module 3 of 4 stormwater management design review
TRANSCRIPT
![Page 1: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/1.jpg)
Stormwater Management Design ReviewNJ DEP Division of Watershed Protectionand Restoration
October 12, 2021
Module 3 of 4
![Page 2: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/2.jpg)
2
Agenda(cont’d. on next slide)
Module 3No. Subject Duration
1 How to Review a Project 1 (xx minutes)Goal 1: Learn to identify which design and performance standards must be
met on siteGoal 2: Learn how to review for compliance with the GI, stormwater runoff
quantity and water quality, and groundwater recharge standardsGoal 3: Learn how to review BMPs for compliance with the design criteria in
the BMP Manual
2 How to Review a Project 2 (xx minutes)Goal 1: Learn how to review BMPs for compliance with the design criteria
in the BMP Manual
Goal 2: Calculate Detention Time
Goal 3: Learn how to review the safety requirements
Goal 4: MTD Design
Goal 5: Groundwater Recharge Spreadsheet
![Page 3: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/3.jpg)
3
Agenda
Module 3 (cont’d.)No. Subject Duration
3 Groundwater Mounding (xx minutes)Goal 1: Learn the requirements under N.J.A.C. 7:8Goal 2: Understand the concepts of groundwater moundingGoal 3: Learn about the methods of calculationGoal 4: Review examples of groundwater mounding analyses
- Quiz 3 and Review (xx minutes)
![Page 4: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/4.jpg)
REVIEWA PROJECT 1
HOW TO
4
Minesh Patel and Anthony RobalikNJDEP Division of Watershed Protection and Restoration
SWMDR Training Module 3October 12, 2021
![Page 5: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/5.jpg)
Presentation Goals
• Learn to identify the design and performance standards that must be met onsite
• Learn how to review applications for compliance with the green infrastructure, water quantity, water quality, and groundwater recharge standards
• Learn how to review BMPs for compliance with the design criteria in the BMP Manual
5
Goals
![Page 6: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/6.jpg)
Presentation Layout
Review Checklist: Pp. 14 – 18 of Chapter 3.4 in the Tier A Guidance Document at
https://www.nj.gov/dep/dwq/pdf/Tier_A/Tier_A_Chapter_3-4.pdf
6
Municipal Guidance Document:
![Page 7: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/7.jpg)
7
STORMWATER MANAGEMENT REPORT
![Page 8: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/8.jpg)
Checking Application
• Pre- and post-construction site plans
• Pre- and post-construction grading plans
• Stormwater report with calculations
• Details of BMPs
• Maintenance plan
8
The applicant needs to submit, at a minimum…
![Page 9: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/9.jpg)
Reading the Report
• Existing conditions
• Proposed conditions
• Subdrainage areas and offsite discharge point(s)
• Disturbance and change in regulated impervious surface and change in regulated motor vehicle surface for each subdrainage area
• Soil survey and testing information
9
Site description
![Page 10: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/10.jpg)
Reading the Report
• What’s required
o BMP design details
o Hydraulic and hydrologic calculations
o Groundwater recharge information
o Groundwater mounding analysis if infiltration is proposed
10
Design and Performance Standards
![Page 11: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/11.jpg)
Reading the Report
• Time of concentration – calculated, not assumed (see Chapter 5)
• Routing calculations for stormwater runoff quality and the 2-, 10- and 100-year storm events
• Hydrographs
• Groundwater recharge spreadsheet
• Groundwater mounding analysis if infiltration is proposed
11
Hydraulic and Hydrologic Calculations
![Page 12: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/12.jpg)
Determining Applicable Design & Performance Standards
1. Has the project disturbed one acre or more since February 2, 2004?
2. Has the project increased regulated impervious coverage by ¼ acre or more since February 2, 2004?
3. Has the project increased regulated motor vehicle surface by ¼ acre or more since March 2, 2021?
4. Is there a combination of 2 and 3 above that totals an area of ¼ acre or more?
5. What is the SCO’s definition of major development?
12
Is the project a major development?
![Page 13: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/13.jpg)
Determining Applicable Design & Performance Standards
• Residential Site Improvement Standards:
o 1 acre or more of disturbance (N.J.A.C. 5:21)
• Stormwater Control Ordinance:
o N.J.A.C. 7:8 Definition of Major Development
o More stringent standard adopted by municipality
• NJDEP Division of Land Use Regulation:
o 1 acre or more of disturbance
o ¼ acre or more increase in impervious coverage
13
“Major Development” definitions:
![Page 14: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/14.jpg)
Determining Applicable Design & Performance Standards
• Watershed
• Category 1
• Flooding problems
• Water quality impairments or TMDLs
• Is the site in a regulated area?
o Flood Hazard Area
o CAFRA
o Freshwater Wetlands
o Highlands
• Is the site in the Pinelands?
14
Where does it discharge to?
![Page 15: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/15.jpg)
Determining Applicable Design & Performance Standards
• Green Infrastructure
• Stormwater runoff quantity control
• Stormwater runoff quality
• Groundwater recharge
15
Design and Performance Standards for Major Developments:
![Page 16: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/16.jpg)
Determining Applicable Design & Performance Standards
16
When may variances or waivers
granted?
![Page 17: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/17.jpg)
Variances – N.J.A.C. 7:8-4.6
• There may be instances where site constraints for using green infrastructure is technically impracticable to meet design and performance standards of a major development project.
• The rule allows variances to be granted at the local level to provide mitigation options for those instances when it is technically impracticable to meet standards.
17
7:8-4.6 Variance from the design and performance standards for stormwater management measures
![Page 18: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/18.jpg)
18
Variances - N.J.A.C. 7:8-4.6
• Technically impracticable to meet any one or more of the design and performance standards on site; and
• The proposed design achieves maximum compliance with the design and performance standard
o Technical impracticable exists only when the standard can not be met for engineering, environmental, or safety reasons
Approval of a variance applies to the individual
drainage area and design and performance standard
Municipality may approve a variance if
the Applicant demonstrates:
![Page 19: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/19.jpg)
19
Variances – MitigationN.J.A.C. 7:8-4.6(a)3
Mitigation Requirements:
• Selected from municipal mitigation plan or proposed by applicant, provided it meets the criteria within the municipal mitigation plan
• Be approved no later than preliminary or final site plan approval of the major development
• Be located in the same HUC 14 as the portion of the major development that was granted the variance
• Be constructed prior to or concurrent with the major development
• Comply with the green infrastructure standards at N.J.A.C. 7:8-5.3
• Applicant or entity assuming maintenance responsibility for the associated major development shall be responsible for maintenance, with a written agreement submitted to the review agency
Approved variance must be submitted to county review
agency and DEP within 30 days of approval
![Page 20: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/20.jpg)
20
Variances – MitigationN.J.A.C. 7:8-4.6(a)3
If variance is from green infrastructure standards
• Mitigation project must provide green infrastructure BMPs to manage an equivalent or greater area and amount of impervious surface than the area of major development granted the variance
• Vegetative filter strips and grass swales excluded as mitigation measures
• GI BMPs used for mitigation must be sized to manage the Water Quality Design Storm (at a minimum)
• GI BMPs used for mitigation are subject to the specified drainage area limitations
![Page 21: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/21.jpg)
21
Variances – MitigationN.J.A.C. 7:8-4.6(a)3
If variance is from groundwater recharge standards
• Mitigation project must equal or exceed GW recharge deficit
If variance is stormwater runoff quality standards
• Mitigation project must provide sufficient TSS removal to equal or
