Montrose Rd – Smart Signal CorridorASCT SE and Pilot Study
Dec 7, 2018
![Page 2: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/2.jpg)
1. Adaptive Signal Control Technology2. Preliminary Engineering & Design Process 3. Montrose Rd. Pilot Deployment4. Lesson Learned
2
Discussion Outline
![Page 3: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/3.jpg)
Traffic Adaptive Benefits 3
Do nothing
Timing Plans age resulting in increased vehicle delay
Retiming #1 Every 3-5 years
Savings
Retiming #2 Every 3-5 years
SavingsSavings
Retiming #3 Every 3-5 yearsConstant Retiming(Automatic – Adaptive)
Periodic Retiming(Manual Effort)
Do NothingImprovement
Incremental Savings
![Page 4: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/4.jpg)
Traffic Adaptive Benefits 4
TOD Plan Changes
Midnight
AM Peak
Midday Off Peak
PM Peak
PM Off Peak
Daily Traffic Variability
Timing Plan Inefficiencies
Delay is minimized when plan matches volume
![Page 5: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/5.jpg)
Traffic Adaptive Benefits 5
Incremental changes based on
“aggressiveness” of settings
Midnight
AM Peak
Midday Off Peak
PM Peak
PM Off Peak
Adaptive Timings Follow Daily Traffic Variability
Settings set to match objective(i.e. throughput, travel time, delay, stops)
![Page 6: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/6.jpg)
Challenges – know the Objectives• Traffic Issues – what are we trying to address?
– Onset of peak period variability– Inefficient plans to accommodate demand variability– Incident detection/response– Multi-modal mobility
• Performance Based Management – Data Driven– Measurable, rational and defendable
• Operations and Maintenance– Higher reliance on automation > systems
6
![Page 7: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/7.jpg)
Planning and Preliminary Engineering 7
• Modified Systems Engineering Process– “Best Fit” COTS solution
• 3 Phase Approach– Initial Criteria Screening to identify candidate systems
(top down)– Detailed Needs and Requirements Analysis to identify
selected system(s) (bottoms up)– Bench/Pilot Test – side-by-side verification (kick the
tires)
SE Process
COTS Capabilities
Best Fit
![Page 8: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/8.jpg)
Traffic Adaptive Systems Evaluated 8
Comparison Kadence SCOOTCost $$ $$$
Optimization Split, Cycle, Offset in steps Split, Cycle, Offsetcontinuous
Detection Existing stop bar andarterial advance detectors
Upstream per-lanedetectors all approaches
Responsiveness Slow – every few cycles Very Fast – Each cycle orphase
Application Mainly arterials Grids, arterials, allcombinations
Architecture NTCIP – uses inherentcontroller capability
Gemini Outstation cabinethardware
Notable Features TOD Tuner, SaturationEnhancements
Bus priority, gating, incidentdetection
![Page 9: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/9.jpg)
Pilot Implementation
• Field Survey – existing conditions and improvements– Detection – evaluated different technologies– CCTV coverage– Cabinet upgrades
• Understanding Existing Conditions – Before analysis• Verification Plan – how well did it meet requirements• Validation Plan – independent MoE data collection
9
![Page 10: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/10.jpg)
Traffic Adaptive Detection 10
Stop Bar Detection (existing)
Existing
Stop Bar Detection (new)
Advance Detection (new)
KadenceSCOOT
![Page 11: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/11.jpg)
Montrose Rd ASCT Architecture 11
![Page 12: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/12.jpg)
Montrose Rd Pilot Corridor 12
![Page 13: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/13.jpg)
Montrose Rd Pilot Corridor 13
Montrose Rd
Montrose Pkwy
Montrose Rd
E. JeffersonSt
Towne R
d
![Page 14: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/14.jpg)
Kadence 14
Cycle and Split Tuning
PLN 1: 150s (0600) PLN 2: 120s (1000)
![Page 15: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/15.jpg)
SCOOT 15
Cycle Tuning
PLN 1: 120s (0600) PLN 2: 110s (0930)
Wednesday Oct 18 Wednesday Oct 11
PLN 3: 120s (1530) PLN 4: 110s (1900)
FreeFree
Adaptive ON (0600) Adaptive OFF (2000)
![Page 16: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/16.jpg)
Montrose Rd & Montrose Pkwy Incident 16
Montrose Rd
Montrose Pkwy
Montrose Rd
E. JeffersonSt
Towne R
d
West towards Tildenwood Dr.
East towards Montrose Pkwy
Monday Oct. 23, 20170730-0830
![Page 17: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/17.jpg)
Montrose Rd & Montrose Pkwy Incident 17
Int. #809 – Kaiser Driveway EB Congestion0730-0830
Monday Oct 23(incident)
Monday Oct 16 Monday Oct 9
![Page 18: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/18.jpg)
Montrose Rd & Montrose Pkwy Incident 18
Int. #785 – E. Jefferson & Montrose Pkwy EBLT Green Time0730-0830
Monday Oct 23(incident)
Monday Oct 16 Monday Oct 9
![Page 19: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/19.jpg)
Montrose Rd & Montrose Pkwy Incident 19
Int. #23 – E. Jefferson & Montrose Rd. NB Stage (split) Time0730-0830
Monday Oct 23(incident)
![Page 20: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/20.jpg)
Lessons Learned 20
AdaptiveBand
Adaptive Timing LimitationsSaturation Inefficiency(demand > capacity)2800 VPH
capacity
Ped Recall limits Cycle/Split
Ped Recall Inefficiency(cycle/split minimum)
~75% of County Signals
![Page 21: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/21.jpg)
Lessons Learned 21
CoordinationLocal Optimization
Coordinated Operation
Local & System
NEMA TS2 (ASC/3)
Ethernet / IP (NTCIP)
Adaptive
Infrastructure
TSM&O
Build the Foundation First
![Page 22: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/22.jpg)
Lessons Learned
• Systems Engineering – develop a common understanding• Senior Management Support – County Executive and Council• Engage all stakeholders – own the process, develop champions• Staffing impacts from a change in operations• Uncovered problems with existing infrastructure – detection• Higher maintenance costs• Adaptive = central, controller/firmware, detection, communications• Prioritize deployment – may not be useful everywhere• Technology is not static• Manage Expectations!!
22
![Page 23: Montrose Rd – Smart Signal Corridor](https://reader035.vdocuments.net/reader035/viewer/2022081623/61570333a097e25c76501591/html5/thumbnails/23.jpg)
www.jacobs.com | worldwide19 December 2018 Jacobs© Copyright
Thank You
Diederick VanDillenJacobs, Baltimore, [email protected]