montana deq and region 8 epa
Embed Size (px)
DESCRIPTION
Montana DEQ and Region 8 EPA. A Joint Project for Effective Utilization of STORET. By: Deborah Dorland Montana DEQ Helena, MT phone: (406) 444-2407 email: [email protected]. Project Development Considerations. Limited resource Cycle of data management Sustainability. - PowerPoint PPT PresentationTRANSCRIPT

Montana DEQ and Region 8 EPA
A Joint Project for Effective Utilization of
STORET

Project DevelopmentConsiderations
• Limited resource
• Cycle of data management
• Sustainability

Task Based Project Components
• Data flow within the agency
• Migrate chemistry data backlog
• Migrate biological data backlog
• Web enabled SIM pilot project
• Requirements analysis for information management

Requirements Analysis
• Determine functional requirements• Recommendation for platform• Explore options for data analysis• Survey of staff needs• Oral interviews for key topics• Summary report developed by MT DEQ,
EPA region 8 and Research Triangle Institute

Task Based Project Components
• Data flow within the agency
• Migrate chemistry data backlog
• Migrate biological data backlog
• Web enabled SIM pilot project
• Requirements analysis for information management

Enhance User Acceptance
• Increase data quantity
• Enhance data quality
• Reduce turnaround time from data collection to STORET warehouse

Data Backlog for Migration
• Chemistry data
• Biological data (taxon abundance)
• Historic data from special projects

Evaluate Data Flow
• Efficiency
• Streamline quality control activities


External Data Flow

Strategy for 319 Project Data and Other External Data Sources
• Standardize format for electonic data deliverables
• Incorporate into contract requirements
• Guidance for data formats
• Provide access to import data directly to STORET through web-enabled SIM

Getting to the Complete SIM Deliverable
• Many data providers manage only a subset of metadata required for STORET– Field monitors create stations and take field
measurements
– Laboratories analyze samples and generate results
– Planning staff or project administrators develop project details
• Data provider must construct the complete data deliverable

Standardize LIMS EDD
• Data from multiple labs in variable formats– State agency labs– University labs– Commercial Labs
• 319 projects use various approaches
• RFP for consistent STORET deliverables

Training and Technical Support
• Workshops
• Telephone / email
• Volunteer training
• Contracted support?

• General guidance
• SIM templates (spreadsheets)
• Lists of acceptable values for STORET
Support

Web-enabled SIMHosted by Gold Systems

• Upload text file
• Select import configuration
• Import data to STORET

Scope and Scalability

Web SIM Pilot Project

McCone Conservation District Water Quality Monitoring

Acknowledgements:
Tom Patton
And
Luke Buckley
Montana Bureau of Mines and Geology

Acknowledgements:
Diane Williams
Dave Stasney
Will McDowell
And
John Babcock
Tri-State Water Quality Council

Acknowledgements:
Jeanne Rae Kirkegard
McCone Conservation District
and
Montana Department of Natural Resources and Conservation (DNRC)