MONOLITHIC REINFORCED CONCRETE CIRCULAR RESERVOIRS

– REINFORCED CONCRETE CIRCULAR SILOS

Page 2: MONOLITHIC REINFORCED CONCRETE CIRCULAR · PDF fileREINFORCED CONCRETE RESERVOIRS Our company provides complete deliveries of circular reinforced concrete reservoirs, most often used

Omega – Teplotechna Praha a.s. is a private joint stock company which is amongst the leading European corporations in the field of tall reinforced concrete constructions.

During its existence our company has completed many tall reinforced concrete buildings including reservoirs, industrial chimneys, silos, pillars etc. These buildings can be found both in the Czech Republic and abroad, where we have managed to build a good reputation.

Our employees have many years of experience with the design, construction, maintenance and repair of such reinforced concrete buildings. They cooperate with research institutes and universities in the Czech Republic as well as abroad so that they have access to the most up–to–date information and know–how in the field.

The experts in the project teams are certified engineers and technicians who graduated from special courses on new technologies and are holders of special certificates.

Omega – Teplotechna Praha a.s. is the holder of ČSN ISO 9001, ČSN EN ISO 14001 and ČSN OHSAS 18001 Certificates.

The company headquarters is located in Prague.

TALL REINFORCED CONCRETE BUILDINGS

On a long–term basis, Omega – Teplotechna Praha a.s. became one of the leading Czech companies engaged in building tall reinforced concrete structures. Originally the company mainly erected reinforced concrete chimneys, using the progressive slipform method. This technology allows us to finish the structure in a very short time. In addition, the final reinforced concrete structure is of high quality, with an exceptionally consistent surface without construction joints. The fast construction also helps to streamline the overall completion of the project.

Over time, as the reinforced concrete structures became more widespread, we started to use the construction technology not only during the construction of chimneys but also to build other tall structures, including:• Silos• Reservoirs• Escape shafts• Technological structures• Bridge pillars

The suitability of using the slipform technology during the construction of the structures mentioned above was proved by their high quality and the speed of the realisation process. During the construction of such structures our company cooperated over the long–term with leading suppliers of both slipform and jump–form systems.The choice of the most appropriate system depends on the number of the structures, their parameters and the term of the completion.

Page 3: MONOLITHIC REINFORCED CONCRETE CIRCULAR · PDF fileREINFORCED CONCRETE RESERVOIRS Our company provides complete deliveries of circular reinforced concrete reservoirs, most often used

REINFORCED CONCRETE RESERVOIRS

Our company provides complete deliveries of circular reinforced concrete reservoirs, most often used as the fermentation tanks at biogas plants, including the preparation of the detail project documentation.The basic dimensions of the inner diameter of circular reservoirs can be up to 50 m, their height can be practically unlimited.The slipform method makes continuous concreting of reinforced concrete constructions possible without leaving any construction joints. The result is improved impermeability of the building. In combination with the secondary protection of the inner surface of reservoirs to ensure chemical resistance and gastightness the high operational reliability and the lifetime of objects can be guaranteed.

Examples of completed works:• The realisation of four identical fuel tanks with a diameter of 50 m and height of 23 m, Loukov, MetrostavConstruction time: 5 months

• The realisation of two identical fermentation tanks with a diameter of 23 m and height of 9.5 m, Biogas Plant Ožďany, Slovakia, Bioproject s.r.o.Construction time: 23 days

• The realisation of two identical fermentation tanks with a diameter of 23 m and height of 9.5 m, Biogas Plant Veľká Čalomija, Slovakia, Bioproject s.r.o.Construction time: 23 days

REINFORCED CONCRETE SILOS

These silos are mostly used for long–term or short–term storage of solid inhomogeneous materials in the food, chemical and construction industries.

Examples of completed works:• The realisation of the clinker storage silo with a diameter of 8 m and height of 41 m, Cement factory Mokrá, MetrostavConstruction time: 45 days

• The realisation of two clinker storage silos, first with a diameter of 22 m and height of 11.2 m and the second with a diameter of 30.3 m and height of 47.15 m, Cement factory Mokrá, MetrostavConstruction time: 60 days

Page 4: MONOLITHIC REINFORCED CONCRETE CIRCULAR · PDF fileREINFORCED CONCRETE RESERVOIRS Our company provides complete deliveries of circular reinforced concrete reservoirs, most often used

MOTTO:

www.ot.cz

Velehradská 26130 00 Praha 3

tel: +420 222 728 681-2 fax: +420 222 728 680e-mail: [email protected]

OSTRAVA BRANCHRolnická 15

709 00 Ostrava-Nová Vestel/fax : +420 596 620 366

e-mail: [email protected]

OLOMOUC BRANCH8. května 15

772 00 Olomouc tel/fax: +420 585 224 432

e-mail: [email protected]

„To complete an up-to-date structure safely and quickly in accordance with the customer’s demands and at reasonable price.“