monday, september 17, 2012 -...

25

Click here to load reader

Upload: dangdiep

Post on 06-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

_

California Public Utilities Commission Daily Calendar Monday, September 17, 2012

Public Utilities Commission of the State of California

Paul Clanon, Executive Director

Headquarters

Southern California Office

505 Van Ness Avenue

320 West 4th Street, Suite 500

San Francisco, CA 94102

Los Angeles, CA 90013

(415) 703-2782

(213) 576-7000

Website: http://www.cpuc.ca.govCalendar Archive: http://www.cpuc.ca.gov/daily_calendar_archive/

Daily Calendar

Monday, September 17, 2012

Commission Meetings

Notices

Public Meetings and Workshops

Notice of Draft Resolutions (PU Code 311(g))

New Filings

Petitions for Modification and Applications for Rehearing

Proposed Decisions/Alternates/Presiding Officers Decisions/Arbitrators Reports

Advice Letter Filings

Miscellaneous Transportation Items

Miscellaneous Communications Matters

Table of Submission Dates for the Preceding Two Weeks

Changes to Hearing Calendar

Hearings

Notice of All-Party Meetings (PU Code 1701.3(c))

The Commissions policy is to schedule hearings (meetings, workshops, etc.) in locations that are accessible to people with disabilities.

The CPUC encourages all Californians to participate in its meetings, hearings, workshops, and proceedings. We try to hold our public meetings only in places that are wheelchair accessible and which can accommodate specialized equipment and other services useful to people with disabilities. Please see the notice of the meeting you wish to attend for more specifics.

If you plan to attend and need specialized accommodations for a particular meeting that are not listed in the notice, request them from the Public Advisors Office at least three business days in advance of the meeting. Contact the Public Advisors Office by any one of the following:

Email: [email protected] toll-free: 1-866-849-8390 Voice: 415-703-2074

FAX: 415-355-5404 (Attn.: Public Advisor)TTY: 1-866-836-7825 (toll-free) 1-415-703-5282

REGULAR COMMISSION BUSINESS MEETINGS

September 27, 2012

9:00 am

San Francisco

October 11, 2012

9:00 am

San Francisco

October 25, 2012

9:00 am

Irvine City HallCouncil Chambers1 Civic Center PlazaIrvine, CA 92606

COMMISSION RATESETTING DELIBERATIVE MEETINGS(Not Open to the Public)

Ratesetting Deliberative Meeting dates are reserved as noted but will only be held if there are ratesetting matters to be considered.

September 24, 2012

1:30 pm

San Francisco

October 8, 2012

1:30 pm

San Francisco

October 22, 2012

1:30 pm

San Francisco

OTHER COMMISSION MEETINGSPublic Hearing Notice: CPUCs Hearing on General Order 156 The Supplier Diversity Program

October 4, 20128:30 am 3:30 pm

University of Southern CaliforniaBovard Auditorium3551 Trousdale ParkwayLos Angeles

The California Public Utilities Commission (CPUC), in its ongoing efforts to promote diversity in utility company practices, will hold its annual public hearing to examine the diversity programs of the state's regulated utilities. Representatives of industry, government, academia, labor, community-based organizations, and other interested parties are expected to attend the hearing. Members of the public are invited to attend; a public comment session will be held. Although a quorum of Commissioners may be in attendance, no CPUC action will be taken at this event. For further information about the hearing, please contact Douglas Phason; email: [email protected] or 415-703-2280.If you plan to attend and need specialized accommodations, please contact the Public Advisor's Office at least three business days in advance of the meeting at CPUC Public Advisor, 505 Van Ness Ave., Room 2103, San Francisco, CA 94102 or call 1-866-849-8390 or 1-415-703-2074; or email [email protected].

Notice of Public Participation Hearing: A.12-04-015 (PPH) - Application of Southern California Edison Company (U338E), for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism, and Related Matters: A.12-04-016, A.12-04-017, and A.12-04-018

October 4, 20127 pm

San Bernardino City Hall Council Chambers300 North D StreetSan Bernardino

The public participation hearing in the above entitled matters will be held at the date and time above. Administrative Law Judge Michael J. Galvin will preside. There may be a quorum of Commissioners present; however, no voting will occur.For questions about the hearing date, time, or place, please call the Calendar Clerk at (415) 703-1203 or [email protected].

If you require special accommodations, please notify Mary Evans at 415-703-2074 or at [email protected], at least 3 5 business days before the hearing.

Notice of Public Participation Hearing: A.12-04-015 (PPH) - Application of Southern California Edison Company (U338E), for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism, and Related Matters: A.12-04-016, A.12-04-017, and A.12-04-018

October 5, 20127 pm

Al Bahr Shriners Center5440 Kearny Mesa RoadSan Diego

The public participation hearing in the above entitled matters will be held at the date and time above. Administrative Law Judge Michael J. Galvin will preside. There may be a quorum of Commissioners present; however, no voting will occur.For questions about the hearing date, time, or place, please call the Calendar Clerk at (415) 703-1203 or [email protected].

If you require special accommodations, please notify Mary Evans at 415-703-2074 or at [email protected], at least 3 5 business days before the hearing.

Notice of Public Participation Hearing: A.12-04-015 (PPH) - Application of Southern California Edison Company (U338E), for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism, and Related Matters: A.12-04-016, A.12-04-017, and A.12-04-018

October 9, 20127 pm

Fresno City Hall Council Chambers2600 Fresno StreetFresno

The public participation hearing in the above entitled matters will be held at the date and time above. Administrative Law Judge Michael J. Galvin will preside. There may be a quorum of Commissioners present; however, no voting will occur.For questions about the hearing date, time, or place, please call the Calendar Clerk at (415) 703-1203 or [email protected].

If you require special accommodations, please notify Mary Evans at 415-703-2074 or at [email protected], at least 3 5 business days before the hearing.

Notice of Safety Leadership Conference

October 23, 20129 am 11:30 am

California Public Utilities Commission320 West 4th Street, AuditoriumLos Angeles

NOTICE IS HEREBY GIVEN that the Commission will host a Safety Leadership Conference targeted to Board Members and Senior Leadership of organizations for whom the CPUC has regulatory oversight. The conference will focus on how Boards and Executive Leadership impact organizational success in the area of safety culture and safety practices and what Boards and Executive Leadership can do to address those organizational failures. Commissioners from the CPUC and/or their advisors may attend and participate in the conference. While a quorum of the CPUC may attend the symposium, no action will be taken. If you have any questions, please contact Michelle Cooke by electronic mail at [email protected] or at (415) 703-2163.

