mkhondo local municipality of draft budget and... · 2020. 5. 19. · mkhondo lm budget mkhondo...

26
MKHONDO LOCAL MUNICIPALITY SUMMARY OF DRAFT BUDGET AND INTEGRATED DEVELOPMENT PLAN 2020-2021 DRAFT BUDGET AND IDP 2020/2021

Upload: others

Post on 01-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • MKHONDO LOCAL MUNICIPALITY

    SUMMARY OF DRAFT BUDGET AND INTEGRATED DEVELOPMENT PLAN

    2020-2021

    DRAFT BUDGET AND IDP 2020/2021

  • 20

    Table of Contents 1. VISION, MISSION AND CORE VALUES ........................................................................................ 2

    VISION ................................................................................................................................................. 2

    MISSION .............................................................................................................................................. 2

    MUNICIPAL CORE VALUES .................................................................................................................. 2

    1. MKHONDO LOCAL MUNICIPALITY POPULATION DISTRIBUTION ............................................. 3

    2. GENERAL TARIFF INCREASE ........................................................................................................ 3

    3. ELECTRICITY TARIFFS (IBT) (INCREASE 6.23% PER UNIT…2020/21) .......................................... 3

    4. HALLS TARIFFS ............................................................................................................................ 4

    5. PROJECTS FOR 2020-2021 .......................................................................................................... 4

    5.1. GRANTS SUMMARY ALLOCATION ..................................................................................... 4

    5.2. MUNICIPAL INFRASTRUCTURE GRANT (MIG).................................................................... 4

    5.3. WATER SERVICES INFRASTRUCTURE GRANT (WSIG) ........................................................ 5

    5.4. OWN FUNDING 2020/2021 ................................................................................................ 6

    6. SECTOR DEPARTMENTS PROJECTS ............................................................................................ 8

    6.1. DEPARTMENT OF AGRICULTURE........................................................................................ 8

    6.2. DEPARTMENT OF EDUCATION ........................................................................................... 9

    6.3. DEPARTMENT OF HEALTH ................................................................................................ 18

    6.4. DEPARTMENT OF SOCIAL DEVELOPMENT ....................................................................... 19

    6.5. DEPARTMENT OF CULTURE, SPORTS AND RECREATION .................................................. 20

    6.6. DEPARTMENT OF HUMAN SETTLEMENTS ....................................................................... 22

    6.7. DEPARTMENT OF COMMUNITY, SAFETY, SECURITY AND LIASON ................................. 23

    7. CONCLUSION ............................................................................................................................ 25

  • 20

    1. VISION, MISSION AND CORE VALUES

    VISION

    A model municipality of excellence

    MISSION

    Committed to deliver quality and sustainable services that will enhance economically viable

    and better life for our community

    MUNICIPAL CORE VALUES

    • Excellence • Honesty • Openness

    • Responsiveness • Professionalism

  • 20

    1. MKHONDO LOCAL MUNICIPALITY POPULATION DISTRIBUTION

    2011 2016

    Population 171 982 189 036

    Number of Households 37 433 45 595

    Households living in RDP House 10 342 11 733

    Households in Shacks within Informal Settlements 642 1086

    (Census, 2011 & Census 2016)

    2. GENERAL TARIFF INCREASE

    Property rates will be increasing by a consumer price index (CPI) of 4.5% which is for

    an example R100 it will be R4.50 increase.

    Electricity consumption is expected to increase by 6.23% as per NERSA approval any

    other general electrical increases will be up to maximum of 4.5%.

    Water, Sanitation, Burial, Plans, Refuse and other general services will be increased by

    4.5%.

    Flat rate remains at R150 per household in areas where there are services but no

    billing is taking place.

    3. ELECTRICITY TARIFFS (IBT) (INCREASE 6.23% PER UNIT…2020/21)

    Prepaid 2019/20

    Increase 2020/21

    Conventional 2019/20

    Increase 2020/21

    (c/kwh) (c/kwh) (c/kwh) (c/kwh)

    Block1 (0 – 50kwh)

    R 1.0338 R 0.0644 R 1.0982 Block1 (0 – 50kwh)

    R 0.9539 R 0.0594 R 1.0133

    Block2 (51 – 350kwh)

    R 1.3247 R 0.0826 R 1.4073 Block2 (51 – 350kwh)

    R 1.2321 R 0.0768 R 1.3089

    Block3 (351 – 600kwh)

    R 1.8141 R 0.113 R 1.9271 Block3 (351 – 600kwh)

    R 1.7752 R 0.1106 R 1.8858

    Block4 (600kwh > )

