of Rs.369.00
Crores in a phased manner and for providing
employment to about 1000 persons.
As per above G.O., the unit has filed
applications for additional S.T of 25% for the year
2008-09 & 2009-10 for the 1st expansion and 50%
reimbursement of S.T. for the year 2010-11, 2011-
12. The SLC has examined and sanction 50%
reimbursement of Sales Tax to the unit for their 1st
expansion and 2nd expansion.
During the process of subsequent claims a
view was emerged that the above G.O was issued
for extending special incentives, applicable only for
2nd expansion and but not for 1st expansion, as the
1st expansion not achieved the desired investment
:: 55 ::
levels and employment as envisaged in the
Government orders.
An amount of Rs4,54,57,790/- was
sanctioned and released towards sales tax
reimbursement for the year 2008-09 and 2009-10
subject to condition of obtaining of proper C.A
certificate on investment made for expansion and
also physical verification and confirmation of
investment made under expansion as per charted
Accountant to treat the unit as Mega project (i.e
above 100crore fresh investment under IIPP 2005-
10) extend additional 25% reimbursement of VAT
as per G.O Ms No.30 Industrial and Commerce (IP)
Department dated:01.04.2011.
An amount of Rs 2,17,89,049/- towards sales
tax reimbursement was also sanctioned by 98th SLC
held on 14.08.2013 for the year 2012-13 for 2nd
expansion subject to verification by Commercial
Tax Department and subject to verification by the
GM,DIC with relevant Charted Accountant
Certificate.
Now the claim for reimbursement of Sales
Tax for the 2013-14 for the 2nd expansion received
in this office for an amount of Rs 2,55,92,425/-.
Since the present claim is the last claim, the claims
may be examined on reimbursement of sales tax as
per the G.O.
“SVC examine the G.O Ms
No: 30 Inds & Comm (IP) Dept Dt:
1/4/2011, where in orders were issued
duly extending 50% VAT / CST or
SGST reimbursement to the unit for a
period of 5 years from DCP for the
Mega Project with an investment of
Rs.369.00 Cr in a phased manner
provided employment to 1000 persons.
The SVC observed that there is an
ambiguity in the G.O whether it is
applicable for the 1st expansion or for
the second expansion or for both.
Therefore the SVC decided to
recommend the sanction the eligible
amount of Rs.2,55,92,425/- (Rupees two
crores fifty five lakhs ninety two
thousand four hundred and twenty five
only) towards reimbursement of sales
:: 56 ::
tax for the year 2013-14. Subject to
clarification and conformation of the
Mega status and applicability of GO for
1st expansion from the Government”.
The SLC may take a view.
18 IIPP 2010 – 15 Scheme – M/s. Vasundhara Cotton
Mills Private Limited (Expansion), S. No. 24A,
Boyapalem (V), Edlapadu (M), Guntur district –
Sanction of reimbursement of Power cost for their
expansion programme – Eligibility – Regarding.
M/s. Vasundhara Cotton Mills Private
Limited (Expansion), S. No. 24A, Boyapalem (V),
Edlapadu (M), Guntur district has submitted claim
applications for sanction of reimbursement of Power
cost under IIPP Scheme 2010 – 15.
The Existing unit M/s. Vasundhara Cotton
Mills Private Limited (Expansion), S. No. 24A,
Boyapalem (V), Edlapadu (M), Guntur district was
established for the activity “Cotton Yarn” with a
capacity of 14400 spindles and the date of
commencement of commercial production of the
Original unit was 01-06-2007. The unit had taken up
1st expansion with a capacity of 3600 spindles, thus
increasing the total capacity to 18000 spindles. The
enhancement of capacity, by virtue of this
expansion, is 25%, satisfying the given norms as per
guidelines.
The General Manager, District Industries
Centre, Guntur has informed that in respect of
investment, the unit holder had actually invested
Rs.465.00 Lakhs on Plant & Machinery without any
further investment on Land and Buildings. The
details of investments are given below:
Sl. No. Details Land
Rs. Lakhs
Buildings
Rs. Lakhs
Plant &
Machinery
Rs. Lakhs
Total
Rs. Lakhs
1 Existing Project 12.00 477.00 1837.00 2326.00
2 Expansion Project 0 0 465.00 465.00
% increase 25.31% 19.99%
As per the operational guidelines, the
expansion project is eligible for incentives, if there
is an increase in the fixed capital investment by at
least 25%. As seen from above, the investment
exceeded 25%, in case of plant & machinery, but the
% increase in investment is less than 25%,(19.99%),
SLC has examined the recommendation of the
verification /scruitiny committee and
observed, there is a deviation in considering
the expansion as per the operational
guidelines i.e the increasing fixed capital
investment is only 19.99% instead of at least
25%. The SLC discussed the issue in detail
and decided to recommend the issue to the
Government to consider the unit for sanction
of incentives on the circumstances and the
recommendation of the GM, DIC for
considering the claim.
:: 57 ::
if the total fixed capital investment is considered.
In this regard, earlier this Office processing
claim applications of the unit the value of
investment has taken wrongly i.e the existing value
has taken as expansion value and expansion value
has taken as existing value, hence the value was
shown as increased to 500.2% and also processed
the claim applications filed from the date of
commencement of production i.e 14.01.2011 to till
date. The same was sanctioned and released.
In this regard, the General Manager, District
Industries Centre, Guntur while recommending the
first claim application, vide his letter No.
4359/C/2015, Dated: 04.11.2015, was informed that
certain units shall have sufficient place in the
existing building for erection of additional
machinery as part of the expansion projects and
hence they do not require any further investments on
land and buildings. In such a case, it would be
appropriate, if the investment on additional
machinery is compared to the investment on the
existing machinery, but not to the total fixed capital
investment. He further informed that the Cotton
Spinning industry is generating huge employment
opportunities this unit may be considered for
incentives under 2010 – 15 and recommended for
favourable consideration of the Commissioner.
In view of the above it is noticed that the
General Manager was recommended the claim in
deviation of the operational guidelines, the same was
processed by this office and was also sanctioned by
the SLC. The claims were sanctioned without
conscious decision with due deliberations in
SVC/SLC and it tantamount to misleading the SVC
and SLC.
The above issue of the unit has been placed
before SVC meeting held on 14/06/2016 and
decision of the SVC is as follows:
“SVC examined the issue in detail and
observed that there is a deviation in
considering the expansion as per the
operational guidelines i.e the increasing
:: 58 ::
fixed capital investment by at least 25%. In
this case the fixed capital investment is
increased only 19.99%. Hence SVC decided
to refer to Government on the circumstances
and the recommendation of the GM, DIC
for considering the claim.
The SLC may take a view.
19 IIPP 2010-15 – M/s. NCL Industries Limited
(Expansion), Kodimipothavaram (V), G.
Konduru (M), Krishna District – Extending
sanction of reimbursement of Sales Tax to the
unit – Regarding.
********
The General Manager, District Industries
Centre, Krishna District has forwarded the claim
application of M/s. NCL Industries Limited
(Expansion), Kodimipothavaram (V), G. Konduru
(M), Krishna District towards sanction of
reimbursement of sales tax for 2014-15 under IIPP
2005-10.
The unit commenced its regular commercial
production w.e.f. 13.03.2007 and obtained IEM
bearing No.3647/SIA/IMO, dt.01.08.2005 for the
line of activity “Cement (Grinind unit) ordinary
portland Cement Pozolona Portland Cement”. The
unit was financed by State Bank of India, Commrl.
Branch, Koti, Hyderabad.
Subsequently, the unit has taken up
Expansion Programme and obtained IEM vide No.
2395/SIA/IMO/2007, dated: 22.08.2007, enhancing
the Installed capacity of the unit from 330000 MTs
to 9,90,000 MTs per annum. State Bank of
Hyderabad, Industrial Finance Branch, Hyderabad
has sanctioned a Term Loan of Rs. 50.00 crores
vide sanction letter No IFB/CR/3230, dated
05.02.2008. The industry has commenced
Commercial Production w.e.f. 11-12.2009 for their
Expansion Plant and filed Part B to Govt. of India
vide SIA No. 2714/IIM/PROD.2009, dt. 21.12.2009.
The General Manager, DIC, Krishna District has
recommended the claim application of the unit for
sanction of Sales Tax Reimbursement for their
Expansion Plant.
As per the endorsement of Additional
SLC discussed the issue in detail and
observed that the claim is similar to the case
of M/s My Home Industries Ltd.,
Visakhapatnam on stock transfer of the
Clinker from the parent unit, which was refer
to the government for clarification and
pending with the government.
Hence the SLC decided to defer the issue, till
receipt of clarification on M/s My Home
Industries Ltd., Visakhapatnam from the
Government.
:: 59 ::
Director at para No.137 N.F., the claim was
recalculated taking into Form-A Certified by the
CTO, Nalgonda & CTO, Vijayawada. The unit is
eligible for sanction of Rs.1,50,27,836/- pertaining
to reimbursement of sales tax for the year 2014-15
upto November, 2014 under IIPP 2005-10.
Further, the unit is eligible sales tax
reimbursement against the tax paid in residual A.P.
shall be paid by A.P. Government as per procedure
laid down in A.P.State Reorganisation Act. Hence
SVC recommended for sanction of Rs.1,50,27,836/-
and released the sanctioned amount of Rs.
1,17,24,605/- against the tax paid in residual Andhra
Pradesh. In respect of an eligible amount of Rs.
33,03,231/- signed by CT Department, Nalgonda
District towards sales tax reimbursement, the release
of funds shall be shared by the State of A.P and
Telangana as per the outcome of the Government
decision.
The State Level Committee in its meeting
held on 8.12.2011 has deferred the issue for
sanction of Sales Tax Reimbursement for Existing
and Expansion Units and referred to inspection of
the Standing Scrutiny Committee for Verification.
The standing scrutiny Committee has
inspected the unit M/s. NCL Industries Limited
(Expansion), Kodimipothavaram (V), G. Konduru
(M), Krishna District on 19.01.2013. The Standing
Scrutiny Committee observations is as follows :
1. There is no purchase of Clinker except Stock
Transfer from Nalgonda unit. However, the unit
is paying Central Excise to the Cement
Manufacturing here at Value Added Price. In
this connection, the Committee has taken a view
that if the unit purchased clinker from its
Original Unit, the Sales Tax Reimbursement at
the selling value of the Cement is appropriate.
2. The facility of Reimbursement of Sales T ax
at the price of Cement will pass the benefit of
Sales Tax Reimbursement to an extent of clinker
value by Stock Transfer will go to the Original
Unit at Nalgonda. However, the Committee is of
the view that the unit is eligible for Sales Tax
Reimbursement to the extent of value addition
from Clinker to Cement only.
:: 60 ::
In the similar case of M/s My Home Industries
Ltd., unit II Mulakalapalli Village, Yelamanchi
Mandal, Visakhapatnam District, the decision of
SLC in its meeting held on 17/03/2016 is as follows:
“Stock transfer from sister concerned
unit
Standing Scrutiny Committee has pointed
that the main Raw material i.e., Clinker to
Unit-II is through a stock transfer from its
parent unit i.e., M/s My Home Industries Ltd.,
located in Nalgonda district, Telangana State
and whereas the company was paying the
Central Excise on the Clinker by the Parent
unit at Nalgonda. During the discussions in the
SLC meeting, two views are emerged:
View – I. The representatives from the
Commercial Taxes Department have stated
that the Stock transfer is permissible and it is
common for the industries/dealers for effecting
Sales Transaction.
Representative of FAPSIA has confirmed
that it is common procedure to allow by Sales
Tax Department for effecting Sale Transaction
beyond the production point across other
places/States.
View – II. By considering the Stock
Transfer of clinker a major Raw Material from
parent unit of My Home Industries Ltd.,
Nalgonda District, Telangana State to unit – II
on free of cost, the eligibility of Sales Tax
reimbursement will be on net sale value of
cement.
View – III. The Sales Tax
reimbursement on the cement sales at unit-II
will be on 100% sale value of the cement if the
clinker from parent unit of Nalgonda District,
Telangana State by stock transfers.
Where as
the Sales Tax reimbursement on cement
sales at unit-II of My Home Industries Ltd. will
be on the net value of Cement – Clinker, if the
clinker from parent unit of My Home Industries
Ltd. is booked under the sales transaction.
It is further submitted that if the unit – II
procures clinker, a major Raw material from
:: 61 ::
any other unit, the Sales Tax reimbursement is
to be calculated as stated above by considering
clinker transaction as sale transaction.
Since, the proposal of the unit-II of My
Home Industries Ltd is to consider it as
separate identifiable investment and in view of
the financial implications, clarification from
Government may be sought on considering
stock transfer of clinker from parent unit of My
Home Industries Ltd. at Nalgonda District,
Telangana State to Unit-II at Visakhapatnam
District as a sale transaction for computing the
eligibility.
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
“SVC examined the claim with similar case of M/s
My Home Industries Ltd., Visakhapatnam on
stock transfer of the Clinker from the parent unit
and decided to defer till receipt of clarification
from Government.”
SLC may take a view.
20 IIPP 2005-10 – Claim application of M/s N.S.L Textiles
Limited, D No: 6/275/1, Inkollu, Prakasam Dist for
sanction of reimbursement of power cost under IIPP
2005-10 – Reg
M/s N.S.L Textiles Limited, has established the
unit at Inkollu, Prakasam Dist for the line of activity “
Cotton Spinning ” , obtained IEM bearing No:
2564SIA/IMO/2006 Dt:16/10/2008 from the
Government of India and commence commercial
production dt: 01/02/2008.
As per G O Rt No:684 Inds & Comm (IP) Dept
Dt: 27/10/2006 and GO Ms No: 351 Inds & Comm (IP)
Dept Dt: 24/06/2009 ( enclosed ) the power
reimbursement extended as para 4 (1) the power cost
reimbursement for M/s NSL Cotton Corporate Ltd
extended at the rate Rs.1/- per unit on the prevailing rate
as on 01/04/2015 as “Mega Project” for the period of 5
years from DCP.
Accordingly the unit sanction Power cost
reimbursement from the DCP i.e 01/02/2008to
31/01/2013. Subsequently as per guideline issued IIPP
2010-15 policy at para no: 7.7.1 the eligibility period for
spinning /weaving/garmenting enterprises /Industries
commenced during IIPP 2005-10 period is extending by
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.3,49,06,296/-
towards power cost reimbursement for 4th quarter
of 2014-15 under IIPP 2005-10 as against
Rs.6,74,79,356/- duly deducting the excess
sanctioned amount of Rs.3,25,73,060/- in earlier
claims towards reimbursement of Power cost
(computation of power cost reimbursement was
done @ 0.75 per unit beyond ‘5’ years period
under Mega Project Category), subject to
submission of the following shortfall documents:
1) IEM Part-B 2) Approved plans from Factories
Department 3) Land conversion certificate 4)
Project Report 5) Valid CFO from APPCB 6)
Approved Plans from DT& CP 7) Base Power
Consumption units of preceding three years from
Chartered Accountant 8) Statement of Accounts
and Certification of Plant & Machinery as per
Guidelines.
Further, SLC has decided to seek the clarification
from the Government on the extension of Mega
Project status beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10
:: 62 ::
another 3 year, making total eligibility period as 8 years.
However there is no mention about the
special incentives provided to Maga Projects. In this
particular case even after completion of 5 years
period as Mega Project status, this office has
erroneously calculated at rate of Rs.1/- as per G O
Rt No:684 Inds & Comm (IP) Dept Dt: 27/10/2006.
After examination it is found that the unit the
unit obtained power load 132 KVA in the phased
manner September 2008 onwards. Accordingly, it
is recalculated from Oct -2008 to Jan -2013 at the
rate of Rs.1/- as per Mega project and at the rate of
Rs.0.75/- from Feb -2013 to till date as per IIPP
2010-15 i.e. after completion of 5 years Mega
Project status.
The General Manager, District Industries
Centre Prakasam District has recommended the
claim application for sanction of reimbursement of
power cost for the period of 4th quarter of 2014-15
and 1st quarter of 2015-16 at what rate. Calculation
nth
Total units consumed Base
Elgible units
Actual rate
Base rate
Eligible rate
Eligible amount as per Rs.0.75/-
Eligible amount as per Rs.1/-
Jan-15
5624955
1268327.5
4356627.5
4.90
2.5 2.4
10455906 11545063
Feb-15
6121517
1268327.5
4853189.5
4.90
2.5 2.4
11647655 12860952
Mar-15
4976637
1268327.5
3708309.5
4.90
2.5 2.4 8899943 9827020
Apr-15
2466905
491857.0
1975048.0
4.90
2.5 2.4 4740115 5233877
384000
0 776470.
0 3063530.
0 5.1
5 2.5 2.65 8118355 8884237
May-15
5659135
1268327.5
4390807.5
5.15
2.5 2.65
11635640 12733342
Jun-15
5789740
1268327.5
4521412.5
5.15
2.5 2.65
11981743 13112096
Jul-15 583793
0 126832
7.5 4569602.
5 5.1
5 2.5 2.65
12109447 13251847
Aug-15
5776033
1268327.5
4507705.5
5.15
2.5 2.65
11945420 13072346
Sep-15
5789613
1268327.5
4521285.5
5.15
2.5 2.65
11981407 13111728
1035156
29 11363250
9
Excess amount already sanctioned
-2253220
2 -4318090
Eligible amount to be sanctioned after deduction 8098342
7 10931441
9
If the unit is eligible as Mega project for 8 years, the eligble amount to be sanctioned by deducting the excess amount already sanctioned by the SLC from the 4th quarter of 2014-15 and 1st quarter 2015-16 claims
109314419
:: 63 ::
If the unit is eligible as Mega project for 5 years, the eligble amount to be sanctioned by deducting the excess amount already sanctioned by the SLC from the 4th quarter of 2014-15 and 1st quarter 2015-16 claims. 80983427
ABSTRACT
As per
GO As per Rs1/-
As per recalculation year wise eligibility amount is
267809
529 296064495
As per SLC sanctioned and released
300382
589 300382589
Total Difference Amount
-
325730
60 -4318094
Total amount to be sanctioned including 1st quarter of 2015-16
As mega project As per IIPP 2005-10
Rs.6,98,78,493/- Rs.3,49,06,296/-
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
“ The Scrutiny Verification Committee examined the
claim and recommended for sanction of
Rs.3,49,06,296/- towards power cost reimbursement for
4th quarter of 2014-15 under IIPP 2005-10 as against
Rs.6,74,79,356/- duly deducting the excess sanctioned
amount of Rs.3,25,73,060/- in earlier claims towards
reimbursement of Power cost (computation of power
cost reimbursement was done @ 0.75 per unit beyond
‘5’ years period under Mega Project Category).
