mohamed hegazy cv -

9
Mohammed Hegazy Mousa Technical Project Manager 002 010 222 36273 [email protected] Personal data Name Mohamed Hegazy Mousa Date & place of birth November 24,1985 Elharam - Giza Home address 9 Nasr Elsawra , El Haram , Giza Sex Male Phone 002- 01022236273 E-mail address [email protected] Nationality Egyptian Military state Exempted Car & driving license Have Marital status Married Education 2002 – 2008: Faculty of Engineering, Cairo University, Egypt Bachelor of Chemical Engineering Graduation score: 64% 1999 - 2002: Orman Language School, Dokki, Giza, Egypt Thanaweya Amma Graduation score: 97% Languages Page 1 of 9

Upload: mohamed-hegazy

Post on 23-Jan-2017

69 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Mohamed Hegazy CV -

Mohammed Hegazy MousaTechnical Project Manager 002 010 222 36273 [email protected]

Personal data

Name Mohamed Hegazy MousaDate & place of birth November 24,1985 Elharam - GizaHome address 9 Nasr Elsawra , El Haram , GizaSex MalePhone 002- 01022236273E-mail address [email protected] EgyptianMilitary state ExemptedCar & driving license HaveMarital status Married

Education2002 – 2008: Faculty of Engineering, Cairo University, Egypt Bachelor of Chemical Engineering Graduation score: 64%

1999 - 2002: Orman Language School, Dokki, Giza, Egypt Thanaweya Amma Graduation score: 97%Languages

Good speaking, reading and writing knowledge of Arabic and English.

Computer Skills

Professional experience in MS-Office, and Microsoft Project. Very good experience in Photoshop and AutoCAD Professional experience in Simulation air dispersion modules using Breeze Aermod. Professional experience in Simulation Software like Pro II, Hysys and VMGSim. Very professional in Dynamic Simulation using Dynsim

Page 1 of 6

Page 2: Mohamed Hegazy CV -

Objective

To secure a challenging and rewarding position with a solid, progressive company that offers Opportunity for performance based career advancement in a setting that utilizes my experience and educational background in Engineer.

Profile Description

Technical Project Manager having total work experience of 7 yearsCurrently working in Contact Group, Egypt Previous Worked as Technical Engineer in Egyptian International Co.

2E.M for Petroleum Services Technology and Engineering Research and Consulting Company

Professional Experience

1. Company Contact Group (Block Industries Foam Factory) Duration November 2012 to till Now Designation Technical Project Manager

Industry Manufacturing EPS and XPS Insulation Products

Job responsibilities:

Implementation New EPS , EPE and XPS Factories in 10th Of Ramadan and 6th

October at Egypt Prepare shop drawings, detailed drawings using AutoCAD for new EPS,EPE and

XPS Factory Design calculations using software’s and excel sheets with reference to

international standards Design and Sizing Process Pipelines, HVAC, Plumbing, Firefighting and utility

piping system like steam, air , water and drain Piping Selection Equipment specifications , size ,working system and features with

suppliers for new factory Contact with suppliers for all technical aspects Prepare technical submittals, hydraulic calculations, operations and maintenance

manuals and compliance Statements, drawing reviews. Evaluate new design, construction and installation methods for best practices Arrange meetings with supplier to review relevant certifications problems Co-ordinate with architectural and electrical design for better project co-ordination

design and installation process Carrying out site surveys, feasibility reports, design calculations and simulations

Page 2 of 6

Page 3: Mohamed Hegazy CV -

Assessment and recommendation of new suppliers, evaluating vendor’s proposals Recommend and select both vendors and consulting personnel for the project Participate in meetings, technical aspects and problem solving techniques Prepare and study the requisition requirements, equipment/material specifications,

and verification and inspection release process, ensure all certification requirements are clearly identified

Estimate the cost of projects on the basis of labor charges, time, used material, tools and other technical challenges

Estimating the actual time of the project Coordinating and assembling the project staff during the entire project session Recruitment all project team (engineering, supervisors , Welding, assembly

technician and labors) Supervision and manage all installation work Supervise installation work on site (piping, steel structure, Equipment) and

ensure it is executed in accordance with the specifications and drawings provided.

Use Lean Technology Application in old and new factory Connect ,follow, supervise and manage manufacturing Suppliers Follow up new Equipment manufacturing , shipping and arrival date Scheduling and planning project timelines Reviewing project contract draft and make remarks.

Prepare bill of quantities and request for pricing/quotation from the sub-contractors.

