Page 1: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …
Page 2: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …
Page 3: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …
Page 4: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …
Page 5: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

1

India ICDS Reform/ICDS IV Project

Preparation Mission

September 28-October 12, 2007

Aide Memoiré

1. A World Bank mission led by Meera Shekar visited India between September 28 to

October 12, 2007, to work with the Government of India (GOI) to prepare the Bank’s proposed

support for the ICDS Reform Project. Members from DfID, UNICEF, USAID, CARE and

Micronutrient Initiative (MI) joined the mission1, and other partners were consulted as required

during the mission. A list of the partners consulted is attached in Annex 1.

2. The mission met with Ms. Deepa Jain Singh, Secretary, Ministry of Women and Child

Development (MWCD), Ms. P. Bolina, Joint Secretary, MWCD, Mr. K. Rajeswara Rao, Project

Director, MWCD and Mr. Prashant, Director, DEA, Ministry of Finance. From the Central

Project Management Unit (CPMU) of the MWCD, the mission met with: Dr. S.K. Adhikari, Asst.

Director, and Mr. Naveen Yadav, Under Secretary. The mission also actively participated in the

Workshop on “Preparation of the IDA assisted ICDS Reform/ICDS-IV Project”, organized by

MWCD and sponsored by UNICEF on October 9-10, 2007. A list of state-level partners from the

8 states as well as development partners working in ICDS consulted by the mission is included in

Annex 2.

3. The objectives of the mission were to continue policy dialogue with the GOI on the

proposed ICDS Reform Project and to review (with GOI and partners) the current state of

preparation of the project vis-à-vis:

The revised time-line for project processing

Orientation/Planning Workshop with eight short listed States and start of preparation of

central and State Project Implementation Plans (PIPs) based on final PIP guidelines.

Finalise the recruitment of the management contractor for the TSU

Evaluation of EOIs and issue of RFP for impact evaluation

Initiation of environmental and social assessments

Finalise all other draft background studies (institutional assessment, procurement

assessment, best-practices study, district mapping, ECE studies, and a time-work study)

4. Progress since Last Mission and Updated Time-line: The mission is highly

appreciative of the concerted efforts of the MWCD team in moving ahead with project

preparations. The progress and speed of preparations over the last 5-7 weeks has been exceptional

and the mission commends MWCD on this achievement. The following paragraphs list the

progress/agreements and next steps. MWCD outlined an updated time-line for project

preparation. As per this timeline, the project is expected to be appraised by the Bank in April

2008 and will be presented for Bank board approval in Aug 2008. MWCD will initiate further

steps as required for EFC/CCEA clearance before negotiations. A copy of the updated time-line is

attached in Annex 3.

1 The mission members included: Meera Shekar (Team Leader), Peter Berman, Venita Kaul and Meera

Priyadarshi (co-TTLs), Snehashish R Chowdhury, Hugo-Diaz Etchevehere, Caryn Bredenkamp, Shankar

Narayanan, Shanker Lal, Tanuj Mathur, Ruma Tavorath, and Mohini Kak (all from the World Bank), and

Silke Seco (from DfID).

Page 6: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

2

5. Technical Support Units for the Central and State levels: The MWCD, World Bank,

and DFID teams jointly evaluated the eight technical proposals submitted for the “Consultancy

Services for the Establishment of Technical Support Units for the ICDS Reform Project”. Three

management firms were short listed and finalization of the selection is ongoing. The contract for

the commencement of the work is expected to be awarded shortly by the Bank as soon as

necessary clearances are obtained from MWCD and DfiD. The TSU (funded from the DfID Trust

Fund) will provide support at Central level, and the 8 short-listed states (Bihar, Rajasthan, Uttar

Pradesh, Madhya Pradesh, Chhattisgarh, Jharkhand, Maharashtra and Andhra Pradesh). DfID has

also proposed that an additional Social Development specialist be added to the TSUs at central

and state levels to take forward the equity and social inclusion issues highlighted in the social

assessment. The Bank welcomes this suggestion (with additional funding from DfID); this was

discussed and agreed upon with MWCD. In due course, this will be followed-up with the selected

management firm.

6. National Workshop with short-listed states: The MWCD successfully organized a

national workshop with the 8 short-listed states. The workshop was sponsored by UNICEF. The

objectives of the workshop were:

(i) To discuss the project concept note of ICDS-IV Project and key principles of the revised

implementation framework of ICDS, which would be aligned with the proposed project;

(ii) To inform the states about GoI’s road map during the 11th Five Year Plan: Revised

implementation framework for ICDS;

(iii) To elicit the views of the participating States on the proposed project

(iv) To discuss the guidelines for the State Project Implementation Plans (PIPs) and to

finalize draft structure/components/interventions under the project; and

(v) To devise and agree on an action plan and timeline for the preparation of the project.

The outcome of the workshop was a common understanding between MWCD, the WCD

departments from the eight short-listed states, and the World Bank regarding the MWCD’s

revised implementation framework for ICDS (under which overall umbrella the IDA support will

be positioned), the 11th plan recommendations, the potential size and nature of IDA support for

ICDS, the five key reform principles on which the IDA support is premised, PIP preparation

guidelines, and the next-steps in preparing the PIPs. A strong emphasis was placed by GOI in

their guidance to the states on five key issues: a) the quality of implementation, b) moving

from “outlays to outcomes” c) flexibility in project design d) evidence-based programming

and e) targeting intensive support in the 158 identified high-burden districts across the 8

states. The districts have been selected on the basis of a careful district-mapping exercise, and

this list is now final. A copy of the workshop agenda is attached in Annex 4.

7. PIP Guidelines and State Workshops: Draft Guidelines for the central and state

PIPs were shared with MWCD and states. These will be finalised soonest based on suggestions

from states and will be distributed by MWCD to the states. MWCD also needs to communicate

to the states, soonest possible, the resource envelope for the preparation of the PIPs. The

Mission suggests to MWCD that they post 2-3 additional key personnel (including

Procurement/Financial Management) at the Central Project Management Unit (CPMU)

soonest possible to guide the preparation of the State PIPs and to prepare the central PIP. Two

options for development of State PIPs were discussed. The States may wish to prepare the PIPs

with/without consultant support. If retroactive financing is sought for these costs, procedures for

recruiting consultants should conform to World Bank procurement guidelines. States may also

Page 7: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

3

wish to explore with other development partners, viz., USAID, CARE, UNICEF and MI all of

who have offered follow-on technical support for the preparation of the PIPs, including

organization of State/District workshops. MWCD and State officials will be in direct contact with

these organizations to follow-up. Of these 8 states, the states that prepare high quality PIPs in a

timely fashion will qualify for IDA support under the proposed project. It was reiterated that IDA

support for the states (for both nutrition and ECE) will be over and above the base-funding for

ICDS general and will focus primarily on quality strengthening, for piloting innovations and

scaling-up innovations.

It was agreed that State level workshops will be organized in each of the selected 8 states before

the initiation of the preparation of the draft State PIPs. The World Bank ICDS team will be

available to participate in these workshops to provide necessary support and guidance as feasible.

8. Nutrition Component: A menu of options for nutrition interventions was shared with

the states for their review. It was agreed that the menu is indicative and that other interventions

will be added to the list, as suggested by States as long as they are supported by evidence. It was

also reiterated that nutrition interventions will focus primarily on the “window of opportunity”

between pre-pregnancy and 2 years of life, and on micronutrient interventions. States have been

advised to work on the interventions through a consultative process.

