    YEAR INTRA MOOT COURT COMPETITION

    BEFORE THE HONOURABLE HIGH COURT OF ALLAHABAD

    APPELLATE JURISDICTION OF THE HIGH COURT OF ALLAHABAD

    APPEAL

    Lalooji & Sons...........................................................................................Appellant

    v

    State of Uttar Pradesh......................................Respondents

    Ravi Pandey( Roll no.- 95)

    Ravi Gangal (Roll no.- 96)

    Ravi Sourav ( Roll no.- 97)

  • 8/10/2019 Moot Court Competition Memorial

    2/13

    2

    TABLE OF CONTENTS

    INDEX OF AUTHORITY...................................................................................................................... 3

    STATEMENT OF JURISDICTION....................................................................................................... 4

    STATEMENT OF FACTS..................................................................................................................... 5

    SUMMARY OF ARGUMENTS............................................................................................................ 6

    ARGUMENTS ADVANCED................................................................................................................ 6

    PRAYER............................................................................................................................................... 13

  • 8/10/2019 Moot Court Competition Memorial

    3/13

    3

    INDEX OF AUTHORITY

    Cases Referred

    British Movietonews Ltd. v. London and

    District Cinemas Ltd.

    L.R. [1952] A.C. 166

    British Movietonews Ltd. v. London and

    District Cinemas Ltd.

    [1951] 1 K.B. 190

    Brogden v. Metropolitan Railway Co. [1877] 2 App Cas 666, HL.

    Williams v. Roffey Bros & Nicholls (Contractors)Ltd.

    [1990] 1 All ER 512

    Louis Dreyfus Negoce S.A. v. Blystad Shipping &Trading Inc.

    252 F.3d 218. (2d Cir. 2001)

    Rajanna v Union of India AIR [1995] SC 1966

    Yagar Muang v. State of Arunachal Pradesh MANU/GH/0184/2002

    Books

    Sarah Howard Jenkins, Corbin on Contracts, Vol. XIII, (ed Joseph M. Perillo),

    LexisNexis Mathew Bender, San Francisco, 2003

    Pollock & Mulla, Indian Contract & Specific Relief Acts, Thirteenth Edition, Vol.

    I, (ed R. G. Padia), LexisNexis Butterworths, New Delhi

    Black's Law Dictionary, Sixth Edition

    Statutes

    Indian Contract Act, 1872

    Indian Evidence Act, 1872

  • 8/10/2019 Moot Court Competition Memorial

    4/13

    4

    STATEMENT OF JURISDICTION

    The Court may exercise its appellate jurisdiction under Section 96 of the Civil Procedure

    Code, 1908 wherein it is clearly stated that except when otherwise expressly provided in the

    body of the Code or by any other law for the time being in force, anappeal shall lie fromeverydecreepassed by anyCourt exercising originaljurisdiction the Court authorized to hear

    appeals from the decisions of such Court.

    http://www.lawnotes.in/Appealhttp://www.lawnotes.in/Decreehttp://www.lawnotes.in/Courthttp://www.lawnotes.in/Jurisdictionhttp://www.lawnotes.in/Jurisdictionhttp://www.lawnotes.in/Courthttp://www.lawnotes.in/Decreehttp://www.lawnotes.in/Appeal
  • 8/10/2019 Moot Court Competition Memorial

    5/13

    5

    STATEMENT OF FACTS

    1) Lalloji and Sons is one of the most prestigious firms dealing in logistics in India, on May 3

    2002 the firm came into an agreement with D.M. Allahabad that from December 1 2002 they

    would provide logistic support to Kumbh Mela, the contract will last for an year, State of

    U.P. by cl. 12 of the agreement agreed to pay to the firm the actual expenses incurred for

    providing the logistics report to the firm.

