monthly progress report in respect of farm …nrfmtti.gov.in/writereaddata/images/mpr july 2016...

22

Upload: others

Post on 19-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl
Page 2: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

MONTHLY PROGRESS REPORT IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR FOR THE

MONTH OF JULY- 2016 (N.PLAN)

Rs. in Lakh S.

No

Sub Head Exp. during

the previous

year 2015-16

B.E

2016-17

Proportionately

Allocated up to

07/16

Amount

spent

during

07/16

Progressive

Total up to

07/16

Excess

(+)

Saving(-)

Likely Exp.

During the

year

Detailed reasons

for excess &

saving

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Demand No.1, Agriculture, Major Head “2401” Demand No.113, Agricultural Engineer, 01 Tractor Training & Testing Section, NON PLAN 1. 010001- Salary 301.93 440.70 183.63 24.79 120.48 (-) 63.15 440.70 The saving is due to

vacant of posts.

2. 010002-Wages 50.24 65.00 21.67 3.74 11.67 (-) 10.00 65.00 Payment of wages is

made only in next

month.

3. 010003-OTA 0.00 0.10 0.04 0.00 0.00 (-) 0.04 0.10 -

4. 010006-Med.Treat 3.53 8.40 2.80 0.09 0.38 (-) 2.42 8.40 Medical claims are

under process.

5. 010011-D.T. Expn. 6.76 7.60 2.53 0.98 1.29 (-) 1.24 7.60 The saving is due to

economy in tours.

6. 010013-O. Expn. 56.98 126.60 42.20 6.31 22.11 (-) 20.09 126.60 Proposals are under

process.

7. 010016-Publication 1.34 1.70 0.57 0.00 0.00 (-) 0.57 1.70 Bills are pending

with PAO

8. 010021-Supplies & Materials 21.44 33.87 11.29 0.00 1.47 (-) 9.82 33.87 Bills are pending

with PAO

9. 010026-Advt. & Publicity. 5.09 7.53 2.51 0.60 0.60 (-) 1.91 7.53 -

10. 010027-Minor Work 62.84 109.40 36.47 0.00 0.00 (-) 36.47 109.40 -

11. 10050-O .C 22.38 44.44 14.81 2.00 2.00 (-) 12.81 44.44 Bills are pending

with PAO

Total 532.53 845.34 318.52 38.51 160.00 (-) 158.52 845.34

Page 3: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

MONTHLY PROGRESS IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR (HARYANA)

FOR THE MONTH OF JULY- 2016

Capital Head 4401 Major Works & My. & Equipment Non- Plan

NON- PLAN Rs. In Lakh

S.

No.

Sub Head Expenditure

during the previous

year 2015-16

B.E. Year

2016-17

Proportionately

allocated up to

07/16

Amount

spent

During

07/16

Progressive

Total up to

07/16

Excess (+)

saving (-)

as per B.E.

Likely Exp.

During the

year

Detailed reasons

for excess &

saving/Remarks

1. 2. 3. 4. 5 6 7 8 9 10

1. 020052 My. & Equip. 16.85 15.00 5.00 2.09 2.09 (-) 2.91 15.00 Annexure-II

2. 020053 Major works 14.91 29.00 9.67 - - (-) 9.67 29.00 Annexure-III

Total 31.76 44.00 14.67 2.09 2.09 (-) 12.58 44.00

4401- CAPITAL (PLAN)

1. 140051 – Motor Vehicle - 10.00 3.33 - - (-) 3.33 10.00 Annexure-IV

2. 140052 – My & Equip. 69.34 50.00 16.67 - - (-) 16.67 50.00 Annexure-IV

3. 140053 – Major works 137.89 660.00 220.00 - - (-) 220.00 660.00 Annexure-V

Total 207.23 720.00 240.00 - - (-) 240.00 720.00

Page 4: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-I

MONTHLY PROGRESS IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR (HARYANA)

Up to JULY, 2016

MAJOR HEAD “2401” MINOR WORKS NON- PLAN Rs. In Lakhs

S.N Name of work Sanction

number

& date

Amount Amount already

spent by the end

of the previous

year (2015-16)

Amount

authorized to

CPWD with date

during 2015-16

Fund utilize

up to June

2016

Likely

Expenditure

during the

year 2016-

17

Remarks

1. 2. 3. 4. 5. 6. 7. 8. 9.

Revenue Section, Major Head “2401” MINOR WORKS, NON- PLAN B.E. 109.40

I. Works already sanctioned by the Department

II Works sanctioned under the power of the Institute

III works for which proposal sent to the department but sanction awaited

1

IV. Proposal at the formulation stage where part of expenditure is likely to be booked in the current year

1 Rewiring of library building area and

hostel. -- 15.00 -- -- -- 15.00 Proposal has been sent

to the Ministry vide

letter No. 5-3/16 Bldgs.

Dt. 17.7.2016.

2 Complete civil & electrical works as

per CPWD norms in the residential

quarters type-II to IV.

-- 25.00 -- -- -- 25.00 CPWD has been

requested to submit the

preliminary estimate.

3 Conversion of Training labs in 2

Computer labs with furniture from

CPWD.

