monterea 204 monterea road - monterea ripley | house

12
CIVIL AND STRUCTURAL www.bornhorstward.com.au Level 4, 67 Astor Terrace Spring Hill, QLD 4000, Australia P. +61 (7) 3013 4699 [email protected] 0 10 20 40 30 50 100 COPYRIGHT © - This document is and shall remain the property of Bornhorst & Ward Pty. Ltd. The document may only be used for the purpose for which it was commissioned and in accordance with the terms of engagement. Unauthorised use of this document in any form whatsoever is prohibited. DATE REV DWN DES CHK APP DESCRIPTION ORIGINAL SIZE A1 PROJECT No. CLIENT PROJECT SUBJECT REVISION DRAWING No. APPROVED RPEQ ASSOCIATED CONSULTANTS DATE DATE CHECKED STATUS 7729 12386 204 MONTEREA ROAD, RIPLEY - STAGE 2 G.J. AND P.J. McHALE AS CONSTRUCTED 23/05/17 23/05/17 G G 18.09.18 AS CONSTRUCTED LCF ABU NR NR F 17.01.18 FOR QUU APPROVAL SY SY NR E 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY D 17.11.17 RESPONSE TO QUU RFI CJM SY C 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM C1600 SEWER RETICULATION NOTES AND DETAILS ALL WATER AND SEWERAGE CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE CURRENT QUEENSLAND WORKPLACE HEALTH AND SAFETY ACT. CONTACT THE DIVISION OF WORKPLACE HEALTH AND SAFETY FOR INFORMATION. PHONE 1300 362 128 "DIAL BEFORE YOU DIG" TO BE CONTACTED PH: 1100 FOR LOCATION FOR THE LOCATION OF EXISTING PUBLIC UTILITIES, PRIOR TO EXCAVATION LOCALITY PLAN UBD MAP REF: 233, GRID N17 SITE ADDRESS: 411 RIPLEY ROAD, RIPLEY N.T.S. LEVEL DATUM R.P. DESCRIPTION LOT 2 ON RP58173 PARISH OF IPSWICH DATUM: PSM: LOCATED: LEVEL: AHD 58130 MONTEREA ROAD & RIPLEY ROAD, RIPLEY 54.763m CONSULTANT: CONTACT: TELEPHONE: BORNHORST AND WARD PTY LTD NICK ROZIS (07) 3013 4699 NOTE: SERVICE LOCATIONS AND DEPTHS ARE ESTIMATED FROM SURVEY DATA AND RECORDS. THE ACTUAL LOCATION OF SERVICES IS TO BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF WORKS. DESCRIPTION No. M.H. No. M.H. TYPE E.S.L. I.L TYPE COVER SEWER DIA. LOT NO 1(A) 0.5 m FROM TEMPORARY END CAP ON EXISTING SEWER STUB CONTRACTOR TO CONSTRUCT LINE 5. 1(B) AFTER CLEANSING, TESTING AND INSPECTION OF CONSTRUCTED WORKS (BY QUU AND CONSULTANT) CONTRACTOR TO NOTIFY QUU OF LIVE WORKS CONNECTION AND ARRANGE FOR QUU REPRESENTATIVE TO ATTEND. 1(C) CONTRACTOR TO PLUG LINE 5 STUB CONNECTION AT DOWNSTREAM MANHOLE UNDER QUU SUPERVISION. LIVE SEWER WORK 3/5 STUB - F.S.L. 48.920 48.536 DEPTH 1.804m INVERT ESTATE/STAGE SITE ADDRESS QUU FILE QUU DELEGATE APP. DATE CLIENT JOB REFERENCE NO. MAINS 411 RIPLEY ROAD, RIPLEY STAGE 2 DIAMETER MATERIAL ASSET REGISTER - RETICULATION SEWER DESIGN CONST LENGTH DESIGN CONST PROPERTY CONNECTIONS DIAMETER MATERIAL DESIGN CONST LENGTH DESIGN CONST MH TYPE & NO. G F X MS MH'S Ø110 53 PE 1 5 1 17-PNT-27548 - GJ & PJ McHALE - 2 - - - - - 160 PE 250 PE 614m 0m - - 315 PE 35m - - - - - - NAME OF ESTATE SUBDIVIDER APPLICATION No. SP DELEGATE APPROVAL DATE DRAWING/PLAN No. No. OF ALLOTMENTS AREA IN Ha. LENGTH OF SEWERS GJ & PJ McHALE - - C1600 - C1603 & C1620 - C1623 53 - 614m 160mm 250mm 315mm 0m 35m 63 50.340 1/9 STUB - 47.293 45.425 1.779 ROAD 3 47.204 5/8 STUB - 46.706 44.428 2.726 DN160 DN160 DN315 ROAD 3 47.154 PROPOSED LIVE WORKS. CONNECTION 2&3 ON DWG C1601 204 MONTEREA ROAD,RIPLEY SEWER RETICULATION STAGE 2 PROPOSED LIVE WORKS. CONNECTION 1 ON DWG C1601 17-PNT-27548 xxCAUTIONxx APPROX. LOCATION OF PUBLIC UTILITIES ONLY. EXACT LOCATION AND DEPTH TO BE DETERMINED ON SITE BY THE CONTRACTOR PRIOR TO COMMENCING WORK. TELSTRA:- PH: 1800 114 918 ENERGEX:- PH: 07 3407 6381 ICC:- PH: 3810 6666 GAS INSPECTOR:- PH: 07 3467 9514 PROPERTY CONNECTIONS HAVE BEEN DESIGNED TO CONTROL THE REQUIRED SERVICE AREA OF EACH LOT AT A GRADE OF 1:60 AND A MAXIMUM DEPTH OF PROPERTY CONNECTION AT 1.5m. UNLESS OTHERWISE STATED. FOR JUNCTION DETAILS. REFER DEQ-SEW-1106-1 TO SEQ-SEW-1106-6 CONTRACTOR SHALL COORDINATE WITH ELECTRICAL, COMMUNICATIONS, FIRE, HYDRAULIC SERVICES AND LANDSCAPE CONSULTANT'S DRAWINGS FOR LOCATIONS OF PROPOSED OR RETAINED SERVICES. NO PAVING OR KERB IS TO BE PLACED UNTIL ALL SERVICES UNDER HAVE BEEN PLACED AND TESTED. ALL WATER AND SEWERAGE CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT 2011. CONTACT THE DIVISION OF WORK PLACE HEALTH AND SAFETY FOR INFORMATION. PH: 1300 362 128 DRAWING LIST C1600 SEWER RETICULATION NOTES AND DETAILS C1601 SEWER RETICULATION LAYOUT C1602 SEWER RETICULATION LEGEND C1603 SEWER RETICULATION NOTES C1620 SEWER RETICULATION LONGITUDINAL SECTION SHEET 1 C1621 SEWER RETICULATION LONGITUDINAL SECTION SHEET 2 C1622 SEWER RETICULATION LONGITUDINAL SECTION SHEET 3 C1623 SEWER RETICULATION LONGITUDINAL SECTION SHEET 4 C1624 SEWER RETICULATION LONGITUDINAL SECTION SHEET 5 ALL LIVE WORKS SHALL BE UNDERTAKEN BY THE CONTRACTOR IN ACCORDANCE WITH A VALID NETWORK ACCESS PERMIT, UNDER THE SUPERVISION OF QUU, AT THE DEVELOPERS EXPENSE 2(A) 0.5 m FROM TEMPORARY END CAP ON EXISTING SEWER STUB CONTRACTOR TO CONSTRUCT LINE 6. 2(B) AFTER CLEANSING, TESTING AND INSPECTION OF CONSTRUCTED WORKS (BY QUU AND CONSULTANT) CONTRACTOR TO NOTIFY QUU OF LIVE WORKS CONNECTION AND ARRANGE FOR QUU REPRESENTATIVE TO ATTEND. 2(C) CONTRACTOR TO PLUG LINE 6 STUB CONNECTION AT DOWNSTREAM MANHOLE UNDER QUU SUPERVISION. 3(A) 0.5 m FROM TEMPORARY END CAP ON EXISTING SEWER STUB CONTRACTOR TO CONSTRUCT LINE 8. 3(B) AFTER CLEANSING, TESTING AND INSPECTION OF CONSTRUCTED WORKS (BY QUU AND CONSULTANT) CONTRACTOR TO NOTIFY QUU OF LIVE WORKS CONNECTION AND ARRANGE FOR QUU REPRESENTATIVE TO ATTEND. 3(C) CONTRACTOR TO PLUG LINE 8 STUB CONNECTION AT DOWNSTREAM MANHOLE UNDER QUU SUPERVISION. TEP 1 ENGINEER'S CERTIFICATION _ _ _ _ _ _ _ _ _ _ _ RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date: 7729 NICHOLAS ROZIS I, ....................................................................., hereby certify that: 1. The information contained in this drawing / document is in compliance with approved drawings and design. 2. The new water and sewerage works defined by this drawing have been designed and constructed in accordance with the SEQ Code. 3. This represents an accurate record of as-constructed works 4. I accept responsibility for the information contained in this drawing / document. 20.09.18 FALVEY STREET CLARKE STREET MICHELS STREET MONTEREA ROAD RIPLEY ROAD

Upload: others

Post on 14-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 G

G 18.09.18 AS CONSTRUCTED LCFABU NR NRF 17.01.18 FOR QUU APPROVAL SY SY NRE 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY D 17.11.17 RESPONSE TO QUU RFI CJM SY C 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

C1600

SEWER RETICULATIONNOTES AND DETAILS

ALL WATER AND SEWERAGE CONSTRUCTION WORK SHALLCOMPLY WITH THE REQUIREMENTS OF THE CURRENTQUEENSLAND WORKPLACE HEALTH AND SAFETY ACT.CONTACT THE DIVISION OF WORKPLACE HEALTH ANDSAFETY FOR INFORMATION. PHONE 1300 362 128

"DIAL BEFORE YOU DIG" TO BE CONTACTEDPH: 1100 FOR LOCATION FOR THE LOCATION OF EXISTING

PUBLIC UTILITIES, PRIOR TO EXCAVATION

LOCALITY PLANUBD MAP REF: 233, GRID N17

SITE ADDRESS: 411 RIPLEY ROAD, RIPLEYN.T.S.

