mongolia: mining infrastructure investment support...
TRANSCRIPT
ICB International Competitive Bidding
NCB National Competitive Bidding
Shopping Procurement method as specified in article 3.5 of the Bank’s Procurement Guidelines
DC Direct Contracting
QCBS Quality- and Costs- Based Selection
QBS Quality-Based Selection
FBS Selection under Fixed Budget
CQS Selection Based on the Consultants’ Qualifications
SSS Single-Source Selection
LCS Least-Costs Selection
IC Selection of Individual Consultants
N/A Not applicable
Abbreviations:
ICB
Shopping
Direct Contracting
NCB < US$1,000,000
Procurement Method
MONGOLIA: MINING INFRASTRUCTURE INVESTMENT SUPPORT PROJECT
Procurement Plan
(Updated on December 2016)
Prior Review Threshold
≥500,000. All ICB and the first 2 NCB goods contracts by PIU
irrespective of cost estimates. All direct contracting, irrespective of
value, will be subject to the Bank’s prior review.
≥US$300,000
< US$100,000
Goods/Non-consulting servicesContracts for procurement of copy rights,
royalties, as well as software and printed
copies of books, meeting the requirements of
Article 3.6 of the Procurement Guidelines.
Thresholds of Procurement Methods and Prior Review
3. All studies are subject to confirmation of eligibility, which will be determined at the end of phase 1. Their timing, content and value will be adjusted at the end of phase 1.
1. All activities financed with AusAID funds will be carried out in accordance with World Bank procurement policies and procedures. World Bank’s Guidelines: "Selection and Employment of Consultants" and "Procurement of Goods, Works, and Non-Consulting Services"
published by the Bank in January 2011.
Consulting Services
Notes:
4. Status column illustrates the procurement as Open meaning procurement has not started, Closed meaning contract completed, Under implementation meaning contract is under its performance and Cancelled meaning procurement had stopped due to unforeseen reason.
2. Shortlists composed entirely of national consultants for services estimated to costs less than US$100,000 equivalent per contract may be composed entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines.
QCBS
QBS
FBS
CQS may be used when < US$200,000
SSS
LCS
IC
For firms, ≥US$200,000 , first contract for each selection method, and
single source selection (SSS) of consultants;
For individuals, only in exceptional cases; all sole-source selection(SSS)
>= USD20,000
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
9,294,469.60
1.1 Consultant Services 9,269,469.6
1.1.1(a)
Individual consultants to provide technical
support to the Working Group for Feasibility
Study of " Orkhon-Gobi" Project
27,666.35 Post IC 4/4/2012 5/4/2012 6/4/2012 7/4/2012 Closed
1.1.1(b)
Consulting firm to prepare TOR for a Feasibility
Study of "Flow regulation of the Orkhon river and
construction of water reservoir complex" Project
149,999.70 Prior CQS 8/1/2013 9/1/2013 10/1/2013 1/1/2014 Closed
1.1.1(c)
Consulting firm to develop Feasibility Study of
"Flow regulation of the Orkhon river and
construction of water reservoir complex" Project
0.00 Prior QCBS 9/25/2016 10/25/2016 7/25/2017 N/A Open
1.1.1(d)
Consulting firm to conduct Environmental
Safeguard Impact Assessment for Orkhon river
and construction water reservoir complex project
0.00 Prior QCBS 9/25/2016 10/25/2016 7/25/2017 N/A Open
1.1.2
Individual consultants to provide technical
support to the WG for FS of " Connection all
strategic importance mining and border agencies
with joint high speed broadband Lines" Project
21,079.38 Post IC 7/4/2012 7/4/2012 7/4/2012 8/4/2012 Closed
1.1.3(a)
Individual consultant to provide technical support
to the WG for FS of " Integrated Steel Complex
with Infrastructure in the central region of
Darkhan-Selenge" Project
37,447.98 Post IC 4/4/2012 5/4/2012 6/4/2012 7/4/2012 Closed
16,247,763.15
27,666.35
149,999.70
Review
by Bank
(Prior /
Post)
Procurement
Method
Component 1: Infrastructure Investments
Estimated Cost (US$) Fund source by WBSigned contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
16,272,763.15
MINIS PROCUREMENT PLAN
2,700,000.00
800,000.00
21,079.38
37,447.98
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
1.1.3(b)
Consulting firm to develop Pre-Feasibility Study
of "Integrated Steel Complex with Infrastructure
in the central region of Darkhan-Selenge" Project
0.00 Prior CQS 6/1/2014 7/1/2014 8/1/2014 3/1/2015 Cancelled
1.1.3(c)
Consulting firm to develop Feasibility Study of
"Integrated Steel Complex with Infrastructure in
the central region of Darkhan-Selenge" Project