9. Piloting innovations – including Conditional Cash Transfers: States may consider

piloting several innovations, including a Conditional Cash Transfer (CCT) scheme in a few

selected districts/blocks using the State-Level Innovation Fund, to be proposed under the project.

Further guidelines based on implementation experience will be discussed with MWCD/States by

a CCT specialist in a subsequent visit to India. The value of lessons learned from the pilot

exercise can be potentially far reaching and hence the pilot will benefit from a rigorous

evaluation.

10. Early Childhood Education (ECE) Component: It was agreed that this component of

the project will be referred to as Early Childhood Education (ECE). A menu of proposed

interventions for ECE (at central and state/district levels the project districts) was shared with

states for their review. It was agreed that the assessment and evaluation of ECE would be better

suited at the state level. While the need for a specially trained facilitator for ECE was to be

emphasized, states will explore and propose different options to ensure this provision.

11. Technical Studies: Findings of the following background studies were shared during the

workshop, for discussion and comments:

a. District Mapping Study – Selection of high-burden districts based on nutrition indices

b. Best Practices in ICDS

c. Procurement Capacity Assessment

d. Time/work study of AWWs

12. Procurement: The findings of the procurement capacity assessment conducted by the

consultant hired by the Bank were discussed with MWCD and States during the mission. The

major issues that require immediate attention are as follows:

Skilled procurement staff must be in place at CPMU and SPMU levels

A procurement manual will need to be developed by MWCD to guide the decentralized

procurement to maintain uniformity in approach

The financial delegations need to be reviewed and modified so that procurement

decisions are taken in a timely manner to reduce the overall time taken for procurement

Page 8: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

4

Internal/external procurement audits need to be strengthened

Storage facilities for supplies need to be strengthened wherever needed and sufficient

budgets need to be provided for transportation

Procurement record keeping and MIS need to be improved

A complaint handling mechanism needs to be developed at all the levels.

A procurement plan needs to be developed and monitored at all the levels.

The proposed arrangements on these issues will need to be included in the procurement chapter of

the central and state PIPs.

The Bank also shared with MWCD its concerns regarding the quality standards (Revised

Schedule M) for procurement of pharmaceuticals and informed MWCD that until the

implementation of schedule M is strengthened in a manner acceptable to the Bank by the Ministry

of Health & Family Welfare, Government of India, pharmaceutical products can only be procured

through International Competitive Bidding (ICB) applying WHO GMP criteria. Procurement

support agencies (PSA) are not to be used for IDA procurement.

13. Follow-up procurement-related actions to be completed before appraisal: The

following procurement-related actions will be required to be completed before project appraisal:

Preparation of a Procurement Plan for first 18 months covering goods, works and

consultancy services to be procured under the project

Preparation of a Procurement Manual for the project including SBD, procurement of

services, contract management, store management etc. MWCD has a draft manual that

may be used as a starting point.

Positioning of at least one dedicated procurement staff at CPMU

Preparation of bid documents/Request for proposal (RFP) documents for the critical

procurement to be taken up at CPMU level

Preparation of procurement chapter of PIP including the proposed procurement

arrangements along with the institutional and decision making structures at all the levels

and the cost table (viz. who will procure what and when)

Mr. Shanker Lal (WB Procurement Specialist) will be available for all procurement-related

discussions/guidance with MWCD/States.

14. Institutional Issues: A review of the Institutional Assessment of ICDS Program

Arrangements was completed by a consultant recruited by the Bank. Key findings from the study,

as well as lessons from the WCD and APERP projects were shared with the states.

15. Assessment of the Financial Management arrangements: The mission was informed

by MWCD that the next phase of ICDS will be implemented through the state and district level

societies and detailed information on this will be available in the Revised ICDS Implementation

Framework, which is expected to be finalized by MWCD shortly. The Bank team will study the

proposed implementation arrangements once precise information on these structures is

made available by MWCD. As part of the preparation process, an assessment of the FM

arrangements for the project will be conducted by the Bank. This will cover aspects relating

to funds flow, accounting, auditing, staff capacity etc. The review would be started in November

07 and would cover a sample of 2 – 3 states2 to enable evaluation of the implementation issues.

The review will include (a) collection of information on all the eight states through a

questionnaire (b) visits to states. The Terms of Reference for the review will be shared with

MWCD by end October 07. Further, a Financial Management Manual for the project will

2 Possible states will be Uttar Pradesh, Chhattisgarh and Madhya Pradesh

Page 9: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

5

need to be prepared by the MWCD by appraisal. This manual will serve as a useful reference

document for the implementing states and will assist the MWCD in effective monitoring. Work

on preparation of the document should start immediately to ensure that the same is finalized well

in time for appraisal. Therefore the first draft of the FMM will need to be ready for discussion

during the pre-appraisal mission. Mr. Tanuj Mathur, Sr. FM specialist from the Bank is

available for any follow-up consultations as needed.

16. Outstanding Audit Issues: The following audit reports under the earlier Women and

Child Development Project (P035827/ Cr. N0420-In) have not been received by the Bank till

date. As per the Bank Policies3 until acceptable audited financial statements are received, the

Bank normally delays negotiations or Board presentation of any new loans benefiting the

implementing entity. Therefore MWCD needs to ensure that the 7 outstanding reports are

submitted to the Bank at the earliest; a list is attached below:

a. Dept. of Woman & Child (05-06)

b. Udisha Nagaland (05-06)

c. Govt. of Orissa (04-05 and 05-06)

d. Udisha Lakshadweep (03-04 and 04-05)

e. Udisha Jammu & Kashmir (04-05)

17. Evaluation Strategy: Following the comments from the MWCD, the draft TORs for

hiring a research agency have been revised and are being submitted to MWCD for a final

clearance. The key objective of this assignment is to provide technical support to MWCD to (i)

develop a comprehensive evaluation plan for the duration of project implementation, and (ii)

develop an appropriate sampling methodology and evaluation tools to be used during the baseline

survey. These tools alongwith the sampling methodology once agreed between the Bank and

MWCD and reviewed with the project States will be used in the baseline survey by the research

agencies. Further technical assistance for the data analysis will be discussed at a later date as

needed. The evaluation plan and survey tools will be made available to MWCD by May 31,

2008.

18. M&E Workshop: MWCD has proposed to organize a Monitoring and Evaluation

workshop in Dec 2007/Jan 2008 to which all states, development partners, experts, etc will be

invited. The objective will be to stimulate thinking about M&E related issues for the development

of state and district PIPs, and also share technical and operational experience related to M&E in

ICDS. It will include presentations by national and international experts, as well as officials and

NGOs who have been involved in “best practice” activities in ICDS. There will also be sessions

on community-monitoring, the Results Framework and the baseline survey.

19. Results Framework: The Draft Results Framework for the ICDS Reform project

(developed during the previous mission) was further refined after discussions with the states at

the State workshop. A draft Annex 3 for the PAD was created, specifying the Results

implementation arrangements, and data sources for all current indicators is attached in Annex 6 of

this aide memoire. This will be further refined during the proposed M&E workshop. The mission

reiterated that as an IDA 14/15 requirement, updated baseline data for the results framework must

be available within six months of project approval. The Bank and other development partners are

jointly reviewing the proposed revised MIS formats and is in the process of submitting detailed

comments to GOI on the same.. These revisions are expected to be finalized before appraisal.