LEVEL DATUM

R.P. DESCRIPTIONLOT 2 ON RP58173PARISH OF IPSWICH

DATUM:PSM:LOCATED:

LEVEL:AHD58130MONTEREA ROAD & RIPLEY ROAD, RIPLEY

54.763m

CONSULTANT:CONTACT:TELEPHONE:

BORNHORST AND WARD PTY LTDNICK ROZIS(07) 3013 4699

NOTE:SERVICE LOCATIONS AND DEPTHS ARE ESTIMATED FROMSURVEY DATA AND RECORDS. THE ACTUAL LOCATION OFSERVICES IS TO BE DETERMINED ON SITE BY THECONTRACTOR PRIOR TO COMMENCEMENT OF WORKS.

DESCRIPTIONNo. M.H.No.

M.H.TYPE

E.S.L. I.LTYPE

COVERSEWER

DIA. LOTNO

1(A) 0.5 m FROM TEMPORARY END CAP ON EXISTING SEWERSTUB CONTRACTOR TO CONSTRUCT LINE 5.

1(B) AFTER CLEANSING, TESTING AND INSPECTION OFCONSTRUCTED WORKS (BY QUU AND CONSULTANT)CONTRACTOR TO NOTIFY QUU OF LIVE WORKSCONNECTION AND ARRANGE FOR QUU REPRESENTATIVETO ATTEND.

1(C) CONTRACTOR TO PLUG LINE 5 STUB CONNECTION ATDOWNSTREAM MANHOLE UNDER QUU SUPERVISION.

LIVE SEWER WORK

3/5 STUB -

F.S.L.

48.920 48.536

DEPTH

1.804m

INVERT

ESTATE/STAGE

SITE ADDRESS

QUU FILE

QUU DELEGATE APP. DATE

CLIENTJOB REFERENCE NO.MAINS

411 RIPLEY ROAD, RIPLEY

STAGE 2

DIAMETER MATERIAL

ASSET REGISTER - RETICULATION SEWER

DESIGN CONSTLENGTH

DESIGN CONST

PROPERTYCONNECTIONS DIAMETER MATERIAL

DESIGN CONSTLENGTH

DESIGN CONST

MH TYPE & NO.

G F X MS

MH'S

Ø11053 PE

1 51

17-PNT-27548

-

GJ & PJ McHALE

-

2

-- -

-

-

160 PE

250 PE

614m

0m

-

-

315 PE 35m

-

-

-

-

- -

NAME OF ESTATESUBDIVIDER

APPLICATION No.

SP DELEGATE

APPROVAL DATE

DRAWING/PLAN No.

No. OF ALLOTMENTS

AREA IN Ha.

LENGTH OFSEWERS

GJ & PJ McHALE

-

-

C1600 - C1603 & C1620 -C1623

53

-

614m160mm

250mm

315mm

0m

35m

63 50.340

1/9 STUB - 47.293 45.425 1.779ROAD 3 47.204

5/8 STUB - 46.706 44.428 2.726

DN160

DN160

DN315 ROAD 3 47.154

PROPOSED LIVE WORKS.

CONNECTION 2&3 ON DWG C1601

204 MONTEREAROAD,RIPLEY

SEWER RETICULATIONSTAGE 2

PROPOSED LIVE WORKS.

CONNECTION 1 ON DWG C1601

17-PNT-27548

xxCAUTIONxxAPPROX. LOCATION OF PUBLIC UTILITIES ONLY.

EXACT LOCATION AND DEPTH TO BE DETERMINEDON SITE BY THE CONTRACTOR PRIOR TO

COMMENCING WORK.

TELSTRA:- PH: 1800 114 918ENERGEX:- PH: 07 3407 6381ICC:- PH: 3810 6666GAS INSPECTOR:- PH: 07 3467 9514

PROPERTY CONNECTIONS HAVE BEEN DESIGNED TOCONTROL THE REQUIRED SERVICE AREA OF EACHLOT AT A GRADE OF 1:60 AND A MAXIMUM DEPTHOF PROPERTY CONNECTION AT 1.5m. UNLESSOTHERWISE STATED. FOR JUNCTION DETAILS.REFER DEQ-SEW-1106-1 TO SEQ-SEW-1106-6

CONTRACTOR SHALL COORDINATE WITH ELECTRICAL,COMMUNICATIONS, FIRE, HYDRAULIC SERVICES ANDLANDSCAPE CONSULTANT'S DRAWINGS FORLOCATIONS OF PROPOSED OR RETAINED SERVICES.NO PAVING OR KERB IS TO BE PLACED UNTIL ALLSERVICES UNDER HAVE BEEN PLACED AND TESTED.

ALL WATER AND SEWERAGE CONSTRUCTION SHALL COMPLYWITH THE REQUIREMENTS OF THE QUEENSLAND WORKHEALTH AND SAFETY ACT 2011. CONTACT THE DIVISION OFWORK PLACE HEALTH AND SAFETY FOR INFORMATION.PH: 1300 362 128

DRAWING LISTSHEET NUMBER SHEET TITLE

C1600 SEWER RETICULATION NOTES AND DETAILSC1601 SEWER RETICULATION LAYOUTC1602 SEWER RETICULATION LEGENDC1603 SEWER RETICULATION NOTESC1620 SEWER RETICULATION LONGITUDINAL SECTION SHEET 1C1621 SEWER RETICULATION LONGITUDINAL SECTION SHEET 2C1622 SEWER RETICULATION LONGITUDINAL SECTION SHEET 3C1623 SEWER RETICULATION LONGITUDINAL SECTION SHEET 4C1624 SEWER RETICULATION LONGITUDINAL SECTION SHEET 5

ALL LIVE WORKS SHALL BE UNDERTAKEN BY THE CONTRACTOR IN ACCORDANCEWITH A VALID NETWORK ACCESS PERMIT, UNDER THE SUPERVISION OF QUU, ATTHE DEVELOPERS EXPENSE

2(A) 0.5 m FROM TEMPORARY END CAP ON EXISTING SEWERSTUB CONTRACTOR TO CONSTRUCT LINE 6.

2(B) AFTER CLEANSING, TESTING AND INSPECTION OFCONSTRUCTED WORKS (BY QUU AND CONSULTANT)CONTRACTOR TO NOTIFY QUU OF LIVE WORKSCONNECTION AND ARRANGE FOR QUU REPRESENTATIVETO ATTEND.

2(C) CONTRACTOR TO PLUG LINE 6 STUB CONNECTION ATDOWNSTREAM MANHOLE UNDER QUU SUPERVISION.

3(A) 0.5 m FROM TEMPORARY END CAP ON EXISTING SEWERSTUB CONTRACTOR TO CONSTRUCT LINE 8.

3(B) AFTER CLEANSING, TESTING AND INSPECTION OFCONSTRUCTED WORKS (BY QUU AND CONSULTANT)CONTRACTOR TO NOTIFY QUU OF LIVE WORKSCONNECTION AND ARRANGE FOR QUU REPRESENTATIVETO ATTEND.

3(C) CONTRACTOR TO PLUG LINE 8 STUB CONNECTION ATDOWNSTREAM MANHOLE UNDER QUU SUPERVISION.

TEP

1

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

FALVEY STREET

CLARKE STREET

MICHELS STREET

MONTEREA

ROAD

RIPLEY

ROAD

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis
AutoCAD SHX Text
568.539

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

PROJECT NORTH

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 M

M 18.09.18 AS CONSTRUCTED LCFABU NR NRL 23.07.18 EASEMENT AMENDED SY SYK 18.07.18 EASEMENT AMENDED CJM SY NRJ 27.02.18 MH1/6 & MH4/6 LOCATION AMENDED TO SUIT SECTION SY SYH 17.01.18 FOR QUU APPROVAL SY SY NR

