mkhondo local municipality of draft budget and... · 2020. 5. 19. · mkhondo lm budget mkhondo...
TRANSCRIPT
-
MKHONDO LOCAL MUNICIPALITY
SUMMARY OF DRAFT BUDGET AND INTEGRATED DEVELOPMENT PLAN
2020-2021
DRAFT BUDGET AND IDP 2020/2021
-
20
Table of Contents 1. VISION, MISSION AND CORE VALUES ........................................................................................ 2
VISION ................................................................................................................................................. 2
MISSION .............................................................................................................................................. 2
MUNICIPAL CORE VALUES .................................................................................................................. 2
1. MKHONDO LOCAL MUNICIPALITY POPULATION DISTRIBUTION ............................................. 3
2. GENERAL TARIFF INCREASE ........................................................................................................ 3
3. ELECTRICITY TARIFFS (IBT) (INCREASE 6.23% PER UNIT…2020/21) .......................................... 3
4. HALLS TARIFFS ............................................................................................................................ 4
5. PROJECTS FOR 2020-2021 .......................................................................................................... 4
5.1. GRANTS SUMMARY ALLOCATION ..................................................................................... 4
5.2. MUNICIPAL INFRASTRUCTURE GRANT (MIG).................................................................... 4
5.3. WATER SERVICES INFRASTRUCTURE GRANT (WSIG) ........................................................ 5
5.4. OWN FUNDING 2020/2021 ................................................................................................ 6
6. SECTOR DEPARTMENTS PROJECTS ............................................................................................ 8
6.1. DEPARTMENT OF AGRICULTURE........................................................................................ 8
6.2. DEPARTMENT OF EDUCATION ........................................................................................... 9
6.3. DEPARTMENT OF HEALTH ................................................................................................ 18
6.4. DEPARTMENT OF SOCIAL DEVELOPMENT ....................................................................... 19
6.5. DEPARTMENT OF CULTURE, SPORTS AND RECREATION .................................................. 20
6.6. DEPARTMENT OF HUMAN SETTLEMENTS ....................................................................... 22
6.7. DEPARTMENT OF COMMUNITY, SAFETY, SECURITY AND LIASON ................................. 23
7. CONCLUSION ............................................................................................................................ 25
-
20
1. VISION, MISSION AND CORE VALUES
VISION
A model municipality of excellence
MISSION
Committed to deliver quality and sustainable services that will enhance economically viable
and better life for our community
MUNICIPAL CORE VALUES
• Excellence • Honesty • Openness
• Responsiveness • Professionalism
-
20
1. MKHONDO LOCAL MUNICIPALITY POPULATION DISTRIBUTION
2011 2016
Population 171 982 189 036
Number of Households 37 433 45 595
Households living in RDP House 10 342 11 733
Households in Shacks within Informal Settlements 642 1086
(Census, 2011 & Census 2016)
2. GENERAL TARIFF INCREASE
Property rates will be increasing by a consumer price index (CPI) of 4.5% which is for
an example R100 it will be R4.50 increase.
Electricity consumption is expected to increase by 6.23% as per NERSA approval any
other general electrical increases will be up to maximum of 4.5%.
Water, Sanitation, Burial, Plans, Refuse and other general services will be increased by
4.5%.
Flat rate remains at R150 per household in areas where there are services but no
billing is taking place.
