MIT FSILG Facility Assessments

June 18, 2018

Page 2: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

2

1. Project Introduction

2. Project Methodology

3. Common and Critical Deficiencies

- Architecture

- Building Systems

- Egress

4. Conclusion

Agenda

Page 3: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

Project Introduction

Page 4: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

4

• 34 houses reviewed

- 2 to 4-hour site visits

• Systems reviewed:

- Architecture

- Structure

- Mechanical, Electrical, Plumbing, Fire Protection

- Life Safety / Egress

• Summary reports

• Meetings with house representatives

Overview

Page 5: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

5

Schedule

G1G1 G1

Site

Visits

Draft

Report

House

MeetingsFinal

Report

G2

Site

Visits

G2

Draft

Report

House

Meetings

G2

Final

Report

G3

Site

Visits

G3 G3 G3

Final

Report

January

G1

G2

House

MeetingsDraft

Reports

February March April May

Page 6: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

Project Methodology

Page 7: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

7

• The scope of the facility condition assessments included:

- Code compliance assessment

- Systems condition assessment

- Documentation of deficiencies and recommendations

- Order-of-magnitude cost estimates

• Arup visually evaluated the conditions of the building structure, shell, interior, and services.

• Building deficiencies were categorized based on the recommended time frame to take action.

Project Methodology

Page 8: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

8

Priority Categories

Category 1 Due within 12

months

These recommendations are limited to

immediate life safety risks or deficiencies

that could cause major disruption to the

use/function of the building and should be

addressed as soon as possible.

Category 2 Due within 5 years These recommendations include moderate

deficiencies that could cause disruption to

the use/function of the building and should

be addressed within 5 years. Readily

achievable items should be addressed as

soon as possible.

Category 3 Due within 10 years These recommendations include

deficiencies that should be addressed but are

not considered to require immediate action

and may require long term planning and

investment. Readily achievable items

should be addressed as soon as possible.

Page 9: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

9

• Arup utilized the current edition of the MA Building Code to develop recommendations across all FSILG houses.

• NFPA 101, Life Safety Code is a nationally recognized code and was used as a reference for existing building requirements.

• The assessments include all code deficiencies, however, many deficiencies may require compliance only when major repairs or renovations occur.

Applicable Codes

Page 10: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

Assessment Findings

Page 11: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

11

• The overall conditions of the buildings vary.

• It is the nature of buildings of this age and occupancy type to require increased upkeep.

• There were many great examples of proactive building maintenance and improvements.

• Common themes:

- Egress

- System maintenance

- Exterior building conditions

- Housekeeping

Assessment Overview

Page 12: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

1

2

12

Architecture Building Systems Egress

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%%

of

Ho

use

s S

urv

eyed

Page 13: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

13

• Architectural issues include:

- Exterior façade

- Windows/skylights

- Exterior doors/door hardware

- Roof and/or roof decking

• Routine inspection and repair plans should be developed.

• Limited instances of immediate structural concerns (less than 10% of houses).

Architecture

Page 14: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

14

• Electrical

- Exposed wiring

- Emergency lighting

• Fire Alarm

- Audio/visual coverage

- System smoke detectors in sleeping areas

• Fire Protection

- Painted, corroded, and taped sprinklers

- Inadequate coverage

- Residential sprinklers

Building Systems

Page 15: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

15

• Mechanical

- Equipment life expectancy

- Restroom ventilation

- Occupant comfort

• Plumbing

- Age of fixtures

- Pipe insulation

• Interior finishes

- Cosmetic issues

Building Systems

Page 16: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

16

• Remove storage from stairways to avoid fire spread into egress path.

- Example: storage closets in stairs

• Installing door closers on bedroom doors will help compartmentalize the building and keep egress paths clear.

- Combination door closer/door hold-open devices

Egress

Page 17: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

17

Hazards in Means of Egress

Page 18: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

18

• The MA Building Code requires each floor to have two exits and for the stairways to be properly enclosed and separated from each other.

• Due to impracticality of installing fully compliant stairways, Arup developed strategies that could be used as a potential basis for a compliance alternative.

Number of Exits

Page 19: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

19

• Floors with access to only one stair or exit could use a fire escape as a second means of egress.

• Stairs and fire escapes should discharge onto a public way to be considered an exit.

• Observed issues include:

- Fire escape balconies

- Fire escapes that do not discharge to grade

Fire Escapes

Page 20: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

20

• Efforts should be made to enclose stairways to prevent fire spread and maintain a safe egress path.

- Fire rated doors

- Draftstop curtain

• Many stairs do not contain compliant railings and guards.

Stairways

Page 21: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

Conclusions

Page 22: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

22

• Based on current codes and best practices, improvements are possible in all evaluated houses

• Some houses have immediate life safety concerns

- Hazards in means of egress

- Number of exits

- Access to exits

- Exit discharge

Conclusions

Page 23: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

23

• Each house should:

- regularly inspect and maintain systems in accordance with applicable codes and best practices.

- manage general housekeeping practices to limit combustible materials in egress paths.

• Renovations could trigger the requirement to upgrade building/life safety systems and accessibility features.

Other Considerations

Page 24: MIT FSILG Facility Assessmentsailg.mit.edu/sites/default/files/images/MIT FSILG Facility Assessments_FINAL.pdf · G1 G1 G1 Site Visits Draft Report House Meetings Final G2 Site Visits

24

• Assessment recommendations are based on current industry best practices.

• In general, the building code is not retroactive.

- Building official can identify hazards and force corrections at any time.

• Registered design professionals and/or licensed contractors should be engaged for repairs and renovations.

• In many cases, alternate means and methods may need to be considered in consultation with the authority having jurisdiction due to age, space limitations, historic considerations, etc.

In Closing