    2) December 2002 communal riots broke out in Meerut and the warehouses were burnt by

    communal mobs, this resulted in enormous increase in the demand by the government of

    logistic support. On June 20, 2003 the original agreement was by mutual consent revised and

    the uniform rate of 10 per square per feet for tenements was substituted by a graded scale. By

    their communication dated July 6, 2003 the firm demanded that the remuneration should be

    enhanced, they proposed a various increments under different heads, this revision of the rates

    was claimed on the plea that the existing rates were fixed in normal times and today's

    conditions are totally altered because of the communal rights. To this letter no immediate

    reply was given by the State of U.P. and the firm continued to supply logistics till September

    2003.

    3) On October 17, 2003 the state of U.P. exercising their option under cl. 9 of the agreement

    served the firm with a notice of the termination of the agreement. On November 1, 2003 the

    firm submitted their claim contending that the supplementary agreement dated June 20, 2003

    was void and not binding upon them, and that , in any event, and from time to time they were

    assured by the chief minister that their claim would be favourably considered by the state of

    U.P. and relying on these assurances they continued to supply the logistics support in

    quantities demanded by the government after incurring "heavy extra expenditure". The

    Principle Secretary if U.P. Government who was duly authorised by the government gave

    repeated verbal assurances that their demands would be satisfied and requested them to

    continue supplies for the successful conduct of Kumbh Mela. Later it was denied by the

    government that any assurance was given from their side and the firm continued to supply

    logistic support relying upon such alleged assurances.

    4) The firm contended that the terms of the contract were "entirely displaced" by reason of

    the commencement of hostilities and the terms of the contract agreed on December 2002

  • 8/10/2019 Moot Court Competition Memorial

    6/13

    6

    could not be taken into view because of the turn of events which were never contemplated by

    the parties. The state of U.P. contended that the performance of the contract has not become

    impossible or unlawful, the contract was in fact performed by the firm, therefore there could

    not have been a claim for the breach of the contract since it and already been performed.

    5) The case is scheduled for hearing in Allahabad High Court in appellate jurisdiction where

    the District Court has held the firm liable for the breach of Contract.

    SUMMARY OF ARGUMENTS

    1) The contract dated 20 June 2003 is void by the virtue of its frustration due to

    unprecedented events.

    2) The contract dated 20 June 2003 is void and the communication of July 6, 2003 and the

    further acceptance of the logistics by the respondents can be construed to have created a

    contract by variation thus making the respondents liable.

    ARGUMENTS ADVANCED

    IstIssue:Frustration of contract dated 20

    thJune 2003

    The counsel on behalf of the appellants contends that the contract dated 20 June 2013 stands

    frustrated by virtue of the unprecedented events which post the commencement of the

    contract. The counsel further submits that even if the contract was entered into post

    commencement of the riots, the ramifications of something as volatile as a riot, its further

    outcome and consequences, could not have been possibly contemplated by a reasonable man.

    Keeping this in mind the counsel submits before the court an excerpt from the case of Lord

    Simon in British Movietonews Ltd. v. London and District Cinemas Ltd1. which is as

    follows:-

    1L.R. [1952] A.C. 166

  • 8/10/2019 Moot Court Competition Memorial

    7/13

    7

    "The parties to an executory contract are often faced, in the course of carrying it out, with a

    turn of events which they did not at all anticipate - a wholly abnormal rise or fall in prices, a

    sudden depreciation of currency, an unexpected obstacle to execution, or the like. Yet this

    does not in itself affect the bargain they have made. If, on the other hand, a consideration of

    the terms of the contract, in the light of the circumstances existing when it was made, shows

    that they never agreed to be bound in a fundamentally different situation which has now

    unexpectedly emerged, the contract ceases to bind at that point - not because the court in its

    discretion thinks it just and reasonable to qualify the terms of the contract, but because on its

    true construction it does not apply in that situation. When it is said that in such circumstances

    the court reaches a conclusion which is 'just and reasonable' (Lord Wright in Constantine

    Steamship Line Ltd. v. Imperial Smelting Corporation Ltd., 1942 AC 154 at p. 186) or one

    'which justice demands' (Lord Sumner in Hirji Mulji v. Cheong Yue Steamship Co.