    R 2.2019 R 0.1372 R 2.3391 Block4 (600kwh > )

    R 2.1196 R 0.1321 R 2.2517

    Basic Charge R 118.64 R 7.40 R 126.04 Basic Charge R 118.64 R 7.40 R 126.04

  • 20

    4. HALLS TARIFFS

    HALLS RENTAL CURRENT TARIFFS

    (2019/20) (4.5%)

    DRAFT TARIFFS (2020/21)

    CATEGORY

    DIFFERENCE

    PIET RETIEF R 802.62 R 36.12 R 838.74

    ETHANDAKUKHANYA R 427.35 R 19.23 R 446.58

    KEMPVILLE R 603.30 R 27.15 R 630.45

    AMSTERDAM R 603.30 R 27.15 R 630.45

    ISWEPE/NTOMBE R 501.15 R 22.55 R 523.70

    WINNIE/SKEYFINI/EZIPHUNZINI R 427.35 R 19.23 R 446.58

    DRIEFONTEIN R 427.35 R 19.23 R 446.58

    5. PROJECTS FOR 2020-2021

    5.1. GRANTS SUMMARY ALLOCATION

    2020/21 GRANTS ALLOCATION

    GRANT ALLOCATIONS 2019-20 ORIGINAL BUDGET

    INCREASE/ (DECREASE)

    2020-21 DRAFT BUDGET

    EQUITABLE SHARE 235 268 000 21 170 000 256 438 000

    MIG 74 419 000 -502 350 73 916 650

    WSIG 30 000 000 -4 000 000 26 000 000

    RBIG - 40 000 000 40 000 000

    INEP 10 000 000 5 440 000 15 440 000

    EEDSMG 4 000 000 -4 000 000 -

    EPWP 2 264 000 -266 000 1 998 000

    FMG 2 680 000 320 000 3 000 000

    TOTAL GRANTS 358 631 000 56 052 000 414 683 000

    5.2. MUNICIPAL INFRASTRUCTURE GRANT (MIG)

    2020/21 CAPITAL BUDGET - MIG

    PROJECT TITLE ORIGINAL BUDGET ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Pmu Management 3 916 800 3 916 800 -

    Construction of Driefontein To Iswepe and Haartebeesfontein Water Bulk Line (Phase 3)

    9 530 553 10 000 000 12 860 000

  • 20

    2020/21 CAPITAL BUDGET - MIG

    PROJECT TITLE ORIGINAL BUDGET ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Installation of Storm Water Drainage 1 000 000 - -

    Construction of Main Access Road to Sandbank

    5 000 000 3 713 937 -

    Upgrading of Gravel Road to Paving Blocks In Ext 7

    19 000 000 10 000 000 6 707 489

    Installation of Water Bulkline to Rastplaas, Maphepheni ,Malayinini & Forest View

    4 000 000 - -

    Construction of Bulk Water Pipe Line and Riticulation at Dr Pols

    22 552 647 34 567 635 -

    Construction of Dignified Sanitation 4 336 000 5 000 000 6 280 048

    Construction of Multi-Purpose Community Hall in Harmony Park

    9 000 000 3 919 991 3 701 300

    Upgrading of Taxi Rank Access Road at Emkhondo

    - - 4 533 434

    Amsterdam Sewer & Reticulation Network

    - 3 221 450 14 250 000

    Kempville Sports Ground - 1 562 692 -

    Rehabilitation of Bus/Taxi Route Ethandakukhanya

    - - 3 500 000

    Amsterdam Paving Road - 2 433 495 -

    Rehabilitation of Mandla Magudulela Stadium at Ethandukukhanya

    - - 2 300 000

    Drilling, Equipping and Electrification of Boreholes In Rural Villages

    3 500 000

    Construction of Driefontein Sanitation Infrastructure

    16 284 379

    TOTAL MIG 78 336 000 78 336 000 73 916 650

    5.3. WATER SERVICES INFRASTRUCTURE GRANT (WSIG)

    WSIG

    ORIGINAL BUDGET

    ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Ethandakukhanya WWTW 20 000 000 20 000 000 26 000 000

    Amsterdam Sewer Reticulation 10 000 000 - -

    Rustplaas Sewer - 8 200 000 -

    Haartebees Sewer - 1 800 000 -

    TOTAL WSIG 30 000 000 30 000 000 26 000 000

  • 20

    INEP 2019/20 ORIGINAL BUDGET ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Electrification of Thembalabasha - - 5 440 000

    Upgrading of Phillip Greyling Substation

    10 000 000 3 139 017 10 000 000

    TOTAL INEP 10 000 000 3 139 017 15 440 000

    EESDMS 2019/20 ORIGINAL BUDGET

    ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Energy Efficiency Programme 4 000 000 - -