exceed the deficit resulting from the variance
If variance is stormwater runoff quantity standards
• Mitigation project must provide equivalent peak flow rate
attenuation upstream and discharge to the same water course
![Page 22: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/22.jpg)
Determining Applicable Design & Performance Standards
• Construction of underground utility line, if revegetated upon completion
• Construction of aboveground utility line, if existing conditions are maintained to MEP
• Construction of public pedestrian access, if made of permeable materials and no greater than 14 ft. wide
22
Linear development exemptions exist for…
![Page 23: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/23.jpg)
Determining Applicable Design & Performance Standards
• Enlargement of existing public roadway or railroad, construction or enlargement of public pedestrian access, if applicant demonstrates:
o Public need for project that can’t be met another way
o D&P Standards met to maximum extent practicable
o Meeting the standards would require condemning existing in-use structures
o Applicant does not have and cannot get rights to other lands for mitigation
23
Waivers from strict compliance with N.J.A.C. 7:8-5.3 exist for…
![Page 24: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/24.jpg)
Determining Applicable Design & Performance Standards
• Stormwater Runoff Quantity, if in Tidal Flood Hazard Area and flooding will not be increased
• Stormwater Runoff Quality, if site has NJPDES permit with specific effluent limit
• Groundwater Recharge, for previously developed areas in urban redevelopment area
24
When Design and Performance Standards do not apply…
![Page 25: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/25.jpg)
Determining Applicable Design & Performance Standards
• “Previously developed portions of areas:
o Delineated on State Plan Policy Map as:
• Planning Area 1
• Designated Centers, Cores, or Nodes
o CAFRA Centers, Cores, or Nodes
o Urban Enterprise Zones
o Urban Coordinated Council Empowerment Neighborhoods
25
Urban Redevelopment Area
![Page 26: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/26.jpg)
Determining Applicable Design & Performance Standards
• Mitigation Plan
• Construction of utility lines, public pedestrian access
• Enlargement of public roadway, railroad, public pedestrian access
• Urban Redevelopment Area
• NJPDES Permits w/ discharge limits
• Tidal Flood Hazard Area
26
Situations that may be eligible for variances/waivers (summary):
![Page 27: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/27.jpg)
27
GREEN
INFRASTRUCTURE
![Page 28: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/28.jpg)
GI in the NJ BMP Manual
28
Chapter 9: GI BMPs
![Page 29: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/29.jpg)
Green Infrastructure StandardsN.J.A.C. 7:8-5.3(b)
29
Best Management Practice Maximum Contributory Drainage Area
Dry Wells 1 acre
GI Manufactured Treatment
Device (MTDs)
2.5 acres
Pervious Paving Systems Area of additional inflow cannot exceed
3 times the area occupied by the BMP
Small-scale Bioretention Systems 2.5 acres
Small-scale Infiltration Basins 2.5 acres
Small-scale Sand Filters 2.5 acres
Contributory Drainage Area Limitation (N.J.A.C. 7:8-5.3(b))
![Page 30: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/30.jpg)
GI in the NJ BMP Manual
30
Chapter 10: GI BMPs for Stormwater Runoff Quantity
• May only be used for Groundwater Recharge and/or Stormwater
Runoff Quality, when applicable, with a Waiver or Variance from
N.J.A.C. 7:8-5.3
![Page 31: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/31.jpg)
Non-GI in the NJ BMP Manual
31
Chapter 11: Non-GI BMPs
• May only be used for Groundwater Recharge, Stormwater Runoff
Quantity and/or Stormwater Runoff Quality, when applicable, with
a Waiver or Variance from N.J.A.C. 7:8-5.3
![Page 32: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/32.jpg)
32
STORMWATER RUNOFF
QUANTITY
![Page 33: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/33.jpg)
Stormwater Runoff Quantity
• Protects against flooding
• Can be met in three different ways
• Must be met for each point of analysis
33
The water quantity standard…
![Page 34: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/34.jpg)
Stormwater Runoff Quantity
• Allows reviewer to identify where stormwater flows
• Required to determine drainage areas and time of concentration
34
Topography
![Page 35: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/35.jpg)
Stormwater Runoff Quantity
• Site plans must show:
o Existing and proposed contours
o Point of analysis
o Tc flow path
o Drainage area to each point of analysis
35
Topography
![Page 36: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/36.jpg)
Stormwater Runoff Quantity
• For sites with multiple drainage areas that don’t converge or have very different cover:
o Each DA should be calculated separately
o Each DA should have separate Tc calculation
o Each DA should meet water quantity standard
36
Topography
![Page 37: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/37.jpg)
Stormwater Runoff Quantity
37
![Page 38: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/38.jpg)
Stormwater Runoff Quantity
• Reviewer needs to verify:
o All drainage areas are delineated correctly
o Verify that proper time of concentration flow path is used
o Verify that time of concentration is calculated properly
38
Topography
![Page 39: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/39.jpg)
Stormwater Runoff Quantity
• Look for depressions on existing site
• Water ponds in natural depressions
• Ignoring depression storage will overestimate existing discharge volumes and peak flows
39
Topography
![Page 40: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/40.jpg)
40
Stormwater Runoff Quantity
![Page 41: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/41.jpg)
Stormwater Runoff Quantity
• Should be clearly marked on plans
• Should be specific: forest, grass, bare soil, impervious coverage
• Include any existing BMPs
41
Land Cover
![Page 42: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/42.jpg)
Stormwater Runoff Quantity
• Reviewer needs to verify:
o What’s on site plan matches actual conditions
o Land cover used in the calculations is the most pervious cover that has existed in past 5 years
42
Land Cover
![Page 43: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/43.jpg)
Stormwater Runoff Quantity
• Soils on-site must be determined
• Required information: HSG and soil type
• Should be submitted with report
• Best way to find soil info is NRCS Web Soil Survey:o https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htmo Google “Web Soil Survey”
43
Soils
![Page 44: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/44.jpg)
Stormwater Runoff Quantity
• Sometimes cannot be found in soil survey
• If information not available, two ways to find HSG:o Default hydrologic soil groups
o Soil testing
• Information on both methods in Chapter 12
44
Soils
![Page 45: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/45.jpg)
Stormwater Runoff Quantity
• Poor soil information is one of the most common review issues encountered
• Soil information can make or break a stormwater management design
• Often the best practice to review soil testing first
45
Soils
![Page 46: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/46.jpg)
Stormwater Runoff Quantity
✓ Identify if the roughness sheet flow coefficient for woods is 0.4 or less.
✓ Determine if the time of concentration in preconstruction condition is calculated appropriately. It is important that existing times of concentration are not underestimated.
46
Stormwater Management Review Checklist
![Page 47: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/47.jpg)
Stormwater Runoff Quantity
• Required for both Rational/Modified Rational Methods and NRCS Method
• Calculated in accordance with the NEH and also Chapter 5 of the BMP Manual
47
Time of Concentration
![Page 48: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/48.jpg)
Stormwater Runoff Quantity
• Review sheet flow, shallow concentrated flow, and channel flow inputs
o Maximum allowable Manning’s roughness coefficient is 0.4 in NJ
• Pre-construction Tc should always be proven by calculation
• Post-construction Tc can no longer be assumed as an allowable minimum for the NRCS method
48
Tc summary…
![Page 49: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/49.jpg)
Stormwater Runoff Quantity
✓ Identify if the runoff from impervious and pervious surfaces are calculated separately and not with a weighted average of the CN numbers for impervious surface and pervious surface.
✓ Determine if the curve number selection makes sense.
