modernisation of surface observations network in kenya€¦ · gsm network (900/1800mhz) gsm modem...

36
Modernisation of Modernisation of Surface Observations Surface Observations Network in KENYA Network in KENYA 7/15/2010 7/15/2010 1

Upload: vanthien

Post on 02-Apr-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Modernisation of Modernisation of Surface Observations Surface Observations

Network in KENYA Network in KENYA

7/15/20107/15/2010 1111

Page 2: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

PresenterPresenterKennedy Omondi Obong’o. y gGrad. Eng. ERB/IEK Kenya Meteorological Department ICT Divisiony g pP.O. Box 30259-00100 G.P.ONAIROBI, KENYATel No: 254-20-3867880-5 Ext 2071-2Cell Phone No: 254-722857807E-mail: [email protected]

[email protected]

7/15/20107/15/2010 22

Page 3: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

ABSTRACTABSTRACT

In order to modernise surface observation technologies and systems, the Kenya Government has

d t k il t f t id i th i t ll ti fundertaken a milestone of stride in the installations of Meteorological, hydro-meteorological and oceanic observation technologies & systems. This paper f d i b i lfocuses on modern automatic observational systems that are state of the art technology that provide real-time data. The systems have improved the temporal resolution of observed weather data but, hitherto, provide spatial resolution meteorological data. A cluster of 45 automatic surface observing systems g yhave been installed but, the target is to install over 200 stations country wide by 2015.

7/15/20107/15/2010 33

Page 4: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

ABSTRACT ContinuesABSTRACT Continues

The triumphant entry of these systems has notably resulted in improved data accuracy, quality, availability, and efficiency in transmission to the collecting centre/Nairobi RTH. From statistical comparisons we deduced that more than 98% of thecomparisons, we deduced that more than 98%, of the observations are consistent and do correlate well with human manned observation stations. Embracing these technologies convincingly demonstrates that staffs IT skill levels have improved considerably by more than 20% However some teething challenges are also20%. However, some teething challenges are also implicitly appreciated and will come out clearly in the paper.

7/15/20107/15/2010 44

Page 5: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

KeywordsKeywordsKeywordsKeywords

SustainabilitySustainabilitySustainability,Sustainability,GSM/GPRS,GSM/GPRS,A i Ob i l h l i (A SAutomatic Observational technologies (AWS, AWOS, Hydro-met, Tidal gauges, RG ), T h l fTechnology transfer,ICT , Special and Temporal Resolutions

7/15/20107/15/2010 55

Page 6: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

BACKGROUNGBACKGROUNG

HistoricallyHistorically;;--FirstFirst KMDKMD AutomaticAutomatic SurfaceSurface ObservationalObservational SystemsSystemsFirstFirst KMDKMD AutomaticAutomatic SurfaceSurface ObservationalObservational SystemsSystemsinstalledinstalled midmid 19901990ss..--BiggestBiggest challenge,challenge, TelemetryTelemetry--SystemSystem timetime couldcould notnotgggg g ,g , yy yysynchronisesynchronise soso hashas toto locklock toto thethe satellitesatellite allocatedallocated slotslot forfortransmissiontransmission andand thusthus uploadupload datadata toto necessitatenecessitate furtherfurthercommunicationcommunication andand distributionsdistributions..

--Otherwise,Otherwise, monthlymonthly datadata wouldwould bebe retrievedretrieved byby directlydirectlyh kih ki ll hh dd dd l dl dhookinghooking aa laptoplaptop computercomputer toto thethe systemsystem andand downdown loadloaddatadata manuallymanually.. DataData then,then, hadhad toto undergoundergo variousvariouscumbersomecumbersome processesprocesses beforebefore storedstored

7/15/20107/15/2010 66

cumbersomecumbersome processesprocesses beforebefore storedstored..66

Page 7: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

BACKGROUNG BACKGROUNG -- contcont

The introduction of GSM/GPRS communications technology in Kenya at the beginning of this millennium was an eye opener for the implementations of several technologies including Automatic Observational Systems.

7/15/20107/15/2010 77

Page 8: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

IntroductionIntroductionThe Automatic observational System -highlymodular in design and architecture

What are the advantages?Troubleshooting, Repair and Maintenance easier.S t d tiSaves on system down time.Minimises/reduces on data lost during maintenance/repair. e ce/ ep .Scalability another characteristic of this system. Sensors can be added to the system without

i i li f h d i i icompromising on quality of the data acquisition. Self calibrating and operate in automatic mode.