    5.4. OWN FUNDING 2020/2021

    OWN ACQUISITION 2020/21 ORIGINAL BUDGET

    ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Laptops/ Computers 500 000 500 000 500 000

    Office Furniture 400 000 400 000 500 000

    Printers and Equipment 300 000 300 000 300 000

    Electrification Of Oosloop, Eziphunzini & Group10

    25 100 000 21 100 000 -

    Upgrading of Water Treament Plant

    - 2 000 000 6 000 000

    Fleet - Mobile Office Trailer & Cars - 2 000 000 2 000 000

    Petermeters - - 250 000

    Microforest Programme - - 500 000

    Radios - - 20 000

    Street Blower Machines - - 12 000

    Mass Bin Containers - - 50 000

    Grass Brushcutters - - 30 000

    Road Marking-Spray - - 500 000

    Traffic Equipment - - 150 000

    Speed Cameras - - 360 000

    Hazmat Equipment - - 350 000

    Jaws of Life (Amsterdam) - - 500 000

    Pedestrian Rollers (2) - - 300 000

    Plate Compactor (3) - - 30 000

    Jack Hammer (3) - - 135 000

    Cycle Rammers (2) - - 70 000

    Replacement of Water Meters - - 500 000

    Network Infrastructure - - 185 000

    UPS - - 120 000

    Software Packages - - 240 000

    Serves - - 760 000

  • 20

    OWN ACQUISITION 2020/21 ORIGINAL BUDGET

    ADJUSTMENT BUDGET

    2020/21 DRAFT BUDGET

    Projector & Mobile Screens - - 20 000

    Bulk Meters - - 1 000 000

    Replacing of Asbestos Pipes - - 1 000 000

    Generators - Wtw & Wwtw - - 1 500 000

    Partitioning Office - Town/Municipal Flats

    - - 1 500 000

    Upgrade of Pump Stations and Installation of Water Valves

    - - 2 350 000

    Construction of Guards Room and Shower Rooms

    - - 650 000

    Intensive Audit Assessment for Water & Wastewater Treatment Works

    - - 350 000

    Total Acquisition 26 300 000 26 300 000 18 382 000

  • 20

    6. SECTOR DEPARTMENTS PROJECTS 6.1. DEPARTMENT OF AGRICULTURE

    PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES

    TIMEFRAMES BUDGET (2019/20-2024/25)

    Government Nutrition Programme (GNP)

    Facilitate the compilation of GNP progress report; implementation and monitoring of agreed upon standard operating procedures; and provision of comprehensive support to farmers to supply the GNP

    Whole province Operational

    Comprehensive Rural Development Programme (CRDP)

    Roll-out implementation of CRDP: establishment of a coordinating committees; implementation and monitoring of agreed upon standard operating procedures; and provision of comprehensive support to rural enterprises and initiatives

    Emakhazeni lm, Pixley ka seme, and Mkhondo LM

    Budget

    Mkhondo (3/3) Agri-Hubs Mkhondo agri-hub in full operations and with markets. Provision of a comprehensive support to farmers to supply the agri-hubs

    Mkhondo LM

    20 000

    Animal Production: Masibuyele Esibayeni Programme

    Provision of livestock to improve food security through Masibuyele esibayeni programme

    Whole province 10 500

    Training:

    Mpumalanga rural skills and learnership programme Whole province 36 000 000

    Training of farmers through CASP and training on mixed farming, crop production, animal production

    Whole province 7 000 000

    Soil Conservation:

    Land care

    MP whole province 9 141 000

  • 20

    6.2. DEPARTMENT OF EDUCATION

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    1. NDAWONYE

    PRIMARY

    SCHOOL

    Renovation of 16 storm damaged

    classrooms, 1 kitchen and 1

    administration office. (6 consist of

    asbestos roof coverings). Replacement

    of roof covering complete with trusses,

    purlins bran daring etc., replacement of

    ceilings including re-wiring, light fittings

    switches and plugs. Paint work to 16

    classrooms, 1 kitchen and 1

    administration block. Engineered to

    investigate visible structural cracks.

    Treat for termite.

    MAINTENANCE GERT

    SIBANDE

    ETHANDA

    KUKHANY

    A

    MKHONDO

    3 - 4 911 623

    2. NEDERLAND Renovation of 16 storm damaged

    classrooms, 1 kitchen and 1

    administration office. (6 consist of

    asbestos roof coverings). Replacement

    of roof covering complete with trusses,

    purlins brandaring etc., replacement of

    ceilings including re-wiring, light fittings

    switches and plugs. Paint work to 16

    MAINTENANCE GERT

    SIBANDE

    COMMO

    NDALE

    MKHONDO 3 - 5 032 623

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    classrooms, 1 kitchen and 1

    administration block. Engineered to

    investigate visible structural cracks.

