modulo 10_4 - guia auditoria - parte 145_en

Upload: dirupy

Post on 05-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    1/34

    Pgina 1 de 34

    MODULO 10

    GUA PARA LA REALIZACIN DE AUDITORIAS INTERNAS DE UNA ORGANIZACIN DE MANTENIMIENTO PARTE 145

    Modelo de aeronave / Talleres / etc...

    PART 145.25(a)

    FACILITY REQUIREMENTS1. Aircraft hangars available for base

    maintenance.

    2. Proof of tenancy, if the hangars are not

    owned by the organisation.3. Sufficiency of hangar space demonstrated by

    a projected hangar visit plan relative to the

    maintenance program.

    4. Update of aircraft hangar visit plan at regular

    intervals.

    5. Aircraft component workshops large enough

    to accommodate the components on planned

    maintenance.

    6. Aircraft hangar and aircraft componentworkshop structures prevent the ingress of thenormally prevailing local weather elements,

    dust, noise, moisture and other air pollution.

    7. Aircraft component workshops and aircraft

    hangars sufficiently heated.

    8. Mass points for electric and electronic

    devices installed.

    9. Adequate energy source: Air vacuum, etc

    10. Floors sealed

    11. Aircraft hangar available whenever

    there is a need due to the kind of work to be

    carried out for line maintenance or there are

    means to stop the work.

    12. Aircraft hangars and component

    workshops separated in such a manner that

    interacting contamination is prevented.

    13. Aircraft hangars and component

    workshops in a condition to prevent

    environmental pollution.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    2/34

    Pgina 2 de 34

    PART 145.25(b)

    FACILITY REQUIREMENTS1. Adequate office accommodations for

    management, planning, quality staff, workshop

    management, technical documentation.2. Adequate means of communication between

    departments installed.

    3. Provisions and accomodation for the

    maintenance staff to study Maintenance Data

    and fill-in the maintenance records in a proper

    manner.

    PART 145.25(c)

    FACILITY REQUIREMENTS1. Room temperatures so that the personnel canwork without undue discomfort.

    2. Working environment such as to ensure the

    carrying out of work tasks in an effective

    manner.

    3. Working environment meeting the specific

    requirements to maintenance work.

    4. Lighting up to the state of the art.

    5. Noise levels such as not to distract personnelfrom carrying out inspection tasks.

    6. Provisions for the case that the working

    environment deteriorates to an unacceptable

    level in respect of temperature, moisture, snow,

    hail, ice, wind, light, solar radiation, to suspend

    the particular maintenance tasks especially at

    line maintenance until satisfactory conditions

    are re-established.

    7. Provisions in the case of occurring dust/otherairborne contamination ( visible surface

    contamination) to seal susceptible accessible

    systems until acceptable conditions are re-

    established.

    PART 145.25(d)

    FACILITY REQUIREMENTS1. Storage facilities for spare parts, technical

    equipment, equipment, tools, other material.2. Unauthorised access

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    3/34

    Pgina 3 de 34

    3. Unserviceable and serviceable components

    stored separately: labelling, segregation.

    4. Storage facilities: clean, well-ventilated and

    even dry temperature to minimise the effects of

    condensation.5. Storage racks of adequate dimensions,

    strength and stiffness to support large aircraft

    components so that they are not distorted during

    storage.

    6. Provisions to ensure that aircraft components

    remain packaged in protective material until

    installed.

    7. Storage instructions established on the basis

    of the manufacturer storage recommendations.8. Inspection of incoming goods and procedures

    for this inspection.

    9. Certificates of the origin and the

    serviceability of spare parts.

    PART 145.30(a)

    PERSONNEL REQUIREMENTS1. Nominated Accountable Manager:

    demonstrate a basic undestanding of PART-145

    and the responsabilities associated with being

    acc. mgr.

    Acceptable as per DGAC IC 31-08

    2. Nominated senior person or persons

    (maintenance management structure): especially

    base maintenance manager, line maintenance

    manager, workshop manager, quality manager.

    3. Is the managing staff suitable?

    Acceptable as per DGAC IC 31-08

    JAA Form 4 accepted.

    5. Responsibilities for the individual scopes of

    duties determined; understood at all levels.

    6. Has DGAC acceptance been sought for the

    accountable manager to also act as manager line

    maintenance and/or workshop manager?

    7. Are titles and authorisations of the

    managerial positions compatible with those

    used in PART-145 or if not - are the titles andauthorisations of the persons notified to the

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    4/34

    Pgina 4 de 34

    DGAC?

    8. Procedures should make clear who deputises

    for any particular manager in the case of

    lengthy absence of said manager(s).

    9.- Is the duty of the accountable manager andof the other senior persons to carry out

    corrective action on the bases of the results ofquality audits (acc. to PART 145.65(b)) laid

    down in writing?

    10.- If there are more managers, they shouldreport ultimately through either the base

    maintenance manager or line maintenance

    manager or workshop manager or quality

    manager to the Acc. Mgr.PART 145.30(b)

    1.- Quality Policy established and promoted by

    the Acc. Manager. (His responsibility).

    PART 145.30(c)

    PERSONNEL REQUIREMENTS1.- Quality Manager nominated by Acc. Mgr.

    2.- QM with right of direct access to the

    accountable manager to ensure that the acc.manager is kept properly informed on quality

    and compliance matters. Privileges and duties

    of QM.

    3.- Requesting remedial action as necessary by

    the Acc. Mgr, Base, Line, Workshop, etc...

    PART 145.30(d)

    PERSONNEL REQUIREMENTS1. Sufficient staff: planning, performance of the

    work, quality monitoring, inspections.Employed / Contrated; At least half of staff at

    each workshop, hanger or flight line ->

    employed

    2. Sufficient number of certifying staff

    3. Man-hours plan: demonstrate sufficient man-

    hours for the work that is intended to be carried

    out (ALL sections of the Organisation)

    Aircraft/components work ALL operators.

    Base Maintenance -> relate to the AircraftHangar Visit Plan. Component Maintenance ->

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    5/34

    Pgina 5 de 34

    relate to the component planned maintenance.

    Specified in the MOE.

    4. Update of man-hour plan (at least every 3

    months and when necessary.

    5. Sufficient man-hours for Quality monitoringfunction [Relevant 145.65(c) sub-paragraphs]

    Quality Moinitoring Staff performing other

    functions ? -> Considered in man-hours plan ?

