mission fems implementation by h.o. core team on war footing basis

34
MISSION FEMS IMPLEMENTATION BY H.O. CORE TEAM ON WAR FOOTING BASIS

Upload: shana-marshall

Post on 17-Dec-2015

218 views

Category:

Documents


3 download

TRANSCRIPT

MISSIONFEMS

IMPLEMENTATION BY H.O. CORE TEAM ON WAR FOOTING

BASIS

H.O. CORE TEAM

• 1. MR. AJAY CHAFALE – AE-MIS-HO

• 2. MR. SATISH NAWATHEY – AE-

DOMBIVLI DIVISION .

• 3. MR. T.G. DESHPANDE – JE –

KALYAN – R – DIVISION

• 4. MR. ABHAY RAUT – JE –

WASHI CIRCLE

H.O. CORE TEAM

• 5. MR. AJAY KHODKE – SA – HO – IT

• 6. MRS. KIRTI MODAK – AP – MIS –

CELL , HO , MUMBAI.

• 7. MR. BAGUL – AP – HO – IT

• 8. MR. TUSHAR BIND – AP – HO - IT

LOCATIONTHROUGH OUT THE STATE AT VARIOUS ZONE / CIRCLE LEVELS

TARGET

• TO COMPLETE ALL THE ACTIVITIES OF FEMS AND GENERATE THE FEEDER WISE ENERGY AUDIT REPORTS FOR A SUB DIVISION

• ANALYSIE THE REPORTS AND THEN TAKE PROPER ACTIONS FOR REDUCING THE LOSSES BY USING FEMS AS A TOOL.

TARGET

• TO FORM A ZONAL / CIRCLE WISE TEAM TO RESOLVE THE PROBLEMS RELATED WITH FEMS AT THE SAME LEVEL ONLY.

• H.O. CORE TEAM WILL BE ALWAYS SUPPRTING TO ZONAL / CIRCLE TEAM FOR 24 Hrs. AND 365 DAYS

THREE DAYS WORKSHOP AT ZONAL / CIRCLE LEVEL

INCLUDES

• INSTALLATION OF SOFTWARE• COMPLETE FEEDING OF MASTER

DATA – ( 11 Activities )• VARIOUS TRANSACTIONS LIKE • DT FAILURE &COMMISSIONING• FEEDER INTERRUPTIONS

ACTIONS RELATED WITH ENERGY AUDIT

• SUB STATION , SUB DIVISION WISE AND FEEDER WISE CONSUMPTION AS AN IN PUT.

• ACCEPTING THE ( BILLED UNITS ) HT & LT BILL DATA COMING FROM “IT”

• GENERATING THE ENERGY AUDIT REPORTS – FEEDER WISE AND SUB DIVISON WISE ALSO.

OUT PUT OF HO CORE TEAM

• GENERATING THE FEEDER WISE LOSSES AT SUB DIVISION LEVEL THROUGH FEMS HAS STARTED.

• UPDATE INFORMATION IS AS FOLLOWS

• TOTAL NO OF FEEDERS FOR E.A.=

% LOSS > 50%

% LOSS between 25% & 50%

% LOSS between 5% & 25

% LOSS < 5%

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION1) East – I 2) West

3) MIDC 4) East – II

5) Netivali 6) Kolshewadi

7) Kalyan – III 8) Kalyan – IV

1)Ulh - 1 2) Ulh - II

3) Ulh - III 4) Ulh - IV

5) Ulh - V 6) Ambernath

7) Badlapur 8) Shahapur

ZONAL / CIRCLE TEAM

i) Mr. Oze – JE

Approx. Participants – 25 Nos

i) Kalyan – I

ii) Kalyan – II

8 Nos

8 Nos

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATIONS PARTICIPANTS

ZONAL / CIRCLE TEAMi)Mr. Nakate – Dy.EE

ii)Mr. Wadodkar – Dy.EE

iii)Mrs. Ambadkar – J.E.

iv)Mrs. Asha Pawar - Sub. Eng

v)Mr. Jayant Limaye – Sub.Eng.

RASTA PETH

4 NOS i) Shivaji Nagar

ii) Aundh

iii) Ganesh Khind

iv) Nagar Road

Approx. 40 to 50 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATIONS PARTICIPANTS

ZONAL / CIRCLE TEAM

Mr. Chikate – S.A. – I.T. – Vasai .

VASAI 4 NOS i) Vasai - West

ii) Virar - East

iii) Virar - West

iv) Dahanu

Approx. 15 to 20 Participants

CIRCLE WISE INFORMATION

CIRCLE S /DN LOCATIONS PARTICIPANTS

ZONAL / CIRCLE TEAM

Being at Initial

Stage

i) Mr. Inamdar – JE

ii) Mr. Wadze - JE

i) NANDED

ii) BID

iii) LATUR

1 No NANDED URBAN S/DN

Approx. 30 to 40 Participants

CIRCLE WISE INFORMATION

CIRLE S/DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Kale – JE

ii) Mr. Vishwas sabnis – J.E.

i) Parbhani

ii) Jalna

3 Nos i) Hingoli

ii) Parbhani

iii) Jaln-R

Approx. 10 to 15 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Kale – JE

ii) Mr. Vishwas Sabnis – J.E.

