Module 14Final Plans and Conclusions

Final Plans and Conclusions Agenda

o Review Final Plans/SWMP by SWMP Preparer

o SWMP Review and Sign Off by SWMP Reviewer

o Sign off Forms (Form 128)

o Policy Memo 27

o Final Project Sign Off Form

o Bid Package relative to the SWMP

o Certification Exam

o Course Evaluation

2Final Plans & Conclusions

o Plans and Cross Sections

o Completed SWMP Template

o Completed SWMP Site Maps

o Specifications and Details

o Work Items and Quantities

o Cost Estimate

o Final Plans Checked against Original Plans

o SWMP Reviewer submits written notice to the RPEM/or designee that the SWMP meets requirements. RPEM sign off on Form 128.

Final Plans/Sign Off Products Produced

3Final Plans & Conclusions

Step 1o Make sure you have completed each of the steps

• Checked final designs for the project and cross-sections

• Completed SWMP template• Completed SWMP site maps• Specifications and detail• Quantities

Step 2 o Make sure all SWMP documents and associated

elements are loaded onto Projectwise Step 3

o Coordinate with the SWMP Reviewer to start final review and approval

CDOT SWMP Administrator for Design

4Final Plans & Conclusions

o CDOT’s MS4 Construction Program requires that SWMPs with SCPs be reviewed. This should be done throughout the SWMP Preparation not just at the end.

o CDOT SWMP Reviewer may not be same person as the SWMP Preparer/SWMP Admin for Design.

o CDOT SWMP Reviewer should work closely with the SWMP Administrator for Design, Project assigned Landscape Architect, and Permanent Stabilization Subject Matter Expert, and must be a CDOT employee not contractor.

o And will sign off on the SWMP and give their sign off to the RPEM (Forms to be determined).

o

CDOT SWMP Reviewer

5Final Plans & Conclusions

o Step 1• Receive the final SWMP including site maps,

specification, quantities and all other associated documents.

o Step 2• Give comments back to the SWMP Administrator

for Design to address. If plans are correct and meet all requirements; provide a project sign off to the RPEM

o Step 3• The RPEM signs the 128 form

CDOT SWMP Reviewer

6Final Plans & Conclusions

The RE will likely be assigned the task of completing the SCP application using the new CEOS platform

Verify with RPEM if the SWMP reviewer or preparer will supply the information that that RE inputs into CEOS or if they will wait until a contractor is selected for the project

CDOT SWMP Reviewer

7Final Plans & Conclusions

The SWMP Reviewer will:

o Complete the review and let the RPEM know as soon as the final plans have been completed or approved.

RPEM or designee will:

o Sign off on Form 128

DE or RE will:

o Complete Form 1048 and RE completes the application

Final Project Sign Off

8Final Plans & Conclusions

o No box for the SWMP Administrator for Design to sign

o RPEM or designee signs off the SWMP has been completed

CDOT Form 128

9Final Plans & Conclusions

1

www.wagehourinsights.com

o Outlines that the RPEM will review all SWMP plans prior to advertisement and ensure that they are site-specific and complete.

o The RPEM’s signature on the clearance to advertise will signify that they have reviewed and concur with the completeness of the SWMP.

o The Environmental Programs Branch will ensure that sufficient and up-to-date guidance is available for the preparers of the SWMP.

o The SCP application and Stormwater Management Plan Certification will be signed by RE after RPEM signs off.

10Final Plans & Conclusions

2CDOT Policy Memo 27

CDOT has developed Meeting Questions for every stage of the design process:

o DSR Meeting

o FIR Meeting

o FOR Meeting

o Final Meeting and Ad

Meeting Questions Final Plans and Ad

11Final Plans & Conclusions

3

Landscape Architecture Website

o Most documents and forms can be found on the CDOT Landscape Architecture website

o https://www.codot.gov/programs/environmental/landscape-architecture

12Final Plans & Conclusions

CDOT DBB Project Development “Process”

Environmental Evaluation/NEPA starts

ConstructionPhase

DesignPhase

Proposed Project

Scope

FIR

FOR

AD

Construction

Module 4 - 12

Module 13

Module 13

Module 14

Module 3

SWMP Development

Process Occurs

13Final Plans & Conclusions

Bid Package

Contents of the Bid Package

o Specificationso Planso Standards Specificationso Standard Detailso Supplemental Materialo Cost Estimate

14Final Plans & Conclusions

Case Study Project Title Sheet

15Final Plans & Conclusions

4

16Final Plans & Conclusions

Bid Package

SWMP Administrator for Design should verify that all quantities from the SWMP are incorporated correctly into the SAQ and bid package.

Conclusions

o CDOT has to ensure that all SWMPs are designed with good engineering, hydrologic and pollution prevention control practices.

o Developing a consist SWMP development program helps to achieve this goal.

o CDOT SWMPs need to follow the CDOT SWMP preparation taught in this certification class and described in CDOT specifications.

o CDOT has developed checks and balances such as sign offs and meeting to ensure the SWMP is being developed in concert with the project design.

17Final Plans & Conclusions

Additional Resources

18Final Plans & Conclusions

HQ contacts and Regional contacts:

o Pamela Cornelisse, [email protected] , 303-757-9542

o Susan Suddjian, [email protected] , and o Greg Fisher, [email protected] Regional Engineers and RWPCMo Regional and Headquarter Landscape Architects

Questions?

19Final Plans & Conclusions