    Treat for termite.

    3. BERGPLAAS Renovation of 5 classrooms and 1 office

    (3 classrooms have structural cracks

    engineer to investigate) replace roof

    and floor coverings including skirting of

    5 classrooms and office, replace all

    doors and locks on 5 classrooms and

    paint work to 7 classrooms, connect

    electricity to two classrooms, replace

    ceiling to the grade r facilities, replaced

    corrugated water pipe and treat for

    termites

    MAINTENANCE GERT

    SIBANDE

    BERGPLA

    AS FARM

    MKHONDO 3 - 544 385

    4. IMIZAMOYETH

    U

    Replacement of perimeter fence

    urgently, making good floor screed

    (potholes) to 5 classrooms, treat for

    termites.

    MAINTENANCE GERT

    SIBANDE

    THANDAK

    UKHANYA

    PIET RETIEF 3 - 158 850

    5. SAKHISIZWE Renovate 20 classrooms,admin block

    and 10 toilets

    MAINTENANCE GERT

    SIBANDE

    DRIEFONT

    EIN

    WAKKERSTR

    OOM

    3 - 3 408 497

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    6. SIPHOKUHLE

    PRIMARY

    SCHOOL

    Renovate 12 classrooms,admin block,

    and 8 toilets

    MAINTENANCE GERT

    SIBANDE

    MSUKALI

    GWA 1

    MKHONDO 2020/09

    /01

    2020/12/

    31

    2020/02/

    31

    3 942 485

    7. EZAKHENI

    COMBINED

    BOARDING

    SCHOOL

    Phase 1: maintenance of the boarding MAINTENANCE GERT

    SIBANDE

    WAKKERS

    TROOM

    MKHONDO 2021/05

    /01

    2021/08/

    01

    2021/09/

    01

    11 487

    538

    8. EMOYENI

    PRIMARY

    SCHOOL

    Phase 2: demolition of 2 dilapidated

    classrooms and construction of 2 x

    classrooms, admin, library, kitchen,

    sports field and parking

    ADDITIONAL

    FACILITIES

    GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 843 196

    9. BERBICE

    PRIMARY

    SCHOOL

    Demolition of 11 existing pit toilets.

    Construction of 11 enviroloo toilets + 5

    urinals +11 basins,

    rehabilitate existing borehole

    provide 1x water tank on steel tank

    stand with fence around, including

    drinking fountains + water distribution

    from borehole to tank and from tank to

    site

    empty existing septic tank + new

    soakaway

    new school electrical grid installation +

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2019/09

    /15

    2020/04/

    15

    2020/07/

    14

    4 556 039

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    school connection + distribution +

    installation to classrooms and admin

    and grade r

    10. DERBY

    PRIMARY

    SCHOOL

    (I) provision of a clearview fence to

    secure the site

    (ii) demolition of existing structures on

    site

    (iii) construction of 9 enviroloo toilets

    and provision of enviroloo units behind

    toilets

    (iv) provision of water (borehole,

    pressure pump, water reticulation, 2 x

    drinking fountains, 2 x 5000l of jojo

    tanks on steel stands and palisade fence

    around tanks)

    (v) bulk connection of electricity and

    electrical installations to toilets

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2019/09

    /15

    2020/04/

    15

    2020/07/

    14

    7 296 757

    11. KWASHUKU S

    SCHOOL

    Demolish existing 17 pit toilets

    renovation of 8 existing toilets,

    construction of 14 new toilets + 17

    basins + 8 urinals, supply

    provide 4 x 5000l jojo tanks +

    rehabilitate borehole

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2019/09

    /01

    2020/02/

    28

    2020/05/

    28

    3 677 576

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    upgrade water services, and drinking

    fountains.

    Upgrade existing sewer system, new

    septic tanks + french drains

    12. ZENDELINGSP

    OST

    COMBINED

    SCHOOL

    Demolition of 36 existing pit toilets.

