mix proportion data trumix

26
QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL MATERIAL Head Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : MIX PROPORTION DATA SHEET (FORM : T2-MD2) PROJECT : SUDIRMAN PLACE BATCH : GENERAL LOCATION : JAKARTA NO.TC/QA/MD2/055/2004 CONTRACTOR : PT. PP CODE : 35F2E2 QUALITY : K-350 (Fc'30 Mpa) CEMENT = 317 SLUMP : 120 ± 20 mm FLY ASH = 52 W/C RATIO : 0.49 SILICA FUME = FINE/AGGREGATES = 38% COMPOSITION FOR 1 CuM (SSD Condition) Water : w/c 0.49 : 180 Lt Cement : I : 317 Kg Fly Ash : : 52 Kg Silica Fume : Micropoz : - Kg SIKA ADMIXURE Plastiment RTD : b.w.c : 0.985 Lt SIKAMENT LN : b.w.c : - b.w.c : - FOSROC ADMIXURE CON P264M b.w.c : 0.821 Lt CON P211 b.w.c : - b.w.c : - Volume of Aggregates AGGREGATES Sand 1 : SILICA : 546 Kg Sand 2 : DUST : 134 Kg Gravel-01 : MLK5-10 : 219 Kg Gravel-02 : MLK10-25 : 876 Kg Gravel-03 : MLK25-40 : - Kg TOTAL : 2.325 Kg Density : 2.325 REMARK FLY ASH 10 % * PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 25 material other than specied herewith is ap[lied as subttitution or addition to mix design at above Ir. Adi Abdu As part of PT. Trumix Beton comitment to material to continous improvement, Technical Su we reserve the right change raw material source or modify mix design an accordance with technical standart wihout notice Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433 Clgn (0254-501201),Blrja (021-5950005), )

Upload: indra-rizky-efendy

Post on 31-Dec-2015

30 views

Category:

Documents


0 download

DESCRIPTION

sasas

TRANSCRIPT

Page 1: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH: GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR : PT. PP CODE : 35F2E2

QUALITY : K-350 (Fc'30 Mpa) CEMENT = 317 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = 52 Kg/m3

W/C RATIO : 0.49 SILICA FUME = Kg/m3

FINE/AGGREGATES = 38%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.49 : 180 Lt

Cement : I : 317 Kg

Fly Ash : : 52 Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD : b.w.c : 0.985 Lt

SIKAMENT LN : b.w.c : -

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.821 Lt

CON P211 b.w.c : -

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 546 Kg

Sand 2 : DUST : 134 Kg

Gravel-01 : MLK5-10 : 219 Kg

Gravel-02 : MLK10-25 : 876 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.325 Kg Density : 2.325 T/CuM

REMARK

FLY ASH 10 %

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 25 March 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement, Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 2: Mix Proportion Data Trumix
Page 3: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH : GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR : PT. PP CODE : 42F2E2

QUALITY : K-425 (Fc'35 Mpa) CEMENT = 383 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = 43 Kg/m3

W/C RATIO : 0.42 SILICA FUME = Kg/m3

FINE/AGGREGATES = 38%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.42 : 180 Lt

Cement : I : 383 Kg

Fly Ash : : 43 Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD : b.w.c : 1.135 Lt

SIKAMENT LN : b.w.c : -

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.946 Lt

CON P211 b.w.c : -

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 532 Kg

Sand 2 : DUST : 131 Kg

Gravel-01 : MLK5-10 : 214 Kg

Gravel-02 : MLK10-25 : 855 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.337 Kg Density : 2.337 T/CuM

REMARK

FLY ASH 10 %

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 25 March 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement,Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Page 4: Mix Proportion Data Trumix

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 5: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH : GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR : PT. PP CODE : 55F2E2

QUALITY : K-550 (Fc'45 Mpa) CEMENT = 481 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = 53 Kg/m3

W/C RATIO : 0.32 SILICA FUME = Kg/m3

FINE/AGGREGATES = 37%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.32 : 170 Lt

Cement : I : 481 Kg

Fly Ash : : 53 Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD : b.w.c : 1.425 Lt

SIKAMENT LN : b.w.c : 1.811 Lt

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.712 Lt

CON P211 b.w.c : 1.585 Lt

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 498 Kg

Sand 2 : DUST : 123 Kg

Gravel-01 : MLK5-10 : 209 Kg

Gravel-02 : MLK10-25 : 835 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.369 Kg Density : 2.369 T/CuM

REMARK

FLY ASH 10 %

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 25 March 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement, Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Page 6: Mix Proportion Data Trumix

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 7: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH : GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR: PT. PP CODE : 30P2

QUALITY : K-300 (Fc'25 Mpa) CEMENT = 309 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = Kg/m3

W/C RATIO : 0.6 SILICA FUME = Kg/m3

FINE/AGGREGATES = 39%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.6 : 185 Lt

Cement : I : 309 Kg

Fly Ash : : - Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD: b.w.c : 0.825 Lt

SIKAMENT LN : b.w.c : - Lt

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.687 Lt

CON P211 b.w.c : - Lt

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 576 Kg

Sand 2 : DUST : 142 Kg

Gravel-01 : MLK5-10 : 222 Kg

Gravel-02 : MLK10-25 : 887 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.321 Kg Density : 2.321 T/CuM