✓ If rational method is used, determine if the selected runoff coefficient makes sense and the source of the runoff coefficient is provided
49
Stormwater Management Review Checklist
![Page 50: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/50.jpg)
Stormwater Runoff Quantity
✓ Review the applicability of the selected modelling method
o Rational Method for peak flows & Modified Rational Method for hydrographs
o NRCS Method
50
Acceptable Methods of Calculations
![Page 51: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/51.jpg)
Stormwater Runoff Quantity
• Used to calculate amount of runoff caused by given precipitation
• Curve numbers – NRCS Method
• Runoff Coefficients – Rational/Modified Rational
51
Curve Numbers/Runoff Coefficients
![Page 52: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/52.jpg)
Stormwater Runoff Quantity
• Stormwater report and plans should clearly show area for each different land cover and HSG
• Both must always be based on “good” hydrologic condition
52
Curve Numbers/Runoff Coefficients
![Page 53: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/53.jpg)
Stormwater Runoff Quantity
53
Curve Numbers/Runoff Coefficients
Area (sf) Land Cover Soil TypeHydrologic
Soil Group
Curve
Number
38,173 Pavement Bucks silt loam B 98
24,689 Lawn Bucks silt loam B 61
14,787 Lawn Lehigh silt loam C 74
9,950 Forest Dunellen sandy
loam
A 30
2,654 Pavement Lehigh silt loam C 98
![Page 54: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/54.jpg)
Stormwater Runoff Quantity
• Curve numbers are available in NEH, Part 630, Chapter 9 Hydrologic Soil-Cover Complexes
• Runoff coefficient is available in Chapter 5
• Reviewer is responsible for ensuring that the designer’s chosen value is reasonable
54
Curve Numbers/Runoff Coefficients
![Page 55: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/55.jpg)
Stormwater Runoff Quantity
• Required to route pervious and impervious areas separately
• Never use a weighted average of pervious and impervious areaso Underestimates flow rates and volumes
• Subdrainage areas to a discharge point (point of analysis)o Peak flow rates from each subdrainage area cannot be
arithmetically added. Hydrographs of subdrainage areas shall be combined and the peak flow rate of the combined hydrograph shall be used at the discharge point
55
Runoff Routing
![Page 56: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/56.jpg)
Stormwater Runoff Quantity
✓ Identify if any existing depression areas are included in the model.
• Depressions and high permeability soils clearly provide stormwater management benefits
• Not possible to accurately calculate time of concentration
• Depression storage should be modeled as an existing basin in pre-development conditions
56
Dealing With Depression Storage
Stormwater Management Review Checklist
![Page 57: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/57.jpg)
Stormwater Runoff Quantity
• If depression area is in middle of site:
o Model depression area
o Calculate time of concentration from depression outlet to point of interest
o Lag depression outflow hydrograph by calculated time of concentration
o Calculate time of concentration for remaining area and route it separately
57
Dealing With Depression Storage
![Page 58: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/58.jpg)
Stormwater Runoff Quantity
58
Dealing With Depression Storage
![Page 59: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/59.jpg)
Stormwater Runoff Quantity
• Determine time of concentration to depression area
• Calculate stage-storage data for depression area
• Model outlet from depression area as a weir
• Route contributory drainage area to depression area
59
Dealing With Depression Storage
![Page 60: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/60.jpg)
Stormwater Runoff Quantity
60
Dealing With Depression Storage
![Page 61: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/61.jpg)
61
Stormwater Quantity Control BMPs
Dealing With Depression Storage
![Page 62: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/62.jpg)
Stormwater Runoff Quantity
✓ Determine if the rainfall depth and intensity for 2-, 10-and 100-year storms are selected properly from NOAA’s partial duration data or NRCS’s county rainfall summary data.
✓ Determine if the appropriate rainfall distribution is used in the calculations.
62
Stormwater Management Review Checklist
![Page 63: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/63.jpg)
Stormwater Runoff Quantity
• For NRCS Method:o 2-, 10- and 100-year, 24-hour storms (NOAA Precipitation
Frequency Data Server)o Water Quality Design Storm (BMP Manual Chapter 5)
• For Rational/Modified Rational Method:o 2-, 10- and 100-year, IDF Curves (NOAA Precipitation
Frequency Data Server)o Water Quality Design Storm Intensity-Duration Curve
(BMP Manual Chapter 5)
63
Rainfall Depth and Intensity
![Page 64: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/64.jpg)
Stormwater Runoff Quantity
• NRCS developed other distributions for NJ in 2012:
o NOAA_C
o NOAA_D
• NJ BMP Manual requires use of these rainfall distributions when designing BMPs
• NOAA_C and NOAA_D already built into many stormwater modeling programs
64
Rainfall Distribution (NRCS Method only)
![Page 65: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/65.jpg)
Stormwater Runoff Quantity
• Applicant must show critical storage volume calculation
• Detention basin design must be based on storm event that results in critical storage volume
65
Design Storm Event (Modified Rational Method)
![Page 66: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/66.jpg)
Stormwater Runoff Quantity
✓ Identify if the DelMarVa unit hydrograph is used, if so, determine if the site meets the criteria for its use –coastal plain, flat topography, permeable soils, low imperviousness.
66
Stormwater Management Review Checklist
![Page 67: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/67.jpg)
Stormwater Runoff Quantity
• SCS Unit Hydrograph may be acceptable throughout the entire state, but must be used outside coastal plain area
• DelMarVa Hydrograph is acceptable in the coastal plain area only
• Must use the same hydrograph in both pre and post conditions
67
Unit Hydrograph (NRCS Method only)
![Page 68: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/68.jpg)
Stormwater Runoff Quantity
68
Review compliance with the standards
Option 1Demonstrate that at no point does the post-development hydrograph exceed the pre-development hydrograph for the 2-, 10- and 100-year storms (N.J.A.C. 7:8-5.6)
• Applicant must submit pre- and post-development hydrographs
• Total runoff volume must be equal or lower in post-development as compared to pre-development
![Page 69: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/69.jpg)
Stormwater Runoff Quantity
69
Review compliance with option 1
![Page 70: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/70.jpg)
Stormwater Runoff Quantity
70
Review compliance with option 1
![Page 71: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/71.jpg)
Stormwater Runoff Quantity
Reduce the post-development peak flows to 50, 75, and 80% of pre-development peak flows for 2-, 10-, and 100-year storms (N.J.A.C. 7:8-5.6)
• Stormwater BMPs with detention function to provide storage volume and reduce the peak flow rate may be required
• Applicant must submit routing calculations
• Most commonly used option to meet stormwater runoff quantity control standard
71
Review compliance with the standards
Option 3:
![Page 72: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/72.jpg)
Stormwater Quantity Control BMPs
• Various GI BMPs can be designed to provide detention function:
72
BMPs with detention component providing storage and reducing peak flow rates
Chapter 9 BMPs:
o Cisterns
o Green roofs
o Pervious paving systems
o Small-scale bioretention
systems
o Small-scale infiltration basins
o Small-scale sand filters
Chapter 10 BMPs:
o Bioretention systems
o Infiltration basins
o Sand filters
o Standard constructed
wetlands
o GI Wet ponds
![Page 73: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/73.jpg)
Stormwater Runoff Quantity
• The report shall provide routing calculations of all design storms for every subdrainage area
o Check if pervious surface and impervious surface are separately calculated
o Check NOAA rainfall distribution
o Check rainfall depth
o Check Tc
73
Review compliance with the standards
Option 3:
![Page 74: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/74.jpg)
Stormwater Runoff Quantity
• The report shall provide routing calculations of the stormwater BMP for all design storms
o Check if exfiltration is used
o Check if the discharge from the orifice is within the reduced flow rate
o Check if the smallest orifice is 2.5” or larger
74
Review compliance with the standards
Option 3:
![Page 75: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/75.jpg)
Stormwater Runoff Quantity
• Exfiltration may be used in small-scale GI BMP routing calculations for 2, 10, 100-year storms
o See Chapter 5 for conditions to use exfiltration in the routings
• Allowing exfiltration in the routing calculation does not necessarily mean infiltration of the entire 2, 10, 100-year storms.
75
Review compliance with the standards
Option 3:
![Page 76: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/76.jpg)
Stormwater Runoff Quantity
o Check groundwater mounding analysis
o Check if discharge from the outlet structure will increase if mounding is higher than the bottom of BMP
76
Review compliance with the standards
Option 3:
![Page 77: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/77.jpg)
Stormwater Runoff Quantity
o Small-scale GI BMPs in Table 5-1 and GI BMPs in Table 5-2 may be used to address the stormwater runoff quantity requirement
• Detention components can be incorporated to provide detention function which reduce peak flow rates.