3. ELECTRICITY TARIFFS (IBT) (INCREASE 6.23% PER UNIT…2020/21)
Prepaid 2019/20
Increase 2020/21
Conventional 2019/20
Increase 2020/21
(c/kwh) (c/kwh) (c/kwh) (c/kwh)
Block1 (0 – 50kwh)
R 1.0338 R 0.0644 R 1.0982 Block1 (0 – 50kwh)
R 0.9539 R 0.0594 R 1.0133
Block2 (51 – 350kwh)
R 1.3247 R 0.0826 R 1.4073 Block2 (51 – 350kwh)
R 1.2321 R 0.0768 R 1.3089
Block3 (351 – 600kwh)
R 1.8141 R 0.113 R 1.9271 Block3 (351 – 600kwh)
R 1.7752 R 0.1106 R 1.8858
Block4 (600kwh > )
R 2.2019 R 0.1372 R 2.3391 Block4 (600kwh > )
R 2.1196 R 0.1321 R 2.2517
Basic Charge R 118.64 R 7.40 R 126.04 Basic Charge R 118.64 R 7.40 R 126.04
-
20
4. HALLS TARIFFS
HALLS RENTAL CURRENT TARIFFS
(2019/20) (4.5%)
DRAFT TARIFFS (2020/21)
CATEGORY
DIFFERENCE
PIET RETIEF R 802.62 R 36.12 R 838.74
ETHANDAKUKHANYA R 427.35 R 19.23 R 446.58
KEMPVILLE R 603.30 R 27.15 R 630.45
AMSTERDAM R 603.30 R 27.15 R 630.45
ISWEPE/NTOMBE R 501.15 R 22.55 R 523.70
WINNIE/SKEYFINI/EZIPHUNZINI R 427.35 R 19.23 R 446.58
DRIEFONTEIN R 427.35 R 19.23 R 446.58
5. PROJECTS FOR 2020-2021
5.1. GRANTS SUMMARY ALLOCATION
2020/21 GRANTS ALLOCATION
GRANT ALLOCATIONS 2019-20 ORIGINAL BUDGET
INCREASE/ (DECREASE)
2020-21 DRAFT BUDGET
EQUITABLE SHARE 235 268 000 21 170 000 256 438 000
MIG 74 419 000 -502 350 73 916 650
WSIG 30 000 000 -4 000 000 26 000 000
RBIG - 40 000 000 40 000 000
INEP 10 000 000 5 440 000 15 440 000
EEDSMG 4 000 000 -4 000 000 -
EPWP 2 264 000 -266 000 1 998 000
FMG 2 680 000 320 000 3 000 000
TOTAL GRANTS 358 631 000 56 052 000 414 683 000
5.2. MUNICIPAL INFRASTRUCTURE GRANT (MIG)
2020/21 CAPITAL BUDGET - MIG
PROJECT TITLE ORIGINAL BUDGET ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Pmu Management 3 916 800 3 916 800 -
Construction of Driefontein To Iswepe and Haartebeesfontein Water Bulk Line (Phase 3)
9 530 553 10 000 000 12 860 000
-
20
2020/21 CAPITAL BUDGET - MIG
PROJECT TITLE ORIGINAL BUDGET ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Installation of Storm Water Drainage 1 000 000 - -
Construction of Main Access Road to Sandbank
5 000 000 3 713 937 -
Upgrading of Gravel Road to Paving Blocks In Ext 7
19 000 000 10 000 000 6 707 489
Installation of Water Bulkline to Rastplaas, Maphepheni ,Malayinini & Forest View
4 000 000 - -
Construction of Bulk Water Pipe Line and Riticulation at Dr Pols
22 552 647 34 567 635 -
Construction of Dignified Sanitation 4 336 000 5 000 000 6 280 048
Construction of Multi-Purpose Community Hall in Harmony Park
9 000 000 3 919 991 3 701 300
Upgrading of Taxi Rank Access Road at Emkhondo
- - 4 533 434
Amsterdam Sewer & Reticulation Network
- 3 221 450 14 250 000
Kempville Sports Ground - 1 562 692 -
Rehabilitation of Bus/Taxi Route Ethandakukhanya
- - 3 500 000
Amsterdam Paving Road - 2 433 495 -
Rehabilitation of Mandla Magudulela Stadium at Ethandukukhanya
- - 2 300 000
Drilling, Equipping and Electrification of Boreholes In Rural Villages
3 500 000
Construction of Driefontein Sanitation Infrastructure
16 284 379
TOTAL MIG 78 336 000 78 336 000 73 916 650
5.3. WATER SERVICES INFRASTRUCTURE GRANT (WSIG)
WSIG
ORIGINAL BUDGET
ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Ethandakukhanya WWTW 20 000 000 20 000 000 26 000 000
Amsterdam Sewer Reticulation 10 000 000 - -
Rustplaas Sewer - 8 200 000 -
Haartebees Sewer - 1 800 000 -
TOTAL WSIG 30 000 000 30 000 000 26 000 000
-
20
INEP 2019/20 ORIGINAL BUDGET ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Electrification of Thembalabasha - - 5 440 000
Upgrading of Phillip Greyling Substation
10 000 000 3 139 017 10 000 000
TOTAL INEP 10 000 000 3 139 017 15 440 000
