    WESTERN COALFIELDS LIMITED

    PENCH-AREA

    SIX MONTHY ENVIRONMENT

    MONITORING REPORT OF

    I. MATHANI UG MINE PROJECT I

    PERIOD: 01.10.2017 to 31.03.2018

  • Compliance of

    Environment Clearance Conditions

    Mathani UG Mine

  • Name of Project: - Mathani UG Mine Clearance Latter No. J-11015/29/93-IA.II (M) Date. 20th January 1995

    S.N. CONDITION COMPLIANCE The underground mine proposal involves The condition has been complied with FC diversion to 165.354 Ha. of Forest Land. obtained vide letter on. 8-85/94 FC date

    . The project should be commenced only 17/24.5.1995. after necessary forestry clearance is granted as under Forest (conservation) Act. 1980

    1.

    2. The levels of SPM and other noxious gases within the mme leasehold area should be regularly monitored to confirm the prescribed limit.

    The ambient air quality monitoring stations have been fixed covering both the mmes. The monitoring is being done on fortnightly basis as Environment (Protection) Amendments Rule 2000 and has been enclosed from the analysis report. It IS seen that the recorded values of different parameters viz SPM, RPM SOx & NOx are well within the permissible limits in both the quarters.

    The Stations are - Thesgora The mine is discontinued Mathani

    1. Manager Office 2. SAM Office 3. Colony (Fitter Plant) 4. Mathani Village

    The mine pumped out water is entirely used in house and there is no effluent being discharged into any receiving surface water body. Water quality IS monitored on fortnightly basis by CMPDIL, RI-IV, Nagpur. The report of QE December, 16/March,201 7 is enclosed herewith. It may be worthwhile to mention here that in U G working sufficient storage (sump) has been provided where strata water gets accumulated which allows significant setting time for settlement of suspended particles. Moreover, the pumped out water rs first treated m a

    I sedimentation tank at surface. Part of this water is j reused within the mine for dust suppression, I

    1 plantation etc and rest is fed into filter plant for J

    I meeting the domestic water demand in the I 1 township ,

    ~i- i ! h'- ..;uhside11~.:e ,:ont~I r~1e~1s~1re ~1,:--~1er j ThC:-mT~ .. \,\ :, , ,pe11ed t ;;-;:,"Z)-;- ·~1 I JG mines u-. I litl i ii' aml su plc.ncnr-n- 1,0.: sho ,,d; devclot.n: .... 11t •.. tdk,'.l uu wl.crcin p;lJJrs I ! • r:

    J he implemented. The likely subsided area

    1

    ! dev-l iped leaving galleries. During this stage the I ! J should be restored to the maximum solid coal pillars (generally of size 30m x30m) I J extent. The reclamation of the subsided i protec! !he surface as such no effect is observed on !

    3. The quality of effluent discharge into the receiving water body shall confirm to the standards prescribed under notification no GSR(E) dated 19/05/1993. Adequate treatment facilities should be installed to prevent water pollution by mme discharge water due to suspended solids, hardness and TDS, coli forms as dealt in the EMP.

  • area and subsequent plantation should be surface. Thesgora mine is closed. Depillaring in

    carried out. Mathani mine has started. Subsidence control measures are being taken. As such there is no marked effect of subsidence on the surface.

    5. The CHP, Belts and Fan house etc should There is no coal handing plant as such in the be designed to minimize noise level and mme. There are individual coal dispatch control measures including development arrangements where ROM coal is loaded into of green belts around potential noise trucks by tippers. To reduce noise, plantation has sources. Mine colony interface etc should been carried out near these dispatch points. Also be implemented to reduce the noise level the entire network of belts is below and only about below the standards prescribed by 400 m is above ground. This portion is covered by competent authority. GI sheets. Ventilation fan is provided with evasee

    to reduce noise level. 6. Regular monitoring of environmental Monitoring .data on quarterly basis is submitted to

    parameters should be done and recorded the regional office /MoEF, Bhopal on a regular data furnished to Ministry and its basis. Monitoring report of QE regional office once in a six month. December, 16/March,201 7 is enclosed as annexure

    along with the six monthly compliance reports. 7. No change in methodology and working No change in methodology and working will be

    should be made without approval of made without approval of ministry. ministry.

    8. The green belt around the mme and Plantation has been done in open spaces available at associated industrial units and township the mine premises. 5200 nos. of plants have been should be developed. The afforestation planted each at Thesgora UG and Mathani UG in scheme should lay special emphasis on 2014-15. The plantation have been done in open spaces mixed culture rather then monoculture. near coal dispatch arrangement, fan house etc.

    9. The Project proponent should undertake Such type of works (socio economic measures) are taken under corporate social responsibility. Preference is given to the nearby villages. However area within 15 km is taken for undertaking CSR works.

    additional . . socio-econorruc measures including community development and health Care/School m Mathani village specifically which falls under the project area. An action report may be submitted to Ministry in this regard.