-- 21.40 -- -- -- 21.40 -do-

4 Renovation of Testing office building. -- 20.00 -- -- -- 20.00 -

5 Misc. Petty works -- 0.50 -- -- -- 0.50 -

Total:- 81.90 81.90

Page 5: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-II

MONTHLY PROGRESS IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR (HARYANA)

Up to JULY, 2016

CAPITAL SECTION, MAJOR HEAD “4401” (NON- PLAN) MACHINERY & EQUIPMENT Rs. in Lakh

S.N Name of Machine/implement/instrument/tools Amount Amount spent

till date

Likely

expenditure

during the year

2016-17

Remarks

1. 2. 3 4 5 6

Capital Section, Major Head “4401” Machinery & Equipment, NON- PLAN B.E. 15.00

I. Proposals already sanctioned by the Department

1 -- -- -- --

II Proposal sent to the department but sanction awaited

1 -- -- -- --

III Equipment sanctioned under the power of the Institute

1.

IV Proposal at the formulation stage in the current year

1. Fogging Machine -- -- 0.25 -

2. Modified Raised Bed Planter -- -- 0.80 Quotation has been received.

3. Roto Seed Drill -- -- 0.75 -do-

4. Tractor Operated Centrifugal Pump (Doctor Make) with 20 feet Suction

Pipe

-- -- 0.30 -

5. Improved and Modern Machinery like Reversible M.B. Plough, Disc

Plough, Disc Harrow, Land Leveler, Rotavator etc.

-- -- 5.00 Quotation has been invited and due date

to receive in Quotation is 20/7/2016

6. Irrigation Pumps for irrigation Lab. (Centrifugal & Submersible) -- -- 1.00 -

7. Irrigation Model Drips & Sprinkler Easy Installation type (One Each) -- -- 0.50 -

8. Gender Friendly Latest Equipment Set -- -- 0.75 -

9. Improved Hydraulic Disc Harrow, Cultivator, Seed Drill & Submersible

pump.

-- -- 1.15 -

10. Laying of drip irrigation system in Orchard Area (1.6 Hectare). -- -- 4.50 -

Total 15.00 -

Page 6: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-III

MONTHLY PROGRESS IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR (HARYANA)

Up to JULY, 2016

CAPITAL SECTION, MAJOR HEAD “4401” MAJOR WORKS NON-PLAN Rs. in Lakh

S.N Name of work Sanction

number &

date

Amount Amount already

spent by the end

of the previous

year

Amount

authorized to

CPWD with date

during 2015-16

Amount already

spent by the end

of the previous

year (2015-16)

Proposed

Amount

2016-17

Expenditure

up to June

2016

Remarks

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Capital Section, Major Head “4401” MAJOR WORKS, NON PLAN B.E. 29.00 Lakh

I. Works already sanctioned by the Department

1.

II. Proposal at the formulation stage where part of expenditure is likely to be booked in the current year

1. Strengthening of flooring of

Test Labs and floor of

implement shed of training.

-- 10.00 -- -- -- 10.00 - Proposal has been

sent to the Ministry

vide letter No. 5-8/16-

Bldgs. Dt. 18.07.2016

2. Development of children

park.

-- 04.00 -- -- -- 04.00 - CPWD has been

requested to submit

the P.E. Total - 14.00 14.00

Page 7: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-IV

MONTHLY PROGRESS IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR (HARYANA)

Up to JULY, 2016

CAPITAL SECTION, MAJOR HEAD “4401” (PLAN) MACHINERY & EQUIPMENT Rs. in Lakh

S.N Name of

Machine/implement/instrument/tools

Sanction

number

& date

Total

amount of

proposal in

2016-17

Amount

already spent

by the end of

the previous

year

Amount

authorized to

CPWD with

during 2016-17

Amount

spent

during the

month

Amount

spent during

the year

2016-17

Likely

expenditure

during the

year

2016-17

Remarks

1. 2. 3. 4. 5. 6. 7. 8. 9 10.

Capital Section, Major Head “4401” Machinery & Equipment, PLAN B.E. Rs. 50.00 Lakh

I. Proposals already sanctioned by the Department

1

II Proposal sent to the department but sanction awaited

1.

III Equipment to be sanctioned under the power of the Institute

IV Proposal at the formulation stage in the current year

1 Up gradation and Renovation of Testing

facility for testing of plant protection

equipment

-- 10.00 -- -- -- -- 10.00 Tender document is being

finalized for the item.

2 Automation of D-700 hydraulic

dynamometer test set up for combine

harvester engine test

-- 15.00 -- -- -- -- 15.00 Tender document is being

finalized for the item.

3 Jigs, Fixtures and instruments for testing of

Agriculture Machinery

-- 07.50 -- -- -- -- 07.50 Tender document is being

finalized for the item.

4 Tractor 35 HP (2 No.) -- 10.00 -- -- -- -- 10.00 On line quotation has been

invited.

5 Tractor 45 H.P. (1 No.) -- 07.50 -- -- -- -- 07.50 -do-

Total 50.00 50.00

MAJOR HEAD “4401” (CAPITAL) MOTOR VEHICLE (PLAN) RS. 10 LAKH (B.E. 2016-17) (Rs. in lacs)

Sl.

No.

Name of the Vehicle Sanction No. &

date

Proposed

Amount (Rs.)