EESDMS 2019/20 ORIGINAL BUDGET
ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Energy Efficiency Programme 4 000 000 - -
5.4. OWN FUNDING 2020/2021
OWN ACQUISITION 2020/21 ORIGINAL BUDGET
ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Laptops/ Computers 500 000 500 000 500 000
Office Furniture 400 000 400 000 500 000
Printers and Equipment 300 000 300 000 300 000
Electrification Of Oosloop, Eziphunzini & Group10
25 100 000 21 100 000 -
Upgrading of Water Treament Plant
- 2 000 000 6 000 000
Fleet - Mobile Office Trailer & Cars - 2 000 000 2 000 000
Petermeters - - 250 000
Microforest Programme - - 500 000
Radios - - 20 000
Street Blower Machines - - 12 000
Mass Bin Containers - - 50 000
Grass Brushcutters - - 30 000
Road Marking-Spray - - 500 000
Traffic Equipment - - 150 000
Speed Cameras - - 360 000
Hazmat Equipment - - 350 000
Jaws of Life (Amsterdam) - - 500 000
Pedestrian Rollers (2) - - 300 000
Plate Compactor (3) - - 30 000
Jack Hammer (3) - - 135 000
Cycle Rammers (2) - - 70 000
Replacement of Water Meters - - 500 000
Network Infrastructure - - 185 000
UPS - - 120 000
Software Packages - - 240 000
Serves - - 760 000
-
20
OWN ACQUISITION 2020/21 ORIGINAL BUDGET
ADJUSTMENT BUDGET
2020/21 DRAFT BUDGET
Projector & Mobile Screens - - 20 000
Bulk Meters - - 1 000 000
Replacing of Asbestos Pipes - - 1 000 000
Generators - Wtw & Wwtw - - 1 500 000
Partitioning Office - Town/Municipal Flats
- - 1 500 000
Upgrade of Pump Stations and Installation of Water Valves
- - 2 350 000
Construction of Guards Room and Shower Rooms
- - 650 000
Intensive Audit Assessment for Water & Wastewater Treatment Works
- - 350 000
Total Acquisition 26 300 000 26 300 000 18 382 000
-
20
6. SECTOR DEPARTMENTS PROJECTS 6.1. DEPARTMENT OF AGRICULTURE
PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES
TIMEFRAMES BUDGET (2019/20-2024/25)
Government Nutrition Programme (GNP)
Facilitate the compilation of GNP progress report; implementation and monitoring of agreed upon standard operating procedures; and provision of comprehensive support to farmers to supply the GNP
Whole province Operational
Comprehensive Rural Development Programme (CRDP)
Roll-out implementation of CRDP: establishment of a coordinating committees; implementation and monitoring of agreed upon standard operating procedures; and provision of comprehensive support to rural enterprises and initiatives
Emakhazeni lm, Pixley ka seme, and Mkhondo LM
Budget
Mkhondo (3/3) Agri-Hubs Mkhondo agri-hub in full operations and with markets. Provision of a comprehensive support to farmers to supply the agri-hubs
Mkhondo LM
20 000
Animal Production: Masibuyele Esibayeni Programme
Provision of livestock to improve food security through Masibuyele esibayeni programme
Whole province 10 500
Training:
Mpumalanga rural skills and learnership programme Whole province 36 000 000
Training of farmers through CASP and training on mixed farming, crop production, animal production
Whole province 7 000 000
Soil Conservation:
Land care
MP whole province 9 141 000
-
20
6.2. DEPARTMENT OF EDUCATION
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
1. NDAWONYE
PRIMARY
SCHOOL
Renovation of 16 storm damaged
classrooms, 1 kitchen and 1
administration office. (6 consist of
asbestos roof coverings). Replacement
of roof covering complete with trusses,
purlins bran daring etc., replacement of
ceilings including re-wiring, light fittings
switches and plugs. Paint work to 16
classrooms, 1 kitchen and 1
administration block. Engineered to
investigate visible structural cracks.
Treat for termite.