3 Op 10.02 on Financial Management; paragraph 7 on ‘Failure to submit Acceptable Audited Financial

Statements’

Page 10: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

6

20. Community-monitoring and social audits and Accreditation of AWCs: The mission

suggests that community monitoring become an important component of the M&E plans

for the project. A background paper on social audits and an operationally-focused 3-page paper

has been prepared by the Bank team. Copies of these were shared with MWCD and with the State

teams as an input in to State PIPs and district plans. The Bank team will make available

additional information on this issue on-line for use by the states/districts. The mission was

informed by MWCD that AWC accreditation is already being practiced by some states and will

be further refined and scaled-up to national level. A detailed proposal is awaited under the

national PIP component. These will include incentives and rewards, surprise inspection visits and

publication of performance of AWCs in local media/newspapers.

21. Annual Health Surveys: The mission was informed that the Registrar-General’s office

will implement an Annual Health Survey (funded by MoHFW) that will cover the 9 EAG states.

It will be a fixed panel survey, representative at the district level, and is planned for an initial

period of 7 years. Fieldwork for the first round is expected to commence in April 2008, and the

first results are expected to be available (in published form) one year later. MWCD (through the

Food and Nutrition Board) has been asked to give inputs. Nutritional status and feeding behavior-

related indicators will be included. The mission was informed that the Planning Commission will

conduct a countrywide impact evaluation of ICDS, as stipulated under the Xth-XIth five year

plan. The Program Evaluation Organization (PEO) is in charge. Sampling has been done, but data

collection agencies are yet to be hired. The evaluation plan for the project should keep this

information in mind to ensure synergies.

22. Social Development and safeguard issues: A large number of the project districts have

large tribal populations; therefore, World Bank Operational Policy 4.10 on Indigenous (Tribal)

peoples will apply. In accordance with the policy, the project would need to ensure that tribal

communities have a voice in project design and implementation through a process of “free, prior

and informed consultation”, that there are effective grievance redress mechanisms in place and a

Tribal Development Plan/Strategy is prepared outlining how the project would ensure effective

inclusion of tribal communities. MWCD needs to submit to the Bank for approval, soonest

possible, TORs for the development of a Tribal Development Plan/strategy. Once the TOR is

cleared, the strategy needs to be developed soonest. This plan will have to be reviewed by the

Bank prior to the Appraisal mission. If construction of Anganwadi centers calls for land

acquisition that result in involuntary resettlement, the World Bank Operational Policy 4.12 on

Involuntary Resettlement will also be applicable. Efforts should be made to avoid involuntary

resettlement to the extent possible. If unavoidable, then the effort should be to minimize

displacement, to treat resettlement as a development program by providing affected people

opportunities for improving their incomes and standard of living or at least to restore them and to

pay compensation for all affected assets at replacement cost. All of this information, summarized

in the form of a Resettlement Action Plan or framework that will be reviewed by the Bank prior to

the Appraisal mission. Copies of both these Operational Policies and related Bank procedures are

attached in Annex 7 and should be shared by MWCD with all participating States and

implementing agencies to make them aware of specific procedures to be followed to comply with

the requirements.

23. Social Assessment: To strengthen the design and implementation of the ICDS reform

process by providing relevant social analysis that promotes equity and social inclusion at all

levels of the program, a Social Assessment consultancy has been planned with DFID support. A

draft Terms of Reference (ToR) developed jointly by the Bank and DfID has been shared with

MWCD. To ensure that the Social Assessment focuses on the most pertinent issues and comes up

Page 11: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

7

with operationally relevant recommendations, the mission requests detailed inputs into the ToR

and design of this exercise. Effective ways of helping the ICDS program reach out to traditionally

excluded sections of the community is a key aspect of the reform process and a well designed and

implemented Social Assessment that is carefully managed by MWCD and participating State

level entities can be an important first step in this direction.

24. Environment safeguards: In accordance with World Bank’s Operational Policy OP

4.01, the proposed project has been classified as Category B. The environmental dimensions of

the project are linked with the construction and use of Anganwadi centres. These issues include

construction and design issues (including drainage, ventilation and lighting, safe building

materials etc), provision of safe potable water (particularly in arsenic and fluoride prone areas),

hygiene practices with regard to cooking, sanitation and cleanliness, location-related issues and

construction related impacts. By appraisal, the MWCD will need to undertake a desk review

which will assess current situation, based on existing assessment reports and state reviews

(e.g. the Facility Survey by NCAER, the Andhra Pradesh review of AWC construction, and other

existing studies). This will provide an understanding of the shortcomings and gaps in

construction, operation and maintenance of Anganwandi centres. Based on the above review, an

Environmental Management Framework (EMF) will be developed. The EMF will incorporate an

Action Plan which will include implementation protocols for awareness and training for the

community on good hygiene practices and necessity to provide safe and clean environment for

children, maintenance of Anganwadi centres, supervision, monitoring and reporting. Management

of waste during construction activities will also be detailed. The EMF will be prepared in such a

manner that these protocols can be incorporated into guideline documents, bidding/ contractual

documents and communication strategies for villages and communities and in the PAD and the

PIPs with appropriate budget lines. Appropriate legal requirements should also be included by

MWCD into the bid documents for construction contractors, wherever applicable. The EMF

including the Action Plan is the borrowers’ responsibility, and will need to be prepared,

reviewed and cleared by the Bank and disclosed in-country before the project can proceed

for Appraisal. More details on the Environmental Assessment are included in Annex 7. MWCD

has further confirmed that only small buildings with 1000-3000 Sq.ft. (AWCs and CDPO Offices

respectively) will be financed under the project. State PWD/RD Code/manual, as relevant, would

be followed strictly in the construction.

25. De-Brief with Development Partners: At the end of the mission, a de-brief was also

organized with development partners on the status of preparation of the ICDS Reform project.

This included a session on the forthcoming launch of the Lancet Series on Nutrition.

26. Readiness filters: The project readiness filters were discussed with MWCD. The next

technical mission is scheduled for end January/early February 2008. In the interim, relevant

mission members will be available for State PIP workshops and the M&E workshop as and when

scheduled/feasible.

27. Development partners in the proposed project: DfiD has joined all Bank ICDS

missions to-date, has financed many of the background studies for project preparation, and has

expressed an interest in staying engaged in ICDS. UNICEF, USAID, CARE and MI have all

expressed continued interest in being technical partners in the development of the project and will

be available to support the states in the development of the PIPs as needed. The mission is highly

appreciative of the tremendous level of support from all partners, under the guidance of MWCD.

Page 12: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

8

28. Next Steps: The following table highlights the key next steps that need to be completed

in the coming months:

Next step/Action Responsibi

-lity

To be

completed

by

Notes

1. Issue Contract to

selected firm for TSU

WB Nov/Dec

2007

Approval of minutes awaited from

MWCD.

2. Issue EOI for technical

support for Impact

Evaluation

WB Nov/Dec

2007

Approval of TORs awaited from

MWCD

3. Social assessment and

tribal assessment

MWCD/

DfiD

Jan/Feb

2008

DfiD and WB have shared draft TORs

for social assessment with MWCD;

MWCD needs to send draft TORs for a

Tribal development plan to WB for

clearance by Nov 07

4. Environmental

assessment and plan

MWCD Appraisal MWCD to send draft TORs for EA for

WB clearance by Nov 2007;

Environmental plan to be approved by

appraisal.

