Page 1: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

MOBILE SUBSTATIONS

2015 MINNESOTA POWER SYSTEMS CONFERENCE

Scott Storrar Contributors: Bill Hansen, Kyle Reddell, Tom McGrath

Page 2: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

2

Basic Mobile Sub Design

Equipment mounted on semi-trailer

Power transformer

High and Low side disconnects

High and Low side protection devices

Cooling equipment for Transformer

Regulators or LTC

2

Page 3: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

3

NSP MS-06

3

Page 4: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

4

Basic Mobile Sub Design

4

Page 5: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

5

External Equipment

5

Source connection, aka Flying Tap

3 single phase voltage regulators

Drag cables to connect load side

Temporary switch between drags and load

Page 6: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

6

External Equipment

6

Page 7: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

7

Source & Load

Connections

7

Page 8: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

8

Installing a Mobile

Substation

Looks easy on paper

8

Page 9: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

9

Electrical Design of Mobile

Installation

Select mobile with correct primary & secondary

voltages

Select mobile with correct MVA rating for load served

Choose tap settings so turns ratios are close to same

value

Correct phase shift

Protection settings for new configuration

9

Page 10: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

10

Example: Tap Settings

10

Station Transformer DETC Tap position 1 =

70725V : 12990V. Ratio of 5.44

Using low side of Mobile Sub Transformer

chosen, 13.09 kV x 5.44 = 71.269kV

Closest options for Mobile Sub Transformer

DETC Tap are 72.4kV or 70.6kV, yielding ratio of

5.5 or 5.39

Tap setting that yields ratio of 5.39 chosen since

it is closer to 5.44

Page 11: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

11

Transformer Phase Angles

11

Phase angle shift of mobile should match that

of substation transformer it replaces

If not, swapping 2 phases on source

connection can fix this or do a drop and pick

Page 12: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

12

Physical Installation Design

Location to park mobile substation

Typically under source line

Close to distribution bus or line

Far away from scheduled activity

Room enough for clearances

Level location

Temporary Fencing

Tie to substation ground grid

12

Page 13: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

13

Physical Installation Design

Generally the further away mobile is from work

area, the better

Sometimes this requires parking mobile on private

or public property (vacant lot, corn field, ditch,

street)

13

Page 14: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

14

Physical Installation Design

Prepare one line sketch showing where mobile will

be connected to transmission line and distribution

line

Prepare location plan showing where mobile will be

parked, temporary transmission and distribution

poles & lines and physical access

Meet on site with personnel for transmission,

substation, distribution, Siting & Land Rights, etc.

14

Page 15: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

15

Physical Installation Design

Location plan drawing

15

Page 16: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

16

Physical Installation Design

One line drawing

16

Page 17: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

17

Serving Load During

Substation Rebuilds

If project is to upgrade or replace an existing

substation

Will mobile be needed for an extended period of

time?

Will mobile be clear of substation construction

activity?

17

Page 18: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

18

Serving Load During

Substation Rebuilds

Has issue to build temporary distribution and

transmission facilities for connection of mobile been

considered?

Can a mobile be tied up for entire construction

period?

Are there alternatives that don’t require use of a

mobile?

18

Page 19: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

19

Testing

19

Overall power factor

Transformer turns ratio

Winding resistance

Excitation

Oil sampled for baseline DGA

Relay settings

Page 20: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

20

Installation Checklist

20

Guide for installing and energizing mobile

substation

Unique to each mobile substation

Used by Foreman and Engineer on-site to verify

correct installation

Detailed steps to energize a ‘lights out’ system or

parallel with substation transformer

Page 21: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

21

Safety Considerations

21

Electrical clearances

Onboard equipment failures awareness

(equipment is low to ground, new installation)

Oil containment considerations

Personnel escape plan

Adequate grounding

Page 22: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

22

Lessons Learned – Load

Check

22

Circuit breaker with shunt trip coils

Current ratios must be correct

Load current could cause trip

Page 23: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

23

Lessons Learned – Phase

Check

Map out how phases connect

Order of H1, H2, H3 is more important than A,B,C

Mobile transformer are Delta-Wye, 30-degree

lagging

Occasionally substations are 30 leading

Proper phase check will catch if mobile is

incorrectly installed

23

Page 24: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

24

Lessons Learned –

Functionality Test

Tests circuit breaker

Problems can be discovered

Vacuum recloser stopped working

Called manufacturer to solve problem

24

Page 25: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

25

Lessons Learned –

Sensitive Relays

Electro-mechanical relays can be sensitive to

vibrations

Tripped a mobile while shutting cabinet door

CO relay for thermal overload

Could not replicate problem

Shut door gently, kept fingers crossed

25

Page 26: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

26

Lessons Learned – Review

Checklist When Conditions

Change

Mobile transformer taken out of service via high side

fuses - was energized single phase

Blew secondary fuses on oil pumps

Status of pumps not checked when TR was re-

energized

Transformer failed within hours

Verify all systems working with checklist

26

Page 27: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

27

Lessons Learned – Field

Testing

De-energized tap switch broke when operated

No testing, so this was not known

Mobile energized and fuses operated

Changes resulting from this near miss

Test mobile before any installation

30-second time delay on high side MOD

2 exit gates on temporary fence

27

Page 28: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

28

Lessons Learned –

Location

Mobile Sub used to support construction project,

also near active rail line

Vibrations of truck and train traffic loosened blade

of high side switch

Blades were not seated properly in the jaws

Repairs were made in the field

Visit mobiles that are installed for long periods to

check for issues and IR it

28

Page 29: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

29

Lessons Learned – Replace

a Grounding Bank

69-23.9kV delta-delta TR with a grounding bank for

relay protection and ground source

Ground bank failed

Mobile sub installed to take its place

Low side connected to system

High side left disconnected

29

Page 30: MOBILE SUBSTATIONScce.umn.edu/documents/CPE-Conferences/MIPSYCON... · 2 Basic Mobile Sub Design Equipment mounted on semi-trailer Power transformer High and Low side disconnects

THANK YOU