REMARK

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 28 January 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement, Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 8: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH : GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR: PT. PP CODE : 35P2

QUALITY : K-350 (Fc'30 Mpa) CEMENT = 345 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = Kg/m3

W/C RATIO : 0.54 SILICA FUME = Kg/m3

FINE/AGGREGATES = 38%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.54 : 185 Lt

Cement : I : 345 Kg

Fly Ash : : - Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD: b.w.c : 0.921 Lt

SIKAMENT LN : b.w.c : - Lt

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.767 Lt

CON P211 b.w.c : - Lt

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 552 Kg

Sand 2 : DUST : 136 Kg

Gravel-01 : MLK5-10 : 222 Kg

Gravel-02 : MLK10-25 : 887 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.327 Kg Density : 2.327 T/CuM

REMARK

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 28 January 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement, Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Page 9: Mix Proportion Data Trumix

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 10: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH: GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR : PT. PP CODE : 35F2E

QUALITY : K-350 (Fc'35 Mpa) CEMENT = 299 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = 70 Kg/m3

W/C RATIO : 0.49 SILICA FUME = Kg/m3

FINE/AGGREGATES = 38%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.49 : 180 Lt

Cement : I : 299 Kg

Fly Ash : : 70 Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD : b.w.c : 0.985 Lt

SIKAMENT LN : b.w.c : - Lt

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.821 Lt

CON P211 b.w.c : - Lt

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 544 Kg

Sand 2 : DUST : 134 Kg

Gravel-01 : MLK5-10 : 219 Kg

Gravel-02 : MLK10-25 : 874 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.32 Kg Density : 2.32 T/CuM

REMARK

FLY ASH 15 %

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 28 January 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement, Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 11: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH : GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR: PT. PP CODE : 42P2E

QUALITY : K-425 (Fc'35 Mpa) CEMENT = 398 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = Kg/m3

W/C RATIO : 0.47 SILICA FUME = Kg/m3

FINE/AGGREGATE = 38%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.47 : 185 Lt

Cement : I : 398 Kg

Fly Ash : : Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD : b.w.c : 1.06 Lt

SIKAMENT LN : b.w.c : - Lt

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.884 Lt

CON P211 b.w.c : - Lt

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 539 Kg

Sand 2 : DUST : 133 Kg

Gravel-01 : MLK5-10 : 216 Kg

Gravel-02 : MLK10-25 : 866 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.336 Kg Density : 2.336 T/CuM

REMARK

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 28 January 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvementTechnical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Page 12: Mix Proportion Data Trumix

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )

Page 13: Mix Proportion Data Trumix

QA & QC ; R&D; TECHNICAL CONCRETE & RAW MATERIAL

MATERIALHead Office : Jl. Gatot Subroto 38, Jakarta 12930 : Ph : (021) - 52962011 ; Fax (021) 52962122

Central Laboratory : Comodor Halim Perdana Kusuma No.29, Jakarta : Ph: 021-8010819: Fax : 021-8017342

MIX PROPORTION DATA SHEET

(FORM : T2-MD2)

PROJECT : SUDIRMAN PLACE BATCH : GENERAL

LOCATION : JAKARTA NO.TC/QA/MD2/055/2004

CONTRACTOR: PT. PP CODE : 42P2E

QUALITY : K-550 (Fc'45 Mpa) CEMENT = 499 Kg/m3

SLUMP : 120 ± 20 mm FLY ASH = Kg/m3

W/C RATIO : 0.35 SILICA FUME = Kg/m3

FINE/AGGREGATES = 37%

COMPOSITION FOR 1 CuM (SSD Condition)

Water : w/c 0.35 : 175 Lt

Cement : I : 499 Kg

Fly Ash : : Kg

Silica Fume : Micropoz : - Kg

SIKA ADMIXURE

Plastiment RTD: b.w.c : 1.331 Lt

SIKAMENT LN : b.w.c : 1.692 Lt

b.w.c : -

FOSROC ADMIXURE

CON P264M b.w.c : 0.666 Lt

CON P211 b.w.c : 1.481 Lt

b.w.c : -

Volume of Aggregates

AGGREGATES

Sand 1 : SILICA : 507 Kg

Sand 2 : DUST : 125 Kg

Gravel-01 : MLK5-10 : 213 Kg

Gravel-02 : MLK10-25 : 850 Kg

Gravel-03 : MLK25-40 : - Kg

TOTAL : 2.369 Kg Density : 2.369 T/CuM

REMARK

* PT. Trumix Beton will not responsible for all qulity matters if any Jakarta, 28 January 2004

material other than specied herewith is ap[lied as subttitution or

addition to mix design at above

Ir. Adi Abdul Azis

As part of PT. Trumix Beton comitment to material to continous improvement, Technical Superintendent

we reserve the right change raw material source or modify mix design

an accordance with technical standart wihout notice

Page 14: Mix Proportion Data Trumix

Plant : Rmbtn (021-87799845), Kmbgn (021-9144515), Kmyran (021-681824), sentul (021-87950564), Krwng (0267-433847),

Clgn (0254-501201),Blrja (021-5950005), )