1,289,320.93 Prior QCBS 7/1/2015 7/30/2015 4/22/2016 4/22/2017Under
implementation
1.1.3(d)
Consulting firm to conduct Environmental
Safeguard Impact Assessment for Integrated Steel
Complex project
218,215.00 Prior QCBS 8/25/2015 9/21/2015 4/22/2016 4/22/2017Under
implementation
1.1.4(a)
Individual consultants to prvide technical support
to the WG for FS of " Shuren Hydropower Plant"
Project
36,214.89 Post IC 4/4/2012 5/4/2012 6/4/2012 7/4/2012 Closed
1.1.4(b)Consulting firm to prepare TOR for Feasibility
Study of "Shuren Hydropower Plant" Project365,728.00 Prior QCBS 5/1/2013 7/1/2013 9/1/2013 5/1/2014 Closed
1.1.4(c)Consulting firm to develop Feasibility Study of
"Shuren Hydropower Plant" Project0.00 Prior QCBS 9/25/2016 10/25/2016 7/25/2017 N/A Open
1.1.4(d)
Consulting firm to conduct Environmental
Safeguard Impact Assessment for Shuren
Hydropower Plant project
0.00 Prior QCBS 9/25/2016 10/25/2016 7/25/2017 N/A Open
1.1.5 Translation (Multiple verbal & written contracts) 30,000.00 Post IC 5/1/2013 5/1/2013 5/1/2013 9/30/2017Under
implementation
1.1.6
Individual consultants to provide technical
support to the WG for FS of " Khuut-Bichigt" of
Phase II and Pre-FS of Phase III under State
Policy on Railway Transportation
46,912.19 Post IC 6/4/2012 6/4/2012 7/4/2012 8/4/2012 Closed
1.1.7 (a)
Individual consultant to prepareToR related to
Environmental and Social Safeguards
Arrangements for a Feasibility Study of South
Gobi in the Naimdain Valley area in the Manlai,
TsogtOvoo, Tsogttsetsiisoums of the
Umnugobiaimag, and around the Zuunmod
deposit area in the AltainTsaad Gobi water supply
system development
5,811.19 Post IC 3/1/2014 3/1/2014 4/1/2014 6/1/2014 Closed
1,289,320.93
218,215.00
2,500,000.00
5,811.19
30,000.00
46,912.19
36,214.89
365,728.00
199,000.00
800,000.00
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
1.1.7 (b)
Consulting firm to conduct GW investigation near
Zuun mod deposit of Gobi beyond Altai in
Shinejinst soum of Bayanhongor province
499,814.00 Prior QCBS 12/1/2014 1/1/2015 10/1/2015 4/1/2017Under
implementation
1.1.7 (c)
Consulting firm to conduct GW investigation in
Zagyin Usny hooloi & Suuj Bulag areas
Tsogttsetsii and Tsogt-Ovoo soums of Umnugobi
province
730,081.00 Prior QCBS 12/1/2014 1/1/2015 10/1/2015 4/1/2017Under
implementation
1.1.7 (d)
Individual consultant to prepare TOR related to
the demand forecasts and business development
for a feasibility study of South Gobi water supply
system development
9,829.47 Post IC 3/1/2014 3/1/2014 4/1/2014 6/1/2014 Closed
1.1.7 (e)
Individual consultant to prepare ToR for the
engineer design related to water supply for a
feasibility study of South Gobi water supply
system development
9,829.47 Post IC 3/1/2014 3/1/2014 4/1/2014 6/1/2014 Closed
1.1.7 (f)
Consulting firm to develop Feasibility study of
regional water supply network/system and
development of technical designs of water
transmission systems for supply of drinking,
household, and industrial water from underground
water deposit at the Balgas Ulaan Lake.
0.00 Prior QCBS 12/1/2014 1/1/2015 4/1/2015 2/1/2016 Cancelled
1.1.7 (h)Consulting firm to conduct ESIA for the South
Gobi water supply project0.00 Prior CQS 11/1/2015 11/1/2015 12/1/2015 9/1/2016 Cancelled
1.1.8(a)Consultants to prepare ToR of the FS of
Substitute Natural Gas Plant project5,939.20 Post IC 3/1/2014 3/1/2014 4/1/2014 6/1/2014 Closed
1.1.8(b)Consultants to prepare ToR of the FS of
Substitute Natural Gas Plant project5,939.20 Post IC 3/1/2014 3/1/2014 4/1/2014 6/1/2014 Closed
1.1.8(c)
Consulting firm to develop Feasibility study of
Substitute Natural Gas Plant, 40-50 million
Nm3/year
1,597,832.00 Prior QCBS 4/1/2015 5/1/2015 3/21/2016 3/21/2017Under
implementation
Consulting firm to conduct Environmental
Safeguard Impact Assessment for Substitute
Natural Gas Plant project
288,437.00 Prior QCBS 10/1/2015 10/30/2015 3/21/2016 6/21/2017Under
implementation
Revision of Cumulative Impact Assessment of
Tavan tolgoi and Baganuur0.00 Prior n/a 12/1/2016 12/30/2016 12/30/2016 3/1/2017
Under
implementation
1.1.9 (a)
Consulting firm to prepare ToR of the Feasibility
Study for extension of Coal Mine “Baganuur”
LLC
50,000.00 Post CQS 9/1/2013 9/1/2013 10/1/2013 3/1/2014 Closed
1.1.8(d)
79,600.00
1,597,832.00
50,000.00
1,600,000.00
839,593.15
5,939.20
190,000.00
549,795.40
5,939.20
9,829.47
9,829.47
288,437.00
Contract Amendment No:1
Assignment will cover additional task of revising the Baganuur and Tavan Tolgoi CIA reports against the comments received during the public consultation held for preceding consultants whose original TORs did not cover the tasks.