C1601

SEWER RETICULATIONLAYOUT

100 5 15 201 : 500 / 1 : 1000

25mA

PLAN BSCALE 1:500

NOTE:ACCESS EASEMENT SHALL BE PROVIDED TOALL MAINTENANCE STRUCTURES WITHINPRIVATE PROPERTY IN FAVOUR OF QUU

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

47.50

47.50

50.00

50.00

50.00

50.0

0

50.00

50.00

50.0

0

50.00

52.5

0

52.5

0

52.5

0

52.50

52.50

52.50

52.5

0

52.50

55.00

55.00

55.00

55.0

0

55.0

0

55.0

0

45.50

46.0046.00

46.0

0

46.50

46.5

0

47.00

47.0

0

47.0

0

48.0

0

48.00

48.00

48.00

48.00

48.50

48.5

048

.50

48.50

48.50

48.50

48.50

49.00

49.0

0

49.0

0

49.0

0

49.00

49.00

49.00

49.00

49.50

49.5

0

49.50

49.5

0

49.50

49.50

49.50

49.50

50.5

0

50.50

50.5

0

50.50

50.50

50.50

50.5

0

51.00

51.0

0

51.00

51.0

0

51.00

51.5

0

51.5

0

51.50

51.5

0

51.50

51.5

0

51.50

52.0

0

52.0

0

52.0

0

52.00

52.0

0

52.00

52.00

52.0

0

52.0053

.00

53.0

0

53.00

53.00

53.00

53.0

0

53.0

0

53.5

0

53.50

53.50

53.50

53.5

0

53.5

053

.50

54.00

54.00

54.00

54.00

54.0

0

54.0

0

54.0

0

54.5

0

54.50

54.50

54.5

0

54.5

0

54.5

0

54.5

0

55.50

55.50

55.5

055

.50

55.5

0

56.00

56.00

56.0

0

56.0

0

56.5

0

56.5

0

50.00

52.5

0

55.00

57.50

49.0

0

49.5

050.5051.0051.5052

.0053

.00

53.5

0

54.0

0

54.5

0

55.5056

.0056.50

58.00

58.00

58.5

059

.00

34

61

68

67

6665646362

90 91 92 93 94 95

33

ROAD

2 ROAD 4 ROAD 4

ROAD 6 ROAD 6

ROAD

3

ROAD

5

ROAD

3

PUBLIC WALKWAY

ROAD 6900

35

36373839

4041

42

43 44 45 46 47 48

49

60

59

58

57

565554

81 80 79 78 77

76

75

74

73

72

71

70

69

68

67

85 86 87 88 89

53525150

84 83 82

96

97

98

99

100

101

102

103

104

105

106

ROAD 5

ROAD 3

PUBLIC WALKWAY

ROAD

2

2.00

0

2.00

0

1.755

2.500

2.400m

2.700m

INDICATIVE ALIGNMENT FOR FUTURESEWER CONNECTION TO SERVICECATCHMENTS: 3A, 3B, 4A, 4B, 5A, 5BON DWG C1690 (B+W Job# 12386A).

1.755

CONSTRUCT Ø160 PE STUB CONNECTION AND ENDCAP FOR FUTURE CONNECTION.(CATCHMENT 2 ON DWG C1690, B+W Job# 12386A)

2.00

0

2.500m

2.000

LIVE SEWER CONNECTION 3REFER PLAN C1600 FOR DETAILS

4.900

5.200

5.100

LIVE SEWER CONNECTION 1REFER PLAN C1600 FOR DETAILS

47.879

51.047

53.118

52.840

52.440

52.054

51.684

55.846

54.034

5.300

1.50

0

1.50

0

2.00

0

1.75

5

1.75

5

2.40

0

2.70

0

2.700

17.900

5.000

5.000

5.200

5.300

5.1008.400

5.8005.2005.5005.2005.100

5.200

7.900

1.700

4 DEGREE DEFLECTIONAT MANHOLE 8/2

CONSTRUCT Ø250 PE STUB CONNECTIONAND END CAP FOR FUTURE CONNECTION.

1.700m

1.000

1.00

0

47.96

47.72

48.11

48.27

48.43

48.76

49.0049.40

49.7250.1451.04

51.8952.8853.96

55.29 54.15 52.89 52.09 50.99 50.40 49.96 49.5349.07

48.85

48.69

48.51

48.37

48.21

48.05

47.61

47.67

47.88

48.08

49.03

48.77

48.52

48.29

47.51

48.31

48.52

49.27

49.53

49.80

48.7448.95

49.95

50.32

49.3649.82

50.7951.20

50.42

52.09

51.1152.25

53.2754.30

53.4154.46

55.3356.41

55.51

56.75 55.60 54.80 53.98 53.43 52.87 52.46 51.95 51.67

51.49

51.37 50.39

50.82

51.18

51.5151.8752.3852.8253.3654.2855.1256.07

19

88

78

68

118

108

46

26

HB16

55

HB15

35

25

58

FUT1

16

36

48

45

15

1.0m WIDE EASEMENTFOR ACCESS

1.0m WIDE EASEMENTFOR ACCESS.

1.000EMT.

LIVE SEWER CONNECTION 3REFER PLAN C1600 FOR DETAILS

98

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 H

H 18.09.18 AS CONSTRUCTED LCFABU NR NRG 17.01.18 FOR QUU APPROVAL SY SY NRF 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY E 17.11.17 RESPONSE TO QUU RFI CJM SY D 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

C1620

SEWER RETICULATIONLONGITUDINAL SECTIONSHEET 1

100 5 15 201 : 500 / 1 : 1000

25mA

3.02.01.00 5.04.01 : 100 / 1 : 200

mB

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

MANHOLE TYPESG - CONCRETE Ø900

F - CONCRETE Ø1200

X - CONCRETE Ø1200

MS - MAINTENANCE SHAFT PE Ø600

TEP - TERMINAL ENTRY POINT

STOP END - STOP END

LID TYPESD - CLASS D TRAFFICABLE

B - CLASS B NON-TRAFFICABLE

FOR MANHOLE AND LID DETAILS

REFER SEQ STD DRAWINGS

CONCRETE BULKHEADSFOR CONCRETE BULKHEAD DETAILS

REFER SEQ STD DWG SEQ-SEW-1206-1

SEWER RETICULATION LONGITUDINAL SECTIONSCALE: 1:500 (HORIZONTALLY)

1:100 (VERTICALLY)

38.000

DN160 PE100 SDR21

1 in 39.98

27.145

48.4

6349

.411

36.6

6547

.571

48.3

031.

840

1.79

0

2/5

75°

MS

BA

1 in 53.33

61.307

48.8

0949

.992

63.8

1048

.300

48.3

201.

692

1.67

2

3/5

-16°

MS

BA

Lot 5

937

.568

1.49

3IL

49.

27m

Lot 5

856

.882

1.48

3IL

49.

63m

2.728

49.7

2651

.472

136.

866

49.6

9049

.710

1.78

21.

762

4/5

15°

MS

BA

Lot 5

70.

000

1.03

2IL

50.

44m

2.840

49.8

2651

.538

TP 1

39.5

9449

.802

49.8

101.

728

1.72

8

HB1/5

2.840

49.9

4151

.598

IP 1

42.4

3449

.913

49.9

131.

685

1.68

5

1 in 27.40

83.462

50.0

8051

.662

TP 1

45.2

7450

.017

49.8

021.

645

1.64

5

Lot 5

67.

525

1.45

6IL

50.

40m

Lot 5

521

.025

1.34

6IL

51.

01m

Lot 5

432

.855

1.38

2IL

51.

42m

Lot 5

347

.095

1.40

9IL

51.

92m

Lot 5

260

.205

1.50

0IL

52.

76m

Lot 5

172

.190

1.49

8IL

53.

61m

Lot 5

00.

000

1.05

8IL

55.

00m

55.3

7356

.058

228.

737

53.0

632.

994

5/5

MS

BA

CHAINAGE

NATURAL SURFACE

DESIGN SURFACE LEVEL

INVERT LEVEL

DEPTH TO INVERT

GRADEDIAMETERPROPERTY DESCRIPTION

JUNCTION INVERT LEVEL

MANHOLE/END NAMEMANHOLE TYPELID TYPEJUNCTION LINEDROP TYPE

DEPTH TO HC

HC INVERT LEVELINVERT LEVELHC TYPEHC LOT No.

CH. FROM D/S MH

EMBEDMENT TYPE

DATUM RL

5

TYPE 3

ALLOTMENT

LIVE SEWER CONNECTION 1. REFER LIVEWORKS TABLE ON DWG C1600

STAGE 1 STAGE 2

DN160 PE100 SDR21

EXISTING

ALLOTMENT

1 in 53.33

48.9

2050

.340

75.5

5948

.536

1.80

4

11.749

DESIGN SURFACEEXISTING SURFACE

R 20

.00

L 5.

685

END

CAP

A1 A1 C3 A1 A1 A1 A1 B1 C3 C3

DEPTH OF LINE DICTATED BYADJACENT STORMWATER LINE

53.0

80

49.6

77

49.6

80

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 H

H 18.09.18 AS CONSTRUCTED LCFABU NR NRG 17.01.18 FOR QUU APPROVAL SY SY NRF 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY E 17.11.17 RESPONSE TO QUU RFI CJM SY D 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

C1621

SEWER RETICULATIONLONGITUDINAL SECTIONSHEET 2

100 5 15 201 : 500 / 1 : 1000

25mA

3.02.01.00 5.04.01 : 100 / 1 : 200

mB

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

SEWER RETICULATION LONGITUDINAL SECTIONSCALE: 1:500 (HORIZONTALLY)

1:100 (VERTICALLY)

CHAINAGE

NATURAL SURFACE

DESIGN SURFACE LEVEL

INVERT LEVEL

DEPTH TO INVERT

GRADEDIAMETERPROPERTY DESCRIPTION

JUNCTION INVERT LEVEL

MANHOLE/END NAMEMANHOLE TYPELID TYPEJUNCTION LINEDROP TYPE

DEPTH TO HC

HC INVERT LEVELINVERT LEVELHC TYPEHC LOT No.

CH. FROM D/S MH

EMBEDMENT TYPE

DATUM RL

MANHOLE TYPESG - CONCRETE Ø900

F - CONCRETE Ø1200

X - CONCRETE Ø1200

MS - MAINTENANCE SHAFT PE Ø600

TEP - TERMINAL ENTRY POINT

STOP END - STOP END

LID TYPESD - CLASS D TRAFFICABLE

B - CLASS B NON-TRAFFICABLE

FOR MANHOLE AND LID DETAILS

REFER SEQ STD DRAWINGS

CONCRETE BULKHEADSFOR CONCRETE BULKHEAD DETAILS

REFER SEQ STD DWG SEQ-SEW-1206-1

47.2

9347

.204

20.9

3745

.425

1.77

9

6

36.000

1 in 69.59

42.648

Lot 6

810

.943

1.48

8IL

45.