    Construction of 29 new enviroloo toilets

    + 21 basins + 8 urinals

    provide 4 x 5000liter jojo tanks fenced

    around including drinking fountains +

    rehabilitate borehole

    drain existing septic tank + new

    soakaway + sewer pipes + fittings

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2020/02

    /15

    2020/09/

    15

    2020/12/

    14

    5 748 388

    13. CANGASA

    PRIMARY

    SCHOOL

    Demolition of pit toilets and

    construction of 11 toilets

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2019/09

    /15

    2020/04/

    15

    2020/07/

    14

    1 327 303

    14. ZIWELILE

    PRIMARY

    SCHOOL

    (FARM

    SCHOOL)

    Construction of 9 enviroloo toilets, 1

    urinal, 7 basins, demolition of 3 existing

    pit toilets, provision of fully equipped

    borehole, 1x 5000l jojo tank and tank

    stand and provision of drinking fountain

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2020/04

    /01

    2020/10/

    01

    2020/12/

    30

    1 541 616

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    15. NOKUTHULA

    PRIMARY

    SCHOOL

    Construction of 20 enviro-loo toilets, 5

    urinals, 14 basins, demolition of 10

    existing pit toilets, equipping of

    borehole, 1x 5000l jojo tank and tank

    stand and provision of drinking fountain

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2020/04

    /01

    2020/10/

    01

    2020/12/

    30

    3 404 138

    16. EMOYENI

    PRIMARY

    SCHOOL

    Construction of 15 enviro-loo toilets, 5

    urinals, 11 basins, demolition of 14

    existing waterborne toilets, equipping

    of borehole, 1 x 5000l jojo tank and tank

    stand and provision of drinking fountain

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2020/04

    /01

    2020/10/

    01

    2020/12/

    30

    2 599 300

    17. EKUPHILENI

    PRIMARY

    SCHOOL

    Construction of 16 enviroloo toilets, 4

    urinals, 11 basins, demolition of 12

    existing pit toilets and provision of

    drinking fountain

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2020/04

    /01

    2020/10/

    01

    2020/12/

    30

    2 516 955

    18. ESIBUSISWENI

    COMBINED

    SCHOOL

    Demolition of 06 existing pit toilets and

    construction of 23 enviro-loo seats and

    8 urinals, 2 x 5000 l water tanks with

    stands. Renovation of 06 waterborne

    toilets

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2019/01

    /15

    2019/06/

    15

    2019/09/

    15

    3 891 282

    19. GLEN ELAND

    COMBINED

    SCHOOL

    Construction of 23 enviro-loo seats and

    8 urinals, 2 x 5000 l water tanks with

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2019/01

    /15

    2019/06/

    15

    2019/09/

    15

    3 877 340

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    stands. Renovation of 06 waterborne

    toilets

    20. INKULULEKO

    PRIMARY

    SCHOOL

    Demolition of 12 existing pit toilets and

    construction of 15 enviro-loo seats

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2019/01

    /15

    2019/06/

    15

    2019/09/

    15

    2 511 223

    21. WELGERVOND

    PRIMARY

    SCHOOLSCHO

    OL

    Demolition of 13 existing pit toilets and

    construction of 15 enviro-loo seats and

    5 urinals, 2 x 5000 l water tanks with

    stands.

    SANITATION GERT

    SIBANDE

    WAKKERS

    TROOM

    MKHONDO 2019/01

    /15

    2019/06/

    15

    2019/09/

    15

    2 868 207

    22. YELLOWSTON

    E PRIMARY

    SCHOOL

    Demolition of 10 existing pit toilets and

    construction of 15 enviro-loo seats.

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2019/01

    /15

    2019/06/

    15

    2019/09/

    15

    2 512 765

    23. KEMPSIDING

    PRIMARY

    SCHOOL

    Construction of 15 new enviroloo toilets,

    renovation of 7 teacher waterbone and

    4 grade r waterborne, supply of 1 x

    5000litre tank and drinking fountains.

    Demolition of 20 existing pit toilets.

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2020/02

    /15

    2020/09/

    15

    2020/12/

    14

    4 227 680

    24. EMONENI

    PRIMARY

    SCHOOL

    Demolition of 06 plain pit toilets to clear

    site for environmental health and safety

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 54 720

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    25. SIBAHLE

    PRIMARY

    SCHOOL

    Demolition of 06 plain pit toilets and

    construction of 10 additional toilets

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 1 228 186

    26. WEEBER

    PRIMARY

    SCHOOL

    Demolition of 04 plain pit toilets and

    construction of 10 additional toilets

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 1 228 186

    27. WETTERAU

    PRIMARY

    SCHOOL

    Demolition of 01 plain pit toilets and

    construction of 19 additional toilets

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2 333 554

    28. UMLAMBO

    COMBINED

    SCHOOL

    Phase 1: demolishing of 5 pit toilets and

    construction of 30 toilets.

    Phase 2: provision of fence.

    Future phase: construction admin,

    library and kitchen, hall, sports field and

    parking.