However, SVC recommendation is subject to
submission of the following shortfall documents: 1)
IEM Part-B 2) Approved plans from Factories
Department 3) Land conversion certificate 4) Project
Report 5) Valid CFO from APPCB 6) Approved Plans
from DT& CP 7) Base Power Consumption units of
preceding three years from Chartered Accountant 8)
Statement of Accounts and Certification of Plant &
Machinery as per Guidelines.
Further, SVC has taken a view to seek the
clarification from the Government on the
extension of Mega Project status beyond 5
years i.e. 8 years as per extended the IIPP
2005-10.SLC may take a view.”
SLC may take view
21 IIPP 2005-10 – Claim application of M/s Ranganayaka
Spinning Mills (P) Ltd, Boyapalem (V), Edlapadu
(M) Guntur Dist for sanction of reimbursement of
power cost under IIPP 2005-10 – Reg
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount Rs.10,05,181/-(Rupees
ten lakhs five thousand one hundred and eighty
one only) towards power cost reimbursement for
:: 64 ::
The General Manager, Dist Industries
Centre, Guntur has recommended the claim proposal
of M/s Ranganayaka Spinning Mills (P) Ltd,
Boyapalem (V), Edlapadu (M) Guntur Dist for
sanction of reimbursement of power cost for 1st
quarter of 2015-16 for the line of activity “ Cotton
yarn manufacturing” and obtain IEM bearing no:
2948/SIA/IMO 2009 The unit has commenced
commercial production w.e.f 09/04/2010.
It is observed that the 3rd & 4th quarters of
2012-13 and 1st quarter of 2013-14 was considered
as "0" value instead of "-" value, when the monthly
consummation is not reached the base units As per
guidelines the worksheet is prepared and shown as
Annexure
. The difference amount is as follows.
As per recalculation year wise eligibility amount is 11384557
As per SLC sanctioned and released 12770380
Total Difference Amount -1385823
Present sanction claim 1st quarter of 2015-16
Apr-15 340223 205698.33
134524.67 5.3 2.6 2.7 363217
462492 308547.5 153944.5 5.57 2.6 2.97 457215
May-15 762524 514245.83
248278.17 5.57 2.6 2.97 737386
Jun-15 794780 514245.83 280534.1
7 5.57 2.6 2.97 833186
1st of 2015-16 Amount 2391004
Deducing Excess amount -1385823
Total Eligible amount 1005181
An excess amount of Rs 13,85,823/- was
sanctioned by the SLC earlier. The eligible amount
to be sanctioned is Rs 10,05,181/- after deducting
the excess amount from the 1st quarter claim of
2015-16.
The same issued was placed in SVC meeting
held on 04/06/2016 and the decision is as follows
SVC examined the claim and recommended for
sanction of Rs.10,05,181/-(Rupees ten lakhs five
thousand one hundred and eighty one only) towards
power cost reimbursement for 1st quarter of 2015-16
duly adjusting the excess amount of Rs.13,85,823/-
sanctioned earlier as per the revised base power
consumption.However, SVC recommendation is subject
to furnishing the shortfalls: 1) Approved Plans from
GP, T&CP, Factories Department 2) Land conversion
1st quarter of 2015-16 duly adjusting the excess
amount of Rs.13,85,823/- sanctioned earlier as per
the revised base power consumption, subject to
furnishing the shortfalls: 1) Approved Plans from
GP, T&CP, Factories Department 2) Land
conversion certificate 3) Valid CFO from APPCB,
4) CE Certificate 5) Approved project report 6)
CA certificate on percentage of share holding.
:: 65 ::
certificate 3) Valid CFO from APPCB, 4) CE
Certificate 5) Approved project report 6) CA certificate
on percentage of share holding.
SVC may take a view. 22 IIPP 2005-10 – Claim application of M/s
Ranganayaka Spinning Mills (P) Ltd,
Boyapalem(V), Edlapadu (M) Guntur Dist for
sanction of reimbursement of power cost under IIPP
2005-10 – Reg.
The General Manager, Dist Industries Centre,
Guntur has recommended the claim proposal of M/s
Ranganayaka Spinning Mills (P) Ltd, Boyapalem(V),
Edlapadu (M) Guntur Dist for sanction of reimbursement
of power cost for 1st quarter of 2015-16 for the line of
activity “ “Cotton yarn manufacturing” and obtain IEM
bearing no: 5591/SIA/IMO/2006 dt: 27/10/2006. The unit
has commenced commercial production w.e.f 10/04/2008
The GM, DIC has fixed the base unit 428538
units duly deducting the inedible machinery i.e., added
additional Machinery i.e 2400 spindles after 6 months of
DCP and recommended the same for sanction from 4th
quarter of 2009-10 to 3rd quarter of 2012-13.
The Government of have issued GO Ms No: 4
Inds & Comm (IP) Dept Dt: 30/01/2013 by considering
the plant & machinery installed within one year as
eligible for incentives under IIPP 2005-10 policy in
respect of spinning mills.
The General Manager, DIC has submitted the
proposals requesting to recompute the claims of 4th
quarter of 2009-10 to 3rd quarter of 2012-13 by taking the
base 514245.83 duly deducting the ineligible machinery
which was added after 6 months of DCP and commended
the same for sanction 4th quarter of 2009-10 to 3rd quarter
of 2012-13. 514245.83 per a month
(6170950/12=514245.83)units considering machinery
(2400 Spindles) added after 6 months but before one year
and requested the COI to concerned for sanction of
eligible balance as per the above G.O.
The no.of units has not cross the base but
earlier the said taken has (0) value instead of (-)
value. Now the total consumption is taken for a
period of one year and cumulative amount would be
taken in to consideration for calculation.
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.53,67,331/-
(Rupees fifty three lakhs sixty seven thousand
three hundred and thirty one only) towards
power cost reimbursement for 1st quarter of
2015-16 and re-computed amount of the earlier
claims as per revised Base Power Consumption,
subject to furnishing the shortfalls:1) Board
resolution on authorization to sign the claim
application. 2) GP approval 3) Land conversion
certificate 4) CFO from APPCB 5) Bank
sanctioned letter 6) Approved project report 7)
CA certificate on percentage of share holding.”
:: 66 ::
The difference amount is as follows
As per above base units recalculate difference amount is as follows
Base As per base calculation SLC amount Difference
Base-1 44555946 50216294 -5660348
Base-II 51060536 50216294 844242
Actual rate
Base rate
Eligible Rate
Total units consumed Base -1
Eligible Amount as per Base -1
Total units consumed Base -2
Eligible Amount as per Base -2
Apr-15 5.3 2.6 2.7 182129 491747
217937 588430
Apr-15 5.57 2.6 2.97 246409 731836
296309 880038
May-15 5.57 2.6 2.97 428538 1272758
514246 1527311
Jun-15 5.57 2.6 2.97 428538 1272758
514246 1527311
Total 3769099 4523089
Difference Amount -5660348 844242
Eligible Amount -1891250 5367331
The same issue was placed in SVC meeting
held on 04/06/2016 and the decision is as follows
“The Scrutiny Verification Committee
examined the proposal and recommended to fix the
Base Power Consumption units by adding Plant &
Machinery installed before one year from DCP. Hence,
SVC recommended for sanction of total amount of
Rs.53,67,331/- (Rupees fifty three lakhs sixty seven
thousand three hundred and thirty one only) towards
power cost reimbursement for 1st quarter of 2015-16
and re-computed amount of the earlier claims as per
revised Base Power Consumption. However, SVC
recommendation is subject to furnishing the
shortfalls:1) Board resolution on authorization to sign
the claim application. 2) GP approval 3) Land
conversion certificate 4) CFO from APPCB 5) Bank
sanctioned letter 6) Approved project report 7) CA
certificate on percentage of share holding.”
SLC may take view 23 IIPP 2005-10 – Claim application of M/s RBA Textiles
(P) Limited (Existing), Krishnagiri Road, Food
Processing Indul. Park, Kuppam (M) Chitoor Dist for
sanction of reimbursement of power cost under IIPP
2010-15 – Reg
M/s RBA Textiles (P) Limited (Existing),
Krishnagiri Road, Food Processing Indul. Park, Kuppam
(M) Chitoor Dist for the line of activity “Mfg of Trading
cotton yarn,” obtained IEM bearing No:
1351/IIM/PROD/2007 dt: 22/11/2007 from the
Government of India and commence commercial
SLC has examined the recommendation of the
verification /scruitiny committee and observed
that an excess amount of Rs.2,27,62,502/-
sanctioned in earlier claims by the SLC as per
the revised calculation as per CA certificate and
sanctioned for adjustment of the same amount in
the present claim i.e 1st half year of 2015-16 after
adjustment, the remaining excess amount of Rs
40,39,307/- to be adjusted in the present claim of
expansion, subject to submission of short fall
documents
1. Company Incorporation
:: 67 ::
production 06/11/2009.
Further, the unit has taken up expansion
programme on 25/12/2010 and it is observed that the
base was fixed 1575000 per month in expansion
project and same was taken ceiling in Existing unit,
but as CA certification the base is fix 1069273. The
detailed work sheet is appended as Annexure.
The issue of the unit is placed before SVC
meeting held on 14/06/2016 and decision of the SVC is
as follows:
The Scrutiny Verification Committee has
verified the claims from DCP and observed
that an excess amount of Rs.2,27,62,502/-
sanctioned in earlier claims by the SLC as per
the revised calculation as per CA certificate
and recommended for adjustment of the same
amount in the present claim i.e 1st half year of
2015-16 after adjustment, the remaining excess
amount of Rs 40,39,307/- to be adjusted in the
present claim of expansion.
1. Company Incorporation 2) Grampanchyath ,
Factories Dept and T&CP approval plans 3)
Valid CFO from APPCB 4) Bank sanctioned
letter 5) Plant and Machinery statement as per
guideline 6) Project report 9) CA certificate for
sharing 7) Reasons for increasing the power.
The SLC may take a view.
2) Grampanchayath , Factories Dept and
T&CP approval plans 3) Valid CFO from
APPCB 4) Bank sanctioned letter 5) Plant
and Machinery statement as per guideline
6) Project report 9) CA certificate for
sharing 7) Reasons for increasing the
power.
24 IIPP 2005-10 – Claim application of M/s RBA
Textiles (P) Limited (Expansion), Krishnagiri Road,
Food Processing Indu. Park, Kuppam (M) Chitoor
Dist for sanction of reimbursement of power cost
under IIPP 2010-15 – Reg
M/s RBA Textiles (P) Limited (Exp),
Krishnagiri Road, Food Processing Indu. Park,
Kuppam (M) Chitoor Dist for the line of activity “
Mfg of Trading cotton yarn ” , obtained IEM bearing
No: 3492/IIM/PROD/2011 from the Government of
India and commence commercial production
25/12/2010.
Further, it is observed that the base was fixed
1575000 per month in expansion project, but as CA
certification the base is fix 1069273. The detailed
work sheet is appended as Annexure.
The issue of the unit is placed before SVC
meeting held on 14/06/2016 and decision of the
SLC has examined the recommendation
of the verification /scruitiny committee
and decided to sanction an amount of
1,87,85,917/- (Rupees one crore eighty
seven lakhs eighty five thousand nine
hundred and seventeen only) after
adjustment of Rs 34,81,156 i.e.
deferencial amount in existing project
claim, subject to submission of the
following shortfall documents:
1. Land sale deed 2) Company
incorporation 3) Board resolution
authorizing sing 4) Grampanchayath,
T&CP dept approval 5) Land converion
approval 6) valied CFO issued APPCB 8)
Project report 9) CA certificate 10)
reasons for increasing the power
:: 68 ::
SVC is as follows:
SVC verified the claim and observed that
an amount of Rs1,93,44,0692/-is due to
pay ot the unit on revised calculation from
DCP as per CA certificate and also
observed an excess amount Rs 40,39,307/-
sanctioned by the SLC is pending for
adjustment in the existing unit . The SVC
decided to recommend to the SLC to
adjust the balance amount in the present
claim (Rs 34,81,156) of the expansion unit
i.e 1st half year of 2015-16 and also the
amount which is due to pay to the unit on
revised calculation. The SVC
recommended to sanction an amount of Rs
1,87,85,917/-( Rupees one crore eighty
seven lakhs eighty five thousand nine
hundred and seventeen only) after
adjustment. Subject to conditions 1. Land
sale deed 2) Company incorporation 3)
Board resolution authorizing sing 4)
Grampanchayath, T&CP dept approval 5)
Land converion approval 6) valied CFO
issued APPCB 8) Project report 9) CA
certificate 10) reasons for increasing the
power
The SLC may take a view
25 IIPP 2005-10 - Claim application of M/s. NSL Textiles
Ltd., Sy No: 371 to 382, Kunchalavaripalem (V),
Cherukupalli (M) Guntur Dist for the sanction of
reimbursement of power cost under IIPP 2005-10 -
Regarding.
M/s N.S.L Textiles Limited, has
established the unit at Kunchalavaripalem (V),
Cherukupalli (M) Guntur Dist for the line of activity “
Weaving & Processing ” , obtained IEM bearing No:
3247/SIA/IMO/2006 Dt:12/11/2007 from the
Government of India and commence commercial
production dt: 31/03/2010.
As per G O Rt No G O Ms NO: 917 Ind &
Comm (IP) Dept dt: 19/12/2008 ( enclosed ) the power
reimbursement extended as para 3(2) the power cost
reimbursement for M/s NSL Cotton Corporate Ltd
extended at the rate Rs.1/- per unit on the prevailing rate
as on 01/04/2015.
Accordingly the unit sanction Power cost
reimbursement from the DCP i.e 31/03/2010 to
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.2,67,09,007/-
towards power cost reimbursement for 1st quarter
of 2015-16 under IIPP 2005-10 including re-
computed power cost reimbursement of earlier
claims @ 0.75 per unit beyond ‘5’ years period
under Mega Project Category, subject to
submission of the following shortfalls: 1)
Approved plans from Factories Department 2)
Land conversion certificate 3) Project Report 4)
Valid CFO from APPCB 5) Approved Plans from
DT& C 6) Approved Plans from Grampanchayat
7) Land Sale Deed / Lease Deed.
Further, SLC decided to seek the clarification
from the Government on the extension of Mega
Project status beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.
:: 69 ::
31/03/2015. Subsequently as per guideline issued IIPP
2010-15 policy at para no: 7.7.1 the eligibility period for
spinning /weaving/garmenting enterprises /Industries
commenced during IIPP 2005-10 period is extending by
another 3 year, making total eligibility period as 8 years.
As per the G O Ms NO: 917 Ind & Comm (IP)
Dept dt: 19/12/2008, the unit is eligible for sanctioned of
reimbursement of power cost @ Rs.1/- per unit for a
period of 5 years i.e. upto 31/03/2015 as “Mega Project”.
The extended the eligibility period for spinning
mills commissioned during IIPP 2005-10 period by
another 3 years, the unit is not eligible for sanctioned of
reimbursement of power cost without any amendment to
the above G.O. and it is eligible @ Rs.0.75 i.e. per IIPP
2005-10 only from 01/04/2015 onwards.
The General Manager, District Industries Centre,
Krishna District has recommended the claim application
for sanction of reimbursement of power cost for the
period of 1st & 2nd quarter of 2015-16.
The detailed statement is appended as Annexure.
As per recalculation year wise eligibility amount is Rs.18,88,34,055/-
As per SLC sanctioned and released Rs.18,18,69,250/-
Total Difference Amount Rs.69,64,805/-
Total amount to be sanctioned including 1st quarter of 2015-16
As mega project As per IIPP 2005-10
Rs.2,83,90,873/- Rs.2,67,09,007/-
The issue has been placed before SVC
Meeting held on 04/06/2016 and the decision of
SVC is as follows:
The Scrutiny Verification Committee has
examined the claim and recommended for sanction of
Rs.2,67,09,007/- towards power cost reimbursement for
1st quarter of 2015-16 under IIPP 2005-10 including re-
computed power cost reimbursement of earlier claims
@ 0.75 per unit beyond ‘5’ years period under Mega
Project Category. However, SVC recommendation is
subject to submission of the following shortfalls: 1)
Approved plans from Factories Department 2) Land
conversion certificate 3) Project Report 4) Valid CFO
from APPCB 5) Approved Plans from DT& C 6)
Approved Plans from Grampanchayat 7) Land Sale
Deed / Lease Deed.
:: 70 ::
Further, SVC has taken a view to seek the
clarification from the Government on the extension of
Mega Project status beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.
SVC may take view
26
IIPP 2005-10 – Claim application of M/s Sri
Lakshmi Godavari Spinning Mills (P) Ltd (Exp-1) ,
Sy No: 113, Chebrolu (V&M), Guntur Dist for
sanction of reimbursement of power cost under IIPP
2005-10 – Reg
M/s Sri Lakshmi Godavari Spinning Mills
(P) Ltd (Exp-1), Sy No: 113, Chebrolu (V&M),
Guntur Dist for the line of activity “Cotton yarn
manufacturing”, obtained IEM bearing No:
3098/SIA/IMP/2010 dt: 26/06/2010 from the
Government of India and commence commercial
production 26/06/2010.
It is observed that from the 1st half year of
2013-14 to 2nd half year of 2014-15, the base was
taken 1470000 per month but as CA certification the
base is fix 1238350 in 2nd expansion project. (DCP-
22/03/2013)
Subsequently 1st expansion base was re- fix
with base 573204 per month instead of 804854. The
detailed work sheet is appended as Annexure.
