module 1 rbm planning senad ploco. policy cycle policy formulation project implementation management...
TRANSCRIPT
MODULE 1RBM Planning
Senad Ploco
Policy Cycle
Policy Formulation
Project Implementation
Management and Control
Poli
tical
weig
ht
Phase
Problem Recognition
Planning is a continuous and structured process, which involves making decisions or choices about alternative ways of using available (water) resources with the aim of achieving particular goals at some time in the future.
Plan (government) is a publicly accessible output of any planning activity or process with general external or internal binding and with a repeatable use for the time horizon given.
Plannig
ICZM Training, Georgetown XI/1999
What does ‘integrated’ mean in IRBM?I - 2 - 4
Mining companies
Water supply company
NGOs
Sea defence
Institutional integration Sectoral integration
Scientific integration
EngineeringEconomyNatural
sciencesSocial
sciences
Agriculture
Spatial
integration
International
National
Regional
Local
Types of planning
Strategic planning Informative Indirect bindingLong termNationalTop-down Integrated
Operational planningLegally bindingDirect bindingShort termRiver basinBottom-upSector
Functions of the plan
Fundamental inventory and documentation mechanism Environmental objectives Info on quality and quantity Info on water status and human impacts and pressures
Legitimacy and public participationCo-ordination of the Programme of Measures
Co-ordination of different plan levels Co-ordination with other natural resources management
Reporting of RBD to European Commission Time horizon first plan: 6 years
Planning issues
ComplexityTiming and time scales
Acceding countries International river issues Interdependency of sub-activities Inflexibility
Process approach versus end-product approach Public participation
Toolbox and data availabilityCapacity building
Key planning principles
principle of sustainable development (intergenerational equity);
principle of integration (a comprehensive analysis of natural, socio-economic and administrative-institutional features referring to the river basin);
precautionary principle (including cost-effective actions to prevent potential irreversibly damages to the environment);
“polluter pays” principle (the costs of prevention should not be imposed on society as a whole);
transparency principle (planning and management decisions are to be made with full public participation).
River Basin Management Plan (Annex VII) – SUMMARY !!!
1. Identification of River Basin District2. Characteristics of River Basin District3. Summary of significant pressures and impacts human activity4. Identification and mapping of protected areas5. Map of monitoring networks6. List of environmental objectives7. Summary of economic analysis8. Summary of Programme of Measures9. Register of more detailed programmes including summary10. Summary of public information and consultation on measures
and results11. List of competent authorities12. Contact points and procedures for obtaining background info
and comments from the public
Implementation phase
Information and consultation of the publicActive involvement of interested partiesImplementation of the Programme of MeasuresMonitoringEvaluationRevision
Subm it interim report onthe im plem entation to the
EC (Art. 15)
Revisedoverview of
significant waterissues
UpdateRBM P
Evaluate the first andprepare the second
period
Implem ent the program m e of m easures for
RBD
Assess currentstatus, analyse
preliminary gaps(Art.5-8)
Set upenvironmental
objectives (Art.4)
Establishm onitoring
program m es(Art.8)
Gap analysis
Develop River BasinM anagement P lan
(RBM P) (Art. 13-25,App. VII)
Set up the program m eof m easures for RDB
(Art. 11)
2012
2013
2015
2004
2006
2009
PublicParticipation (Art. 14)
Subm it interim report onthe im plem entation to the
EC (Art. 15)
Revisedoverview of
significant waterissues
UpdateRBM P
Evaluate the first andprepare the second
period
Implem ent the program m e of m easures for
RBD
Assess currentstatus, analyse
preliminary gaps(Art.5-8)
Set upenvironmental
objectives (Art.4)
Establishm onitoring
program m es(Art.8)
Gap analysis
Develop River BasinM anagement P lan
(RBM P) (Art. 13-25,App. VII)
Set up the program m eof m easures for RDB
(Art. 11)
2012
2013
2015
2004
2006
2009
PublicParticipation (Art. 14)
Planning proces
River Basin Districts (WFD: art. 2-3)
Definition of River Basin DistrictsDelination of geographical area including (several) river basins and aquifers(Sub)Basin, Basin, District (International)Aquifer and coastal areas includedDifferent modalities
Appoint administrative authority to these districts
Indicate arrangements for international river basins and aquifers
Characteristics of River Basin District (art. 5 )
General characterizationRegister of protected areasIdentification of human pressures and impacts
Economic analysis of water use
Characterization
CategorisationTypologyWater body delineationReference conditions for surface waters (next
slide)System A (2 ambition levels) Very good status: nearly undisturbed Good status: slight shortfall
System B (2 ambition levels) Maximum ecological potential Good ecological potential
Reference conditions
System A: very good status: nearly undisturbed Reference data Models Paleo data Expert opinions
System B: maximum ecological potential (water body type that is most similar to the uninfluenced body of surface water). Hydro-morphologic restriction (part of the sewer system) Economic derogation (practicability)
Protected areas
They require special protection under EU legislation Drinking water resourcesEconomically significant aquatic speciesRecreational watersNutrient sensitive areasSpecies habitat protection areasOther areas indicated by other directives, conventions, ...
Economic analysis
Economic analysis on present water usesBaseline scenario economic developmentAssessment of cost recovery and water services pricing
Cost effectiveness of measuresCompleting knowledge gapsIdentification of significant water issues
Human impacts and pressures
Human pressures on water bodies Surface and groundwater
Expected impacts Risk assessment (for failing environmental objectives) Identification of water bodies at risk
Monitoring system
Environmental objectives (art. 4) for surface water bodies
Prevention of deteriorationRestore good surface water statusRestore good ecological potential for HMWImplement measures (a.o)
Reduction priority substances pollutionCessation priority hazardous substances
Environmental objectives (art. 4) for ground water
Prevention of groundwater pollution
Restoration of groundwater bodies
Balance between abstraction and recharge
Monitoring of surface,groundwater, transitional and coastal waters (art. 8)
Objectives
To establish a coherent and comprehensive overview of water status within each river basin district.
Risk assessment Evaluation of measures
Modalities Surveillance monitoring: long-term changes for all biological,
hymo and phisico-chemical parameters Operational monitoring: changes of water bodies „at risk”
resulting from PoM Investigative: for more detailed analysis
WFD and Monitoring
Gap analysis
Assessment of current statusComparison with environmental objectivesAnalysis of status
Benchmarks Indicators
Formulation of main significant issuesSubject to public participation
Programme of Measures (art. 11)
Water quality and quantity of surface and groundwater
Existing EU obligationsRequired by other regulations or directives e.g.
hazardous substances, drinking water quality and more stringent than EWFD
Basic measures: package to reach good quality in 2015 (next slide)
Supplementary (extra) measures (next slide)Additional measures (through international agreements)
Basic Measures
Extension of sensitive or vulnerable areas (zoning)Reporting and authorisation
Water use and discharge permit systemResources protection areasDischarge control enforcementSystem of charges and pricingMechanisms for co-ordination Infrastructure development or adaptation
Supplementary measures
Codes of good practicesSystem of benchmarks
Voluntary agreementsAwareness creation campaignsEconomic and tax instrumentsAdvisory programmes to sectors
Agriculture, industry etc.
Supplementary measures
ACTIVE
PARTICIPATION