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2019/09

    /01

    2020/02/

    28

    2020/06/

    01

    4 937 655

    29. SINETHEMBA

    SECONDARY

    SCHOOL

    Phase 1: demolishing of 11 pit toilets,

    construction of 13 enviroloo toilets, and

    provision of fence.

    Future phase: construction of library and

    kitchen, sports field and parking.

    SANITATION GERT

    SIBANDE

    WAKKERS

    TROOM

    MKHONDO 3 306 642

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    30. MOOLMAN

    PRIMARY

    SCHOOL

    Phase 1: demolishing of 14 pit toilets

    and construction of 15 toilets and fence.

    Phase 2: construction grade r centre.

    Future phase: construction of library

    kitchen, hall, sports field and parking.

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 3 489 958

    31. VULANDLELA

    PRIMARY

    SCHOOL

    Phase 1: provision of water pump for

    the borehole construction of 4 toilets

    and construction grade r centre.

    Future phase: construction of admin

    library kitchen, hall, sports field and

    parking.

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2 030 274

    32. DUMISANI

    PRIMARY

    SCHOOL

    Phase 1: provision of water and repairs

    of the borehole..

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 491 274

    33. MADOLA

    PRIMARY

    SCHOOL

    Construction of additional 15 toilets

    inclusive of 8 grade r toilets

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2019/09

    /01

    2020/02/

    28

    2020/06/

    01

    1 500 000

    34. BUHLEBUYEZA

    PRIMARY

    SCHOOL

    Construction of additional 23 toilets

    inclusive of grade r toilets

    SANITATION GERT

    SIBANDE

    AMSTERD

    AM

    MKHONDO 2020/05

    /15

    2020/11/

    15

    2020/02/

    15

    1 766 829

  • 20

    NO

    .

    PROJECT

    NAME

    PROJECT DESCRIPTION SUB-SUB-

    PROGRAMME(IN

    FRASTRUCTURE)

    LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET

    (2019/20-

    2024/25)

    DISTRICT

    MUNICIPALI

    TY

    CIRCUIT LOCAL

    MUNICIPALI

    TY

    DATE:

    START

    DATE:

    FINISH

    FINAL

    ACCOUNT

    TPC

    35. IMIZAMOYETH

    U PRIMARY

    SCHOOL

    Construction of additional 20 toilets

    inclusive of 8 grade r toilets

    SANITATION GERT

    SIBANDE

    MKHOND

    O

    MKHONDO 2020/05

    /15

    2020/11/

    15

    2020/02/

    15

    1 859 820

    6.3. DEPARTMENT OF HEALTH

    PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES

    TIMEFRAMES BUDGET (2019/20-2024/25) R’00

    THANDUKHANYA COMMUNITY HEALTH CENTRE

    Thandukhanya community health centre (construction of new community health centre and accommodation units) (phase 2)

    MKHONDO LM 112 865 000

  • 20

    6.4. DEPARTMENT OF SOCIAL DEVELOPMENT

    PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES

    TIMEFRAMES BUDGET (2019/20-2024/25)

    MKHONDO SUB DISTRICT OFFICE Mkhondo sub district office (initiation, planning, design and construction)

    MKHONDO LM, PIETRIETIEF -27.0074100 30.8008380

    28 082 000

    DRIEFONTEIN BRANCH OFFICE Driefontein branch office (sub-division & rezoning supply mobile office)

    MKHONDO LM,, DRIEFONTEIN -26.9984450 30.4158220

    5,000 000

    Driefontein branch office

    2 500 000

  • 20

    6.5. DEPARTMENT OF CULTURE, SPORTS AND RECREATION

    PROJECT PROJECT DESCRIPTION LOCATION (GIS COORDINATES) TIMEFRAMES BUDGET (2019/20-2024/25)

    R’00

    ETHANDUKUKHANYA PUBLIC LIBRARY

    Ethandukukhanya public library: new library MKHONDO LM, ETHANDUKUKHANYA PUBLIC LIBRARY

    2019/20 - 2020/21 19 500 000

    PIET RETIEF LIBRARY Piet Retief library upgrade MKHONDO LM, PIET RETIEF

    2020/21 - 2021/22 1 000 000

    PROJECT/PROGRAMME NAME/DESCRIPTION PROJECT BENEFICIARY/ WARD/LOCATION

    2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000

    TOTAL PROJECT COST R’000

    INTERPRETATIVE CENTER FOR SAUL MKHIZE Saul Mkhizeville -27.007452 30.417938 -26 9820603 30.4522805 - 26.9641 30.4666