The issue of the unit is placed before SVC
meeting held on 04/06/2016 and decision of the
SVC is as follows:
“The Scrutiny Verification
Committee has verified the claims
from DCP and observed that an
excess amount of Rs.1,44,63,271/-
sanctioned in earlier claims by the
SLC as per the revised calculation
and recommended for adjustment of
the same amount in the 1st & 2nd
quarter of 2015-16 in the claim of 1st
expansion that is worked out for an
amount of Rs.1,01,53,480/- and the
balance amount of Rs.43,09,792/-
may be adjusted in the present claim
of 2nd expansion of 1st half year of
2015-16 under IIPP 2005-10, subject
to submission of the following
shortfall information:
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of
Rs.1,44,63,271/- sanctioned in earlier
claims by the SLC as per the revised
calculation and accorded sanction for
adjustment of the same amount in the 1st &
2nd quarter of 2015-16 in the claim of 1st
expansion that is worked out for an amount
of Rs.1,01,53,480/- and also accorded
sanction for adjustment of the balance
amount of Rs.43,09,792/- in the present
claim of 2nd expansion of 1st half year of
2015-16 under IIPP 2005-10, subject to
submission of the following shortfall
information:
1. Land documents 2. Board resolution 3.
T&CP , Factories, Gram panchayath
approved plan 4. Valid CFO from APPCB, 5.
Land conversion certificate”.
:: 71 ::
1. Land documents 2. Board
resolution 3. T&CP , Factories, Gram
panchayath approved plan 4. Valid
CFO from APPCB, 5. Land
conversion certificate”.
The SLC may take a view.
27 IIPP 2005-10 – Claim application of M/s Sri
Lakshmi Godavari Spinning Mills (P) Ltd (Exp-2),
Sy No: 113, Chebrolu (V&M), Guntur Dist for
sanction of reimbursement of power cost under IIPP
2010-15 – Reg.
M/s Sri Lakshmi Godavari Spinning Mills
(P) Ltd (Exp-2), Sy No: 113, Chebrolu (V&M),
Guntur Dist for the line of activity “ Cotton yarn
manufacturing ” , obtained IEM bearing No:
2760/SIA/IMOP/2011 dt: 30/08/2011 from the
Government of India and commence commercial
production 22/03/2013.
Further, it is observed that from the 1st half
year of 2013-14 to 2nd half year of 2014-15, the
base was taken 1470000 per month but as CA
certification the base is fix 1238350. The worksheet
is placed below. The detailed work sheet is
appended as Annexure.
The issue of the unit is paced before SVC
meeting held on 14/06/2016 and decision of the
SVC is as follows:
“SVC verified the claim and recommended
for sanction of Rs. 1,27,41,314/- (Rupees
one crore twenty seven lakhs forty one
thousand three hundred and fourteen
only) towards reimbursement of power
cost for1st half year of 2015-16 under
IIPP 2010-15, subject to submission of the
following shortfall information:
1. Land documents 2. Land conversion
certificate 3.Valid CFO from APPCB 4.
CA Certificate for share holdings.”
The SLC may take a view.
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs. 84,31,522/-
(Rupees Eighty four laksh thirty one thousand
five hundred and twenty two only) towards
reimbursement of power cost for1st half year
of 2015-16 under IIPP 2010-15, after
deduction of the balance excess amount of
43,09,792/- pertaining expansion-1, subject to
submission of the following shortfall
information:
1. Land documents 2. Land conversion
certificate 3.Valid CFO from APPCB
4. CA Certificate for share holdings.
28 IIPP 2005-10 – Claim application of M/s Vasantha
Spinners Ltd (Exp-1) NH-5, Thimmapuram (V),
Edlapdau (M) Guntur for sanction of
reimbursement of power cost under IIPP 2005-10
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.70,13,739/-
:: 72 ::
– Reg
M/s Vasantha Spinners Ltd (Exp-1) , has
established the unit at Thimmapuram (V), Edlapdau
(M) Guntur Dist for the line of activity “ Cotton
Spinning ” , obtained IEM bearing No:
3099/SIA/IMO/2009 Dt:1/12/2009 from the
Government of India and commence commercial
production dt: 22/03/2010.
It is to submit that after verification of the
claim application of the captioned unit , The CA
has corticated the 3 years units consumed by the
unit the detailed are as follows.
Year Year Units consumed
1 2007-08 11390800
2 2008-09 13174530
3 2009-10 15993400
Thus the highest average is in the year 2009-
10 of 1332783 units/ month
As per Central office computation, the
consumption of units taken in the month of March
2010is for 22 days only as the DCP was on
04/12/20090 and calculated the proportionate
consumption for 22 days is 797535units only Thus
the total units consumed in the year 2009-10are
taken as 15667135 units and the base calculated per
month 1305594 . Further computation with two bases
are prepared i.e 1) 1332783 and 2) 1305594 and
shone has annexure -1
The different amount is as follows
As per above base units recalculate difference amount is as follows
Base As per base calculation SLC amount Difference
Base-1 22397962 19557950 2840012
Base-II 19400494 19557950 -157456
1st quarter of 2015-16 As per base -1 As per base -2
Month
2nd Expansion Base -1
1st Expansion Base
Eligible units as per Base -1
Actual rate
Base rate
Eligible rate
Eligible amount as per Base -1
2nd Expansion Base -2
Eligible units as per Base -2
Eligible amount as per Base -2
(Seventy lakhs thirteen thousand seven hundred
and thirty nine only) towards reimbursement of
power cost for1st & 2nd quarters of 2015-16
under IIPP 2005-10 Subject to submission of the
following shortfall information: 1. land documents
2. Board resolution authorizing person to sign to
claim 3. Grampanchayath, Factories Dept, T&CP
dept approved plan 4. Approved project report 5.
Land conversion certificate 6. Bank sanctioned
letter 7. CA certificate indicating Investments”
:: 73 ::
Apr-15
542091
496570
45521
5.3
2.6
2.7
122907
522237.6 25667.6
69303
79069
2 60130
7 1893
85 5.
57 2.6
2.97
562473
783356.4
182049.4
540687
May-15
1332783
1097877.5
234905.5
5.57
2.6
2.97
697669
1305594
207716.5
616918
Jun-15
1332783
1097877.5
234905.5
5.57
2.6
2.97
697669
1305594
207716.5
616918
Jul-15
1332783
1097877.5
234905.5
5.57
2.6
2.97
697669
1305594
207716.5
616918
Aug-15
1332783
1097877.5
234905.5
5.57
2.6
2.97
697669
1305594
207716.5
616918
Sep-15
1332783
1097877.5
234905.5
5.57
2.6
2.97
697669
1305594
207716.5
616918
Total 4173
727 3694
579
Difference Amount 2840
012
-1574
56
Total Eligible Amount 7013
739 3537
123
The same issue was placed in SVC meeting held on
04/06/2016 and decision is as follows
“ SVC verified the claim and observed the DCP
of the first expansion is 04/12/2009 and subsequently
gone into2nd expansion and DCP is 22.03.2010 i.e
within a year. The GM has recommended the base by
taking consumption of units for 11 months and twenty
days proportionately. The revised calculations made by
taking 11months 11 days consumption and also for a
complete one year consumption. The SVC observed, if
base is calculated by taking 11 months 22 days into
consideration the reimbursement will be more and if we
take the full one year into consideration reimbursement
will be less. There are claims for both first and 2nd
expansion simultaneously, the SVC decided to
recommend to consider the base fixed 1332783 fin 2nd
expansion as per CA certificate for the year 2009-10,
which is beneficial to the Government. In view the 2nd
expansion, the eligible units for the 1st expansion
considered fixed i.e (Units in 2nd base - Units in
second base) recommended for sanction of
Rs.70,13,739/-( Seventy lakhs thirteen thousand seven
hundred and thirty nine only) towards reimbursement
of power cost for1st & 2nd quarters of 2015-16 under
IIPP 2005-10 including the amount of Rs 28,40,012/-
due to pay to the unit in view of revised calculation.
Subject to submission of the following shortfall
information: 1. land documents 2. Board resolution
authorizing person to sign to claim 3. Grampanchayath,
Factories Dept, T&CP dept approved plan 4. Approved
project report 5. Land conversion certificate 6. Bank
sanctioned letter 7. CA certificate indicating
Investments”
SLC may take a view
:: 74 ::
29 IIPP 2005-10 – Claim application of M/s Vasantha
Spinners Ltd (Exp-2) NH-5, Thimmapuram (V),
Edlapdau (M) Guntur for sanction of
reimbursement of power cost under IIPP 2005-10
– Reg
M/s Vasantha Spinners Ltd (Exp-2) , has
established the unit at Thimmapuram (V), Edlapdau
(M) Guntur Dist for the line of activity “ Cotton
Spinning ” , obtained IEM bearing No:
3099/SIA/IMO/2009 Dt:1/12/2009 from the
Government of India and commence commercial
production dt: 22/03/2010.
It is to submit that after verification of the
claim application of the captioned unit , The CA
has corticated the 3 years units consumed by the
unit the detailed are as follows.
S No Year Units consumed
1 2007-08 11390800
2 2008-09 13174530
3 2009-10 15993400
Thus the highest average is in the year 2009-
10 of 1332783 units/ month
As per Central office computation, the
consumption of units taken in the month of March
2010is for 22 days only as the DCP was on
22/03/2010 and calculated the proportionate
consumption for 22 days is 797535units only Thus
the total units consumed in the year 2009-10are
taken as 15667135 units and the base calculated per
month 1305594
The no.of units has not cross the base but
earlier the said taken has (0) value instead of (-)
value. Now the total consumption is taken for a
period of one year and cumulative amount would be
taken in to consideration for calculation.
In view of the above we may prepare
computation with two bases i.e 1) 1332783 and 2)
1305594 is placed as Annexure
As per above base units recalculate difference amount is as follows
Base As per base calculation
SLC amount Difference
Base-1 112353958 113031268 -677310
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.2,96,03,220/-
(Rupees two crores ninety six lakhs three
thousand two hundred and twenty only) towards
power cost reimbursement for 1st and 2nd quarter
of 2015-16 under IIIPP 2005-2010 subject to
submission of the following shortfall information:
. Land documents 2. Valid CFO from APPCB, 3.
Company incorporation certificate 4. Board
resolution authorising to sing on claim application
5, GP, T&CP Factories Dept approval 6. Land
conversion certificate 7. Bank sanction letter 8.
CA Certificate 9. Reason for increase power load
10. GM to clarify the name of the unit is M/s
Vasantha Industries Ltd as per power bill claim is
preferred in the name of M/s Vasantha spinners
Ltd
:: 75 ::
Base-II 114811308 113031268 1780040
Ist quarter of 2015-16 claim application
Month
No of Units
Base -1
Elgible units as per Base -1
Actual rate
Base rate
Eligible rate
Eligible amount
Base -2
Elgible units as per Base -2
Eligible amount
Apr-
15
137716
2 599752
777410
5.
30
2.60
2.
70
209900
6 5905
20 786642
212393
3
166710
6 733031
934075
5.
57
2.60
2.
97
277420
4 7150
74 952032
282753
5
May-15
292527
6
133278
3
159249
3
5.
57
2.60
2.
97
472970
4 1305
594
161968
2
481045
6
Jun-15
312129
6
133278
3
178851
3
5.
57
2.60
2.
97
531188
4 1305
594
181570
2
539263
5
2nd quarter of 2015-16 claim
Jun-15
299634
8
133278
3
166356
5
5.
57
2.60
2.
97
494078
8 1305
594
169075
4
5021539.4
Jul-
15
310772
2
133278
3
177493
9
5.
57
2.60
2.
97
527156
9 1305
594
180212
8
5352320.2
Aug-
15
306792
6
133278
3
173514
3
5.
57
2.60
2.
97
515337
5 1305
594
176233
2
523412
6
Total 1st & 2nd quarter 2015-
16
302805
29
307625
45
Difference
-677310
178004
0
Total Elgible
amount
296032
20
325425
85
The same issue was placed in SVC meeting held in
14/06/2016 and decision was placed below
:: 76 ::
”SVC verified the claim and recommended for
sanction of Rs.2,96,03,220/-( Rupees two crores ninety
six lakhs three thousand two hundred and twenty only)
towards power cost reimbursement for 1st and 2nd
quarter of 2015-16 under IIIPP 2005-2010 duly
adjusting the excess amount of Rs 6,77,310/- sanctioned
earlier under IIPP 2010-15 by correcting the base power
consumption, subject to submission of the following
shortfall information: . Land documents 2. Valid CFO
from APPCB, 3. Company incorporation certificate 4.
Board resolution authorising to sing on claim application
5, GP, T&CP Factories Dept approval 6. Land
conversion certificate 7. Bank sanction letter 8. CA
Certificate 9. Reason for increase power load 10. GM to
clarify the name of the unit is M/s Vasantha Industries
Ltd as per power bill claim is preferred in the name of
M/s Vasantha spinners Ltd.
SLC may take view
30 IIPP 2005-10 – Claim application of M/s Sri Venakta
Siva Parvathi Spinning Mills (P) Ltd ( Exp-II) GBC
Road, Chebrolu (M), Guntur Dist for sanction of
reimbursement of power cost under IIPP 2005-10 – Reg
M/s Sri Venkata Siva Parvathi Spinning Mills (P)
Ltd ( Exp-II) has established the unit at Chebrolu (M),
Guntur Dist for the line of activity “ Spinning Yarn” ,
obtained IEM bearing No: 1689/SIA/IMO/2007 dt:
080/06/2007 from the Government of India and
commence commercial production 07/07/2008.
It is observed that from the 3rd quarters of
2012-13 to 2nd quarter of 2013-14 zero value taken
and compute calculation but as per guidelines "0"
value instead of "-" value effect when the monthly
consumption is not reached the base value . The
worksheet is placed as Annexure
. The difference amount is as follows.
As per recalculation year wise eligibility amount is 29930626
As per SLC sanctioned and released 37939600
Total Difference Amount -8008974
1st quarter of 2015-16 ( Present Claim) Ap
r.
15
6125
89
3813
31
23125
8
5.
3 2.6 2.7 624396.06 Ap
r.
15
9382
71
5719
97
36627
4
5.
57 2.6 2.97 1087834.37
SLC has examined the recommendation of the
verification /scruitiny committee and observed an
excess amount of Rs.80,09,324/- sanctioned in
earlier claims by the SLC and decided for
adjustment of the same amount in the 1st quarter
of 2015-16 that is worked out for an amount of
Rs.46,66,353/- and the balance amount of
Rs.33,42,971/- should be adjusted in future
claims. Hence sanction of reimbursement of
power cost towards 1st quarter of 2015-16 is
treated as “Zero”, subject to furnishing the
shortfalls:1) Land documents 2) Valid CFO from
APPCB 3) Approved project report 4) Land
conversion certificate 5) Company incorporation
6) Approved Plans from GP, T&CP Factories
Dept 7) Certification on Plant & Machinery as per
guidelines 8) CA certificate on percentage of
share holding.
:: 77 ::
M
ay.
15
1428
620
9533
28
47529
2
5.
57 2.6 2.97 1411617.24 Ju
ne.
15
1472
690
9533
28
51936
2
5.
57 2.6 2.97 1542505.14
Total 4666352.81
Difference amount -8009324
-3342970.9
An excess amount of Rs 80,09,324/- was sanctioned by the SLC, earlier. The same amount may be adjusted in the 1st quarter of 2015-16 and the balance amount of Rs 33.42,971/-,after adjustment may be adjusted in the future claims.
The issue has been placed before the SVC
meeting held on 04/06/2016 and the decision of the
SVC is as follows
“ The Scrutiny Verification Committee has examined
the claims from DCP and confirmed that an excess
amount of Rs.80,09,324/- sanctioned in earlier
claims by the SLC and recommended for adjustment of
the same amount in the 1st quarter of 2015-16 that is
worked out for an amount of Rs.46,66,353/- and the
balance amount of Rs.33,42,971/- in future claims.
However, SVC recommedation is subject to furnishing
the shortfalls:1) Land documents 2) Valid CFO from
APPCB 3) Approved project report 4) Land conversion
certificate 5) Company incorporation 6) Approved
Plans from GP, T&CP Factories Dept 7) Certification
on Plant & Machinery as per guidelines 8) CA
certificate on percentage of share holding.”
In view of the above SVC may take a view.
31 IIPP 2005 – 2010 Scheme – M/s. Viswa Teja
Spinning Mills Ltd., Boyapalem (V), Edlapadu (M),
Guntur district – Permission for change of Financial
Institution of the unit – Regarding.
M/s. Viswa Teja Spinning Mills Ltd.,
Boyapalem (V), Edlapadu (M), Guntur district has
obtained IEM bearing No. 2623/SIA/IMO/2004,
dated 22/07/2004 with line of activity “Cotton Yarn”
and commencement of commercial production on
09/04/2005. Further, the unit has taken up 1st
expansion on 16/06/2006 and 2nd Expansion on
26/09/2007. The Financial Institution i.e., State
Bank of India, Commercial Branch, Guntur has
financed the unit.
Further, the General Manager, District
Industries Centre, Guntur has informed that M/s.
Viswa Teja Spinning Mills Ltd., Boyapalem (V),
Edlapadu (M), Guntur district has submitted
proposal for approval of change of Bank from State
SLC discussed the issue in detail and
accorded permission for change of financial
institution from State Bank of India, Commercial Bank branch, Guntur to HDFC Bank Limited, Guntur
:: 78 ::
Bank of India, Commercial Bank branch, Guntur to
HDFC Bank Limited, Guntur and submitted the
following documents:
1. NOC from BM, SBI, Commercial
Branch, Guntur.
2. Letter from BM, HDFC Bank
Limited, Guntur.
In this regard, the General Manager,
District Industries Centre, Guntur has requested to
consideration of the proposal for change of Financial
Institution i.e., State Bank of India to HDFC Bank
Limited, Guntur of M/s. Viswa Teja Spinning Mills
Ltd., Boyapalem (V), Edlapadu (M), Guntur district.
As per Para 11.0 of guidelines of IIPP 2005
– 10 “The Industrial units that availed
incentives/concessions should obtain the No
Objection Certificate from the concerned financing
institutions in respect of aided units before seeking
the approval of Commissioner of Industries for any
change of the constitution/Management/name &
style of the unit within the first six (6) years from
the date of commencement of Commercial
production”.
The SLC may take a view.
32 IIPP – 2005-10 – Claim application of M/s. Sri Srinivasa
Spintex (India) Limited (Expansion-I), 8-104 & 105,
Pedatadepalli (V), Tedepalligudem (M), West Godavari
District for sanction of reimbursement of power cost –
Regarding.