NOTICESCharge for Commission Documents

To purchase Commission documents, there is a charge of 20 cents a printed page (postage prepaid) with a minimum purchase of $2.00.

Commission Resources Available for Rental

The auditorium, hearing rooms, and training room at the headquarters of the California Public Utilities Commission, located at 505 Van Ness Avenue, San Francisco, California, are available for rent. Further information about requirements and fees can be obtained by contacting Scott Finger (415) 703-1641.

PUBLIC MEETINGS & WORKSHOP NOTICESPublic Workshop Notice: R.11-10-023 Second Teleconference - Resource Adequacy 2013 Templates and Guides

September 17, 20129:30 am 12 pm

California Public Utilities CommissionVia WebEx

This workshop will discuss and explain changes to the 2013 Resource Adequacy (RA) compliance templates (both System and Local templates) and RA Guide since the August 6th workshop. Draft templates and guides, as well as WebEx information, will be sent to the service list in advance of the workshop and posted to the CPUC website. This workshop will be broken into two sections. The first section will demonstrate the features of the RA templates and guides that are new for 2013 compliance year. Once the new features and procedures are demonstrated, those that are familiar with the process can drop off the WebEx. The rest of the time will be a general demonstration of the RA templates and guides for those that seek further clarification, or for those representing new LSEs.This is an ideal time for those representing new LSEs to gain an understanding of filing procedures and rules. We encourage representatives from LSEs to develop questions or functions that Energy Division staff can clarify or demonstrate during the workshop. For LSEs that need more one-on-one training, Energy Division RA staff will gladly set up these trainings offline to go through the templates in finer detail.Link to 2013 RA decision: http://docs.cpuc.ca.gov/PUBLISHED/FINAL_DECISION/169718.htm 2013 templates and guides, as well as other compliance materials, will be posted to the RA compliance materials page here:http://www.cpuc.ca.gov/PUC/energy/Procurement/RA/ra_compliance_materials.htmFor questions about the workshop or to notify Energy Division staff of particular functions of the templates and guides that may need clarification, please contact Donald Brooks (415 703-2626, email: [email protected]) or Jaime Rose Gannon (415 703-2818, email: [email protected]).

Public Workshop Notice: A-11-05-017 and A.11-06-016 Multifamily Segment Study and Request for Proposal (RFP) Input Public Workshop

September 17, 201210 am 2 pm

Pacific Energy Center, Green Room851 Howard StreetSan Francisco

Conference Phone Line: 1-866-325-0587Participant Code: *4159732317*

Per D. 12-08-044, within 30 days of the effective date of that decision, the Energy Division and the IOUs are directed to hold a one-day public workshop to garner input from interested stakeholders and parties on the development of the third party consultant request for proposal (RFP) for a Multifamily Segment Study. This public workshop soliciting public input on the Multifamily Segment Study and request for proposal (RFP) will be held at PG&Es Pacific Energy Center on Monday, September 17, 2012 from 10:00am 2:00pm.Parties who wish to provide input on the formulation of the Multifamily Segment Study RFP must draft and post one page of comments to the CPUC Evaluation Project Public Review Site located at: http://www.energydataweb.com/cpuc/home.aspx. To post comments, click on the log in tab to create an account. To post comments, select the Search Tab and enter Multifamily Consultant. Then you will be presented with the options to view and comment on this announcement document. Comments are limited to one page and should include suggestions to the scope and direction of the RFP and study only. Commenters should review the direction outlined in Section 3.10.6.4 - Comprehensive Multifamily Segment Strategies Formulation and Implementation in D. 12-08-044 to advise their comments. Comments will be closed by Monday September 17th. If you have any questions, please feel free to send an email to the study contacts below. Additionally, if you plan to attend in person, please RSVP to Mary ODrain below.Tory Francisco, Energy Division, CPUC ([email protected]). Mary ODrain, PG&E ([email protected]).

Public Workshop Notice: On the Joint Utilities 2012-2014 Statewide Permanent Load Shifting Program Proposal

September 18, 20129:30 am 4 pm

California Public Utilities Commission505 Van Ness Avenue, Golden Gate Training Room (Corner of Van Ness Avenue and McAllister Street)San Francisco

The investor-owned utilities jointly submitted the 2012-2014 Statewide Permanent Load Shifting Program Proposal (PLS Proposal) and updated cost-effectiveness analyses to the Energy Division in compliance with D.12-04-045. The utilities PLS Proposal will be vetted by the parties at the public workshop. The focus of this workshop is program design and cost-effectiveness.The utilities PLS Proposal and updated cost-effectiveness analyses can be accessed at

1. Statewide PLS Program Proposal (8/8/12, pdf), 2. PGE PLS DR Reporting Updated Template ( 8/6/12, excel)3. SDG&E PLS DR Reporting Template (7/30/12, excel), and4. SCE PLS DR Reporting Template (7/30/12, excel).

For workshop details/agenda and further questions, please contact: Joanne Leung at (415) 703-1149 or [email protected].

(UPDATED) Public Workshop Notice: Energy Division Workshop on Operating Flexibility for the 2012 LTPP (REVISED AS OF 9/13/12)

September 19, 201210 am 4 pm (CHANGE IN TIME)

and

September 20, 2012 (CANCELLED)

California Public Utilities Commission505 Van Ness Avenue, AuditoriumSan Francisco

Call-in Number: 1-866-758-1675; Passcode: 3481442Press *6 to mute/unmute.

AGENDAEnergy Division staff is hosting presentations on operating flexibility for use in the 2012 LTPP (R.12-03-014). This workshop is intended to inform parties about operating flexibility methodologies and issues. Contact Nat Skinner (415-703-1393).

