mohamed azarudeen

5
PERSONAL / CONTACT DETAILS Date / Place of Birth 29 th May 1993 / Tamilnadu – India Nationality Indian Marital Status Single Mobile No. KSA : +966592206760 Present Address JUBAIL – KSA E-Mail Address [Work]: [email protected] [Personal][email protected] Driving License KSA& Indian Driving Licenses Language Skills English: Fluent ( Writing , Reading & Speaking), Tamil Computer Skills MS Office (Excel, Word & Power Point) HIGHLIGHTS OF ACADEMIC BACKGROUND Qualification Year Institute Affiliation Graduation / Electronics and Communication Engineering 2014 Meenakshi Ramaswamy Engineering College BE Higher Secondary / Tamil Nadu State board 2010 Alpha Plus Matriculation Higher Secondary School Class 12 Secondary / Tamil Nadu State board 2008 R.C. Higher Secondary School Class 10 COURSES / TRAINING Course Description Year Location Provider FUNDAMENTALS OF COMMUNICATIONS 2012 TAMIL NADU BSNL EMBEDDED SOFTWARE, Mat lab, VLSI Design, B2 Spice, KEIL 2013 TAMIL NADU MREC JAVA, J2EE 2014 TAMIL NADU CSC .NET 2014 TAMIL NADU CSC Negotiation 2016 JUBAIL –KSA SAUDI KAD EMPLOYMENT SCAN Graduation/ Electronics and Saudi Kad Communication Engineering company INDIA KSA [ 2014] [ Present] CORE COMPETENCIES Utility/Operation/quality Commercial Operations Infrastructure/ Trouble shooting Management /Coordination Planning / Progress Monitoring Shut down coordination Contract Management Cost Controlling/ Man management Installation / Repairing Project & Corporate Profitability Engineering Management & Coordination Preservation Constructability MOHAMED AZARUDEEN

Upload: mohamed-azarudeen

Post on 09-Feb-2017

39 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: mohamed azarudeen

PERSONAL / CONTACT DETAILS

Date / Place of Birth 29th May 1993 / Tamilnadu – India Nationality Indian Marital Status Single

Mobile No. KSA : +966592206760

Present Address JUBAIL – KSA E-Mail Address [Work]: [email protected] [Personal][email protected]

Driving License KSA& Indian Driving Licenses Language Skills English: Fluent ( Writing , Reading & Speaking), Tamil

Computer Skills MS Office (Excel, Word & Power Point)

HIGHLIGHTS OF ACADEMIC BACKGROUND Qualification Year Institute Affiliation

Graduation / Electronics and Communication Engineering 2014 Meenakshi Ramaswamy Engineering College BE

Higher Secondary / Tamil Nadu State board 2010 Alpha Plus Matriculation Higher Secondary School Class 12

Secondary / Tamil Nadu State board 2008 R.C. Higher Secondary School Class 10

COURSES / TRAINING Course Description Year Location Provider

FUNDAMENTALS OF COMMUNICATIONS 2012 TAMIL NADU BSNL EMBEDDED SOFTWARE, Mat lab, VLSI Design, B2 Spice, KEIL 2013 TAMIL NADU MREC

JAVA, J2EE 2014 TAMIL NADU CSC .NET 2014 TAMIL NADU CSC

Negotiation 2016 JUBAIL –KSA SAUDI KAD

EMPLOYMENT SCAN

 

Graduation/ Electronics and Saudi Kad Communication Engineering company INDIA KSA [ 2014] [ Present]

CORE COMPETENCIES

Utility/Operation/quality Commercial Operations Infrastructure/ Trouble shooting Management /Coordination Planning / Progress Monitoring Shut down coordination Contract Management Cost Controlling/ Man management Installation / Repairing Project & Corporate Profitability Engineering Management & Coordination Preservation

Constructability

MOHAMED AZARUDEEN

Page 2: mohamed azarudeen

Experienced Oil & Gas and Projects Management professional. Extensive construction, commissioning, operations, projects coordination, projects management and start-up experience. Team Oriented Manager, focused on achieving targets and promoting/developing a culture of continuous improvement. A behavioral Safety and Incident Injury Free (IIF) leadership. Attended Many classroom and online Courses, workshops, and webinars in Project management, Safety, Quality, etc.,

Experience in senior/middle management with Contractor, Consultant and Client organization, for

process plant installation, heavy fabrication, pipeline installation, pressure vessel fabrication and installation to manage, direct and co-ordinate all project and site activities as head of Project Execution Team, with overall responsibility for the execution of the project in compliance with all contractual requirements and to ensure that resource usage is optimized to achieve, or exceed, company’s expectations. I have experience in project administration, client liaison, project conception, execution and closeout, contract administration, budget preparation and control.

KEY EXPERIENCE

CURRENT RULES & RESBONSABILITIES

Supervise and lead team of Engineers in the management, direction and coordination of all project resources, assuming entire responsibility in order to ensure that project meets all client contractual requirements safety requirements, quality requirements, along with schedule adherence, and in cost effective manner

Review contract/tendering documentation, to ensure a thorough understanding of the contract requirements and direct preliminary planning stages as necessary.