*****
The General Manager, District Industries Centre,
West Godavari District has recommended the claim
proposal M/s. Sri Srinivasa Spintex (India) Limited
(Expansion-I), 8-104 & 105, Pedatadepalli (V),
Tedepalligudem (M), West Godavari District for sanction
of reimbursement of power cost for the 1st half year of
2015-16. The unit has taken up 1st expansion programme
for the line of activity of “Cotton Yarn/other fabric yarn”
and obtained IEM bearing No.2840/IIM/PROD/2010,
Dated:02/03/2010. The unit has commenced commercial
production w.e.f.01/01/2011 under 1st expansion.
The unit has been sanctioned reimbursement of
power cost over & above base consumption of 688903
units per month. Further, the unit has gone into 2nd
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.41,32,086/-
(Rupees Forty one lakhs thirty two thousand and
eighty six only) towards reimbursement of power
cost for 1st half year of 2015-16 under IIPP
2010-15, subject to submission of the following
shortfall information:
1. Land lease or sale deed, 2. Company
incorporation certificate, 3. Board resolution, 4.
5.Valid CFO, 6.Statement of Accounts,
7.Machinery statement as per guidelines, 8. Civil
Engineer certificate, 9. Power release certificate,
10.C.A. Certificate for expansion project.
11.Gramapanchayath approval 12. Land
conversion certificate 13.Bank term loan sanction
letter 14. Project report 15. CA certificate for
shareholding 16. DT&CP approval 17. Factories
:: 79 ::
expansion and commenced commercial production w.e.f.
14/06/2012. Hence, the 1st expansion unit is eligible for
availing reimbursement of power cost over & above the
base consumption and below the base consumption of 2nd
expansion project.
It is observed that the following deviations for
sanctioning the reimbursement of power cost:
The units consumed for the last 3 years from the DCP of
the 2nd expansion:
Year No of units 33KV – Rate as on April, 2005 = Rs.3.35
2007-08 8266841 Expn-I – DCP – 01/01/2011
2008-09 12069055 Expn-II – DCP – 14/06/2012
2009-2010 19302994
A: Average of 3 years : 13212963 units –
13212963/12= 1101080 units per month.
B: 75% of highest consumption : 75% x
19302994 = 14477246 units per year.
B: Criteria is highest of A and B
Monthly base is fixed as 14477246 /12 =
1206437 units per month.
As per the operational guidelines para No. 5.4.7
under IIPP 2010-15 us as follows:
“The base annual consumption will be either
average annual power consumption of previous
three financial years of the
Expansion/Diversification project as certified by
Chartered Accountant or power consumption for
75% of installed capacity utilization of the original
industrial enterprise, whichever is higher. Power
consumed over and above the base consumption
will be eligible for reimbursement of power cost. If
the Enterprise/Industry taken up
expansion/diversification in the same year, the
base power consumption will be calculated
proportionately.”
Dept approved plans.”
:: 80 ::
Power cost reimbursement of 2nd quarter of 2015-16 of M/s Sri
Srinivasa Spintex (India) Ltd.( 1st Expansion)
Month Y
r
Eligi
ble base
base
alrea
dy fixe
d
Base of 1st
Expn
.
Units
eligible
Fix
ed
eligible
rate
Amt eligible
April
2
01
5
1206
437
6889
03
5175
34
0.7
5 388151
May
20
1
5
1206
437
6889
03
5175
34
0.7
5 388151
June
2
0
1
5
1206
437
6889
03
5175
34
0.7
5 388151
July
2
0
15
1206437
688903
517534
0.75 388151
Augus
t
2
01
5
1206
437
6889
03
5175
34
0.7
5 388151
Septe
mber
2
01
5
1206
437
6889
03
5175
34
0.7
5 388151
Eligible amount for 1st half year of 2015-16 2328903
By duly revising the base power consumption
units the detailed computation is done at – Annexure – I
and details are as follows:
The detailed computation is prepared from
SLC Wise sanctioned and Eligible cost
S
L
C N
o. Sanctioned Eligible Differential Amount
98 1169340 2328903 1159563
10
2 3834460 4071520 237060
10
2 3709580 4333468 623888
7 1854790 2328903 474113
8 1854790 2328903 474113
T
otal 12422960 15391697 2968737
Amount Eligible from 1st half year 2012-13 to 2nd half year
2014-15
1423214
3
Amount sanctioned from 1st half year 2012-13 to 2nd half year 2014-15
1242296
0
:: 81 ::
Differential amount (less amount sanctioned) 1809183
Differential amount to be sanctioned as upto 2nd half year
2014-15 Rs. 18,09,183/-
Amount computed for 1st half year of 2015-16
Rs. 23,28,903/-
Total amount to be considered as on 2nd quarter of 2015-
16 Rs. 41,38,086/-
I. If the base consumption for the 2nd expansion
project fixed as 13212963 units upper year –
13212963/12 = 1101080 units per month.duly
taking the average power consumption of the last
three years prior to 2nd expansion, the 1st
expansion unit is eligible for sanction of
reimbursement of power cost is arrived Rs.
23,28,903/- for 1st half year of 2015-16.
II. If the base consumption for the 2nd expansion
project fixed as 14477246 units per year –
14477246 /12 = 1206437 units per month
duly taking the 75% of highest consumption of
the last three years prior to 2nd expansion, the 1st
expansion unit is eligible for sanction of
reimbursement of power cost is arrived Rs.
23,28,903/- for 1st half year of 2015-16 and Rs.
18,09,183/- of differential amount totaling an
amount of Rs. 41,38,086/- is eligible.
The issue has been placed before SVC Meeting
held on 14/06/2016 and the decision of SVC is as
follows:
“SVC verified the claim and
recommended for sanction of
Rs.41,32,086/- (Rupees Forty one lakhs
thirty two thousand and eighty six only)
towards reimbursement of power cost
for 1st half year of 2015-16 under
IIPP 2010-15, including re-computed
amount of Rs.18,52,797/- as per the
revised Base Power Consumption by
considering 75% of installed capacity
utilized (highest as per operational
guidelines), subject to submission of the
following shortfall information:
:: 82 ::
1. Land lease or sale deed, 2. Company
incorporation certificate, 3. Board
resolution, 4. 5.Valid CFO, 6.Statement
of Accounts, 7.Machinery statement as
per guidelines, 8. Civil Engineer
certificate, 9. Power release certificate,
10.C.A. Certificate for expansion
project. 11.Grampanchyath approval 12.
Land conversion certificate 13.Bank
term loan sanction letter 14. Project
report 15. CA certificate for
shareholding 16. DT&CP approval 17.
Factories Dept approved plans.”
SLC may take a view.
33 IIPP – 2005-10 – Claim application of M/s. Ravali
Spinners Pvt. Ltd. (Expansion-2), Khandavali, Peravali
(M), West Godavari District for sanction of
reimbursement of power cost – Regarding.
*****
The General Manager, District Industries Centre,
West Godavari District has recommended the claim
proposal M/s. Ravali Spinners Pvt. Ltd. (Expansion-2),
Khandavali, Peravali (M), West Godavari District for
sanction of reimbursement of power cost for the 2nd
quarter of 2015-16. The unit has taken up 2nd expansion
programme for the line of activity of “Cotton Yarn” and
obtained IEM bearing No.1497/SIA/IMO/2012,
Dated:02/07/2012. The unit has commenced commercial
production w.e.f.20/11/2010 under 2nd expansion.
The unit has been sanctioned reimbursement of
power cost over & above base consumption of 1068297
units per month.
It is observed that the following deviations for
sanctioning the reimbursement of power cost:
The units consumed for the last 3 years from the DCP of
the 2nd expansion:
Year No of units 33KV – Rate as on April, 2005 = Rs.3.35
2007-08 7485315 Expn-I – DCP – 01/01/2009
2008-09 11103361 Expn-II – DCP – 20/11/2010
2009-2010 19870021
A: Average of 3 years : 12819566 units –
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs.67,17,811/-
(Rupees Sixty seven lakhs seventeen thousand
eight hundred and eleven only) towards
reimbursement of power cost for 1st half year of
2015-16 under IIPP 2010-15, subject to
submission of the following shortfall information:
1.DT&CP approval 2. Land conversion
certificate 3. Valid CFO from APPCB 4. List of
Plant & Machinery as per guidelines
:: 83 ::
12819566/12= 1068297 units per month.
B: 75% of highest consumption : 75% x19870021
= 14902516 units per year.
B: Criteria is highest of A and B
Monthly base is fixed as 14902516/12
= 1241876 units per month.
As per the operational guidelines para No. 5.4.7
under IIPP 2010-15 us as follows:
“The base annual consumption will be
either average annual power
consumption of previous three financial
years of the Expansion/Diversification
project as certified by Chartered
Accountant or power consumption for
75% of installed capacity utilization of
the original industrial enterprise,
whichever is higher. Power consumed
over and above the base consumption
will be eligible for reimbursement of
power cost. If the Enterprise/Industry
taken up expansion/diversification in
the same year, the base power
consumption will be calculated
proportionately.”
By duly revising the base power consumption
units the detailed computation is done at – Annexure – I
and details are as follows:
Details of SLC wise sanctioned amount in Rs.
Sl. No. SLC No. Amount
1 97 15895880
2 98 1329500
3 101 3320430
4 2 8897540
5 5 8128820
6 7 8944940
Total 46517110
Present claim for 1st half year of 2015-16
April
201
5 2585935 1241876 1344059
0.7
5 1008044
May
201
5 3291947 1241876 2050071
0.7
5 1537553
:: 84 ::
June
201
5 3586155 1241876 2344279
0.7
5 1758209
July
201
5 4138695 1241876 2896819
0.7
5 2172614
August
201
5 4743875 1241876 3501999
0.7
5 2626499
September
201
5 5352000 1241876 4110124
0.7
5 3082593
Eligible amount for 1st Quarter of 2015-16 12185513
Eligible amount for 2nd Quarter of
2015-16 after deducting the earlier
excess sanctioned amount of
Rs.54,67,703/- duly revised tbe base
consumption 75% of highest power
utilised in the precedent 3years from the
2nd expansion.
671781
1
The issue has been placed before SVC Meeting
held on 14/06/2016 and the decision of SVC is as
follows:
SVC verified the claim and recommended
for sanction of Rs.67,17,811/- (Rupees Sixty
seven lakhs seventeen thousand eight hundred
and eleven only) towards reimbursement of
power cost for1st half year of 2015-16 under
IIPP 2010-15, subject to submission of the
following shortfall information:
1.DT&CP approval 2. Land conversion
certificate 3. Valid CFO from APPCB 4. List of
Plant & Machinery as per guidelines
SLC may take a view
34 IIPP 2005-10 – Claim application of M/s Amaravathi
Textiles Pvt LTd ( 4th Exp) NH-5, Martur Prakasam Dist
for sanction of reimbursement of power cost under IIPP
2005-10 – Reg
M/s Amaravathi Textiles Pvt LTd ( 4th Exp), has
established the unit at NH-5, Martur Prakasam Dist for
the line of activity “ Cotton yarn Spinning ” , obtained
IEM bearing No: 1523/SIA/IMO/2007 Dt:23/05/2007
from the Government of India and commence
commercial production dt: 23/07/2009
As per G O Rt No: 370 Inds & Comm (IP) Dept
Dt: 21/06/2007 ( enclosed as Annexure -1) the power
reimbursement extended as para 5 (1) the power cost
reimbursement for M/s Amaravathi Textiles Pvt Ltd
extended at the rate Rs.1/- per unit on the prevailing rate
as on 01/04/2015.
Accordingly the unit sanction Power cost
SLC has examined the recommendation of
the verification /scruitiny committee and
decided to sanction an amount of Rs.1,33,85,866/- (Rupees one crore thirty three
lakhs eighty five thousand eight hundred sixty six
only) towards reimbursement of power cost for
2nd quarter 2015-16 claim as against
Rs.2,88,16,757/- by deducting Rs.1,54,30,891/-
on considering reimbursement of power cost @
0.75 per unit beyond ‘5’ years period under Mega
Project Category.
Further, SLC decided to seek the clarification
from the Government on the extension of Mega
Project status beyond 5 years i.e. 8 years as per
extended the IIPP 2005-10.”
:: 85 ::
reimbursement from the DCP i.e 27/03/2009 to
31/03/2014. Subsequently as per guideline issued IIPP
2010-15 policy at para no: 7.7.1 the eligibility period for
spinning /weaving/garmenting enterprises /Industries
commenced during IIPP 2005-10 period is extending by
another 3 year, making total eligibility period as 8 years.
However there is no mention about the
special incentives provided to Mega Projects.
In this particular case even after completion of 5
years period this office has erroneously calculated at
rate of Rs.1/- as per GO No:370.
The no.of units has not cross the base but
earlier the said taken has (0) value instead of (-)
value. Now the total consumption is taken for a
period of one year and cumulative amount would be
taken in to consideration for calculation shown as
Annexure
The same issue was placed before SVC held
on 04/06/2016 and decision is as follows
“The Scrutiny Verification Committee examined the issue
and recommended for sanction of Rs.1,33,85,866/-
(Rupees one crore thirty three lakhs eighty five thousand
eight hundred sixty six only) towards reimbursement of
power cost for 2nd quarter 2015-16 claim as against
Rs.2,88,16,757/- by deducting Rs.1,54,30,891/- on
considering reimbursement of power cost @ 0.75 per
unit beyond ‘5’ years period under Mega Project
Category.Further, SVC opined that seek the clarification
from the Government on the extension of Mega Project
status beyond 5 years i.e. 8 years as per extended the
IIPP 2005-10.”
SLC may take a view
35 IIPP 2005-10 – Claim application of M/s Kalpataruvu
spinning Mills Ltd ( Expansion) Thimmapuram (V),
Edlapadu Guntur Dist for sanction of reimbursement of
power cost under IIPP 2010-15 – Reg
M/s Kalpataruvu spinning Mills Ltd ( Expansion)
Thimmapuram (V), Edlapadu Guntur Dist for the line of
activity “ Cotton yarn ” , obtained IEM bearing No:
1130/SIA/IMO/2011 dt: 06/04/2011 from the
Government of India and commence commercial
production dt: 01/06/2012
It is to submit that after verification of the
claim application of the captioned unit , The CA has
corticated the 3 years units consumed by the unit the
detailed are as follows.
SLC has examined the recommendation of the
verification /scruitiny committee and decided
to sanction an amount of Rs. 42,84,913/-
(Rupees forty two lakh eighty four thousand nine
hundred and thirteen only) towards
reimbursement of power cost for 1st half year of
2015-16 under IIPP 2010-15, subject to
submission of the following shortfall information:
1. IEM Part-B, 2.DT&CP, Factories Dept
approval 3. Valid CFO from APPCB
:: 86 ::
CRITERIA 1 : AVERAGE ANNUAL CONSUMPTION FOR 3 YEARS PRIOR TO EXPANSION
YEAR
YEARLY
CONSUMPTION BEFORE EXPANSION
AVERAGE YEARLY CONSUMPTION
UNITS IN LAST 3 YEARS BEFORE EXPANSION
2009-10 7132531
7307285 2010-11 7693750
2011-12 7095575
CRITERIA 2 : CONSUMPTION AT 75% CAPACITY UTILIZATION OF EXISTING PROJECT PRIOR TO
EXPANSION
Installed Power Capacity prior to
Expansion 1150 KVA
Consumption per annum at 100%
Capacity utilization prior to Expansion
1150 KVA X 24 Hrs X 350 Days =
9660000 KVAH
Consumption per annum at 75% Capacity utilization prior to Expansion
9660000 X 75% = 7245000 KVAH
CRITERIA 3 : CONSUMPTION Highst year of 75% CAPACITY UTILIZATION OF EXISTING PROJECT PRIOR TO EXPANSION
2010-11 7693750 5770312.5
Base Consumption fixed for Expansion project
= 73,07,285 Units per Annum i.e., 6,08,940 units per Month
The same issue was placed before the SVC held on
14/06/2016 and decision is as follows
SVC verified the claim and recommended for sanction
of Rs. 42,84,913/-(Rupees forty two lakh eighty four
thousand nine hundred and thirteen only ) towards
reimbursement of power cost for 1st half year of
2015-16 under IIPP 2010-15 subject to submission of
the following shortfall information: 1. IEM Part-B,
2,DT&CP , Factories Dept approval 3, Valid CFO
from APPCB
SLC may take a view
36
IIPP 2010-15 – Special incentives to SC / ST
entrepreneurs – Claim application of M/s. Sri Sai
Lakshmi Multi Specialty Hospital & CT Scan
Centre, D. No. 12-3-55, 4th Cross, Sai Nagar,
Anantapuram - Release of Investment Subsidy –
Change of project cost – Regarding.
The General Manager, District Industries
Centre, Anantapuram District has informed that M/s.
Sri Sai Lakshmi Multi Specialty Hospital & CT
Scan Centre, D. No. 12-3-55, 4th Cross, Sai Nagar,
SLC has examined the recommendation of the
verification/scruitiny committee and approved
the revised project cost of Rs. 85, 38,377/-
and sanctioned an amount of Rs.29,88,431/-
towards Investment subsidy instead of
Rs.38,63,430/- and advised to release the
amount of Rs.29,88,431/- as per procedure in
vogue.
:: 87 ::
Anantapuram has filed application within the
prescribed time limit for sanction of investment
subsidy for the line of activity of Health and
Medical Services and the unit financed by State
Bank of India, Anantapur, the entrepreneur belongs
to ST Community and the Director of Industries
sanctioned investment subsidy for an amount of
Rs.38,63,430/-
Further, this office has issued consolidated
proceedings No. 39/1/2015/8042/8042, dated
03/07/2015 for release and the GM has submitted
that the unit was inspected by him along with IPO
on 09/04/2015 and found that the CT Scan
machinery was not present at the time of inspection
and not released the amount sanctioned and
requested the unit holder to submit the reasons for
non-availability of the CT Scan Machine.
The unit holder has submitted his
representation vide his letter dated 06/08/2015
stating that CT Scan machine was sent to Chennai
for repairs and will be returned by the end of
August, 2015 and also stated that he is unable to pay
loan instalments to the bank and requested for
release of investment subsidy.
Further, the GM has submitted that the unit
was once again inspected on 29/01/2016 found the
unit has working satisfactorily and informed that the
CT Scan Machine was not present in the premises
and the CT Scan machine was sent to Mednob
Healthcare, Madhurai, Tamilnadu for repair and
requested to sanction the investment subsidy to
the unit for an amount of Rs.29,88,431/- basing on
the revised project cost duly eliminating the CT scan
machine instead of already sanctioned investment
subsidy of Rs.38,63,430/-.