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
1.1.9 (b)Consulting firm to develop Feasibility Study for
extension of Coal Mine "Baganuur" LLC585,981.91 Prior QCBS 4/1/2014 5/1/2014 7/1/2014 7/1/2016 Closed
1.1.9 (c)Consulting firm to conduct additional exploration
at Coal Mine "Baganuur" LLC2,339,695.00 Prior QCBS 4/1/2014 5/1/2014 7/1/2014 12/1/2015 Closed
1.1.9 (d)Consulting firm to conduct Cumulative Impacts
Assessment in Baganuur Coal Mine Region127,812.48 Prior CQS 1/14/2015 2/14/2015 3/14/2015 10/14/2015 Closed
1.1.10
Drilling and collecting probe from Tumurtei
minefield for "Integrated Steel Complex with
Infrastructure in the central region of Darkhan-
Selenge" Project
99,400.00 Prior LCS 8/1/2013 9/1/2013 11/1/2013 2/1/2014 Closed
1.1.11
Laboratory test of probe for "Integrated Steel
Complex with Infrastructure in the central region
of Darkhan-Selenge" Project
140,233.00 Prior LCS 8/1/2013 9/1/2013 12/1/2013 3/1/2014 Closed
1.1.12(a)Individual consultant to prepare ToR of the Pre-
FS of 1.1.12b1,970.43 Post IC 3/1/2014 3/1/2014 4/1/2014 5/1/2014 Closed
1.1.12(b)
Consulting firm to develop pre-feasibility study
for developing optimal mineral resources
extraction model and plan for Mongolia
119,580.00 Prior CQS 6/1/2014 7/1/2014 12/1/2014 9/1/2015 Closed
1.1.13(a)Individual consultant to prepare ToR of the Pre-
FS of 1.1.13b1,947.90 Post IC 3/1/2014 3/1/2014 4/1/2014 6/1/2014 Closed
1.1.13(b)
Consulting firm to develop Pre-feasibility study
for "Recycling of water polluted form mineral
processing, its pollution classification and study
on investigation mode
180,675.68 Prior CQS 7/1/2014 8/1/2014 12/1/2014 10/1/2015 Closed
1.1.14Consulting firm to conduct Cumulative Impacts
Assessment in TavanTolgoi Coal Mine Region176,189.25 Prior CQS 1/14/2015 2/14/2015 3/14/2015 10/14/2015 Closed
1.1.15 Preparation of the ESIA TOR for priority projects 9,087.00 Post IC 3/1/2015 3/1/2015 4/1/2015 12/1/2015 Closed
1.1.16
1.1.16(a) National Short term Environmental consultant Post IC 4/15/2016 4/30/2016 5/10/2016 2/10/2017Under
implementation
1.1.16(b)National Short term Media and public relations
consultantPost IC 4/15/2016 4/30/2016 5/10/2016 2/10/2017
Under
implementation
1.1.16(c)Consultant firm to prepare of Non-Technical
Summary Booklets 9,600.00 Post SSS 12/21/2016 12/21/2016 12/22/2016 12/30/2016
Under
implementation
1.2 Goods 25,000.00
1.2.1 Printing, copying & publication 25,000.00 Post Shopping 5/1/2013 5/1/2013 5/1/2013 9/30/2017Under
implementation
9,087.00
585,981.91
176,189.25
25,000.00
127,812.48
119,580.00
51,200.00
180,675.68
300,000.00
International panel members to monitor the Shuren Hydropower Plant project and "Flow regulation of the Orkhon river and construction of water reservoir complex" Project
1,947.90
2,339,695.00
99,400.00
140,233.00
1,970.43
25,000.00
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
2,045,463.29
2.2 Consultants 334,061.57
2.2.1
2.2.1(a)
To hire consultants majored in law, economy and
environment able to organize capacity building
trainings on development of TORs and Feasibility
studies etc., on PPP concessions (2 individuals)
9,330.84 Post IC 5/1/2014 5/1/2014 5/1/2014 7/1/2014 Closed
2.2.2
2.2.2(a)
To hire international legal and fiscal experts able
to develop mineral resources mines ownership
agreement (6 individuals)
52,363.63 Post IC 10/1/2013 10/1/2013 10/1/2013 1/1/2014 Closed
2.2.3
2.2.3(a) Team Leader
2.2.3(b) Financial Expert (2 individuals)
2.2.3(c) Management consultant (4 individuals)
2.2.4
2.2.4(a) Technical specialist of steel processing 18,759.03 Prior SSS 8/1/2013 8/1/2013 9/1/2013 3/1/2014 Closed
2.2.4(b)Ore concentrator in charge of Steel complex
project7,275.89 Prior SSS 8/1/2013 8/1/2013 9/1/2013 3/1/2014 Cancelled/Closed
2.2.5
2.2.5(a) Hydropower Plant technical specialist 14,884.13 Post IC 5/1/2013 6/1/2013 8/1/2013 5/1/2014 Closed
2.2.6
2.2.6(a) Technical consultant 11,259.47 Post IC 7/1/2013 8/1/2013 9/1/2013 3/1/2014 Closed
2.2.7Training capacity building and training needs
assessment consultancy for MINIS19,433.51 Post IC 8/1/2013 9/1/2013 9/1/2013 2/1/2014 Closed
9,330.84
Ministry of Mining: Full-time experts to strengthen abilities of government officials to prepare terms of reference and carry out feasibility studies, including support to, inter alia: strategic planners, engineers, technical specialists, economists and environmental and social experts.
Post IC
18,759.03
14,884.13
11,259.47
346,061.57
7,275.89
2,063,061.57
0.00
Component 2: Capacity Building
Selection of experts for Ministry of Industry and Agriculture: To provide technical support to the Working group to prepare feasibility study of Steel complex project AND to carry out monitoring on the selected consulting firm performance which aims to prepare TOR of feasibility study
1/1/2014
Selection of a Consultancy Team for State Property Committee: Complete review of financial and economic indicators within state owned and parastatal companies and improvement of planning outcome. Review of management, controlling and monitoring
52,363.63
Selection of experts for Ministry of Energy: To provide technical support to the Working group to prepare feasibility study of Shuren HHP project AND to carry out monitoring on the selected consulting firm performance which aims to prepare TOR of feasibility study
10/1/2013 10/1/20130.00
Selection of experts for Ministry of Environment and Green Development: To provide technical support to the Working group to prepare feasibility study of Orkhon Gobi project AND to carry out monitoring on the selected consulting firm performance which aims to prepare TOR of feasibility
study
19,433.51
10/1/2013
Ministry of Economic Development: Part-time consultants to strengthen abilities of government officials to prepare terms of reference and carry out feasibility studies, including support to, inter alia: strategic planners, engineers, technical specialists, economists and environmental and social
experts.