Co-ordinate the work of the mobilization team to ensure that all necessary activities are reviewed with actions appropriately assigned, timescales agreed and relevant parties briefed with new communication channels established where ever necessary.

Establish along with the Project Management Team, the resourcing requirements for respective project segments, including staffing and plant to ensure that these are accurate and realistic and that any necessary steps needed to supply resources have been arranged.

Liaise with relevant staff to ensure that the project monitoring system is implemented adequately and that output on financial performance is reviewed at the appropriate level and frequency to ensure effective control of the project budget.

Provide adequate resources and expertise on site to ensure the effective supervision, monitoring and control of the work being undertaken to ensure full compliance with all relevant standards and Client/Company’s policy and procedures.

Review Safety and QA/QC project plans with respective functional heads and submit to client for approval. Resolve any contractual/legal matters and ensures that appropriate action is taken which does not

compromise nor expose Company to unnecessary risk. Maintain under regular review, the demobilization plans of the workforce and plant as the project

progresses in order to facilitate the relocation of the workforce and the further utilization or disposal of plant.

Act as the Company’s official representative with clients, suppliers, partners and third party contractors - negotiating terms and conditions where necessary, ensuring that Company interests are both optimized and protected.

Monitor payments from clients and initiate payments to suppliers and subcontractors ensuring all terms and conditions have been met.

Participate in a formal review of the project with relevant parties on completion and identify opportunities for learning and development, Establishes and maintains good relations with clients, partners and local authorities aimed at safeguarding and promoting Company’s interests.

Provide commercial and technical input for the Contracts Department at the estimation stage, when requested, ensuring that adequate provision is made for all proposed activities.

Manage the preparation and presentation of the final documentation and liaises with the client for the issuance of the acceptance certificate and release of performance bonds and bank guarantees.

Provide commercial and technical input for the Contracts Department at the estimation stage, when requested, ensuring that adequate provision is made for all proposed activities.

PROFESSIONAL EXPERIENCE

Page 3: mohamed azarudeen

E & I Engineer

Maintain potential projects (OMPP) Present Main Contractor Saudi Kad Construction Company.Location KSA – MUNIFA ,TANAJEEB ,SAFANYIAH Contract duration 60 Months. Contract Type Lump Sum. (EPC Contract).Client ARAMCO, KSA Project Description

Onshore Pipeline work includes construction of on shore cross country Pipeline, hydrocarbons transmission pipelines, water distribution / injection, pumping stations, well site development, well site flow lines and trunk lines to Production Plant (GOSP), and all associated pipeline earth work and right of way.

Electrical and Instrumentation (E & I) and Substation/Distribution Construction work includes construction of Electrical Substations, Power distribution grids, installation of transformers and circuit breakers/ switchgear, and all associated instrumentation and interconnections.

Civil underground and above ground infrastructure systems and utilities required inside and outside Saudi Aramco oil & gas facilities: fire, cooling and drinking water systems, water storage and distribution systems, drainage systems, waste water systems, storm-water, pavements,

Communication Work – Inside Plant (ISP) includes:

Inside Plant work as follow: RTUs, SCADA Systems, OTN, Outside Plant interface work and Control Systems & related facilities

Inside Plant work as follow: transmission, data network, telephone switching & related equipment, Fiber optic inside plant, transmission systems, Data Communication systems and Radio Systems

Cathodic Protection (CP) and Transmission Line work includes construction of galvanic anodes, impressed current Cathodic Protection (ICCP) system installation, power transmission lines, and all associated site preparation and earth works.

PROFESSIONAL EXPERIENCE

SAUDI KAD COMPANY

Page 4: mohamed azarudeen

E & I Engineer Tie-in 3 Oil Wells Instruments installation with ESD (Emergency Shutdown) & Tie-in 6 water Injection wells with all Instruments Main Contractor Saudi Kad Construction Company.Location KSA – MUNIFA Contract duration 180 Calendar days. Contract Type Lump Sum. (EPC Contract).Client ARAMCO, KSA Project Description Fabrication of facility production platforms and jacket fabrication. Work includes structure &

piping fabrication, painting, electrical and instrument equipment installation of platforms electrical, instrument cables trays, cable pulling Plates rolling , pressing and machining up to 50 mm plate for the jacket cans and sleeves ,star plates doubles and corrosion anode installation, commissioning of RTU and PLC logic for Emergency Shutdown.