    10. An Environmental Management Cell is m existence at project level, at Area level and at company HQs. ·1 relating to the environmental

    I The cell at project level is headed by SAM and 1

    management action plan I'he head of the , assisted by the manager of the mine I i cell should di redly rt>," 11 t to .he ~ hiet , The Area Cell , · lic...1ded hv 1- ( Tf'vi headed hy UM ( En v ) and ' I duly assisted by a team or qualified personnel. _

    11. Adequate fund provision (Capital & I There is separate account for the funds earmarked L_~ecurring) should be made for/ for env1r~nment prot:c5i0n measures and is be1~~J

    An environmental management cell has to be established to carry out function

  • implementation of all safeguard utilized and recovered for the said purpose only. measures. As per the cost estimates based on May 1994 Rs.139.93 lakhs. The funds shall not be diverted and upgraded along with project cost revision if any.

    12. The Ministry reserving the right to It is duly noted that the Ministry reserves the right stipulate any other condition as may be to stipulate any other condition as may be required required in the interest of environments in the interest of environmental protection and that protection. Failure to comply with failure to comply with environmental stipulation environmental stipulation as above would as above would result in withdrawal of clearance result in withdrawal of clearance granted. granted.

    13. Environment compliance status report Being complied with by submitting the six visa-vis project progress should be monthly reports on a regular basis. Report for six submitted for scrutiny· of this ministry months October, 2016 to March,2017 is enclosed and Regional office once in six months

    here with. regularly.

    14. The above conditions would be enforced It is duly noted. inter alia under the provision of water (prevention and control of pollution) Act. 197 4 the air (prevention and control of pollution Act 1981 and the Environmental (Protection) Act 1986

  • SIX MONTHLY ENVIRONMENT REPORT ·

    MATHANI VG Mine

  • Western Coalfields Limited W cl, Pen ch Area

    Six Monthly Compliance Report Against Conditions Of Environment 01.10.2017 to 31.03.2018

    PART-1 Name of the Project Mathani UG Mine Location & address Nehariya Sub Area Manager,WCL P.O. Palatwara Address for correspondence Dist. Chhindwara

    MOEF's Clearance No & Date J-11015/29/93-IA. II (M) dated 20.01.95

    Period of Status Report 01.10.2017 to 31.03.2018 Date of Submission of Last Report 08.12.2017

    Year of Commencement of Project work 1993 (Opening of mine)

    TYPE OF LAND REQUIRED AS PER EMP MATHANI

    FOREST 48 Ha (leasehold) AGRICULTURE 62 Ha (leasehold) OTHERS TOTAL

  • Paii-lI

    AIR pollution control Status of Environment

    Mathani Mine No. of Ambient Monitoring Name of location

    Al I .Manager Office A2 2.SAM Office A3 3.Colny (Filter Plant) A4 4. Mathani village Ambient air quality status for the average Monitoring Report for QE Dec 2017 & March 95% time weighted values parameters 2018 enclosed. From the Analysis Report, it is prescribed by state Pollution Control Board. seen that the values of different Parameter of

    ambient air Viz SPM, RPM, Sox, Nox which are being monitored on fortnightly basis as per Env. (Protection) Amendment Rule 2000 are well with in the limits

    WATER POLLUTION CONTROL:- Mathani

    A No of station & frequency of Monitoring 01- Fortnightly B Description of Location Mine water discharge C Average concentration of Maj or Pollutants The only source of pollution in this UG Mine is

    prescribed by Sate Pollution Control Board mine pumped out water. The quality of the same is being monitored every fortnight. Average

    I concentration of five (protection) Amendment Rules 2000 have been found to be well below

    I I . the limits. Entire mine water goes through I I primary sedimentaition at mine sumps. Then the

    I 1 ~ -: . f E -fl d. h I Quantity o t unt isc arge to I Local water course from each source (in M3) ! jay

    same ts pumped to filter plant for treatment & j then used for mine use.

    I Nil (Entire Mine pumped out water is recycled --i, for in-house uses)

    I

  • N' II f C t I OISe po u IOil on ro Noise pollution Control Mathani No of noise monitoring station I Location 1) Near Fan house.