MAINTENANCE GERT
SIBANDE
ETHANDA
KUKHANY
A
MKHONDO
3 - 4 911 623
2. NEDERLAND Renovation of 16 storm damaged
classrooms, 1 kitchen and 1
administration office. (6 consist of
asbestos roof coverings). Replacement
of roof covering complete with trusses,
purlins brandaring etc., replacement of
ceilings including re-wiring, light fittings
switches and plugs. Paint work to 16
MAINTENANCE GERT
SIBANDE
COMMO
NDALE
MKHONDO 3 - 5 032 623
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
classrooms, 1 kitchen and 1
administration block. Engineered to
investigate visible structural cracks.
Treat for termite.
3. BERGPLAAS Renovation of 5 classrooms and 1 office
(3 classrooms have structural cracks
engineer to investigate) replace roof
and floor coverings including skirting of
5 classrooms and office, replace all
doors and locks on 5 classrooms and
paint work to 7 classrooms, connect
electricity to two classrooms, replace
ceiling to the grade r facilities, replaced
corrugated water pipe and treat for
termites
MAINTENANCE GERT
SIBANDE
BERGPLA
AS FARM
MKHONDO 3 - 544 385
4. IMIZAMOYETH
U
Replacement of perimeter fence
urgently, making good floor screed
(potholes) to 5 classrooms, treat for
termites.
MAINTENANCE GERT
SIBANDE
THANDAK
UKHANYA
PIET RETIEF 3 - 158 850
5. SAKHISIZWE Renovate 20 classrooms,admin block
and 10 toilets
MAINTENANCE GERT
SIBANDE
DRIEFONT
EIN
WAKKERSTR
OOM
3 - 3 408 497
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
6. SIPHOKUHLE
PRIMARY
SCHOOL
Renovate 12 classrooms,admin block,
and 8 toilets
MAINTENANCE GERT
SIBANDE
MSUKALI
GWA 1
MKHONDO 2020/09
/01
2020/12/
31
2020/02/
31
3 942 485
7. EZAKHENI
COMBINED
BOARDING
SCHOOL
Phase 1: maintenance of the boarding MAINTENANCE GERT
SIBANDE
WAKKERS
TROOM
MKHONDO 2021/05
/01
2021/08/
01
2021/09/
01
11 487
538
8. EMOYENI
PRIMARY
SCHOOL
Phase 2: demolition of 2 dilapidated
classrooms and construction of 2 x
classrooms, admin, library, kitchen,
sports field and parking
ADDITIONAL
FACILITIES
GERT
SIBANDE
AMSTERD
AM
MKHONDO 843 196
9. BERBICE
PRIMARY
SCHOOL
Demolition of 11 existing pit toilets.
Construction of 11 enviroloo toilets + 5
urinals +11 basins,
rehabilitate existing borehole
provide 1x water tank on steel tank
stand with fence around, including
drinking fountains + water distribution
from borehole to tank and from tank to
site
empty existing septic tank + new
soakaway
new school electrical grid installation +
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2019/09
/15
2020/04/
15
2020/07/
14
4 556 039
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
school connection + distribution +
installation to classrooms and admin
and grade r
10. DERBY
PRIMARY
SCHOOL
(I) provision of a clearview fence to
secure the site
(ii) demolition of existing structures on
site
(iii) construction of 9 enviroloo toilets
and provision of enviroloo units behind
toilets
(iv) provision of water (borehole,
pressure pump, water reticulation, 2 x
drinking fountains, 2 x 5000l of jojo
tanks on steel stands and palisade fence
around tanks)
(v) bulk connection of electricity and
electrical installations to toilets
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2019/09
/15
2020/04/
15
2020/07/
14
7 296 757
11. KWASHUKU S
SCHOOL
Demolish existing 17 pit toilets
renovation of 8 existing toilets,
construction of 14 new toilets + 17
basins + 8 urinals, supply
provide 4 x 5000l jojo tanks +
rehabilitate borehole
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2019/09
/01
2020/02/
28
2020/05/
28
3 677 576
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
upgrade water services, and drinking
fountains.
Upgrade existing sewer system, new
septic tanks + french drains
12. ZENDELINGSP
OST
COMBINED
SCHOOL
Demolition of 36 existing pit toilets.