    6.- Procedure to reassess work intended to be

    carried out when actual staff availability is less

    than planned staffing level for any particular

    work shift or period.

    7.- Plan Deviations: notified ?, (25% shortfall)

    PART 145.30(d)PERSONNEL REQUIREMENTS

    1. Procedures for establish & control

    competence of Maintenance, [Management] and

    Quality Audit Personnel. (By 'on the job' and/or

    by examination).

    2. Job descriptions for each job role.

    3. Planners: are able to interpret maintenance

    reqs. into maintenance tasks & have no

    authority to deviate from the maintenance data.

    4.Mechanics: able to carry out maintenance

    tasks to any standard specified in the

    maintenance data

    5.Mechanics: have to report to supervisors

    mistakes requiring rectification to re-establish

    required maintenance standards.

    6. Specialised service staff: Able to carry out

    specialised maintenance tasks (i.e. NDT, ) tothe standard specified in the maintenance data

    and will both inform and await instructions

    from their supervisor in any case it is not

    possible to complete the specialized

    maintenance in accordance with maintenance

    data.

    7. Supervisors: able to ensure that all requiredmaintenance tasks are carried out and where not

    completed or where it is evident that a particularmaintenance task cannot be carried out to the

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    6/34

    Pgina 6 de 34

    maintenance data, then such problems have to

    be reported to the Quality Mgr. for appropriate

    action. When they carry out maintenance tasks,

    they understand that such tasks should not be

    undertaken when incompatible with theirmanagement responsibilities.

    8. Certifying staff: able to determine, whether

    an aircraft or a component can be released to

    service or not.

    9. Planners, specialized services staff,

    supervisors and certifying staff: knowledge of

    organization regulations and requirements

    relevant to their particular role in the

    organisation.10.- Quality Audit Staff: monitor compliance

    with PART-145 identifying non compliance in

    an effective and timely manner.

    11.- Competence must include understanding of

    the application of human factors and human

    performance issues.

    12.- Continuation Human Factors training (All

    maintenance, Management & Quality Audit

    personnel)[See req's AMC 145.30(e)5, 7,8 & 9 ]

    13.- Initial Human Factors training.

    [See Appndx 9 and AMC 145.30(e)6, 8 & 9 ]

    PART 145.30(f)

    PERSONNEL REQUIREMENTS(NDT Personnel))

    1. Procedures for Qualification (Level 1,2 or 3) of

    personnel who carry out and/or control a (1

    )"continued airworthiness non-destructive test" of

    aircraft structures and/or components for the (2)

    "particular non-destructive test". (European Standard

    EN 4179).

    Exception: equivalent std. in the case of PART145

    MO outside JAA full member States.

    (1) Continued airworthiness non-destructive testing means such testing specified by the type certificate holder or manufacturer in the PART 145.45

    maintenence data for in service aircraft/component for the purpose of determining the continued fitness of the product to operate safely

    (2) Particular non-destructive test means any one or more of the following: Dye penetrant, magnetic particle, eddy current, ultrasonic and

    radiographic methods inlcuding X ray and gamma ray.

    2. Personnel for any other specialised task ->

    appropriately qualified i.a. with any existing nationalstd. recognised by DGAC as an appropriate std.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    7/34

    Pgina 7 de 34

    3.- Level 3 personnel. qualified via EN 4179 to

    establish and authorise methods, techniques -> does

    not permit such personnel to deviate from methods

    and techniques of the continued airworthiness data(NDT manuals, SBs, unless these allow such

    deviations).

    4.- Personnel qualified in PART-66 sub-category B1 -

    > carry out and/or control contrast dye penetrant tests.

    5.- Examinations: conducted by personnel or

    organisations udner the general control of National

    aerospace NDT Board. In basence of such a Board theDGAC will make arrangements with another JAA fullmember Authority to use the NDT Board of that State.

    6.- New NDT methods: thermography and

    shearography (not addressed by EN 4179). Carried

    out i.a. with the particular equipment manufacturers

    recomendations including any training and

    examination process to ensure competence of the

    personnel with the process.

    7.- Non-destructive Inspections: procedure for

    training and assessment for competence of personnel -

    > Boroscoping and other techniques (delamination

    coin tapping, etc..)

    PART 145.30 (g) 1

    PERSONNEL REQUIREMENTSLine Maintenance

    (Aircraft MTOW > 5700 KG)

    1.-Aircraft type rated certifying staff qualified PART

    145.35 plus PART-66 Sub-category B1 and B2.

    [includes personnel holding protected rights under

    PART-66.1(d)]

    2.- In addition: may use appropriate task trained

    Certifying staff qualified PART 145.35 plus PART-66category A ==> (1) minor schedule line maintenance [List of typical tasks permitted after appropriate task training to be carried out by the Cat A for the purpose of issuinga PART-145.50 aircraft CRS --> AMC 145.30(f)(1) 3]

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    8/34

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    9/34

    Pgina 9 de 34

    PART 145.30(h)

    PERSONNEL REQUIREMENTS(Aircraft MTOW < 5700 KG)

    Until PART-66 specifies a requirement continuedcompliance with current national aviation regulations

    of the JAA full member Authority that granted or

    proposes the grant PART-145 approval.

    PART 145.30(i)

    PERSONNEL REQUIREMENTS(Aircraft components)

    Until PART-66 specifies a requirement

    continued compliance with current antional

    aviation regulations of the JAA full member

    Authority ...

    PART 145.30(j)

    PERSONNEL REQUIREMENTS(Special circumstances)

    1.- Non-JAA State or non-JAA full member

    State based PART-145 maintenanceorganization approved by a JAA full member:

    may use certifying staff qualified to the national

    aviation regulations of the State in which is

    based ==> JAA full member in conjunction

    with JAA Maintenance Division being satisfied

    that such regulations result in a standard

    comparable with PART-66 + JAA additional

    conditions, where specified.

    2.- [RESERVED] for non-JAA State basedPART-145 maintenance organisation accepted

    by the JAA in accordance with PART-145.10(c)

    3.- Limited line maintenance carried out by

    another organization under the quality system of

    a JAA full member approved organization at a

    non-JAA State or Non-JAA full member State

    location ==> (Same as #1 above)

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    10/34

    Pgina 10 de 34

    4.- Repetitive pre-flight airworthiness directive,

    which specifically states that the flight crew

    may carry out such AD, the PART-145

    approved organization may issue a limitedPART-145 authorization to the aircraft

    commander and/or the flight engineer subject to

    being satisfied that sufficient training has been

    carried out to ensure he can accomplish the AD

    to the required standard.

