mission of the world bank... · 1 india icds reform/icds iv project preparation mission september...
TRANSCRIPT
1
India ICDS Reform/ICDS IV Project
Preparation Mission
September 28-October 12, 2007
Aide Memoiré
1. A World Bank mission led by Meera Shekar visited India between September 28 to
October 12, 2007, to work with the Government of India (GOI) to prepare the Bank’s proposed
support for the ICDS Reform Project. Members from DfID, UNICEF, USAID, CARE and
Micronutrient Initiative (MI) joined the mission1, and other partners were consulted as required
during the mission. A list of the partners consulted is attached in Annex 1.
2. The mission met with Ms. Deepa Jain Singh, Secretary, Ministry of Women and Child
Development (MWCD), Ms. P. Bolina, Joint Secretary, MWCD, Mr. K. Rajeswara Rao, Project
Director, MWCD and Mr. Prashant, Director, DEA, Ministry of Finance. From the Central
Project Management Unit (CPMU) of the MWCD, the mission met with: Dr. S.K. Adhikari, Asst.
Director, and Mr. Naveen Yadav, Under Secretary. The mission also actively participated in the
Workshop on “Preparation of the IDA assisted ICDS Reform/ICDS-IV Project”, organized by
MWCD and sponsored by UNICEF on October 9-10, 2007. A list of state-level partners from the
8 states as well as development partners working in ICDS consulted by the mission is included in
Annex 2.
3. The objectives of the mission were to continue policy dialogue with the GOI on the
proposed ICDS Reform Project and to review (with GOI and partners) the current state of
preparation of the project vis-à-vis:
The revised time-line for project processing
Orientation/Planning Workshop with eight short listed States and start of preparation of
central and State Project Implementation Plans (PIPs) based on final PIP guidelines.
Finalise the recruitment of the management contractor for the TSU
Evaluation of EOIs and issue of RFP for impact evaluation
Initiation of environmental and social assessments
Finalise all other draft background studies (institutional assessment, procurement
assessment, best-practices study, district mapping, ECE studies, and a time-work study)
4. Progress since Last Mission and Updated Time-line: The mission is highly
appreciative of the concerted efforts of the MWCD team in moving ahead with project
preparations. The progress and speed of preparations over the last 5-7 weeks has been exceptional
and the mission commends MWCD on this achievement. The following paragraphs list the
progress/agreements and next steps. MWCD outlined an updated time-line for project
preparation. As per this timeline, the project is expected to be appraised by the Bank in April
2008 and will be presented for Bank board approval in Aug 2008. MWCD will initiate further
steps as required for EFC/CCEA clearance before negotiations. A copy of the updated time-line is
attached in Annex 3.
1 The mission members included: Meera Shekar (Team Leader), Peter Berman, Venita Kaul and Meera
Priyadarshi (co-TTLs), Snehashish R Chowdhury, Hugo-Diaz Etchevehere, Caryn Bredenkamp, Shankar
Narayanan, Shanker Lal, Tanuj Mathur, Ruma Tavorath, and Mohini Kak (all from the World Bank), and
Silke Seco (from DfID).
2
5. Technical Support Units for the Central and State levels: The MWCD, World Bank,
and DFID teams jointly evaluated the eight technical proposals submitted for the “Consultancy
Services for the Establishment of Technical Support Units for the ICDS Reform Project”. Three
management firms were short listed and finalization of the selection is ongoing. The contract for
the commencement of the work is expected to be awarded shortly by the Bank as soon as
necessary clearances are obtained from MWCD and DfiD. The TSU (funded from the DfID Trust
Fund) will provide support at Central level, and the 8 short-listed states (Bihar, Rajasthan, Uttar
Pradesh, Madhya Pradesh, Chhattisgarh, Jharkhand, Maharashtra and Andhra Pradesh). DfID has
also proposed that an additional Social Development specialist be added to the TSUs at central
and state levels to take forward the equity and social inclusion issues highlighted in the social
assessment. The Bank welcomes this suggestion (with additional funding from DfID); this was
discussed and agreed upon with MWCD. In due course, this will be followed-up with the selected
management firm.
6. National Workshop with short-listed states: The MWCD successfully organized a
national workshop with the 8 short-listed states. The workshop was sponsored by UNICEF. The
objectives of the workshop were:
(i) To discuss the project concept note of ICDS-IV Project and key principles of the revised
implementation framework of ICDS, which would be aligned with the proposed project;
(ii) To inform the states about GoI’s road map during the 11th Five Year Plan: Revised
implementation framework for ICDS;
(iii) To elicit the views of the participating States on the proposed project
(iv) To discuss the guidelines for the State Project Implementation Plans (PIPs) and to
finalize draft structure/components/interventions under the project; and
(v) To devise and agree on an action plan and timeline for the preparation of the project.
The outcome of the workshop was a common understanding between MWCD, the WCD
departments from the eight short-listed states, and the World Bank regarding the MWCD’s
revised implementation framework for ICDS (under which overall umbrella the IDA support will
be positioned), the 11th plan recommendations, the potential size and nature of IDA support for
ICDS, the five key reform principles on which the IDA support is premised, PIP preparation
guidelines, and the next-steps in preparing the PIPs. A strong emphasis was placed by GOI in
their guidance to the states on five key issues: a) the quality of implementation, b) moving
from “outlays to outcomes” c) flexibility in project design d) evidence-based programming
and e) targeting intensive support in the 158 identified high-burden districts across the 8
states. The districts have been selected on the basis of a careful district-mapping exercise, and
this list is now final. A copy of the workshop agenda is attached in Annex 4.
7. PIP Guidelines and State Workshops: Draft Guidelines for the central and state
PIPs were shared with MWCD and states. These will be finalised soonest based on suggestions
from states and will be distributed by MWCD to the states. MWCD also needs to communicate
to the states, soonest possible, the resource envelope for the preparation of the PIPs. The
Mission suggests to MWCD that they post 2-3 additional key personnel (including
Procurement/Financial Management) at the Central Project Management Unit (CPMU)
soonest possible to guide the preparation of the State PIPs and to prepare the central PIP. Two
options for development of State PIPs were discussed. The States may wish to prepare the PIPs
with/without consultant support. If retroactive financing is sought for these costs, procedures for
recruiting consultants should conform to World Bank procurement guidelines. States may also
3
wish to explore with other development partners, viz., USAID, CARE, UNICEF and MI all of
who have offered follow-on technical support for the preparation of the PIPs, including
organization of State/District workshops. MWCD and State officials will be in direct contact with
these organizations to follow-up. Of these 8 states, the states that prepare high quality PIPs in a
timely fashion will qualify for IDA support under the proposed project. It was reiterated that IDA
support for the states (for both nutrition and ECE) will be over and above the base-funding for
ICDS general and will focus primarily on quality strengthening, for piloting innovations and
scaling-up innovations.
It was agreed that State level workshops will be organized in each of the selected 8 states before
the initiation of the preparation of the draft State PIPs. The World Bank ICDS team will be
available to participate in these workshops to provide necessary support and guidance as feasible.