Aurangabad 8 Nos i) Chavani

ii) Cidco

iii) Shahaganj

iv) Kranti Chawk

v) Power House

vi) Sillod

vii) Kannad

viii) Vaijapur

Approx. 20 to 25 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Kumthekar – AE

ii) Mr. Bhagwat - JE

i) Kolhapur 2 Nos i) Kolhapur North Zone

ii) Kolhapur East Zone

Approx. 30 to 40 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Rajkumar Patil – JE

i) Sholapur 1 No Sholapur – A Zone

Approx. 5 to 7 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Jagdale – JE

i) Sangli 2 Nos i) Sangli Central Zone

ii) Sangli North Zone

Approx. 10 to 15 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Karad 2 Nos i) Kard – U

ii) Karad - II

Approx. 5 to 8 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Abhay Raut – JE

i) Washi 2 Nos i) Panvel – U Bhingari

ii) Washi Railway

Approx. 15 to 20 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Ms. Manisha Surwade – JE

i) Thane 3 Nos i) Neelam Nagar

ii) Kopri

iii) Lokmanya

Approx. 5 to 7 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

Mr. Amrutkar from “IT” Nasik

i) Nasik 1 No Satpur MIDC

Approx. 5 to 7 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

REMARK

Complete – one day training session for Morshi Dn. At Morshi

i) Amaravati 1 No Amaravati – U Approx. 25 To 40 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Lonare – JE

i) Nagpur Rural

ii) Nagpur Urban

2 Nos i) Nagpur Rural S/Dn

ii) Shankar Nagar

Approx. 25 to 30 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS

ZONAL / CIRCLE TEAM

i) Mr. Amit Shivalkar – JE

ii) Mr. Shendre – JE

i) Chandrapur under Nagpur Rural Zone including Bhandara & Gondia Circle

1 No Ballarshah Approx. 25 to 30 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN LOCATION PARTICIPANTS ZONAL / CIRCLE TEAM

Mr. Harshad Apate – AP

Mr. Misal JE

Mr. Sinkar

JE

Ratnagiri Circle

2 Nos i) R – I

ii) CHIPLUN - Rural

Approx. 10 to 12 Participants

CIRCLE WISE INFORMATION

CIRCLE S / DN

LOCATION PARTICIPANTS ZONAL / CIRCLE TEAM

Sindhudurg 2 Nos i)KUDAL - U

ii)RAJAPUR

Approx. 5 to 7 Participants

STATISTICAL CIRCLE WISE TOTAL INFORMATION

TOTAL NO OF CIRCLES

TOTAL NO OF S / DNS

APPROX. TOTAL PARTICIPANTS

REMARKIN ADDITION TO THIS SAY AROUND

200 ENGINEERS

HAVE TAKEN TRAINING AT NASIK TRD TILL UP DATE .

25 NOS 57 NOS APPROX. 250 TO 300

OBSERVATIONS • EXISTING METERS AT ALL 33/22/11 KV

S/S NEEDS TO BE REPLACED BY STATIC OR ELECTRONIC WITH HIGH CLASS & ACCURACY ON TOP PRIORITY.

• ONLY INTRESTED ENGINEERS ARE FAMILIER WITH CMS AND FEMS ACTIVITIES AND HENCE ACTIVITIES OF S/DN ARE CONTINUED.

OBSERVATIONS

• MANY S/DNS ARE DEPENDENT ON OPERATOES ( OUT SOURCED )

• ACTIVITIES GETS STOPPED ,THE MOMENT ENGINEER GETS TEANSFERED OR OPERATOR LEAVE THE JOB.

• ALL SUB DIVISION WISE LOSSES VARIES FROM 8% TO 40 %

SOFT REQUIREMENT• 1. AS AND WHEN THERE IS A DESIRED OUT

PUT,CONCERNS SHOULD NOT BE TRANSFERRED IRRESPECTIVE OF NO OF YEARS.

• 2. PREFERABLY ONE INDEPENDENT ENGINEER SHOULD OPERATE ALL THESE ACTIVITIES AT SUB DIVISION LEVEL RELATED WITH CMS AND FEMS AND ALSO RECENTLY INTODUCED SPOT BILLING SYSTEM.

SOFT REQUIREMENT

• 3. IF THE REQUIREMENT NO -2 IS FULL

FILLED THEN THE ACTIVITIES WILL

CONTINUE FOR A LONGER PERIOD

• 4. AMC OF PROFIT CENTERS SHOULD

BE EITHER AT CIRCLE LEVEL OR

AT THE MOST AT ZONAL LEVEL.

SOFT REQUIREMENT• AN APPROPRIATE ACTION SHOULD BE TAKEN FROM MANAGEMENT SIDE TO BOOST THE MORAL OF THE ZONAL / CIRCLE TEAM

• MSEDCL SHOULD PROVIDE FACILITY TO AVAIL INTREST FREE LOAN TO PURCHASE DESKTOP PC OR LAPTOP TO WORK EVEN AT RESIDANCE.

SOFT REQUIREMENT

• A SEPARATE INDEPENDENT TEAM FROM IT SHOULD BE THERE FOR DEVELOPMENT OF FEMS & CMS

• CMS & FEMS TRAINING SHOULD BE IMPARTED TO INDUCTION BATCH ON TOP PRIORITY.