Page 1: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Air Berlin discovers GLS

Marc Altenscheidt

Page 2: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

GLS versus ILS

GLS coupled with RNP

CAT III Certification – Autoland Capability

Air Berlin‘s plans for GLS adoption

Bremen & Malaga– GLS Evaluation Phase

Why should an operator (e.g. Air Berlin) support GLS technology?

Page 3: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

GLS versus ILS

…from a Pilot‘s view!

Page 4: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Autopilot mode selection requires the same pilot actions for ILS and GLS approaches.

GLS annunciations are identical to those used for ILS.

Normal and Non-Normal Operations for GLS approaches are aligned with the Normal and Non-Normal Operations for an ILS approach.

GLS

GLS versus ILS

…from a Pilot‘s view!

Page 5: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

GLS coupled with RNP

Example future procedure.

Potentially useful paths (avoid terrain, airspace, weather).

RNP based.

GLS final segment.

Page 6: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

GLS coupled with RNP (avoid terrain)

Page 7: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

CAT III Certification – Autoland Capability

BOEING: “GLS approaches have been demonstrated through autoland and rollout.”

Flight Tests have shown: The GLS approach is even more precise compared to the ILS.

To substitute the existing ILS stations (e.g. in Europe) the CAT III certification is absolutely mandatory!

Page 8: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Air Berlin‘s plans for GLS adoption

All new Air Berlin Boeing 737 Next Generation aircraft will be able to conduct GLS Approaches.

The Air Berlin „GLS“ Boeing 737 Fleet:

10 aircraft at the end of 2009

Air Berlin will receive a total of 80 GLS capable aircraft in the next 5 years.

Evaluation Approaches at Bremen and Malaga.

Close cooperation with DFS and AENA.

GLS introduction and development on Air Berlin Line operation is given a high project priority by Air Berlin Fleet Management.

Page 9: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Air Berlin is approved by the LBA since August 2008 to conduct GLS Evaluation approaches at Bremen.

Additionally the following constraints by the authority must be redeemed:

• GLS Setup Pilot Flying/Pilot Monitoring

Pilot Flying (PF) will set the GLS channel.

IMC: The Pilot Monitoring (PM) will set the ILS frequency to crosscheck the GLS Signals (Note: Due to Channel/Frequency mismatch the Identifier on the PFD may appear in amber and the FD bars on the PM side may disappear).

VMC: Outside visual references like PAPI or Runway may be used by the PM to crosscheck the GLS Signals.

Bremen – GLS Evaluation Phase

Page 10: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Minima

The following increased Minima must be used:

Decision Altitude (DA): 440 feetRVR: 650 Meters

After the evaluation phase Air Berlin will receive the full CAT I certification for GLS approaches:Decision Altitude (DA): 200 feetRVR: 550 Meters

Bremen – GLS Evaluation Phase

Page 11: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Air Berlin is approved by the LBA since August 2008 to conduct GLS Evaluation approaches at Malaga.

Additionally the following constraints by the authority must be redeemed:

Pilot Monitoring (PM) will set the GLS channel. Due to the Ground Station prototype system design Air Berlin is only allowed to

monitor the GLS Signal by the PM.

The PF will set and fly the ILS.

The GLS Signal in Malaga is for monitoring purposes only!

Malaga – Monitoring flights only!

Page 12: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Malaga – Monitoring flights only!

Page 13: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

GLS/GBAS Statistics

0

5

10

15

20

25

30

AGP BRE

successful

unsuccessful

August - November 2008, 100 % successful!

Page 14: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS

Why should an operator (e.g. Air Berlin) support GLS technology?

GLS procedures are identical to ILS procedures – No additional training is required, which results in no extra costs!

GLS coupled with RNP offers a great range of new approach procedures, to satisfy Emission requirements.

Airport “upgrading” in terms of IFR approach procedures (e.g. La Palma, MDA 1850 ft.) – more flexibility, less diversions.

Lower maintenance costs for the Ground System results in lower Airport fees (e.g. Europe).

Page 15: Montag, 21. September 2015 Air Berlin discovers GLS Marc Altenscheidt

Wednesday, April 19, 2023

Marc AltenscheidtAir Berlin discoveres GBAS