Further, it is to submit that the SLC in its
meeting held on 15/05/2014 sanctioned an amount
of Rs.38,63,430/- @35% on the total eligible project
cost of Rs.1,10,38,377/-. Revised project cost
submitted by the GM after elimination of CT Scan
Machine is as follows:
Original Project Cost 1,10,38,377
(-) CT Scan Machine cost 25,00,000
Revised project cost after elimination of CT Scan Machine 85,38,377
Availability of machinery at the unit, at the time inspection is 85,38,377
Quantum of subsidy calculated at the rate of 35% 29,88,431
:: 88 ::
Director of Industries &
Chairman, State Level Committee (SLC).
In view of the above, the proposal is placed
before the SLC for ratifying the previous SLC
decision and also to take a decision for sanction and
release of investment subsidy @ 35% of
Rs.29,88,431/- on the eligible revised project cost of
Rs.85,38,377/- to the captioned unit.
SLC may take a view.
:: 89 ::
LIST OF MEMBERS ATTENDED THE 9th STATE LEVEL COMMITTEE MEETING HELD ON 20/02/2016
AT 11.30AM. IN THE CONFERENCE HALL OF M.D, A.P.S.F.C, CHIRAG ALI LANE, HYDERABAD-A.P
SL.NO. MEMBERS NAME & DESIGNATION OF MEMBER /
__________________________________________________ REPRESENTAT___________________ _______
Sri/Smt:
1. Chairman, Kartikeya Misra, IAS.,
State Level Committee. Chairman, SLC / Director of Industries.
2. The President T. Sujatha
FAPCCI, Hyderabad Deputy Director
3. The Chairman Y V Krishna Mohan
CII. Hyderabad Convener, MSME,
4. The President GRK Reddy
FAPSIA, Working President
5. The Managing Director, V.Siva Ramakrishna ,
APSFC, Hyderabad. Senior Branch Manager.
6. The Chairman, D.Dharma Teja
AP Spinning Mill Assosiation President
7. The Managing Director B.Maheswara rao
APIIC. DGM(B), APIIC
8. The Commissioner, R.Sadananda rao
Commercial Taxes, AP, Hyderabad. Assistant Commissioner
9. The Cheif Engineer (Commercial), Ch.V Ramana
APTRANSCO, Hyderabad. ADE (Comml.), Hyd
10. The Member Secretary, R Sreeramulu
APPCB, Hyd SEE, Hyderabad
11. The Convenor K.Siva Kumar
SLBC, Hyderabad Chief Manager, AB, ZO, Vijayawada.
12. The Chief Manager A.Venkata Reddy
Syndicate Bank Assit General .Manager, Vijayawada.
13. The Commissioner Khushbu Kothari
B.C Welfare, Hyderabad Asst B C Welfare Officer, Vijayawada.
14. The Chief Manager, P.Sudhakar
SBI, SME Br, Hyderabad. AGM (SME)
15. The Deputy General Manager Ch.S R Prasad
SME, Head Office, SBH, Hyderabad Chief Manager.
16. The President D Bujji Babu
DICCI, (AP), Hyderabad Member
17. The President K Kanaka Durga
ALEAP, Hyderabad . Member
18. The President Dr.Bhrama reddy
FSME, Hyderabad Member
:: 90 ::
19. The President P.Bhaskara Rao
AP Chambers of Commerce & Industry Member.
Fadaration
20. The Additional Director B.Suresh Babu
Central Office, Hyderabad Additional Director
:: 91 ::
I. SANCTION OF REIMBURSEMENT OF STAMP DUTUY Annexure -1
S No
Date of received claim
Agenda Sanctioned amount
1 14/09/2015
M/s Maruthi Ispat & Energy Pvt. Ltd., Sy.No. 167, Madhavaram (V), Mantralayam
Rs.28,923/- (Rupees twenty eighty thousand nine hundred and twenty three only) towards stamp duty reimbursement subject to submission of the following shortfall information:1) IEM Part-B 2)Certification of Incorporation 3) Board resolution on authorization to sign the claim application 4) Approved plan from Factories Department 5) Land Conversion Certificate 6) project report 7) CA certificate on share holding 8) Valid CFO from APPCB 9) Approved Plans from Grampanchayath 10) Minutes of the District Level Pre-scrutiny Committee 11) Certification of the Banker on Plant & Machinery as per guidelines.
2 15/09/2015
M/s South India Krishna Oil and Fats Pvt. Ltd., Sy.No. 275, 279, 280 & 281, Epuru Bit-IB, Pantapalem Muthukur (V&M), SPSR Nellore District
Rs.33,86,475/- (Rupees thirty three lakhs eighty six thousand four hundred and seventy five only) towards sanction of reimbursement of Stamp Duty under IIPP 2005-10 subject to submission of the following shortfall information:1) IEM Part-B 2)Certificate of Incorporation 3) Board resolution on authorization to sign the claim application 4) Approved Plans form Factories Department 5) Land Conversion Certificate 6) Project report 7) CA certificate on share holding 8) Minutes of the District Level Pre-scrutiny Committee 9) Banker certificate on Plant & Machinery as per guidelines .
:: 92 ::
II.REIMBURSEMENT OF SALES TAX Annexure –II
S No
Date of
received
claim
Name & address of the unit Sanctioned amount
1 08/09/2015
M/s Regen Powertech Pvt. Ltd.,
Sy. No. 182 to 188, APIIC,
Industrial Park, Mambattu (V),
Tada (M), Nellore District
Rs.11,35,89,444/- (Rupees eleven crores thirty five lakhs
eighty nine thousand four hundred and forty four only)
towards sales tax reimbursement for the year 2013-14
subject to submission of the following shortfall
information:1) Land Sale Deed or Lease Deed
2) Certificate of Incorporation 3) Board resolution on
authorization to sign the claim application 4) Approved
Plan from Gram Panchayath, 5) Approved Plans from
Factories Department, 6) Approved Plans from IALA 7)
Boiler’s Certificate 8) Land conversion certificate 9)
Bank sanctioned letter 10) Civil Engineer certificate 11)
Approved project report 12) Power release certificate.
2 14/09/2015
M/s Sree Jayajyothi Cements
Limaited, Yanakandla (V),
Banaganpalli (M), Kurnool
District
Rs.1,64,88,816/- (Rupees one crore sixty four lakhs
eighty eight thousand eight hundred and sixteen only)
towards sales tax reimbursement subject to submission of
the following shortfall information:1) Land Sale Deed /
Lease Deed 2) Certificate of Incorporation 3) Board
resolution on authorization to sign the claim application
4) Approval Plans from Grampanchayath 5)
Approved Plans from Factories Department 6) Approved
Plans from T&CP 7) Land Conversion Certificate 8)
CFO issued by APPCB 9) Bank Statement Letter on
Plant & Machinery 10) Civil Engineer Certificate 11)
Power Release Certificate 12)Project Report 13) CA
certificate on Share holding 14) Statement of Accounts
from Financial Institution.
3 15/09/2015
M/s A S Jute Product Pvt Ltd
(Existing) Sy No: 20/2 & 21,
Nerallavalasa(V), Padmanabam
(m), Visakhapatnam
Rs.17,94,255/- (Rupees seventeen lakhs ninety four
thousand two hundred and fifty five only) towards
sanction of reimbursement of sales tax in respect of
2014-15 under IIPP 2010-15 subject to submission of
shortfall document - Civil Engineer Certificate
4 26/10/2015
M/s.Jaypee Balaji Cement Plant,
Rs No: 99, Budawada,
Jaggaiahpet (M), Krisna Dist
Rs.8,22,63,860/- (Rupees eight crores twenty two lakhs
sixty three thousand eighty hundred and sixty only)
towards sanction of reimbursement of sales tax in respect
of 2014-15 under IIPP 2010-15 subject to submission of
the following shortfall information:1) Land sale deed /
lease deed 2) Certificate of Incorporation 3) Board
resolution on authorization to sign the claim application
4) CFO from APPCB, 6) Certification of Plant &
Machinery as per guidelines 7) Project report 8)
Chartered Accountant Certificate on share holding
:: 93 ::
5 30/10/2015
M/s Net Matrix Limited, Plot
No: 15&15A, APSEZ,
Atchuthapuram, Visakhapatnam
Rs.23,70,000/- (Rupees Twenty three lakhs seventy
thousand only) towards sanction of reimbursement of
Sales Tax in respect of 2014-15 under IIPP 2010-15
subject to submission of the following shortfall
information:1) Land Sale Deed / Lease Deed 2) Board
resolution on authorization to sign the claim application
3) Chartered Accountant Certificate on shareholding.
6 31/10/2015
M/s.Rajapalayam Mills Ltd.,
Gopinenipalem (V), Vatsavai
(M), Krishna Dist
Rs.3,23,470/- (Rupees three lakhs twenty three thousand
four hundred and seventy only) towards sanction of
reimbursement of sales tax in respect of 2014-15 under
IIPP 2005-10
7 31/10/2015
M/s.Sudarshanam Spinning
Mills Tirumalagiri (V),
Jaggaiahpet (M), Krishna Dist
Rs.16,48,050/- (Rupees sixteen lakhs forty eight
thousand and fifty only) towards sanction of
reimbursement of sales tax in respect of 2014-15 under
IIPP 2005-10
8 26/11/2015
M/s Parag Milk Foods Private
Limited, Samudrapalli(V),
Pengaragunta(PO),
Palamaner(M), Chittoor District
Rs.21,75,294/- (Rupees twenty one lakhs seventy five
thousand two hundred ninety four only) towards
reimbursement of sales tax for the year of 2014-15
under IIPP 2010-15 subject to submission of the
following shortfall information:1) Valid CFO from
APPCB 2.Form – A Certificate with round seal of the
CT department .
9 31-10-
2015
M/s.Sri Harini Textiles Limited,
Tirumalagiri (V), Jaggaiahpet
(M), Krishna Dist
Rs.88,370/- (Rupees eighty eight thousand three
hundred and seventy only) towards sanction of
reimbursement of sales tax in respect of 2014-15
under IIPP 2005-10.
:: 94 ::
10 31-10-
2015
M/s.Sri Vishnu Shankar Mills
Limited, Gopinenipalem (V),
Vatsavai (M), Krishna Dist
Rs.5,59,040/- (Rupees five lakhs fifty nine thousand
and forty only) towards sanction of reimbursement
of sales tax in respect of 2014-15 under IIPP 2005-
10
11 31-10-
2015
M/s.Sandhya Spinning Mill
Ltd., Gopinenipalem (V),
Vatsavai (M), Krishna Dist
Rs.4,19,720/- (Rupees four lakhs nineteen thousand
seven hundred and twenty only) towards sanction of
reimbursement of sales tax in respect of 2014-15
under IIPP 2005-10
12 29-12-
2015
M/s Worington Nitin Cylinders
Ltd, VSEZ, Duvvada(V&M),
Visakhapatnam
Rs.14,09,370/- ( Rupees fourteen lakhs nine
thousand three hundred and seventy only) towards
sanction of reimbursement of Sales tax in respect of
2012-13 under IIPP 2010-15.
:: 95 ::
III.REIMBURSEMENT OF POWER COST Annexure –III
S
No
Date of
received
claim
Name of the unit Sanctioned amount
1 02/08/2015
M/s Shri Govindaraja Textiles Ltd,
708, Peddarangapuram (V),
Pulivendala (M), Kadapa
Rs.4,20,75,189/- (Rupees four crores twenty lakhs
seventy five thousand one hundred and eighty nine only)
towards present claim of 1st quarter of 2015-16
incluring deferential amount.
2 28/08/2015
M/s Sakku Spinning Mills Ltd,
(existing) Chinakondrupadu (V),
Prathipadu (M), Guntur
Rs.48,56,200/- (Rupees forty eight lakhs fifty six
thousand and two hundred only) towards power cost
reimbursement for 1st quarter of 2015-16 under IIPP
2005-10, subject to submission of the following shortfall
information:1) Land conversion certificate 2)Valid CFO
from APPCB 3) Approved Project Report 4) CA
certificate on Board resolution authorizing person
signing the claim application for 1st quarter of 2015-16.
6) Approved Plans from Gram Panchayath, T&CP, and
Factories Department 7) Bank sanction letter.
3 28/08/2015
M/s Gajavalli Spinning Mils (P) Ltd,
Narakoduru (V), Chebrolu (V) & (M),
Guntur Dist
Rs.54,58,825/- (Rupees fifty four lakhs fifty eight
thousand eight hundred and twenty five only) towards
power cost reimbursement for 1st quarter of 2015-16
under Industrial Investment Promotion Policy 2005-
2010, subject to submission of the following shortfall
information:1) Valid CFO from APPCB 2) Land
conversion certificate 3) Approved Plans from Gram
panchayat, Factories Dept & T&CP 4) CA certificate
on percentage of share holding
4 28/08/2015 M/s Kallam Spinning Mils (Open End
unit) Chowdavaram (V), Guntur Dist
Rs.34,95,350/- (Rupees thirty four lakhs ninety five
thousand three hundred and fifty only) towards power
cost reimbursement for 1st quarter of 2015-16 subject
to submission of the following shortfall information:1)
Board resolution, 2) Approved Plans from T&CP,
Factories, Gram panchyath 3) Land conversion
certificate 4)Valid CFO from APPCB 5) CA certificate
on percentage of share holding.
:: 96 ::
5 28/08/2015
M/s Sri Venkata Siva Parvathi
Spinning Mill (P) Ltd, (2nd Exp) GBC
Road, Chebrolu (V&M), Guntur Dist Zero
6 29/08/2015 M/s Ranganayaka Spinning Mills (P)
Ltd, Boyapalem (V), Edlapaldu (M),
Rs.53,67,331/- (Rupees fifty three lakhs sixty seven
thousand three hundred and thirty one only) towards
power cost reimbursement for 1st quarter of 2015-16
subject to furnishing the shortfalls:1) Board resolution
on authorization to sign the claim application. 2) GP
approval 3) Land conversion certificate 4) CFO from
APPCB 5) Bank sanctioned letter 6) Approved project
report 7) CA certificate on percentage of share holding.
7 29/08/2015
M/s Ranganayaka Spinning Mills (P)
Ltd, (Exp) Boyapalem (V), Edlapaldu
(M),
Rs.10,05,181/-(Rupees ten lakhs five thousand one
hundred and eighty one only) towards power cost
reimbursement for 1st quarter of 2015-16 subject to
furnishing the shortfalls: 1) Approved Plans from GP,
T&CP, Factories Department 2) Land conversion
certificate 3) Valid CFO from APPCB, 4) CE Certificate
5) Approved project report 6) CA certificate on
percentage of share holding.
8 29/08/2015
M/s Pavan Cotton Products (P) Ltd
(Exx-1) Pulladigunta(V),
Vatticherukur (M), Guntur
Rs. 16,02,752/- (Rupees sixteen lakhs two thousand
seven hundred fifty two only) towards power cost
reimbursement for 1st quarter of 2015-16 subject to
furnishing the shortfalls: land documents 2) Valid CFO
from APPCB, 3) Land conversion certificate 4)
Approved project report 5) T&C approval plan 6) CA
certificate on percentage share holding
9 29/08/2015
M/s Sri Venkata Lakshmi Narasimha
spinning Mills ,(Exp) Sy No: 176/4,
GBC, Road, Chebrolu (V &M),
Guntur
deferred
10 29/08/2015
M/s Krishna Murthy Spinning Mills
(P) Ltd, NH-5, Thimmapuram (V),
Edladpau (M), Guntur Dist
Rs.36,82,550/- ( Rupees thirty six lakhs eighty two
thousand five hundred and fifty only) towards power
cost reimbursement for 1st quarter of 2015-16 subject
to submission of the following shortfall information:1)
Approved Plans from Grampanchyath, T&CP,
Factories 2) Valid CFO from APPCB 3) Land
Conversion certificate 3) Bank sanction letter 4)
:: 97 ::
Approved project report
11 05/09/2015
M/s YSR spinning & weaving Mills
(P) Ltd (3rd Exp) D No: 265 7A,
Gangavaram (V), Nadendla (M),
Guntur Dist
Rs.10,75,860/- (Rupees ten lakhs seventy five
thousand eight hundred and sixty only) towards power
cost reimbursement for 1st half year 2012-13 to 2nd half
year of 2014-15 subject to submission of the following
shortfall information:1) Land documents 2) Board
resolution on authorization to sign the claim application
3) Approved Plan from Grampanchayath, 4)Approved
Plan from T&CP Department 5) Approved Plan from
Factories Department
12 10/09/2015
M/s.The KCP Limited (KCP Cement
Unit-II)Muktyala, Jaggaiapeta (M)
Krishna Dist
Rs.81,97,460/- (Rupees eighty one lakhs ninety seven
thousand four hundred and sixty only) towards power
cost reimbursement for 1st quarter of 2015-16 Subject to
submission of the following shortfall information:1)
Certification of Incorporation 2) Board resolution on
authorization to sign the claim application 3) Approved
Plans from DT&CP / UDA 4) Valid CFO /
Acknowledgment from APPCB 5) Project report 6) CA
certificate for shareholding 7) Land Conversion
Certificate.
13 11/09/2015
M/s Sri Lakshmi Narasimha Spinning
Mill (India) Pvt Ltd,
Veppalavaripalem (M), Prakasam Dist
Rs.56,61,810/- (Rupees Fifty six lakhs sixty one
thousand eight hundred and ten only) towards power
cost reimbursement for 1st quarter of 2015-16 Subject to
submission of the following shortfall information:1)
Approved Plan from T&CP 2) Valid CFO /
Acknowledgment from APPCB 3)
Approved Plan from Grampanchayth 4) Land
Conversion Certificate.
14 15/09/2015
M/s Sai Global Yarntex (India) Pvt
LTd, Sy No: 103/a, 107,133,143/1,
142/2, Vellampalli (V), Maddipadu
(M), Prakasam Dist
Rs.5,55,930/- (Rupees five lakhs fifty five thousand
nine hundred and thirty only) towards power cost
reimbursement for 1st quarter of 2015-16 subject to
submission of the following shortfall information:1)
Land Sale Deed / Lease Deed 2) Approved
Plans from Grampancyath 3) Approved Plans from
T&CP 4) Approved Plans from Factories Department
5) Land Conversion Certificate 6) Civil Engineer
Certificate 7) Approved Project Report .
