module 12 - improvement exercise

Upload: farzad-rezaei

Post on 04-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Module 12 - Improvement Exercise

    1/28

    Module 12.1

    Improvement exercise

  • 7/30/2019 Module 12 - Improvement Exercise

    2/28

    Learning Outcomes

    On successful completion of this modulelearners will be able to

    - Demonstrate an application of the combined

    knowledge gained in previous modules.

  • 7/30/2019 Module 12 - Improvement Exercise

    3/28

    Introduction.

    A friend has approached you for advice. They show you a set of plans for a single storey

    two bedroom dwelling.

    The dwelling was originally built more than 10

    years ago.

    The specifications for the construction details,insulation, ventilation, space heating and water

    heating, etc are not up to date. You are asked to write new specifications.

    Sorry do not build this style of house is notan acceptable reply.

  • 7/30/2019 Module 12 - Improvement Exercise

    4/28

    Plan view

  • 7/30/2019 Module 12 - Improvement Exercise

    5/28

    Front elevation - north

  • 7/30/2019 Module 12 - Improvement Exercise

    6/28

    Rear elevation - south

  • 7/30/2019 Module 12 - Improvement Exercise

    7/28

    End view east.

  • 7/30/2019 Module 12 - Improvement Exercise

    8/28

    End view - west

  • 7/30/2019 Module 12 - Improvement Exercise

    9/28

    Sectional elevation.

  • 7/30/2019 Module 12 - Improvement Exercise

    10/28

    Existing specifications.

    Floor insulation.Concrete floor slab with 50mm insulation.

    U-value 0.33 W / m2 K.

    Wall insulation.Cavity block work wall.

    100mm cavity and 50mm partial fill insulation.

    U-value 0.40 W / m2 K.

    Roof insulation.

    150mm mineral wool insulation between ceilingjoists. Ventilated roof space.

    U-value 0.27 W / m2 K.

  • 7/30/2019 Module 12 - Improvement Exercise

    11/28

    Existing specifications - continued.

    Ventilation.Natural ventilation.

    Windows + glass doors.

    Aluminium frame without thermal break.

    Double glazing with 16mm air filled gap.

    Overall window U-value 3.0 W / m2 K.

    Lighting.

    100% incandescent bulbs.

  • 7/30/2019 Module 12 - Improvement Exercise

    12/28

    Existing specifications - continued.

    Water heating.Primary water heating.

    Electric water heating inside a 100 litre cylinder.

    Secondary water heating.

    From a back boiler at the open fireplace in theliving room. (winter period only).

    Fireplace using a mix of coal and wood fuels.

  • 7/30/2019 Module 12 - Improvement Exercise

    13/28

    Existing specifications - continued.

    Space heating.Primary space heating.

    Electric storage heaters in all rooms.

    Secondary space heating.

    From a back boiler at the open fireplace in theliving room. (winter period only).

    Fireplace using a mix of coal and wood fuels.

  • 7/30/2019 Module 12 - Improvement Exercise

    14/28

    Improvement floor insulation.

    Original U-value 0.33 W/m2

    K.

    Current local building regulations?

    Passive house specification?

    Recommended construction detail?Consider also thermal bridging and air tightness.

  • 7/30/2019 Module 12 - Improvement Exercise

    15/28

    Improvement wall insulation.

    Original U-value 0.40 W/m2

    K.

    Current local building regulations?

    Passive house specification?

    Recommended construction detail?Consider also thermal bridging and air tightness.

  • 7/30/2019 Module 12 - Improvement Exercise

    16/28

    Improvement roof insulation.

    Original U-value 0.27 W/m2

    K.

    Current local building regulations?

    Passive house specification?

    Recommended construction detail?Consider also thermal bridging and air tightness.

  • 7/30/2019 Module 12 - Improvement Exercise

    17/28

    Improvement ventilation.

    Original ventilation method NaturalOriginally building pressure test. No test.

    Current local building regulations?

    Passive house specification?Recommended ventilation detail? Pressure test?

  • 7/30/2019 Module 12 - Improvement Exercise

    18/28

    Improvement windows.

    Original windows - aluminium 3.0 W/m2

    K.

    Current local building regulations?

    Passive house specification?

    Recommended window detail?Consider also thermal bridging and air tightness.

  • 7/30/2019 Module 12 - Improvement Exercise

    19/28

    Improvement Lighting.

    Original lighting. Incandescent.Current local building regulations?

    Passive house specification?

    Recommended lighting detail?

  • 7/30/2019 Module 12 - Improvement Exercise

    20/28

    Improvement primary water heating.

    Original primary water heating ElectricCurrent local building regulations?

    Passive house specification?

    Recommended primary water heating detail?Consider renewable energy and controls.

  • 7/30/2019 Module 12 - Improvement Exercise

    21/28

    Improvement secondary water heating.

    Original secondary water heating Fire placeCurrent local building regulations?

    Passive house specification?

    Recommended secondary water heating detail?Consider renewable energy and controls.

  • 7/30/2019 Module 12 - Improvement Exercise

    22/28

    Improvement primary space heating.

    Original primary space heating ElectricCurrent local building regulations?

    Passive house specification?

    Recommended primary space heating detail?Consider renewable energy and controls.

  • 7/30/2019 Module 12 - Improvement Exercise

    23/28

    Improvement secondary space heating.

    Original secondary space heating Fire placeCurrent local building regulations?

    Passive house specification?

    Recommended secondary space heating detail?Consider renewable energy and controls.

  • 7/30/2019 Module 12 - Improvement Exercise

    24/28

    Improvement others.

    OriginalCurrent local building regulations?

    Passive house specification?

    Recommended detail?

  • 7/30/2019 Module 12 - Improvement Exercise

    25/28

    Improvement others.

    OriginalCurrent local building regulations?

    Passive house specification?

    Recommended detail?

  • 7/30/2019 Module 12 - Improvement Exercise

    26/28

    Improvement others.

    OriginalCurrent local building regulations?

    Passive house specification?

    Recommended detail?