72m

Lot 6

933

.793

1.44

8IL

45.

97m

Lot 7

047

.739

1.40

8IL

46.

17m

Lot 7

159

.685

1.44

2IL

46.

35m

1 in 47.62

61.673

47.6

5847

.825

63.5

8546

.188

46.2

081.

637

1.61

7

1/6

MS

BA

Lot 7

29.

654

1.41

7IL

46.

58m

Lot 7

322

.104

1.37

0IL

46.

85m

Lot 7

433

.882

1.33

0IL

47.

10m

Lot 7

546

.561

1.30

7IL

47.

35m

Lot 7

658

.517

1.27

0IL

47.

60m

5.448

48.3

3548

.927

TP 1

25.2

5747

.503

47.5

031.

424

1.42

4

5.448

48.4

8949

.062

IP 1

30.7

0647

.617

47.6

171.

444

1.44

4

HB1/6

21.358

48.7

4649

.185

TP 1

36.1

5447

.731

47.7

311.

453

1.45

3

Lot 7

74.

641

1.27

9IL

48.

00m

Lot 7

818

.784

1.42

5IL

48.

30m

1 in 20.20

54.634

49.8

0849

.831

157.

512

48.1

8048

.200

1.65

11.

631

2/6

MS

BA

Lot 7

910

.497

1.38

9IL

48.

96m

Lot 8

022

.225

1.46

1IL

49.

62m

Lot 8

136

.701

1.47

2IL

50.

73m

Lot 8

249

.543

1.48

4IL

51.

86m

1 in 20.06

20.858

53.3

8453

.794

212.

147

50.9

0452

.440

2.89

01.

354

3/6

MS

BC3

Lot 8

36.

740

1.47

4IL

52.

92m

Lot 8

418

.527

1.44

2IL

54.

00m

54.9

5055

.649

233.

005

53.4

802.

169

4/6

TEP

B

DN160 PE100

LIVE SEWER CONNECTION 2. REFERLIVE WORKS TABLE ON DWG C1600

STAGE 1 STAGE 2

EXISTING

ROAD

DESIGNSURFACE

EXISTINGSURFACE

SDR211 in 69.59

END

CAP

TYPE 3

ROAD RESERVE

DN160 PE100 SDR21R

20.0

0L1

0.93

1

A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 B1 C1 A1 B1

46.1

75

46.1

99

48.1

38

48.1

38

50.9

27

52.4

84

53.9

24

45.4

52

47.4

23

47.4

23

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 K

K 18.09.18 AS CONSTRUCTED LCFABU NR NRJ 17.01.18 FOR QUU APPROVAL SY SY NRH 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY G 21.11.17 DESIGN SURFACE UPDATED SY SY F 17.11.17 RESPONSE TO QUU RFI CJM SY

C1622

SEWER RETICULATIONLONGITUDINAL SECTIONSHEET 3

100 5 15 201 : 500 / 1 : 1000

25mA

3.02.01.00 5.04.01 : 100 / 1 : 200

mB

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

SEWER RETICULATION LONGITUDINAL SECTIONSCALE: 1:500 (HORIZONTALLY)

1:100 (VERTICALLY)

1 in 34.92

69.488

47.0

0747

.338

312.

821

44.5

6344

.718

2.77

52.

620

6/8

42°

FUT

FA

44.6

28Lo

t 106

0.00

01.

467

IL 4

6.25

m

Lot 1

053.

734

1.45

1IL

46.

30m

Lot 1

0415

.579

1.50

0IL

46.

45m

Lot 1

0327

.279

1.50

0IL

46.

60m

Lot 1

0239

.479

1.50

0IL

46.

77m

Lot 1

0151

.454

1.47

5IL

46.

95m

Lot 1

0063

.888

1.50

0IL

47.

10m

1 in 52.07

81.028

48.0

1948

.336

382.

309

46.7

0746

.727

1.62

91.

609

7/8

21°

GB

A

Lot 9

910

.691

1.50

0IL

47.

25m

Lot 9

828

.456

1.50

0IL

47.

50m

Lot 9

747

.959

1.50

0IL

47.

90m

Lot 9

663

.341

1.50

0IL

48.

25m

49.6

5849

.947

463.

337

48.2

841.

663

8/8

GB

A

CHAINAGE

NATURAL SURFACE

DESIGN SURFACE LEVEL

INVERT LEVEL

DEPTH TO INVERT

GRADEDIAMETERPROPERTY DESCRIPTION

JUNCTION INVERT LEVEL

MANHOLE/END NAMEMANHOLE TYPELID TYPEJUNCTION LINEDROP TYPE

DEPTH TO HC

HC INVERT LEVELINVERT LEVELHC TYPEHC LOT No.

CH. FROM D/S MH

EMBEDMENT TYPE

DATUM RL

81.

236

1.49

4

1.50

0

1.50

0

MANHOLE TYPESG - CONCRETE Ø900

F - CONCRETE Ø1200

X - CONCRETE Ø1200

MS - MAINTENANCE SHAFT PE Ø600

TEP - TERMINAL ENTRY POINT

STOP END - STOP END

LID TYPESD - CLASS D TRAFFICABLE

B - CLASS B NON-TRAFFICABLE

BD - BOLT DOWN LID

FOR MANHOLE AND LID DETAILS

REFER SEQ STD DRAWINGS

CONCRETE BULKHEADSFOR CONCRETE BULKHEAD DETAILS

REFER SEQ STD DWG SEQ-SEW-1206-1

CLR

1.0

90IL

45.7

4512

00x6

00Ø

DRAI

N46

.835

47.0

9027

0.03

744

.350

2.73

9

5/8

-42°

FB

A

DN315 PE100 SDR21

1 in 263

35.043

LIVE SEWER CONNECTION 3. REFERLIVE WORKS TABLE ON DWG C1600

DESIGN SURFACEEXISTING SURFACE

DN315 PE100

STAGE 1 STAGE 2

EXISTING

PUBLIC WALKWAY

SDR21

TYPE 3

PUBLIC WALKWAY

DN160 PE100 SDR21

1 in 263

36.000

46.7

0647

.154

277.

777

44.4

282.

726

TYPE 3

PUBLIC WALKWAY

BD

INSTALLTEMPORARYEND CAP

C4 C2 C2 C2 C2 C2 A2 A2 A2 A2 A2 A4Lo

t 89

0.00

01.

474

IL 4

8.63

m

MANHOLE SHALL BE PE LINED INACCORDANCE WITH Std. Drg'sSEQ-WAT-1307-2 TO 1307-4.

DN250 WATER MAINIL 54.65Clr. 3.64 m

1 in 76.48

27.050

52.8

4253

.231

515.

832

50.4

0350

.423

2.82

82.

808

9/8

GB

ALo

t85

0.00

0IL

52.

45m

1 in 180

19.368

54.8

1955

.687

542.

882

50.7

7750

.807

4.91

04.

880

10/8

XD

56.0

6255

.964

562.

250

50.9

155.

050

11/8

1 in 25.00

52.495

48.3

041.

643

Lot 8

814

.799

IL 4

9.80

m

Lot 8

727

.997

IL 5

0.40

m

Lot 8

640

.505

IL 5

1.35

m

TEM

P EN

D CA

P

A

44.6

49

44.7

48

46.7

33

46.8

09

48.3

84

48.4

42

50.4

74

50.4

94

50.9

73

50.9

33

51.2

71

44.5

03

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 H

H 18.09.18 AS CONSTRUCTED LCFABU NR NRG 17.01.18 FOR QUU APPROVAL SY SY NRF 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY E 17.11.17 RESPONSE TO QUU RFI CJM SY D 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

C1623

SEWER RETICULATIONLONGITUDINAL SECTIONSHEET 4

100 5 15 201 : 500 / 1 : 1000

25mA

3.02.01.00 5.04.01 : 100 / 1 : 200

mB

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

PROPOSED FUTURE SEWERSCALE: 1:500 (HORIZONTALLY)

1:100 (VERTICALLY)

CHAINAGE

NATURAL SURFACE

DESIGN SURFACE LEVEL

INVERT LEVEL

DEPTH TO INVERT

GRADEDIAMETERPROPERTY DESCRIPTION

JUNCTION INVERT LEVEL

MANHOLE/END NAMEMANHOLE TYPELID TYPEJUNCTION LINEDROP TYPE

DEPTH TO HC

HC INVERT LEVELINVERT LEVELHC TYPEHC LOT No.

CH. FROM D/S MH

EMBEDMENT TYPE

DATUM RL 32.000

250Ø PE

1 in 303

66.682

47.0

0747

.338

0.00

044

.563

44.6

282.