Construction of 29 new enviroloo toilets
+ 21 basins + 8 urinals
provide 4 x 5000liter jojo tanks fenced
around including drinking fountains +
rehabilitate borehole
drain existing septic tank + new
soakaway + sewer pipes + fittings
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2020/02
/15
2020/09/
15
2020/12/
14
5 748 388
13. CANGASA
PRIMARY
SCHOOL
Demolition of pit toilets and
construction of 11 toilets
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2019/09
/15
2020/04/
15
2020/07/
14
1 327 303
14. ZIWELILE
PRIMARY
SCHOOL
(FARM
SCHOOL)
Construction of 9 enviroloo toilets, 1
urinal, 7 basins, demolition of 3 existing
pit toilets, provision of fully equipped
borehole, 1x 5000l jojo tank and tank
stand and provision of drinking fountain
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2020/04
/01
2020/10/
01
2020/12/
30
1 541 616
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
15. NOKUTHULA
PRIMARY
SCHOOL
Construction of 20 enviro-loo toilets, 5
urinals, 14 basins, demolition of 10
existing pit toilets, equipping of
borehole, 1x 5000l jojo tank and tank
stand and provision of drinking fountain
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2020/04
/01
2020/10/
01
2020/12/
30
3 404 138
16. EMOYENI
PRIMARY
SCHOOL
Construction of 15 enviro-loo toilets, 5
urinals, 11 basins, demolition of 14
existing waterborne toilets, equipping
of borehole, 1 x 5000l jojo tank and tank
stand and provision of drinking fountain
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2020/04
/01
2020/10/
01
2020/12/
30
2 599 300
17. EKUPHILENI
PRIMARY
SCHOOL
Construction of 16 enviroloo toilets, 4
urinals, 11 basins, demolition of 12
existing pit toilets and provision of
drinking fountain
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2020/04
/01
2020/10/
01
2020/12/
30
2 516 955
18. ESIBUSISWENI
COMBINED
SCHOOL
Demolition of 06 existing pit toilets and
construction of 23 enviro-loo seats and
8 urinals, 2 x 5000 l water tanks with
stands. Renovation of 06 waterborne
toilets
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2019/01
/15
2019/06/
15
2019/09/
15
3 891 282
19. GLEN ELAND
COMBINED
SCHOOL
Construction of 23 enviro-loo seats and
8 urinals, 2 x 5000 l water tanks with
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2019/01
/15
2019/06/
15
2019/09/
15
3 877 340
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
stands. Renovation of 06 waterborne
toilets
20. INKULULEKO
PRIMARY
SCHOOL
Demolition of 12 existing pit toilets and
construction of 15 enviro-loo seats
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2019/01
/15
2019/06/
15
2019/09/
15
2 511 223
21. WELGERVOND
PRIMARY
SCHOOLSCHO
OL
Demolition of 13 existing pit toilets and
construction of 15 enviro-loo seats and
5 urinals, 2 x 5000 l water tanks with
stands.
SANITATION GERT
SIBANDE
WAKKERS
TROOM
MKHONDO 2019/01
/15
2019/06/
15
2019/09/
15
2 868 207
22. YELLOWSTON
E PRIMARY
SCHOOL
Demolition of 10 existing pit toilets and
construction of 15 enviro-loo seats.
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2019/01
/15
2019/06/
15
2019/09/
15
2 512 765
23. KEMPSIDING
PRIMARY
SCHOOL
Construction of 15 new enviroloo toilets,
renovation of 7 teacher waterbone and
4 grade r waterborne, supply of 1 x
5000litre tank and drinking fountains.
Demolition of 20 existing pit toilets.
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2020/02
/15
2020/09/
15
2020/12/
14
4 227 680
24. EMONENI
PRIMARY
SCHOOL
Demolition of 06 plain pit toilets to clear
site for environmental health and safety
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 54 720
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
25. SIBAHLE
PRIMARY
SCHOOL
Demolition of 06 plain pit toilets and
construction of 10 additional toilets
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 1 228 186
26. WEEBER
PRIMARY
SCHOOL
Demolition of 04 plain pit toilets and
construction of 10 additional toilets
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 1 228 186
27. WETTERAU
PRIMARY
SCHOOL
Demolition of 01 plain pit toilets and
construction of 19 additional toilets
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2 333 554
28. UMLAMBO
COMBINED
SCHOOL
Phase 1: demolishing of 5 pit toilets and
construction of 30 toilets.
Phase 2: provision of fence.
Future phase: construction admin,
library and kitchen, hall, sports field and
parking.