Follow and supervise projects schedule and cost with in fabrication execution budget for ongoing projects Follow and supervise variation, claims, fabrication shop cash flow. Follow and supervise material control. Cable pulling for all the instruments and meggering. Installation and termination of all Instruments and Motor operated Values. Installation of umblical tube and termination of ss tubing to the SSV and SSSV values. Commissioning of all Instrumrnts. Verify ESP reading of this well and stop command through SCADA in a control room Correct ESD diagnostic of analog input cards to reflect correct status of used channels Corrosion injection pump to be connected, tested and commissioned

RESPONSABILITIES / DUTIES

Prepare and conduct project Kick of meeting Prepare and review project schedule, cash flow with reference to contract requirement. Study contract requirement, milestones, project specification and permit system requirement. Study project execution budget. Setup and issue uncertainty issue register at the early stage of project to identify the risk/threat. Issue & Review project S-curve, manpower histogram and approve project planning package. Man management, planning review and defined the sub milestones to achieve contractual milestones. Follow detail engineering deliverable progress outputs with relative to contract master schedule and dates. Prioritize detail engineering deliverables and be online with construction & procurement priorities. Follow & finalize subcontracting, Cathodic protection and Overhead power lines,etc Highlight material certification requirement for procurement in relative of 3.1, 3.2 Certificates. Prepare project consumables, safety, and mobilization requirement with reference to project requirement. Mobilization site facilities, equipment and manpower based on project & schedule requirement & specs. Setup the material laydown area for material, site facilities & confirm site facility according to NFPA. Install all well head and flow line piping instruments and termination. Leak test, loop checking and commisioning. Mechanical completion requirement, punch list closure, closeout report.

COMPLETED PROJECTS

RESPONSABILITIES / DUTIES Man management, planning review and defined the sub milestones to achieve contractual milestones.

Electrical and instrumentation installation including cable tray, cable laying, and equipment installation (VSD Panels Transformers, Fire and gas panels, RTU, SIS .....), glanding, termination, up to pre commissioning.

Load out process , reviewing load out procedure Early Detection of overruns. Coordination / Integration of Cost Control with other concerned departments. Review simultaneous operation to maximize manpower utilization and budget man-hour consuming. Follow up and approve purchase order requests for requirement. Coordination with Company awarded project to forecast the forecast requirement. Final testing before startup for cause and effect.

Page 5: mohamed azarudeen

E & I Engineer Tie-in 4 Oil Wells Instruments installation with ESD (Emergency Shutdown) Main Contractor Saudi Kad Construction Company.Location KSA – MUNIFA CAUSEWAYContract duration 90 Calendar days. Contract Type Lump Sum. (EPC Contract).Client ARAMCO, KSA Project Description Fabrication of facility production platforms and jacket fabrication. Work includes structure &

piping fabrication, painting, electrical and instrument equipment installation of platforms electrical, instrument cables trays, cable pulling Plates rolling , pressing and machining up to 50 mm plate for the jacket cans and sleeves ,star plates doubles and corrosion anode installation, commissioning of RTU and PLC logic for Emergency Shutdown.

Ӏ-Electrical and Instrumentation design experience Complete design of instruments layouts. Cable and conduits scheduling, material takeoff, provide instruments to input process piping and instrumentation diagrams (P&ID), preparing martial take off requirement.

ӀӀ- Electrical and Instrumentation technical experience Preparing and reviewing instruments and cables specification in accordance with company standard general codes (full awareness of Aramco standard). Preparing and revving valves datasheet, vendor technical specification, provide technical input to P&ID and Inter connection Diagrams. ӀӀӀ-Field Electrical and Instrumentation experience 1-Familiar with codesAnd standards (SAMS, SAES) 2- Awarness of Cable routing,P&Id and inter connection diagram. 3-Monitoring the daily work activtites. 4- assembled a Daily meeting to ensure safty producer opertional and for workforce 5-Line inspection and preparation for Pressure leak Test for impulse Tubing. 6-Walk through and line inspection with testing group. 7-Co-ordinating the line checking for the test packs as per priority. 8- Execution of final commissioning with client inspector. 9- Executed the punch list clearance for all instruments. 10-Test packs coordinator at site to complete the punch item h clearance 11- Reinstatement of test packs after testing. 12- Coordinating the scope of work for sub-contractors and estimate the jobs carried out. 13- Co-ordinate the inspection with third party inspection i.e. aramco company and snamprogite company ENI GROUP.

RESPONSABILITIES / DUTIES Follow and supervise material control. Cable pulling for all the instruments and meggering. Installation and termination of all Instruments and Motor operated Values. Installation of umblical tube and termination of ss tubing to the SSV and SSSV values. Commissioning of all Instrumrnts. Verify ESP reading of this well and stop command through SCADA in a control room Correct ESD diagnostic of analog input cards to reflect correct status of used channels Corrosion injection pump to be connected, tested and commissioned Final testing before startup for cause and effect. Electrical and instrumentation installation including cable tray, cable laying, and equipment installation (VSD

Panels Transformers, Fire and gas panels, RTU, SIS .....), glanding, termination, up to pre commissioning. Coordination / Integration of Cost Control with other concerned departments. Review simultaneous operation to maximize manpower utilization and budget man-hour consuming. Follow up and approve purchase order requests for requirement. Coordination with Company awarded project to forecast the forecast requirement.

RESPONSABILITIES / DUTIES