Cancelled
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
2.2.8
2.2.8(a) Performance monitoring consultant (PMC) 23,237.36 Post IC 12/1/2013 1/1/2014 1/1/2014 6/1/2016 Closed
2.2.8(b)2015 Technical consultant (TC) 11,892.16 Post IC 12/1/2013 1/1/2014 1/1/2014 1/1/2015 Closed
2.2.8(b)(i)2016 Senior specialist 25,200.00 Post IC 4/1/2016 4/1/2016 5/1/2016 5/1/2017Under
implementation
2.2.8(c) Technical consultant (TC) 17,631.00 Post IC 4/15/2015 4/15/2015 4/15/2015 4/16/2016 Closed
2.2.8(d) Technical consultant (TC) 48,000.00 Post IC 4/15/2015 4/15/2015 5/7/2015 5/7/2017Under
implementation
2.2.9
2.2.9(a) Financial audit consultant 15,595.92 Post IC 1/14/2014 1/14/2014 1/14/2014 9/14/2014 Closed
2.2.9(b) Performance audit consultant 15,249.19 Post IC 1/14/2014 1/14/2014 1/14/2014 9/14/2014 Closed
2.2.9(c) Information technology consultant 15,268.54 Post IC 1/14/2014 1/14/2014 1/14/2014 9/14/2014 Closed
2.2.10
2.2.10(a) Project management consultants 14,340.45 Post IC 3/14/2014 3/14/2014 4/14/2014 2/15/2015 Closed
2.2.10(b) Project research consultants 14,340.45 Post IC 3/14/2014 3/14/2014 4/14/2014 2/15/2015 Closed
2.2.11
2.2.11(a)Individual Consultant to Research Mining Impact
on Regions Development0.00 Post IC 1/15/2017 1/30/2017 2/1/2017 9/30/2017 Open
2.2.12
2.2.12(a) ESIA specialist 0.00 Post IC 4/14/2016 4/14/2016 6/14/2016 6/14/2017 Cancelled
1,711,401.72
Estimated Cost (US$)
Fund source by
WB
Total estimated cost
for all fund sources
Signed contract amount
(US$)
2,275,608.99 6,331,118.69 5,167,423.98
2,261,076.30
3.1 Consultant Services 180,000.00 1,363,721.88 477,142.35
12,000.00
4,055,509.70
1,176,695.70
Selection of (1) Financial audit consultant (FAC), (1) Performance audit consultant (PAC) and (1) Information technology consultant (ITC) for the Mongolian National Audit Office to improve the efficient track and to audit the massive mining activities including the assessments on preliminary
impact and rehabilitation system to the nature from the mining process.
25,200.00
14,340.45
National development Agency: Selection of Individual Consultant to Research Mining Impact on Regions Development
7,200.00
23,237.36
11,892.16
15,595.92
15,249.19
15,268.54
1,717,000.00
Selection of (1) Performance monitoring consultant (PMC) and (1) Technical consultant to support coordination of the major Mining Infrastructure project Eastern Railway Corridor Project and North East Asia Regional Transport Strategy financing and implementation (TC) for Ministry of
Finance in order to improve the cooperation of the WB, MoF, PIU and other counterparts.
17,631.00
48,000.00
Selection of 2 consultants for construction materials and industrialization projects specialized consultant for Ministry of Constrcution and Urban Development
Capacity building activities and training for Component 2
14,340.45
Selection of specialist for assist and monitor the contractor implmentation and performance for the major projects ESIA under MoEGDT
Estimated Cost (US$) Fund source
by DFATComponent 3: Groundwater Management
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.1.1(a)(i)Individual consultant to develop Reform standard
of water sector terminology (team leader)0.00 9,900.00 9,045.67 Post IC 5/15/2015 6/14/2015 6/14/2015 11/1/2016 Closed
3.1.1(a)(ii)Individual consultant to develop Reform standard
of water sector terminology (expert)0.00 8,100.00 7,400.98 Post IC 5/15/2015 6/14/2015 6/14/2015 11/1/2016 Closed
3.1.1(b)Individual consultant to develop the long term
planning mainstream on Hydrogeology research 0.00 4,998.28 4,998.28 Post IC 5/15/2015 6/14/2015 6/14/2015 9/15/2016 Closed
3.1.1(c)(i)Individual consultant to process and publish the
Water use estimation manual (Team leader)0.00 Post IC 7/15/2016 7/15/2016 8/15/2016 12/15/2016
3.1.1(c)(ii)Individual consultant to process and publish the
Water use estimation manual (Expert)0.00 Post IC 7/15/2016 7/15/2016 8/15/2016 12/15/2016
3.1.1(d)
Individual consultant to prepare ToR for Ground
water research for reliable water supply of Soum
center
0.00 9,996.38 9,996.38 Post IC 7/15/2015 7/14/2015 8/14/2015 9/14/2015 Closed
3.1.1(e)
Individual consultant to prepare ToR for water
security issues in Mongolian legal documents and
structure by make an analysis to reflect the
further action
0.00 5,999.66 5,999.66 Post IC 7/15/2015 7/14/2015 8/14/2015 12/14/2015 Closed
3.1.2Assess Legal / Institutional Framework (multiple
procurements)0.00 28,000.00 28,000.00 Post IC 4/15/2016 4/15/2016 5/15/2016 2/1/2017
Under
implementation
3.1.2(a)(i)
Individual consultancy service for developing the
methodology for conducting GW exploration and
estimating GW resource (Team
Leader)
0.00 9,314.15 9,314.15 Post IC 7/14/2014 7/14/2014 8/14/2014 2/14/2015 Closed
Cancelled
9,900.00
8,100.00
4,998.28
9,996.38
5,999.66
28,000.00
9,314.15
0.000.00 0.00
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.1.2(a)(ii)
Individual consultancy service for developing the
methodology for conducting GW exploration and
estimating GW resource (Expert)
0.00 7,620.67 7,620.67 Post IC 7/14/2014 7/14/2014 8/14/2014 2/14/2015 Closed
3.1.2(b)(i)
Individual consultancy service for developing the