    5.- (1) Unforeseen case of an aircraft grounded

    at a location not having an appropriate approvedor accepted PART-145 organisation ==>issue a

    one-off PART-145 certification authorization to

    a person not less than 5 years maintenance

    experience and holding a valid ICAO aircraft

    license rated for the aircraft type requiring

    certification, subject to the PART-145

    organisation obtaining and holding on file

    evidence of the experience and the license. All

    such cases must be reported to the JAA fullmember Authority within 7 days after the

    issuance. Maintenance that could affect flight

    safety could be required to be rechecked by the

    contracted PART-145 approved or accepted

    organisation.

    (1) Unforeseen: could not be reasonable have been predicted by the operator because the defect was unexpected due to being part of a hitherto reliablesystem.

    PART 145.35(a)

    CERTIFYING STAFFIssuing or re-issuing certification authorization:

    adequate understanding of the relevant aircraft

    and/or aircraft components (the ones at his

    certification authorization) together with the

    associated organization procedures.Trained received/ relevant maintenance

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    11/34

    Pgina 11 de 34

    experience and exams passed of the product

    type and associated organization procedures:

    how the product functions, what are the most

    common defects with associated consequences.

    Training and examination may be reduced or

    eliminated when AMC 145.35(e) subparagraph

    3 is taken into account.

    PART 145.35(b)

    CERTIFYING STAFF

    All aircraft release certifying staff are (1)

    involved in at least 6 months of actual aircraft

    maintenance experience in any 2 year period.

    (1) Involved means he has worked in an aircraft maintenance environment and has either exercised the privileges of the certification authorization and/orhas actually carried out maintenance on at least some of the aircraft type systems specified in the particular authorization.

    PART 145.35(c)

    CERTIFYING STAFF1.- Continuation training: all certifying staff

    receiving sufficient in each 2 year period.Remain current in terms of organization

    procedures, knowledge of relevant technology

    and human factor issues.

    Feedback: the organization receives feedback

    on the adequacy of its procedures and

    maintenance instructions. (Involvement of the

    quality department to ensure that feedback is

    actioned OR a procedure to ensure that

    feedback is formally passed from the training

    department to the quality department to initiate

    action.

    2.- Continuation training: changes in

    requirements such as PART-145, in

    organization procedures; modification standard

    of the products being maintained; human factorissues identified from any internal or external

    analysis of incidents. Instances where stafffailed to follow procedures and the reasons.

    Identify to the company incomplete or incorrect

    procedures.

    3.- Continuation training: all certifying staff

    receive sufficient in each 2 year period.

    Sufficient duration should be related to relevant

    quality audit findings and other internal/externalsources of information available on human

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    12/34

    Pgina 12 de 34

    errors in maintenance. [Less audit findings the

    less continuation training will be needed].

    Aircraft components: the duration would follow

    the same philosophy but should be scaled down

    to reflect the more limited nature of the

    activity.

    Review content at least once in every 24 month

    period.

    4.- Method of training: flexible process and

    could, for example, include a PART-147

    continuation training course, aeronautical

    college courses, internal short duration courses,

    seminars, etc. The elements, general content

    and length of such training should be specifiedin the MOE unless such training is undertaken

    under a PART-147 approval when such details

    may be specified under the PART-147 approval

    and cross referenced in the MOE.

    PART 145.35(d)

    CERTIFYING STAFF1.- Programme for continuation training: list all

    certifying staff, when training will take place, the

    elements of such training and an indication that it wascarried out reasonably on time as planned. Such

    information should be transferred to the certifying

    staff record [req'd by PART-145.35(h)]

    2.- Procedure to ensure compliance with relevant

    sub-paragraphs of PART 145.35 as the basis for issue

    of the certification authorisations, plus, if applicable, a

    procedure to ensure compliance with PART-66.

    PART 145.35(e)

    CERTIFYING STAFF1.- Procedure for assessing for competence,

    qualification and capability related to intended

    certifying duties all prospective certifying staff

    (except the one off 145.30(1)(5)), before the issue or

    reissue of a certification authorisation.

    2.- Assessment of Competence and capability:

    working the person under the supervision of either

    another certifying person or a quality auditor forsufficient time to arrive at a conclusion.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    13/34

    Pgina 13 de 34

    Sufficient time: depending if the person is fully

    exposed to relevant work (as little as a few weeks).

    Persons recruited from another PART-145 approved

    organisation and was a certifying staff: it is reasonable

    to accept a written confirmation from the person

    responsible for running the quality system about the

    person.

    3.- Qualification assessment: collecting copies of all

    documents that attest to qualification (licence and/or

    any authorisation held) followed by a confirmation

    check with the organisation(s) that issued such

    document(s) and finally a comparison check for

    differences between the product type ratings on the

    qualification documents and the relevant producttypes maintained by the PART-145 organisation

    (maybe he will need type differences training).

    PART 145.35(f)

    CERTIFYING STAFF1.- Certifying staff authorisation documents

    availability.

    2.- Authorisation document clearly show thescope and limits of such authorisation to the

    certifying staff and any authorised person that

    may require to examine the authorisation..

    3.- Use of codes ==> code translation readilyavailable.

    PART 145.35(g)

    CERTIFYING STAFF1.- Issue of PART-145 certification: person in

    charge. Quality Manager.

    2.- Nomination of other persons in accordance

    with a procedure acceptable to the JAA.

    PART 145.35(h)CERTIFYING STAFF

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    14/34

    Pgina 14 de 34

    1.- Records of each certifying staff member: at

    least name, date of birth, basic training, type

    training, continuation training, experience,

    qualifications relevant to the approval, scope of

    the authorisation, date of first issue of the

    authorisation, expire date of the authorisation (if

    appropriate), identification number of the

    authorisation.

    2.- Organisation's quality department control of

    these records

    3.- Access to the system: persons authorised

    kept to a minimu, ...

    4.- Access by certifying person to his own

    records: any real case, Do they know they have

    access?

    5.- Access to the JAA staff.