8. Nutrition Component: A menu of options for nutrition interventions was shared with
the states for their review. It was agreed that the menu is indicative and that other interventions
will be added to the list, as suggested by States as long as they are supported by evidence. It was
also reiterated that nutrition interventions will focus primarily on the “window of opportunity”
between pre-pregnancy and 2 years of life, and on micronutrient interventions. States have been
advised to work on the interventions through a consultative process.
9. Piloting innovations – including Conditional Cash Transfers: States may consider
piloting several innovations, including a Conditional Cash Transfer (CCT) scheme in a few
selected districts/blocks using the State-Level Innovation Fund, to be proposed under the project.
Further guidelines based on implementation experience will be discussed with MWCD/States by
a CCT specialist in a subsequent visit to India. The value of lessons learned from the pilot
exercise can be potentially far reaching and hence the pilot will benefit from a rigorous
evaluation.
10. Early Childhood Education (ECE) Component: It was agreed that this component of
the project will be referred to as Early Childhood Education (ECE). A menu of proposed
interventions for ECE (at central and state/district levels the project districts) was shared with
states for their review. It was agreed that the assessment and evaluation of ECE would be better
suited at the state level. While the need for a specially trained facilitator for ECE was to be
emphasized, states will explore and propose different options to ensure this provision.
11. Technical Studies: Findings of the following background studies were shared during the
workshop, for discussion and comments:
a. District Mapping Study – Selection of high-burden districts based on nutrition indices
b. Best Practices in ICDS
c. Procurement Capacity Assessment
d. Time/work study of AWWs
12. Procurement: The findings of the procurement capacity assessment conducted by the
consultant hired by the Bank were discussed with MWCD and States during the mission. The
major issues that require immediate attention are as follows:
Skilled procurement staff must be in place at CPMU and SPMU levels
A procurement manual will need to be developed by MWCD to guide the decentralized
procurement to maintain uniformity in approach
The financial delegations need to be reviewed and modified so that procurement
decisions are taken in a timely manner to reduce the overall time taken for procurement
4
Internal/external procurement audits need to be strengthened
Storage facilities for supplies need to be strengthened wherever needed and sufficient
budgets need to be provided for transportation
Procurement record keeping and MIS need to be improved
A complaint handling mechanism needs to be developed at all the levels.
A procurement plan needs to be developed and monitored at all the levels.
The proposed arrangements on these issues will need to be included in the procurement chapter of
the central and state PIPs.
The Bank also shared with MWCD its concerns regarding the quality standards (Revised
Schedule M) for procurement of pharmaceuticals and informed MWCD that until the
implementation of schedule M is strengthened in a manner acceptable to the Bank by the Ministry
of Health & Family Welfare, Government of India, pharmaceutical products can only be procured
through International Competitive Bidding (ICB) applying WHO GMP criteria. Procurement
support agencies (PSA) are not to be used for IDA procurement.
13. Follow-up procurement-related actions to be completed before appraisal: The
following procurement-related actions will be required to be completed before project appraisal:
Preparation of a Procurement Plan for first 18 months covering goods, works and
consultancy services to be procured under the project
Preparation of a Procurement Manual for the project including SBD, procurement of
services, contract management, store management etc. MWCD has a draft manual that
may be used as a starting point.
Positioning of at least one dedicated procurement staff at CPMU
Preparation of bid documents/Request for proposal (RFP) documents for the critical
procurement to be taken up at CPMU level
Preparation of procurement chapter of PIP including the proposed procurement
arrangements along with the institutional and decision making structures at all the levels
and the cost table (viz. who will procure what and when)
Mr. Shanker Lal (WB Procurement Specialist) will be available for all procurement-related
discussions/guidance with MWCD/States.
14. Institutional Issues: A review of the Institutional Assessment of ICDS Program
Arrangements was completed by a consultant recruited by the Bank. Key findings from the study,
as well as lessons from the WCD and APERP projects were shared with the states.
15. Assessment of the Financial Management arrangements: The mission was informed
by MWCD that the next phase of ICDS will be implemented through the state and district level
societies and detailed information on this will be available in the Revised ICDS Implementation
Framework, which is expected to be finalized by MWCD shortly. The Bank team will study the
proposed implementation arrangements once precise information on these structures is
made available by MWCD. As part of the preparation process, an assessment of the FM
arrangements for the project will be conducted by the Bank. This will cover aspects relating
to funds flow, accounting, auditing, staff capacity etc. The review would be started in November
07 and would cover a sample of 2 – 3 states2 to enable evaluation of the implementation issues.
The review will include (a) collection of information on all the eight states through a
questionnaire (b) visits to states. The Terms of Reference for the review will be shared with
MWCD by end October 07. Further, a Financial Management Manual for the project will
2 Possible states will be Uttar Pradesh, Chhattisgarh and Madhya Pradesh
5
need to be prepared by the MWCD by appraisal. This manual will serve as a useful reference
document for the implementing states and will assist the MWCD in effective monitoring. Work
on preparation of the document should start immediately to ensure that the same is finalized well
in time for appraisal. Therefore the first draft of the FMM will need to be ready for discussion
during the pre-appraisal mission. Mr. Tanuj Mathur, Sr. FM specialist from the Bank is
available for any follow-up consultations as needed.
16. Outstanding Audit Issues: The following audit reports under the earlier Women and
Child Development Project (P035827/ Cr. N0420-In) have not been received by the Bank till
date. As per the Bank Policies3 until acceptable audited financial statements are received, the
Bank normally delays negotiations or Board presentation of any new loans benefiting the
implementing entity. Therefore MWCD needs to ensure that the 7 outstanding reports are
submitted to the Bank at the earliest; a list is attached below:
a. Dept. of Woman & Child (05-06)
b. Udisha Nagaland (05-06)
c. Govt. of Orissa (04-05 and 05-06)
d. Udisha Lakshadweep (03-04 and 04-05)
e. Udisha Jammu & Kashmir (04-05)
17. Evaluation Strategy: Following the comments from the MWCD, the draft TORs for
hiring a research agency have been revised and are being submitted to MWCD for a final
clearance. The key objective of this assignment is to provide technical support to MWCD to (i)
develop a comprehensive evaluation plan for the duration of project implementation, and (ii)
develop an appropriate sampling methodology and evaluation tools to be used during the baseline
survey. These tools alongwith the sampling methodology once agreed between the Bank and
MWCD and reviewed with the project States will be used in the baseline survey by the research
agencies. Further technical assistance for the data analysis will be discussed at a later date as
needed. The evaluation plan and survey tools will be made available to MWCD by May 31,
2008.
18. M&E Workshop: MWCD has proposed to organize a Monitoring and Evaluation
workshop in Dec 2007/Jan 2008 to which all states, development partners, experts, etc will be
invited. The objective will be to stimulate thinking about M&E related issues for the development
of state and district PIPs, and also share technical and operational experience related to M&E in
ICDS. It will include presentations by national and international experts, as well as officials and
NGOs who have been involved in “best practice” activities in ICDS. There will also be sessions
on community-monitoring, the Results Framework and the baseline survey.