methodology for conducting GW exploration in
Uranium deposit area (Team Leader)
0.00 7,822.86 7,822.86 Post IC 7/14/2014 7/14/2014 8/14/2014 7/1/2015 Closed
3.1.2(b)(ii)
Individual consultancy service for developing the
methodology for conducting GW exploration in
Uranium deposit area (Expert)
0.00 5,867.15 5,867.15 Post IC 7/14/2014 7/14/2014 8/14/2014 7/1/2015 Closed
3.1.2(b)(iii)
Individual consultancy service for developing the
methodology for conducting GW exploration in
Uranium deposit area (Expert)
0.00 5,867.15 5,867.15 Post IC 7/14/2014 7/14/2014 8/14/2014 7/1/2015 Closed
3.1.2(c)(i)
Individual consultancy service for development of
guideline on estimation of unit budget for GW
exploration work (Team leader)
0.00 6,471.83 6,471.83 Post IC 5/15/2015 6/14/2015 6/14/2015 9/14/2015 Closed
3.1.2(c)(ii)
Individual consultancy service for development of
guideline on estimation of unit budget for GW
exploration work (Expert)
0.00 5,295.16 5,295.16 Post IC 5/15/2015 6/14/2015 6/14/2015 9/14/2015 Closed
3.1.3
Water sample and analyze its result of water
supply sources of soum centers and settled area in
the 3 RBAs
0.00 0.00 0.00 Post Shopping 4/15/2016 4/15/2016 5/15/2016 12/14/2016 Cancelled
3.1.4 Groundwater soil baseline research 0.00 88,204.35 88,204.35 Post CQS 7/15/2015 7/14/2015 9/14/2015 1/14/2016 Closed
3.1.5Conducting arsenic propagation survey in
groundwater 0.00 0.00 0.00 Prior CQS 10/15/2015 10/14/2015 11/14/2015 12/14/2016 Cancelled
3.1.6(a)
Consulting firm to conduct Umard Govi Guveet
Khalkhiin Dundad Tal Basin Integrated Water
supply management Plan
0.00 132,264.24 132,264.24 Post CQS 10/15/2015 10/14/2015 4/14/2016 5/1/2017Under
implementation
5,867.15
5,867.15
7,620.67
6,471.83
0.00
7,822.86
5,295.16
88,204.35
125,000.00
132,264.24
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.1.6(b)Consulting firm to conduct Galba Uush Dolood
Basin Integrated Water supply management Plan0.00 150,000.00 142,973.82 Post CQS 10/15/2015 10/14/2015 4/14/2016 5/1/2017
Under
implementation
3.1.6(c)Consulting firm to conduct Altain Uvur Govi Tal
Basin Integrated Water supply management Plan0.00 150,000.00 0.00 Prior CQS 10/15/2015 11/14/2015 2/1/2017 8/1/2017 Open
3.1.7Ground water research for reliable water supply
of Soum center0.00 0.00 0.00 Prior QCBS 10/15/2015 10/14/2015 11/14/2015 12/14/2016 Cancelled
3.1.8South gobi regional consolidated assessment and
mapping (based on previous study)180,000.00 728,000.00 0.00 Prior QCBS 1/1/2017 1/30/2017 2/15/2017 2/15/2017 Open
3.1.9
Consulting firm to develop proposals for water
security issues in Mongolian legal documents and
structure by make an analysis to reflect the
further action
0.00 0.00 0.00 Post CQS 10/15/2015 10/14/2015 11/14/2015 12/14/2016 Cancelled
3.2 Goods for WBC and WBA units 391,700.00 391,700.00 391,700.00
3.2.1 Purchase of Office IT equipment and furniture 198,500.00 198,500.00 198,500.00 Prior ICB 10/1/2013 11/1/2013 1/1/2014 2/1/2014 Closed
3.2.2Field office vehicles (one for each WBA, total of
3)193,200.00 193,200.00 193,200.00 Prior ICB 9/1/2013 10/1/2013 11/1/2014 2/1/2014 Closed
3.3 Goods for WBC and WBA units 589,058.05 1,207,952.80 1,194,560.07
3.3.1Purchase and installment of monitoring
equipment 434,990.50 914,981.00 914,981.00 Prior ICB 5/1/2014 6/1/2014 7/1/2014 11/1/2015 Closed
3.3.2 Purchase and installment of field equipment 125,603.09 125,603.09 125,603.09 Prior ICB 5/1/2014 6/1/2014 7/1/2014 7/1/2015 Closed
3.3.3Purchase & Install Management Information
Systems0.00 45,000.00 0.00 Post Shopping 7/15/2015 7/14/2015 8/14/2015 12/14/2015 Cancelled
3.3.4Implement I&C System (high performance
computer processor) 0.00 3,488.47 3,488.47 Post Shopping 9/15/2015 9/15/2015 8/14/2015 12/14/2015 Closed
3.3.4(a) AHGW MODFLOW Analyst 0.00 35,240.00 35,240.00 PostDirect
contracting9/15/2015 9/15/2015 9/15/2015 10/15/2015 Closed
3.3.4(b) ArcGIS desktop product Advanced 0.00 5,720.02 5,720.02 Post Shopping 9/15/2015 9/15/2015 9/15/2015 10/15/2015 Closed
3.3.4(c) Aquifer Test Pro 0.00 1,395.00 1,395.00 PostDirect
contracting9/15/2015 9/15/2015 9/15/2015 10/15/2015 Closed
3.3.5 Purchase of borehole video system 0.00 79,668.03 79,668.03 Post Shopping 4/15/2016 5/14/2016 5/14/2016 8/14/2016 Closed
3.3.6 Other groundwater investigation 28,464.46 41,857.19 28,464.46 Post Shopping 1/1/2015 1/1/2015 1/1/2015 9/30/2017Under
implementation
0.00
45,000.00
3,488.47
0.00
5,720.02
548,000.00
79,668.03
13,392.73
618,894.75
1,395.00
0.00
142,973.82
150,000.00
0.00
35,240.00
479,990.50
0.00
0.00
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.4 Goods for GWMIUnit 20,903.08 20,903.08 20,903.08
3.4.1 Purchase of Office Hardware & Software 13,860.18 13,860.18 13,860.18 Post Shopping 8/1/2013 8/1/2013 8/1/2013 9/1/2013 Closed
3.4.2 Purchase of Office furniture 7,042.90 7,042.90 7,042.90 Post Shopping 8/1/2013 8/1/2013 8/1/2013 9/1/2013 Closed
3.5Consultant Service for Groundwater
Management and Information Unit (One)72,706.90 310,530.38 310,530.38
3.5.1/2013Groundwater management unit national
coordinator /Senior Hydro geologist21,144.64 24,369.76 24,369.76 Post IC 6/1/2013 6/1/2013 7/1/2013 9/1/2016 Closed