    6.- Keeping of these records at least two years

    after the certifying person has ceased

    employment with the organisation.

    Copy of their record for certifying staff when

    leaving the organisation..

    Real examples.

    PART 145.35(i)CERTIFYING STAFF1.- Copy of authorisation provided to certifying

    staff (documented or electronic format).

    PART 145.35(j)

    CERTIFYING STAFF1.- Provide the authorisation when requested in

    a reasonable time (24 hrs.)

    Authorised persons (official or business person

    or organisation with a valid reason for seeing

    the authorisation).

    (Ask the certifying staff).

    Real cases ?

    PART 145.40(a)

    EQUIPMENT, TOOLS AND

    MATERIAL1. Disposal (1) of all tools, equipment and

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    15/34

    Pgina 15 de 34

    material needed for: scope of approval,

    Capability List, (as specified in the approved

    data).(1) Availability of equipment and tools means permanent except in the case of any tool or equipment that is so rarely needed that its permanent availability

    is not necessary.

    2. Control of tools and equipment that need

    servicing or calibration --> clearly identifiedand listed.

    Including personal tools.

    3. Manufacture of tools and equipment:

    procedures included in MOE.

    4. Base maintenance: sufficient aircraft access

    equipment and inspection platform/docking.

    5. Necessary raw material and aircraftcomponents readily available i.a. with

    manufacturer unless the organisation has an

    established spares provisioning procedure

    PART 145.40(b)

    EQUIPMENT, TOOLS ANDMATERIAL

    1. Calibration and Control (2) of in use tools,

    equipment and test equipment. (2) procedure to inspect/service and, where appropriate, calibrate such items on a regular basis and indicate to users that the item is within any inspectionor service or calibration time-limit.

    2.1. Record of calibrations and standards

    used.

    2.2. Register for all precision tooling and

    equipment.

    3. Clear system of labelling to show when the

    next inspection or service or calibration is due

    or whether the item is unserviceable (where it

    may not be obvious).

    4. Manufacturers' instructions or different time

    period --> Do Organisation results show that the

    used periods are appropriate in a particular

    case?

    PART 145.45(a) & (b)

    MAINTENANCE DATA1. Hold and use of applicable(1) current

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    16/34

    Pgina 16 de 34

    maintenance data for the intended scope of

    work (including modifications and repairs)..

    (1)Relevant to any aircraft, aircraft component or process specified in the approval class rating or associated capability list.

    2. Airworthiness Directives, Operational

    directives, DGAC-E Info and DGACMaintenance requirements, Maintenance and

    repair manuals, etc.; Recognized Applicable

    standards; Maintenance instructions produced

    by the organisation.

    3. JAA Info: All Maintenance related PARTs

    & AMC, IEMs; Temporary Guidance leaflets;

    PART-145 listed Organisations.

    4. For Class rating A --Aircraft: in addition to

    previous info. also (where published)appropriate sections of the operator's aircraft

    maintenance programme, aircraft maintenance

    manual, repair manual, supplementary

    structural inspection document, corrosion

    control document, SBs, SLs, SIs, modification

    leaflets, NDI manual, parts Catalogue, type

    certificate data sheet any other specific

    document issued by the type certificate or

    suppl. type certificate holder.Exception when operator or customer provided

    maintenance it is not necessary to hold them

    when the work order is completed other than

    145.55(c). (1) in relation to the maintenance work scope at each particular maintenance facility.

    5. For Class rating B --Engines/APUs: in

    addition to info. in number 3 & 4 above (where

    published) appropriate sections(1) of theengine/APU maintenance and repair manual,

    SBs, SLs, modification leaflets, NDI manual,parts catalogue, type certificate data sheet and

    any other specific document issued by the type

    certificate or suppl. type certificate holder.

    Exception when operator or customer providedmaintenance it is not necessary to hold them

    when the work order is completed other than

    145.55(c).

    6. For Class rating C --Components: inaddition to info. in number 3 & 4 above (where

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    17/34

    Pgina 17 de 34

    published) appropriate sections(1) of the vendor

    maintenance and repair manual, SBs and SLs,

    plus any document issued by the type

    certificate holder as maintenance data.

    Exception when operator or customer provided

    maintenance it is not necessary to hold themwhen the work order is completed other than

    145.55(c)

    (1) in relation to the maintenance work scope at each particular maintenance facility.

    7. Only Class rating D--Specialised services:

    documents in number 3 plus the specialized

    service(s) process specification.

    Exception when operator or customer provided

    maintenance it is not necessary to hold themwhen the work order is completed other than145.55(c)

    PART 145.45(c)

    MAINTENANCE DATA1. Procedure for Modification of Maintenance

    Data: equivalent or improved maintenance

    standards and type certificate holder informed.

    DO NOT: engineering design of repairs andmodifications.

    Procedure should:

    a) address the need for a practical

    demonstration by the mechanic to the quality

    personnel of the proposed modified

    maintenance instruction. The quality personnel

    should approve or not the modified

    maintenance instruction and ensure the TCholder is informed.

    b) include a paper/electronic traceability of the

    complete proces from start to finish and ensure

    that the relevant maintenance instruction

    clearly identifies the modification. Only used in the following circunstances:a.- Where the type certificate/suppl. type certificate holders original intent can be carried out in a more practical or more efficient manner. b.- Where the type certificate/suppl. type certificateholders original intent can not be acheved by following the maintenance instructions. For example,

    when a component cannot be replaced following the original maintenance instructions. c.- For the use of alternative tools/equipment.

    PART 145.45(d)

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    18/34

    Pgina 18 de 34

    MAINTENANCE DATA1. Major and Minor Repairs: organisations

    must be appropriately approved as required by

    PART-21 Subpart M to classify repairs and to

    approve minor repair design data except nextparagraph.

    Describe how repairs will be classified i.a. PART-21 Subpart M, how new repair design will be approved and how the organisation will ensure that only

    approved repair data is used in the implementation of a repair. Also elements of the next paragraph.

    2. Not for organisations that only carries out

    repairs i.a. with the approved type certificate

    holders published repair data or any other

    DGAC approved repair data.

    Procedure to ensure that appropriate action is

    taken in the case of damage assessment and the

    need to use only approved repair data.