• Detention components must be situated in the same location as small-scale GI BMP or GI BMP
o Detention space above the maximum water level of the water quality design storm, or
o Below the surface component of the BMP
Use of Detention Component in GI BMPs
![Page 78: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/78.jpg)
78
STORMWATER RUNOFF QUALITY
![Page 79: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/79.jpg)
Stormwater Runoff Quality
• Remove TSS by 80%
• Remove nutrients to maximum extent feasible
• Applies at net increase of ¼ acre or more of
regulated motor vehicle surface
79
Design and Performance Standards
![Page 80: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/80.jpg)
Stormwater Runoff Quality
• Removal rates apply to each on-site drainage area,
unless the runoff converges on-site
• Pursuant to FHACA Rules, runoff from WQDS
discharged within a 300-foot riparian zone must
reduce TSS by 95%
80
Design and Performance Standards
![Page 81: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/81.jpg)
Stormwater Runoff Quality
• Regulated Motor Vehicle Surface:
o Any net increase in motor vehicle surface
o Existing motor vehicle surface that is currently receiving
water quality treatment, where the water quality
treatment will be modified or removed.
81
Design and Performance Standards
![Page 82: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/82.jpg)
Stormwater Runoff Quality
• Pervious paving areas
o Often used to replace traditional pavement
o Considered regulated motor vehicle surface toward
the ¼ acre increase
o If designed properly, pervious paving systems can
provide required TSS removal
82
Design and Performance Standards
![Page 83: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/83.jpg)
Stormwater Runoff Quality
• Rooftop runoff
o Not considered significant source of TSS
o Can be infiltrated using dry well
o Can be significant source of nutrients
o May require pretreatment – See design criteria in BMP
Manual
83
Design and Performance Standards
![Page 84: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/84.jpg)
Stormwater Runoff Quality
• Design storm based on historic data
• Nonlinear rainfall distribution resulting in 1.25 inches of precipitation in 2 hours
• Relatively common and intense storm
• Designed to capture frequent storms that cause significant stormwater runoff pollution
84
Water Quality Design Storm
![Page 85: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/85.jpg)
85
Stormwater Runoff Quality
Water
Quality
Design
Storm
![Page 86: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/86.jpg)
86
Stormwater Runoff Quality
Water
Quality
Design
Storm
![Page 87: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/87.jpg)
Stormwater Runoff Quality
• Water quality criteria met through implementation of Chapter 9 GI BMPs:
o Cisternso Drywellso Grass swaleso Green roofso GI MTDso Pervious paving systemso Small-scale bioretention systemso Small-scale infiltration basinso Small-scale sand filterso Vegetative filter strips
• NJ BMP Manual contains design criteria for the various Chapter 9 GI BMPs
87
BMPs for Meeting Water Quality
![Page 88: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/88.jpg)
Stormwater Runoff Quality
88
% TSS and Nutrient Removal Rates for BMPs
BMP TSS RemovalRate
Phosphorus Removal Rate*
Nitrogen Removal Rate*
Bioretention Systems 80-90% 60% 30%
Standard Constructed Wetlands 90% 50% 30%
Extended Detention Basins 40-60% 20% 20%
Infiltration Basins 80% 60% 50%
Manufactured Treatment Devices 50% or 80% N/A N/A
Pervious Paving Systems 80% 60% 50%
Sand Filters 80% 50% 35%
Vegetative Filter Strips 60-80% 30% 30%
Wet Ponds 50-90% 50% 30%
Grass Swales ≤ 50% N/A N/A
Subsurface Gravel Wetlands 90% N/A 90%
![Page 89: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/89.jpg)
Stormwater Runoff Quality
• Not all BMPs meet 80% TSS removal
• Can use multiple BMPs in series to achieve reduction
• For two BMPs in series: 𝑅 = 𝐴 + 𝐵 −𝐴𝑥𝐵
100
89
Water Quality BMPs in Series
![Page 90: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/90.jpg)
Stormwater Runoff Quality
• When using BMPs in series, arrange BMPs from upstream to downstream in:1. Ascending order of TSS removal rate2. Ascending order of nutrient removal rate3. By relative ease of sediment and debris removal
• Do not use two of same type of BMPs in series
Vegetative Filter Strip (60%)
Small-scale Infiltration Basin (80%)
Total % TSS Removal, 𝑅 = 60 + 80 – [(60*80)/100] = 92%
90
Water Quality BMPs in Series
![Page 91: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/91.jpg)
Stormwater Runoff Quality
• Required on all major developments
• Shall be addressed to maximum extent feasible
• Some BMPs have adopted nutrient removals
• Nutrient removal often best performed through source control
91
Nutrient Removal
![Page 92: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/92.jpg)
Stormwater Runoff Quality
• Stormwater Management rules require:
o Design BMPs in accordance with BMP Manual or
o Alternative designs if design engineer provides documentation demonstrating capability of alternative removal rates and methods
• Any approved alternatives must be submitted to the Department
92
Water Quality BMPs
![Page 93: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/93.jpg)
Stormwater Runoff Quality
• Ensure water quality BMPs chosen are adequate to achieve required TSS removal rate
• Ensure small-scale GI BMPs from Table 5-1 are used unless a waiver or variance from NJAC 7:8-5.3 is obtained
• Ensure runoff from all drainage areas requiring water quality treatment is being collected and treated
• Ensure BMP design meets criteria under applicable BMP Manual subchapter
• Ensure a deed notice of the stormwater BMP is submitted for approval and recorded in county clerk's office prior to the commencement of construction
93
Reviewing for Water Quality Compliance
![Page 94: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/94.jpg)
Stormwater Runoff Quality
• BMPs must each drain within 72 hours of storm
o BMPs installed subject to pedestrian traffic, drain time is 24 hours
• In general, most GI BMPs require at least 2 ft separation from seasonal high water table
o Underdrain GI BMP needs 1 ft separation
o GI MTD is subject to manufacturer’s specification
94
Water Quality BMPs – General Design Criteria
![Page 95: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/95.jpg)
Stormwater Runoff Quality
• Commonly used BMPs:
o Small-scale infiltration basins
o Small-scale bioretention systems
o GI Manufactured treatment devices
o Grass swales
o Pervious paving systems
95
Water Quality BMPs
![Page 96: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/96.jpg)
Stormwater Runoff Quality
96
![Page 97: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/97.jpg)
Stormwater Runoff Quality
• Designed to infiltrate runoff into subsoil
• 80% TSS removal rate
• Can also be used to meet the water quantity and groundwater recharge requirements
97
Small-scale Infiltration Basins
![Page 98: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/98.jpg)
Stormwater Runoff Quality
• Must be designed to infiltrate Water Quality Design Storm volume
• Must meet infiltration permeability testing requirements in accordance with Chapter 12
• Maximum depth from WQDS of 24 inches
98
Small-scale Infiltration Basins –Design Criteria
![Page 99: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/99.jpg)
Stormwater Runoff Quality
• Must include a 6 inch, AASHTO M-6 or ASTM C-33 sand layer
• Bottom of basin must be level and un-compacted
• Subsurface infiltration basins require 80% TSS pretreatment
• Design hydraulic conductivity of most restrictive soil horizon below basin bottom should be between 0.5 –10 inches/hour
99
Small-scale Infiltration Basins –Design Criteria
![Page 100: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/100.jpg)
Stormwater Runoff Quality
• Designed for water quantity control but no outlet structure
• Underdrains or liners
• Topsoil or vegetation
• Standing water 72 hours after the precipitation stops
100
Small-scale Infiltration Basins –You Should Not See …
![Page 101: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/101.jpg)
101Courtesy of NJDOT
Stormwater Runoff Quality
![Page 102: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/102.jpg)
Stormwater Runoff Quality
102
![Page 103: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/103.jpg)
Stormwater Runoff Quality
• Thick soil bed and dense vegetation to enhance pollutant removal
• TSS removal rate based on types of plants and soil bed thickness
103
Small-scale Bioretention Systems
![Page 104: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/104.jpg)
Stormwater Runoff Quality
• Vary in size from small rain gardens to basins
• Can be designed to infiltrate or to be underdrained
104
Small-scale Bioretention Systems
![Page 105: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/105.jpg)
Stormwater Runoff Quality
• Must include a soil bed at 18 - 24 inches in depth
• Bioretention mix must consist of following, by volume:
o 85 - 95% sand (< 25% fine or very fine sand)
o No more than 15% silt and clay
o 2 - 5% clay
• Bioretention mix must be amended with 3 - 7% organics, by weight
105
Small-scale Bioretention Systems –Design Criteria
![Page 106: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/106.jpg)
Stormwater Runoff Quality
• Maximum water quality depth of 12 in. for flat-bottomed systems
• Maximum water quality depth of 18 in. at down-gradient end of a bioretention swale
• Maximum bottom slope of 10% for bioretention swale
• Minimum density of vegetation of 85%
106
Small-scale Bioretention Systems –Design Criteria
![Page 107: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/107.jpg)