5. State ICDS workshops States/

MWCD

Starting in

Nov 2007

MWCD to send to states the resource

envelope and final PIP guidelines;

Bank team will participate in all state

w’shops to the extent possible;

6. M&E workshop with

states

MWCD Dec 07/Jan

08

WB team will participate as feasible;

Other technical partners welcome to

join.

7. Thematic workshops on

IEC, Convergence,

Community participation

etc for necessary inputs in

to PIPs

MWCD/

States

Jan/Feb

2008

WB team will participate as feasible;

8. Clearance of audit

issues

MWCD/

States

Appraisal/n

egotiations

9. FM Manual MWCD/

States

Appraisal WB to conduct FM appraisal after

MWCD gives more detailed

information on the FM/institutional

arrangements; Tanuj Mathur to provide

support as needed.

10. Procurement manual MWCD/

States

Appraisal Shanker Lal will provide support as

needed.

11. Other procurement

action as listed in para 12

MWCD Appraisal

Attachments: Annexures 1 to 7

Page 13: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

9

List of Annexures:

Annexure 1: List of Development Partners Met

Annexure 2: List of Participants at the Preparation Workshop held on 9-10 October, 2007

Annexure 3: Activity Chart for ICDS Reform/ICDS IV Project

Annexure 4: Agenda for Preparation Workshop held on 9-10 October, 2007

Annexure 5: Menu of Interventions for Nutrition Component of the Project

Annexure 6: Results Framework

Annexure 7: Links to Bank Safeguard Policies on Social and Environment Assessment

Page 14: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

10

ANNEXURE 1

List of Development Partners Consulted

ICDS Partners Meeting

SNo. Name Designation Organization /

Address

Tel Nos. Email

1 Kalyani Singh Head, Dept of

Food and

Nutrition

Lady Irwin College,

Sikandra Road, New

Delhi

98 994 50616 [email protected]

2 Ted Greiner Senior

Nutritionist

PATH, Washington

DC, USA

202 822 0033 [email protected]

3 Prema

Ramachandran

Director Nutrition Foundation of

India, New Delhi

98 914 85605 premaramachandran@

gmail.com

4 Rama

Narayanan

Advisor,

Nutrition

Security Studies

MS Swaminathan

Research Foundation,

Chennai

044-22541229 [email protected]

5 Cynthia Lewis Program Officer,

Global Health

Bill & Melinda Gates

Foundation

206 709 3728 cyndi.lewis@

gatesfoundation.org

6 Veenu Seth Reader in

Nutrition

Lady Irwin College,

Sikandra Road, New

Delhi

98 681 06060 veenu_seth@

hotmail.com

7 Deepika Nayar

Chaudhery

Chief Executive

Officer

Micronutrient

Initiatives

98 107 22787 dchaudhery@

mincronutrient.org

8 Sandhaya

Venkateshwar

an

Director

Advocacy

CARE, 27 Hauz Khas

Village

2656 4101 svenkateswaran@

careindia.org

9 Mukesh

Kumar

Program

Director, INHP

CARE, 27 Hauz Khas

Village

2656 4101 [email protected]

10 Ritu Sharma Knowledge

Manager

CARE, 27 Hauz Khas

Village

98 118 88981 [email protected]

11 Ashi Kohli

Kathuria

Deputy Office

Director

USAID, US Embassy,

New Delhi

98 110 83350 [email protected]

12 V. Ramesh

Babu

Senior Program

Manager

USAID, US Embassy,

New Delhi

98 730 04702 /

2419 8226

[email protected]

13 Purnima

Menon

Research Fellow IFPRI - New Delhi,

Pusa Campus

2584 6565 [email protected]

14 Usha Kiran Senior Program

Officer

Gates Foundation,

Sanskrit Bhawan, A-10,

Qutab Institutional

Area, Aruna Asaf Ali

Road, New Delhi

4100 3100 /

98 115 12032

usha.kiran@india.

gatesfoundation.org

15 Pramita

Sudharto

Deputy WHO

Rep.

WHO Country Office,

India

98 117 55021

16 Yonas Tegegn Partnership

Officer

WHO Regional Office

for South East Asia

98 104 06175 [email protected]

17 Sadhna Bhagat Consultant Global Alliance for

Improved Nutrition

4658 0246 consultant.gain@

gmaili.com

Page 15: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

11

SNo. Name Designation Organization /

Address

Tel Nos. Email

18 R. Sankar Regional Rep Global Alliance for

Improved Nutrition

4658 0246 [email protected]

19 Suneel K

Muttoo

Resident Advisor The AZZ Project 2C2,

Parkwood Apartments,

Rao Tula Ram Marg,

New Delhi - 110 022

2618 2085 [email protected]

20 I.P. Bhagwat Chief Program

Officer

Bhavishya Alliance

"Dakshina", 7th floor,

Plot 2, Sector 11, CBD,

Belapur, Navi Mumbai

98 679 59022 [email protected]

21 Massee

bateman

USAID, US Embassy,

New Delhi

22 Rajiv Tandon Sr. Advisor

Child Survival

USAID, US Embassy,

New Delhi

24198586 / 98

111 03305

[email protected]

23 Kajali Paintal Nutritionist PATH 98 116 64503 [email protected]

24 Sridhar

Srikantiah

BASICS 98 115 16335 [email protected] /

[email protected]

25 Deepika

Srivastava

Officer - in -

charge CDN,

Unicef India

73, Lodi Estate, New

Delhi

98 112 60888 [email protected]

26 Leena Sushant Program

Consultant

The Inclen Trust

International

98 689 57499 /

2696 0376

[email protected]

27 Vaishali

Deshmukh

Program

Consultant

INCLEN 98 685 25220 [email protected]

28 Sushma

Sharma

Food & Nutrition

Consultant

252, Vasant Enclave,

New Delhi - 110 057

98 183 57725 sushma.sharmalic@

gmail.com

29 Seema Puri Reader & Head

Dept of Nutrition

Institute of Home

Economics, F-4, Hauz

Khas enclave, New

Delhi

98 100 03220 [email protected]

30 Silke Seco Health Adviser DFID 98 991 07640 [email protected]

31 Shane Prigge Food

Technologist

WFP 98 734 32780 [email protected]

32 Dominique

Franneyora

PLD WFP 2615 0000 dominique.tranvefort@

wfp.org

33 Manoj Das Program

Consultant

Internationl Clinical

Epidemogoloy, New

Delhi

2696 0375 [email protected]

34 Radha Holla Policy &

Planning

Breast feeding

Promotion Network of

India

[email protected]

Page 16: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

12

ANNEXURE 2

WORKSHOP ON PREPARATION OF THE IDA ASSISTED ICDS-IV

PROJECT

Organized by

Ministry of Women & Child Development, Govt. of India In collaboration with

UNICEF

9-10 October 2007

Venue:

Hotel Claridges, Aurangzeeb Road, New Delhi

Lis t of Participants

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

State Governments

1 Smt Chhaya Ratan

Secretary

Andhra Pradesh Department of Women Development,

Child Welfare & Disabled Welfare

Govt of Andhra Pradesh, Secretariat

Hyderabad 500 022

Tel No. 040-23456852, 27612253

Fax No. 040-23450008

NO

2 Ms Y.V.Anuradha

Director

Andhra Pradesh Directorate of Women Development &

Child Welfare

Govt of Andhra Pradesh, Vengalrao Nagar

Ameerpet, Behind Sarathi Studio

Hyderabad 500 00

Tel No. 040-23733221, 23732587,

23734259

Fax No. 040-040-23733848, 23733665

Yes

3. Ms Sarala Rajjya

Lakshmi

Dy. Director

Andhra Pradesh -do-

Yes

4 Ms K. Rajya

Lakshmi

Regional

Andhra Pradesh - do - Yes

5 Ms Addi Chandrika

Dy. Director

Andhra Pradesh - do - Yes

6 Shri Vijoy Prakash

Secretary

Bihar Social Welfare Department

Govt. of Bihar, Old Secretariat

Patna –800 001

Telefax No. 06122239707

Fax No. 0612-2226906

Page 17: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

13

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

7 Shri Uday Singh

Kumawat

Director

Bihar Social Welfare Department

Directorate of ICDS, Govt of Bihar

Indira Bhawan, 2nd Floor

R.C. Singh Path, PATNA – 800 001

Telefax No. 0612-2226906

8 Shri Arvind

Chaudhary

Accounts Officer

Bihar - do -

9 Shri Jawahar

Shrivastava Secretary

Chhattisgarh Deptt of Women & Child Development

254 DKS Bhawan, Mantralaya

Govt of Chhattisgarh

Raipur 492 001

Telefax No. 0771-2234201, 2234190,

2234188

No

10 Shri Dinesh

Shrivastava

Director

Chhattisgarh Govt. of Chhattisgarh

Deptt. of Women & Child Development

D.K.S.Bhawan, Shastri Chowk

RAIPUR 492 001

Tel No. 0771-2234192, 2234190

Yes

11 Shri Prateek Khare

Joint Director

Chhattisgarh - do - Yes

12 Shri N.L.

Choudhary

Deputy Director

Chhattisgarh - do - Yes

13 Shri Sajid Meman

Assistant Director

Chhattisgarh - do - Yes

15 Shri U.K.Sangma

Principal Secretary

Jharkhand Deptt. of Social Welfare & WCD

Govt. of Jharkhand

Project Bhawan, HEC, Sector III

Dhurwa, Ranchi 834004

Tel No. 0651-2400757

Fax No. 0651-2400758

No

15 Shri D.K.Saxena

Special Secretary

(Social Welfare)

Jharkhand - do - Yes

16 Shri Ravindra

Agarwal

Director

Jharkhand Directorate of Social Welfare

Deptt. of Women & Child Development

Govt of Jharkhand, Engineering Hostel

Dhurwa, Ranchi 834 004

Tel No. 0651-2400893

Fax No. 0651-2400893

Yes

17 Shri S.P.Verma

Asstt. Director

Jharkhand - Do - Yes

18 Shri Prashant

Mehta

Principal Secretary

Madhya Pradesh Women & Child Development Department

Govt. of Madhya Pradesh

Secretariat, Vallabh Bhawan

Bhopal - 462 001

Tel No. 0755-2441043

Yes

Page 18: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

14

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

Fax No. 0755-4007113

19 Ms Kalpana

Srivastava

Director

Madhya Pradesh Directorate of Women & Child

Development

Govt. of Madhya Pradesh

IInd Block, 4th Floor, Paryawas Bhawan

Jail Road, BHOPAL – 16

Tel No. 0755-4007100, 2553318, 2553269

Fax No. 0755-4007103

Yes

20 Shri Akhilesh

Kumar Shrivastava

Programme Director

Madhya Pradesh - do Yes

21 Shri Gangrade

Deputy Director

Madhya Pradesh - do - Yes

22 Dr. Vijay Satvir

Singh

Secretary

Maharashtra Women & Child Development Deptt.

Govt. of Maharashtra

New Administrative Building, 4th Floor.

Madam Cama Road, Mumbai - 400 032

Tel No. 022-22027050,

Fax No. 022-22828281

WILL

CONFIRM ON

05/10/07

22 Shri Ujjwal Uke

Commissioner

Maharashtra Commissionerate of Women & Child

Development

Govt. of Maharashtra

Raigad Bhawan, 1st Floor (Rear Wing)

CBD Belapur, Navi Mumbai 400 614

Tel No. 022-27565158; Fax No. 022-

27565159

Yes

23 Shri D.J.Mundhe

Dy. Commissioner

(ICDS)

Maharashtra - do - Yes

24 Dr. Manjusha

Molwane

Nutrition Specialist

Maharashtra - do - Yes

25 Shri Uttam Karpe

Dy. CEO (ICDS)

Maharashtra - do - Yes

26 Smt Alka Kala

Principal Secretary

Rajasthan Deptt. of Women & Child Development

Govt. of Rajasthan

Secretariat

Jaipur 302 001

Telefax No. 0141-2227666

Yes

27 Ms Sarita Singh

Director

Rajasthan Deptt. of Women & Child Development

Govt. of Rajasthan

2 Jal Path, Gandhi Nagar

JAIPUR 302 015

Tel No. 0141-2705561

Fax No. 0141-270 5638

Yes

28 Dr. Mukta Arora,

Officer-in-charge

(UNICEF

Programmes)

Rajasthan -do- Yes

Page 19: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

15

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

29 Shri Amal Kr.

Verma

Secretary

Uttar Pradesh Deptt. of Women & Child Development

Government of Uttar Pradesh,

Room No.121, Bapu Bhavan

Lucknow - 226 001

Tel No. 0522-2237157

Fax No. 0522-2237231

Yes

30 Shri Datadin Pashi

Director

Uttar Pradesh Directorate of ICDS

Bal Vikas Pariyojana Parishad

3rd Floor, Indira Bhawan

Lucknow 226 001; Tel No. 0522-228 7248,

228 7249

Fax No. 0522-228 7032

No

31 Mr. Narendra

Kumar

Additional Director

Uttar Pradesh - do - Yes

32 Shri Santosh

Kumar

Dy. Director (ICDS)

Uttar Pradesh - do - Yes

Ministry of Women & Child

Development, GoI

1 Smt Renuka

Chowdhury Hon’ble

Minister of State

(I/C) for Women and

Child Development

MWCD, GoI Ministry of Women & Child Development,

Shastri Bhawan, New Delhi.