Prepare and co-ordinate all mechanical project material list and costing. Empowered to enter into contracts and purchase necessary equipment and

supplies. Supervised onsite work crews and contractors to execute recovery plans on a daily

basis. Overall supervision of Civil/Structural engineers/designers including Lead

Discipline Engineers. Responsible for technical selections, technical evaluations for project

specifications Responsible for all assembly work and Plant Start up Preparation of different detailed projects visibility studies like ( EPS Foam

Factory , XPS Foam Factory , EPE Foam Factory, Bitumen Insulation Factory , Cement Bags Factory , Rubber Factory , and Interlock Factory)

Prepare cost model for all Factory products Create solutions for old technologies Contact with mould manufacturing suppliers and follow them in manufacturing

process and time plane Developing full-scale plans for various projects

Page 3 of 6

Page 4: Mohamed Hegazy CV -

Plan, manage and coordinate the day to day production activities to ensure a continuous flow of input from one machine to another for optimum production and efficiently utilization of the machines.

Ensure that proper plans and resources (people, facilities, supplies etc.) are in place and efficiently utilized to ensure the uninterrupted supply of material and service

Check all department report and time span Connect with all group factories to solving all technical problems and handle all

paper and documentation Supervision and manage assembly and disassembly equipment in all group

factories Prepare monthly report that they; sales report, production capacity report, active

equipment report, Spare parts consumption report, Raw material consumption report and Energy consumption report

Follow up daily problems received from all departments and try solving it Troubleshooting planning, production ,manufacturing ,sales ,purchases and

Quality Departments Communicates effectively with clients to identify problems and try solving it Preparation of monthly evaluation plant performances in statistical and graphical

form. Analyze / audit the use of energy in the plant Recommend strategies for reducing energy costs Innovation , plan and Execution Energy saving system (Natural Gas, Electricity

and Water) Organize and plan for preventive maintenance in such a way that production

activity will not be paralyzed. Preparing the budgets and CAPEX for different projects Preparing technical reports for project tenders. Ensure all Safety and Environmental procedures are respected (5 S)

Defined project plans and schedules, monitored progress and made adjustments to accommodate changes in requirements, scope, and available resources. Coordinated engineers in developing and integrating software.

Sustains and improves reliability, plant operation, maintenance, and systems documentation for a leading EPS and XPS Foam Factory.

Directs a 115-member staff responsible for the largest EPS, EPE and XPS facilities, with processing output of 35 tons per day.

Implements a wide variety of engineering solutions to increase equipment availability, increase net operating rate, reduce operation losses, and achieve standard and acceptable production rates.

Provide technical support and guidance to junior engineers and quantity surveying department.

Preparation of Production and sales manuals and presentations for Chairman

Page 4 of 6

Page 5: Mohamed Hegazy CV -

2. Company Egyptian International Co. 2E.M for Petroleum Services Technology, Egypt.

Duration October 2010 to October 2012Designation Technical Project Engineer

Industry Petroleum and Chemical Raw Material Products

Job responsibilities: Preparation of manuals and presentations for sales team Preparation of different projects visibility studies Continually seeks opportunities to increase internal client satisfaction and deepen

clients relationships Market company products through deals with different companies in different

fields to supply them with our products Follow-up tenders for different companies in all field Connect with Suppliers in all different countries Come up with the new and advanced ways for the construction of a particular

project, regarding its completion and success. Estimate the cost of projects on the basis of labor charges, time, used material,

tools and other technical challenges Estimating the actual time of the project Check the report and time span Lead the implementation and planning of the project Define the project tasks as well as the requirement of resources. Coordinating and assembling the project staff during the entire project session. Follow-up daily raw materials specifications supplied to cement and steel

companies Implementation of used oil recycling Plant In Alexandria

3. Company Engineering Research & Consulting Company, Egypt Duration June 2008 to September 2010 Designation Project Engineer

Industry Research & Consulting

Job responsibilities:

Developing full-scale plans for various projects. Scheduling and planning project timelines.

Page 5 of 6

Page 6: Mohamed Hegazy CV -

Modeling and simulation different dynamic simulation units and Plants Assist in participating in evaluating Energy Audit for more than ten factories Find Solution for Energy Saving for different factories Propose alternative energy sources for certain plant equipment such as bio-waste

to energy, solar hot water pre-heaters, and solar chillers

Preparation of manuals and presentations for training, simulation for different chemical processes and training in different simulation programs

Instructor of VMGSim course (Simulation Software)

Preparation of different projects visibility studies

Preparation of different OTS projects using Dynism software Modeling and simulation different air dispersion models for many plants Trainer coordinator Communicates effectively with internal clients to identify needs and evaluate

alternative business solutions with company project management. Continually seeks opportunities to increase internal client satisfaction and deepen

client relationships.

TrainingSouth Valley cement CompanyArabian Cement CompanySIDPECECHEMEPCENPPIEGPCBahgat Group

Declaration

I, hereby declare that all the above details are true and genuine to the best of my knowledge.

Mohammed Hegazy Mousa

Page 6 of 6