Stormwater Runoff Quality
• Applies to any BMP designed to infiltrate runoff
o Small-scale infiltration basin
o Dry well
o Small-scale bioretention system (w/o underdrain)
o Small-scale sand filter (w/o underdrain)
107
Infiltration Criteria
![Page 108: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/108.jpg)
Stormwater Runoff Quality
• Soil permeability must be tested
• Must apply a factor of 2 to any tested permeability
𝐷𝑒𝑠𝑖𝑔𝑛 𝑃𝑒𝑟𝑚𝑒𝑎𝑏𝑖𝑙𝑖𝑡𝑦 =𝐹𝑖𝑒𝑙𝑑 𝑃𝑒𝑟𝑚𝑒𝑎𝑏𝑖𝑙𝑖𝑡𝑦
2
• Minimum design permeability of 0.5 inches/hour, maximum of 10 inches/hour
108
Infiltration Criteria
![Page 109: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/109.jpg)
Stormwater Runoff Quality
• Must have at least 2 feet of separation from SHWT
• Depth to SHWT must be proven via soil testing
• Must assess groundwater mounding impacts
109
Infiltration Criteria
![Page 110: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/110.jpg)
Stormwater Runoff Quality
• Protection of infiltration area from compaction and sedimentation during construction
• Post-construction soil testing to verify as-built conditions are sufficient to allow infiltration
110
Infiltration BMPs – What you should see
![Page 111: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/111.jpg)
111
More Information:
Stormwater Management UnitBureau of Flood Hazard and Stormwater Engineering
Watershed Engineering ElementDivision of Watershed Protection and Restoration
401 East State Street
PO Box 420, Mail Code 401-2B
Trenton, NJ 08625-420
Tel: 609-633-7021
www.njstormwater.org
Minesh [email protected]
Anthony [email protected]
![Page 112: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/112.jpg)
REVIEWA PROJECT 2
HOW TO
Changi WuNJDEP Division of Watershed Protection and Restoration
SWMDR Training Module 3October 12, 2021
![Page 113: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/113.jpg)
Presentation Goals
2
Goals
Goal 1: Learn how to review BMPs for compliance
with the design criteria in the BMP ManualGoal 2: Calculate Detention Time
Goal 3: Learn how to review the safety requirements
Goal 4: MTD DesignGoal 5: Groundwater Recharge Spreadsheet
![Page 114: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/114.jpg)
Stormwater Runoff Quality
3
Example: Small-Scale Bioretention System
![Page 115: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/115.jpg)
Stormwater Runoff Quality
• Step 1: Calculate the runoff volume and peak flow rate for water quality design storm by using NRCS methodo 939 cf and 0.74 cfs
• Step 2: Sizing the pretreatmento In this case, a MTD is used for pretreatment by following the
MTD certification letter
4
Example: Small-Scale Bioretention System
![Page 116: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/116.jpg)
Stormwater Runoff Quality
• Step 3: Run the routing calculation with exfiltrationo Infiltration area is initially set up as 600 sf
o Side slope is 3:1 (H:V)
o The size of surface areas and the dimensions of the basin at different heights can be calculated accordingly based on the slope
o The exfiltration rate is half of the tested saturated hydraulic conductivity of the most restrictive soil layer as described in Chapter 12• 1 in/hr is used for exfiltration rate
• Areas on the side slope cannot be used for exfiltration
• The discharge rate through the infiltration area shall be calculated:o 1 in/hr x 600 sf x 1/12 in/ft x 3,600 hr/sec = 0.01 cfs
5
Example: Small-Scale Bioretention System
![Page 117: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/117.jpg)
Stormwater Runoff Quality
• Step 3: Run the routing calculation with exfiltration (Continued)
• Adjust the height of the first orifice to result in a water depth that only allows for infiltration of the water quality design storm
o 0.98 ft
• The runoff volume discharged through exfiltration is 939 cfs
• The drain time is the discharged volume through exfiltration divided by the exfiltration rate
o 18.78 hrs
6
Example: Small-Scale Bioretention System
![Page 118: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/118.jpg)
Stormwater Runoff Quality
7
Example: Small-Scale Bioretention System
![Page 119: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/119.jpg)
Stormwater Runoff Quality
• Step 4: Check the Separation from SHWT
o Lowest point of the basin is 3 ft below the existing ground level
o SHWT is 8 feet below the existing ground level
o SHWT is 5 feet from the lowest point of the basin
8
Example: Small-Scale Bioretention System
![Page 120: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/120.jpg)
Stormwater Runoff Quality
• Step 5: Groundwater Mounding Analysis
o 1 in/hr for recharge rate as the initial input
o Horizontal hydraulic conductivity rate is 1 times the recharge rate as the project is outside the coastal plain
o Use the drain time calculated in step 3 as the duration of infiltration
o Use half of the basin dimensions calculated in step 3 as input for x and y
9
Example: Small-Scale Bioretention System
![Page 121: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/121.jpg)
Stormwater Runoff Quality
• The mounding height is 2.861 ft from the water table
• SHWT is 5 feet below the lowest point of the basin
• The mounding will reach to 2.139 feet below the lowest point of the basin
10
Example: Small-Scale Bioretention System
![Page 122: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/122.jpg)
Water Quality
11
![Page 123: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/123.jpg)
Extended Detention Basins
• Extended detention basins cannot be used for groundwater recharge
• TSS removal rate based on detention time
• Detention Time: time between when the maximum storage volume is achieved to when only 10% of the maximum volume remains
• Use Water Quality Design Storm for TSS removal rate calculation
12
Design and Performance Standards
![Page 124: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/124.jpg)
13
Water Quality
![Page 125: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/125.jpg)
Water Quality
14
Courtesy of NJDOT
Extended Detention Basins – Design Example
Water Quality
![Page 126: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/126.jpg)
Water Quality
15
Extended Detention Basins – Design Example
Water Quality
![Page 127: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/127.jpg)
Water Quality
• Maximum storage: 0.832 acre-ft at 2.10 hrs
• 10% of maximum storage: 0.0832 acre-ft
16
Extended Detention Basins –
Design Example
Extended Detention Basins – Design Example
Water Quality
![Page 128: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/128.jpg)
17
Extended Detention Basins – Design Example
Water QualityWater Quality
![Page 129: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/129.jpg)
18
Extended Detention Basins – Design Example
Water Quality
• Maximum storage: 2.10 hr• Detention time ends at 17.85 hr• Detention time = 17.85 - 2.10 = 15.75 hr• TSS removal rate ≈ 47%
![Page 130: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/130.jpg)
Wet Ponds
19
![Page 131: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/131.jpg)
Wet Ponds
• Wet ponds (GI)o designed to maintain at least a 10-foot wide area of native
vegetation along at least 50 percent of the shoreline and to include a stormwater runoff retention component designed to capture stormwater runoff for beneficial reuse, such as irrigation
o used for water quantityo used for water quality only when a Waiver or Variance from
N.J.A.C. 7:8-5.3 is obtainedo BMP Chapter 10.5
• Wet Ponds (Non-GI)o used for water quantity and quality only when
a Waiver or Variance from N.J.A.C. 7:8-5.3 is obtainedo BMP Chapter 11.6
20
Two Different BMPs
![Page 132: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/132.jpg)
Wet Ponds
• Minimum 0.25 acre permanent pool surface area
• Minimum ratio of the permanent pool volume to the Water Quality Design Storm volume is 1:1
• Minimum drainage area of 20 acres
• Requires very low permeability soils or an impermeable liner
21
Design Criteria
![Page 133: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/133.jpg)
Wet Ponds
22
TSS Removal Rate
• Without extended detention time
o TSS removal rate is based on the ratio of volume in the permanent pool to the volume of the Water Quality Design Storm volume
o Ratio is from 1:1 to 3:1 for TSS removal rate from 50% to 80%
• Additional TSS removal up to 90% can be provided using extended detention
o Ratio of permanent pool volume to Water Quality Design Storm runoff volume (1:1 to 3:1) and
o Detention time (12 to 24 hours)
![Page 134: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/134.jpg)
23
Water Quality
![Page 135: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/135.jpg)
24
SAFETY REQUIREMENTS
![Page 136: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/136.jpg)
Safety Requirement
25
Escape Provision NJAC 7:8-6.2
2.5 ft below
permanent water
level
1 to 1.5 ft above
permanent water
level
• Safety Ledges
o Required for basins having a permanent pool of water >2.5 ft
o Requires two steps
• Each step 4-6 ft wide
• 1st step 2.5 ft below permanent water level
• 2nd step 1 to 1.5 ft above permanent water level
![Page 137: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/137.jpg)
26
MANUFACTURED TREATMENT DEVICES (MTDs) DESIGN
![Page 138: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/138.jpg)
MTD Design
27
Green Infrastructure Guidance for MTDs (April 23, 2020)
For an MTD to be considered “green infrastructure” in accordance with the March 2, 2020 amendments to the Stormwater Management rules at N.J.A.C. 7:8, the MTD must meet the GI definition noted at amended N.J.A.C. 7:8-1.2.Specifically, the MTD shall (1) infiltrate into the subsoil; and/or (2) treat stormwater runoff through filtration by vegetation or soil.