2 PS/Addl.PS to MOS MWCD, GoI

3 Ms Deepa Jain

Singh

Secretary

MWCD Ministry of Women & Child Development,

Shastri Bhawan, New Delhi. Tel No. 011-

23383586

Yes

4 Ms P.Bolina

Joint Secretary

MWCD Tel No. 011-2338 1654 Yes

5 Shri S.K.Ray

Joint Secretary &

Financial Advisor

MWCD Tel No. 011-2338 2696

6 Sh. K.Rajeswara

Rao

Director

MWCD

Tel No. 011-2338 5614

Yes

7 Shri Mahesh C.

Arora

Director

MWCD

Tel No. 011-2338 9434

8 Shri P.K.Thakur

Director (Finance)

MWCD Tel No. 011-2338 1851

9 Ms Archna Sharma

Awasthi

Deputy Secretary

MWCD Tel No. 011-23074215

10 Ms Rimjhim Prasad

Director

MWCD

11 Ms Jatinder Kaur

Under Secretary

MWCD

Page 20: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

16

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

12 Sh. S.K.Dargan

Under Secretary

MWCD

13 Sh. Naveen Yadav

Under Secretary

MWCD Yes

14 Dr. S.K.Adhikari

Asstt. Director

MWCD Yes

15 Sh. A.K.Goyal

Sr. Programmer

MWCD Yes

16 Sh J.S.Minhas

Section Officer

MWCD Yes

NIPCCD/FNB

1 Dr. A. K. Gopal

Director

NIPCCD 5 Siri Institutional Areas

Hauz Khas, New Delhi 110 016

Tel No.011-26515579, 26964373

Yes

2 Dr. Dinesh Paul

Additional Director

-d0- -do-

Tel. No. 011- 26963383

Yes

3 Dr. (Ms) Savita

Bhakhry

Joint Director

-do- -do- Yes

4 Ms Shashsi Prabha

Gupta

Technical Advisor

FNB, MWCD Ministry of Women & Child Development,

Shastri Bhawan, New Delhi.

Tel. No. 011-2362519

Yes

5 Dr. Jai Singh

Joint Tech. Advisor

FNB, MWCD -do-

Tel. No. 011-23341467

Yes

Other

Ministries/Departments

1 Shri Srikara Nayak

Director (WCD)

Planning Commission

Yojana Bhawan

Sansad Marg, New Delhi 110 001

2 Mr. Prashant

Director (FB)

Department of Economic Affairs

Ministry of Finance, Govt. of India

North Block, New Delhi 110 001

The World Bank

1 Dr. Peter Berman

Lead Economist

World Bank South Asia Human Development Sector

The World Bank

70 Lodi Estate, New Delhi 110 003

Yes

2 Dr. Meera Shekar

Sr. Nutrition

Specialist & Task

Team Leader

WB

- do -

Yes

3 Ms Meera

Priyadarshi

Senior Nutrition

Specialist

WB - do - Yes

Page 21: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

17

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

4 Dr. Venita Kaul

Senior Education

Specialist

WB - do - Yes

5 Mr. Snehashish Rai

Chowdhury

Operations Officer -

Health

WB - do - Yes

6 Dr. Caryn

Bredenkamp

Economist

WB - do - Yes

7 Mr. Sankar

Narayanan

Procurement

Specialist

WB - do - Yes

8 Mr. Tanuj Mathur

Financial

Management

Specialist

WB - do -

9 Ms Mohini Kak

Consultant

WB - do- Yes

10 Ms Tanushree

Haldar

WB - do - Yes

11 Ms Nira Singh WB - do- Yes

Development Partners

1. Ms Silke Seco

Health Advisor

DFID DFID India

British High Commission

B-26 Tara Crescent, Qutab Institutional

Area, New Delhi 110 016; Tel No. 011-

26529123 Extn. 3358

Fax No. 011-26529296

Yes

2. Arundhuti R.

Chowdhury

Social Development

Advisor

DFID Yes

3. Ms. Elizabeth Sime

Country Director

CARE CARE India

27, Hauz Khas Village, New Delhi-110016

Yes

4. Dr. (Ms) Dora

Warren

Asstt. Country

Director

CARE - do - Yes

5. Mr. Mukesh Kumar

Program Director

(INHP)

CARE - do - Yes (will attend

on 9.10.07 only)

6. Mr. Sanjay Kumar CARE

7. Ms. Ashi Kathuria USAID Yes

Page 22: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

18

SlNo Name/Designation State/

Organization

Address/Fax No Confirmation

8. Mr. Ramesh Babu USAID Yes

Mr. Luc Laviolette

Regional Director

MI Micronutrient Initiative India

11 Zamroodpur Community Centre

Kailash Colony Extension

New Delhi-110048

Tel No. 011-41009801 extn. 131; Fax No.

41009808

NO

Dr. Deepika

Chaudhery

CEO, MI

MI - do - Yes

Mr. Eimer Barr

Acting Country

Representative

UNICEF UNICEF

70 Lodi Estate; New Delhi-110003

Tel No. 011-24690401; Fax No. 011-

24627521, 24691410

Yes

Ms Deepika

Shrivastava

Project Officer

UNICEF UNICEF

70 Lodi Estate

New Delhi-110003

Yes

Ms. Rita Punhani

Consultant

UNICEF -do-

Mob. No. 9899110771

Yes

Page 23: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

19

ANNEXURE 3

Activity Chart for ICDS Reform/ICDS IV Project

Complete

d

In

progress

Not Started /

Incomplete

Sl.

No

.

Activity/Sub-Activity

By

wh

om

Dec

-06

Ja

n-0

7

Feb

-07

Ma

r-07

Ap

r-0

7

Ma

y-07

Ju

n-0

7

Ju

l-07

Au

g-0

7

Sep

-07

Oct

-07

No

v-0

7

Dec

-07

Ja

n-0

8

Feb

-08

Ma

r-08

Ap

r-0

8

Ma

y-08

Ju

n-0

8

Ju

l-08

Au

g '

08

Sep

'08

Month 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1 PCN Review and

Approval

GO

I/

WB

2 First Preparation

Mission

WB

/

GO

I

3 Background Studies

WB

/

GO

I

4 EFC for Revised

National Framework

GO

I

5 Second Preparation

Mission

WB

/

GO

I

6 Preparation of draft

Central and State PIPs

GO

I

Page 24: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

20

7 Pre - Appraisal

Mission

WB

8 Finalisation of Central

and State PIPs

GO

I/

WB

9 Appraisal Mission

WB

10 EFC/Cabinet

Clearances

GO

I

11 Negotiations

GO

I/

WB

12 Submission of Board

Package

WB

13 Board Approval

WB

14 Effectiveness

GO

I/

WB

Page 25: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

21

ANNEXURE 4

Workshop on Preparation of the IDA assisted ICDS-IV Project

Organized by

Ministry of Women & Child Development, Govt. of India

In collaboration with

UNICEF

9-10 October 2007

Venue:

Hotel Claridges, Aurangzeeb Road, New Delhi

A g enda

Day/Time Issue Details

9 Oct 2007: Vice Regal

Session I: 10.00 – 11.30 hrs

09.30 - 10.00 hrs Registration

10.00 - 11.00 hrs Welcome and Introduction to the

Workshop

By Ms P.Bolina, Joint Secretary, MWCD

Expected outcome of the workshop By Dr. Meera Shekar, Sr. Nutrition

Specialist & Task Team Leader, The

World Bank

Accelerating young child nutrition and

development outcomes

By Mr. Eimer Barr, Acting Country

Representative, UNICEF

Keynote address By Ms Deepa Jain Singh, Secretary,

MWCD

11.00 - 11.30 hrs Tea/Coffee Break

Session II: 11.30 – 13.00 hrs

[Chair: Ms Alka Kala, Principal Secretary, DWCD, Govt of Rajasthan]

11.30 – 12.10 hrs Revised Implementation Framework for

ICDS – An Overview

By Ms P. Bolina, Joint Secretary,

MWCD

- PPT (30mts)

- Remarks by Participants (10mts)