19. Results Framework: The Draft Results Framework for the ICDS Reform project
(developed during the previous mission) was further refined after discussions with the states at
the State workshop. A draft Annex 3 for the PAD was created, specifying the Results
implementation arrangements, and data sources for all current indicators is attached in Annex 6 of
this aide memoire. This will be further refined during the proposed M&E workshop. The mission
reiterated that as an IDA 14/15 requirement, updated baseline data for the results framework must
be available within six months of project approval. The Bank and other development partners are
jointly reviewing the proposed revised MIS formats and is in the process of submitting detailed
comments to GOI on the same.. These revisions are expected to be finalized before appraisal.
3 Op 10.02 on Financial Management; paragraph 7 on ‘Failure to submit Acceptable Audited Financial
Statements’
6
20. Community-monitoring and social audits and Accreditation of AWCs: The mission
suggests that community monitoring become an important component of the M&E plans
for the project. A background paper on social audits and an operationally-focused 3-page paper
has been prepared by the Bank team. Copies of these were shared with MWCD and with the State
teams as an input in to State PIPs and district plans. The Bank team will make available
additional information on this issue on-line for use by the states/districts. The mission was
informed by MWCD that AWC accreditation is already being practiced by some states and will
be further refined and scaled-up to national level. A detailed proposal is awaited under the
national PIP component. These will include incentives and rewards, surprise inspection visits and
publication of performance of AWCs in local media/newspapers.
21. Annual Health Surveys: The mission was informed that the Registrar-General’s office
will implement an Annual Health Survey (funded by MoHFW) that will cover the 9 EAG states.
It will be a fixed panel survey, representative at the district level, and is planned for an initial
period of 7 years. Fieldwork for the first round is expected to commence in April 2008, and the
first results are expected to be available (in published form) one year later. MWCD (through the
Food and Nutrition Board) has been asked to give inputs. Nutritional status and feeding behavior-
related indicators will be included. The mission was informed that the Planning Commission will
conduct a countrywide impact evaluation of ICDS, as stipulated under the Xth-XIth five year
plan. The Program Evaluation Organization (PEO) is in charge. Sampling has been done, but data
collection agencies are yet to be hired. The evaluation plan for the project should keep this
information in mind to ensure synergies.
22. Social Development and safeguard issues: A large number of the project districts have
large tribal populations; therefore, World Bank Operational Policy 4.10 on Indigenous (Tribal)
peoples will apply. In accordance with the policy, the project would need to ensure that tribal
communities have a voice in project design and implementation through a process of “free, prior
and informed consultation”, that there are effective grievance redress mechanisms in place and a
Tribal Development Plan/Strategy is prepared outlining how the project would ensure effective
inclusion of tribal communities. MWCD needs to submit to the Bank for approval, soonest
possible, TORs for the development of a Tribal Development Plan/strategy. Once the TOR is
cleared, the strategy needs to be developed soonest. This plan will have to be reviewed by the
Bank prior to the Appraisal mission. If construction of Anganwadi centers calls for land
acquisition that result in involuntary resettlement, the World Bank Operational Policy 4.12 on
Involuntary Resettlement will also be applicable. Efforts should be made to avoid involuntary
resettlement to the extent possible. If unavoidable, then the effort should be to minimize
displacement, to treat resettlement as a development program by providing affected people
opportunities for improving their incomes and standard of living or at least to restore them and to
pay compensation for all affected assets at replacement cost. All of this information, summarized
in the form of a Resettlement Action Plan or framework that will be reviewed by the Bank prior to
the Appraisal mission. Copies of both these Operational Policies and related Bank procedures are
attached in Annex 7 and should be shared by MWCD with all participating States and
implementing agencies to make them aware of specific procedures to be followed to comply with
the requirements.
23. Social Assessment: To strengthen the design and implementation of the ICDS reform
process by providing relevant social analysis that promotes equity and social inclusion at all
levels of the program, a Social Assessment consultancy has been planned with DFID support. A
draft Terms of Reference (ToR) developed jointly by the Bank and DfID has been shared with
MWCD. To ensure that the Social Assessment focuses on the most pertinent issues and comes up
7
with operationally relevant recommendations, the mission requests detailed inputs into the ToR
and design of this exercise. Effective ways of helping the ICDS program reach out to traditionally
excluded sections of the community is a key aspect of the reform process and a well designed and
implemented Social Assessment that is carefully managed by MWCD and participating State
level entities can be an important first step in this direction.
24. Environment safeguards: In accordance with World Bank’s Operational Policy OP
4.01, the proposed project has been classified as Category B. The environmental dimensions of
the project are linked with the construction and use of Anganwadi centres. These issues include
construction and design issues (including drainage, ventilation and lighting, safe building
materials etc), provision of safe potable water (particularly in arsenic and fluoride prone areas),
hygiene practices with regard to cooking, sanitation and cleanliness, location-related issues and
construction related impacts. By appraisal, the MWCD will need to undertake a desk review
which will assess current situation, based on existing assessment reports and state reviews
(e.g. the Facility Survey by NCAER, the Andhra Pradesh review of AWC construction, and other
existing studies). This will provide an understanding of the shortcomings and gaps in
construction, operation and maintenance of Anganwandi centres. Based on the above review, an
Environmental Management Framework (EMF) will be developed. The EMF will incorporate an
Action Plan which will include implementation protocols for awareness and training for the
community on good hygiene practices and necessity to provide safe and clean environment for
children, maintenance of Anganwadi centres, supervision, monitoring and reporting. Management
of waste during construction activities will also be detailed. The EMF will be prepared in such a
manner that these protocols can be incorporated into guideline documents, bidding/ contractual
documents and communication strategies for villages and communities and in the PAD and the
PIPs with appropriate budget lines. Appropriate legal requirements should also be included by
MWCD into the bid documents for construction contractors, wherever applicable. The EMF
including the Action Plan is the borrowers’ responsibility, and will need to be prepared,
reviewed and cleared by the Bank and disclosed in-country before the project can proceed
for Appraisal. More details on the Environmental Assessment are included in Annex 7. MWCD
has further confirmed that only small buildings with 1000-3000 Sq.ft. (AWCs and CDPO Offices
respectively) will be financed under the project. State PWD/RD Code/manual, as relevant, would
be followed strictly in the construction.
25. De-Brief with Development Partners: At the end of the mission, a de-brief was also
organized with development partners on the status of preparation of the ICDS Reform project.
This included a session on the forthcoming launch of the Lancet Series on Nutrition.
26. Readiness filters: The project readiness filters were discussed with MWCD. The next
technical mission is scheduled for end January/early February 2008. In the interim, relevant
mission members will be available for State PIP workshops and the M&E workshop as and when
scheduled/feasible.
27. Development partners in the proposed project: DfiD has joined all Bank ICDS
missions to-date, has financed many of the background studies for project preparation, and has
expressed an interest in staying engaged in ICDS. UNICEF, USAID, CARE and MI have all
expressed continued interest in being technical partners in the development of the project and will
be available to support the states in the development of the PIPs as needed. The mission is highly
appreciative of the tremendous level of support from all partners, under the guidance of MWCD.
8
28. Next Steps: The following table highlights the key next steps that need to be completed
in the coming months:
Next step/Action Responsibi
-lity
To be
completed
by
Notes
1. Issue Contract to
selected firm for TSU
WB Nov/Dec
2007
Approval of minutes awaited from
MWCD.