7/15/20107/15/2010 88

Page 9: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

AWS BLOCK DIAGRAMAWS BLOCK DIAGRAMTELEMETRY

DATA LOGGERFunctions

1 Acquire Process POWER UNIT1. Acquire, Process,2. Archival

POWER UNIT

SENSORS Figure 1

7/15/20107/15/2010 99

SENSORS g

Page 10: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

REMOTE AUTOMATIC SYSTEM

AWS CENTRAL BASE SYSTEM

GSM/GPRS NETWORK

SOLAR PANEL

APPLICATION SOFTWARE COMMUNICATES TO UPDATE THE SYNOPTIC

S C

E E W K

PANEL USER INTERFACE WITH NEWEST DATA

DATAFig 13: Observer Window

GSM Network (900/1800MHz)GSM Modem GSM Modem

LOGGER

PYROWS/WD

RG/TBAT/RH

BARO

BASE STATION COMPUTERFigure 2

7/15/20107/15/2010 1010

BASE STATION COMPUTER

1010

Page 11: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

SOME AWS SENSORSSO S S SO SAT/RH BAROMETRIC PRESSURERGAUGE EVAPORATION PAN

WIND ANEMOMETERS SOLAR RADIATION NET RADIATION SUNSHINE HOURS

7/15/20107/15/2010 1111

Page 12: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Data logger

The data acquisition system heart of theThe data acquisition system , heart of the remote monitoring and control system.S l d l thSamples, processes, measures and logs the sensors as per the Setup configuration. Based on a microprocessor controlled system environment.

7/15/20107/15/2010 1212

Page 13: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

SensorsCollecting raw data. In engineering terms coverts the processIn engineering terms, coverts the process variables in different energy forms to electrical energy then signal conditionedenergy then signal conditioned Measured elements -Air temperature, Relative h idit B R i Wi d dhumidity, Baro pressure, Rain, Wind speed and direction, Solar radiation, Soil moisture, E ti tEvaporation etc.

7/15/20107/15/2010 1313

Page 14: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

TelemetryyCommunication ability of the system to relay data in real time through available communication media.Supported; satellite, radio, fixed line telephony, wireless through GSM/GPRS p y, g

7/15/20107/15/2010 1414

Page 15: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

PowerThe life line of almost all blocks. AC power is used were available, but since most of the stations are installed in remote

l l d h bareas solar panels are used to charge battery and thus supply the systems. Areas with AC power still have solar panel connected as a redundant alternative.

7/15/20107/15/2010 1515

Page 16: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

AWS distribution in KenyaAWS distribution in Kenya

Moyale

Lodwar

Ki l

WajirMarsabit

Moyale

Kitale

Kisumu EmbuGarissa

EldoretKakamega

Nyanyuki

NyahururuMeru

Kericho

ThikaNairobi

Lamu

NarokKisii

NyanyukiNakuru Nyeri

Makindu

Voi Msabaha

Lamu

Figure 3

7/15/20107/15/2010 16161616

Figure 3

Page 17: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Where KMD Automatic System?Where KMD Automatic System?MeteorologicalMeteorological NetworkNetwork distributeddistributed

nationallynationallynationallynationally37 Synoptic stations ( 24 AWS 37 Synoptic stations ( 24 AWS --Automated)Automated)Automated)Automated)17 Automatic Hydro17 Automatic Hydro--met Systems met Systems

G G A d d A d d 3 River Gauging3 River Gauging--Automated Radar Automated Radar based Water Level based Water Level

7/15/20107/15/2010 17171717

Page 18: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

ContsConts

10 Airports ( 3 AWOS + 2 up c10 Airports ( 3 AWOS + 2 up c--10 Airports ( 3 AWOS + 2 up c10 Airports ( 3 AWOS + 2 up c--Automated )Automated )4 Automatic Tidal Gauges in India 4 Automatic Tidal Gauges in India 4 Automatic Tidal Gauges in India 4 Automatic Tidal Gauges in India oceanocean