3.5.1/2015Groundwater management unit national
coordinator /Senior Hydro geologist 0.00 46,905.37 46,905.37 Post IC 1/15/2015 2/15/2015 2/15/2015 7/31/2017
Under
implementation
3.5.2Groundwater management unit GIS database
specialist 19,030.19 81,808.15 81,808.15 Post IC 6/1/2013 6/1/2013 7/1/2013 7/31/2017
Under
implementation
3.5.3 Socio-Economic Development specialist 15,858.49 52,037.21 52,037.21 Post IC 6/1/2013 6/1/2013 7/1/2013 12/30/2016 Closed
3.5.4/2013Environmental and ecological development
specialist15,605.33 27,989.63 27,989.63 Post IC 8/1/2013 8/1/2013 8/1/2013 9/1/2016 Closed
3.5.4/2015Environmental and ecological development
specialist0.00 30,812.18 30,812.18 Post IC 6/1/2015 7/1/2013 7/1/2013 7/31/2017
Under
implementation
3.5.5/2014 Ground water modeling (MODFLOW) specialist 1,068.25 21,828.73 21,828.73 Post IC 8/1/2014 8/1/2014 8/1/2014 9/1/2016 Closed
3.5.5/2015 Ground water modeling (MODFLOW) specialist 0.00 24,779.35 24,779.35 Post IC 11/1/2015 11/1/2015 1/1/2016 7/31/2017Under
implementation
3.6Consultant Service for Water Basin
Administrations (Three individuals)291,401.21 1,502,391.73 1,473,403.57
3.6.1/2013 Altain uvur RBA director 16,624.80 21,943.08 21,943.08 Post IC 7/1/2013 8/1/2013 8/1/2013 9/1/2016 Closed
3.6.1(a)/2015 Altain uvur RBA director 0.00 39,390.21 39,390.21 Post IC 1/1/2015 1/1/2015 2/1/2015 6/30/2017Under
implementation
3.6.1(b) Galba Uush dolood RBA director 16,637.17 57,775.97 57,775.97 Post IC 7/1/2013 8/1/2013 8/1/2013 6/30/2017Under
implementation
3.6.1©Umard Gobi guveet Khalkhiin dundad RBA
director16,624.80 57,763.60 57,763.60 Post IC 7/1/2013 8/1/2013 8/1/2013 6/30/2017
Under
implementation
3.6.2(a)Altai Uvur Gobi Basin Surface water resources
specialist 8,842.45 47,724.11 47,724.11 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.2(b)Galba-uush Dolood Basin Surface water resources
specialist 8,854.16 47,795.27 47,795.27 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
38,881.66
38,941.11
0.00
24,779.35
36,178.72
0.00
3,225.12
46,905.37
62,777.96
0.00
237,823.48
1,210,990.52
12,384.30
30,812.18
20,760.48
5,318.28
39,390.21
41,138.80
41,138.80
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.6.2(c)Umard Gobiin Guveet Khalkhiin Dundad Tal
Basin Surface water resources specialist 8,775.46 47,716.05 47,716.05 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.3(a)Altai Uvur Gobi Basin Underground water
resources specialist 8,842.45 47,780.81 47,780.81 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.3(b)Galba-uush Dolood Basin Underground water
resources specialist 8,854.16 47,794.75 47,794.75 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.3(c)Umard Gobiin Guveet Khalkhiin Dundad Tal
Basin Underground water resources specialist 8,842.45 47,783.04 47,783.04 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.4(a)/2013Altai Uvur Gobi Basin Hydro construction &
design analysis specialist 4,932.94 4,932.94 4,932.94 Post IC 9/1/2013 9/1/2013 1/1/2014 9/1/2016 Closed
3.6.4(a)(i)/2014Altai Uvur Gobi Basin Hydro construction &
design analysis specialist2,392.29 43,460.88 43,460.88 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.4(b)/2013Galba-Uush Dolood Basin Hydro construction &
design analysis specialist8,787.17 16,434.67 16,434.67 Post IC 9/1/2013 9/1/2013 1/1/2014 9/1/2016 Closed
3.6.4(b)/2015Galba-Uush Dolood Basin Hydro construction &
design analysis specialist 0.00 24,600.20 24,600.20 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation
3.6.4(c)
Umard Gobiin Guveet Khalkhiin Dundad Tal
Basin Hydro construction & design analysis
specialist
8,507.49 47,448.08 47,448.08 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.5(a)Altai Uvur Gobi Basin Water quality and hydro
ecology engineer 8,842.45 47,780.81 47,780.81 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.5(b)Gakba-uush Dolood Basin Water quality and
hydro ecology engineer 8,854.16 47,794.96 47,794.96 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.5(c)Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Water quality and hydro ecology engineer 8,842.45 33,265.64 33,265.64 Post IC 9/1/2013 9/1/2013 1/1/2014 9/1/2016 Closed
3.6.6(a)
Altai Uvur Gobi Basin Underground water
resources investigations, research, warrant
specialist
8,842.45 47,780.81 47,780.81 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.6(b)
Galna-uush Dolood Basin Underground water
resources investigations, research, warrant
specialist
8,854.16 47,795.27 47,795.27 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.6(c)
Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Underground water resources
investigations, research, warrant specialist
8,842.45 47,783.04 47,783.04 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.7(a) Altai Uvur Gobi Basin GIS database specialist 8,842.45 47,780.81 47,780.81 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.7(b) Galba-Uush Dolood Basin GIS database specialist 8,854.16 47,795.01 47,795.01 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.7(c)Umard Goviin Guveet Khalkhiin Dundad Tal