Amount already

spent by the end

of year 2015-16

Fund Required in

the year

2016-17

Remarks

1. Motor Vehicle -- 10.00 -- 10.00 Drafting of proposal under way.

Page 8: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-V

MONTHLY PROGRESS IN RESPECT OF FARM MACHINERY TRAINING & TESTING INSTITUTE, HISAR (HARYANA)

Up to JULY, 2016 CAPITAL SECTION, MAJOR HEAD “4401” MAJOR WORKS (PLAN) Rs. in Lakh

S.N Name of work Sanction

number & date

Amount Year 2013-14 Year 2014-15 Amount

spent

during the

2015-16

Fund

required in

2016-17

Remarks

Authoriz

ation to

CPWD

Amount

utilized

by

CPWD

Authoriz

ation to

CPWD

Amount

utilized

by

CPWD

1. 2. 3. 4. 5. 6. 8. 9 10.

Capital Section, Major Head “4401” Major Works, PLAN B.E. Rs. 660.00 Lakh

I. Works already sanctioned by the Department

1. Extension of Trg. Building 2-15/2013

M&T(Admin)

28/05/2014

230.51 -- -- -- -- 181.27 49.24 LOA has been received from the

Ministry and Communicated to CPWD.

2. Extension of Girls Hostel with

security compound wall

2-6/2015

M&T(Admin)

dated 30/7/15

25.24 -- -- -- -- 7.04 18.20 -do-

II Works sanctioned under the power of the Institute

III Works for which proposal sent to the department but sanction awaited

IV Proposal at the formulation stage where part of expenditure is likely to be booked in the current year

1. Const. of boundary wall around the

farm and 37 Acres area up to south

bye pass.

-- -- -- -- -- -- -- 250.00 CPWD has been requested to

submit the Preliminary

Estimates.

2 Complete Renovations of old hostel,

rooms along with attached Toilet,

Bathrooms with modular Kitchen

-- -- -- -- -- -- -- 75.00 -do-

3 Const. of Engine test laboratory 4

Engine test beds with control Pennel

and Plant Protection test laboratory.

-- -- -- -- -- -- -- 150.00 -do-

4 Extension of Test Track up to 100

meters. -- -- -- -- -- -- -- 70.00 -do-

5 Flooring & Side wall for already

existing Kachha Pond at Farm -- -- -- -- -- -- -- 25.00 __

6 Face uplifting of old building

attached to the new building Road

facing with aluminum channels.

-- -- -- -- -- -- -- 22.56 __

Total -- -- -- -- -- -- -- 660.00

Page 9: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

FARM MACHINERY TRAINING & TESTING INSTITUTES, HISAR

REVENUE RECEIPT DURING JULY -2016

Sl

No.

Item During

previous year

During

07/2016

Progressive up to

07/2016

Remarks

1 Training

484995 370130 475530

2 Testing

12468053 240234 2240627

3 Farm Orchard

- - -

4 Farm Produce

841555 128180 1164991

5 Any other (Misc.)

266046 41504 76933

Total 14060649 780048 3958081

Page 10: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

STAFF POSITION AS ON 31-07-2016

Sl. No. Group Sanctioned posts Posts filled Posts vacant

1. A 3 3 0

2. B 7 7 0

3. B (NG) 12 9 3

4. C 60+1 41+1 19

Total 82+1 60+1 22

Sl. No. Name of the post No. of Vacancy Date Since Vacant Reason for vacancy/present status

GROUP-B(N.G) Non-Technical

Office Supdt. 2 01.03.2011

29.07.2014

Ministry is Competent Authority to initiate the action.

Steno Grade-I 1 22.11.2012 -do-

Group-C

Steno Grade-II 2 29.05.2001

29.12.2012

-do-

LDC 2 30.08.2014

30.03.2016

-do-

Tech. Asstt. 2 01.02.2014

01.04.2014

-do-

Senior Technician 7 01.10.2014

01.01.2015

31.03.2015

06.01.2016

06.01.2016

01.04.2016

01.04.2016

-do-

MTS (Non-Tech.) 4 01.11.2014

01.02.2015

01.04.2015

18.03.2016

-do-

MTS (Technical) 2 01.10.2014

11.01.2016

Advertised through Employment News, New Delhi for which

the closing dated for receipt of applications was 03.07.2016.

Letter has been written to Ministry for further action. Total 22 Nos.

Page 11: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

FARM MACHINERY TRAINING &TESTING INSTITUTE,HISAR

DETAILS OF COURT CASES

Name of Office : Northern Region Farm Machinery Training & Testing Institute,

Hisar

Name of the Director : SH. P.K. PANDEY

E-mail : [email protected]

Telephone No. : 01662-276984

Sl

No.

Case

No./Court/Branch

Name of the

parties

Brief Issues Name of Govt. counsel

and phone No.

Remarks

1. CWP/1438/2003

High Court,

Chandigarh

NRFMT&TI

Vs. President

Agri.

Works

Admitted on 29.7.2004 & to

be decided by Hon’ble Court

as per turn. Case updated on

5.1.2013

H.C. Arora,

ACGSC, Chandigarh

09217309891

To be decided by Hon”ble Court as per

turn. Case updated on 5.1.2013.

2. Civil Court Hisar Prem Bihari

v/s A.N. Meshram

Admitted Reply filed.

Sanchar Anand Advocate,

Hisar

28-9-2016

3. Session

Court,Hisar.

A.N.Meshram

V/Prem Bihari

Admitted reply filled. -do- 2-8-2016

Page 12: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

TESTING WING

TESTING PROGRESS FOR THE MONTH OF JULY

2016

S.No. Particulars Nos.

