Page 1: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

MODULE 1RBM Planning

Senad Ploco

Page 2: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Policy Cycle

Policy Formulation

Project Implementation

Management and Control

Poli

tical

weig

ht

Phase

Problem Recognition

Page 3: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Planning is a continuous and structured process, which involves making decisions or choices about alternative ways of using available (water) resources with the aim of achieving particular goals at some time in the future.

Plan (government) is a publicly accessible output of any planning activity or process with general external or internal binding and with a repeatable use for the time horizon given.

Plannig

Page 4: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

ICZM Training, Georgetown XI/1999

What does ‘integrated’ mean in IRBM?I - 2 - 4

Mining companies

Water supply company

NGOs

Sea defence

Institutional integration Sectoral integration

Scientific integration

EngineeringEconomyNatural

sciencesSocial

sciences

Agriculture

Spatial

integration

International

National

Regional

Local

Page 5: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Types of planning

Strategic planning Informative Indirect bindingLong termNationalTop-down Integrated

Operational planningLegally bindingDirect bindingShort termRiver basinBottom-upSector

Page 6: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Functions of the plan

Fundamental inventory and documentation mechanism Environmental objectives Info on quality and quantity Info on water status and human impacts and pressures

Legitimacy and public participationCo-ordination of the Programme of Measures

Co-ordination of different plan levels Co-ordination with other natural resources management

Reporting of RBD to European Commission Time horizon first plan: 6 years

Page 7: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Planning issues

ComplexityTiming and time scales

Acceding countries International river issues Interdependency of sub-activities Inflexibility

Process approach versus end-product approach Public participation

Toolbox and data availabilityCapacity building

Page 8: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Key planning principles

principle of sustainable development (intergenerational equity);

principle of integration (a comprehensive analysis of natural, socio-economic and administrative-institutional features referring to the river basin);

precautionary principle (including cost-effective actions to prevent potential irreversibly damages to the environment);

“polluter pays” principle (the costs of prevention should not be imposed on society as a whole);

transparency principle (planning and management decisions are to be made with full public participation).

Page 9: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

River Basin Management Plan (Annex VII) – SUMMARY !!!

1. Identification of River Basin District2. Characteristics of River Basin District3. Summary of significant pressures and impacts human activity4. Identification and mapping of protected areas5. Map of monitoring networks6. List of environmental objectives7. Summary of economic analysis8. Summary of Programme of Measures9. Register of more detailed programmes including summary10. Summary of public information and consultation on measures

and results11. List of competent authorities12. Contact points and procedures for obtaining background info

and comments from the public

Page 10: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Implementation phase

Information and consultation of the publicActive involvement of interested partiesImplementation of the Programme of MeasuresMonitoringEvaluationRevision

Page 11: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Subm it interim report onthe im plem entation to the

EC (Art. 15)

Revisedoverview of

significant waterissues

UpdateRBM P

Evaluate the first andprepare the second

period

Implem ent the program m e of m easures for

RBD

Assess currentstatus, analyse

preliminary gaps(Art.5-8)

Set upenvironmental

objectives (Art.4)

Establishm onitoring

program m es(Art.8)

Gap analysis

Develop River BasinM anagement P lan

(RBM P) (Art. 13-25,App. VII)

Set up the program m eof m easures for RDB

(Art. 11)

2012

2013

2015

2004

2006

2009

PublicParticipation (Art. 14)

Subm it interim report onthe im plem entation to the

EC (Art. 15)

Revisedoverview of

significant waterissues

UpdateRBM P

Evaluate the first andprepare the second

period

Implem ent the program m e of m easures for

RBD

Assess currentstatus, analyse

preliminary gaps(Art.5-8)

Set upenvironmental

objectives (Art.4)

Establishm onitoring

program m es(Art.8)

Gap analysis

Develop River BasinM anagement P lan

(RBM P) (Art. 13-25,App. VII)