:: 98 ::
15 15/09/2015 M/s NSL Textiles Ltd, D No: 6/275-1,
Inkollu , Prakasam Dist
Rs.3,49,06,296/-(Rupees three crores forty nine lakhs
six thousand two hundred and ninety six only) towards
power cost reimbursement for 4th quarter of 2014-15
subject to submission of the following shortfall
documents: 1) IEM Part-B 2) Approved plans from
Factories Department 3) Land conversion certificate 4)
Project Report 5) Valid CFO from APPCB 6)
Approved Plans from DT& CP 7) Base Power
Consumption units of preceding three years from
Chartered Accountant 8) Statement of Accounts and
Certification of Plant & Machinery as per Guidelines,
16 15/09/2015
M/s NSL Textiles Ltd, Sy No: 371 to
382, Kunchalavaripalem (V)
Cherukupalli (M), Guntur Dist
Rs.2,67,09,007/- towards power cost reimbursement for
1st quarter of 2015-16 under IIPP 2005-10 subject to
submission of the following shortfalls: 1) Approved
plans from Factories Department 2) Land conversion
certificate 3) Project Report 4) Valid CFO from APPCB
5) Approved Plans from DT& CP 6)
Approved Plans from Grampanchayat 7) Land Sale
Deed / Lease Deed.
17 15/09/2015
M/s A S Jute Product Pvt Ltd (Exp)
Sy No: 20/2 & 21, Nerallavalasa(V),
Padmanabam (m), Visakhapatnam
Rs. 9,19,148/- (Rupees nine lakhs nineteen thousand
one hundred and forty eighty only) towards power cost
reimbursement for 1st & 2nd half years of 2014-15
18 16/09/2015
M/s Sree Jayajyothi Cements
Limaited, Yanakandla (V),
Banaganpalli (M), Kurnool District
Rs.11,36,28,130/- (Rupees eleven crores thirty six
lakhs twenty eighty thousand one hundred and thirty
only) towards sanction of reimbursement of power cost
in respect of 1st quarters of 2015-16 IIPP 2010-15
subject to submission of the following shortfall
information:1) Land Conversion Certificate 2) Plant &
Machinery Statement certified by the Financial
Institution as per guideline 3) Project report 4)
Charted Accountant Certificate on share holding 5 ) Sale
Deed 6) Board resolution on authorization to sign the
claim application.
:: 99 ::
19 18/09/2015
M/s NSL Textiles Ltd, (Mega
Project) Edlapadu (V), & (M), Guntur
Dist
Rs 1,59,96,232/- (Rupees one crore fifty nine lakhs
ninety six thousand two hundred and thirty two only)
towards power cost reimbursement for 1st quarter of
2015-16 subject to submission of the following shortfall
information:1) Land Sale Deed / Lease Deed 2) Land
Conversion Certificate 3) Valid CFO from APPCB 4)
Project Report 5) CA certificate on share holding 6)
Approved Plans from Gram Panchayat 7) Approved
Plans from T&CP 8) Approved Plans from Factories
Department.
20 21/09/2015 M/s.NSL Textiles Ltd., Veeravalli
(V), Bapulapadu (M), Krishna Dist
Rs.2,80,76,307/- (Rupees two crores eighty lakhs
seventy six thousand three hundred and seven only)
towards sanction of reimbursement of power cost in
respect of 1st quarters of 2015-16
21 26/09/2015 M/s.Paramesu Biotech Private
Limited, West Godavari District
Rs.7,21,700/- (Rupees seven lakhs twenty one thousand
and seven hundred only) towards sanction of
reimbursement of power cost in respect of 2nd half year
of 2015-16 under IIPP 2005-10 subject to submission
of the following shortfall information:1) Project Report
2) IEM Part-B 3) Approved plans from Grampanchyath
4) Approved plan from Factories Department 5)
Approved plans of T&CP Department 6) Power Release
Certificate duly incorporating power load.
22 28/09/2015
M/s Vasantha Spinners Ltd, (Exp-I)
NH-5, Thimmapuram (V), Edlapadu
(M), Guntur Dist
deferred
23 09/10/2015
M/s Lohiya Edible Oils Pvt. Ltd.,
(Unit-II) (Existing), Plot No.25, IDA,
Vakalapudi (V), Kakinada Rural
Mandal, East Godavari District
Rejected
:: 100 ::
24 17/10/2015
M/s Emami Biotech Limited, Sy.No.
501 to 510, Krishnapatnam Port Zero
Point, Pantapalem (V), Muthukuru
(M), SPSR Nellore District
Rs.65,55,470/- (Rupees sixty five lakhs fifty five
thousand four hundred and seventy only) towards
sanction of reimbursement of power cost in respect of
2nd quarters of 2015-16 under IIPP 2005-10 Subject to
submission of the following shortfall information:1)
Meeseva receipt for the 1st quarter of 2015-16 2) Date
of receipt of application at DIC not available for the
2nd claim 3) IEM, Partnership form B, unattested 4)
Gram Panchayth, Factories , T&CP Dept approved plans
5) M/c statement not as per guidelines 6) project report
7) Board resolution authorizing the person not singed 8)
Land conversion certificate
25 17/10/2015
M/s Sree Rayalaseema Alkalies and
Allied Chemicals Ltd., Gondiparla
(V), Kurnool
Rs.11,82,39,540/- (Rupees eleven crores eighty two
lakhs thirty nine thousand five hundred and forty only)
towards sanction of reimbursement of power cost in
respect of 2nd quarters of 2015-16 under IIPP 2005-10
subject to submission of the following shortfall
information:1) IEM Part-B 2) Land Sale Deed / Lease
Deed 3) Certificate of Incorporation 4) Board resolution
on authorization to sign the claim application 5)
Approved Plan from Factories Department 6) Valid
Boiler Certificate 7) Certification of Plant and
Machinery as per operational guidelines 8) Civil
Engineer Certificate 9) Project Report 10) Chartered
Accountant Certificate on shareholding 11) Land
Conversion Certificate 12) CA certificate for
consumption of power for previous period for fix base
12) CFO certificate not attested 13) Gram Panchayth
approval not furnished 15) Power release certificate not
attested & Payment proof for the power bills.
26 26/10/2015
M/s Sri Anantha Lakshmi Spinning
Mills (P) Ltd, (Exp-1) 59/1,
Boyapalem (V), Edlapadu (M), Guntur
Dist
Rs.66,04,160/- (Rupees sixty six lakhs four thousand
one hundred and sixty only) towards sanction of
reimbursement of power cost in respect of 2nd quarters
of 2015-16 under IIPP 2015-20 subject to submission
of the shortfall document - Land conversion certificate
27 26/10/2015
M/s.Jaypee Balaji Cement Plant, Rs
No: 99, Budawada, Jaggaiahpet (M),
Krisna Dist
Rs.6,09,63,560/- (Rupees six crores nine lakh sixty
three thousand five hundred and sixty only) towards
sanction of reimbursement of power cost in respect of
1st & 2nd quarters of 2014-15 under IIPP 2010-15
subject to submission of the following shortfall
information:1) Land sale deed / lease deed 2) Certificate
of Incorporation 3) Board resolution on authorization to
sign the claim application 4) CFO from APPCB 5)
Certification of Plant & Machinery as per guideline by
GM DIC 7) Project Report 8) Chartered Accountant
Certificate on share holding
:: 101 ::
28 30/10/2015
M/s Net Matrix Limited, Plot No:
15&15A, APSEZ, Atchuthapuram,
Visakhapatnam
Rs.16,89,180/- (Rupees sixteen lakhs eighty nine
thousand one hundred and eighty only) towards sanction
of reimbursement of power cost in respect of 1st & 2nd
quarters of 2014-15 under IIPP 2010-15 Subject to
submission of the following shortfall information:1)
Land Sale Deed / Lease Deed 2) Board resolution on
authorization to sign the claim application 3) Chartered
Accountant Certificate for investment & share holding.
29 31/10/2015
M/s.Sudarshnam Spinning Mills Ltd.,
Rs.52&53, Tirumalagiri (V), Jaggaipet
(M) Krishna Dist
Rs.38,26,440/- (Rupees thirty eight lakhs twenty six
thousand four hundred and forty only) towards sanction
of reimbursement of power cost in respect of 1st
quarters of 2015-16 under IIPP 2005-10
30 31/10/2015
M/s.Sri Harini Textiles Limited,
Rs.No:47,48 & 49, Tirumalagiri (V),
Jaggaiahpet (M), Krishna Dist
Rs.36,63,940/- (Rupees thirty six lakhs sixty three
thousand nine hundred and forty only) towards sanction
of reimbursement of power cost in respect of 1st
quarters of 2015-16 under IIPP 2005-10
31 31/10/2015
M/s.Sandhya Spinning Mill Ltd.,
Gopinenipalem (V), Vatsavi (M),
Krishna Dist
Rs.42,67,010/- (Rupees forty two lakhs sixty seven
thousand and ten only) towards sanction of
reimbursement of power cost in respect of 1st quarters of
2015-16 under IIPP 2005-10
32 31/10/2015
M/s.Rajapalayam Mills Ltd.,
Gopinenipalem (V), Vatsavai (M),
Krishna Dist
Rs.47,32,410/- (Rupees forty seven lakhs thirty two
thousand four hundred and ten only) towards sanction of
reimbursement of power cost in respect of 1st quarters
of 2015-16 under IIPP 2005-10
33 31/10/2015
M/s.Sri Vishnu Shankar Mill Ltd.
Gopinenipalem (V), Vatsavai (M),
Krishna Dist
Rs.45,04,810/- (Rupees forty five lakhs four thousand
eight hundred and ten only) towards sanction of
reimbursement of power cost in respect of 1st quarters
of 2015-16 under IIPP 2005-10
34 01/11/2015
M/s Bala Rama krishna Spinning
Mills (P) Ltd, (Exp-1) Chowdavaram
(V), Guntur
Rs.20,30,212/- (Rupees twenty lakhs thirty thousand
two hundred and twelve only) subject to submission of
the following shortfall information:1) IEM Part -B for
confirmation of DCP 2) Approved Plans from T
&CP Department 3) Valid CFO from APPCB 4) Bank
Statement Certification 5) Civil Engineer Certificate 6)
Approved project report 7) Land Sale Deed / Lease
Deed 8) Approved Plans from Factories Department
:: 102 ::
35 02/11/2015 M/s Bhavya Cements Ltd, Tangeda
(V), Dachepalli (M), Guntur Dist
Rs.5,37,74,480/- (Rupees five crore thirty seven lakhs
seventy four thousand four hundred and eighty only)
towards sanction of reimbursement of power cost in
respect of 2nd quarters of 2015-16 under IIPP 2005-10
36 03/11/2015
M/s J C Bio Tech (P) Ltd, Plot No:
548 to 550, IGC, Gundlapalli (V),
Maddipadu (M), Prakasam Dist
Rs.25,76,700/- (Rupees twenty five lakhs seventy six
thousand and seven hundred only) towards sanction of
reimbursement of power cost in respect of 1st half year
of 2015-16 under IIPP 2010-15 subject to submission
of the following shortfall information:1) Land
Conversion Certificate 2) Valid CFO from APPCB 3)
Approved Plans from Factories Department 4) Plant &
Machinery Statement from Financial Institution as per
guidelines
37 04/11/2015 M/s Amaravathi Textiles (P) Ltd (4th
Exp) Martur (V&M), Prakasam Dist
Rs.1,33,85,866/- (Rupees one crore thirty three lakhs
eighty five thousand eight hundred sixty six only)
towards reimbursement of power cost for 2nd quarter
2015-16
38 06/11/2015
M/s.PVR Spinning and Weaving
Mills (Expansion),RSNo.110/2,
108/2,3,4,, Kondaipalem road, Tetali
village, Tanuku (M), West Godavari
District
Rs.14,68,326/-(Rupees fourteen lakhs sixty eight
thousand three hundred and twenty six only) towards
sanction of reimbursement of power cost in respect of
1st half year of 2015-16 subject to submission of
shortfall documents: 1) IEM Part-B for expansion
project 2) Approved Plans from T&CP
Department 3) Valid CFO From APPCB 4 ) Project
Report
:: 103 ::
39 07/11/2015 M/s Ajantha Spintex Limited, Kakani
(V), Narasaopet(M) Guntur
Rs.38,52,320/-(Rupees thirty eight lakhs fifty two
thousand three hundred and twenty only) towards
sanction of reimbursement of power cost in respect of
1st half year of 2015-16 under IIPP 2010-15 Subject to
submission of the following shortfall
information:1)Approved Plans from Gram Panchayath
2) Land Conversion Certificate 3) Valid CFO from
APPCB 4) Approved Plans from T&CP Department 5)
Approved Plans from Factories Department 6) Bank
sanction letter
40 13/11/2015
M/s Teamec Chorate Limited, Plot
No: 558 & 559, IGC, Gundlapalli (V),
Maddi padu (M) Prakasam Dist
Rs.1,22,20,900/- (Rupees one crore twenty two lakhs
twenty thousand and nine hounded only) towards
sanction of reimbursement of power cost in respect of 1st
half year of 2015-16 under IIPP 2010-15 subject to
submission of the following shortfall information:1)
Valid CFO from APPCB 2) Justification whether new
unit or expansion as per IEM 3) Certification of Plant
& Machinery as per operational guidelines.
41 16/11/2015
M/s Idupulapadu Cotton Mils Pvt Ltd
, Jonnatali (V), Martur (M), Prakasam
Dist
Rs.3,16,80,240/- (Rupees three crore sixteen lakhs
eighty thousand two hundred and forty only) towards
sanction of reimbursement of power cost in respect of
2nd quarter of 2015-16 under IIPP 2005-10.
42 18/11/2015 M/s.NSL Textiles Ltd., Near JNTU,
APIIC, Pulivendula, YSR Kadapa dist
Rs.1,49,97,650/- (Rupees one crore forty nine lakhs
ninety seven thousand six hundred and fifty only)
towards sanction of reimbursement of power cost in
respect of 1st quarters of 2015-16 under IIPP 2005-10
:: 104 ::
43 20/11/2015 M/s Kallam Spinning Mils Ltd, G T
Road, Martur (V&M), Prakasam Dist
Rs.1,03,30,060/- (Rupees one crore three lakhs thirty
thousand and sixty only) towards sanction of
reimbursement of power cost in respect of 1st half year
of 2014-15 & 1st half year of 2015-16 under IIPP
2005-10 Subject to submission of shortfall document -
Certification of Plant & Machinery as per operational
guidelines.
44 23/11/2015
M/s.Ravali Spinners Pvt Ltd., (Exp-
1), Khandavali (V), Peravalli (M)
West Godavari Dist
Rs.1,95,93,928/- (Rupees one crore ninety five lakhs
ninety three thousand nine hundred and twenty eight
only) towards sanction of reimbursement of power cost
in respect of 2nd quarter of 2015-16 under IIPP 2005-
10, subject to following shortfalls:1) Meeseva Receipt
conformation form the GM, DIC 2) Valid CFO from
APPCB, 3) Project report 4) Chartered Accountant
certification on shareholding 5) Certificate of
Incorporation 6) Board resolution on authorization to
sign the claim application 7) Statements of Accounts 8)
IEM Part-B 9) Land Sale Deed / Lease Deed 10) Land
Conversion Certificate 11) Plant & Machinery statement
of the Financial Institution as per operational guidelines
12) Civil Engineer Certificate 13) Chartered Accountant
Certificate for fixing the base units 14) Difference in
power load w.r.t. DCP 15) Approved Plans from Gram
Panchayat 16) Approved Plans from DT&CP with
attestation 17)Approved Plans from Factories
Department with attestation.
45 24/11/2015
M/s.The KCP Limited(KCP Cement
Unit-II), Muktyala, Jaggaiahpeta (M)
Krishna Dist
Rs.66,12,650/- (Rupees sixty six lakhs twelve thousand
six hundred and fifty only) towards sanction of
reimbursement of power cost in respect of 2nd quarter
of 2015-16 under IIPP 2005-10
:: 105 ::
46 24/11/2015
M/s. Mandava Cotton Mills Pvt Ltd.,
Sy No: 92/4, Ampapuram (V),
Bapulapadu (M), Krishna Dist
Rs.64,03,280/- (Rupees sixty four lakhs three thousand
two hundred and eighty only) towards sanction of
reimbursement of power cost in respect 1st quarter of
2015-16 under IIPP 2005-10 subject to submission the
following shortfalls:1) Valid CFO from APPCB, 2)
Bank sanction letter 3) Project report 4) Chartered
Accountant Certification on shareholding 5) Reasons
for decrease of KVA from 2000 to 1650 and
clarification on connection load.
47 26/11/2015
M/s.Sri Vishnu Shankar Mill Ltd.
Gopinenipalem (V), Vatsavai (M),
Krishna Dist sanction of
reimbursement of power cost in
respect 2nd quarter of of 2015-16
under IIPP 2005-10
Rs.47,36,821/- (Rupees forty seven lakhs thirty six
thousand eight hundred and twenty one only) towards
sanction of reimbursement of power cost in respect 2nd
quarter of 2015-16 under IIPP 2005-10
48 26/11/2015
M/s.Rajapalayam Mills Ltd.,
Gopinenipalem (V), Vatsavai (M),
Krishna Dist
Rs.49,83,559/- (Rupees forty nine lakhs eight three
thousand five hundred and fifty nine only) towards
sanction of reimbursement of power cost in respect 2nd
quarter of 2015-16 under IIPP 2005-10
49 26/11/2015
M/s.Sandhya Spinning Mill Ltd.,
Gopinenipalem (V), Vatsavai (M),
Krishna Dist
Rs.47,81,223/- (Rupees forty seven lakhs eighty one
thousand two hundred and twenty three only) towards
sanction of reimbursement of power cost in respect 2nd
quarter of 2015-16 under IIPP 2005-10
50 26/11/2015
M/s.Sri Harini Textiles Limited,
Rs.No:47,48 & 49, Tirumalagiri (V),
Jaggaiahpet (M), Krishna Dist
Rs.44,85,360/- (Rupees forty four lakhs eighty five
thousand three hundred and sixty only)towards sanction
of reimbursement of power cost in respect 2nd quarter
of 2015-16 under IIPP 2005-10
:: 106 ::
51 26/11/2015
M/s.Sudarshanam Spinning Mills Rs
No: 52 & 53 Tirumalagiri (V),
Jaggaiahpet (M), Krishna Dist
Rs.41,19,245/- (Rupees forty one lakhs nineteen
thousand two hundred and forty five only) towards
sanction of reimbursement of power cost in respect 2nd
quarter of 2015-16 under IIPP 2005-10
52 26/11/2015
M/s.Vennar Ceramics Ltd,
Perikigudem, Mandavalli (M), Krishna
Dist
Rs.28,99,800/- (Rupees twenty eight lakhs ninety nine
thousand and eight hundred only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information:1) Board resolution for
authorizing persons to sign the claim. 2) Project report
3) CA certificate for share holding.