I Target

[vide ministry’s letter No. 13-5/2016 M &T (I & P ) dated 01.02.2016

140

II No. Applications carried forward from the previous year 181

III No. of Application received during the month (A-1) Nil

IV No. of Application received up to the reporting month 13

V Net number of applications received up to reporting month [S.N. II+IV] 194

VI Machines carried forward from the previous year 89

VII No. of Machines received for test during the month (A-2) 15

VIII No. of Machines received for test up to the reporting month 75

IX Net No. of Machines received for test up to the reporting month [VI +VIII] 164

X No. of machine under test carried forward from the previous year 89

XI No. of Machines taken up for test during the month 15

XII No. of Machines taken up for test up to reporting month 75

XIII Net No. of Machines taken up upto reporting month [S. No. X +XII ] 164

XIV No. of Machines yet to be received [S.No. V- XIII] (A-5) 30

XV No of draft report carried forward from previous year 17

XVI No of draft test report released upto previous month 59

XVII No. of Draft Test Reports released during the month (A-3) 26

XVIII No. of Draft Test Reports released up to the reporting month (XVI+XVII) 85

XIX No. of Final Test Reports released during the month (A-4) 26

XX No. of Final Test Reports released up to the reporting month 81

XXI Machines under test [S.No XIII-XX] (A-6) 83

XXII Machines tested since inception. 1906

XXIII Monthly Progress Report on CMVR/Emission/Type Approval

CMVR certificate issued on COMBINE HARVESTERS

During the current month 01

During the current year 02

CMVR certificate issued since inception 219

Page 13: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-1

List of application received in July 2016

Sl. No. Type of

machine Make and Model Type of test Name and adderessof applicant/Manufacturer

Nil

Annexure-2

List of machines Taken up for test in July 2016 SL.

No

Type of machine Make and Model Type

of test

Applicant’s name and address Taken for

test on

1 HTP Power Sprayer GK-968E ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road, New Timber Yard

Layout, Mysore Main Road, Bangalore

July, 16

2 HTP Power Sprayer GKPS-150 ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road, New Timber Yard

Layout, Mysore Main Road, Bangalore

July, 16

3 Battery Operated Knapsack

Sprayer GK- 16-EL ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road, New Timber Yard

Layout, Mysore Main Road, Bangalore

July, 16

4 Engine Power Knapsack

Sprayer “ SHAKTI SPS-708” ICT M/s Shakti Agro Industries, 2153/1, Radha Swami Road, St. No. 6, Arjun Nagar,

Gill Road, Ludhiana (Pb)

July, 16

5 operated Knapsack Sprayer “ HYNEXT HY-910” ICT M/s RSR Pvt. Ltd., E-27, Sector-6, Noida-201301 (U.P) July, 16

6 Battery operated Knapsack

Sprayer “ HYNEXT HY-930” ICT M/s RSR Pvt. Ltd., E-27, Sector-6, Noida-201301 (U.P) July, 16

7 Battery operated Knapsack

Sprayer “ HYNEXT HY-805” ICT M/s RSR Pvt. Ltd., E-27, Sector-6, Noida-201301 (U.P) July, 16

8 POWER WEEDER “ CAM ID-135” ICT M/s Competent Agriculture Machinery, App. C.O. Office, Delhi-Saharanpur Road,

City Baraut-250611, Distt.Bagpat (UP)

June, 16

9 Power Weeder “ CAM ID-85A” ICT M/s Competent Agriculture Machinery, App. C.O. Office, Delhi-Saharanpur Road,

City Baraut-250611, Distt.Bagpat (UP)

June, 16

10 Power Weeder “ CAM ID-1 G 4.1” ICT M/s Competent Agriculture Machinery, App. C.O. Office, Delhi-Saharanpur Road,

City Baraut-250611, Distt.Bagpat (UP)

June, 16

11 Power Weeder “ RTP/GX-160” ICT M/s Aspee India Pvt. Ltd., Aspee House, B.J. Patel House, Malad (West), Mumbai-

400064 (MS)

June, 16

12 POWER WEEDER RTT3 ICT M/S New Swan Multitech Ltd.,Vill Raiah, Kohara-Muchhiwada Road, Ludhiana Oct. 16

13 POWER WEEDER BEX NSML-PW-622 ICT M/S New Swan Multitech Ltd.,Vill Raiah, Kohara-Muchhiwada Road, Ludhiana Oct. 16

14 POWER WEEDER SWAN P70 ICT M/S New Swan Multitech Ltd.,Vill Raiah, Kohara-Muchhiwada Road, Ludhiana Oct. 16

15 POWER WEEDER SWAN Z2 ICT M/S New Swan Multitech Ltd.,Vill Raiah, Kohara-Muchhiwada Road, Ludhiana Oct. 16

SUMMARY

1 Combine Harvester Nil

2 Seed bed preparation Nil

3 Sowing & Planting Nil

4 Inter-cultivation 08

5 Residue Management Nil

6 Harvesting & threshing Nil

7 PP Equipment Nil

8 Misc. Nil

TOTAL 15

Page 14: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-3

List of Draft test reports released in July, 2016 Sl.