    2) Colony

    Description of location and dB (A) value Location Code Ptun-I 1) Near Fan house. Day time - enclosed

    Night time - enclosed

    2) Colony Day time - enclosed Night time- enclosed

    Noise level Standard as per Day time - enclosed Environmental (Protection) Night time - enclosed Amendment Rule 2000

    Monitoring Report ofQ.E Dec 2017 & March 2018 enclosed. The Monitoring is conducted by CMPDI IV. Nagpur

    Part-III LAND USE STATUS

    STATUS OF IMPLEMENTATION OF PROVISIONS OF EMP. S.NO. PARTICULARS ASPEREMP CURENTYEAR

    1. Area Excavated Not Applicable Not Applicable (Ha)

    2. Top soil removed Not Applicable Not Applicable (MM3)

    3. OB Backfilled Not Applicable Not Applicable (MM3)

    4. OB dumped Not Applicable Not Applicable (MB30)

    5. Area recovered for Not Applicable Not Applicable physical reclamation

    6. Area reclaimed Biologically

    7. Annual production 4.0 Lakhs Tonnes/Annum 1,20,000 te Targeted : 2016-17 Actual 1,24,230 te

    Note: Not applicable since these are underground mines

  • S.NO. PARTICULARS ASPEREMP CURENTYEAR

    S.NO. Current Progressive Current Progressive 1. OB dumps & Not Not Not Not

    Embankment Applicable Applicable Applicable Applicable (Prosed)

    2. Safety Zone Not Not Not Not Applicable Applicable Applicable Applicable.

    3. Back filled NA NA NA NA areas

    4. Other.Areas Nil 81000 nos. 5. Total area Nil 19 ha

    under Plantation in Ha

    6. Species No. of 2500 plants/Ha

    REHABILITATION & RESETLEMENT- For the project no village is resettled or rehabilitated

    S.NO. PARTICULARS Current Progressive 1. No of land ousters nil 4 SC/St

    4 Others 2. Nose of land ousters nil 5 employment

    rehabilitated 3. Nos of PAP's/PAF,s to be nil . ..............

    resettled 4. Area of new site nil No shifting required 5. Status of development Running Running

  • EXPENDITURE : Sr. Activity 2017-18 Progressive No (since 2013-14) 1. Plantation - 4,30, 179 2. Water Cess - 7211 3. Miscellaneous

    > CTE/CTO fee 4,80,000 > Mobile water 5,83,594 31,62,898

    spraying > others 63,574

    4. Environment Monitoring By CMPDIL By CMPDIL

    SUB AREA MA~~ NEHARIYA SUB-AREA MATHANI UG MINE

    MA~ MATHANI UG MINE

  • DATA SHEET

  • Part -1 DATA SHEET

    SIX MONTHLY MONITORING REPORTS S.No. Particulars

    MATHANI

    1 Project type : River- Coal Mining

    valley/Mining/Industry/Thermal/Nuclear/Others {specify1

    2 Name of the Project Mathani Project

    J Clearance letter/Om No. date J-11015/29/93-IA tr [M] date. 20.01.95

    .

    Location 4 a. Districts { s}

    Chhindwara

    b. State {s} Madhya Pradesh

    c. Latitude/Longitude Latitude 780 56

    1

    51.63"

    Address of Correspondence Longitude 220 14' 20.16"

    a. Project Chief Engineer Sub Area Manager Sub Area

    5 P.O.Bagbardhiya(Parasia) Dist. Chhindwara [MP]

    b. Address of Executive Project Engineer/ Manager

    Manager with PIN code/ FAX number Mathani UG Mine, WCL P.0 Palatwara Dist. Chhindwara [MP]

    Salient Features: Annexure

    6 a. Of the Project b. Of the Environmental Management Plans Annexure

    7 EC Area 216.070 ha

    8 Break-up of the Project affected population a. No dwellings are being affected

    with emm1eration of those losing B.4 SC/ST and 4 other people

    aagricultural land only, both dwelling units affected all of them have been

    and agricultural land only; both dwelling given employment one dependent

    units and agricultural land; & Landless each as per Company's rules

    laborers/ artisans. besides land compensation.

    l

  • 9. a. Project cost as originally planned and subsequent revised estimates and the year of price reference

    b. Allocation made for environmental management plans with items & year- Rs 5.05/ Tonnes breakup

    c. Actual expenditure incurred on the Project so far..

    Rs 2422.29 lakhs .

    l 0. FOREST LAND REQUIRED No. 8-85/94 FC date. 17 / a. The status of approval for diversion of 24.05.1995 forest land for non-forestry use

    b. The status of clearing felling NA.

    c. The status of compensatory forestation if any NA.

    D.Cornments on viability & sustainability of compensatory Afforestation programmer in NA. the light of actual field experience so far.

    11. The status of clearing felling in non- forest NA areas [ such as submergence area of reservoir, approach roads] if any with quantitative information.

    12. Status of Construction 1993 opening of Mine A. Date of commencement [ actual and /or planned] 24 years

    I

    b. Date of completion if the Project is yet to Life at rated production as per EC. start I

    I

    I I I

  • :......----------- - ---- --

    Reasons for the delay if the Project is yet to Originally Project was delayed 13. start by two years due to non-availability

    of power connection FromMPEB.

    Date of Site vists a. The date on which the project was No visit in recent past monitored by the Regional Officer on previous occasions if any

    No visit in recent past b. Date of site visit for this monitoring report

    ~ov SUB AREA MANAGER NEHARIYA SUB-AREA MATHANI UG MINE