Meeting Number: 741 769 312Meeting Password: LTPP

Go to https://van.webex.com/van/j.php?ED=189577152&UID=491292852&PW=NNGQ4MGM0MTBk&RT=MiM0

Public Workshop Notice: Energy Division Workshop Cost-Benefit Analysis Models for Energy Storage Use Case

September 24, 20129:30 am 4 pm

California Public Utilities Commission505 Van Ness Avenue, AuditoriumSan Francisco

Conference Phone Line: 1-866-758-1675Participant Code: 3481442

WebEx details TBD

AGENDAPhase 2 of the Energy Storage Proceeding (R.10-12-007) will include analysis of the cost-effectiveness of specific applications for energy storage. This workshop will introduce possible models and tools for conducting such analysis, and will review and discuss certain economic and operational assumptions that should be incorporated. There will also be a status update of the development of various storage Use Cases. Contact Arthur ODonnell (415-703-1184) or Aloke Gupta (415-703-5239).

Public Workshop Notice: 2nd Workshop on California LifeLine Programs Direct Application Process

September 25, 20121 pm - 3 pm

California Public Utilities Commission505 Van Ness Avenue, Auditorium(Corner of Van Ness Avenue and McAllister Street)San Francisco

Call-in Number: 1-866-741-9705; Code: 6691236

Pursuant to Ordering Paragraph 12 of Resolution T-17366, Communications Division will host a second workshop to discuss the direct application processing for the California LifeLine Program.We will have a listen-only conference line available. The phone number is 866-741-9705 with the passcode, 6691236.Link to Resolution T-17366: http://docs.cpuc.ca.gov/PUBLISHED/FINAL_RESOLUTION/170652.htm If there are any questions, please contact Michaela Pangilinan at (415) 703-1890.

Public Meeting Notice: CPUC Thought Leaders Series: Stationary Fuel Cell Applications

October 1, 20121 pm - 3:30 pm

California Public Utilities Commission505 Van Ness Avenue, Auditorium(Corner of Van Ness Avenue and McAllister Street)San Francisco

How can they help California Achieve its goal of clean, reliable electricity? California is the leading U.S. market for stationary fuel cell deployment. State policies and incentive programs, such as the Self Generation Incentive Program (SGIP), have been critical to the successful deployment of nearly 40 MW of commercial stationary fuel cell product throughout the state. Stationary fuel cells are providing reliable, efficient, and clean power and heat in the distributed power market. How is the technology evolving, and what benefits are fuel cells bringing to the California economy, job sector, and overall operation of the electric power grid?This special briefing is hosted by the California Stationary Fuel Cell Collaborative and the University of California, Irvine, National Fuel Cell Research Center. Opening remarks will be provided by Commissioner Timothy Alan Simon. CPUC Perspective will be provided by Melicia Charles, Customer Generation Programs Supervisor, CPUC Energy Division. The keynote presentation will be provided by Professor Scott Samuelsen, Director, National Fuel Cell Research Center.Please direct questions and inquiries to Marzia Zafar - [email protected] (415) 703-1997- California Public Utilities Commission, 505 Van Ness Avenue, San Francisco, CA 94102.

Public Workshop Notice: Energy Efficiency Finance Pilots Workshop (R.09-11-014)

October 2, 20129:30 am 5 pm

California Public Utilities Commission505 Van Ness Avenue, Auditorium(Corner of Van Ness Avenue and McAllister Street)San Francisco

Call in number: 1-866-812-8481; Passcode:9058288

WebEx link is below.

California Gas Company (SoCalGas), on behalf of San Diego Gas and Electric, Pacific Gas and Electric, and Southern California Edison, will be hosting a workshop with the consulting team led by Harcourt, Brown and Carey (HBC) to present proposals for the financing pilots ordered under Decision 12-05-015. An agenda will be sent to the service lists a week prior to the workshop.The workshop will be facilitated by HBC and will be structured around the four designated pilot areas: Single-Family, Multi-Family, Small Business and Non-Residential. A report detailing the pilot proposals will be issued concurrent with the workshop. SoCalGas will be requesting post-workshop comments (due October 10th) and will re-issue the report to the CPUC no later than October 19th.For parties that would like to participate in the workshop, but cannot attend in person, webinar and conference line capabilities will be available. Please note that there are only 100 available ports on this conference line. If you and several of your colleagues are calling from one location, please use a common telephone to ensure that other participants can access the conference call.The consulting team lead by HBC has set up a web site, www.caleefinance.com, to communicate with stakeholders and receive their input. On this site, HBC posts documents, announces workshops and other meetings, collects comments, and enables stakeholders to easily communicate with the project staff. At this site, stakeholders can submit their email addresses to be notified about key developments.Please contact Frank Spasaro ([email protected]) if you have questions.Meeting information ------------------------------------------------------- Meeting Number: 748 897 490 Meeting Password: workshop ------------------------------------------------------- To start or join the online meeting ------------------------------------------------------- Go to https://van.webex.com/van/j.php?ED=189749807&UID=491292852&PW=NYmVkM2I0ZjE1&RT=MiM0

(UPDATED) Public Meeting Notice: Thought Leaders Session on Green Economy Partnerships (REVISED AS OF 9/12/12)

October 26, 20121:30 pm - 3:30 pm

California Public Utilities Commission505 Van Ness Avenue, Auditorium(Corner of Van Ness Avenue and McAllister Street)San Francisco

The next topic in the ongoing Thought Leaders Speaker Series will be: Green Economy Partnerships This discussion will introduce the strategic public/private partnerships focused on developing the green economy in California. Green Economy Partnerships will highlight partnerships between multiple stakeholders such as: utilities, government, industry, labor, educators, and investors; aimed at leveraging limited resources and removing barriers in an effort to drive sustainable economic, environmental, and societal benefits. Keynote Speaker & Moderator: Gavin Newsom, Lieutenant Governor, State of California Panelists include: Nancy Pfund, Managing Partner, DBL InvestorsDoug Avery, CALCTP Manager, Southern California EdisonTim Rainey, Executive Director, California Workforce Investment Board

The session is free, open to the public and will be webcast. To register for this event (appreciated but not required) and for more information on the Thought Leaders Speaker Series, please visit: www.cpuc.ca.gov/thoughtleaders.For questions, please contact Devla Singh at [email protected] or 415-703-5581.

NOTICE OF DRAFT RESOLUTIONS(Pursuant to PU Code 311(g))

The Energy Division has prepared Draft Resolution E-4538 (Redacted), for the September 27, 2012 Commission Meeting addressing San Diego Gas and Electric Companys Advice Letter 2377-E requests approval of two purchase and sale agreements for renewable energy credits with Cabazon Wind Partners LLC and Whitewater Hill Wind Partners LLC. Questions & comments should be directed to [email protected] .