No

Name of the Machine Make and Model

and type of test

Nature

of Test

Name and address of Manufacturer Date of release

of draft report

Target Date for

release of final

test report

1 SELF PROPELLED

COMBINE HARVESTER

“SWAN NSE CH-

515

ICT M/s New Swan Multi Tech Ltd., Vill. Raian, Kohara Road,

Ludhiana-141126 (Pb) 15.04.15

July,16 July,16

2 SELF PROPELLED

COMBINE HARVESTER

PANESAR SC-

410

ICT M/s Panesar Agriculture Industries, Bathinda Road, Opp.

Power House, Near Handiaya Chowk, Distt.Barnala (Pb)

July,16 July, 16

3 SELF PROPELLED

COMBINE HARVESTER-

Track Type

CLAAS TIGER

30 TERRA

TRACK

ICT M/s Claas India Pvt. Ltd., Morinda By Pass, Village Maruti

Kalan, Morinda-140101, Distt. Ropar (Pb)

July,16 July, 16

4 Portable Power Sprayer GK-967E ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore

July,16 July,16

5 High Pressure Power

Knapsack Sprayer with two

stroke engine)

HYNEXT HY-

803”

ICT M/s RSR Pvt. Ltd., E-27, Sector-6, Noida-201301 (U.P) July,16 July,16

6 Knapsack power sprayer

with Honda GX25 Engine

AGRITECH BA-

708H”

ICT M/s Balaji Agencies, 5-2-396, 81/A, Shop No. 7 Hyderbasti,

Opp. Hero Honda Showroom (Modi Motors), R.P. Road,

Secunderabad-500003 (AP)

July,16 July,16

7 Battery operated cum

manual Sprayer (2 in one)

Kala Trishul” ICT M/s Dhan Laxmi Steels, Kansal Market, Motia-Khan, Mandi

Gobindgarh, Distt Fatehagarh Sahib-147301 (Pb)

July,16 July,16

8 Battery Operated Knapsack

Sprayer

Shanker Brand

SPS-16

ICT M/s Asian Agrico Industries, Gandevi Road, Bilimora-396321,

Distt. Navsarat (Guj)

July,16 July,16

9 High Pressure Power

knapsack sprayer with 4

stroke engine.

Hymatic H-802 ICT M/s Hymatic Agro Equipment Pvt.Ltd., A-64, Sector-2, Noida-

201301 (UP)

July,16 August,16

10 Battery operated Knapsack

Sprayer

JB-16-C-7 ICT M/s Rekha Agriplas Limited, D.No. 30-22-77, Kanakadurga

Talkies Road, Seetharamapuram, Vijayawada-2 (AP)

July,16 July,16

11 Battery optd. Knapsack

sprayer (16ltrs.)

Hymatic H-805N ICT M/s Hymatic Agro Equipment Pvt.Ltd., A-64, Sector-2, Noida-

201301 (UP)

July,16 August,16

12 Knapsack Power Sprayer GK-708W ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore

July,16 July,16

13 Portable Power Sprayer GK-768W ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore

July,16 July,16

14 Knapsack Power Sprayer GK- 969 ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore

July,16 July,16

15 Power Sprayer-Horizontal

Triple Piston Pump

REDBEE HTP-

22AK

ICT M/s Redbee Machines, No. 162, & 162(D), 2nd Cross,

Belagola Industrial Area, Metagalli, Mysore (Karnataka)

July,16 July,16

16 Power sprayer Electrical

operated

Fortune Agro

FAI-18EM

ICT M/s Fortune Agro Impex, Fortune House, 343, 9th

Block SIR M

Visveshvaraya Layout Kengunte Ist Main Road, Bangalore-

560056

July,16 July,16

17 4 Strokes Back Pack

Sprayer “

Agrimate AM-709 ICT M/s Rattnagiri Impex Pvt. Ltd., Annapurna House, 1/1G, New

Guddadahalli, Mysore Road, Bangalore-560026

July,16 July,16

Page 15: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

18 Battery cum hand optd.

Knapsack sprayer (16ltrs.)

Hymatic H-807 ICT M/s Hymatic Agro Equipment Pvt.Ltd., A-64, Sector-2, Noida-

201301 (UP)

July,16 August,16

19 Power sprayer Electrical

operated

Fortune Agro

FAI-20PES

Comme

rcial

M/s Fortune Agro Impex, Fortune House, 343, 9th

Block SIR M

Visveshvaraya Layout Kengunte Ist Main Road, Bangalore-

560056

July,16 July,16

20 ENGINE OPERATED

POWER SPRAYER

AGRITECH TA

36708

ICT M/s Thirumala Agencies, 5-2-396, 81/A, Shop No. 6,7,8 Opp.

Modi Motors (Hero Honda Showroom), Hyderabasthi, R.P.