    Describe actions to be taken when the need for damage assessment and/or repair action arises. (At minimum the need to assess damage against published

    approved repair data and the action to be taken if damage is beyond the limits or outside the scope of such data. Repair by replacement of damaged parts,

    requesting technical support from the type certificate holder or from an organisation approved i.a. PART-21 Subpart JA and finally DGAC approval of the

    particular repair data.PART 145.45(e)

    MAINTENANCE DATA1. Provide a common workcard or worksheet

    system for use throughout relevant parts(1) of

    the organisation and either transcribe

    accurately the maintenance data or make

    precise reference to the particular maintenance

    task(s). Maybe computer generated and held

    on an electronic data base subject to both

    adequate safeguards against unauthorised

    alteration and a backup electronic data base

    which is updated within 24 hours of any entry

    made to the main electronic data base. (1) with regard to aircraft base maintenance, aircraft line maintenance, engine workshops, mechanical workshops and avionic workshops.

    2. When maintenance service to an aircraft

    operator who require their workcard or

    worksheet system to be used then such docs.

    may be used ---> establish a procedure to

    ensure correct completion of the aircraft

    operators workcards/worksheets.

    3. Complex maintenance tasks --> transcribedonto the workcards or worksheets and sub-

    divided into clear stages to ensure a record of

    the accomplishment of the maintenance task.

    Need to differentiate and specify, when

    relevant, disassembly, accomplishment of task,

    reassembly and testing.

    4. Lenghty tasks involving a succession of

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    19/34

    Pgina 19 de 34

    personnel --> use supplementary workcards -

    which was accomplished by each person.

    PART 145.45(f) & (g)

    MAINTENANCE DATA

    1. All applicable maintenance data readilyavailable for use when required by

    maintenance personnel.

    2. Maintenance data and maintenance-related

    documents accessible to mechanics, supervisors

    and certifying staff in the maintenance area.

    (close proximity to the aircraft being

    maintained).

    3. Computer terminals, microfiche readers/printers available in a sufficient number or can

    these devices produce a sufficient number of

    copies.

    4. Maintain a check that all amendments are

    being received.

    Procedure to monitor the amendment status of

    all data

    5. Maintenance data provided/controlled bycustomers: must show that either it has a

    written confirmation that all such data is up to

    date or it has work orders specifying the

    amendment status of the data to be used or it

    can show that it is on the operator/customer

    data amendment list.

    PART 145.50(a)

    CERTIFICATION OFMAINTENANCE

    1. Procedure for CRS at the completion of any

    package of maintenance(1) specified by the

    operator i.a. with such operator's responsibility

    in PART OPS 1(3).890.(1) any one or combination of the following elements; a check or inspection from the operator's programme, ADs, overhauls, repairs, modifications,

    component replacements and defect rectifications.

    2. Procedure for New defects or incomplete

    maintenance work orders identified during

    number 1 above--> aircraft operator agreementto rectify such defects or completing the

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    20/34

    Pgina 20 de 34

    missing elements.

    If operator declines to have such maintenance,

    then 145.50(d) will apply.

    3. Components maintained off the aircraft -->

    CRS to service for such maintenance and

    another CRS to being installed properly on theaircrat when such action occurs.

    4. Procedures to issue the certificate of release

    to service at the completion of any defect

    rectification, whilst the aircraft operates flight

    between scheduled maintenance.

    5. JAA Form One for components whilst off the

    aircraft.

    Component for use by the organisation, may not

    be necessary depending upon the organisations'

    internal release procedures defined in MOE.

    PART 145.50(b)

    CERTIFICATION OFMAINTENANCE

    1. Certificate of release statement(1) acc. to

    AMC 145.50(b)1

    (1) The CRS statement in block 19 of the JAA Form One is slightly at variance with AMC 145.50(b)1 in that it refers to information in particular boxes onthe Form.

    2. Relation to the task in the manufacturer's or

    PART-OPS operator's instruction or the aircraftmaintenance programme (may cross-refer to a

    manufacturer's/operator's instruction in a

    maintenance manual, SB, etc...

    3. Approval reference of the organization and

    identity of certifying staff.

    4. Date maintenance was carried out.5. Procedures to document the calendar

    time/flying hours/cycles/engine cycles relative

    to any life or overhaul limitation.

    6. Extensive maintenance: summarise the

    maintenance so long as there is a unique cross-

    rererence to the work-pack containing full

    details of maintenance carried out. Dimensional

    information should be retained in the work-packrecord.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    21/34

    Pgina 21 de 34

    7. Certificates of release to service signed with

    the normal signature or computer release to

    service. [stamp is optional]

    8. If computer release to service --> Only the

    particular person can electronically issue the

    CRS. Magnetic or optical personal card in

    conjunction with a personal identity number

    (PIN) known only to the individual which is

    keyed into the computer.

    PART 145.50(c)

    CERTIFICATION OFMAINTENANCE

    1. Does the Maintenance Organisation have a

    procedure to ensure that all components whichhave to be installed on the aircraft have been

    subject to the alteration required at the date ofinstallation and that all AD`s are complied

    with?

    Used components prior to PART-145 --> 1 Jan

    2000

    2. Procedure: issue JAA Form One forcomponents last maintained prior to PART-145.

    PART 145.50(d)

    CERTIFICATION OFMAINTENANCE

    1. Procedure when unable(1) to complete all

    maintenance required by the customer (being

    the aircraft operator) within the aircraftoperators limitations --> entered in the aircraft

    CRS before issue of such certificate.

    Check for real examples.

    (1) Unable means that the maintenance required by the operator could not be completed due either to running out of available maintenance downtime forthe scheduled check or by virtue of the condition of the aircraft requiring additional maintenance downtime.

    2. Operator informed in case where full

    compliance with 145.50(a) cannot be achieved

    within the operators limitations. If the operator

    agrees to the deferment of full compliance, then

    the CRS may be issued subject to details of thedeferment, including the operator's authority(2),

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    22/34

    Pgina 22 de 34

    being endorsed on the certificate.

    Check for real examples. (2) Whether or not the operator does have authority to defer maintenance is an issue between the ops and its authority. In case of doubt --> PART145should inform its DGAC, of such doubt, before issue of the CRS. This will allow DGAC to investigate the matter with the ops NAA.

    3. Procedure: draw attention to the fact that

    145.50(a) does not normally permit the issue of

    a CRS in the case of non-compliance.