775

2.71

0

6/8

FBD

A44

.628

48.0

6648

.066

66.6

8244

.848

3.21

8

FUT/1

TEM

P EN

D CA

P

FUTURE CONNECTION CROSSESBENEATH EXISTING OVERLAND

FLOW PATH WITH 0.93m COVER

EDGE OF EXISTING PARKDEDICATION / RP BOUNDARY

DRAINGE CROSSING

TYPE 9 - UNREINFORCED

8

MANHOLE TYPESG - CONCRETE Ø900

F - CONCRETE Ø1200

X - CONCRETE Ø1200

MS - MAINTENANCE SHAFT PE Ø600

TEP - TERMINAL ENTRY POINT

STOP END - STOP END

LID TYPESD - CLASS D TRAFFICABLE

B - CLASS B NON-TRAFFICABLE

BD - BOLT DOWN LID

FOR MANHOLE AND LID DETAILS

REFER SEQ STD DRAWINGS

CONCRETE BULKHEADSFOR CONCRETE BULKHEAD DETAILS

REFER SEQ STD DWG SEQ-SEW-1206-1

DESIGN SURFACE

EXISTING SURFACE

44.6

49

44.7

48

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17

LOCALITY PLANSCALE 1:2500

BRISBANE UBD MAP REF: 233, GRID N17

204 MONTEREAROAD,RIPLEY

WATER RETICULATIONSTAGE 2

R.P. DESCRIPTIONLOT 2 ON RP58173

PROJECT SETOUT CONTROLSOURCE: BAIRD & HAYES SURVEYORS IPSWICH

PHONE: 07 3812 2076 THEIR REF: 12880

DATUM: AHD , PLANAR

STD ID TYPE LOCATION

57629 PSMNORTH EASTERN CRN OF

INTERSECTION OF MONTEREARD & RIPLEY RD

LOCAL GOVERNMENT: IPSWICH CITY COUNCILLOCALITY: RIPLEY

PE100

CONST

CONST

ASSET REGISTER - WATER RETICULATION

NUMBERMETERS DIAMETER

20

DIAMETER

25

32

SERVICES

40

Cu

Cu

PEDESIGN

180

250

125

DIAMETERMAINSDESIGN

MATERIAL

QUU DELEGATES APP. DATE.

JOB REF. No.CLIENT

QUU FILE/APPLICATION

ESTATE/STAGESITE ADDRESS

CONSTDESIGN

CONSTLENGTH

DESIGN

25

-

-

237m

53

-

STAGE 2411 RIPLEY ROAD, RIPLEY

GIS COMMENTS

OFFICER

DATE -

-

PLAN CUSTODIAN

DATE RELEASED

OFFICER/REC'D

LIVE CONNECTION(S)/PASSED(W)

DATE

JOB NUMBER

REFERENCE

GIS CAPTURE-

-

-

PRIVATE BOOSTER REQUIRED? NO

FUNDED BY UTILITY ( ) COUNCIL ( )

DEVELOPER ( ) OTHER ( )

DATE RELEASED

OFFICER

-

-

UTILITY/DELEGATE'S COMMENTS

FUNDING

ON MAINTENANCE DETAILS

DATE

START -

BY

UTILITY/DELEGATE

FINISH

-

-

-

-

AS CONSTRUCTED RECEIVED

X

-

-

-

FED GOV'T ( ) STATE ( )

-

-

-

-

-

-

SERVICE DETAILSSIZENO. LOT NUMBERS

53 20mm

N0TE: SERVICES AND METERS THAT WILL CONNECT TO EXISTING WATER MAIN ARETO BE INSTALLED BY A QUU ENDORSED CONTRACTOR.

ALL LIVE WORKS SHALL BE UNDERTAKEN BY THE CONTRACTOR IN ACCORDANCEWITH A VALID NETWORK ACCESS PERMIT, UNDER THE SUPERVISION OF QUU, ATTHE DEVELOPERS EXPENSE

xxCAUTIONxxAPPROX. LOCATION OF PUBLIC UTILITIES ONLY.

EXACT LOCATION AND DEPTH TO BE DETERMINEDON SITE BY THE CONTRACTOR PRIOR TO

COMMENCING WORK.

TELSTRA:- PH: 1800 114 918ENERGEX:- PH: 07 3407 6381ICC:- PH: 3810 6666GAS INSPECTOR:- PH: 07 3467 9514

C1700

WATER RETICULATIONNOTES

MAGUIRE STREET (ROAD 2), RIPLEY

DATE

SIGNATURE

COMMENCED

STREET

LENGTH

COMPLETEDDATE

TYPE OF MAIN DN250 PE

SOUTH END OF ROAD (CH 155)

CONNECTIONS & SUBSTITUTION

1.00m

- 25mm

- 32mm

- OTHER

42 - 49, 50 - 60, 67 - 89, 96 - 106

-

-

PE100

PE100

121m

223m

120m

-

H

H 18.09.18 AS CONSTRUCTED LCFABU NR NRG 17.01.18 FOR QUU APPROVAL SY SY NRF 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY E 20.11.17 RESPONSE TO QUU RFI SY SY D 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

NOTE:ALL ROAD CROSSING CONDUITS INSTALLED TOBE PVC-M CLASS, 'SERIES 1', PN12.

BRADLEYS STREET (ROAD 5), RIPLEY

DATE

SIGNATURE

COMMENCED

STREET

LENGTH

COMPLETEDDATE

TYPE OF MAIN DN125 PE

SOUTH END OF ROAD (CH 125)

1.00m

CARLOS STREET (ROAD 3), RIPLEY

DATE

SIGNATURE

COMMENCED

STREET

LENGTH

COMPLETEDDATE

TYPE OF MAIN DN180 PE

SOUTH END OF ROAD (CH 420)

1.00m

CONNECTION #1

CONNECTION #2

CONNECTION #3

GJ & PJ McHALE

PROPOSED LIVE WORKS.

CONNECTION 3 ON DWG C1702

PROPOSED LIVE WORKS.

CONNECTION 2 ON DWG C1702

PROPOSED LIVE WORKS.

CONNECTION 1 ON DWG C1702

MATERIAL LENGTH

17-PNT-27548

MSCL150 6m

DRAWING LISTSHEET NUMBER SHEET TITLE

MONTEREA STAGE 2 ONLYC1700 WATER RETICULATION NOTESC1701 WATER RETICULATION NOTES AND DETAILSC1702 WATER RETICULATION LAYOUTC1703 WATER RETICULATION LEGENDC1705 WATER DETAIL SECTION SHEET 1C1706 WATER DETAIL SECTION SHEET 2

ALL WATER AND SEWERAGE CONSTRUCTION SHALL COMPLY WITH THEREQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT 2011.CONTACT THE DIVISION OF WORKPLACE HEALTH AND SAFETY FORINFORMATION. PHONE: 1300 362 128

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

MONTEREA

ROAD

RIPLEY

ROAD

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17

100m

m -

150m

m *

150m

m M

IN -

NO

N T

RAFF

ICAB

LE30

0mm

MIN

- TR

AFFI

CABL

E

MARKING TAPE

GEOTEXTILEOVERLAY

* REFER SEQ STD DWGSEQ-WAT-1201-1

TYPE C EMBEDMENT FOR FLEXIBLE & RIGID PIPESSCALE 1:10

PIPE

EM

BEDM

ENT

TREN

CH F

ILL

TRENCH FLOOR

C1701

WATER RETICULATIONNOTES AND DETAILS

H

H 18.09.18 AS CONSTRUCTED LCFABU NR NRG 17.01.18 FOR QUU APPROVAL SY SY NRF 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY E 20.11.17 RESPONSE TO QUU RFI SY SY D 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

THESE WORKS ARE CONSIDERED MAJOR WORKS THAT MUST BE SUPERVISED BY ACONSULTING ENGINEER WITH RPEQ ACCREDITATION. THE CONSULTING ENGINEERTO ARRANGE A PRE START MEETING BY CONTACTING [email protected]

THIS DESIGN PACKAGE SHOWS PROPERTY CONNECTIONS FOR OTHER/FUTURESTAGES THAT ARE NOT APART OF THIS APPROVAL. OBTAIN SEPARATE APPROVALFROM QUU FOR OTHER OR FUTURE PROPERTY CONNECTIONS.

ALL WATER AND SEWERAGE CONSTRUCTION SHALL COMPLY WITH THEREQUIREMENTS OF THE QUEENSLAND WORK HEALTH AND SAFETY ACT 2011.CONTACT THE DIVISION OF WORKPLACE HEALTH AND SAFETY FORINFORMATION. PHONE: 1300 362 128

ENVIRONMENTAL NOTESVEGETATION PROTECTION1. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED

PRIOR TO CONSTRUCTION, OR REPLACED IF DESTROYED.2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD,

GIRDLES SHALL BE CONSTRUCTED WITH 1.8m BATTENS CLOSELYSPACED AND ARRANGED VERTICALLY FROM GROUND LEVEL.GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTIONSAND REMAIN UNTIL COMPLETION.

3. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED.IF ROOTS ARE SEVERED THE DAMAGED AREA SHOULD BE TREATEDWITH A SUITABLE FUNGICIDE. CONTACT IPSWICH CITY COUNCILARBORIST FOR FURTHER ADVICE.

4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BYAPPROVED ARBORIST.

SOIL1. TOPSOIL AND SUBSOIL SHOULD BE STOCKPILED SEPARATELY.2. CARE SHOULD BE TAKEN TO PREVENT SEDIMENT FROM ENTERING

THE STORMWATER SYSTEM. THIS MAY INVOLVE PLACINGAPPROPRIATE SEDIMENT CONTROLS AROUND STOCKPILES.

CREEK CROSSINGS1. SILTATION CONTROL MEASURES SHALL BE PLACED DOWNSTREAM

OF ANY EXCAVATION WORK.2. APPROPRIATE SEDIMENT CONTROLS SHALL BE USED TO PREVENT

SEDIMENT FROM ENTERING THE CREEK.3. NO SOIL SHALL BE STOCKPILED WITHIN 5m OF THE CREEK.