2. Issue EOI for technical
support for Impact
Evaluation
WB Nov/Dec
2007
Approval of TORs awaited from
MWCD
3. Social assessment and
tribal assessment
MWCD/
DfiD
Jan/Feb
2008
DfiD and WB have shared draft TORs
for social assessment with MWCD;
MWCD needs to send draft TORs for a
Tribal development plan to WB for
clearance by Nov 07
4. Environmental
assessment and plan
MWCD Appraisal MWCD to send draft TORs for EA for
WB clearance by Nov 2007;
Environmental plan to be approved by
appraisal.
5. State ICDS workshops States/
MWCD
Starting in
Nov 2007
MWCD to send to states the resource
envelope and final PIP guidelines;
Bank team will participate in all state
w’shops to the extent possible;
6. M&E workshop with
states
MWCD Dec 07/Jan
08
WB team will participate as feasible;
Other technical partners welcome to
join.
7. Thematic workshops on
IEC, Convergence,
Community participation
etc for necessary inputs in
to PIPs
MWCD/
States
Jan/Feb
2008
WB team will participate as feasible;
8. Clearance of audit
issues
MWCD/
States
Appraisal/n
egotiations
9. FM Manual MWCD/
States
Appraisal WB to conduct FM appraisal after
MWCD gives more detailed
information on the FM/institutional
arrangements; Tanuj Mathur to provide
support as needed.
10. Procurement manual MWCD/
States
Appraisal Shanker Lal will provide support as
needed.
11. Other procurement
action as listed in para 12
MWCD Appraisal
Attachments: Annexures 1 to 7
9
List of Annexures:
Annexure 1: List of Development Partners Met
Annexure 2: List of Participants at the Preparation Workshop held on 9-10 October, 2007
Annexure 3: Activity Chart for ICDS Reform/ICDS IV Project
Annexure 4: Agenda for Preparation Workshop held on 9-10 October, 2007
Annexure 5: Menu of Interventions for Nutrition Component of the Project
Annexure 6: Results Framework
Annexure 7: Links to Bank Safeguard Policies on Social and Environment Assessment
10
ANNEXURE 1
List of Development Partners Consulted
ICDS Partners Meeting
SNo. Name Designation Organization /
Address
Tel Nos. Email
1 Kalyani Singh Head, Dept of
Food and
Nutrition
Lady Irwin College,
Sikandra Road, New
Delhi
98 994 50616 [email protected]
2 Ted Greiner Senior
Nutritionist
PATH, Washington
DC, USA
202 822 0033 [email protected]
3 Prema
Ramachandran
Director Nutrition Foundation of
India, New Delhi
98 914 85605 premaramachandran@
gmail.com
4 Rama
Narayanan
Advisor,
Nutrition
Security Studies
MS Swaminathan
Research Foundation,
Chennai
044-22541229 [email protected]
5 Cynthia Lewis Program Officer,
Global Health
Bill & Melinda Gates
Foundation
206 709 3728 cyndi.lewis@
gatesfoundation.org
6 Veenu Seth Reader in
Nutrition
Lady Irwin College,
Sikandra Road, New
Delhi
98 681 06060 veenu_seth@
hotmail.com
7 Deepika Nayar
Chaudhery
Chief Executive
Officer
Micronutrient
Initiatives
98 107 22787 dchaudhery@
mincronutrient.org
8 Sandhaya
Venkateshwar
an
Director
Advocacy
CARE, 27 Hauz Khas
Village
2656 4101 svenkateswaran@
careindia.org
9 Mukesh
Kumar
Program
Director, INHP
CARE, 27 Hauz Khas
Village
2656 4101 [email protected]
10 Ritu Sharma Knowledge
Manager
CARE, 27 Hauz Khas
Village
98 118 88981 [email protected]
11 Ashi Kohli
Kathuria
Deputy Office
Director
USAID, US Embassy,
New Delhi
98 110 83350 [email protected]
12 V. Ramesh
Babu
Senior Program
Manager
USAID, US Embassy,
New Delhi
98 730 04702 /
2419 8226
13 Purnima
Menon
Research Fellow IFPRI - New Delhi,
Pusa Campus
2584 6565 [email protected]
14 Usha Kiran Senior Program
Officer
Gates Foundation,
Sanskrit Bhawan, A-10,
Qutab Institutional
Area, Aruna Asaf Ali
Road, New Delhi
4100 3100 /
98 115 12032
usha.kiran@india.
gatesfoundation.org
15 Pramita
Sudharto
Deputy WHO
Rep.
WHO Country Office,
India
98 117 55021
16 Yonas Tegegn Partnership
Officer
WHO Regional Office
for South East Asia
98 104 06175 [email protected]
17 Sadhna Bhagat Consultant Global Alliance for
Improved Nutrition
4658 0246 consultant.gain@
gmaili.com
11
SNo. Name Designation Organization /
Address
Tel Nos. Email
18 R. Sankar Regional Rep Global Alliance for
Improved Nutrition
4658 0246 [email protected]
19 Suneel K
Muttoo
Resident Advisor The AZZ Project 2C2,
Parkwood Apartments,
Rao Tula Ram Marg,
New Delhi - 110 022
2618 2085 [email protected]
20 I.P. Bhagwat Chief Program
Officer
Bhavishya Alliance
"Dakshina", 7th floor,
Plot 2, Sector 11, CBD,
Belapur, Navi Mumbai
98 679 59022 [email protected]
21 Massee
bateman
USAID, US Embassy,
New Delhi
22 Rajiv Tandon Sr. Advisor
Child Survival
USAID, US Embassy,
New Delhi
24198586 / 98
111 03305
23 Kajali Paintal Nutritionist PATH 98 116 64503 [email protected]
24 Sridhar
Srikantiah
BASICS 98 115 16335 [email protected] /
25 Deepika
Srivastava
Officer - in -
charge CDN,
Unicef India
73, Lodi Estate, New
Delhi
98 112 60888 [email protected]
26 Leena Sushant Program
Consultant
The Inclen Trust
International
98 689 57499 /
2696 0376
27 Vaishali
Deshmukh
Program
Consultant
INCLEN 98 685 25220 [email protected]
28 Sushma
Sharma
Food & Nutrition
Consultant
252, Vasant Enclave,
New Delhi - 110 057
98 183 57725 sushma.sharmalic@
gmail.com
29 Seema Puri Reader & Head
Dept of Nutrition
Institute of Home
Economics, F-4, Hauz
Khas enclave, New
Delhi
98 100 03220 [email protected]
30 Silke Seco Health Adviser DFID 98 991 07640 [email protected]
31 Shane Prigge Food
Technologist
WFP 98 734 32780 [email protected]