Road, Secunderabad-500003 (AP)

July,16 July,16

21 Engine Operated Power

Sprayer

Diamond TS-60 ICT M/s Rekha Agriplas Limited, D.No. 30-22-77, Kanakadurga

Talkies Road, Seetharampuram, Vijaywada-2 (AP)

July,16 July,16

22 Battery operated Knapsack

Sprayer

JB-16-C-2 ICT M/s Rekha Agriplas Limited, D.No. 30-22-77, Kanakadurga

Talkies Road, Seetharamapuram, Vijayawada-2 (AP)

July,16 July,16

23 Power Sprayer-Diaphragm

Pump

“REDBEE DP-

20K

ICT M/s Redbee Machines, No. 162, & 162(D), 2nd Cross,

Belagola Industrial Area, Metagalli, Mysore (Karnataka)

July,16 July,16

24 Power Sprayer-Diaphragm

Pump

REDBEE DP-

30K

ICT M/s Redbee Machines, No. 162, & 162(D), 2nd Cross,

Belagola Industrial Area, Metagalli, Mysore (Karnataka)

July,16 July,16

25 Power Sprayer-Horizontal

Triple Piston Pump

“REDBEE HTP-

45AK

ICT M/s Redbee Machins, No. 162, & 162(D), 2nd Cross, Belagola

Industrial Area, Metagalli, Mysore (Karnataka)

July,16 July,16

26 Self Propelled Combine

Harvester

TC 5.30 ICT M/s New Holland Fiat (India) Pvt. Ltd.,

Plot No. A 33, Chakan Industrial Area,

Phase IV, Village-Nighone, Taluka-Khed,

Pune-410501 (Maharashtra)

July, 2016 August, 2016

SUMMARY

1 Combine Harvester 04

2 Seed bed preparation NIL

3 Sowing & Planting NIL

4 Inter-cultivation NIL

5 Residue Management Nil

6 Harvesting & threshing NIL

7 PP Equipment 22

8 Misc. NIL

TOTAL 26

Page 16: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

Annexure-4

List of final test report released in July 2016

Sr.

No.

Type of machine Make and Model Type

of test

Applicant’s/Manufacturer’s Address Test Report No Month of

release

1 Hydraulic Power

Sprayer Commando-708 ICT M/s Pasura Crop Care Pvt.Ltd., Flat No. 2B, MS Nilyam, Plot

No. 15, Hacp Colony, Kharkhan, Secunderabad (Telangana) PS-217/1881/2016 July, 2016

2 Hydraulic Power

Sprayer Viswas-708 ICT M/s Pasura Crop Care Pvt.Ltd., Flat No. 2B, MS Nilyam, Plot

No. 15, Hacp Colony, Kharkhan, Secunderabad (Telangana) PS-218/1882/2016 July, 2016

3 Hydraulic Power

Sprayer Commando-P-

768

ICT M/s Pasura Crop Care Pvt.Ltd., Flat No. 2B, MS Nilyam, Plot

No. 15, Hacp Colony, Kharkhan, Secunderabad (Telangana) PS-219/1883/2016

July, 2016

4 Self Propelled

Combine Harvester

“SWAN NSE CH-

515

ICT M/s New Swan Multi Tech Ltd., Vill. Raian, Kohara Road,

Ludhiana-141126 (Pb) 15.04.15 Comb-158/1884/2016

July, 2016

5 Self Propelled

Combine Harvester

PANESAR SC-

410

ICT M/s Panesar Agriculture Industries, Bathinda Road, Opp.

Power House, Near Handiaya Chowk, Distt.Barnala (Pb) Comb-159/1885/2016

July, 20 16

6 Self Propelled

Combine Harvester-

Track Type

CLAAS TIGER

30 TERRA

TRACK

ICT M/s Claas India Pvt. Ltd., Morinda By Pass, Village Maruti

Kalan, Morinda-140101, Distt. Ropar (Pb) Comb-160/1886/2016

July, 2016

7 Portable Power

Sprayer

GK-967E ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore PS-220/1887/2016

July, 2016

8 High Pressure Power

Knapsack Sprayer

With Two Stroke

Engine)

HYNEXT HY-

803”

ICT M/s RSR Pvt. Ltd., E-27, Sector-6, Noida-201301 (U.P)

PS-221/1888/2016

July, 2016

9 Knapsack Power

Sprayer With Honda

GX25 Engine

AGRITECH BA-

708H”

ICT M/s Balaji Agencies, 5-2-396, 81/A, Shop No. 7 Hyderbasti,

Opp. Hero Honda Showroom (Modi Motors), R.P. Road,

Secunderabad-500003 (AP)

PS-222/1889/2016

July, 2016

10 Battery Operated

Cum Manual

Sprayer

Kala Trishul” ICT M/s Dhan Laxmi Steels, Kansal Market, Motia-Khan, Mandi

Gobindgarh, Distt Fatehagarh Sahib-147301 (Pb) PS-223/1890/2016

July, 2016

11 Battery Operated

Knapsack Sprayer

Shanker Brand

SPS-16

ICT M/s Asian Agrico Industries, Gandevi Road, Bilimora-396321,

Distt. Navsarat (Guj) PS-224/1891/2016

July, 2016

12 Battery Operated

Knapsack Sprayer

JB-16-C-7 ICT M/s Rekha Agriplas Limited, D.No. 30-22-77, Kanakadurga

Talkies Road, Seetharamapuram, Vijayawada-2 (AP) PS-225/1892/2016 July, 2016

13 Knapsack Power

Sprayer

GK-708W ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore PS-226/1893/2016

July, 2016

14 Portable Power

Sprayer

GK-768W ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore PS-227/1894/2016