12.10 – 12.40 hrs Sharing from the consultative processes

for the revised implementation framework

held during April 2007

By Ms Deepika Shrivastava, Project

Officer, UNICEF (30mts)

12.40 – 13.20 hrs Project Concept Note

- Key Principles of the Project, Thrust

Areas and Project Components

By Mr. K.Rajeswara Rao, Director,

MWCD

- PPT (30mts)

- Discussion with States (10mts)

Page 26: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

22

Day/Time Issue Details

13.20 – 14.00 hrs Rationale for IDA support to the proposed

ICDS-IV Project – World Bank’s

Perspective

By Dr. Meera Shekar, World Bank

(30mts)

- Discussion with States (10mts)

14.00 – 15.00 hrs Lunch Break

Session III: 14.00 – 17.40 hrs

[Chair: Ms P. Bolina, Joint Secretary, MWCD, GoI]

15.00 – 18.00 hrs States’ Expectations from the Project By State Governments

[Andhra Pradesh, Bihar, Chhattisgarh,

Jharkhand, Madhya Pradesh,

Maharashtra, Rajasthan and Uttar

Pradesh]

- PPT on proposing 3-4 key

interventions under the project both

for nutrition and ECE components (8

States X 15mts each) (120mts)

- Discussion (30mts)

10 Oct 2007: Vice Regal

Session IV: 09.30 – 13.00 hrs

[Chair: Shri Amal Kumar Verma, Secretary, DWCD, Govt of Uttar Pradesh]

9.00 – 9.40 hrs Dissemination of findings of Technical Studies commissioned by the World Bank

(i) District Mapping Study – Selection of

high-burden districts based on nutrition

indices

By Dr. Caryn Bredenkamp, E T

Specialist, World Bank

- PPT (10mts); - Discussion (10mts)

(ii) Best Practices in ICDS By Ms Deepika Chaudhery, CEO,

Micronutrient Initiative

- PPT (10mts); - Discussion (10mts)

9.40 – 10.00 hrs Social Assessment for the proposed

project

By Shankar Narayanan, Sr. Social

Development Specialist, World Bank

PPT (10mts); - Discussion (10mts)

10.00 – 10.40 hrs Lessons learned from previous IDA

assisted ICDS Projects with specific

reference to project planning and

management – Sharing Experiences

By Mr. Snehashish Rai Chowdhury,

Operations Officer, World Bank

- PPT (20mts)

- Feedback/Experience from States

(20mts)

10.40 – 11.00 hrs Tea/Coffee Break

11.00 – 12.15 hrs Preparation of Project Implementation Plans (PIPs) – Design and Components

A. Overview of Draft PIP Guidelines for

project States

By Dr. S.K.Adhikari, Asstt. Director,

MWCD and Mr. S. Rai Chowdhury,

World Bank

- PPT on draft State PIP guidelines

(15mts)

B. Nutrition Component By Dr. Meera Shekar, World Bank

- PPT on proposed interventions

(15mts);

Page 27: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

23

Day/Time Issue Details

C. ECE Component By Dr. Venita Kaul, Sr. Education

Specialist, World Bank

- PPT on proposed interventions

(15mts);

Discussions (30mts)

12.15 – 13.00 hrs Presentations on Technical Studies commissioned by the World Bank

(iv) Procurement Capacity Assessment PPT by Mr. Shankar Lal, Procurement

Specialist, World Bank (15mts)

(v) Time/work study of AWWs PPT by Dr. Venita Kaul, World Bank

(15mts)

12.30 – 13.15 hrs Draft Results Framework for the ICDS-IV

Project

By Dr. Caryn Bredenkamp, World Bank

- PPT (15mts)

Discussion (15mts)

13.15 – 14.00 hrs Lunch Break

(Viewing of A short film titled ‘Bachpan’ on convergence with health, education etc.

in Madhya Pradesh

Session V: 14.00 – 17.00 hrs

[Chair: Shri Ujjwal Uke, Commissioner (ICDS), Govt of Maharashtra]

14.00 – 15.30 hrs Group Work on Project Interventions –

Listing out priorities based on PCN and

States’ presentations

(parallel session)

Group 1: Nutrition Component

(to be facilitated by WB/UNICEF)

Group 2: ECE Component

(to be facilitated by

WB/NIPCCD/UNICEF)

15.30 – 16.00 hrs Feedback from the Group Work By Groups

- PPT on key recommendations (15mts

each)

16.00 – 16.30 hrs Preparation of ICDS-IV Project: Next

Steps/Actions to be taken

By Dr. S.K.Adhikari, MWCD

- PPT outlining key tasks with timeline;

Setting up of Technical Support Units

(TSUs) etc. (15mts)

- Discussion (15mts)

16.30 – 17.00 hrs Concluding Remarks

By Secretary/Joint Secretary, MWCD

World Bank /UNICEF

Abbreviations: GoI- Government of India, MWCD – Ministry of Women & Child Development;

MOS – Minister of State; WB – World Bank; PCN – Project Concept Note; PPT – PowerPoint

Presentation

Page 28: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

24

ANNEXURE 5

Menu of Interventions for Nutrition Component of ICDS Reform Project

(Draft to be updated)

1. Nutrition and Health Education and IEC through local mass media

(newspapers, radio, TV) and interpersonal communications to focus on behaviour

change and increased demand for:

Increased rest during pregnancy (specially last trimester)

Appropriate new-born care

Promotion of exclusive breast-feeding for 6 months

Start adequate Complementary foods (with micronutrient sprinkles) at 6

months

Hand-washing after defecation and before feeding; Personal & Environmental

hygiene to reduce infections

Delayed pregnancies, birth spacing* and maternal care during pregnancy

Prevention of STDs and Reproductive tract infections (to prevent LBW)*

Iron-folate supplementation during pregnancy & adolescence (to prevent

LBW)*

Pediatric iron supplementation*

Consumption of iodised salt*

Twice-annual Vitamin A supplementation for all children 1-5 years*

Twice-annual de-worming (especially in endemic areas) *

Zinc treatment during diarrhea*

2. Strong focus on growth promotion and intensive counseling by AWWs linked

to

• Referral of sick children to health facilities

• Pre-pregnancy and pregnancy care for mothers

• Exclusive breast-feeding for 6 months

• Complementary food at 6 months with micronutrient sprinkles

3. Other optional interventions

• Iron-folate supplements for adolescent girls and infants

• Micronutrient sprinkles for complementary foods for infants

• Distribution of iodised salt/double-fortified salt for demonstration to poor

families

• Testing the scope of conditional cash transfers for mothers who exhibit good

health/nutrition behaviours

• Community organization of mothers self-help groups and links with micro-

finance programs

• Links with WCD’s creche-program (especially in urban areas)

Page 29: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

25

ANNEXURE 6

Results Framework

ICDS Reform Program

DRAFT

Output of Preparation Mission, Jan-Feb 2007

This is a (revised) preliminary Results Framework that builds upon the Results Framework

developed during the Jan-Feb 2007 Preparation Mission of the ICDS IV Reform Program. It

incorporates suggestions made during the October Preparation Mission and the October

Consultative Workshop. It will be further refined during an M&E workshop for project states to

be held in Nov/Dec 2007.