32 Dominique
Franneyora
PLD WFP 2615 0000 dominique.tranvefort@
wfp.org
33 Manoj Das Program
Consultant
Internationl Clinical
Epidemogoloy, New
Delhi
2696 0375 [email protected]
34 Radha Holla Policy &
Planning
Breast feeding
Promotion Network of
India
12
ANNEXURE 2
WORKSHOP ON PREPARATION OF THE IDA ASSISTED ICDS-IV
PROJECT
Organized by
Ministry of Women & Child Development, Govt. of India In collaboration with
UNICEF
9-10 October 2007
Venue:
Hotel Claridges, Aurangzeeb Road, New Delhi
Lis t of Participants
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
State Governments
1 Smt Chhaya Ratan
Secretary
Andhra Pradesh Department of Women Development,
Child Welfare & Disabled Welfare
Govt of Andhra Pradesh, Secretariat
Hyderabad 500 022
Tel No. 040-23456852, 27612253
Fax No. 040-23450008
NO
2 Ms Y.V.Anuradha
Director
Andhra Pradesh Directorate of Women Development &
Child Welfare
Govt of Andhra Pradesh, Vengalrao Nagar
Ameerpet, Behind Sarathi Studio
Hyderabad 500 00
Tel No. 040-23733221, 23732587,
23734259
Fax No. 040-040-23733848, 23733665
Yes
3. Ms Sarala Rajjya
Lakshmi
Dy. Director
Andhra Pradesh -do-
Yes
4 Ms K. Rajya
Lakshmi
Regional
Andhra Pradesh - do - Yes
5 Ms Addi Chandrika
Dy. Director
Andhra Pradesh - do - Yes
6 Shri Vijoy Prakash
Secretary
Bihar Social Welfare Department
Govt. of Bihar, Old Secretariat
Patna –800 001
Telefax No. 06122239707
Fax No. 0612-2226906
13
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
7 Shri Uday Singh
Kumawat
Director
Bihar Social Welfare Department
Directorate of ICDS, Govt of Bihar
Indira Bhawan, 2nd Floor
R.C. Singh Path, PATNA – 800 001
Telefax No. 0612-2226906
8 Shri Arvind
Chaudhary
Accounts Officer
Bihar - do -
9 Shri Jawahar
Shrivastava Secretary
Chhattisgarh Deptt of Women & Child Development
254 DKS Bhawan, Mantralaya
Govt of Chhattisgarh
Raipur 492 001
Telefax No. 0771-2234201, 2234190,
2234188
No
10 Shri Dinesh
Shrivastava
Director
Chhattisgarh Govt. of Chhattisgarh
Deptt. of Women & Child Development
D.K.S.Bhawan, Shastri Chowk
RAIPUR 492 001
Tel No. 0771-2234192, 2234190
Yes
11 Shri Prateek Khare
Joint Director
Chhattisgarh - do - Yes
12 Shri N.L.
Choudhary
Deputy Director
Chhattisgarh - do - Yes
13 Shri Sajid Meman
Assistant Director
Chhattisgarh - do - Yes
15 Shri U.K.Sangma
Principal Secretary
Jharkhand Deptt. of Social Welfare & WCD
Govt. of Jharkhand
Project Bhawan, HEC, Sector III
Dhurwa, Ranchi 834004
Tel No. 0651-2400757
Fax No. 0651-2400758
No
15 Shri D.K.Saxena
Special Secretary
(Social Welfare)
Jharkhand - do - Yes
16 Shri Ravindra
Agarwal
Director
Jharkhand Directorate of Social Welfare
Deptt. of Women & Child Development
Govt of Jharkhand, Engineering Hostel
Dhurwa, Ranchi 834 004
Tel No. 0651-2400893
Fax No. 0651-2400893
Yes
17 Shri S.P.Verma
Asstt. Director
Jharkhand - Do - Yes
18 Shri Prashant
Mehta
Principal Secretary
Madhya Pradesh Women & Child Development Department
Govt. of Madhya Pradesh
Secretariat, Vallabh Bhawan
Bhopal - 462 001
Tel No. 0755-2441043
Yes
14
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
Fax No. 0755-4007113
19 Ms Kalpana
Srivastava
Director
Madhya Pradesh Directorate of Women & Child
Development
Govt. of Madhya Pradesh
IInd Block, 4th Floor, Paryawas Bhawan
Jail Road, BHOPAL – 16
Tel No. 0755-4007100, 2553318, 2553269
Fax No. 0755-4007103
Yes
20 Shri Akhilesh
Kumar Shrivastava
Programme Director
Madhya Pradesh - do Yes
21 Shri Gangrade
Deputy Director
Madhya Pradesh - do - Yes
22 Dr. Vijay Satvir
Singh
Secretary
Maharashtra Women & Child Development Deptt.
Govt. of Maharashtra
New Administrative Building, 4th Floor.
Madam Cama Road, Mumbai - 400 032
Tel No. 022-22027050,
Fax No. 022-22828281
WILL
CONFIRM ON
05/10/07
22 Shri Ujjwal Uke
Commissioner
Maharashtra Commissionerate of Women & Child
Development
Govt. of Maharashtra
Raigad Bhawan, 1st Floor (Rear Wing)
CBD Belapur, Navi Mumbai 400 614
Tel No. 022-27565158; Fax No. 022-
27565159
Yes
23 Shri D.J.Mundhe
Dy. Commissioner
(ICDS)
Maharashtra - do - Yes
24 Dr. Manjusha
Molwane
Nutrition Specialist
Maharashtra - do - Yes
25 Shri Uttam Karpe
Dy. CEO (ICDS)
Maharashtra - do - Yes
26 Smt Alka Kala
Principal Secretary
Rajasthan Deptt. of Women & Child Development
Govt. of Rajasthan
Secretariat
Jaipur 302 001
Telefax No. 0141-2227666
Yes
27 Ms Sarita Singh
Director
Rajasthan Deptt. of Women & Child Development
Govt. of Rajasthan
2 Jal Path, Gandhi Nagar
JAIPUR 302 015
Tel No. 0141-2705561
Fax No. 0141-270 5638
Yes
28 Dr. Mukta Arora,
Officer-in-charge
(UNICEF
Programmes)
Rajasthan -do- Yes
15
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
29 Shri Amal Kr.
Verma
Secretary
Uttar Pradesh Deptt. of Women & Child Development
Government of Uttar Pradesh,
Room No.121, Bapu Bhavan
Lucknow - 226 001
Tel No. 0522-2237157
Fax No. 0522-2237231
Yes
30 Shri Datadin Pashi
Director
Uttar Pradesh Directorate of ICDS
Bal Vikas Pariyojana Parishad
3rd Floor, Indira Bhawan
Lucknow 226 001; Tel No. 0522-228 7248,
228 7249
Fax No. 0522-228 7032
No
31 Mr. Narendra
Kumar
Additional Director
Uttar Pradesh - do - Yes
32 Shri Santosh
Kumar
Dy. Director (ICDS)
Uttar Pradesh - do - Yes
Ministry of Women & Child
Development, GoI
1 Smt Renuka
Chowdhury Hon’ble
Minister of State
(I/C) for Women and
Child Development
MWCD, GoI Ministry of Women & Child Development,
Shastri Bhawan, New Delhi.
