Modular Design and Benefits

Presented by:

Keyes Niemer, Ph.D., P.E.

Project Manager

The Shaw Group

ASME Nuclear Technical Seminars: Blueprint for New Build

June 5-8, 2011 • Columbia, SC

Page 2: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Presentation Overview

• What is Modularization?

• Challenges & Benefits of Modularization

• Modularization Examples

• Module Fabrication Facilities

Page 3: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Corporate Profile

The Shaw Group Inc.® is a leading global provider of technology, engineering,

procurement, construction, maintenance, fabrication, manufacturing, consulting,

remediation, and facilities management services to clients in the energy,

chemicals, environmental, infrastructure, and emergency response industries.

• Headquarters: Baton Rouge, LA

• Stock Ticker: NYSE: SHAW

• Number of employees: 27,000

• FY 2010 Revenues: $7 billion

• Backlog: $20.6 billion (as of 2/28/11)

• Website: www.shawgrp.com

Page 4: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Shaw’s Power Group Overview

• Three divisions comprise Shaw’s

Power Group:

– Fossil Division

– Nuclear Division

– Plant Services Division

• Ranked No. 1 in Power on Engineering News-

Record’s Top 500 Design Firms for three

consecutive years (2008, 2009, 2010)

• Approximately 4,500 professional employees

Page 5: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

What is Modularization?A term used to describe the three levels of “off-site” or

“on-site out of the hole” fabrication of piping, equipment and structures.

Pre-assemblyPre-fabrication

Module

Page 6: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Philosophy: Modularization Allows

Activities To Be Done in Parallel

Page 7: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Modularization Pros

• Streamline field installation

– Reduces number and skills requirement

– Facilitates remote site locations

– Shortens/reduces multiple work fronts

– Reduces risk of site conditions/weather

– Breaks projects into manageable parts

– Improves safety, quality, and productivity performance

– Shortens duration of and reduces field staff

Page 8: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

• Reduce on-site fabrication

• Reduce temporary facilities

• Reduce scaffolding

• Reduce small tools and consumables

• Reduce staff and craft

• Reduce amount of dimensional control

• Reduce number of field welds

Modularization Construction Pros

Page 9: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

• Committed execution sequence

• Committed module delivery schedule and routes

• Potential for design changes and rework

• Potential loss or damage during transport

• Heavier construction cranes

• More cranes earlier for large module assembly and

outfitting

• More planning, communication, organization

• Less flexibility

Modularization Construction Cons

Page 10: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Modularization Evaluation Attributes

• Construction Schedule

• Detailed Engineering (timeliness of deliverables)

• Labor Availability (welding, electricians, etc.)

• Procurement Risk (can materials/equipment be delivered on time?)

• Safety Impact (e.g., work areas, working at height)

• Quality

• Transportation & Lifting

• Site Attributes

Page 11: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Engineering Prerequisites

• Engineering MUST BE DONE DONE!

• EPC/Fabricator = Module Team

• Early Engineering and Construction Installation Details Development = Will be constructible

• Must Engineer Twice, i.e. design, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position

Page 12: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Pipe/Equipment Module

Page 13: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Modular Designed Pipe Rack

Page 14: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Modular Designed Boiler Feed

Water Pumps and Piping

Page 15: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Modular Designed Cooling Water Skid

Page 16: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Modularized HRSG Shipped to Site via

Ocean Ship and Barge from Indonisia

Page 17: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

HRSGs Arrive @ Jobsite in NY City

Page 18: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Oil/Gas Platform

Page 19: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Purchaser Oversight

• Module fabrication at key facilities is seen as extensions of the Construction Projects and is expected to be treated as small EPC Projects with dedicated teams representing the Purchaser

• Full time residency at fabrication facilities anticipated for Purchaser’s Quality Control and Expediting representatives with periodic surveillance by Quality Assurance

• Purchaser’s Engineering staff may be assigned to fabrication facilities on a full time or part time basis to facilitate communication and resolution of design related issues

• Purchaser’s Management representation to be assigned to fabrication facilities to interface with Fabricator Management and assure common goals are being met

Page 20: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Owner Oversight

• Owners being the Licensees have ultimate responsibility

for regulatory compliance of the plants

• Equipment and system reliability, quality, operability and

maintainability are of significant interest

• Owner’s representatives expected to provide rigorous

oversight of Purchaser’s and Fabricator’s activities

• Owners responsible for performing 100% of Inspections,

Tests, Analyses and Acceptance Criteria (ITAAC)

verification during construction and documentation of

inspection results

Page 21: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Regulator Oversight

• Regulator oversight at fabrication facilities responsible

for safety related modules is expected

• Regulator inspections to encompass Owner,

Purchaser and Fabricator Program implementation

and effectiveness

• Regulator is responsible for witnessing a sample of

Owner’s ITAAC related activities and documentation of

inspection results

Page 22: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Shaw Modular Solutions Facility

• Located in Lake Charles, LA

• 410,000 sf under roof for

fabrication, assembly and

inspection

• 7 production bays

• 8,200 sf administrative building

• 10,000 sf training facility

• Truck, barge and rail access

• NQA-1 program

• Located on 120 acres of land

with an option for 180 more acres

Page 23: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Shaw Modular Solutions Facility

Page 24: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Shaw Modular Solutions Facility

Page 25: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Shaw Modular Solutions Facility

Page 26: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Shaw Modular Solutions Facility

Page 27: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 28: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 29: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 30: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 31: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 32: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 33: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 34: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 35: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 36: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 37: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 38: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 39: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 40: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 41: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 42: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication - CA20 Aux Building

CA20 comprised of 72 Sub-

Modules:

Size (N x E x Height):

44’-0” x 68’-9” x 68’-0”

[13m x 21m x 20.7m]

Dry Weight:

1,712,000 lbs. [777 Mg]

Page 43: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

CA20_01

J1

J2

K2

L2

CA20_02

CA20_03

CA20_04

CA20_05

CA20_06 CA20_07 CA20_08

CA20_10

CA20_11

CA20_12

CA20_13

CA20_14

CA20_15 CA20_16 CA20_017

CA20_18

CA20_19

CA20_20

CA20_21

CA20_22

CA20_23 CA20_24 CA20_25

CA20_26

CA20_27 CA20_28 CA20_29

CA20_30

CA20_71 CA20_72 CA20_73

Sub-Module CA20_01

Module Fabrication – CA20 Submodules

Page 44: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

68’-0”

8’-6”

8’-3”

CA20-01

30 Tons

68’-0”

Module Fabrication –

Sub-Module CA20_01

Page 45: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 46: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 47: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 48: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 49: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 50: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 51: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Fabrication

Page 53: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly Building

Page 54: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly - Upender

Page 55: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Platen

Page 56: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 57: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 58: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 59: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 60: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 61: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 62: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Module Assembly

Page 63: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Summary

• Modularization has been extensively used by the shipbuilding and chemical process industries resulting in significant value to the client

• The Westinghouse AP1000 is utilizing modularization extensively in China and the U.S.

• Given the right business and project conditions, modularization should be strongly considered for fabrication and construction of the next generation of power plants

Page 64: Modular Design and Benefitsdesign, fab, assemble to fit, ship, offload, assemble and outfit, and load to prime mover and lift into position Pipe/Equipment Module Modular Designed Pipe

Questions?