The Energy Division has prepared Draft Resolution E-4535, for the September 27, 2012 Commission Meeting addressing San Diego Gas & Electric Companys AL 2297-E, Southern California Edison Companys AL 2644-E, and Pacific Gas and Electric Companys AL 3251-G/3934-E proposed tariffs to implement the privacy and security rules adopted by D.11-07-056. Questions & comments should be directed to [email protected] and [email protected].

The Communications Division has prepared Resolution T-17375 for the Commission Meeting September 27, 2012. This Resolution increases the California Teleconnect Fund surcharge rate from 0.079% to 0.59% effective November 1, 2012. Any questions or comments should be directed to Adam Clark; email: [email protected].

A copy of the proposed Resolution T-17375 is available at: http://www.cpuc.ca.gov/PUC/documents/.

The Communications Division has prepared a Revised Draft Resolution T-17376 for the September 27, 2012, Commission Agenda. This revised draft resolution adopts the Universal LifeLine Telephone Service Trust Fund Budget for Fiscal Year 2013-14. The Communications Division e-mailed the draft resolution to parties in accordance with PU Code Section 311(g)(1). Comments and reply comments are due by September 12th & 19th respectively. Any questions should be directed to:

Benjamin ScheinCommunications Division California Public Utilities Commission505 Van Ness Ave. San Francisco, CA 94102or-(415) 703-1088;email: [email protected]

The web link is http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=26220562.

The Communications Division has prepared a Revised Draft Resolution T-17377 for the September 27, 2012, Commission Agenda. This revised draft resolution adopts the California Teleconnect Fund Budget for Fiscal Year 2013-14. The Communications Division e-mailed the draft resolution to parties in accordance with PU Code Section 311(g)(1). Comments and reply comments are due by September 12 and 17, 2012, respectively. Any questions should be directed to:

Adam ClarkCommunications Division California Public Utilities Commission505 Van Ness Ave. San Francisco, CA 94102-or- (415) 703-5212; email: [email protected]

Please visit the CPUC website under the following link for a copy of the revised draft Resolution T-17377.http://docs.cpuc.ca.gov/SearchRes.aspx?ProposedDecisions=1&DaySearch=30

The Communications Division has prepared Draft Resolution T-17379 for the September 27, 2012, Commission Agenda. This draft resolution approves a fiscal agent for the Inland Empire Regional Broadband Consortium under the California Advanced Services Funds Rural and Urban Regional Broadband Consortia Grant Account. The Communications Division e-mailed the draft resolution to parties in accordance with PU Code Section 311(g)(1). Opening and reply comments are due by September 12 and 17, 2012, respectively.Comments should be directed to:

Angela AhSamCommunications Division California Public Utilities Commission505 Van Ness Ave. San Francisco, CA 94102-or- (415) 703-5482; email: [email protected]

Visit the CPUC website under the following link for a copy of draft Resolution T-17379.http://docs.cpuc.ca.gov/SearchRes.aspx?docformat=ALL&DocID=26562313

The Energy Division has prepared an ALTERNATE Draft Resolution E-4522 regarding the request for approval of five PPAs between Southern California Edison Company and Brightsource Energy Company.In addition, the original Draft Resolution E-4522 was originally mailed for a Commission decision on September 13, 2012 but now is held for further review. Both the Draft Resolution and ALTERNATE Draft Resolution are scheduled to be voted on at the October 11, 2012 Commission meeting.

The weblink is http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M027/K708/27708212.PDF.

The Consumer Protection and Safety Division has prepared draft Resolution TL-19105 for the October 11, 2012, Commission Meeting. The resolution requires insurance companies and surplus lines brokers to file insurance information with the Commission electronically. Comments are due September 27, 2012. Any questions should be directed to:

Paul Wuerstle, ManagerCPSD Transportation Enforcement BranchPublic Utilities Commission505 Van Ness Ave.San Francisco, CA 94102-or- (415) 703-2183; email: [email protected]

The web link is: http://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M027/K152/27152142.PDF

NEW FILINGS

8/29/12

A.12-08-021 - In the Matter of the Application of Fox Express, LLC for passenger stage authority under Section 1031, et seq., of the California Public Utilities (PU) Code to transport passengers and baggage express, on an on-call, county to county basis, between points in the counties of San Diego, Imperial, Orange, Los Angeles, San Bernardino, Riverside, Kern, Tulare, Fresno, Monterey, Santa Clara, San Francisco, Alameda, and Sacramento, described in the body of the Application; and to establish a Zone of Rate Freedom (ZORF) under Section 454.2 et seq., of the PU Code. [Attn: Ebi Esule, Consultant dba Transportationinformation.com, P.O. Box 1789 Hollywood, CA 90078-1789; telephone 323-378-6494.]

8/31/12

A.12-08-022 - Application of Abdul Rahim Popal, dba Bay Transit Shuttle for a Certificate of Public Convenience and Necessity to operate as an on-call, door-to-door Passenger Stage Service between points in the following counties: Alameda, Contra Costa, Marin, Napa, San Francisco, San Joaquin, San Mateo, Santa Clara, Solano and Sonoma, and the following International Airports: San Francisco, San Jose and Oakland; and to establish a Zone of Rate Freedom.[ Attn: Abdul Rahim Popal dba Bay Transit Shuttle, 1480 Thrush Ave., #35, San Leandro CA 94578; telephone 510-714-4000.]

9/4/12

A.12-09-005 - In the Matter of the Application of Shaker Saker, dba Sky Hawk Airporter & Limo, for authority to operate as a passenger stage corporation between points in San Francisco, Alameda, Marin, Solano, Santa Clara, Napa, San Joaquin, San Mateo, Sacramento, Sonoma and Contra Costa Counties and the San Francisco, Oakland and San Jose International Airports; and to Establish a Zone of Rate Freedom. [Attn: Daniel W. Baker Esq., Baker Lane, Lafayette, CA 94546; telephone 925-962-9966]

9/6/12

C.12-09-006 - Vaya Telecom, Inc. (U7122C), Complainant, vs. North County Communications Corporation (U5631C), Defendant [for Relief from Defendant's Switched Access Charges, and related relief.]