2 PS/Addl.PS to MOS MWCD, GoI
3 Ms Deepa Jain
Singh
Secretary
MWCD Ministry of Women & Child Development,
Shastri Bhawan, New Delhi. Tel No. 011-
23383586
Yes
4 Ms P.Bolina
Joint Secretary
MWCD Tel No. 011-2338 1654 Yes
5 Shri S.K.Ray
Joint Secretary &
Financial Advisor
MWCD Tel No. 011-2338 2696
6 Sh. K.Rajeswara
Rao
Director
MWCD
Tel No. 011-2338 5614
Yes
7 Shri Mahesh C.
Arora
Director
MWCD
Tel No. 011-2338 9434
8 Shri P.K.Thakur
Director (Finance)
MWCD Tel No. 011-2338 1851
9 Ms Archna Sharma
Awasthi
Deputy Secretary
MWCD Tel No. 011-23074215
10 Ms Rimjhim Prasad
Director
MWCD
11 Ms Jatinder Kaur
Under Secretary
MWCD
16
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
12 Sh. S.K.Dargan
Under Secretary
MWCD
13 Sh. Naveen Yadav
Under Secretary
MWCD Yes
14 Dr. S.K.Adhikari
Asstt. Director
MWCD Yes
15 Sh. A.K.Goyal
Sr. Programmer
MWCD Yes
16 Sh J.S.Minhas
Section Officer
MWCD Yes
NIPCCD/FNB
1 Dr. A. K. Gopal
Director
NIPCCD 5 Siri Institutional Areas
Hauz Khas, New Delhi 110 016
Tel No.011-26515579, 26964373
Yes
2 Dr. Dinesh Paul
Additional Director
-d0- -do-
Tel. No. 011- 26963383
Yes
3 Dr. (Ms) Savita
Bhakhry
Joint Director
-do- -do- Yes
4 Ms Shashsi Prabha
Gupta
Technical Advisor
FNB, MWCD Ministry of Women & Child Development,
Shastri Bhawan, New Delhi.
Tel. No. 011-2362519
Yes
5 Dr. Jai Singh
Joint Tech. Advisor
FNB, MWCD -do-
Tel. No. 011-23341467
Yes
Other
Ministries/Departments
1 Shri Srikara Nayak
Director (WCD)
Planning Commission
Yojana Bhawan
Sansad Marg, New Delhi 110 001
2 Mr. Prashant
Director (FB)
Department of Economic Affairs
Ministry of Finance, Govt. of India
North Block, New Delhi 110 001
The World Bank
1 Dr. Peter Berman
Lead Economist
World Bank South Asia Human Development Sector
The World Bank
70 Lodi Estate, New Delhi 110 003
Yes
2 Dr. Meera Shekar
Sr. Nutrition
Specialist & Task
Team Leader
WB
- do -
Yes
3 Ms Meera
Priyadarshi
Senior Nutrition
Specialist
WB - do - Yes
17
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
4 Dr. Venita Kaul
Senior Education
Specialist
WB - do - Yes
5 Mr. Snehashish Rai
Chowdhury
Operations Officer -
Health
WB - do - Yes
6 Dr. Caryn
Bredenkamp
Economist
WB - do - Yes
7 Mr. Sankar
Narayanan
Procurement
Specialist
WB - do - Yes
8 Mr. Tanuj Mathur
Financial
Management
Specialist
WB - do -
9 Ms Mohini Kak
Consultant
WB - do- Yes
10 Ms Tanushree
Haldar
WB - do - Yes
11 Ms Nira Singh WB - do- Yes
Development Partners
1. Ms Silke Seco
Health Advisor
DFID DFID India
British High Commission
B-26 Tara Crescent, Qutab Institutional
Area, New Delhi 110 016; Tel No. 011-
26529123 Extn. 3358
Fax No. 011-26529296
Yes
2. Arundhuti R.
Chowdhury
Social Development
Advisor
DFID Yes
3. Ms. Elizabeth Sime
Country Director
CARE CARE India
27, Hauz Khas Village, New Delhi-110016
Yes
4. Dr. (Ms) Dora
Warren
Asstt. Country
Director
CARE - do - Yes
5. Mr. Mukesh Kumar
Program Director
(INHP)
CARE - do - Yes (will attend
on 9.10.07 only)
6. Mr. Sanjay Kumar CARE
7. Ms. Ashi Kathuria USAID Yes
18
SlNo Name/Designation State/
Organization
Address/Fax No Confirmation
8. Mr. Ramesh Babu USAID Yes
Mr. Luc Laviolette
Regional Director
MI Micronutrient Initiative India
11 Zamroodpur Community Centre
Kailash Colony Extension
New Delhi-110048
Tel No. 011-41009801 extn. 131; Fax No.
41009808
NO
Dr. Deepika
Chaudhery
CEO, MI
MI - do - Yes
Mr. Eimer Barr
Acting Country
Representative
UNICEF UNICEF
70 Lodi Estate; New Delhi-110003
Tel No. 011-24690401; Fax No. 011-
24627521, 24691410
Yes
Ms Deepika
Shrivastava
Project Officer
UNICEF UNICEF
70 Lodi Estate
New Delhi-110003
Yes
Ms. Rita Punhani
Consultant
UNICEF -do-
Mob. No. 9899110771
Yes
19
ANNEXURE 3
Activity Chart for ICDS Reform/ICDS IV Project
Complete
d
In
progress
Not Started /
Incomplete
Sl.
No
.
Activity/Sub-Activity
By
wh
om
Dec
-06
Ja
n-0
7
Feb
-07
Ma
r-07
Ap
r-0
7
Ma
y-07
Ju
n-0
7
Ju
l-07
Au
g-0
7
Sep
-07
Oct
-07
No
v-0
7
Dec
-07
Ja
n-0
8
Feb
-08
Ma
r-08
Ap
r-0
8
Ma
y-08
Ju
n-0
8
Ju
l-08
Au
g '
08
Sep
'08
Month 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
1 PCN Review and
Approval
GO
I/
WB
2 First Preparation
Mission
WB
/
GO
I
3 Background Studies
WB
/
GO
I
4 EFC for Revised
National Framework
GO
I
5 Second Preparation
Mission
WB
/
GO
I
6 Preparation of draft
Central and State PIPs
GO
I
20
7 Pre - Appraisal
Mission
WB
8 Finalisation of Central
and State PIPs
GO
I/
WB
9 Appraisal Mission
WB
10 EFC/Cabinet
Clearances
GO
I
11 Negotiations
GO
I/
WB
12 Submission of Board
Package
WB
13 Board Approval
WB
14 Effectiveness
GO
I/
WB
21
ANNEXURE 4
Workshop on Preparation of the IDA assisted ICDS-IV Project
Organized by
Ministry of Women & Child Development, Govt. of India
In collaboration with
UNICEF
9-10 October 2007
Venue:
Hotel Claridges, Aurangzeeb Road, New Delhi
A g enda
Day/Time Issue Details
9 Oct 2007: Vice Regal
Session I: 10.00 – 11.30 hrs
09.30 - 10.00 hrs Registration
10.00 - 11.00 hrs Welcome and Introduction to the
Workshop
By Ms P.Bolina, Joint Secretary, MWCD
Expected outcome of the workshop By Dr. Meera Shekar, Sr. Nutrition
Specialist & Task Team Leader, The
World Bank
Accelerating young child nutrition and
development outcomes
By Mr. Eimer Barr, Acting Country
Representative, UNICEF
Keynote address By Ms Deepa Jain Singh, Secretary,
MWCD
11.00 - 11.30 hrs Tea/Coffee Break
Session II: 11.30 – 13.00 hrs
[Chair: Ms Alka Kala, Principal Secretary, DWCD, Govt of Rajasthan]
11.30 – 12.10 hrs Revised Implementation Framework for
ICDS – An Overview
By Ms P. Bolina, Joint Secretary,
MWCD
- PPT (30mts)
- Remarks by Participants (10mts)
12.10 – 12.40 hrs Sharing from the consultative processes
for the revised implementation framework
held during April 2007
By Ms Deepika Shrivastava, Project
Officer, UNICEF (30mts)
12.40 – 13.20 hrs Project Concept Note
- Key Principles of the Project, Thrust
Areas and Project Components
By Mr. K.Rajeswara Rao, Director,
MWCD
- PPT (30mts)
- Discussion with States (10mts)
22
Day/Time Issue Details