![Page 139: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/139.jpg)
MTD Design
• Must be verified by NJCAT and certified by NJDEP
• Devices that are not currently certified by NJDEP cannot be used to meet the design and performance standards
• Sizing calculation in the certification letter
• http://www.njstormwater.org/treatment.html
• Maximum contributory drainage area of a GI MTD is 2.5 acres
28
Design and Performance Standards
![Page 140: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/140.jpg)
MTD Design
29
MTD Design must follow the design criteria and use only models listed in the Certification
• The maximum treatment flow rate (MTFR) for the manufactured treatment device (MTD) is calculated using the New Jersey Water Quality Design Storm (1.25 inches in 2 hrs) in N.J.A.C. 7:8-5.5. …
• The stormwater treatment unit shall be installed using the same configuration reviewed by NJCAT, and sized in accordance with the criteria specified in the certification
• Sizing configuration by the maximum treatment flow rate (MTFR) and maximum inflow impervious area, whichever results in the highest minimum configuration
![Page 141: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/141.jpg)
MTD Design
30
MTD Design must follow the design criteria and use only models listed in the Certification
Sample language in the Certification Letter settingthe
design criteria:
In order for an GI MTD to meet the definition of GI, the GI MTD
must treat stormwater runoff through filtration by vegetation. To
this end, consistent with the vegetative cover requirement for
bioretention systems, the minimum vegetative cover in an GI
MTD is 85% in order to qualify as GI under the Stormwater
Management rules at N.J.A.C. 7:8. The vegetative cover should
be determined based on the expected coverage of the
proposed plantings when matured. Plant death or damage shall
require replanting to maintain this 85% coverage requirement if
the system is installed as GI.
![Page 142: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/142.jpg)
MTD Design
31
Sample language in the Certification Letter setting the
design criteria:
Any MTD with bio-filtration media that would be placed "below
ground" as a vault without any vegetation can be considered
GI (for NJ purposes) only if the device infiltrates the entire Water
Quality Design Storm into the subsoil. Further, the below ground
device (vault) would need to meet the NJDEP Stormwater BMP
Manual conditions of having the soil below the MTD meet the
minimum tested infiltration rate of one inch per hour, have at
least two feet of separation from the seasonal high water table, and infiltrate into the subsoil.
![Page 143: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/143.jpg)
MTD Design
• MTDs are commonly sized using the rational method
• Q = ciA
• Many people mistakenly think the intensity of the Water Quality Design storm is the average of the 1.25 inches of rain in two hours
o 1.25 inches / 2 hours = 0.625 inches/hour– This is not correct!
32
Design Criteria
![Page 144: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/144.jpg)
33
Water Quality
![Page 145: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/145.jpg)
MTDs
34
Design Criteria
• Tc must be calculated in accordance with Chapter 15, in Part 630 of the NEH.
• For Tc = 10 minutes, i = 3.2 inches/hr
o Using 0.625 inches/hr underestimates flow by 80.5%
![Page 146: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/146.jpg)
Water Quality
• BMPs should be designed to meet criteria in the BMP Manual
• Multiple BMPs can be used in series when necessary
• Infiltration BMPs require detailed soil permeability testing
• Detention BMPs must calculate the detention time to determine TSS removal rate
• Use intensity-Duration-Frequency curve in Figure 5-16 when using Rational Method to calculate peak flow rate
35
In summary…
![Page 147: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/147.jpg)
36
GROUNDWATER RECHARGE
![Page 148: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/148.jpg)
Groundwater Recharge
• Demonstrate that 100% of the pre-development groundwater recharge is maintained or
• Infiltrate the difference in the 2-year storm runoff volume
37
Rule Requirements
Groundwater Recharge
![Page 149: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/149.jpg)
Groundwater Recharge
• Pros:o Simple calculation
• Cons:o Requires larger infiltration structure,
o Greater risk of failure,
o Larger groundwater mound
38
Infiltrate 2-year storm difference:
Groundwater Recharge
![Page 150: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/150.jpg)
Groundwater Recharge
• Use NRCS Method
• Show pre- and post-construction 2-year runoff volumes
• Follow all other assumptions of NRCS Method
o Curve numbers and time of concentration match quantity and quality analyses
39
The calculation of the 2-year storm difference should…
Groundwater Recharge
![Page 151: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/151.jpg)
Groundwater Recharge
• Requires use of New Jersey Groundwater Recharge Spreadsheet
• Need to review:
o Pre-development vs. post-development land use inputs
o BMP designs
40
Maintain 100% of pre-development groundwater recharge:
Groundwater Recharge
![Page 152: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/152.jpg)
41
Groundwater Recharge
![Page 153: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/153.jpg)
Groundwater Recharge
• Inputs (Orange cells):o Municipality
o Pre- and post-development land covers
o Pre- and post-development soils
o Acres
• Output:o Post-development annual recharge deficit
42
Page 1 (Annual Recharge Worksheet)
Groundwater Recharge Spreadsheet
![Page 154: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/154.jpg)
Groundwater Recharge
• Soils and land covers must match site plans
• Soils determined by soil survey or Chapter 12 defaults
• Pre- and post-development areas should match
43
Groundwater Recharge Spreadsheet
Page 1 (Annual Recharge Worksheet)
![Page 155: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/155.jpg)
Groundwater Recharge
44
Groundwater Recharge
![Page 156: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/156.jpg)
45
Groundwater Recharge
![Page 157: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/157.jpg)
Groundwater Recharge
• Parameter from Annual Recharge Worksheeto Vdef: Post-development deficit recharge
• Default from page 1 or other inputo Aimp: Post-D Impervious area (Targeted
Impervious area) contributing to recharge calculation• Default value is the total impervious surface from the first
page• Can be partial impervious surface runoff to recharge BMP
• Automatically populated outputo Annul BMP recharge volume
46
Groundwater Recharge Spreadsheet
Page 2 (BMP Calculation)
![Page 158: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/158.jpg)
Groundwater Recharge
• segBMP = the post-developed site segment in which the proposed recharge BMP will be locatedo Used to specify where on the site the recharge BMP will be
located
o Can be set to zero if this is still undetermined or if BMPs will be placed over multiple segments
o Porous pavement, segment shall be the impervious area of the post-development
47
Groundwater Recharge Spreadsheet
Parameter from Annual Recharge Worksheet
![Page 159: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/159.jpg)
Groundwater Recharge
• ABMP = BMP Area (the footprint of a BMP, excluding sloped areas)
• dBMP = BMP effective depth (maximum equivalent water depth that can be achieved in the BMP before overflow begins)
o If the BMP is filled with stone, the effective depth is the actual depth x the porosity