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2019/09
/01
2020/02/
28
2020/06/
01
4 937 655
29. SINETHEMBA
SECONDARY
SCHOOL
Phase 1: demolishing of 11 pit toilets,
construction of 13 enviroloo toilets, and
provision of fence.
Future phase: construction of library and
kitchen, sports field and parking.
SANITATION GERT
SIBANDE
WAKKERS
TROOM
MKHONDO 3 306 642
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
30. MOOLMAN
PRIMARY
SCHOOL
Phase 1: demolishing of 14 pit toilets
and construction of 15 toilets and fence.
Phase 2: construction grade r centre.
Future phase: construction of library
kitchen, hall, sports field and parking.
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 3 489 958
31. VULANDLELA
PRIMARY
SCHOOL
Phase 1: provision of water pump for
the borehole construction of 4 toilets
and construction grade r centre.
Future phase: construction of admin
library kitchen, hall, sports field and
parking.
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2 030 274
32. DUMISANI
PRIMARY
SCHOOL
Phase 1: provision of water and repairs
of the borehole..
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 491 274
33. MADOLA
PRIMARY
SCHOOL
Construction of additional 15 toilets
inclusive of 8 grade r toilets
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2019/09
/01
2020/02/
28
2020/06/
01
1 500 000
34. BUHLEBUYEZA
PRIMARY
SCHOOL
Construction of additional 23 toilets
inclusive of grade r toilets
SANITATION GERT
SIBANDE
AMSTERD
AM
MKHONDO 2020/05
/15
2020/11/
15
2020/02/
15
1 766 829
-
20
NO
.
PROJECT
NAME
PROJECT DESCRIPTION SUB-SUB-
PROGRAMME(IN
FRASTRUCTURE)
LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET
(2019/20-
2024/25)
DISTRICT
MUNICIPALI
TY
CIRCUIT LOCAL
MUNICIPALI
TY
DATE:
START
DATE:
FINISH
FINAL
ACCOUNT
TPC
35. IMIZAMOYETH
U PRIMARY
SCHOOL
Construction of additional 20 toilets
inclusive of 8 grade r toilets
SANITATION GERT
SIBANDE
MKHOND
O
MKHONDO 2020/05
/15
2020/11/
15
2020/02/
15
1 859 820
6.3. DEPARTMENT OF HEALTH
PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES
TIMEFRAMES BUDGET (2019/20-2024/25) R’00
THANDUKHANYA COMMUNITY HEALTH CENTRE
Thandukhanya community health centre (construction of new community health centre and accommodation units) (phase 2)
MKHONDO LM 112 865 000
-
20
6.4. DEPARTMENT OF SOCIAL DEVELOPMENT
PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES
TIMEFRAMES BUDGET (2019/20-2024/25)
MKHONDO SUB DISTRICT OFFICE Mkhondo sub district office (initiation, planning, design and construction)
MKHONDO LM, PIETRIETIEF -27.0074100 30.8008380
28 082 000
DRIEFONTEIN BRANCH OFFICE Driefontein branch office (sub-division & rezoning supply mobile office)
MKHONDO LM,, DRIEFONTEIN -26.9984450 30.4158220
5,000 000
Driefontein branch office
2 500 000
-
20
6.5. DEPARTMENT OF CULTURE, SPORTS AND RECREATION
PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET (2019/20-2024/25)
R’00
ETHANDUKUKHANYA PUBLIC LIBRARY
Ethandukukhanya public library: new library MKHONDO LM, ETHANDUKUKHANYA PUBLIC LIBRARY
2019/20 - 2020/21 19 500 000
PIET RETIEF LIBRARY Piet Retief library upgrade MKHONDO LM, PIET RETIEF
2020/21 - 2021/22 1 000 000
PROJECT/PROGRAMME NAME/DESCRIPTION PROJECT BENEFICIARY/ WARD/LOCATION
2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000
TOTAL PROJECT COST R’000
INTERPRETATIVE CENTER FOR SAUL MKHIZE Saul Mkhizeville -27.007452 30.417938 -26 9820603 30.4522805 - 26.9641 30.4666
100% COMPLETION 9 600 9 600 (FUNDED BY
NATIONAL SPORT, ARTS AND CULTURE)
PROPOSED OF NAME CHANGE ARE SUBMITTED THROUGH LGNC, AND PGNC TO THE MINISTER OF SPORTS ARTS AND CULTURE FOR REVIEWAL
3 local municipalities in Gert Sibande District
3 PROPOSED NAME CHANGED THROUGH LGNC AND PGNC
450 450
SUPPORT OF THE TRADITIONAL COUNCILS WITH RSA FLAGS THAT SEEKS TO FOSTER CONSTITUTIONAL VALUES
Traditional councils in Gert Sibande District
17 TRADITIONAL COUNCIL PROVIDED WITH RSA FLAGS
99 99
SIGNIFY THE RICH HISTORY OF THE COUNTRY BY ELEVATING CERTAIN DAYS INTO PUBLIC HOLIDAYS SO THAT THEY CAN BE CELEBRATED OR COMMEMORATED
Any 2 local municipalities and will benefit all municipalities Gert Sibande District
2 NATIONAL AND HISTORICAL DAYS CELEBRATED
3 250 3 250
-
20
PROJECT/PROGRAMME NAME/DESCRIPTION PROJECT BENEFICIARY/ WARD/LOCATION
2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000
TOTAL PROJECT COST R’000
PROJECTS UNDERTAKEN TO PROMOTE ALL THE FUNCTIONS OF THE REPOSITORY THROUGH ORAL HISTORY, RECORDS MANAGEMENT SEMINARS OR ARCHIVES CONFERENCES IN RESPONSE TO NEW DEVELOPMENTS IN THE PROFESSION
Benefiting all the local municipalities in the province
1 ORAL HISTORY HOSTED 500 500
DEVELOPMENT OF READING MATERIALS IN DESIGNATED LANGUAGES OF THE PROVINCE THROUGH TERMINOLOGY DEVELOPMENT AND LITERATURE PROJECTS
Writers in siswati and isindebele at gert sibande region
ONE SISWATI AND ISINDEBELE BOOK PRODUCED
216 216
COOPERATIVES SUPPORTED TO INCREASE MARKETING PLATFORMS FOR EXPOSURE OF ARTS AND CRAFT PRODUCTS
Local arts and craft cooperatives 5 ARTS AND CRAFT COOPERATIVES SUPPORTED
67 67
MINI LIBRARY PROJECT IMPLEMENTED TO INCREASE ACCESS TO LIBRARY SERVICE FOR PEOPLE LIVING WITH SIGHT DISABILITY
MKHONDO
10 LIBRARIES OFFERING SERVICES TO THE BLIND
557 557
PEOPLE ACTIVELY PARTICIPATING IN ORGANISED SPORT AND ACTIVE RECREATION EVENTS SUCH AS INDIGENOUS GAMES, BIG WALK RURAL SPORTS, GOLDEN GAMES AND ETC.
4136 athletes in each local munipality
28 952 PEOPLE ACTIVELY PARTICIPATING IN ORGANISED SPORT AND ACTIVE RECREATION EVENTS
2 373 2 373
LOCAL LEAGUES ORGANISED BY FEDERATIONS OR ASSOCIATIONS IN COMMUNITIES WHERE CLUB DEVELOPMENT PROGRAM IS ESTABLISHED.