53 26/11/2015
M/s Parag Milk Foods Private
Limited, Samudrapalli(V),
Pengaragunta(PO), Palamaner(M),
Chittoor District
Rs. 53,22,700/- ( Rupees fifty three lakhs twenty two
thousand and seven hundred only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information: 1) Civil Engineering
certificate, 2) Original Statement of Accounts, 3) Plant
and machinery statement as per guidelines, 4) As per the
claim application it is expansion, the GM, DIC should
confirm whether it is expansion project or new.
54 27/11/2015
M/s.Silica Ceramica Pvt Ltd.,
Narayanapuram (V), Unguturu (M), W
G Dist.
Rs.82,77,130/- (Rupees eighty two lakhs seventy seven
thousand one hundred and thirty only) towards
reimbursement of power cost for 1st and 2nd quarter of
2015-16 subject to submission of the following shortfall
information:1. Land sale deed or lease deed 2. Company
incorporation certificate, 3. Project report 4. Valid CFO
from APPCB, 5. CA certificate for share holding, 6.
Machinery statement as per guidelines 7.Factories Dept
approval with plans 8) Land conversion certificate
9.Board resolution for authorizing the person to sign the
claim 10.Bank sanction letter 11. Statement of Account
with attestation.
:: 107 ::
55 27/11/2015
M/s.Sri Srinivasa Spintex (India)
Limited (Expansion-I), Pedatadepalli
(V), Tadapalligudem (M), W.G Dist
Rs.41,38,086/- (Rupees Forty one lakhs thirty eight
thousand and eighty six only) towards reimbursement of
power cost for 1st half year of 2015-16 under IIPP
2010-15, subject to submission of the following shortfall
information:1. Land lease or sale deed, 2. Company
incorporation certificate, 3. Board resolution, 4. 5.Valid
CFO, 6.Statement of Accounts, 7.Machinery statement
as per guidelines, 8. Civil Engineer certificate, 9. Power
release certificate, 10.C.A. Certificate for expansion
project. 11.Grampanchyath approval 12. Land
conversion certificate 13.Bank term loan sanction letter
14. Project report 15. CA certificate for shareholding 16.
DT&CP approval 17. Factories Dept approved plans.
56 27/11/2015
M/s.Sri Srinivasa Spintex Private
Limited. (existing), Pedatadepalli (V),
Tadapalligudem (M), W.G Dist
Rs.58,48,780/- (Rupees fifty eight lakhs forty eight
thousand seven hundred and eighty only) towards
reimbursement of power cost for 1st quarter of 2015-16
under IIPP 2005-10, subject to submission of the
following shortfall information1. Grampanchyath
approval 2. Land conversion certificate 3.Bank term
loan sanction letter 4. Project report 5. CA certificate for
shareholding 6. DT&CP approval 7. Factories Dept
approved plans 8. Justification for increase in power
load.
57 27/11/2015
M/s.Sri Srinivasa Spintex Private
Limited (existing), Pedatadepalli (V),
Tadapalligudem (M), W.G Dist
Rs 60,34,790/- (Rupees sixty lakhs thirty four thousand
seven hundred and ninety only) towards reimbursement
of power cost for 2nd quarter of 2015-16 under IIPP
2005-10 subject to submission of the following shortfall
information1. Grampanchyath approval 2. Land
conversion certificate 3.Bank term loan sanction letter 4.
Project report 5. CA certificate for shareholding 6.
DT&CP approval 7. Factories Dept approved plans 8.
Justification for increase in power load.
58 27/11/2015
M/s.SVR Spinning Mills Private
Limited, Malleswaram (V), Peravalli
(M), W G Dist
Rs. 21,44,430/- (Rupees twenty one lakhs forty four
thousand four hundred and thirty only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information: 1. Board resolution 2.
Valid CFO from APPCB, 3.Civil Engineer certificate 4.
Project report 5.CA certificate for share holding 6.
:: 108 ::
Reason for increase in power load from 750KVA to
1501 KVA
59 27/11/2015
M/s.Sri Srinivasa Spintex (India)
Limited (Exp-2), Pedatadepalli (V),
Tadapalligudem (M), W.G Dist
Rs. 32,56,942/- (Rupees thirty eight lakhs fifty six
thousand nine hundred and forty two only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information: 1. IEM part-B, 2. Land
sale deed or lease deed 3. Gram Panchayath approval 4.
DT&CP approval/ UDA approval 5. Machinery
statement duly certified as per guidelines 6. Company
incorporation certificate 7. Board authorization 8. Land
conversion 9. Civil engineer certificate 10.CA
certificate.
60 02/12/2015
M/s Bhavanam Spinning Mills (P)
Ltd, (Exp), Bhimenenivaripalem,
Guntur Dist
Rs.32,88,840/-(Rupees Thirty two lakhs eighty eight
thousand eight hundred and forty only) towards
reimbursement of power for 2nd quarter of 2015-16
under IIPP 2005-10.
61 02/12/2015
M/s Sree Veerabramedra Swamy
Spinning Mills, Lingam gutta (V),
Chilakalurpeta (M), Guntur Dist
Rs.43,89,500/- (Rupees Forty three lakh eighty nine
thousand five hundred only) towards reimbursement of
power cost for2nd quarter of 2015-16 under IIPP 2005-
10.
62 02/12/2015
M/s Sakku Spinning Mills Ltd,
(existing)Chinakondrupadu (V),
Prathipadu (M), Guntur
Rs.36,50,100/- (Rupees thirty six lakhs fifty thousand
and one hundred only) towards reimbursement of power
cost for 2nd quarter of 2015-16 subject to submission
of the following shortfall information:1. Land
conversion certificate 2. Valid CFO from APPCB 3.
Approved project port 4.CA certificate 5. Board
resolution for person to sign in claim application. 6.
Gram Panchyath, T&CP and Factories Dept approval 7.
Bank sanctioned letter.
:: 109 ::
63 02/12/2015
M/s Sri Lakshmi Godavari Spinning
Mills (P) Ltd, (Existing) S.No: 113,
Chebrolu (V) & (M), Guntur Dist
Rs.59,26,440/- (Rupees fifty nine lakhs twenty six
thousand four hundred and forty only) towards
reimbursement of power cost for 2nd quarter of 2015-16
subject to submission of the following shortfall
information: 1. Confirmation on installation of
additional machinery due to increase in power load from
650 kva to 4950 kva
64 02/12/2015
M/s Bhavanam Spinning Mills (P) Ltd,
(Exp -2,) Bhimenenivaripalem, Guntur
Dist
Rs.88,95,970/- (Rupees eighty eight lakhs ninety five
thousand nine hundred and seventy only) towards
reimbursement of power cost for 2nd quarter of 2015-
16 under IIPP 2005-10
65 02/12/2015
M/s Sakku Spinning Mills Ltd,
(Exp)Chinakondrupadu (V),
Prathipadu (M), Guntur
Rs.76,84,160/- (Rupees seventy six lakhs eighty four
thousand one hundred and sixty only) towards
reimbursement of power cost for 1st half year of 2015-
16 subject to submission of the following shortfall
information:
66 02/12/2015
M/s Vasantha Spinners Ltd, (Exp-I)
NH-5, Thimmapuram (V), Edlapadu
(M), Guntur Dist
Rs.96,64,822/- (Rupees Ninety six lakhs sixty four
thousand eight hundred and twenty two only) towards
reimbursement of power cost for 1st & 2nd quarters of
2015-16 Subject to submission of the following
shortfall information: 1. land documents 2. Board
resolution authorizing person to sign to claim 3. Grama
panchayath, Factories Dept, T&CP dept approved plan
4. Approved project report 5. Land conversion
certificate 6. Bank sanctioned letter 7. CA certificate
indicating Investments
67 02/12/2015
M/s Sri Venkata Siva Parvathi
Spinning Mill (P) Ltd, (2nd Exp) GBC
Road, Chebrolu (V&M), Guntur Dist
Rs. 11,49,700/- (Rupees Eleven lakhs forty nine
thousand seven hundred only) towards reimbursement
of power cost for 2nd quarter of 2015-16 under IIPP
2005-10,
68 02/12/2015 M/s Sri Sai Balaji Spintex (P) Ltd,
Unnava(V), Edlapadu (M), Gutnur.
Rs.84,58,286/- (Rupees Eighty four lakhs fifty eight
thousand two hundred and eighty six only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information:1. T&CP, Factories Dept
approval 2. Valid CFO from APPCB.
:: 110 ::
69 02/12/2015
M/s.Usha Spincoat Pvt Ltd,
Chikkavaram , Gannavaram (M),
Krishna Dist
Rs.83,73,470/- (Rupees eighty three lakhs Seventy
three thousand four hundred and seventy only) towards
reimbursement of power cost for2nd quarter of 2015-
16 under IIPP 2010-15
70 02/12/2015
M/s Lanco Industries(2nd Expansion),
Rachagunneri(V), Srikalahasthi(M),
Chittoor District
Rs.2,55,92,425/- (Rupees two crores fifty five lakhs
ninety two thousand four hundred and twenty five only)
towards reimbursement of sales tax for the year 2013-
14, subject to clarification and conformation of the
Mega status and applicability of GO for 1st expansion
from the Government and also subject to submission of
short fall information 1. Land sale deed or lease deed 2.
Company incorporation certificate,3.Grama Panchayat
approval, 4.Town and country planning approval 5.
Land conversion certificate 6.Power release certificate
7. Valid CFO issued by APPCB 8. Board resolution
authorizing the person to sign the claim applications 9.
Project report. 10.CA certificate for shareholding
10.GM, DIC, has not mentioned the line of activity in
his recommendation.
71 04/12/2015
M/s Vasantha Spinners Ltd, (Exp-II)
NH-5, Thimmapuram (V), Edlapadu
(M), Guntur Dist
Rs.2,71,82,699/-(Rupees two crores Seventy one lakhs
eighty two thousand six hundred and ninety nine only)
towards power cost reimbursement for 1st and 2nd
quarter of 2015-16 under IIIPP 2005-2010 subject to
submission of the following shortfall information: 1.
Land documents 2. Valid CFO from APPCB, 3.
Company incorporation certificate 4. Board resolution
authorising to sing on claim application 5, GP, T&CP
Factories Dept approval 6. Land conversion certificate
7. Bank sanction letter 8. CA Certificate 9. Reason for
increase power load 10. GM to clarify the name of the
unit is M/s Vasantha Industries Ltd as per power bill
claim is preferred in the name of M/s Vasantha spinners
Ltd.
72 04/12/2015
M/s Viswateja Spinning Mills Ltd
(Exp-2) D No: 219, Boyapalem (V),
Edlapadu (M), Guntur
Rs. 1,46,19,330/- Rupees one crore forty six lakhs
nineteen thousand three hundred and thirty only)
towards reimbursement of power cost for1st & 2nd
quarter of 2015-16 under IIPP 2005-10.
73 04/12/2015
M/s Gajavalli Spinning Mils (P) Ltd,
Narakoduru (V), Chebrolu (V) & (M),
Guntur Dist
Rs.54,85,380/- (Rupees fifty four lakhs eighty five
thousand three hundred and eighty only) towards
reimbursement of power cost for2nd quarter of 2015-16
under IIPP 2010-15.
74 04/12/2015 M/s Kallam Spinning Mils (Open End
unit) Chowdavaram (V), Guntur Dist .
Rs.41,43,680/- (Rupees forty one lakh forty three
thousand six hundred and eighty only) towards
reimbursement of power cost for2nd half year of 2015-
:: 111 ::
16 under IIPP 2005-10, subject to submission of the
following shortfall information: 1.Board resolution 2.
T&CP dept GP Factories Dept plan approval 3. Land
conversion certificate 4. Valid CFO from APPCB 5.CA
certificate indicating share holding
75 04/12/2015 M/s Ranganayaka Spinning Mills (P)
Ltd, Boyapalem (V), Edlapaldu (M),
Rs.45,81,930/- (Rupees forty five lakh eighty one
thousand nine hundred and thirty only) towards
reimbursement of power cost for 2nd quarter of of
2015-16 under IIPP 2005-10, subject to submission of
the following shortfall information: 1D T&CP dept GP
Factories Dept plan approval 2. Land conversion
certificate 3. CE certificate 4. Approved project report
5.CA certificate for share holding
76 04/12/2015
M/s Ranganayaka Spinning Mills (P)
Ltd, (Exp) Boyapalem (V), Edlapaldu
(M),
Rs. 25,37,360/- (Rupees twenty five lakhs thirty seven
thousand three hundred and sixty only) towards
reimbursement of power cost for2nd quarter of 2015-16
under IIPP 2010-15 subject to submission of the
following shortfall information:. 1) Gram panchayath
plan approval 2. Land conversion certificate 3. Board
resolution 4. Valid CFO from APPCB 5.Bank
sanctioned letter 6. Approved project report 7. CA
certificate for share holding.
77 04/12/2015
M/s Idupulapadu Cotton Mills (Exp-5)
Ganapavaram (V), Nadendla(M),
Guntur
Rs.63,97,810/- (Rupees sixty three lakhs ninety seven
thousand eight hundred and ten only) towards
reimbursement of power cost for3rd quarter of 2015-16
under IIPP 2005-10
78 04/12/2015
M/s Sri Ravi Chandra Textiles,
Ponnekalu (V), Tadikonda (M),
Guntur
Rs.31,76,730/- (Rupees thirty one lakh seventy six
thousand seven hundred and thirty only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15.
79 04/12/2015
M/s Mittpalli Spinners Ltd,
Chinaturakapalem (V), Narasaropeta
(M), Guntur Dist
Rs.78,33,476/- (Rupees Seventy eight lakh thirty three
thousand four hundred and seventy six only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information: 1) Board resolution 2)
DT&CP approval 3) Factories Dept approval 3) valid
CFO frrom APPCB 4) Land conversion certificate 5)
List of Plant & Machinery
:: 112 ::
80 04/12/2015
M/s Pavan Cotton Products (P) Ltd
(Exx-1) Pulladigunta(V),
Vatticherukur (M), Guntur
Rs. 26,98,750/-(Rupees twenty six lakhs ninety eight
thousand seven hundred and fifty only) towards
reimbursement of power cost for2nd quarter of 2015-16
under IIPP 2005-10, subject to submission of the
following shortfall information: 1. Land documents 2.
Valid CFO from APPCB 3. Land conversion certificate
4. Approved project report 5. DT&CP approval plan 6.
CA certificate indicating % of share holding
81 04/12/2015
M/s Nandhivardana Textiels Milsl
LTd, NH-5, Thimmapuram (V0,
Edlapadu (M) Guntur Dist
Rs.24,33,774/- (Rupees twenty four lakhs thirty three
thousand seven hundred and seventy four only) towards
reimbursement of power cost for1st half years of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information: 1. Land documents 2.
Board resolution authorized to sign on claim application
3. T&CP, GP, Factories Dept approved plans 4. Valid
CFO from APPCB 5. Land conversion.6. Bank sanction
letter
82 04/12/2015 M/s Sree Lalitha Parameswari
Spinning Mills (P) Ltd, Guntur
Rs.1,65,96,163/- (Rupees One crore sixty five lakh
ninety six thousand one hundred and sixty three only)
towards reimbursement of power cost for1st and 2nd
half years of 2015-16 under IIPP 2010-15, subject to
submission of the following shortfall information: 1.
Land documents 2. Board resolution authorizing sing on
claim application 3. T&CP, GP, Factories Dept
approved plans 4. Valid CFO from APPCB 5. Land
conversion.
83 04/12/2015 M/s Krishna Ganga Spinning(P) Ltd,
Guntur Dist
Rs. 1,10,63,200/- (Rupees one crore ten lakhs sixty
three thousand two hundred only) towards
reimbursement of power cost for 4th quarter of 2010-11
to 2nd quarter of 2015-16 under IIPP 2010-15, subject to
submission of the following shortfall information: 1.
Land documents 2.. T&CP, GP, Factories Dept
approved plans 3. Valid CFO from APPCB 5. Land
conversion.6. Approved project report 7.Reason for
increase of power load 8. Plant and Machinery statement
attestation on documents.
84 04/12/2015
M/s Sriven Spincot Pvt Ltd , D No: 8-
87, Karuchela Road, Edlapadu
(V&M), Guntur
Rs.36,93,750/- (Rupees thirty six lakhs ninety three
thousand seven hundred and fifty only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information: T& CP plan 2. Land
conversion certificate 3. Valid CFO from APPCB.
85 04/12/2015
M/s Sri Lakshmi Godavari Spinniner,
(EXP-I) S.No: 113, Chebrolu (V) &
(M), Guntur Dist Zero
:: 113 ::
86 04/12/2015
M/s Sri Venkata Lakshmi Narasimha
spinning Mills ,(Exp) Sy No: 176/4,
GBC, Road, Chebrolu (V &M),
Guntur
Rs.27,83,900/-(Rupees Twenty seven lakhs eighty three
thousand nine hundred only) towards reimbursement of
power cost for 2nd half year of 2014-15 and 1st half
year of 2015-16 under IIPP 2010-15, subject to
submission of the following shortfall information: 1.
IEM Part -B 2.DT&CP , Factories, Gram panchayath
approved plan 3. Land conversion 4. CA certificate in
original 5. Reason for increase of power load.
87 04/12/2015
M/s Sri Venkata Uma Sankara Spintex
(P) Ltd, Sy No: 33, 35/1, Vemavaram,
Phirangipuram(M), Guntur Dist
Rs.50,66,890/-(Rupees fifty lakhs sixty six thousand
eight hundred and ninety only) towards reimbursement
of power cost for1st half year of 2015-16 under IIPP
2010-15 subject to submission of the following shortfall
information:1. DT&CP, Factories Dept approved plan 2.