    100% COMPLETION 9 600 9 600 (FUNDED BY

    NATIONAL SPORT, ARTS AND CULTURE)

    PROPOSED OF NAME CHANGE ARE SUBMITTED THROUGH LGNC, AND PGNC TO THE MINISTER OF SPORTS ARTS AND CULTURE FOR REVIEWAL

    3 local municipalities in Gert Sibande District

    3 PROPOSED NAME CHANGED THROUGH LGNC AND PGNC

    450 450

    SUPPORT OF THE TRADITIONAL COUNCILS WITH RSA FLAGS THAT SEEKS TO FOSTER CONSTITUTIONAL VALUES

    Traditional councils in Gert Sibande District

    17 TRADITIONAL COUNCIL PROVIDED WITH RSA FLAGS

    99 99

    SIGNIFY THE RICH HISTORY OF THE COUNTRY BY ELEVATING CERTAIN DAYS INTO PUBLIC HOLIDAYS SO THAT THEY CAN BE CELEBRATED OR COMMEMORATED

    Any 2 local municipalities and will benefit all municipalities Gert Sibande District

    2 NATIONAL AND HISTORICAL DAYS CELEBRATED

    3 250 3 250

  • 20

    PROJECT/PROGRAMME NAME/DESCRIPTION PROJECT BENEFICIARY/ WARD/LOCATION

    2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000

    TOTAL PROJECT COST R’000

    PROJECTS UNDERTAKEN TO PROMOTE ALL THE FUNCTIONS OF THE REPOSITORY THROUGH ORAL HISTORY, RECORDS MANAGEMENT SEMINARS OR ARCHIVES CONFERENCES IN RESPONSE TO NEW DEVELOPMENTS IN THE PROFESSION

    Benefiting all the local municipalities in the province

    1 ORAL HISTORY HOSTED 500 500

    DEVELOPMENT OF READING MATERIALS IN DESIGNATED LANGUAGES OF THE PROVINCE THROUGH TERMINOLOGY DEVELOPMENT AND LITERATURE PROJECTS

    Writers in siswati and isindebele at gert sibande region

    ONE SISWATI AND ISINDEBELE BOOK PRODUCED

    216 216

    COOPERATIVES SUPPORTED TO INCREASE MARKETING PLATFORMS FOR EXPOSURE OF ARTS AND CRAFT PRODUCTS

    Local arts and craft cooperatives 5 ARTS AND CRAFT COOPERATIVES SUPPORTED

    67 67

    MINI LIBRARY PROJECT IMPLEMENTED TO INCREASE ACCESS TO LIBRARY SERVICE FOR PEOPLE LIVING WITH SIGHT DISABILITY

    MKHONDO

    10 LIBRARIES OFFERING SERVICES TO THE BLIND

    557 557

    PEOPLE ACTIVELY PARTICIPATING IN ORGANISED SPORT AND ACTIVE RECREATION EVENTS SUCH AS INDIGENOUS GAMES, BIG WALK RURAL SPORTS, GOLDEN GAMES AND ETC.

    4136 athletes in each local munipality

    28 952 PEOPLE ACTIVELY PARTICIPATING IN ORGANISED SPORT AND ACTIVE RECREATION EVENTS

    2 373 2 373

    LOCAL LEAGUES ORGANISED BY FEDERATIONS OR ASSOCIATIONS IN COMMUNITIES WHERE CLUB DEVELOPMENT PROGRAM IS ESTABLISHED.

    Local leagues at gert sibande region

    2 LOCAL LEAGUES SUPPORTED 1 210 1 210

    SCHOOLS, HUBS AND CLUBS SUPPORTED WITH EQUIPMENT AND/ATTIRE IN AN EFFORT TO PROVIDE OPPORTUNITIES FOR PARTICIPATION

    Schools, hubs and clubs 25 SCHOOLS,7 HUBS AND 20 CLUBS PROVIDED WITH SPORT EQUIPMENT

    1 404 1 404

    LEARNERS PARTICIPATING IN SCHOOL SPORT TOURNAMENTS AT A DISTRICT LEVEL

    390 learners in all local municipalities

    2 733 LEARNERS PARTICIPATING IN SCHOOL

    548 548

  • 20

    PROJECT/PROGRAMME NAME/DESCRIPTION PROJECT BENEFICIARY/ WARD/LOCATION

    2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000

    TOTAL PROJECT COST R’000

    SPORT TOURNAMENTS AT A DISTRICT LEVEL

    IDENTIFY ATHLETES SUPPORTED THROUGH SPORTS CODES TO ACCESS SCIENTIFIC SUPPORT PROGRAMME AND BE COMPETITIVE IN NATIONAL SPORT PLATFORMS