    It should state what action the mechanic,

    supervisor and certifying staff should take to

    bring the matter to the attention of the relevant

    department or person responsible for co-

    ordination with the ops (discuss and solve with

    the ops).

    In addition, the appropriate 145.30(a) person(s)

    should be kept informed in writing of suchpossible non-compliance situations.

    PART 145.50(e)

    CERTIFICATION OFMAINTENANCE

    1. Aircraft grounded at a location other than themain line station or main base due to non-

    availability of a component with the appropriate

    release certificate --> temporary fit a componentwithout the appropriate CRS for 30 flight hours

    max. or until the aircraft first returns to the main

    line station or main base, whichever is sooner,subject to the ops agreement and said

    component having a suituable serviceable tag(1)

    but otherwise in compliance with all other

    PART-OPS 1 or 3 Subpart M and PART-145

    req's.(2)

    Check real examples.

    (1) a tag which clearly states that the aircraft component is serviceable; that clearly specifies the organisation releasing the component together with details

    of the JAA-NAA or non-JAA NAA under whose approval the organisation works including the approval or authorisation reference.

    (2) making an appropriate entry in the aircraft technical log, checking for compliance with type design standards, modifications, repairs, ADs, life

    limitations and condition of the component plus information on where, when and why the aircraft was grounded.

    PART 145.50(f)

    CERTIFICATION OFMAINTENANCE

    1. NO CRS when: Non-compliance know to the

    PART145 organisation which could hazard

    flight safety.

    Check Real Examples. Examples: significant cracking, deformation, corrosion or failure of primary structure, any evidence of burning, electricalarcing,, significant hydraulic fluid or fuel leakage and any emergency system or total system failure. An AD overdue.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    23/34

    Pgina 23 de 34

    PART 145.55(a)

    MAINTENANCE RECORDS1. Record all details of work carried out:

    unambiguous requirements for the execution

    and keeping of maintenance records. Properly executed an retained records --> information essential in controlling unscheduled and scheduled maintenance, and trouble shooting to eliminatethe need for re-inspection and rework to establish airworthiness.

    2. Executed: as a minimum all necessary to

    prove all requirements have been met, including

    sub-contractor's release documents.Prime objective: secure and easily retrievable

    records with comprehensive and legible

    contents

    Aircraft records should contain basic details of

    all serialised aircraft components and all othersignificant components installed, to ensure

    traceability to such installed component

    documentation an associated PART145.45

    maintenance data.

    3. Gas turbine engines assembled from modules

    --> Total time in service and maintenance

    records for each module.

    Kept with the module and should show

    compliance with any mandatory requirementspertaining to that module.

    4. Reconstruction of lost maintenance records:

    by reference to other records which reflect the

    time in service, research of records maintained

    by repair facilities and reference to recordsmaintained by individual mechanics etc.

    When still incomplete --> statement in the new

    record describing the loss and establishing the

    time in service based on the research and thebest estimate time in service and summitted to

    the DGAC for acceptance.

    Real examples. Additional maintenance may be required.

    5. Paper system: robust material which can

    withstand normal handling and filing. It should

    remain legible throught the required retention

    period.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    24/34

    Pgina 24 de 34

    6. Computer systems:

    Backup system updated at least within 24 hours

    of any maintenance.

    Computer systems: control maintenance and/or record details of work carried out.

    7. Computer systems:

    Each terminal --> programme safeguardsagainst the ability of unauthorized personnel to

    alter the databaseComputer systems: control maintenance and/or record details of work carried out

    PART 145.55(b)

    MAINTENANCE RECORDS1. Procedure which describes the delivery to the

    operator of the CRS, together with a copy of

    any specific approved repair/modification data.

    PART 145.55(c)

    MAINTENANCE RECORDS1. Provisions to retain a copy of all detailed

    maintenance records and any associated

    maintenance data for two years from the date it

    was released.

    Check for real examples.

    2. Procedures of other required storage times

    for Maintenance Organisations, due to thecontract with a PART-OPS holder and the

    requirement to hold operational record,

    determined in the MOE. Retention period

    would be PART-OPS 1(3) Subpart M.

    3. Records stored in a safe way with regard to

    fire, flood and theft.

    4. Computer backup discs, tapes, etc. stored in adifferent location from that containing the

    working discs, tapes, etc., in an environment

    that ensures they remain in good condition.

    5. Provisions for maintenance records of last

    two years (if the PART145 Organization

    terminates operation): last owner/customer or

    contact DGAC.

    PART 145.60(a)

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    25/34

    Pgina 25 de 34

    OCCURRENCE REPORTING1. MOE provisions for the duty to report

    unairworthy conditions (aircraft or aircraft

    components) to the DGAC and aircraft TC

    holder .

    Serious cracks, permanent deformation, burning or serious corrosion of struture found during scheduled maintenance of the aircraft or engine or propeller

    or helicopter rotor system. Failure of any emergency system during scheduled testing. Some ADs actions require to report conditions.

    2. Are the persons responsible for these reports

    within the Maintenance Organisation clearly

    identified ?

    PART 145.60(b)

    OCCURRENCE REPORTING1. Persons responsible to report and Forms in

    accordance with the DGAC. regulations (IC`s),

    included in MOE.PART 145.60(c)

    OCCURRENCE REPORTING1. Procedure for the contracted Maintenance

    Organisation for reporting unairworthy

    conditions to the PART-OPS operator.

    PART 145.60(d)

    OCCURRENCE REPORTING

    1. Time limit for reporting as soon aspracticable but in any case within 3 days.

    PART 145.65(a)

    MAINTENANCE PROCEDURESAND QUALITY SYSTEM

    1. Maintenance Organisation Exposition must

    include a quality policy.

    Example: IEM 145.70(a) (10)PART 145.65(b)

    MAINTENANCE PROCEDURESAND QUALITY SYSTEM

    1. Maintenance Organisation Exposition with

    the maintenance procedures: it should address

    145.25 to 145.95.

    Appdx. 2 of PART145: example of typical

    procedures.

    2. Procedures: provision and control of

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    26/34

    Pgina 26 de 34

    specialised services.

    3. Subcontracting procedures [(Ref.: Appendix

    6 ``Non-PART-145 Organisations Working

    Under the Quality System of a PART-145

    Approved Maintenance Organisation'')

    4. Aircraft line and base maintenance:

    procedures to ensure that no one person be

    required to carry out and inspect in relation to a

    maintenance task involving some element ofdisassembly/reassembly of several aircraft

    components of the same type fitted to more than

    one system on the same aircraft during a

    particular maintenance check.