13.20 – 14.00 hrs Rationale for IDA support to the proposed
ICDS-IV Project – World Bank’s
Perspective
By Dr. Meera Shekar, World Bank
(30mts)
- Discussion with States (10mts)
14.00 – 15.00 hrs Lunch Break
Session III: 14.00 – 17.40 hrs
[Chair: Ms P. Bolina, Joint Secretary, MWCD, GoI]
15.00 – 18.00 hrs States’ Expectations from the Project By State Governments
[Andhra Pradesh, Bihar, Chhattisgarh,
Jharkhand, Madhya Pradesh,
Maharashtra, Rajasthan and Uttar
Pradesh]
- PPT on proposing 3-4 key
interventions under the project both
for nutrition and ECE components (8
States X 15mts each) (120mts)
- Discussion (30mts)
10 Oct 2007: Vice Regal
Session IV: 09.30 – 13.00 hrs
[Chair: Shri Amal Kumar Verma, Secretary, DWCD, Govt of Uttar Pradesh]
9.00 – 9.40 hrs Dissemination of findings of Technical Studies commissioned by the World Bank
(i) District Mapping Study – Selection of
high-burden districts based on nutrition
indices
By Dr. Caryn Bredenkamp, E T
Specialist, World Bank
- PPT (10mts); - Discussion (10mts)
(ii) Best Practices in ICDS By Ms Deepika Chaudhery, CEO,
Micronutrient Initiative
- PPT (10mts); - Discussion (10mts)
9.40 – 10.00 hrs Social Assessment for the proposed
project
By Shankar Narayanan, Sr. Social
Development Specialist, World Bank
PPT (10mts); - Discussion (10mts)
10.00 – 10.40 hrs Lessons learned from previous IDA
assisted ICDS Projects with specific
reference to project planning and
management – Sharing Experiences
By Mr. Snehashish Rai Chowdhury,
Operations Officer, World Bank
- PPT (20mts)
- Feedback/Experience from States
(20mts)
10.40 – 11.00 hrs Tea/Coffee Break
11.00 – 12.15 hrs Preparation of Project Implementation Plans (PIPs) – Design and Components
A. Overview of Draft PIP Guidelines for
project States
By Dr. S.K.Adhikari, Asstt. Director,
MWCD and Mr. S. Rai Chowdhury,
World Bank
- PPT on draft State PIP guidelines
(15mts)
B. Nutrition Component By Dr. Meera Shekar, World Bank
- PPT on proposed interventions
(15mts);
23
Day/Time Issue Details
C. ECE Component By Dr. Venita Kaul, Sr. Education
Specialist, World Bank
- PPT on proposed interventions
(15mts);
Discussions (30mts)
12.15 – 13.00 hrs Presentations on Technical Studies commissioned by the World Bank
(iv) Procurement Capacity Assessment PPT by Mr. Shankar Lal, Procurement
Specialist, World Bank (15mts)
(v) Time/work study of AWWs PPT by Dr. Venita Kaul, World Bank
(15mts)
12.30 – 13.15 hrs Draft Results Framework for the ICDS-IV
Project
By Dr. Caryn Bredenkamp, World Bank
- PPT (15mts)
Discussion (15mts)
13.15 – 14.00 hrs Lunch Break
(Viewing of A short film titled ‘Bachpan’ on convergence with health, education etc.
in Madhya Pradesh
Session V: 14.00 – 17.00 hrs
[Chair: Shri Ujjwal Uke, Commissioner (ICDS), Govt of Maharashtra]
14.00 – 15.30 hrs Group Work on Project Interventions –
Listing out priorities based on PCN and
States’ presentations
(parallel session)
Group 1: Nutrition Component
(to be facilitated by WB/UNICEF)
Group 2: ECE Component
(to be facilitated by
WB/NIPCCD/UNICEF)
15.30 – 16.00 hrs Feedback from the Group Work By Groups
- PPT on key recommendations (15mts
each)
16.00 – 16.30 hrs Preparation of ICDS-IV Project: Next
Steps/Actions to be taken
By Dr. S.K.Adhikari, MWCD
- PPT outlining key tasks with timeline;
Setting up of Technical Support Units
(TSUs) etc. (15mts)
- Discussion (15mts)
16.30 – 17.00 hrs Concluding Remarks
By Secretary/Joint Secretary, MWCD
World Bank /UNICEF
Abbreviations: GoI- Government of India, MWCD – Ministry of Women & Child Development;
MOS – Minister of State; WB – World Bank; PCN – Project Concept Note; PPT – PowerPoint
Presentation
24
ANNEXURE 5
Menu of Interventions for Nutrition Component of ICDS Reform Project
(Draft to be updated)
1. Nutrition and Health Education and IEC through local mass media
(newspapers, radio, TV) and interpersonal communications to focus on behaviour
change and increased demand for:
Increased rest during pregnancy (specially last trimester)
Appropriate new-born care
Promotion of exclusive breast-feeding for 6 months
Start adequate Complementary foods (with micronutrient sprinkles) at 6
months
Hand-washing after defecation and before feeding; Personal & Environmental
hygiene to reduce infections
Delayed pregnancies, birth spacing* and maternal care during pregnancy
Prevention of STDs and Reproductive tract infections (to prevent LBW)*
Iron-folate supplementation during pregnancy & adolescence (to prevent
LBW)*
Pediatric iron supplementation*
Consumption of iodised salt*
Twice-annual Vitamin A supplementation for all children 1-5 years*
Twice-annual de-worming (especially in endemic areas) *
Zinc treatment during diarrhea*
2. Strong focus on growth promotion and intensive counseling by AWWs linked
to
• Referral of sick children to health facilities
• Pre-pregnancy and pregnancy care for mothers
• Exclusive breast-feeding for 6 months
• Complementary food at 6 months with micronutrient sprinkles
3. Other optional interventions
• Iron-folate supplements for adolescent girls and infants
• Micronutrient sprinkles for complementary foods for infants
• Distribution of iodised salt/double-fortified salt for demonstration to poor
families
• Testing the scope of conditional cash transfers for mothers who exhibit good
health/nutrition behaviours
• Community organization of mothers self-help groups and links with micro-
finance programs
• Links with WCD’s creche-program (especially in urban areas)
25
ANNEXURE 6
Results Framework
ICDS Reform Program
DRAFT
Output of Preparation Mission, Jan-Feb 2007
This is a (revised) preliminary Results Framework that builds upon the Results Framework
developed during the Jan-Feb 2007 Preparation Mission of the ICDS IV Reform Program. It
incorporates suggestions made during the October Preparation Mission and the October
Consultative Workshop. It will be further refined during an M&E workshop for project states to
be held in Nov/Dec 2007.