o For sloped BMP like bioretention swale, use averaged dBMP but adjust ABMP to keep that ABMP x dBMP should always equal the storage volume
48
Groundwater Recharge Spreadsheet
BMP Design Inputs
![Page 160: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/160.jpg)
Groundwater Recharge
• dBMPu = Vertical distance from the vegetated ground surface to the maximum water level of the BMPo Positive if the maximum level is below the ground
surface and negative if above the ground surface
• dEXC = Vertical distance from the vegetated ground surface to the bottom of the BMP
49
Groundwater Recharge Spreadsheet
BMP Design Inputs
![Page 161: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/161.jpg)
Groundwater Recharge
50
Groundwater Recharge Spreadsheet
BMP Design
![Page 162: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/162.jpg)
Groundwater Recharge
51
Groundwater Recharge Spreadsheet
BMP Design
![Page 163: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/163.jpg)
Groundwater Recharge
52
Groundwater Recharge Spreadsheet
BMP Design
![Page 164: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/164.jpg)
53
Groundwater Recharge Example
![Page 165: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/165.jpg)
54
Groundwater Recharge Example
![Page 166: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/166.jpg)
Groundwater Recharge
55
Groundwater Recharge Example
![Page 167: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/167.jpg)
Groundwater Recharge
56
GL EL.=15 Berm EL.=16
Groundwater Recharge Example
![Page 168: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/168.jpg)
Groundwater Recharge
• dBMPu = 15 (GL)– 13.36 (orifice)
= 1.64 ft (19.7 inches)
• dEXC = 15 – 12 = 3 ft (36 inches)
57
BMP Design
Groundwater Recharge Example
![Page 169: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/169.jpg)
Groundwater Recharge
• The BMP effective depth: 1.36 ft (13.36 – 12 ft)
• Volume below first outlet: 59,400 ft3
58
BMP Design
Groundwater Recharge Example
![Page 170: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/170.jpg)
Groundwater Recharge
• dBMP = 1.36 ft
• ABMP = ?o Remember: BMP area times effective depth must equal
volume
o 𝐴𝐵𝑀𝑃 =𝑉
𝑑𝐵𝑀𝑃=
59,400
1.36=43,676 ft2
59
BMP Design
Groundwater Recharge Example
![Page 171: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/171.jpg)
Groundwater Recharge
• ABMP = 43,676 ft2 (the same)
• dBMP = 1.36 ft (the same)
• dBMPu = -1.36 feet (16.3 inches)
• dEXC = 0 inches
60
Groundwater Recharge
What if this BMP had been designed as a bioretention system?
Groundwater Recharge Example
![Page 172: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/172.jpg)
Groundwater Recharge
• Recharge of stormwater with high pollutant loading or industrial stormwater exposed to source material is prohibited
• All recharge BMPs must meet the infiltration criteria and structural design criteria in Chapters 9, 10, 11
• All BMPs designed to infiltrate must consider adverse hydraulic impact on the groundwater table
61
Rule Requirements
Groundwater Recharge
![Page 173: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/173.jpg)
Water Quality
62
Summary
• Highlights of BMPso Small-Scale Bioretention System
o Extended detention basins
o Wet ponds
• Soil Testing – Appendix E/ Chapter 12
• Groundwater Recharge
![Page 174: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/174.jpg)
More Information:
63
Stormwater Management UnitBureau of Flood Hazard and Stormwater Engineering
Watershed Engineering ElementDivision of Watershed Protection and Restoration
401 East State Street
PO Box 420, Mail Code 401-2B
Trenton, NJ 08625-420
Tel: 609-633-7021
www.njstormwater.org
changi [email protected]
![Page 175: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/175.jpg)
MOUNDINGREQUIREMENTS, CALCULATIONS
and EXAMPLES
GROUNDWATER
Changi Wu/ Lisa Schaefer
NJDEP Division of Watershed Protection
and Restoration
SWMDR Training Module 3
October 12, 2021
![Page 176: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/176.jpg)
Introduction
• Requirements Under N.J.A.C. 7:8
• Concepts
• Method of Calculation
• Examples
2
Goals
![Page 177: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/177.jpg)
Groundwater Mounding
• N.J.A.C. 7:8-5.4(a)2.iv, “The design engineer shall assess the hydraulic impact on the groundwater table and design the site so as to avoid adverse hydraulic impacts. “
• Localized increase in the height of the groundwater table as a result of infiltration
• Caused by concentrating large amount of recharge into one area
• Can cause basin failure or damage to nearby structures
Background
3
![Page 178: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/178.jpg)
https://pubs.usgs.gov/sir/2010/5102/support/sir2010-5102.pdf4
Groundwater Mounding
![Page 179: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/179.jpg)
5
METHOD of
CALCULATION
![Page 180: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/180.jpg)
Groundwater Mounding
• Hantush equation developed in 1967 to calculate mounding beneath infiltration basin
• Easiest way to use the Hantush method is a spreadsheet developed by USGS
• Can only calculate the maximum height of mounding
Calculation
6
![Page 181: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/181.jpg)
7
https://www.njstormwater.org/bmp_manual/
Chapter 13
Download Hantush Excel Spreadsheet
The Hantush Spreadsheet
![Page 182: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/182.jpg)
The Hantush Spreadsheet
• Recharge rate (in/hr)
• Specific yield (dimensionless)
• Horizontal hydraulic conductivity (in/hr)
• Basin dimensions (feet)
• Duration of infiltration (hours)
• Initial thickness of saturated zone (ft)
Input Parameters
8
![Page 183: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/183.jpg)
The Hantush Spreadsheet
• Recharge rate (in/hr)
o Design soil permeability rate (vertical saturated soil hydraulic conductivity)
• Horizontal hydraulic conductivity
o Rarely a tested parameter
o In the coastal plain: 5 𝑥 recharge rate
o Outside the coastal plain: 1 𝑥 recharge rate
9
Input Parameters
![Page 184: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/184.jpg)
• Specific yield
o Specific yield governs how much water the unsaturated zone can store when recharged runoff reaches the water table
o The volume of water that will drain from the soil, as a result of gravity, divided by the total volume of the soil
o Default value 0.15 and up to a maximum value 0.2, with supporting soil test results
10
The Hantush Spreadsheet
Input Parameters
![Page 185: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/185.jpg)
• Basin dimensions (assumes rectangular and vertical sides)
o Input as ½ length in x-direction and ½ length in y-direction of the footprint of a BMP
• Circular shape BMP use the radius of the circular basin as both x and y.
• Irregular shape BMP, convert the shape to a rectangular shape that has same depth of stormwater runoff to be infiltrated and is best fitted to the original shape.
• If a BMP is designed with sloped sides, use the bottom footprint as the length and the width of the BMP and use the total volume of the runoff to be infiltrated divided by the area of the bottom footprint to calculate the duration of infiltration period 11
The Hantush Spreadsheet
Input Parameters
![Page 186: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/186.jpg)
• Initial thickness of saturated zone (ft)
o Unless proven by a field test showing the thickness of saturated zone beneath the proposed BMP, the default value is 10 ft.
o Note that the thickness of saturated zone used in the Hantush spreadsheet is not the thickness of a large regional aquifer. It is the distance from the Seasonal High Water Table (SHWT) to the first hydraulically restrictive layer.