Local leagues at gert sibande region
2 LOCAL LEAGUES SUPPORTED 1 210 1 210
SCHOOLS, HUBS AND CLUBS SUPPORTED WITH EQUIPMENT AND/ATTIRE IN AN EFFORT TO PROVIDE OPPORTUNITIES FOR PARTICIPATION
Schools, hubs and clubs 25 SCHOOLS,7 HUBS AND 20 CLUBS PROVIDED WITH SPORT EQUIPMENT
1 404 1 404
LEARNERS PARTICIPATING IN SCHOOL SPORT TOURNAMENTS AT A DISTRICT LEVEL
390 learners in all local municipalities
2 733 LEARNERS PARTICIPATING IN SCHOOL
548 548
-
20
PROJECT/PROGRAMME NAME/DESCRIPTION PROJECT BENEFICIARY/ WARD/LOCATION
2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000
TOTAL PROJECT COST R’000
SPORT TOURNAMENTS AT A DISTRICT LEVEL
IDENTIFY ATHLETES SUPPORTED THROUGH SPORTS CODES TO ACCESS SCIENTIFIC SUPPORT PROGRAMME AND BE COMPETITIVE IN NATIONAL SPORT PLATFORMS
The centre is based at Govern Mbeki local municipality (sasol recreation ) and service all local municipalities in Gert Sibande District
SPORT ACADEMY SUPPORTED TO ASSIST ATHLETES TO ACCESS SCIENTIFIC SUPPORT PROGRAMME
558 558
REFERS TO ATHLETES THAT ARE SUPPORTED THROUGH A SPORTS ACADEMY PROGRAMME. SUPPORT INCLUDES THE HOLISTIC SUPPORT DOCUMENTED IN THE ACADEMY FRAMEWORK SUPPORT CAN VARY FROM SCIENTIFIC SUPPORT
Athletes supported through the sports academy programme at Gert Sibande region
102 NUMBER OF ATHLETES SUPPORTED BY THE SPORTS ACADEMIES TO ACCESS SCIENTIFIC SUPPORT PROGRAMME
440 440
6.6. DEPARTMENT OF HUMAN SETTLEMENTS
PROJECT PROJECT DESCRIPTION LOCATION TIMEFRAMES BUDGET (2019/20-2024/25)
INTEGRATED HUMAN SETTLEMENT
Kempville Extension 2
MKHONDO LM -27,036578 30,804161
Eziphunzini
MKHONDO LM -27,025851 30,76679
Kempville Extension 2 Integrated Human Settlement
MKHONDO LM -27,036036 30,805325
-
20
PROJECT PROJECT DESCRIPTION LOCATION TIMEFRAMES BUDGET (2019/20-2024/25)
Piet Retief Extension 7 Integrated Human Settlement -
MKHONDO LM 27,01125 30,813259
Amsterdam Integrated Human Settlement -
MKHONDO LM 26,611331 30,658828
6.7. DEPARTMENT OF COMMUNITY, SAFETY, SECURITY AND LIASON
NAME/DESCRIPTION PROJECT/PROGRAMME NAME/DESCRIPTION
PROJECT
BENEFICIARY/
WARD/LOCATION
2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000
TOTAL PROJECT COST
R’000
CIVILIAN OVERSIGHT
SAFETY PROMOTION
EDUCATIONAL AWARENESS CAMPAIGNS
(01) human trafficking awareness campaign
Piet retief 03 educational awareness campaigns conducted
225 000 225 000
(01) liquor traders workshop
Piet retief
(01) anti-rape awareness campaign
Iswepe
CRIME PREVENTION INITIATIVE
Contact crime
• Border security • Human
trafficking awareness campaign
Moral regeneration
• Nerston • Bothashoop
(piet retief) Armsterdam
03 contact crime initiatives implemented
50 000 50 000
50 000 50 000
-
20
NAME/DESCRIPTION PROJECT/PROGRAMME NAME/DESCRIPTION
PROJECT
BENEFICIARY/
WARD/LOCATION
2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000
TOTAL PROJECT COST
R’000
Rural safety Stock theft
Entombe 01 Rural safety initiative implemented
25 000 25 000
CRIME PREVENTION INITIATIVE
School safety Campaign against drugs and substance abuse
Kwashuku secondary school
04 School safety initiatives implemented
230 000 230 000
School debate
Prison visits 70 000 70 000
Sports against crime
COMMUNITY POLICE RELATIONS
Assess community safety forums (CSFS)
Mkhondo local municipality
01 community safety forum assessed
52 000
52 000
DIRKIESDORP
Assess community police forums (CSFS)
Mkhondo
03 community police forums (CPFS) assessed
180 000 180 000 AMSTERDAM
COMMUNITY POLICE RELATIONS
Deploy tourism safety monitors
Nerston (3) 583 680 583 680
-
20
7. CONCLUSION
The municipality is mandated to deliver efficient, sufficient and sustainable service delivery
to all the Mkhondo Local Municipality residents
We urge all our community members to report their incorrect and inconsistent
accounts, disputes, leaking and faulty meters as well as not receiving the account at
all.
We also request coordination with ward committees to identify and encourage
indigent registration for the needy in their wards.
All consumers must pay for their services in-order for the municipality to continue
giving sustainable service delivery.
Those who are faulting on their debt arrangements will be cut-off and they will be
expected to pay reconnection fees and other charges.
Report any criminal activities on tampering and illegal connection of servi