July, 2016

15 Knapsack Power

Sprayer

GK- 969 ICT M/s Suntec Agri. Equipments India Pvt. Ltd., 50A, Main Road,

New Timber Yard Layout, Mysore Main Road, Bangalore PS-228/1895/2016

July, 2016

16 Portable Power

Sprayer

REDBEE HTP-

22AK

ICT M/s Redbee Machines, No. 162, & 162(D), 2nd Cross,

Belagola Industrial Area, Metagalli, Mysore (Karnataka) PS-229/1896/2016

July, 2016

Page 17: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

17 Power Sprayer

Electrical Operated

Fortune Agro FAI-

18EM

ICT M/s Fortune Agro Impex, Fortune House, 343, 9th

Block SIR

M Visveshvaraya Layout Kengunte Ist Main Road, Bangalore-

560056

PS-230/1897/2016

July, 2016

18 Knapsack Power

Sprayer

Agrimate AM-709 ICT M/s Rattnagiri Impex Pvt. Ltd., Annapurna House, 1/1G, New

Guddadahalli, Mysore Road, Bangalore-560026 PS-231/1898/2016

July, 2016

19 Power Sprayer

Electrical Operated

Fortune Agro FAI-

20PES

Comm

ercial

M/s Fortune Agro Impex, Fortune House, 343, 9th

Block SIR

M Visveshvaraya Layout Kengunte Ist Main Road, Bangalore-

560056 PS-232/1899/2016

July, 2016

20 Engine Operated

Power Sprayer

AGRITECH TA

36708

ICT M/s Thirumala Agencies, 5-2-396, 81/A, Shop No. 6,7,8 Opp.

Modi Motors (Hero Honda Showroom), Hyderabasthi, R.P.

Road, Secunderabad-500003 (AP)

PS-233/1900/2016

July, 2016

21 Engine Operated

Power Sprayer

Diamond TS-60 ICT M/s Rekha Agriplas Limited, D.No. 30-22-77, Kanakadurga

Talkies Road, Seetharampuram, Vijaywada-2 (AP) PS-234/1901/2016

July, 2016

22 Battery Operated

Knapsack Sprayer

JB-16-C-2 ICT M/s Rekha Agriplas Limited, D.No. 30-22-77, Kanakadurga

Talkies Road, Seetharamapuram, Vijayawada-2 (AP) PS-235/1902/2016

July, 2016

23 Power Sprayer-

Diaphragm Pump

“REDBEE DP-

20K

ICT M/s Redbee Machines, No. 162, & 162(D), 2nd Cross,

Belagola Industrial Area, Metagalli, Mysore (Karnataka) PS-236/1903/2016

July, 2016

24 Power Sprayer-

Diaphragm Pump

REDBEE DP-

30K

ICT M/s Redbee Machines, No. 162, & 162(D), 2nd Cross,

Belagola Industrial Area, Metagalli, Mysore (Karnataka) PS-237/1904/2016

July, 2016

25 Power Sprayer-

Horizontal Triple

Piston Pump

“REDBEE HTP-

45AK

ICT M/s Redbee Machins, No. 162, & 162(D), 2nd Cross, Belagola

Industrial Area, Metagalli, Mysore (Karnataka) PS-238/1905/2016

July, 2016

26 Self Propelled

Combine Harvester

TC 5.30 ICT M/s New Holland Fiat (India) Pvt. Ltd.,

Plot No. A 33, Chakan Industrial Area,

Phase IV, Village-Nighone, Taluka-Khed,

Pune-410501 (Maharashtra)

Comb-161/1906/2016

July, 2016

SUMMARY

Combine Harvester 04

Sugarcane Harvester 00

Seed bed preparation 00

Sowing & Planting 00

Intercultivation 00

PP Equipment 00

Residue Management 22

Harvesting & Threshing 00

Misc. 00

TOTAL 26

Page 18: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

TRAINING WING

NRFMT&TI, Hisar No. 8-4/2015-Trg. Dated :01-08-2016

1. Training Activities S.No. Particulars U T A NB TT M1 Total

In

campus

Off

Campus

1. Target 2600

( vide Ministry letter No. 13-5/16-M&T(I&P) dt. 01-02-2016)