    When only one person --> workcard should

    include an additional stage for re-inspection,after completion of all the same tasks.

    5. Amendment procedures for the change of the

    maintenance organisation exposition

    PART 145.65 (c) 1

    MAINTENANCE PROCEDURESAND QUALITY SYSTEM

    1. Maintenance Organisation quality system,

    including independent audits. Audits: routine sample checks of all aspects of PART-145 organisation's ability to carry out all maintenance to the required standards and includes someproduct sampling (end result of process). It should include a percentage of random audits carried out on a sample basis when maintenance is being carried

    out (during night-> organisations working at night )

    2. .Audit Plan : time schedule, content of the

    audits to be carried out, random audits on a

    sample basis when maintenance is being carried

    out (at night, etc.), line stations,

    Not each procedure against each product line

    when it is common, except if findings have

    been identified in that procedure of one productline --> other product lines until the findings

    have been rectified.

    3. Maintenance procedures subject to annual

    inspection in relation to each product model

    (Class rating of Appendix 1).

    Example: an organisation with a capability to maintain aircraft, engines, brakes and autopilots would need 4 complete audit sample checks each year.

    Appendix 5 --> Examples of audit subjects and plans.

    4. Product audits (it could be combined with

    procedure audits).Combined product audits with procedure audits by selecting a specific product example (aircraft or engine or instrument) and sample checking all the

    procedures and requirements associated with the specific product example.

    Sample check: to witness any relevant testing and visually inspect the product and associated documentation. Not disassembly unless big findings.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    27/34

    Pgina 27 de 34

    5. Smallest organisations (1): the independent

    audit part of the quality system may be

    contracted to another PART-145 approved org.

    or a person with appropriate technical

    knowledge and proven satisfactory audit

    experience acceptable to the JAA full memberAuthority.

    Audit being carried out twice in every 12 month (1)Maximum of 10 personnel actively engaged in maintenance.

    6. Line stations: integrated into the system andinclude a plan to audit each listed line station at

    a frequency consistent with the extend of flight

    activity at the particular station. (24 months

    periods except increase i.acc. paragraph 7)

    7 Increase any audit time periods up to 100%:

    there is no safety related findings and subject tobeing satisfied that the organisation has a good

    record of rectifying findings in a timely manner.

    8 System to issue audit reports : what was

    checked and the resulting findings againstapplicable requirements, procedures and

    products. sent to relevant departments, target

    date.

    9. Independence Audits: personnel not

    responsible for the function, procedure or

    products being checked. .

    10. Large organisation (more than 500

    maint. staff) --> dedicated quality audit group

    whose sole function is to conduct audits, raise

    finding reports and follow up to check that

    finding are rectified.

    11. Medium sized (less than 500) --> usecompetent personnel from one

    section/department not responsible for the

    production function, procedure or product to

    audit the section/department that is responsible

    subject to the overall planning and

    implementation being under the control of the

    quality manager.

    12. Small organisations (maximum of 10

    maint. staff) --> may contract the independentaudit element of the quality system to another

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    28/34

    Pgina 28 de 34

    PART145 approved maintenance organisation

    or a competent person acceptable to the DGAC.

    PART 145.65(c) 2

    MAINTENANCE PROCEDURES

    AND QUALITY SYSTEM1. Quality Feedback System: reporting to thepersons or group of persons in 145.30(a) and

    ultimately to the accountable manager.

    2. Management control follow up system may

    not be contracted to outside persons.

    3. All findings resulting from the independent

    quality audits are properly investigated.

    Proper corrective actions.

    4. All findings resulting from the independentquality audits are corrected in a timely manner.

    Timely corrective actions.

    Reports sent to the relevant departments for

    rectification action giving target rectification

    dates. Rectification dates should be discussed

    with such departments before the quality

    department or nominated quality auditor

    confirms such dates in the report.

    5. Relevant departments are required to rectifyfindings and inform the quality department or

    nominated quality auditor of such rectification..

    6. Enable accountable manager to be kept

    informed of any safety issues and the extent of

    compliance with PART-145.

    7. Regular meetings of Acc. Mgr. with staff to

    check progress on rectification (large

    organisations QM take this roll, based on the

    fact that the Acc. Mgr. meeting twice a yearwith senior staff).

    8.- )Records pertaining quality audit and the

    quality feedback system ==> Retention period:

    Two years after the date of clearance of the

    finding to which they refer or to suppor changes

    to the audit time periods, whichever is the

    longer.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    29/34

    Pgina 29 de 34

    PART 145.70(a)

    MAINTENANCE ORGANISATIONEXPOSITION

    1. Management Part of the MOE:a) statement signed by the accountable

    manager. [IEM 145.70 (a) 9]

    If Acc. Mgr is not chief executive officer -->

    countersign the statement.

    b) Quality Policy [IEM 145.70 (a) 10]

    c) titles and names of the senior persons.

    d) duties and responsibilities of the senior

    persons, including matters on which they may

    deal directly with the DGAC.e) organisation chart showing associated

    chains of responsibility of the senior person(s).

    f) list of certifying staff

    g) general description of manpower resources.

    h) general description of the facilities located

    at each address specified in the approval

    certificate.

    i) specification of the scope of work relevant

    to the extent of approval.j) notification procedure acc. to PART 145.85

    for organisation changes.

    k) MOE amendment procedure.

    One document and available to senior persons

    145.30(a) who should be familiar with it.

    2. Working Procedures:a) PART 145.25 facility requirements

    b) PART 145.30 personnel requirements

    c) PART 145.35 record of certifying staffd) PART 145.40 equipment, tools and material

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    30/34

    Pgina 30 de 34

    e) PART 145.45 Airworthiness data

    f) PART 145.50 certification of maintenance

    g) PART 145.55 maintenance records

    h) PART 145.60 reporting of unairworthy

    conditions

    i) PART 145.65 maintenance procedures andquality system

    j) PART 145.70 maintenance organisation

    exposition

    k) PART 145.75 privileges of the approved

    maintenance organisation

    2. Working Procedures: (CONT.)l) PART 145.80 limitations of the approved

    maintenance organisation

    m) PART 145.85 changes to organisation

    n) PART 145.90 Continued validity of appr.(*)

    o) PART 145.95 equivalent safety case

    (All them may be kept as separate documents)

    (*) Continued Validity: no expiration date; neither surrendered, superseded, suspended, revoked.