Eventually, and in line with recommendations, the number of indicators will be reduced to

approximately 10-12 key outcome and output indicators that are closely related to the attainment

of the PDOs. In addition, one or two key input or process indicators of items that are crucial for

project implementation may be included. Some additional indicators may need to be added to

capture a potential component on capacity-building, including M&E, institutional capacity and

IEC. Key indicators need to be disaggregate by SC, ST and poor/non-poor.

PDO / OUTCOME Indicator

The PDO is twofold:

(i) To enhance awareness and

adoption of appropriate

feeding and caring

behaviors, and expand the

utilization of nutrition

services by parents of

children aged 0-3 years;

and

(ii) To improve early child

education outcomes and

school readiness for

children 3-6 years old

in selected high-burden

districts/states

For PDO (i)

Awareness:

% women know that their children should be breastfed exclusively for 6

mths

% women know that complementary foods should be introduced at

about 6 mths

% mothers know that her child needs Vitamin A dose every 6 mths

% mothers aware that her child should receive ORS during diarrhoea

% mothers aware that she needs 3 antenatal care visits during pregnancy

Service Utilization and Behaviors:

% children aged 6-72mths who were exclusively breastfed for 6 mths

% children whose mothers initiated their breastfeeding within 1 hour of

delivery

% children receiving semi-solids around 6 mths of age

% mothers that brought children aged 0-36 months to the anganwadi for

growth monitoring and promotion in the previous month

% mothers that consumed at least 100 IFA tablets during pregnancy

For PDO (ii)

% children in the community, aged 30-6 years, enrolled in ECE

% children enrolled in ECE that attend the anganwadi’s ECE program

for the mandated minimum opening time, i.e at least 16 days per month

Percentage of children (of those attending ECE or of those enrolled in

ECE) aged 3-6 years (or 5-6 years) that are evaluated as school ready

Percentage of children of school-ready age that graduated to primary

school

Page 30: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

26

Intermediate Outcome / OUTPUT Intermediate Outcome/OUTPUT Indicators

Related to Nutrition component:

Improved delivery of ICDS health

and nutrition services to pregnant

women and children aged 0-3

months

Improvements in the national policy

framework for health and nutrition

% anganwadis that held growth-monitoring and promotion sessions for

children under 3 in the previous month

% anganwadis that conducted a Health and Nutrition Day in the

previous month

Mean number of home visits conducted by the anganwadi worker the

previous month

% anganwadi workers that received a visit by the supervisor within the

last month

Development of IEC materials and a media campaign (how to

measure?)

Guidelines and frameworks developed (which ones?)

Related to education component:

Improved preschool education

service delivery in selected high-

burden districts

A stronger national policy

framework for the implementation

of quality ECCE

Related to capacity-building,

including M&E and institutional

capacity-building

% anganwadis with a functionary that has received specialized (i.e. non-

orientation) ECE training (under the new project)

% anganwadis providing ECE for the mandated minimum period (i.e.

at least 16 days per month)

Mean number of times that preschool kits were used during the

preceding week

% anganwadi workers conducting five or more activities for ECE per

day (on the day before interview)

Quality standards for ECE have been set

Mechanism for quality assurance is in place

Mechanism for accreditation is in place

New training strategy for ECE workers developed

Communication strategy developed

New MIS framework is being used

% anganwadis with two workers in place

District plans produced on time (define what “on time means”)

Page 31: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

27

Table 1: Results Monitoring Arrangements

Target Values Data Collection and Reporting

Outcome Indicators BL YR1 YR2 YR3 YR4 YR5 Frequency

and

Reports

Data Collection

Instruments

Responsibility for

Data Collection

Health and Nutrition

% women (with

children under 1) that

breastfed children

exclusively for 6 mths

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

% mothers that

brought children aged

0-36 months to the

anganwadi for growth

monitoring in the

previous month

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

% mothers (with

children under 1) that

received at least 100

IFA tablets during

pregnancy

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

% mothers aware that

her child should

receive ORS during

diarrhea

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

% mothers aware that

need 3 ANC visits

during pregnancy

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

ECCE

% children aged 5-6

years that have

completed a full two

years of ECCE

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

Mean school readiness

scores (which scale?)

of children aged 6

years / % children

scoring a defined

minimum

Annual Household survey

(Baseline.

Midterm, Endline)

Sentinel

household surveys

Contracted

Research Institute

(with

PMUresponsibility)

Results Indicators for

each Component

Component 1:

Improved local

delivery of nutrition

services

% anganwadis with

two workers in place

Quarterly HMIS4 MWCD

% anganwadis that

held growth-

monitoring sessions of

children under 3 in the

Quarterly HMIS MWCD

4 All data collected by the HMIS can be verified by the baseline, midterm and endline surveys

Page 32: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

28

previous month

% anganwadis

conducted a Health

and Nutrition Day in

the previous month –

delete since ANM

responsibility? Or

valid since indicator of

convergence

Quarterly HMIS MWCD

Mean number of home

visits conducted by the

anganwadi worker the

previous month

Quarterly HMIS MWCD

% of anganwadi

workers that received a

visit by the supervisor

within the last month

Quarterly HMIS MWCD

Component 2:

Improved national

framework for

nutrition

Development of IEC

materials and a media

campaign

Guidelines and

frameworks developed

(which ones?)

Regular (define!)

district plans produced

Component 3:

Improved local

delivery of ECCE

services

% anganwadis with a

trained (define!) ECCE

functionary in place

Mean number of hours

per week that ECCE is

provided

% anganwadi

buildings that conform

to agreed norms

(define!), with respect

to space, light, floor

quality

% anganwadis that

provide a meal

(define!) on a regular

(define!) basis

Number of times that

preschool kits were

used during the

preceding week

Observational measure

of quality?

Component 4:

Improved national

framework for ECCE

Quality standards are

in place

Page 33: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

29

Mechanism for quality

assurance is in place

Mechanism for

accreditation is in

place

Training strategy for

ICDS preschool

teachers established

Communication

strategy developed

Periodic (define!)

research studies

conducted

MIS

% district officers who

know (define) essential

indicators…

Page 34: Mission of the World Bank... · 1 India ICDS Reform/ICDS IV Project Preparation Mission September 28-October 12, 2007 Aide Memoiré 1. A World Bank mission led by Meera Shekar …

30

ANNEXURE 7

Details of Bank Safeguard Policies on Social and Environment Assessment are available

at:

www.worldbank.org/safeguards

Environmental Assessment

Listed below are the Bank's policies on Environmental Assessment and Disclosure to

facilitate compliance with these policies.

http://intranet.worldbank.org/WBSITE/INTRANET/OPSMANUAL/0,,contentMDK:200

64724~pagePK:60001255~piPK:60000911~theSitePK:210385,00.html

http://intranet.worldbank.org/WBSITE/INTRANET/OPSMANUAL/0,,contentMDK:200

64614~pagePK:60001255~piPK:60000911~theSitePK:210385,00.html

http://intranet.worldbank.org/WBSITE/INTRANET/OPSMANUAL/0,,contentMDK:200

65218~pagePK:60001255~piPK:60000911~theSitePK:210385,00.html

For disclosure - pages 2 and 10 are relevant.

http://intranet.worldbank.org/WBSITE/INTRANET/UNITS/ESSDNETWORK/INTSAF

EPOL/0,,contentMDK:20458765~hlPK:1010150~menuPK:1009290~pagePK:64168332

~piPK:64168299~theSitePK:584402,00.html