12
The Hantush Spreadsheet
Input Parameters
![Page 187: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/187.jpg)
• Duration of infiltration (hours)
o Time for infiltrating the runoff volume through the BMP
o Using the recharge rate in the input
o Maximum value is 72 hr
13
The Hantush Spreadsheet
Input Parameters
![Page 188: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/188.jpg)
• Maximum mounding height decreases
o when following inputs increase:
• Horizontal hydraulic conductivity increases
• Specific yield increases
• Initial thickness of saturated zone increases
14
The Hantush Spreadsheet
How the Input Values Affect the Results
![Page 189: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/189.jpg)
• When the mounding height is higher than the bottom of the BMP, the recharge rate is impacted because of the reduced hydraulic gradient
o Use a smaller recharge and longer duration of infiltration
o The recharge rate times the duration of infiltration and the area of the footprint shall be equal to the volume infiltrated
15
The Hantush Spreadsheet
Interpreting the Results
𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑟𝑢𝑛𝑜𝑓𝑓 𝑡𝑜 𝑏𝑒 𝑖𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑡𝑒𝑑 𝑐𝑓 =
Duration of 𝑥 𝐼𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑡𝑖𝑜𝑛 𝑥 𝑅𝑒𝑐ℎ𝑎𝑟𝑔𝑒
infiltration period (hr) 𝑎𝑟𝑒𝑎 𝑠𝑓 𝑟𝑎𝑡𝑒 𝑖𝑛/ℎ𝑟
![Page 190: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/190.jpg)
• When result shows that mounding height reaches the bottom of the infiltration BMP o decrease recharge rate & longer infiltration period, or
o design a larger but shallower basin
16
The Hantush Spreadsheet
Interpreting the Results
![Page 191: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/191.jpg)
17
GROUNDWATER
MOUNDING
EXAMPLES
![Page 192: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/192.jpg)
Introduction
• Demonstrate simple analysis
• Demonstrate calculating impacts to nearby structures
18
Goals
![Page 193: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/193.jpg)
Examples
1. No adverse hydraulic impact to groundwater
2. Adverse hydraulic impact to groundwater and adjustments required
19
Scenarios:
![Page 194: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/194.jpg)
No Adverse Hydraulic Impact to Groundwater Scenario
• A major development located in the coastal plain proposes an
infiltration basin, whose bottom footprint measures 50 ft by 50 ft, to
infiltrate 5,000 cf of runoff generated by the Water Quality Design
Storm (WQDS).
o The maximum depth of ponding water is designed to be 2 ft
o Soil testing was performed in accordance with Chapter 12
o The soil testing report shows that the Seasonal High Water Table
(SHWT) is 7.5 ft below the 6 inch thick bottom sand layer of the
basin
o The tested soil permeability rate of the most restrictive soil horizon
below the basin is 4 in/hr
o No nearby underground structures are present
20
![Page 195: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/195.jpg)
No Adverse Hydraulic Impact to Groundwater Scenario
Step #1: Calculate the duration of infiltration period
Duration of infiltration period, t (hours)
= 𝑣𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑟𝑢𝑛𝑜𝑓𝑓 𝑡𝑜 𝑏𝑒 𝑖𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑡𝑒𝑑 𝑐𝑓 𝑥 12 𝑖𝑛/𝑓𝑡
𝐼𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑡𝑖𝑜𝑛 𝑎𝑟𝑒𝑎 𝑠𝑓 𝑥 𝑅𝑒𝑐ℎ𝑎𝑟𝑔𝑒 𝑟𝑎𝑡𝑒 𝑖𝑛/ℎ𝑟
Infiltration area
= 50 ft 𝑥 50 ft = 2,500 sf
Recharge Rate = ½ Tested Infiltration rate
= 0.5 𝑥 4 in/hr = 2 in/hr
Therefore, t
= 5,000 𝑐𝑓 𝑥 12 𝑖𝑛/𝑓𝑡
2,500 𝑠𝑓 𝑥 2 𝑖𝑛/ℎ𝑟= 12 hr
21
![Page 196: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/196.jpg)
No Adverse Hydraulic Impact to Groundwater Scenario
Step #2: Prepare the inputs for the spreadsheet
22
Parameter Value
Recharge rate (R) 2 in/hr (4 ft/day)
Specific yield (Sy) 0.15
Horizontal hydraulic conductivity (Kh) 10 in/hr (20 ft/day)
½ length of basin (x direction) 25 ft
½ length of basin (y direction) 25 ft
Duration of infiltration period (t) 12 hr (0.5 days)
Initial thickness of saturated zone (hi(0)) 10 ft
![Page 197: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/197.jpg)
No Adverse Hydraulic Impact to Groundwater Scenario
Step #2: Input Section of the Hantush Spreadsheet
23
![Page 198: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/198.jpg)
No Adverse Hydraulic Impact to Groundwater Scenario
Step #2: Results Section of the Hantush Spreadsheet
24
SHWT
![Page 199: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/199.jpg)
How the Hantush Spreadsheet Represents an Adverse Hydraulic Impact
Results Section of the Hantush Spreadsheet
25
SHWT
![Page 200: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/200.jpg)
Drywell Scenario
26
• A site is located outside the coastal plain. A 7 ft high by 5 ft diameter drywell is proposed to store and infiltrate 137.4 cf of roof runoff from a single-family home for the Water Quality Design Storm.
o The house has a basement floor located just above the groundwater table.
o The edge of the drywell is 10 ft away from the house. o Soil testing was performed in accordance with Chapter 12o The soil testing report shows that SHWT is 2 ft below the bottom of
the drywello The tested soil permeability rate of the most restrictive soil horizon
below the basin is 4 in/hro The duration of infiltration period, t =
= 𝑣𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑟𝑢𝑛𝑜𝑓𝑓 𝑡𝑜 𝑏𝑒 𝑖𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑡𝑒𝑑 𝑐𝑓 𝑥 12 𝑖𝑛/𝑓𝑡
𝐼𝑛𝑓𝑖𝑙𝑡𝑟𝑎𝑡𝑖𝑜𝑛 𝑎𝑟𝑒𝑎 𝑠𝑓 𝑥 𝑅𝑒𝑐ℎ𝑎𝑟𝑔𝑒 𝑟𝑎𝑡𝑒 𝑖𝑛/ℎ𝑟
= 137.4 𝑐𝑓 𝑥 12 𝑖𝑛/𝑓𝑡
19.62 𝑠𝑓 𝑥 2 𝑖𝑛/ℎ𝑟= 42 hr
![Page 201: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/201.jpg)
Drywell Scenario
Step #1: Prepare the inputs for the spreadsheet
27
Parameter Value
Recharge rate (R) 2 in/hr (4 ft/day)
Specific yield (Sy) 0.15
Horizontal hydraulic conductivity (Kh) 2 in/hr (4 ft/day)
½ length of basin (x direction) 2.5 ft
½ length of basin (y direction) 2.5 ft
Duration of infiltration period (t) 42 hr
Initial thickness of saturated zone (hi(0)) 10 ft
![Page 202: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/202.jpg)
Drywell scenario
28
Step #2: Results Section of the Hantush Spreadsheet
SWHT
Centerline of the drywell
![Page 203: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/203.jpg)
Drywell Scenario
29
Step #2: Results Section of the Hantush Spreadsheet
![Page 204: Module 3 of 4 Stormwater Management Design Review](https://reader030.vdocuments.net/reader030/viewer/2022012720/61b2c6896a10c46bba10accd/html5/thumbnails/204.jpg)
Any Questions?
30
Stormwater Management UnitBureau of Flood Hazard and Stormwater Engineering
Watershed Engineering ElementDivision of Watershed Protection and Restoration
401 East State Street
PO Box 420, Mail Code 401-2B
Trenton, NJ 08625-420
Tel: 609-633-7021
www.njstormwater.org
Changi [email protected]
Lisa [email protected]