Land conversion certificate 3. Valid CFO from APPCB
4. Statement of Account 5. Bank sanction letter.
88 04/12/2015
M/s Thatavarthi Apparels Ltd,
(Spinning Division), Kavuru (V),
Chilakaluriperta (M), Guntur Dist
sanction of reimbursement of power
cost in respect 1st half year of 2015 -
16 under Industrial Investment
Promotion Policy 2005-10.
Rs.60,40,819/- (Rupees sixty lakhs forty thousand eight
hundred and nineteen only) towards reimbursement of
power cost for1st half year of 2015-16 under IIPP
2010-15 subject to submission of the following shortfall
information: 1 GP, Factories , DT&CP plan approval
2.Valid CFO from APPCB 3. CE Certificate 4.
Approved project report 4. Machinery statement as per
guidelines
89 04/12/2015
M/s Veera Assosicates, (Exp-1), NH-
5, Ganapavaram (V), Nadendla (M),
Guntur Dist
Transferred (MSME)
90 04/12/2015 M/s Sai Manasa Spintex (India) Ltd ,
Martur (V&M) Guntur
Rs.4,20,333/- (Rupees four lakh twenty thousand three
hundred and thirty three only) towards reimbursement of
power cost for 1st half year of 2015-16 under IIPP
2010-15, subject to submission of the following shortfall
information1:1. DT&CP and Factories approved plan 2,
Valied CFO 3. Land conversion 4. M/c list as per
guideline
:: 114 ::
91 04/12/2015 M/s Gajavalli spinning (P) Ltd (Exp),
Chebrolu (V&M) Guntur
Rs. 99,43,150/-(Rupees ninety nine lakhs forty three
thousand one hundred and fifty only) towards
reimbursement of power cost for 2nd half year of
2014-15 and first half year of 2015-16 under IIPP 2010-
15, subject to submission of the following shortfall
information:1. Company Incorporation 2 T&CP plan
3.Factories Dept approved plan for expansion 4. Land
conversion certificate, 5. Valid CFO 6. Bank sanctioned
letter 7. CE certificate 8. Approved project report
92 04/12/2015
M/s Supriya Spinning Mills Pvt Ltd
(Exp), Boyapalem, Edlapadu (M),
Guntur Dist Deferred
93 04/12/2015 M/s Lakshmi Godavari Spinning Mills
Ltd (2nd Exp), Guntur
Rs. 84,31,522/- (Rupees Eighty four lakhs thirty one
thousand five hundred and twenty two only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information:1. Land documents 2.
Land conversion certificate 3.Valid CFO from APPCB
4. CA Certificate for share holdings
94 04/12/2015
M/s Kalpataru Spinnning Mills (Exp),
Sy NO: 210, 211/a, Thimmapuram
(V), Edlapadu (M) Guntur Dist
Rs. 42,84,913/-(Rupees forty two lakh eighty four
thousand nine hundred and thirteen only ) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information: 1. IEM Part-B,
2,DT&CP , Factories Dept approval 3, Valid CFO from
APPCB
95 04/12/2015
M/s Sri Venkata Siva Parvathi
Spinning Mills (P) Ltd (unit -II),
Cherbrolu (V&M), Guntur
Rs. 58,79,240/- ( Rupees fifty eight lakhs
seventy nine thousand two hundred and forty only)
towards reimbursement of power cost for 1st half year
of 2015-16 under IIPP 2010-15, subject to submission
of the following shortfall information: 1. DT& CP ,
Factories Dept plan 2 Valid CFO from APPCB 3, Land
conversion 4. Statement of Accounts in original.
96 04/12/2015
M/s Krishna Murty Spinning Mills (P)
Ltd, NH-5, Thimmapuram (V),
Edlapadu (M) Guntur Dist
Rs.39,19,130/- (Rupees thirty nine lakhs nineteen
thousand one hundred and thirty only) towards
reimbursement of power cost for 2nd quarter of 2015-16
under IIPP 2010-15 subject to submission of the
following shortfall information:1.GP, Factories, 2.
DT&CP Dept approval 3. Valid CFO from APPCB 4.
Land conversion certificate 5. Bank sanctioned letter
6.Approved project report
97 07/12/2015 M/s NSL Textiles Ltd, (Mega Project)
Edlapadu (V), & (M), Guntur Dist
Rs. 4,88,71,500/-(Rupees four crores eighty eight lakhs
seventy one thousand fifty only) under IIPP 2005-10,
subject to submission of the following shortfall
documents: 1) IEM Part-B 2) Approved plans from
Factories Department 3) Land conversion certificate 4)
Project Report 5) Valid CFO from APPCB 6)
:: 115 ::
Approved Plans from DT& CP 7) Base Power
Consumption units of preceding three years from
Chartered Accountant 8) Statement of Accounts and
Certification of Plant & Machinery as per Guidelines.
98 07/12/2015
M/s NSL Textiles LTd (Garments
Division) Sy nO: 253, Budampadu
(V), Guntur Dist
Rs.5,99,640/- (Rupees five lakhs ninety nine thousand
six hundred and forty only) towards reimbursement of
power cost for 2nd quarter of 2015-16 under IIPP
2005-10, subject to submission of the following shortfall
information: 1.Company incorporation certificate 2,
Board resolution 3. GP Factories Dept approved plan
4.Land conversion certificate 5. Valid CFO from
APPCB 6 Statement of Accounts 6. Machinery list not
as per guideline 7. CE certificate.
99 07/12/2015
M/s NSL Textiles Ltd, Sy No: 371 to
382, Kunchalavaripalem (V)
Cherukupalli (M), Guntur Dist
Rs.2,00,04,500/- (Rupees two crores four thousand five
hundred only) towards reimbursement of power cost
for2nd quarter of 2015-16 under IIPP 2005-10 subject
to submission of the following shortfall information: 1)
Approved plans from Factories Department 2) Land
conversion certificate 3) Project Report 4) Valid CFO
from APPCB 5) Approved Plans from DT& CP , 6)
Approved Plans from Grampanchayat 7) Land Sale
Deed / Lease Deed.
100 07/12/2015
M/s.Ravali Spinners Pvt Ltd.,
(Expansion), Khandavalli (V),
Peravali (M), W G Dist
Rs.67,17,811/- (Rupees Sixty seven lakhs seventeen
thousand eight hundred and eleven only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information: 1.DT&CP approval 2.
Land conversion certificate 3. Valid CFO from APPCB
4. List of Plant & Machinery as per guidelines
101 07/12/2015 M/s.Avanthi Feeds, Kovvuru, W G
Dist
Rs.41,82,026/- (Rupees forty one lakhs eighty two
thousand and twenty six only) towards reimbursement
of power cost for1st half year of 2015-16 under IIPP
2010-15 subject to submission of valid CFO from
APPCB
102 07/12/2015
M/s.Paramesu Biotech Private
Limited, Devarapalli (V & M), W G
Dist
Rs. 25,47,370/- (Rupees twenty five lakhs forty seven
thousand three hundred and seventy only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information:1 Project report 2 IEM
part-B 3. Gramapanchayath, Factories Dept and T&CP
approved plans 4.Power release certificate
103 14/12/2015
M/s Sudha Agro Oil & Chemical
Industries Ltd.(Spinning Division),
Valuthimmapuram(V), Peddapuram
(M), East Godavari District
Rs. 30,32,660/- (Rupees thirty lakhs thirty two
thousand six hundred and sixty only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information: 1) Land documents 2.
Board resolution 3.Machinery statement as per guideline
4. T&CP approved plan 5. Valid CFO from APPCB
6.CE certificate 7.Power release certificate.
:: 116 ::
104 15/12/2015 M/s.Balabalajee Textiles Limited
(Exp-I), Tanuku (V&M), W G Dist
Rs.96,57,257/- (Rupees ninety six lakhs fifty seven
thousand two hundred and fifty seven only) towards
reimbursement of power cost for 1st half year of 2015-
16 under IIPP 2010-15, subject to submission of the
following shortfall information:1. Land sale/lease deed
2. Board resolution 3.Company incorporation 4.
DT&CP & Factories Department approved plan 5. Valid
CFO from APPCB 6.Bank TL sanctioned letter
7.Project report.
105 16/12/2015 M/s Jagadguru Textiels (P) Ltd (Exp) ,
Prakasam
Rs.19,22,061/- (Rupees nineteen lakhs twenty two
thousand and sixty one only) towards reimbursement of
power cost for1st half year of 2015-16 under IIPP
2005-10 subject to submission of the following shortfall
information: 1. Board resolution 2. Land conversion
certificate 3. Valid CFO from APPCB 4. Approved
project report 5.CA certificate
106 18/12/2015 M/s NSL Textiles Ltd, D No: 6/275-1,
Inkollu , Prakasam Dist Rs. 3,60,36,270/- (Rupees three crore sixty lakhs thirty
six thousand two hundred and twenty only) towards
reimbursement of power cost for 2nd half year of
2015-16 under IIPP 2010-15 subject to submission of
the following shortfall information:1. IEM Part-B,2.
Factories Dept approved plans 3.Land conversion 4.
Approved project report 5. Valid CFO from APPCB 6.
Factories, T&CP approved plan 7. List of Plant and
machinery and statement of account.
107 18/12/2015
M/s.Shri Govindaraja Textiles Pvt Ltd,
(Existing) Peddaragapuram (V),
Pulivendula (M), YSR Kadapa Dist
Rs.1,03,68,386/- (Rupees one crores three lakhs sixty
eight thousand three hundred and eighty six only)
towards present claim of 2nd quarter of 2015-16 under
IIPP2005-10, subject to the following short fall
information: 1. Gram panchayat approval, 2. Land
conversion.
108 18/12/2015
M/s.Shri Govindaraja Textiles
(Expansion)Peddaragapuram (V),
Pulivendula (M), YSR Kadapa Dist
Rs.2,75,92,413- (Rupees Two crores seventy five lakhs
ninety two thousand four hundred and thirteen only)
towards reimbursement of power cost for1st half year
of 2015-16 under IIPP 2010-15 subject to submission
of the following shortfall information: 1. Gram
panchayat approval , 2. Land conversion.3. Valid CFO
from APPCB, 4. Approved Project report 5. Form B not
properly filed
:: 117 ::
109 28/12/2015 M/s Bhavya Cements Ltd, Tangeda
(V), Dachepalli (M), Guntur Dist
Rs.2,42,05,540/- (Rupees two crore forty two lakhs
five thousand five hundred and forty only) towards
reimbursement of power cost for3rd quarter of 2015-16
under IIPP 2010-15
110 29/12/2015
M/s Worington Nitin Cylinders Ltd,
VSEZ, Duvvada(V&M),
Visakhapatnam
Rs.14,09,370/- ( Rupees fourteen lakhs nine thousand
three hundred and seventy only) towards sanction of
reimbursement of Sales tax in respect of 2012-13
under IIPP 2010-15 subject to submission of the
following shortfall information: 1. BIS certificate
2.Valid CFO from APPCB 3. IEM part-B 4) Land
conversion certificate 5. Project report 6 Factories Dept
palns
111 31/12/2015
M/s RBA Textiles Private Limited
Firm. Ltd., Krishnagiri Road, Foood
Processing Industrial Park,
Kuppam(M), Chittoor
Zero
112 31/12/2015
M/s RBA Textiles Private Limited
Firm. Ltd., Krishnagiri Road, Foood
Processing Industrial Park,
Kuppam(M), Chittoor
Rs. 1,87,85,917/- (Rupees one crore eighty seven lakhs
eighty five thousand nine hundred and seventeen only)
for 1st half year of 2015-16, Subject to conditions 1.
Land sale deed 2) Company incorporation 3) Board
resolution authorizing. 4) Grampanchayath, T&CP dept
approval 5) Land conversion approval 6) valid CFO
issued APPCB 8) Project report 9) CA certificate 10)
Reasons for increasing the power.
113 04/01/2016 M/s.The Gowthami Solvent Oils Ltd.,
Mortha, Undrajavaram (M), W G Dist
Rs. 42,03,780/-(Rupees forty two lakhs three thousand
seven hundred and eighty only) towards reimbursement
of power cost for1st half year of 2015-16 under IIPP
2010-15 subject to submission of the following shortfall
information: 1) IEM Part-B2 ) Land documents 3)
Certificate of Incorporation 4) Board resolution 5) GP,
Factories and DT&CP approval 6) Land conversion 7)
CFO from APPCB 8) Bank sanctioned letter 9)
Statement of Accounts as per guidelines 9) M/c
statement as per guidelines 10) CE certificate 11)
Project report 12) Power release certificate
114 04/01/2016
M/s.Gowthami Spintex (India)
Limited, Duvva(V), Tanuku (M), W G
Dist
Rs.38,74,100/- (Rupees thirty eight lakhs seventy four
thousand one hundred only) towards reimbursement of
power cost for1st half year of 2015-16 under IIPP
2010-15 subject to submission of the following shortfall
information: 1) IEM Part-B 2) Land documents 3)
Memorandum of Articles 4) GP, Factories T&CP dept
approved plan s 5) Valid CFO from APPCB 6)
Statement of Accounts 7) List of M/c as per guidelines
8) CE certificate 9) Project report
:: 118 ::
115 04/01/2016
M/s.The Gowthami Solvent Oils
Limited, Tetali (V), Tanuku (M), W G
Dist
Rs.1,91,42,536/- (Rupees one crore ninety one lakhs
forty two thousand and five hounded and thirty six
only) towards reimbursement of power cost for1st and
2nd quarter of 2015-16 under IIPP 2005-10 subject to
submission of the following shortfall information 1)
IEM part -B, 2) Land documents 3) Certificate of
Incorporation 4) Board resolution 5) Grampanchayat,
Factories dept and T&CP planning approved plans 6)
Land conversion certificate 7) CFO from APPCB, 10)
Bank term loan sanctioned letter 11) Statement of
Accounts issued by the Financing bank 12) Plant &
Machinery as per guide lines 13) CE certificate 14)
Project report 15) Power release certificate.
116 04/01/2016
M/s.Praveen Spinners (India) Pvt Ltd.,
Ravicherla (V), Nuzivid (M), Krishna
Dist
Rs. 50,28,740/- (Rupees fifty lakhs twenty eight
thousand seven hundred and forty only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information: 1) Company
incorporation 2) Land conversion 3) Valid CFO from
APPCB
117 05/01/2016
M/s.Amoda Spintex Ltd.,
Ravikampadu (V), Jaggaipeta
(M)Krishna Dist
Rs. 45,68,550/- ( Rupees forty five lakhs sixty eight
thousand five hundred and fifty only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information: valid CFO issued by
APPCB, 2) Bank term loan sanctioned letter 3) Project
report 4) CA certificate for share holding
118 05/01/2016
M/s.Mohan Spintex India Limited
(Unit-II), Remalle (V), Bapulapadu
(M), Krishan Dist
Rs.3,14,20,658/- ( Rupees three crores fourteen lakhs
ninety three thousand four hundred and eighteen only)
subject to submission of the following shortfall
information: 1) Land sale deed 2) Reason for increase
Power 4000 to 5000KVA 3) T& CP planning Dept 4)
Board resolution 5) Land conversion 6)
Grampanchayath approved plans 7) CFO from APPCB
119 05/01/2016
M/s.Mohan Spintex India Ltd.,
(Expansion), Vattgudipadu(V),
Agripalli (M) Krishna Dist
Rs.87,39,910/- (Rupees eighty seven lakhs thirty nine
thousand nine hundred and ten only) towards
reimbursement of power cost for 2nd quarter of 2015-
16 under IIPP 2005-10 subject to submission of the
following shortfall information:1) Mee seva receipt 2)
Land sale deed 2) Bank sanctioned letter4) Project
report 5) T&CP dept approval 6) Statement of Accounts
7) Plant & M/c statement as per guidelines 8) Status of
original unit and no correlation between IEM of original
and expansion project 9) IEM Part -B indicated only
DCP of expansion project and does not indicates the
capacity of original unit to decided the eligibility and
IEM is not clear 10) claim application is not completely
filled in leaving blank the capacity of original unit.
However earlier claims are sanctioned 11) Variation in
:: 119 ::
line of activity to be clarified by GM DIC 12) T&CP ,
Grampanchayath approval 13) Land conversion
approval 14) CFO from APPCB
120 05/01/2016
M/s.Zuari Cement Limited
(Expansion) Krishna Nager,
Yerraguntla (M), YSR Kadapa Dist
Rs. 34,96,183/- (Rupees Thirty Four lakhs Ninety Six
thousand one hundred and eighty three only) towards
reimbursement of power cost for1st, 2nd & 3rd quarters
of 2014-15 under IIPP 2005 -10 subject to submission
of the following shortfall information:1) land sale deed
or lease deed 2) company incorporation 3)
Grampanchayath and T&CP and Factories approval 4)
Boiler certificate 5) Land conversion certificate 6) Bank
sanctioned letter 9) Project report 10) CA certificate for
share holding 11) Statement of Accounts and Plant &
Machinery as per operational guidelines.
121 07/01/2016
M/s.Swarnalatha Spintex Pvt Ltd.,
Serinarasannapalem (V), Bapulapadu
(M), Krishna Dist
Rs.77,08,390/- ( Rupees seventy seven lakhs eight
thousand three hundred and ninety only) towards
reimbursement of power cost for1st half year of 2015-
16 under IIPP 2010-15 subject to submission of the
following shortfall information:1) Land conversion
certificate 2) CFO from APPCB
122 08/01/2016
M/s South India Krishna Oil and Fats
Pvt. Ltd., Sy.No. 275, 279, 280 & 281,
Epuru Bit-IB, Pantapalem Muthukur
(V&M), SPSR Nellore District
Rs.45,74,890/- (Rupees forty five lakhs seventy four
thousand eight hundred and ninety only) towards
reimbursement of power cost for1st and 2nd quarter of
2015-16 under IIPP 2005-10 subject to submission of
the following shortfall information:1) T&CP approval
plan 2) Boiler certificate 3) Land conversion certificate
4) GM, DIC has certificated the activity in claim refined
oil and not in his covering letter 5) Person signing the
claim has not indicated name of the person to verify the
board resolution Authorization 6) Factories Dept
approval 7) Boiler certificate 8) land conversion
certificate 9) Statement of Accounts not certified by GM
DIC 10) Machinery statement as per guideline 11)
reason for increase the power load 12) Original DCP
27/09/2011 Additional power has given 07/12/2013as
per Form-B13) Power bill for Jan 2015 is not finishing