2. No. of Applications carries

forwarded from the previous

year

62

--

--

465

121

--

05

653

3 No. of application received

during the month

--

--

--

46

16

--

--

62

4 Total No. of applications

received up to the reporting

month

95

--

37

745

344

80

22

1323

5 Number of trainees carried

forwarded from previous

year

62

--

--

465

121

--

05

653

6 Number of trainees carried

forwarded from previous

month

--

--

--

166

--

--

--

166

7 No. of trainees joined

during the month

--

--

--

184

16

--

--

200

8 Total of 6+7 above

--

--

--

350

16

--

---

366

9 Trainees trained during the

month

--

--

--

350

16

--

--

366

Page 19: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

10

Trainees trained up to

reporting month

94

--

36

548

316

80

22

1096

11 Trainees discontinued

during the month

-- -- -- -- -- -- -- --

12 Trainees discontinued upto

reporting month

01 -- -- -- 11 -- -- 12

13 No. of Trainees under

training

-- -- -- -- -- -- -- ---

Break up of trainees trained during the month- Category-wise

i a) General -- -- -- 139 09 -- -- 148

Ii b) SC -- -- -- 45 02 -- -- 47

iii c) BC -- -- -- 158 05 -- -- 163

iv d) ST -- -- -- 08 -- -- -- 08

14 Break up of trainees trained up to the month- Category-wise

i e) General 41 -- 13 244 157 80 12 547

Ii f) SC 30 -- 09 78 55 -- 02 174

iii g) BC 23 -- 14 214 83 -- 07 341

iv h) ST -- -- -- 12 21 -- 01 34

15 Break up of trainees trained during the month- Land holding-wise

i Landless -- -- -- 152 05 -- -- 157

ii Marginal -- -- -- 60 05 -- -- 65

iii Small -- -- -- 61 04 -- -- 65

iv Semi-Medium -- -- -- 36 01 -- -- 37

V Medium -- -- --- 34 01 -- -- 35

vi Large -- -- -- 07 -- -- -- 07

16 Break up of trainees trained up to the month- Land holding-wise

i Landless 94 -- 36 350 301 44 22 847

ii Marginal -- -- -- 60 08 03 -- 71

iii Small -- -- -- 61 05 05 -- 71

Page 20: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

iv Semi-Medium -- -- -- 36 01 12 -- 49

V Medium 34 01 15 50

vi Large -- -- -- 07 -- 01 -- 08

17 Apprentice Under Training

( Graduate/ITI Trade)

14

18 Women/ Women farmers

trained during the month

-- -- -- 44 -- -- -- 44

19 Women/ Women farmers

trained up to the month

40 -- 01 80 04 -- -- 125

20 Total Farmers trained up

to the month

94 -- -- 198 11 80 -- 383

21 Total trainees trained since

inception

58331

2. Demonstration Activities

2.1 Demonstration programmes under Saansad Adarsh Gram Yojana (SAGY) :- 03

2.1.1 Demonstration during the month : - 03

2.1.2 Demonstration (SAGY) up to the month :-03

1 No. of Demonstration : 03

2 No. of State covered : One

3 No. of Constituency covered : 03

4 No. of Machines demonstrated : 03

5 No. of beneficiary : 146

6. Category-wise Break up of beneficiaries up to July, 2016

Male Female Total

SC 15 --- 15

ST --- --- ---

OBC --- 02 02

GEN 126 03 129

TOTAL 141 05 146

NRFMT&TI, Hisar No. 08-4/2015-Trg. Dated : 01-08-2016

Page 21: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

2.2 Demonstration of Newly Developed Equipment under SMAM :- 07

2.2.1 Demonstration during the month :NIL :-07

2.2.2 Demonstration (SMAM) up to the month : 07

1 No. of Demonstration : 07

2 No. of Machines demonstrated : 03

3 No. of beneficiary : 282

6. Category-wise beneficiaries up to July, 2016

Male Female Total

SC 66 --- 66

ST --- --- ---

OBC 25 --- 25

GEN 191 --- 192

TOTAL 282 --- 282

(SANJAY KUMAR)

Agriculture Engineer

\-for Director-

Distribution :-

1. Accounts Section (04 copies)

2. Director for information.

3. I/c Computer Cell for uploading on web site.

Page 22: MONTHLY PROGRESS REPORT IN RESPECT OF FARM …nrfmtti.gov.in/writereaddata/Images/MPR July 2016 (Admin).pdf · Total 14060649 780048 3958081 . STAFF POSITION AS ON 31-07-2016 Sl

MONTHLY PROGRESS REPORT IN RESPECT OF NORTHERN FARM MACHINERY

TRAINING & TESTING INSTITUTE, HISAR (HARYANA) FOR THE MONTH OF JULY

2016

1 Total area of the Farm 119.00 ha

2 Area under road, channels & Canals 15.60 ha

3 Lease registered between kribhco &GLF 1.50 ha

4 Pond area 1.00 ha

5 Undeveloped, Undulated & Saline area

infested with Kabuli Kiker & bushes : 47.12 ha

6

Net available cultivable area

53.78 ha (a) Irrigated Area : 21.60 Ha

(b) Rain fed Area : 32.18 Ha

Sl No.

Name of the crop

Area covered and yield during the previous year

2015-16

Name of the crop Area covered during the

reporting month July 2016

Progressive area covered & Yield for different crop during the year

2016-17

Remarks

1. 2. 3. 4. 5. 6.

1. KHARIF SEASON

i. Bajra Bajra ( FBC-16) Area-16.00Ha Yield- 62.57 Qtls.

Bajra ( FBC-16) Area-12.00Ha

Bajra ( FBC-16) Area-12.00Ha

Application of Weedicide &Top dressing of Urea has been completed during the month.

2. RABI SEASON

ii. Mustard Mustard (RH-30 /Laxmi) Area: 16.00 Ha. Yield- 103.55 Qtls.

Produce has been disposed off.

iii. Wheat Wheat (HD-2967) Area :16.00 Ha Yield- 430.05 Qtls.

Produce has been disposed off.

3.Horticulture Crop

iv. Amla Amla /Chakaiya Area :1.6 Ha

Amla /Chakaiya Area :1.6 Ha

Amla /Chakaiya Area :1.6 Ha

Amla orchard has been newly established in plot no. 12 on experimental basis. Irrigation is in progress.

3. Weather Condition: Weather was cloudy, rains during the month was 243.8 mm. & Cumulative rain fall from 1st June, 2016 to 31st July 2016 is 320.8 mm.

4. Revenue : During the month revenue received in July, 2016 is Rs. 1,28,180/- and cumulative Revenue from 1stApril, 2016 to 31st July, 2016 is Rs.11,64,991/- (Rupees Eleven Lakhs Sixty Four Thousand Nine Hundred Ninety One only).

(J.P. CHOURE) FARM SUPDT