Set up the program m eof m easures for RDB

(Art. 11)

2012

2013

2015

2004

2006

2009

PublicParticipation (Art. 14)

Planning proces

Page 12: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

River Basin Districts (WFD: art. 2-3)

Definition of River Basin DistrictsDelination of geographical area including (several) river basins and aquifers(Sub)Basin, Basin, District (International)Aquifer and coastal areas includedDifferent modalities

Appoint administrative authority to these districts

Indicate arrangements for international river basins and aquifers

Page 13: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Characteristics of River Basin District (art. 5 )

General characterizationRegister of protected areasIdentification of human pressures and impacts

Economic analysis of water use

Page 14: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Characterization

CategorisationTypologyWater body delineationReference conditions for surface waters (next

slide)System A (2 ambition levels) Very good status: nearly undisturbed Good status: slight shortfall

System B (2 ambition levels) Maximum ecological potential Good ecological potential

Page 15: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Reference conditions

System A: very good status: nearly undisturbed Reference data Models Paleo data Expert opinions

System B: maximum ecological potential (water body type that is most similar to the uninfluenced body of surface water). Hydro-morphologic restriction (part of the sewer system) Economic derogation (practicability)

Page 16: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Protected areas

They require special protection under EU legislation Drinking water resourcesEconomically significant aquatic speciesRecreational watersNutrient sensitive areasSpecies habitat protection areasOther areas indicated by other directives, conventions, ...

Page 17: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Economic analysis

Economic analysis on present water usesBaseline scenario economic developmentAssessment of cost recovery and water services pricing

Cost effectiveness of measuresCompleting knowledge gapsIdentification of significant water issues

Page 18: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Human impacts and pressures

Human pressures on water bodies Surface and groundwater

Expected impacts Risk assessment (for failing environmental objectives) Identification of water bodies at risk

Monitoring system

Page 19: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Environmental objectives (art. 4) for surface water bodies

Prevention of deteriorationRestore good surface water statusRestore good ecological potential for HMWImplement measures (a.o)

Reduction priority substances pollutionCessation priority hazardous substances

Page 20: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Environmental objectives (art. 4) for ground water

Prevention of groundwater pollution

Restoration of groundwater bodies

Balance between abstraction and recharge

Page 21: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Monitoring of surface,groundwater, transitional and coastal waters (art. 8)

Objectives

To establish a coherent and comprehensive overview of water status within each river basin district.

Risk assessment Evaluation of measures

Modalities Surveillance monitoring: long-term changes for all biological,

hymo and phisico-chemical parameters Operational monitoring: changes of water bodies „at risk”

resulting from PoM Investigative: for more detailed analysis

Page 22: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

WFD and Monitoring

Page 23: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Gap analysis

Assessment of current statusComparison with environmental objectivesAnalysis of status

Benchmarks Indicators

Formulation of main significant issuesSubject to public participation

Page 24: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Programme of Measures (art. 11)

Water quality and quantity of surface and groundwater

Existing EU obligationsRequired by other regulations or directives e.g.

hazardous substances, drinking water quality and more stringent than EWFD

Basic measures: package to reach good quality in 2015 (next slide)

Supplementary (extra) measures (next slide)Additional measures (through international agreements)

Page 25: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Basic Measures

Extension of sensitive or vulnerable areas (zoning)Reporting and authorisation

Water use and discharge permit systemResources protection areasDischarge control enforcementSystem of charges and pricingMechanisms for co-ordination Infrastructure development or adaptation

Page 26: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Supplementary measures

Codes of good practicesSystem of benchmarks

Voluntary agreementsAwareness creation campaignsEconomic and tax instrumentsAdvisory programmes to sectors

Agriculture, industry etc.

Page 27: MODULE 1 RBM Planning Senad Ploco. Policy Cycle Policy Formulation Project Implementation Management and Control Political weight Phase Problem Recognition

Supplementary measures

ACTIVE

PARTICIPATION