9/7/12

A.12-09-007 - Application Of Southern California Edison Company (U338E) For Expedited Approval Of Five Third-Party Demand Response Resource Purchase Agreements.

PETITIONS FOR MODIFICATION AND APPLICATIONS FOR REHEARING

NONE

PROPOSED DECISIONS * ALTERNATES * PRESIDING OFFICERS DECISIONS * ARBITRATORS REPORTS

NONE

ADVICE LETTER FILINGS

To inquire about a filing, call the Energy Division (703-1093), Communications Division (703-3052) or Water Division (703-2028).To protest a filing, mail the original letter/telegram to the Chief of the appropriate division (i.e., "Chief, [Energy, Communications or Water] Division"), to be received no later than 20 days after the date the Advice Letter was filed."Effective TBD" means that the date is to be determined by further Commission action. A date listed as "anticipated effective" may be subject to change. An Advice Letter Supplement is not a new filing, and there is no protest period unless indicated.

06/25/12

Telecom 41

Worldnet Communications Services, Inc., Updating Taxes & Surcharges (effective TBD)

08/29/12

Telecom 12615

Verizon California, Inc., Interconnection Agreement -California Broadband Cooperative, Inc. (effective TBD)

08/31/12

Telecom 134

Sage Telecom, Inc., Adds New Plan (effective TBD)

09/05/12

Telecom 4264

AT&T Communications of California, Inc., Cancel A Tariff Schedule (effective TBD)

09/05/12

Telecom 41107

Pacific Bell, Contract (effective TBD)

09/05/12

Telecom 41108

Pacific Bell, Contract (effective TBD)

09/10/12

Telecom 543

TW Telecom of California, LP, Contract (effective TBD)

09/12/12

Energy 4111E

Pacific Gas and Electric Company, Power Purchase Agreement for the Procurement of Eligible Renewable Energy Resources between RE Kansa LLC and PGE (anticipated effective 03/03/13)

09/13/12

Telecom 212A

Pac-West Telecomm, Inc., Access Tariff Revision (effective TBD)

09/14/12

Water 326-A

Del Oro Water Co., Inc., Supplements A.L.No.326, [Paradise Pines District] Increase rates to recover costs incurred on its Service Improvement Plan projects and on-going meter replacement program (effective TBD)

ADVICE LETTER SUSPENSIONS

NONE

ADVICE LETTER PROTESTS

NONE

MISCELLANEOUS TRANSPORTATION ITEMSFilings with Consumer Protection and Safety Division

NONE

MISCELLANEOUS COMMUNICATIONS MATTERS

NONE

TABLE OF SUBMISSION DATES FOR THE PRECEDING TWO WEEKS

9/10/12ALJ Hymes

A.11-11-017 - In the Matter of the Application of Pacific Gas and Electric Company for Adoption of its Smart Grid Pilot Deployment Project (U39E).

CHANGES TO HEARING CALENDARNEW SETTINGS - NONE

RESETTINGS - NONE

REMOVALS FROM CALENDAR - NONE

HEARINGS CONTINUED

ALJ Yip-Kikugawa

I.11-02-016 - Order Instituting Investigation on the Commissions Own Motion into the Operations and Practices of Pacific Gas and Electric Company with Respect to Facilities Records for its Natural Gas Transmission System Pipelines,Evidentiary Hearing held and continued to September 17

ALJ Galvin

A.12-04-015 - Application of Southern California Edison Company (U338E) for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism,And Related Matters:A.12-04-016A.12-04-017A.12-04-018Evidentiary Hearing held and continued to September 21

HEARINGS CONCLUDED - NONE

HEARINGS

Dates in parentheses following the word also are subject to change without notice. The assigned Commissioners name is listed next to the proceedings as matter of record; the assigned Commissioner may not be present at the hearing.

(PHC) = Prehearing Conference

(ECP) = Expedited Complaint Procedure

(CA) = Closing Argument

(EH) = Evidentiary Hearing

(OSC) = Order to Show Cause

(LM) = Law & Motion

(PPH) = Public Participation Hearing

(WS) = Workshop

(OA) = Oral Argument

(IAM) = Initial Arbitration Meeting

(FPH) = Full Panel Hearing

(STC) = Status Conference

(AH) = Arbitration Hearing

(FOA) = Final Oral Argument

(DC) = Discovery Conference

(APPEAL) = Appeal Hearing of General Order 156

(CITATION) = Appeal Hearing of Citation

(SCF) = Settlement Conference

9/17/129:00 a.m.ALJ WilsonComr Sandoval

A.12-02-013 (EH) - In the Matter of the Application of Golden State Water Company, on Behalf of its Bear Valley Electric Service Division (U913E),for Approval of Costs and Authority to Increase General Rates and Other Charges for Electric Service by Its Bear Valley Electric Service Division,Commission Courtroom, San Francisco(Also September 18 19)

9/17/129:30 a.m.ALJ Yip-KikugawaComr Florio

I.11-02-016 (EH) - Order Instituting Investigation on the Commissions Own Motion into the Operations and Practices of Pacific Gas and Electric Company with Respect to Facilities Records for its Natural Gas Transmission System Pipelines,Commission Courtroom, San Francisco(Also September 18 - 19)

9/18/1210:00 a.m.ALJ McKinneyComr Florio

I.09-12-016 (PHC) - Order Instituting Investigation on the Commission's own motion into the alleged failure of TracFone Wireless, Inc. (U-4231-C) to collect and remit public purpose program surcharges and user fees on revenue from its sale of intrastate telephone service to California consumers, in violation of the laws, rules and regulations of this State; Order to Show Cause why Respondent should not immediately be ordered to pay all such outstanding sums plus interest, and be subject to penalties for such violations,Commission Courtroom, San Francisco

9/19/129:00 a.m.ALJ YackninComr Florio

A.11-08-014 (EH) - Application of the City of Davis to Construct one new at-grade pedestrian and bicycle crossing at the main train station platform access in the vicinity of Mile Post No. 76.0, and an emergency-access only private crossing in the vicinity of Mile Post 76.3 of the Union Pacific Railroad Company in the City of Davis, County of Yolo, State of California,Commission Courtroom, San Francisco(Also September 20)

