Completed by Date
Title Company
GENERAL PROJECT INFORMATION:
Project Name
Building AddressStreet City State Zip
Contact Name
Phone Fax Email
CONTRACTOR INFORMATION
1) Installation Firm Floor Preparation (TEC® products)
AddressStreet City State Zip
Phone Fax Email
Installation Manager Name
2) Installation Firm (Finish Flooring)
AddressStreet City State Zip
Phone Fax Email
Installation Manager Name
3) General Contractor (If Applicable)
AddressStreet City State Zip
Phone Fax Email
Project Manager Name
Checklist
Moisture Mitigation Pre-Installation Checklist
Page 2
GENERAL FLOOR DESCRIPTION (attach floor plan/s if available):
1) Floor Description
Area of floor (ft2) Multiple floors (describe)
Use of space beneath area to be protected
2) Slab thickness inches
Location of floor slab below grade on grade above grade
On or below grade - moisture vapor retarder below slab yes no
(If yes) Type of vapor retarder
Directly under concrete Under sand cushion
Above grade (type of above grade slab construction)
Elevated on steel deck Elevated structural (flat)
Elevated structural (one-way joists) Waffle slab
Other (describe)
Concrete mix design available no yes (attach)
3) Curing compound or sealer used no yes (describe and attach product data sheet)
4) Flatness / levelness (under 10 ft. straightedge or FF/ FL) especially at joints
As currently measured As specified
5) Roughness (ICRI CSP Profile - Minimum CSP-3)
6) Existing contamination (describe)
ChecklistTEC® Moisture Mitigation Pre-Installation
Page 3
7) General walk-around inspection:
Ground slopes away from building no yes
Landscape irrigation against building no yes
Gutter/Drainage System
Roofing System
CONSTRUCTION JOINTS AND JOINT CONDITION:
1) Saw cuts
Spacing ft X ft Filled Not Filled
If filled, describe material used to fill
If unfilled, provide width and depth
2) Expansion / Isolation joints
Provide spacing and material used to fill
3) Joint and crack conditions
Provide width, displacement, and locations using a map--and attach drawing
BUILDING HISTORY AND EXPECTED USES:
Age of Building
Concrete placed (date) Previous flooring (type and date)
Describe building history as it pertains to moisture issues
Evidence of building movement-past, present
ChecklistTEC® Moisture Mitigation Pre-Installation
ChecklistTEC® Moisture Mitigation Pre-Installation
Page 4
Anticipated uses/traffic
Anticipated underlayment name
Anticipated finish flooring (include manufacturer name, product and brand)
EVALUATED TEST DATA:
Existing Moisture Conditions (provide all that are available):
a. ASTM F2170 RH reading
Slab - Number of tests
Date and time taken
Calibration date
Range of test results
b. pH
Number of tests
Date and time taken
Range of Test Results: max / min
c. Calcium Chloride test per ASTM F1869
Number of tests
Dates conducted
Range of Test Results: max / min
d. Temperature
Ambient – Date & Time taken
Slab surface – Date & Time taken
Page 5
e. Building
Enclosed – yes / no
Temperature Controlled(Service conditions) – yes / no
The information provided above is a complete and accurate accounting of the conditions present on this jobsite.I acknowledge that any false information may result in the voiding of any limited system or product warranties provided by H.B. Fuller Construction Products, Inc. for this jobsite.
Signature Date
tecspecialty.com
H.B. Fuller Construction Products Inc.1105 South Frontenac Street