REHABILITATION1. PREDISTURBANCE SOIL PROFILES & COMPACTION LEVELS SHALL BE

REINSTATED.2. PREDISTURBANCE VEGETATION PATTERNS SHALL BE RESTORED.

CONTRACTOR SHALL COORDINATE WITH ELECTRICAL,COMMUNICATIONS, FIRE, HYDRAULIC SERVICES ANDLANDSCAPE CONSULTANT'S DRAWINGS FORLOCATIONS OF PROPOSED OR RETAINED SERVICES.NO PAVING OR KERB IS TO BE PLACED UNTIL ALLSERVICES UNDER HAVE BEEN PLACED AND TESTED.

FIRE ANT TREATMENT ZONE - DISPOSAL OFMATERIAL SHALL BE IN ACCORDANCE WITH THEDEPARTMENT OF PRIMARY INDUSTRIESREGULATIONS.REFER WEBSITE: WWW.DAF.QLD.GOV.AU FORMOVEMENT CONTROL DETAILS.

FIRE ANT TREATMENT ZONE

ALL ENVIRONMENT PROTECTION MEASURES SHALL BEIMPLEMENTED PRIOR TO ANY CONSTRUCTION WORK,INCLUDING CLEARING, COMMENCING.

GENERAL NOTES1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH

CURRENT SOUTH EAST QUEENSLAND WATER SUPPLY CODESPECIFICATIONS AND STANDARDS.

2. UNLESS SPECIFIED OTHERWISE ALL MATERIALS AND WORK SHALLCOMPLY WITH THE RELEVANT AUSTRALIAN STANDARDS

3. ADOPT LIP OF KERB OR SHOULDER OF ROAD AS PERMANENT LEVEL.4. COVER ON MAINS FROM PERMANENT LEVEL TO BE AS SHOWN IN

SEQ-WAT-1200-2.5. CONDUITS TO BE INSTALLED IN ACCORDANCE WITH THE STANDARD

DRAWINGS.6. A WATER METER SUPPLIED AT THE DEVELOPER'S COST, IS TO BE

INSTALLED AT THE SERVICE POINT OF EACH LOT IN ACCORDANCEWITH THE STANDARD DRAWING FOR THE SEQ-SP.

7. ALL MATERIALS USED IN THE WORKS SHALL COMPLY WITH THESEQ-SP's ACCEPTED PRODUCTS AND MATERIALS LIST OR BEAPPROPRIATELY SHOWN, LISTED AND DEFINED IN THE ENGINEERINGSUBMISSION SO THAT THE ALTERNATIVE PRODUCT OR MATERIALCAN BE ASSESSED AND IF APPROPRIATE, APPROVED BY THE SEQ-SP.

8. SUBSTITUTE MATERIAL NOT TO BE USED WITHOUT WRITTENAPPROVAL FROM THE SUPERINTENDENT AND SEQ-SP.

9. ALL CONCRETE FOOTPATHS TO BE CLEAR OF WATER MAINS.10. TEST / CHLORINATION POINTS TO BE INSTALLED IN ACCORDANCE

WITH STANDARD DRAWING NO. SEQ-WAT-1410-1.11. THE CONSTRUCTION OF THE WATER RETICULATION WORK SHOWN

ON THIS DRAWING MUST BE SUPERVISED BY AN ENGINEER WHOHAS RPEQ REGISTRATION. WORKS NOT COMPLYING WITH THEREQUIREMENT WILL NOT BE PERMITTED TO CONNECT TO THERETICULATION SYSTEM.

12. ALL CONSTRUCTION WORK SHALL COMPLY WITH THE QUEENSLANDWORKPLACE HEALTH AND SAFETY ACT. CONTACT YOUR NEARESTOFFICE OF THE DIVISION OF WORKPLACE HEALTH AND SAFETY FORINFORMATION. Ph. 1300 362 128

13. THE CONTRACTOR SHALL TAKE ALL REASONABLE AND PRACTICALMEASURES TO PREVENT OR REDUCE HARM TO THE ENVIRONMENTAS SET OUT IN THE ENVIRONMENTAL PROTECTION ACT.

CONSTRUCTION1. CONSTRUCT EMBEDMENT AND TRECHFILL TO SEQ-WAT-1201-1 AND

IPSWICH CITY COUNCIL STANDARDS FOR ROAD CROSSINGS.2. PROVIDE BULKHEADS / TRENCHSTOPS IN ACCORDANCE WITH SEQ

WATER D & C CODE TABLE 7.5 AND SEQ-WAT-1209-1 & 1210-1.3. CONSTRUCT THRUST BLOCKS ON ALL BENDS, TEES, TAPERS AND

DEAD-ENDS IN ACCORDANCE TO SEQ-WAT-1205-1 & 1206-1.4. CONSTRUCT PROPERTY SERVICES TO SEQ-WAT-1107 & 1107-3.5. INSTALL DETECTABLE MARKER TAPE ON ALL WATER MAINS AND

PROPERTY SERVICES.6. INSTALL FIRE HYDRANTS AND STOP VALVES TO SEQ-WAT-1301-1,

1302-1, 1303-1, 1305-1, 1306-1 & 1409-1.7. CONSTRUCT SCOURS TO SEQ-WAT-1307-2.8. INSTALL PAVEMENT MARKERS TO SEQ-WAT-1300-1 &1300-2.9. INSTALL TEST / CHLORINATION POINTS TO SEQ-WAT-1410-1 AT THE

END OF ALL MAINS BEFORE SCOUR AND WHERE REQUIRED FORCOMMISSIONING PURPOSES.

10. WATER MAINS SHALL BE DISUSED / ABANDONED IN ACCORDANCEWITH PROCEDURES SET OUT IN THE SEQ WATER SUPPLY CODE.

11. VALVES AND FIRE HYDRANTS ON ABANDONED PIPELINE TO REMAINUNLESS NOTED OTHERWISE. SURFACE BOXES TO BE REMOVED ANDBACKFILLED.

12. REMOVE AND REINSTATE OBJECTS IN LINE OF THE CONSTRUCTIONSUCH AS SIGNS, FENCES ETC.

13. QUU OR THEIR AUTHORISED CONTRACTORS ONLY CAN OPERATETHE EXISTING WATER NETWORK.

EXCAVATION AND BACKFILLING1. EMBEDMENT TYPE C - STANDARD

REFER SEQ STD DWG SEQ-WAT-1201-1 FOR DETAILS2. ALL EXCAVATION, BACKFILLING AND COMPACTION SHALL BE

CARRIED OUT IN ACCORDANCE WITH THE SEQ WATER SUPPLY CODEUNLESS NOTED OTHERWISE.

3. THE CONTRACTOR SHALL MAKE ALL ENQUIRES AND INVESTIGATIONSFOR THE PROTECTION OF PUBLIC AND PRIVATE PROPERTYINCLUDING SERVICES FROM DAMAGE PRIOR TO COMMENCING ANYEXCAVATION. THE CONTRACTOR SHALL PROVIDE AND CONSTRUCTALL TEMPORARY WORKS AS REQUIRED.

4. STRUCTURES TO BE MAINTAINED IN A STABLE CONDITION AND NOPART TO BE OVERSTRESSED DURING CONSTRUCTION.

5. THE BOTTOM OF THE EXCAVATION SHALL REMAIN IN ANUNDISTURBED CONDITION AND BE SUITABLE FOR THE SPECIFICREQUIREMENT. THE MINIMUM SOIL BEARING CAPACITY SHALL BE100kPa.

6. ALL EXCAVATIONS SHALL BE MADE SAFE AGAINST MOVEMENTDURING CONSTRUCTION BY MEANS OF STABLE BATTERS, SHEETPILING, PROTECTIVE SHEETS, etc.

7. APPROPRIATE TEMPORARY PROTECTION AND MAN PROOF SITEFENCING SHALL BE PROVIDED DURING CONSTRUCTION.

8. PIPELINES SHALL NOT BE CONSTRUCTED IN UNCONTROLLED FILL.CERTIFICATES, CERTIFYING THE REQUIRED COMPACTION HAS BEENACHIEVED, WILL BE REQUIRED BY QUU PRIOR TO CONSTRUCTEDAPPROVAL.

9. HEAVY CONSTRUCTION EQUIPMENT SHALL NOT OPERATE WITHIN5m FROM THE EDGE OF EXCAVATION UNLESS SPECIFIC PROVISIONSARE MADE TO PROVIDE SUPPORT FROM THE RESULTING LOADS.

10. SPOIL PILES SHALL BE A MINIMUM OF 1m FROM THE TRENCH EDGE.11. BACKFILL MIXTURE AROUND TREE ROOTS SHALL CONSIST OF THREE

PARTS TOPSOIL AND ONE PART COMPOST, LIGHTLY COMPACTED.

SITE RESTORATION1. SITE RESTORATION IS TO BE COMPLETED TO PRE-EXISTING

CONDITIONS AS A MINIMUM.2. THE TRENCH AREA IS TO BE TOP SOILED AND TURFED OR SEEDED ON

COMPLETION OF WORKS.3. ALL PLANTING SHALL BE MAINTAINED THROUGHOUT THE

ESTABLISHMENT PERIOD.

PROJECT NOTESGENERAL1. THESE DRAWINGS ARE TO BE READ WITH ALL PROJECT DRAWINGS,

CONTRACT DOCUMENTS, SPECIFICATIONS AND STANDARDDRAWINGS LISTS.