9/20/129:30 a.m.ALJ RoscowComr Peevey

A.11-06-007 (EH) - Application of Southern California Edison Company (U338E) To Establish Marginal Costs, Allocate Revenues, Design Rates, and Implement Additional Dynamic Pricing Rates,Commission Courtroom, San Francisco(Also September 21)

9/20/1210:00 a.m.ALJ BemesderferComr Peevey

A.08-09-024 (EH) - Application of San Pablo Bay Pipeline Company LLC for Approval of Tariffs for the San Joaquin Valley Crude Oil PipelineAnd Related Matters:C.08-03-021C.09-02-007C.09-03-027Commission Courtroom, San Francisco

9/20/1210:00 a.m.ALJ Minkin

GO 156 2012-1 (TELEPHONIC - APPEAL) - In the Matter of the Appeal under General Order 156 filed by Michael T. McKeeman, SEYFARTH SHAW LLP.,Administrative Law Judges Office, San Francisco

9/21/1210:00 a.m.ALJ GalvinComr Ferron

A.12-04-015 (EH) - Application of Southern California Edison Company (U338E) for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism,And Related Matters:A.12-04-016A.12-04-017A.12-04-018Commission Courtroom, San Francisco(Also September 24 and September 28)

9/24/129:30 a.m.ALJ WetzellComr Peevey

1:30 p.m.ALJ Yip-KikugawaComr Florio

I.12-01-007 (EH) - Order Instituting Investigation on the Commissions Own Motion into the Operations and Practices of Pacific Gas and Electric Company to Determine Violations of Public Utilities Code Section 451, General Order 112, and Other Applicable Standards, Laws, Rules and Regulations in Connection with the San Bruno Explosion and Fire on September 9, 2010,Commission Courtroom, San Francisco(Also September 25 28; October 1 5; October 8 12; and October 15 19)

(Not Consolidated)

I.11-11-009 - Order Instituting Investigation on the Commissions Own Motion into the Operations and Practices of Pacific Gas and Electric Companys Natural Gas Transmission Pipeline System in Locations with High Population DensityCommission Courtroom, San Francisco

9/24/1210:00 a.m.ALJ RoscowComr Peevey

A.12-02-020 (EH) - Application of Pacific Gas and Electric Company for Approval of its 2012 Rate Design Window Proposals (U39E),Commission Courtroom, San Francisco(Also September 25 28)

9/25/1210:00 a.m.ALJ ClarkComr Florio

A.12-02-010 (EH) - Application of Pacific Gas and Electric Company for Compliance Review of Electric Energy Resource Recovery Account Entries, Contract administration, Economic Dispatch of Electric Resources, and Utility Retained Generation Fuel Procurement Activities for the Period January 1 through December 31, 2011 (U39E),Commission Courtroom, San Francisco

(Also September 26)

10/1/1210:00 a.m.ALJ RoscowComr Florio

A.12-04-009 (EH) - Application of Pacific Gas and Electric Company (U39E) for Adoption of Electric Revenue Requirements and Rates Associated with the Market Redesign and Technology Upgrade (MRTU) Initiative,Commission Courtroom, San Francisco(Also October 2)

10/1/1210:00 a.m.ALJ GamsonComr Ferron

C.12-02-021 (EH) - Mr. John S. Davis, Complainant vs. Southern California Edison Company (U338E), Defendant,Junipero Serra State Office Building, 320 West 4th Street, Suite 500, Los Angeles, CA

10/4/127:00 p.m.ALJ GalvinComr Ferron

A.12-04-015 (PPH) - Application of Southern California Edison Company (U338E) for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism,And Related Matters:A.12-04-016A.12-04-017A.12-04-018San Bernardino City Hall Council Chambers, 300 North D Street, San Bernardino, CA

10/5/1210:00 a.m.ALJ MasonComr Peevey

A.11-12-010 (PHC) - Application of Neighbors for Smart Rail for Rehearing of Resolution SX-100 and for Oral Argument,Commission Courtroom, San Francisco

10/5/121:30 p.m.ALJ MinkinComr Ferron

A.12-01-008 (PHC) - Application of San Diego Gas & Electric Company (U902E) For Authority To Implement Optional Pilot Program To Increase Customer Access To Solar Generated Electricity,Commission Courtroom, San Francisco

10/5/127:00 p.m.ALJ GalvinComr Ferron

A.12-04-015 (PPH) - Application of Southern California Edison Company (U338E) for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism,And Related Matters:A.12-04-016A.12-04-017A.12-04-018Al Bahr Shriners Center, 5440 Kearny Mesa Road, San Diego, CA

10/8/1210:00 a.m.ALJ MasonComr Peevey

A.12-04-024 (PHC) - In the Matter of the Application of Southern California Gas Company (U904G) to Establish a Biogas Conditioning & Upgrading Services Tariff,Commission Courtroom, San Francisco

10/9/1210:00 a.m.ALJ RoscowALJ Yip-KikugawaComr Ferron

A.11-10-002 (EH) - Application of San Diego Gas & Electric Company (U902E) For Authority To Update Marginal Costs, Cost Allocation, And Electric Rate Design,Commission Courtroom, San Francisco(Also October 10 12 and October 15 - 19)(Note: Hearing will start at 10:00 a.m. on the 1st day of each week and 9:30 a.m. on the remaining days)

10/9/127:00 p.m.ALJ GalvinComr Ferron

A.12-04-015 (PPH) - Application of Southern California Edison Company (U338E) for Authority to Establish Its Authorized Cost of Capital for Utility Operations for 2013 and to Reset the Annual Cost of Capital Adjustment Mechanism,And Related Matters:A.12-04-016A.12-04-017A.12-04-018Fresno City Hall Council Chambers, 2600 Fresno Street, Fresno CA

10/17/1210:30 a.m.ALJ MacDonald

C.12-05-014 (ECP) Resa Rosenstein, Complainant vs. Southern California Edison Company (U338E), Defendant,Menifee City Hall Conference Room, 29714 Haun Road, Menifee, CA

10/22/1210:00 a.m.ALJ WeatherfordComr Florio

C.11-10-024 (PHC) - Rolando Menendez, Complainant vs. Pacific Gas and Electric Company (U39E), Defendant,Commission Courtroom, San Francisco

10/22/1210:00 a.m.ALJ Minkin

GO 156 2012-1 (APPEAL) - In the Matter of the Appeal under General Order 156 filed by Michael T. McKeeman, SEYFARTH SHAW LLP.,Commission Courtroom, San Francisco