7/15/20107/15/2010 1818

Page 19: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

From figure 3, the systems have improved the From figure 3, the systems have improved the temporal and spatial resolution of observed temporal and spatial resolution of observed weather data in particularly in the western part ofweather data in particularly in the western part ofweather data in particularly in the western part of weather data in particularly in the western part of the county along the Nzoia basin that is currently the county along the Nzoia basin that is currently well cover and therefore predictions have been 90 well cover and therefore predictions have been 90 we cove d e e o e p ed c o s ve bee 90we cove d e e o e p ed c o s ve bee 90percent accurate. In fact from these systems’ data, percent accurate. In fact from these systems’ data, the disastrous floods that have caused numerous the disastrous floods that have caused numerous calamities over the years were averted thanks to calamities over the years were averted thanks to prompt real time information for flood forecast, prompt real time information for flood forecast,

li i d iti ti l t ili i d iti ti l t iearlier warning and mitigations alert issuance.earlier warning and mitigations alert issuance.

7/15/20107/15/2010 19191919

Page 20: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

The country spatial resolution of observedThe country spatial resolution of observed weather data still remains a challenge thus calling for more efforts and resources to becalling for more efforts and resources to be mobile to alleviate this trend.From statistical comparisons we deduced thatFrom statistical comparisons, we deduced that more than 98%, of the observations are consistent and do correlate well with humanconsistent and do correlate well with human manned observation stations.

7/15/20107/15/2010 2020

Page 21: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

The system comes with WMO message formats of SYNOP METER SPECI BUFR CREXSYNOP, METER, SPECI, BUFR, CREX, reports, graphs, exporting, importing, printing, troubleshooting tools and many other capabilitiestroubleshooting tools and many other capabilities.Thus Manual entries made easy.The system is also observer interactive it allow anThe system is also observer interactive, it allow an observer to enter weather phenomenon and information.information.This has made work easier at station levels and thus work that was previously being done by three people p y g y p pis now comfortably being done by one person and more interesting just by a lick of a mouse.

7/15/20107/15/2010 2121

Page 22: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

BOTTLENECKSBOTTLENECKS

Maintenance SustainabilityMaintenance SustainabilityTechnology transfer and capacity buildingGS /G S i idGSM/GPRS service providersLarge data VolumesVandalisms

7/15/20107/15/2010 2222

Page 23: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Maintenance SustainabilityMaintenance Sustainability

The recommended routine and preventiveThe recommended routine and preventive maintenance/repair should be performed quarterly per year but being a developingquarterly per year, but being a developing country with many financial constraints, sometimes a year passes withoutsometimes, a year passes without maintenance/repair being carried out. However should it be done it is a curativeHowever, should it be done, it is a curative maintenance or when the system has completely failed

7/15/20107/15/2010 2323

completely failed.

Page 24: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Maintenance Sustainabilityy

Thus sustainability is one of the greatestThus, sustainability is one of the greatest challenges. S ki f d d i fStocking of recommended spare pairs for maintenance/repair and computer virus are l bl h llalso notable challenges.

7/15/20107/15/2010 2424

Page 25: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Technology transfer and capacity building

Technology transfer and capacity building task was first gy p y gdifficult and was meet with resistance. However, as days went by the staff started appreciating the technology suffice to say that some of them even took a bold step of registering p g gthemselves to IT teaching institutions. To day, considerable numbers of staff in the out stations are computer literate Embracing these technologies convincinglycomputer literate. Embracing these technologies convincingly demonstrates that staffs IT skill levels have improved considerably by more than 20%. In all out stations officers were trained on the away to interact with the systems and morewere trained on the away to interact with the systems and more so the computer receiving stations.

7/15/20107/15/2010 2525

Page 26: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

GSM/GPRS service providersGSM/GPRS service providersGSM/GPRS service providers have also contributed pnegatively to data exchange. Circuit switched data (CSD) used

i l h iPoor signal strength or no coverage in some parts of the country. Another difficulty is in remote login via GSMAnother difficulty is in remote login via GSM network. The communications often hangs while interrogating the remote station. Lastly, the cost of GSM/GPRS service is still exorbitant.

7/15/20107/15/2010 2626

Page 27: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Large data VolumesLarge data Volumes

The Automatic Observational Systems provideThe Automatic Observational Systems provide real-time data at frequency that is determined by the user of the system For Meteorologicalby the user of the system. For Meteorological purposes, we have configured our system to log data every 10 minutes This is definitelylog data every 10 minutes. This is definitely large volumes of Data. Currently we are using access database withCurrently, we are using access database with storage capacity of 2GB.