Eventually, and in line with recommendations, the number of indicators will be reduced to
approximately 10-12 key outcome and output indicators that are closely related to the attainment
of the PDOs. In addition, one or two key input or process indicators of items that are crucial for
project implementation may be included. Some additional indicators may need to be added to
capture a potential component on capacity-building, including M&E, institutional capacity and
IEC. Key indicators need to be disaggregate by SC, ST and poor/non-poor.
PDO / OUTCOME Indicator
The PDO is twofold:
(i) To enhance awareness and
adoption of appropriate
feeding and caring
behaviors, and expand the
utilization of nutrition
services by parents of
children aged 0-3 years;
and
(ii) To improve early child
education outcomes and
school readiness for
children 3-6 years old
in selected high-burden
districts/states
For PDO (i)
Awareness:
% women know that their children should be breastfed exclusively for 6
mths
% women know that complementary foods should be introduced at
about 6 mths
% mothers know that her child needs Vitamin A dose every 6 mths
% mothers aware that her child should receive ORS during diarrhoea
% mothers aware that she needs 3 antenatal care visits during pregnancy
Service Utilization and Behaviors:
% children aged 6-72mths who were exclusively breastfed for 6 mths
% children whose mothers initiated their breastfeeding within 1 hour of
delivery
% children receiving semi-solids around 6 mths of age
% mothers that brought children aged 0-36 months to the anganwadi for
growth monitoring and promotion in the previous month
% mothers that consumed at least 100 IFA tablets during pregnancy
For PDO (ii)
% children in the community, aged 30-6 years, enrolled in ECE
% children enrolled in ECE that attend the anganwadi’s ECE program
for the mandated minimum opening time, i.e at least 16 days per month
Percentage of children (of those attending ECE or of those enrolled in
ECE) aged 3-6 years (or 5-6 years) that are evaluated as school ready
Percentage of children of school-ready age that graduated to primary
school
26
Intermediate Outcome / OUTPUT Intermediate Outcome/OUTPUT Indicators
Related to Nutrition component:
Improved delivery of ICDS health
and nutrition services to pregnant
women and children aged 0-3
months
Improvements in the national policy
framework for health and nutrition
% anganwadis that held growth-monitoring and promotion sessions for
children under 3 in the previous month
% anganwadis that conducted a Health and Nutrition Day in the
previous month
Mean number of home visits conducted by the anganwadi worker the
previous month
% anganwadi workers that received a visit by the supervisor within the
last month
Development of IEC materials and a media campaign (how to
measure?)
Guidelines and frameworks developed (which ones?)
Related to education component:
Improved preschool education
service delivery in selected high-
burden districts
A stronger national policy
framework for the implementation
of quality ECCE
Related to capacity-building,
including M&E and institutional
capacity-building
% anganwadis with a functionary that has received specialized (i.e. non-
orientation) ECE training (under the new project)
% anganwadis providing ECE for the mandated minimum period (i.e.
at least 16 days per month)
Mean number of times that preschool kits were used during the
preceding week
% anganwadi workers conducting five or more activities for ECE per
day (on the day before interview)
Quality standards for ECE have been set
Mechanism for quality assurance is in place
Mechanism for accreditation is in place
New training strategy for ECE workers developed
Communication strategy developed
New MIS framework is being used
% anganwadis with two workers in place
District plans produced on time (define what “on time means”)
27
Table 1: Results Monitoring Arrangements
Target Values Data Collection and Reporting
Outcome Indicators BL YR1 YR2 YR3 YR4 YR5 Frequency
and
Reports
Data Collection
Instruments
Responsibility for
Data Collection
Health and Nutrition
% women (with
children under 1) that
breastfed children
exclusively for 6 mths
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
% mothers that
brought children aged
0-36 months to the
anganwadi for growth
monitoring in the
previous month
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
% mothers (with
children under 1) that
received at least 100
IFA tablets during
pregnancy
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
% mothers aware that
her child should
receive ORS during
diarrhea
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
% mothers aware that
need 3 ANC visits
during pregnancy
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
ECCE
% children aged 5-6
years that have
completed a full two
years of ECCE
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
Mean school readiness
scores (which scale?)
of children aged 6
years / % children
scoring a defined
minimum
Annual Household survey
(Baseline.
Midterm, Endline)
Sentinel
household surveys
Contracted
Research Institute
(with
PMUresponsibility)
Results Indicators for
each Component
Component 1:
Improved local
delivery of nutrition
services
% anganwadis with
two workers in place
Quarterly HMIS4 MWCD
% anganwadis that
held growth-
monitoring sessions of
children under 3 in the
Quarterly HMIS MWCD
4 All data collected by the HMIS can be verified by the baseline, midterm and endline surveys
28
previous month
% anganwadis
conducted a Health
and Nutrition Day in
the previous month –
delete since ANM
responsibility? Or
valid since indicator of
convergence
Quarterly HMIS MWCD
Mean number of home
visits conducted by the
anganwadi worker the
previous month
Quarterly HMIS MWCD
% of anganwadi
workers that received a
visit by the supervisor
within the last month
Quarterly HMIS MWCD
Component 2:
Improved national
framework for
nutrition
Development of IEC
materials and a media
campaign
Guidelines and
frameworks developed
(which ones?)
Regular (define!)
district plans produced
Component 3:
Improved local
delivery of ECCE
services
% anganwadis with a
trained (define!) ECCE
functionary in place
Mean number of hours
per week that ECCE is
provided
% anganwadi
buildings that conform
to agreed norms
(define!), with respect
to space, light, floor
quality
% anganwadis that
provide a meal
(define!) on a regular
(define!) basis
Number of times that
preschool kits were
used during the
preceding week
Observational measure
of quality?
Component 4:
Improved national
framework for ECCE
Quality standards are
in place
29
Mechanism for quality
assurance is in place
Mechanism for
accreditation is in
place
Training strategy for
ICDS preschool
teachers established
Communication
strategy developed
Periodic (define!)
research studies
conducted
MIS
% district officers who
know (define) essential
indicators…
30
ANNEXURE 7
Details of Bank Safeguard Policies on Social and Environment Assessment are available
at:
www.worldbank.org/safeguards
Environmental Assessment
Listed below are the Bank's policies on Environmental Assessment and Disclosure to
facilitate compliance with these policies.
http://intranet.worldbank.org/WBSITE/INTRANET/OPSMANUAL/0,,contentMDK:200
64724~pagePK:60001255~piPK:60000911~theSitePK:210385,00.html
http://intranet.worldbank.org/WBSITE/INTRANET/OPSMANUAL/0,,contentMDK:200
64614~pagePK:60001255~piPK:60000911~theSitePK:210385,00.html
http://intranet.worldbank.org/WBSITE/INTRANET/OPSMANUAL/0,,contentMDK:200
65218~pagePK:60001255~piPK:60000911~theSitePK:210385,00.html
For disclosure - pages 2 and 10 are relevant.
http://intranet.worldbank.org/WBSITE/INTRANET/UNITS/ESSDNETWORK/INTSAF
EPOL/0,,contentMDK:20458765~hlPK:1010150~menuPK:1009290~pagePK:64168332
~piPK:64168299~theSitePK:584402,00.html