10/23/129:30 a.m.ALJ LongComr Florio

A.12-02-014 (EH) - Application of California Pacific Electric Company, LLC (U933E) for Authority to Among Other Things, Increase Its Authorized Revenues for Electric Service, Update Its Energy Cost Adjustment Clause Billing Factors, Establish Marginal Costs, Allocate Revenues, And Design Rates, as of January 1, 2013,Commission Courtroom, San Francisco(Also October 24 - 25)

10/23/1210:00 a.m.ALJ McKinneyComr Florio

A.08-05-019 (PHC) - Application of California Water Service Company (U-60-W) for an order confirming its discontinuance of the ESP program as provided in D.07-12-055, Ordering Paragraph 19, approving accounting for the residual affiliate transaction, and confirming under D.07-12-055, Ordering Paragraph 16 that Applicant's residual services to its affiliate CWS Utility Services comply with applicable law,Commission Courtroom, San Francisco

10/23/1210:00 a.m.ALJ MacDonaldComr Simon

A.10-02-009 (STC) - In the Matter of the application of Channel Islands Telephone Company (U7068C) to expand its existing certificate of public convenience and necessity to include full facilities-based authority to construct telecommunications facilities to serve certain previously-unserved Channel Islands,Commission Courtroom, San Francisco

10/26/1210:00 a.m.ALJ MasonComr Peevey

A.11-08-004 (PHC) - In the Matter of the Application of the City of San Clemente for an order authorizing the alteration and improvement of seven existing San Clemente Beach Trail At-Grade Crossings,Commission Courtroom, San Francisco

10/29/1210:00 a.m.ALJ RochesterComr Ferron

A.12-05-001 (EH) - Joint Application of Park Water Company (U314W) and Apple Valley Ranchos Water Company (U346W) for Authority to Establish an Authorized Cost of Capital for 2013 -2015,And Related Matters:A.12-05-002A.12-05-004A.12-05-005Commission Courtroom, San Francisco(Also October 30 November 2)

10/29/1210:00 a.m.ALJ MasonComr Ferron

A.12-06-010 (PHC) - In the Matter of the Application of Pacific Gas and Electric Company for Recovery of Costs of Gas Compressor Station Compliance with AB 32 (U39G),Commission Courtroom, San Francisco

10/29/122:00 p.m.ALJ MasonComr Sandoval

A.12-07-007 (PHC) - In the Matter of the Application of California Water Service Company (U60W), a California corporation, for an order 1) authorizing it to increase rates for water service by $92,765,000 or 19.4% in test year 2014, 2) authorizing it to increase rates on January 1, 2015 by $17,240,000 or 3.0%, and on January 1, 2016 by $16,950,000 or 2.9% in accordance with the Rate Case Plan, and 3) adopting other related rulings and relief necessary to implement the Commission's ratemaking policies,Commission Courtroom, San Francisco

10/30/1210:00 a.m.ALJ DudaComr Florio

A.11-12-011 (EH) - In the Matter of Application of Kerman Telephone Co. (U1012C) d/b/a Sebastian, to Review Intrastate Rates and Charges and Rate of Return for Telephone Service Furnished within the State of California, and to Modify Selected RatesCommission Courtroom, San Francisco(Also October 31 November 1)

11/2/1210:00 a.m.ALJ BusheyComr Sandoval

A.10-09-019 (PHC) - In the Matter of the Application of San Jose Water Company (U168W) for Commission Approval of Cost Recovery for Upgrading the Montevina Water Treatment Plant,Commission Courtroom, San Francisco

11/2/121:30 p.m.ALJ WilsonComr Florio

A.12-08-001 (PHC) - Application of Southern California Edison Company (U338E) for Approval of Its Forecast 2013 ERRA Proceeding Revenue Requirement,Commission Courtroom, San Francisco

11/5/1210:00 a.m. 4:00 p.m.ALJ Yip-KikugawaComr Peevey

A.11-03-014 (EH) - Application of Pacific Gas and Electric Company for Approval of Modifications to its SmartMeter Program and Increased Revenue Requirements to Recover the Costs of the Modifications (U39M),And Related Matters:A.11-03-015A.11-07-020Commission Courtroom, San Francisco(Also November 6 9 and November 13 16)

11/5/1210:00 a.m.ALJ BemesderferComr Ferron

A.12-05-003 (EH) - Application of Southern California Edison Company (U338E) for Authorization to Recover Costs Incurred in 2009, 2010, and 2011 and Recorded in the Bark Beetle Catastrophic Event Memorandum Account,Commission Courtroom, San Francisco

11/6/1210:00 a.m.ALJ MinkinComr Florio

A.10-06-007 (EH) - In The Matter of the Application of San Diego Gas & Electric Company (U902E) for a Permit to Construct the South Bay Substation Relocation Project,Commission Courtroom, San Francisco(Also November 7 at 9:00 a.m.)

11/6/122:00 p.m.ALJ MasonComr Sandoval

A.12-06-016 (PHC) - In the Matter of the Application of California Water Service Company (U60W), a Corporation, for Authority to Recover Costs Associated with General Office Building Renovation,Commission Courtroom, San Francisco

11/8/1210:00 a.m.ALJ PrestidgeComr Florio

A.10-09-016 (EH) - In the Matter of the Application of Southern California Edison Company (U338E) for a Permit to Construct Electrical Facilities with Voltages between 50 kV and 200 kV: Lakeview Substation Project,Commission Courtroom, San Francisco(Also November 9)

11/14/129:00 a.m.ALJ ViethComr Florio

R.11-02-018 (EH) - Order Instituting Rulemaking into Transfer of Master-Meter/Submeter systems at Mobilehome parks and Manufactured Housing Communities to Electric and Gas Corporations,Commission Courtroom, San Francisco(Also November 15 16)

11/14/1210:00 a.m.ALJ ClarkComr Florio

A.12-04-001 (EH) - Application of Southern California Edison Company (U338E) for a Commission Finding that its Procurement-Related and Other Operations for the Record Period January 1 Through December 31, 2011 Complied with its Adopted Procurement Plan; for Verification of its Entries in the Energy Resource Recovery Account and Other Regulatory Accounts; and for Refund of $26.810 Million Recorded in Six Memorandum Accounts,Commission Courtroom, San Francisco(Also November 15)