    The centre is based at Govern Mbeki local municipality (sasol recreation ) and service all local municipalities in Gert Sibande District

    SPORT ACADEMY SUPPORTED TO ASSIST ATHLETES TO ACCESS SCIENTIFIC SUPPORT PROGRAMME

    558 558

    REFERS TO ATHLETES THAT ARE SUPPORTED THROUGH A SPORTS ACADEMY PROGRAMME. SUPPORT INCLUDES THE HOLISTIC SUPPORT DOCUMENTED IN THE ACADEMY FRAMEWORK SUPPORT CAN VARY FROM SCIENTIFIC SUPPORT

    Athletes supported through the sports academy programme at Gert Sibande region

    102 NUMBER OF ATHLETES SUPPORTED BY THE SPORTS ACADEMIES TO ACCESS SCIENTIFIC SUPPORT PROGRAMME

    440 440

    6.6. DEPARTMENT OF HUMAN SETTLEMENTS

    PROJECT PROJECT DESCRIPTION LOCATION TIMEFRAMES BUDGET (2019/20-2024/25)

    INTEGRATED HUMAN SETTLEMENT

    Kempville Extension 2

    MKHONDO LM -27,036578 30,804161

    Eziphunzini

    MKHONDO LM -27,025851 30,76679

    Kempville Extension 2 Integrated Human Settlement

    MKHONDO LM -27,036036 30,805325

  • 20

    PROJECT PROJECT DESCRIPTION LOCATION TIMEFRAMES BUDGET (2019/20-2024/25)

    Piet Retief Extension 7 Integrated Human Settlement -

    MKHONDO LM 27,01125 30,813259

    Amsterdam Integrated Human Settlement -

    MKHONDO LM 26,611331 30,658828

    6.7. DEPARTMENT OF COMMUNITY, SAFETY, SECURITY AND LIASON

    NAME/DESCRIPTION PROJECT/PROGRAMME NAME/DESCRIPTION

    PROJECT

    BENEFICIARY/

    WARD/LOCATION

    2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000

    TOTAL PROJECT COST

    R’000

    CIVILIAN OVERSIGHT

    SAFETY PROMOTION

    EDUCATIONAL AWARENESS CAMPAIGNS

    (01) human trafficking awareness campaign

    Piet retief 03 educational awareness campaigns conducted

    225 000 225 000

    (01) liquor traders workshop

    Piet retief

    (01) anti-rape awareness campaign

    Iswepe

    CRIME PREVENTION INITIATIVE

    Contact crime

    • Border security • Human

    trafficking awareness campaign

    Moral regeneration

    • Nerston • Bothashoop

    (piet retief) Armsterdam

    03 contact crime initiatives implemented

    50 000 50 000

    50 000 50 000

  • 20

    NAME/DESCRIPTION PROJECT/PROGRAMME NAME/DESCRIPTION

    PROJECT

    BENEFICIARY/

    WARD/LOCATION

    2020/21 TARGET 2020/21 BUDGET ALLOCATION (ANNUAL) R’000

    TOTAL PROJECT COST

    R’000

    Rural safety Stock theft

    Entombe 01 Rural safety initiative implemented

    25 000 25 000

    CRIME PREVENTION INITIATIVE

    School safety Campaign against drugs and substance abuse

    Kwashuku secondary school

    04 School safety initiatives implemented

    230 000 230 000

    School debate

    Prison visits 70 000 70 000

    Sports against crime

    COMMUNITY POLICE RELATIONS

    Assess community safety forums (CSFS)

    Mkhondo local municipality

    01 community safety forum assessed

    52 000

    52 000

    DIRKIESDORP

    Assess community police forums (CSFS)

    Mkhondo

    03 community police forums (CPFS) assessed

    180 000 180 000 AMSTERDAM

    COMMUNITY POLICE RELATIONS

    Deploy tourism safety monitors

    Nerston (3) 583 680 583 680

  • 20

    7. CONCLUSION

    The municipality is mandated to deliver efficient, sufficient and sustainable service delivery

    to all the Mkhondo Local Municipality residents

    We urge all our community members to report their incorrect and inconsistent

    accounts, disputes, leaking and faulty meters as well as not receiving the account at

    all.

    We also request coordination with ward committees to identify and encourage

    indigent registration for the needy in their wards.

    All consumers must pay for their services in-order for the municipality to continue

    giving sustainable service delivery.

    Those who are faulting on their debt arrangements will be cut-off and they will be

    expected to pay reconnection fees and other charges.

    Report any criminal activities on tampering and illegal connection of servi