Basin GIS database specialist 8,842.45 47,783.04 47,783.04 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.8(a)Altai Uvur Gobi Basin Water fee and payment
specialist 6,316.05 30,604.24 30,604.24 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation24,288.19
38,938.36
38,940.85
38,940.59
38,940.59
41,068.59
38,940.59
38,938.36
38,940.80
24,423.19
38,940.59
38,938.36
38,940.59
38,938.36
38,941.11
0.00
24,600.20
38,940.59
7,647.50
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.6.8(b)Galba-Uush Dolood Basin Water fee and payment
specialist 6,324.42 34,162.60 34,162.60 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.8(c)Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Water fee and payment specialist 6,316.05 30,605.97 30,605.97 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation
3.6.9(a)Altai-Uvur Gobi Basin Socio-Economic
development Specialist 6,316.05 30,604.24 30,604.24 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation
3.6.9(b)Galba-Uush Dolood Basin Socio-Economic
development Specialist 6,324.42 30,614.60 30,614.60 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation
3.6.9(c)
Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Basin Socio-Economic development
Specialist
6,316.05 34,154.97 34,154.97 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.10(a)Altai-Uvur Gobi Basin Training and public
relations officer (secretary) 6,316.05 34,153.37 34,153.37 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.10(b)/2013Galba-Uush Dolood Basin Training and public
relations officer (secretary) 6,324.42 12,649.42 12,649.42 Post IC 9/1/2013 9/1/2013 1/1/2014 9/1/2016 Closed
3.6.10(b)/2015Galba-Uush Dolood Basin Training and public
relations officer (secretary)0.00 21,453.31 21,453.31 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017
Under
implementation
3.6.10(c)
Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Training and public relations officer
(secretary)
6,316.05 33,940.76 33,940.76 Post IC 9/1/2013 9/1/2013 1/1/2014 6/30/2017Under
implementation
3.6.11(a) Altai Uvur Gobi Basin Office accountant 5,052.83 24,511.89 24,511.89 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016Under
implementation
3.6.11(b) Galba_uush Dolood Basin Office accountant 5,059.52 24,520.00 24,520.00 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016Under
implementation
3.6.11(c)Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Office accountant 5,052.83 24,513.31 24,513.31 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation
3.6.12(a)/2013 Altai-Uvur Gobi Basin Driver – Storekeeper 4,059.77 10,897.46 10,897.46 Post IC 9/1/2013 9/1/2013 1/1/2014 9/1/2016 Closed
3.6.12(a)/2015 Altai-Uvur Gobi Basin Driver – Storekeeper 0.00 14,704.54 14,704.54 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016Under
implementation
3.6.12(b) Galba-Uush Dolood Basin Driver – Storekeeper 4,071.76 23,690.89 23,690.89 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016Under
implementation
3.6.12(c)Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Driver – Storekeeper 4,099.97 23,718.95 23,718.95 Post IC 9/1/2013 9/1/2013 1/1/2014 12/30/2016
Under
implementation
19,460.48
24,290.18
27,838.92
27,837.32
6,325.00
19,460.48
6,837.69
14,704.54
27,838.18
19,619.13
19,618.98
24,289.92
27,624.71
21,453.31
24,288.19
19,459.06
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.6.13(a) Altai-Uvur Gobi Basin Administrative secretary Post IC 5/1/2016 5/1/2016 5/1/2016 9/1/2017Under
implementation
3.6.13(b)Galba-Uush Dolood Basin Administrative
secretary Post IC 5/1/2016 5/1/2016 5/1/2016 9/1/2017
Under
implementation
3.6.13(c)Umard Goviin Guveet Khalkhiin Dundad Tal
Basin Administrative secretary Post IC 5/1/2016 5/1/2016 5/1/2016 9/1/2017
Under
implementation
3.6.14 Local trips for water quality 0.00 28,988.16 0.00 Post IC 5/1/2016 5/1/2016 5/1/2016 9/1/2017 Open
3.7Non-Consultancy Service Conduct
Groundwater Investigations (per WBA)191,839.75 692,945.00 692,945.00
3.7.1Drilling of GW wells in 3 basins (drilling and
casing)191,839.75 691,845.00 691,845.00 Prior ICB 5/1/2014 6/14/2014 6/14/2014 12/14/2015 Closed
3.7.2 Installation of Three online logger 0.00 1,100.00 1,100.00 Prior DC 11/15/2016 11/15/2016 12/15/2016 1/30/2017Under
implementation
3.8 WBA, WBC and WAU Operating Costs 538,000.00 538,000.00 425,343.74
3.8.1 Transportation cost 0.00 0.00 0.00 n/a n/a n/a n/a n/a Open
3.8.2 Translation cost of WBA, WBC and WAU 0.00 0.00 0.00 n/a n/a n/a n/a n/a Open
3.8.3
Office operating cost of WBA, WBC, WAU
offices (for 3 locations for 3.5 years, including
office rent, local staff DSA, office communication
cost, internet fee, office supply, advertisement and
material shipping cost)
538,000.00 538,000.00 425,343.74 n/a
To be disbursed
against
reasonable
actual cost
n/a n/a n/a n/a Open
0.00 310,000.00 180,895.79
1,045,188.60
4.1 Consulting Services 695,564.35
4.1.1 PMU Director 139,719.16 Post IC 11/1/2011 11/1/2011 11/1/2011 n/aUnder
implementation
4.1.2 PMU Procurement Specialist 75,455.83 Post IC 11/1/2011 11/1/2011 11/1/2011 n/aUnder
implementation
1,124,137.35
226,179.16
135,812.83
1,617,647.88
18,000.00
Component 4: Project Management
Capacity building activities and training for Component 3.