7/15/20107/15/2010 2727

Page 28: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

VandalismsVandalisms

Last but not least 10 percent of all theLast but not least, 10 percent of all the installed Automatic Observational Systems have had solar panel vandalized so farhave had solar panel vandalized so far.

7/15/20107/15/2010 2828

Page 29: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

NZOIA RIVER HydroNZOIA RIVER Hydro--met network met network --figure 4figure 4NZOIA RIVER HydroNZOIA RIVER Hydro met network met network figure 4figure 4

MT. ELGON CHERANGANY HILLS

MAU WATER MAU WATER TOWER

Figure 4

FLOOD PLAIN LAKE

7/15/20107/15/2010 2929

PLAIN LAKE VICTORIA

2929

Page 30: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Figure 5

WEBUYE

Automatic Telemetric Hydromet Stations

(Automatic Telemetric)

SEMOGERE Kaimosi FTC

7/15/20107/15/2010 3030RWAMBWA

3030

Page 31: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

AWS INSTALLATION AT LODWAR Fig re 6

7/15/20107/15/2010 3131

AWS INSTALLATION AT LODWAR- Figure 6

Page 32: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

7 00 0 0

PRODUCT - Forecast chart - Figure 7

3.09

0.471.49

7.22

4.76

0

2.31 2.011.13

6.00

7.00 0.0

5.0

10.010.48

16.32 16.615.32

4.18

3 72

4.54

4.57

4.63

4.65

4.00

5.00

el (m

)

15.0

20.0

ll (m

m)

24.91

22.543.72

2.6

3.813.153.45

2.732.93 2.83

2.452.58

2.83

3.333.00

Wat

er L

eve

25.0

30.0

35 0

Are

al R

ainf

al

2.45

1.00

2.00 35.0

40.0

45.0

0.00

6-O

ct-

08

7-O

ct-

08

8-O

ct-

08

9-O

ct-

08

0-O

ct-

08

1-O

ct-

08

1-N

ov-

08

2-N

ov-

08

3-N

ov-

08

4-N

ov-

08

5-N

ov-

08

6-N

ov-

08

7-N

ov-

08

8-N

ov-

08

9-N

ov-

08

0-N

ov-

08

1-N

ov-

08

50.0

7/15/20107/15/2010 3232

2 2 2 2 3 3 01

02

03

04

05

06

07

08

09

10

11

Rainfall Forecast Level Water Level Flood Alert Flood Warning

3232

Page 33: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

Observed and Predicted River levels at Rwambwa RGS

6Observed Predicted

4

5

m)

2

3

River level (m

1

0

1‐Sep‐08

6‐Sep‐08

11‐Sep

‐08

16‐Sep

‐08

21‐Sep

‐08

26‐Sep

‐08

1‐Oct‐08

6‐Oct‐08

11‐Oct‐08

16‐Oct‐08

21‐Oct‐08

26‐Oct‐08

31‐Oct‐08

5‐Nov

‐08

10‐Nov

‐08

15‐Nov

‐08

20‐Nov

‐08

7/15/20107/15/2010 3333

Page 34: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

CONCLUSIONSCONCLUSIONSIn a nutshell, Automatic Observational system is the , ytechnology that envisages assuring availability of meteorological data for posterity development.

h i h h h blThe triumphant entry of these systems has notably resulted in improved data accuracy, quality, availability and efficiency in transmission to theavailability, and efficiency in transmission to the collecting centre/Nairobi RTH. Installation of these systems in remote area will definitely improve on spatial data resolution and reduce manual observational constraints that are experienced in remote areas

7/15/20107/15/2010 3434

experienced in remote areas.

Page 35: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

G d bl d i iGod bless and inspire thi t h l ithis technology in developing countries anddeveloping countries and world overworld over.

7/15/20107/15/2010 3535

Page 36: Modernisation of Surface Observations Network in KENYA€¦ · gsm network (900/1800mhz) gsm modem gsm modem logger pyro ws/wd rg/tb at/rh baro base station computer figure 2 7/15/2010

THANK YOU FOR YOUR THANK YOU FOR YOUR TIMETIME

7/15/20107/15/2010 36363636