2. DO NOT SCALE DRAWING, WORK TO DIMENSIONS.3. NO WORK IS TO COMMENCE ON SITE UNTIL APPROVAL TO PROCEED

HAS BEEN GIVEN BY THE SUPERINTENDENT.4. OBTAIN APPROPRIATE PERMITS, APPROVALS AND NOTIFY RELEVANT

AUTHORITIES BEFORE COMMENCING WORK ON SITE.5. VERIFY ALL DIMENSIONS ON SITE PRIOR TO COMMENCING WORK.6. THE SUPERINTENDENT WILL ON REQUEST RESOLVE ANY POINT OF

CONFLICT.7. WHERE A JUNCTION IS TO MADE TO EXISTING CONSTRUCTION, THE

CONTRACTOR SHALL CONFIRM THE LOCATION AND LEVEL OF THISCONSTRUCTION PRIOR TO COMMENCING WORK ON ANY CRITICALSECTION. THE SUPERINTENDENT MAY VARY LEVELS AND GRADIENTSOF NEW WORKS TO ACHIEVE A SATISFACTORY CONNECTION.

8. A LICENSED ELECTRICIAN SHALL MAKE AN ASSESSMENT OF THEPOTENTIALLY AFFECTED PROPERTY EARTHING SYSTEM WHERE AMETALLIC WATER MAIN IS TO BE REPLACED BY A PLASTIC MAIN.WORK SHALL NOT COMMENCE UNTIL ELECTRICIAN CERTIFIES INWRITING THAT IT IS SAFE TO PROCEED WORK.

TRAFFIC CONTROL1. TRAFFIC CONTROL IS TO BE IN ACCORDANCE WITH THE

QUEENSLAND TRANSPORT MANUAL OF UNIFORM TRAFFIC CONTROLDEVICES. IF REQUESTED BY THE SUPERINTENDENT, THECONTRACTOR IS REQUIRED TO PROVIDE FOR APPROVAL TRAFFICMANAGEMENT PLANS DETAILING THE TRAFFIC MOVEMENTS TO BEPROVIDED, THEIR STAGING, AND THE SIGNAGE ADOPTED IN EACHSTAGE.

SAFETY IN DESIGN1. THE 'SAFETY IN DESIGN' RISK MITIGATION MEASURES FOR THIS

PROJECT DO NOT NECESSARILY ACCOUNT FOR ALL DESIGN,CONSTRUCTION, OPERATION, MAINTENANCE AND DEMOLITIONASSESSMENTS. IT DOES NOT REDUCE OR LIMIT THE OBLIGATIONSOF THE CONSTRUCTOR, USER, OPERATOR, MAINTAINER ANDDEMOLISHER TO PERFORM THEIR OWN SAFETY IN DESIGN RISKASSESSMENT.

2. CONSTRUCTION AND INSTALLATION SAFE WORK METHODSTATEMENTS, TO ELIMINATE AND MINIMISE INSTALLATION RISKS,TO BE REVIEWED BY A SUITABLY QUALIFIED PERSON.

ALL LIVE WORKS TO BE UNDERTAKEN BY THECONTRACTOR IN ACCORDANCE WITH A VALIDNETWORK ACCESS PERMIT UNDER THE SUPERVISION OFQUU, AT THE DEVELOPER'S EXPENSE.

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

PROJECT NORTH

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 L

L 18.09.18 AS CONSTRUCTED LCFABU NR NRK 01.02.18 DETAIL 6 AMENDED SY SY NRJ 17.01.18 FOR QUU APPROVAL SY SY NRH 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY G 20.11.17 RESPONSE TO QUU RFI SY SY

C1702

WATER RETICULATIONLAYOUT

100 5 15 201 : 500 / 1 : 1000

25m

PLANSCALE-1:500

NOTE:WATER CONDUITS TO BE CONSTRUCTED TOWESTERN SIDE OF ROAD 2 AT LOCATIONSNOTED. CHAINAGE REFERENCES TO ROAD 2ARE PROVIDED TO LOCATE THESE CROSSINGS.CROSSINGS TO EXTEND MINIMUM 1.0m PASTBACK OF KERB FOR FUTURE WATER SERVICES.

ALL LIVE WORK SHALL BE UNDERTAKEN BY THECONTRACTOR IN ACCORDANCE WITH A VALID NETWORKACCESS PERMIT, UNDER THE SUPERVISION OF QUU ATTHE DEVELOPERS COST

ALL WATER AND SEWERAGE CONSTRUCTION SHALLCOMPLY WITH THE REQUIERMENTS OF THE QUEENSLANDWORK HEALTH AND SAFETY ACT 2011. CONTACT THEDIVISION OF WORKPLACE HEALTH AND SAFETY FORINFORMATIONPHONE: 1300 362 128

CONSTRUCT EMBEDMENT AND TRENCHFILLTO SEQ-WAT-1201-1 AND IPSWICH CITYCOUNCIL STANDARDS FOR ROAD CROSSINGS

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

DN40PE100

PN16

34

61

68

67

6665646362

900

ROAD 6 ROAD 6

ROAD

3

ROAD

5

ROAD

3

PUBLIC WALKWAY

900

35

36373839

4041

42

43 44 45 46 47 48

49

60

59

58

57

565554

81 80 79 78 77

76

75

74

73

72

71

70

69

68

67

85 86 87 88 89

53525150

84 83 82

96

97

98

99

100

101

102

103

104

105

106

ROAD 5

ROAD 3

PUBLIC WALKWAY

ROAD

2

2.31

5

2.31

5

2.315

2.315

CONSTRUCT TEMPORARYEND CAP FOR FUTURE

CONNECTION

R10.000

R10.00R25.500

FHDN125 PE100 PN16

FH

DN180 PE100 PN16

FH

DN180 PE100 PN16

DN25

0 PE

100

REFER DETAIL 6CONNECTION ON

DWG C1705

REFER LIVE WORKS CONNECTION 3ON DWG C1706

FH

FH

R13.750

2.31

5

FH

STORMWATER CROSSINGCLEARANCE 0.301m

REFER DETAIL 4 WATER MAINCLEARANCE DWG C1705

2 - Ø150 45° BEND (22.6kn) EACH

STAGE 2

FH

REFER DETAIL 1 LIVE WORKSCONNECTION ON DWG C1705

REFER DETAIL 2 LIVEWORKS CONNECTION

ON DWG C1705

FH

REFER DETAIL 5 CONNECTIONON DWG C1705

DN25

0 PE

100

PN16

DN25

0 PE

100

PN16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40

PE1

00PN

16

DN40 PE100

PN16

DN40 PE100

PN16

DN40PE100

PN16

DN40 PE100

PN16

FOR TEMPORARY END OFLINE ARRANGEMENT

REFER SEQ-WAT-1303-2

EXISTING WATER MAIN WITHIN ROADCARRIAGEWAY DUE TO SERVICES LOCATEDWITHIN AND CROSSING THE VERGE.

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

21/0

9/20

18 9

:22:

08 A

MJ:\

2012

\123

86\D

WGS

\DRG

\C17

03.D

WG

EXISTING PROPOSED

BATTER

BUILDING PAD

DRIVEWAY

EXTENT OF BITUMEN

EXTENT OF BUILDING

EDGE OF SHOULDER

FENCE - FAUNA FRIENDLY

FENCE - LOCK RAIL

FENCE - PEDESTRIAN SAFETY FENCE

FOOTPATH

KERB AND CHANNEL

KERB FLUSH

KERB INVERT

KERB ONLY

LINE OF VEGETATION

KERB RAMP

RETAINING WALL

STONE PITCHING

STREET NAME SIGN

TREE WITH TREE PROTECTION ZONE (TPZ)

TRAFFIC SIGN

TOE OF BATTER

TOP OF BATTER

TOE OF BATTER

TOP OF BATTER

DW

TOE OF WALL

TOP OF WALL

TOE OF WALL

TOP OF WALL

EXISTING PROPOSED

OPEN CHANNEL

ROOFWATER DRAINAGE

STORMWATER DRAINAGE

STORMWATER DRAINAGE (FROM RECORDS)

STORMWATER

EXISTING PROPOSED

DEMOLISHED SERVICE

ELECTRICITY U/G

ELECTRICITY O/H

GAS

OPTIC FIBRE

TELECOMMUNICATION

TELECOMMUNICATION (FROM RECORDS)

PP PP

SERVICES

SEWER

WATER

ROADWORKS

EXISTING PROPOSED

PROPERTY BOUNDARY

EASEMENT

EASEMENT HATCH

BOUNDARIESEXISTING PROPOSED

SEWER

SEWER DISSUSED

SEWER (FROM RECORDS)

SEWER PROPERTY CONNECTION

SEWER RISING MAIN

LOT CONTROL POINT61.35

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 D

D 18.09.18 AS CONSTRUCTED LCFABU NR NRC 17.01.18 FOR QUU APPROVAL SY SY NRB 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY A 20.11.17 RESPONSE TO QUU RFI SY SY

C1703

WATER RETICULATIONLEGEND

EXISTING PROPOSED

WATER

WATER (FROM RECORDS)

WATER CONDUIT

FIRE HYDRANT

VALVE

SCOUR VALVE

END CAP

WATER METER

TEST/CHLORINATION POINT

REDUCER

PIPE MATERIAL CHANGE

WATER SERVICE POINT

ISOLATION VALVE TO REMAIN CLOSEDPENDING CLEARANCE OF NEW MAIN

THRUST/ANCHOR BLOCK

DN40PE

FH

WMT WMT

100150 100150

DICLPVC DICLPVC

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 K

K 18.09.18 AS CONSTRUCTED LCFABU NR NRJ 01.02.18 DETAIL 6 AMENDED SY SY NRH 17.01.18 FOR QUU APPROVAL SY SY NRG 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY F 20.11.17 RESPONSE TO QUU RFI SY SY