11/19/129:00 a.m.ALJ ViethComr Florio

I.12-04-010 (EH) - Order Instituting Investigation on the Commissions Own Motion into the Operations and Practices of Pacific Gas & Electric Company regarding Anti-Smart Meter Consumer Groups,Commission Courtroom, San Francisco(Also November 20 21)

11/19/1210:00 a.m.ALJ ClarkComr Ferron

A.12-03-001 (EH) - Application of Pacific Gas and Electric Company for Approval of Economic Development Rate for 2013-2017 (U39E),Commission Courtroom, San Francisco(Also November 27 - 28)

11/20/1210:00 a.m.ALJ MacDonaldComr Florio

A.12-08-003 (PHC) - In the Matter of the Application of PacifiCorp (U901E) for Authority to Update its Rates Pursuant to its Energy Cost Adjustment Clause Effective January 1, 2013,Commission Courtroom, San Francisco

12/4/1210:00 a.m.ALJ ClarkComr Peevey

A.12-04-020 (EH) - In the Matter of the Application of Pacific Gas and Electric Company to Establish a Green Option Tariff (U39E),Commission Courtroom, San Francisco,(Also December 5 6)

12/5/1210:00 a.m.ALJ BarnettComr Florio

A.12-05-006 (EH) - Application of West Coast Gas Company to Revise its Gas Rates and Tariffs (U910G),Commission Courtroom, San Francisco

12/11/1210:00 a.m.ALJ RochesterComr Sandoval

A.08-07-010 (EH) - Application of Golden State Water Company (U133W) for an order authorizing it to increase rates for water service by $20,327,339 or 20.12% in 2010; by $2,646,748 or 2.18% in 2011; and by $4,189,596 or 3.37% in 2012 in its Region II Service Area and to increase rate for water service by $30,035,914 or 32.67% in 2010; by $1,714,524 or 1.39% in 2011; and by $3,664,223 or 2.92% in 2012 in its Region III Service Area,And Related Matter:A.07-01-014Commission Courtroom, San Francisco(Also December 12 14)

12/11/1210:00 a.m.ALJ MasonComr Peevey

A.11-12-010 (EH) - Application of Neighbors for Smart Rail for Rehearing of Resolution SX-100 and for Oral Argument,Commission Courtroom, San Francisco(Also December 17 18)

12/12/1210:00 a.m.ALJ McKinneyComr Florio

I.09-12-016 (EH) - Order Instituting Investigation on the Commission's own motion into the alleged failure of TracFone Wireless, Inc. (U-4231-C) to collect and remit public purpose program surcharges and user fees on revenue from its sale of intrastate telephone service to California consumers, in violation of the laws, rules and regulations of this State; Order to Show Cause why Respondent should not immediately be ordered to pay all such outstanding sums plus interest, and be subject to penalties for such violations,Commission Courtroom, San Francisco(Also December 13 14)

12/17/1210:00 a.m.ALJ McKinneyComr Florio

C.12-04-028 (EH) - 555 YVR, LLC, Complainant vs. Pacific Gas and Electric Company (U39E) Defendant,Commission Courtroom, San Francisco(Also December 18)

1/7/1310:00 a.m.ALJ LongComr Florio

A.11-11-002 (EH) - In the Matter of the Application of San Diego Gas & Electric Company (U902G) and Southern California Gas Company (U904G) for Authority To Revise Their Rates Effective January 1, 2013, in Their Triennial Cost Allocation Proceeding,Commission Courtroom, San Francisco(Also January 8 - 11 and January 14 - 18)

1/7/1310:00 a.m.ALJ McKinneyComr Peevey

I.12-04-011 (EH) - Order Instituting an Investigation on Whether Great Oaks Water Companys Failure to Inform the Commission and its Staff of its Treatment of Pump Tax Revenues Collected from Customers Violated the Commissions Rule of Practice and Procedure 1.1, the Uniform System of Accounts for Class A Water Companies, the Rate Case Plan, or Public Utilities Code Sections 451 and 794,Commission Courtroom, San Francisco(Also January 8 - 11)

1/16/132:00 p.m. & 7:00 p.m.ALJ WeatherfordComr Peevey

A.12-04-019 (PPH) - Application of California-American Water Company (U210W) for Approval of the Monterey Peninsula Water Supply Project and Authorization to Recover All Present and Future Costs in Rates,Monterey City Hall Council Chambers, 580 Pacific Street, Monterey, CA

1/25/1310:00 a.m.ALJ WilsonComr Florio

A.12-06-003 (EH) - Application of San Diego Gas & Electric Company (U902E) for Approval of: (i) Contract Administration, Least Cost Dispatch and Power Procurement Activities in 2011, (ii) Costs Related to those Activities Recorded to the Energy Resource Recovery Account and Transition Cost Balancing Account in 2011 and (iii) Costs Recorded in Related Regulatory Accounts in 2011,Commission Courtroom, San Francisco

4/2/1310:00 a.m.ALJ WeatherfordComr Peevey

A.12-04-019 (EH) - Application of California-American Water Company (U210W) for Approval of the Monterey Peninsula Water Supply Project and Authorization to Recover All Present and Future Costs in Rates,Commission Courtroom, San Francisco(Also April 3 5 and April 8 - 11)

4/22/1310:00 a.m.ALJ BemesderferComr Peevey

A.12-01-015 (EH) - Application of SFPP, L.P. for authority, pursuant to Public Utilities Code Section 455.3, to change its rates for pipeline transportation services within California,And Related Matters:C.12-03-005C.12-03-006C.12-03-007C.12-04-004C.12-04-006C.12-04-007Commission Courtroom, San Francisco(Also April 23 - 25; April 29 May 2; and May 6 - 9)

5/20/139:00 a.m.ALJ ViethComr Peevey

A.07-06-031 (EH) - In the Matter of the Application of Southern California Edison Company (U338E) for a Certificate of Public Convenience and Necessity Concerning the Tehachapi Renewable Transmission Project (Segments 4 through 11),

Commission Courtroom, San Francisco(Also May 21 23)

NOTICE OF ALL-PARTY MEETINGS (PU Code 1701.3(c))

(A quorum of Commissioners and/or their staff may attend All-Party Meetings noticed on the Daily Calendar.)

NONE

Page 2