    3. Lists :a) List of PART-OPS operators to which the

    Maintenance Organisation provides an aircraft

    maintenance service

    b) List of organisations under Quality Control

    of PART-145 organisation [PART145.75(b)]

    c) List of line stations [PART 145.75(d)]

    d) List of contracted PART-145 approved

    organisations if appropriate.

    4. The following items must be dealt with during

    the audits:

    a) personnel familiarisation with those parts of

    the manuals which are relevant to themaintenance work they carried out

    b) who should amend the manual particularly

    where there are several parts.

    c) Quality manager responsible for the

    amendment and submission of the MOE,

    including associated procedures manuals.d) Is it agreed - if appropriate - by the DGAC.

    that some defined classes of amendments may

    be incorporated without prior DGAC-E.

    approval ?

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    31/34

    Pgina 31 de 34

    5. Organisation approved against any other PART

    (i.e. PART OPS) ---> A supplement covering the

    differences will suffice to meet the requs. except

    that the supplement must have an index showing

    where those parts missing fro the supplement arecovered.

    PART 145.70(b)

    MAINTENANCE ORGANISATIONEXPOSITION

    1.- Possible separate documents or

    separate electronic data files:

    a).- List of Certifying Staff

    b).- Maintenance procedures and Lists (Sub-

    paragraphs 2 and 3, in previous paragraph).

    Check for clear cross reference in management

    part of MOE.PART 145.70(c)

    MAINTENANCE ORGANISATIONEXPOSITION

    1. Maintenance Organisation Exposition

    approval by the DGAC-E. / Knowledge of the

    status by the organisation.

    PART 145.75 (a)

    PRIVILEGES OF THE APPROVEDMAINTENANCE ORGANISATION1.- Maintenance locations identified in the

    approval and /or in the approved MOE.

    PART 145.75 (b)

    PRIVILEGES OF THE APPROVEDMAINTENANCE ORGANISATION

    1.- Organisations under the Quality Control ofthis PART-145 Organisation: procedures.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    32/34

    Pgina 32 de 34

    PART 145.75 (c)

    PRIVILEGES OF THE APPROVEDMAINTENANCE ORGANISATION

    1.- Procedures for occasional line maintenanceat any location as per PART-145.75(c).

    2.- Procedures for occasional maintenance

    arising from the unserviceability of the A/C.

    [PART 145.75(c)]

    PART 145.75 (d)

    PRIVILEGES OF THE APPROVEDMAINTENANCE ORGANISATION1.- Line maintenance stations: check works

    done versus the capability. (Other than main

    location).

    2.- Line maintenance procedures.

    PART 145.75 (e)

    PRIVILEGES OF THE APPROVED

    MAINTENANCE ORGANISATION1.- See examples of CRS's of work performed

    as per (a), (b), (c) and/or (d)

    PART 145.80

    LIMITATIONS ON THEAPPROVED MAINTENANCE

    ORGANISATIONAll necessary facilities, equipment, tooling,

    material, maintenance data and Certifying staff.

    Check all Aircraft Types, Engine Types & C

    Ratings. Temporarily not hold all the necessary tools, equipment for an aircraft type or variant specified in the approval. Not need to amend the approval to deletethe aircraft type or variants on the basis that it is a temporary situation and there is a commitment from the organisation to re-acquire tools, equipment etc.

    before maintenance on the type may recommence.

    PART 145.85 (a)

    CHANGES TO THE APPROVEDMAINTENANCE ORGANISATION1. Confirm No Changes without notification

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    33/34

    Pgina 33 de 34

    (before such changes take place):

    - name

    - locations

    - additional locations

    - accountable manager- senior persons

    - facilities, equipment, tools, material,

    procedures, work scope and,certifying staff that

    could affect the approval. - This paragraph is to enable the PART-145 organisation to remain approved if agreed by DGAC during negotiations about

    any of the specified changes. Without this paragraph the approval would automatically be suspended in all cases.

    - Exception are the case of proposed changes in personnel not known to the management beforehand.

    PART 145.85 (b)

    CHANGES TO THE APPROVEDMAINTENANCE ORGANISATION

    1.- DGAC: Conditions under which the PART-

    145 Organisation may operate during such

    changes.

    PART 145.90

    CONTINUED VALIDITY OFAPPROVAL

    Approvals without expiration date, orsurrended, superseded, suspended, revoked.

    a.- Organisation remaining in compliance with

    PART-145

    b.- access granted to JAA Authority,

    c.- payment of charges prescribed.

    PART 145.95(a)

    EQUIVALENT SAFETY CASESIs it understood by the organisation ?

    1.- Exemption: situation not envisaged by a

    PART 145 requirement and subject to

    compliance with any supplementary conditions.

    Such conditions must be agreed by the JAA full

    member Authorities to ensure continuedrecognition of the approval. When equivalent safety case has been accepted by the JAA full member Authorities --> amended PART's or AMC's or initially as maintenance TGL's.

  • 7/31/2019 MODULO 10_4 - Guia Auditoria - Parte 145_en

    34/34

    Pgina 34 de 34

    PART 145.95(b)

    EQUIVALENT SAFETY CASESIs it understood by the organisation ?

    1.- Exception: the DGAC may exempt an

    organisation from a requirement in PART 145

    on an individual case by case permission basis

    only subject to compliance with anysupplementary condition(s) necessary to ensure

    equivalent safety.

    PART 145.100

    REVOCATION, SUSPENSION,

    LIMITATION OR REFUSAL TORENEW THE PART-145APPROVAL CERTIFICATE

    a.- Does the Organisation knows their rights

    with respect to Revocation, suspension,

    limitation and refusal ? (described in JAA

    Administration & Guidance Material).. 28 days notice to the holder in writing of its intention so to do and the reasons for its proposal and must offer the holder an opportunity to makerepresentations and said Authority will consider those representations.

    b.- Safe operation of an aircraft could be

    adversely affected:In addition to paragraph (a) --> Provisionally

    suspend, in part or in whole, the PART-145

    approval certificate without prior notice until

    the sub-paragraph (a) procedure is complete..