C1705

1.00.50.250 .751 : 25 / 1 : 50

1.25m

WATER DETAIL SECTIONSHEET 1

DETAIL 6 - CONNECTIONSCALE-1:25

NOTE:REFER TO SEQ STD DWG SEQ-WAT-1205-1FOR THRUST BLOCK DETAIL

INSTALL2 - DN250 PE FULL FACE FLANGE ADAPTOR WITH GRADE 316 S.S. BACKING RING2 - DN250 PE E-F COUPLINGS1 - DN200 DICL VALVE1 - DN200 DICL 45° BEND1 - DN200 x DN200 DICL FL-FL-FL TEE (50.7KN)1 - DN200 x DN150 DICL REDUCER (21.2KN)1 - DN150 DICL VALVE1 - DN180 PE FULL FACE FLANGE ADAPTOR WITH GRADE 316 S.S. BACKING RING1 - DN180 PE E-F COUPLING1 - DN180 PE PIPE LENGTH (CUT TO SUIT)1 - DN180 PE 45° E-F BEND

LIVE WORKS CONNECTION 2SCALE-1:25

LIVE WORKS CONNECTION 1SCALE-1:25

DETAIL 5 - CONNECTIONSCALE-1:25

INSTALL2 - DN250 PE FULL FACE FLANGE ADAPTOR WITH GRADE 316 S.S. BACKING RING1 - DN200 x 100 FL-FL-FL WYES1 - DN200 DICL FL-FL VALVE1 - DN100 DICL FL-FL VALVE1 - DN125 PE FULL FACE FLANGE ADAPTOR WITH GRADE 316 S.S. BACKING RING

INSTALL2 - DN180 PE FULL FACE FLANGE ADAPTOR WITH GRADE 316 S.S. BACKING RING4 - DN150 MSCL 45° SEGMENTAL BEND DEFLECTION BEND (REFER SEQ-WAT-1403-1).3 - DN150 MSCL PIPE SEGMENT (LENGTH CUT TO SUIT)

AFTER CLEARANCE OF NEW MAINREMOVE1 - DN250 PE END CAP FROM EXISTING MAIN.1 - DN250 PE TEMPORARY TEST POINT AND END CAP FROM NEW MAIN.

INSTALL1 - DN250 PE PIPE (CUT TO SUIT)2 - DN250 E-F COUPLINGS

AFTER CLEARANCE OF NEW MAINREMOVE1 - DN125 PE END CAP FROM EXISTING MAIN.1 - DN125 PE TEMPORARY TEST POINT AND END CAP FROM NEW MAIN.

INSTALL1 - DN125 PE PIPE (CUT TO SUIT)2 - DN125 E-F COUPLINGS

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

0.500mmin

Ø375 RCP STORMWATERDRAINAGE

0.30

0m m

in

0.500mmin

0.60

0CO

VER

0.60

0CO

VER

TYPE 'I' (UNREINFORCED) SUPPORT AS PERSEQ-WAT-1203-1 STD DRG FOR DETAILS

DESIGN SURFACE

EXISTING SURFACE

DN180 PE100 PN16DN180 PE100 PN16

PE MSCL PEMSCL

DETAIL 4 - WATER MAIN CLEARANCESCALE-1:25

UNCOATED STEEL PIPE BEYOND CONCRETE ENCASEMENTSHALL BE FULLY PROTECTED (TYPICALLY) IN ACCORDANCEWITH WSAA WATER SUPPLY CODE PART:1, CLAUSE 7.6.3

DN150 MSCL

DN150 MSC

L

WATER MAIN SHALL BE DESIGNEDUP AND OVER OTHER SERVICES ASFIRST PREFERENCE. CONFIRM COVERAND ALTERNATIVE MATERIALS.

PE FLANGED STUB AND E-F COUPLINGAS NOTED IN 'INSTALL' BELOW. PE FLANGED STUB AND

E-F COUPLING AS NOTEDIN 'INSTALL' BELOW.

DN25

0 PE

100

SDR1

1

DN250 PE100 SDR11

DN180 PE100 SDR11

ELECTRO-FUSION (E-F)WELDED JOINTS TYPICALLY.(FULLY RESTRAINED MAIN). 45° E-F

WELDED JOINT

EX DN125 PE100 SDR11

DN125 PE100

SDR11

TEMPORARY TEST &CHLORINATION POINT.

TEMPORARY E-F END CAP. CUT OFFTEMPORARY END CAP AND TEST

POINT PRIOR TO LIVE CONNECTION.

ELECTRO-FUSION (E-F)WELDED JOINT

WORKS PRIOR TO

LIVE CONNECTION

LIVE CONNECTION

ELECTRO-FUSION (E-F)WELDED JOINT

DN25

0 PE

100

SDR1

1

TEMPORARY TEST &CHLORINATION POINT.

TEMPORARY E-F END CAP. CUT OFFTEMPORARY END CAP AND TEST

POINT PRIOR TO LIVE CONNECTION.

ELECTRO-FUSION (E-F)WELDED JOINT

WO

RKS

PRIO

R TO

LIVE

CO

NN

ECTI

ON

LIVE

CO

NN

ECTI

ON

EXIS

TIN

G DN

250

PE10

0 SD

R11

ELECTRO-FUSION (E-F)WELDED JOINT

EXISTING STOP VALVE LOCATEDAT ROAD INTERSECTION FOR

ISOLATION.

ELECTRO-FUSION (E-F)WELDED JOINTS TYPICALLY.(FULLY RESTRAINED MAIN).

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis

CIVIL AND STRUCTURAL www.bornhorstward.com.au

Level 4, 67 Astor TerraceSpring Hill, QLD 4000, Australia

P. +61 (7) 3013 4699

[email protected]

0 10 20 4030 50 100

COPYRIGHT © - This document isand shall remain the property ofBornhorst & Ward Pty. Ltd. Thedocument may only be used forthe purpose for which it wascommissioned and in accordancewith the terms of engagement.Unauthorised use of thisdocument in any form whatsoeveris prohibited.

DATEREV DWN DES CHK APPDESCRIPTION

ORIGINAL SIZE A1

PROJECT No.CLIENT PROJECT SUBJECT

REVISIONDRAWING No.

APPROVED

RPEQ

ASSOCIATED CONSULTANTS

DATE DATE

CHECKED

STATUS

A1 UNREDUCED

A3 REDUCED

UNREDUCED / REDUCEDSCALES

DIMENSIONS IN METRES EXCEPT WHERESHOWN OTHERWISE. CULVERT AND PIPESIZES IN MILLIMETRES

7729

12386204 MONTEREA ROAD, RIPLEY - STAGE 2

G.J. AND P.J. McHALE

AS CONSTRUCTED

23/05/17 23/05/17 H

H 18.09.18 AS CONSTRUCTED LCFABU NR NRG 17.01.18 FOR QUU APPROVAL SY SY NRF 12.12.17 AMENDEMENTS TO QUU COMMENTS CJM SY E 20.11.17 RESPONSE TO QUU RFI SY SY D 26.09.17 UPDATED TITLEBLOCK INFORMATION RMWTM

C1706

10.05.02.50 7.51 : 250 / 1 : 500

12.5mA

1.00.50.250 .751 : 25 / 1 : 50

1.25mB

WATER DETAIL SECTIONSHEET 2

AFTER CLEARANCE OF NEW MAINREMOVE1 - DN180 PE END CAP FROM EXISTING MAIN.1 - DN180 PE TEMPORARY TEST POINT AND END CAP FROM NEW MAIN.

INSTALL1 - DN180 PE PIPE (CUT TO SUIT)2 - DN180 E-F COUPLINGS

PLANSCALE-1:250

LIVE WORKS CONNECTION 3SCALE-1:25

ENGINEER'S CERTIFICATION

_ _ _ _ _ _ _ _ _ _ _RPEQ (signature) RPEQ No. _ _ _ _ _ _ Date:7729

NICHOLAS ROZISI, ....................................................................., hereby certify that:1. The information contained in this drawing / document is in compliance

with approved drawings and design.2. The new water and sewerage works defined by this drawing have been

designed and constructed in accordance with the SEQ Code.3. This represents an accurate record of as-constructed works4. I accept responsibility for the information contained in this drawing /

document.

20.09.18

0.900m

DN180 PE100 SDR11

EX DN180 PE100

ELECTRO-FUSION (E-F)WELDED BENDS TYPICALLY.(FULLY RESTRAINED MAIN).

ELECTRO-FUSION (E-F)WELDED JOINT

TEMPORARY TEST &CHLORINATION POINT.

TEMPORARY E-F END CAP. CUT OFFTEMPORARY END CAP AND TEST

POINT PRIOR TO LIVE CONNECTION.

ELECTRO-FUSION (E-F)WELDED JOINT

WORKS PRIOR TO

LIVE CONNECTION

LIVE CONNECTION

68

67

70

69

68

67

106

17.900

2.30

021.000

FH

OD180 PE100

FOR LIVE WORKS CONNECTION 3SEE DETAIL BELOW

1.90

0

ELECTRO-FUSION (E-F)WELDED BENDS TYPICALLY.(FULLY RESTRAINED MAIN).

AutoCAD SHX Text
. . . . . . . . . . . .
AutoCAD SHX Text
. . . . .
AutoCAD SHX Text
W.Kemp
AutoCAD SHX Text
N.Rozis