To be disbursed
against
reasonable
actual cost
0.00 18,000.0018,000.00
501,105.25
310,000.00
1,100.00
500,005.25
28,988.16
0.00
0.00
0.00
0.00
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
4.1.3 PMU Financial Management Specialist 114,749.57 Post IC 11/1/2011 11/1/2011 11/1/2011 n/aUnder
implementation
4.1.4 PMU Administrative Assistant 77,148.68 Post IC 12/1/2011 12/1/2011 1/1/2012 n/aUnder
implementation
4.1.5PMU Contract Management and Monitoring
Specialist 13,217.10 Post IC 4/1/2013 4/1/2013 5/1/2013 9/1/2016 Closed
4.1.5(i)/2013PMU Contract Management and Monitoring
Specialist 60,233.38 Post IC 1/1/2014 1/1/2014 2/1/2014 n/a
Under
implementation
4.1.6PMU Environment Safeguard and Water
Management Specialist22,036.85 Post IC 7/1/2013 8/1/2013 8/1/2013 9/1/2016 Closed
4.1.6/2015PMU Environment Safeguard and Water
Management Specialist 41,036.96 Post IC 1/1/2015 1/1/2015 2/1/2015 n/a
Under
implementation
4.1.7 Junior procurement specialist 42,158.73 Post IC 9/1/2013 9/1/2013 10/1/2013 n/a Closed
4.1.8 Communication officer 54,800.00 Post IC 5/14/2015 5/15/2015 5/15/2015 n/aUnder
implementation
n/a Auditing 55,008.09 n/a n/a n/a n/a n/a n/a n/a
4.2 Goods and Equipment 88,510.53
PMU Computers, Office Equipment and Office
Furniture /15 contracts/Post Shopping 3/1/2013 3/1/2013 3/1/2013 4/1/2013 Closed
Financial Software for PMU Prior DC 3/1/2013 3/1/2013 3/1/2013 4/1/2013 Closed
Webpage for PMU Prior Shopping 3/1/2013 3/1/2013 3/1/2013 4/1/2013 Closed
Webpage upgrade 3,500.00 Post Non/CS 11/1/2016 11/1/2016 11/15/2016 12/15/2016Under
implementation
Vehicle for PMU 49,900.00 Prior Shopping 3/1/2013 3/1/2013 3/1/2013 4/1/2013 Closed
4.3 Operating Cost for PMU 261,113.72
4.3.1 PMU operating costs 261,113.72 n/a
To be disbursed
against
reasonable
actual costs
n/a n/a n/a n/a Open
TOTAL ESTIMATED COST 17,552,545.47
Modified
Remarks: 1.1.7(b) The Ministry approved the additional scoping that was necessary 9.8%. The amendment request is being reviewed.
1.1.7(c)
1.1.9(b)
1.1.16(a)
1.1.16(b)
1.1.16(c)
2.2.8(a)
2.2.8(b)(i)
2.2.11
3.1.8
3.5
35,110.53
54,800.00
405,000.00
26,284,591.29
182,762.57
124,668.68
22,036.85
3,500.00
88,510.53
123,536.96
49,900.00
405,000.00
35,110.53
4.2.1
13,217.10
42,158.73
123,956.38
Contract price amended according to Bank Nol dated 3 Jun 16
Two consultants added according to Bank Nol dated 8 Apr 16
Bank advised to add this consultancy service on 21 Dec 16
Contract price is amended through the email 28 Jan 15 from Bank.
75,008.09
Ministry of Finance requested to extend the contract duration 6 to 12 months. PMU noticed to Bank on 8 Nov 16
Originally on the PP February 2016 Ministry of Industry requested to hire IC with budget 24k. Due to recent government structural change Ministry of Industry restructured to National Development Agency. Therefore National Development
agency proposed to hire IC for 8 months with 1500k monthly salary.
Originally planned to finance the remaining 180k part from IDA according to PP 6 Nov 15, due to budget shortage it was excluded from the PP February 16. During the mission March 2016 MEGDT requested 180k again from IDA and mission
team agreed to add back to the line.
Extended the contracts of 4 staff (head + 3 technical specialists) of GWMIU for 10 months (till July 2017) at reduced ratio by 70% of current salary according to Aide memoire September 2016.
The Ministry approved the additional scoping that was necessary 15%. The amendment request is being reviewed.
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
3.6 Extended the contracts of 8 staff (director + 7 specialists) for each of the 3 RBA’s for 9 months (till June 2017) at 70% of current salary according to Aid memore September 2016
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)
Invite
Proposals
Receive
Proposals
Award
Contract
Contract
Completion
Review
by Bank
(Prior /
Post)
Procurement
MethodEstimated Cost (US$) Fund source by WB
Signed contract amount
(US$)Status
Procurement Process
Contract Description of Contract
Implementation Scheduling (Month/Year)