    Ltd. (1926) AC 497 (510), this result is arrived at by putting a just construction upon the

    contract in accordance with an 'implication ............. from the presumed common intention of

    the parties''

    Thus it can simply be attributed from the above cited authority that if the conditions post

    commencement of the contract are fundamentally and so extraneously different from the

    condition which preceded the commencement of the contract, the contract shall cease to exist.

    Further reliance can be laid on the judgement in the case of British Movietonews Ltd. v.

    London and District Cinemas Ltd.2which is as follows:-

    "............. no matter that a contract is framed in words which taken literally or absolutely,

    cover what has happened, nevertheless, if the ensuing turn of events was so completely

    outside the contemplation of the parties that the court is satisfied that the parties, as

    reasonable people, cannot have intended that the contract should apply to the new situation,

    then the court will read the words of the contract in a qualified sense; it will restrict them to

    the circumstances contemplated by the parties; it will not apply them to the uncontemplated

    turn of events, but will do therein what is just and reasonable."

    Thus if it can safely be proved that the ensuing turn of events as in the case at hand where the

    ramifications of a riot could not have been conceived by a reasonable due to its volatile

    2[1951] 1 K.B. 190

  • 8/10/2019 Moot Court Competition Memorial

    8/13

    8

    nature, then it is for the court to "read the words of the contract in a qualified sense" and to

    restrict them to the circumstances contemplated by the parties.

    Further the counsel would like to most humbly submit before this court a excerpt from

    Corbin on Contracts3which is as follows:-

    "An Official comment to the Uniform Commercial Code states that increased cost alone will

    not excuse performance but an increase that " alters the essential nature of the performance"

    may justify a discharge under the impracticability rule of UCC 2-615.

    Uniform Commercial Code 2-615 sets forth a rule for excusing non- performance in contracts

    for the sale of goods, in this commercial context the UCC rejects the stringency of the

    traditional common law " impossibility" doctrine and adopts the more lenient impossibility

    approach that had emerged in some court cases earlier in the twentieth century. Rather than

    excusing a seller from its duty of performance only if it is physically or objectively

    impossible, UCC 2-615 justifies a seller's non- performance if it is "commercially

    impracticable""

    Throwing some light on the issue at hand from the abovementioned authority and using it in

    the present context it can be considered that the appellant in the present case can be exempted

    from the performance of the contract because of the commercial impracticability which can

    be considered to be a valid ground for the frustration of a contract.

    IInd

    Issue: The supplementary agreement dated June 20, 2003 is void.

    A. The communication of the firm dated July 6, 2003 led to the implied form of

    variation in the terms of the earlier contract.

    Parties to an agreement may vary some of its terms by a subsequent agreement. The

    Indian Evidence Act 1872 forbids the admission of oral evidence to contradict or vary

    written agreements,4but this does not bar oral evidence to prove a subsequent variation or

    3Sarah Howard Jenkins, Corbin on Contracts,Vol. XIII, (ed Joseph M. Perillo), LexisNexis Mathew Bender,

    San Francisco, 2003, p.514The Indian Evidence Act 1872, S. 92; The Specific Relief act 1963, S. 18(c), as to the effect of subsequent

    variation on the right to seek specific performance.

  • 8/10/2019 Moot Court Competition Memorial

    9/13

    9

    modification, unless such variation is required by law to be in writing or seeks to vary an

    instrument which has been registered.5

    It is humbly submitted thatby their communication dated July 6, 2003, the firm had

    demanded that the remuneration, establishment & contingencies, and mandi & financing

    charges be enhanced. In respect of the buying remuneration, a 25% increase was

    proposed; and in respect of mandi & financing charges, an increase of 112%. This

    revision of rates was totally justified considering the fact that the existing rates, fixed in

    normal time, were entirely superseded by totally altered conditions obtaining in

    communal riot. To this letter, no immediate reply was given by State of U.P., but still the

    firm continued to supply the logistic till September 2003 which was duly received by the

    State of U.P. Besides this, since July 6, 2003 the appellants were being continually

    assured by the Chief Minister that the claim made by them would be favourably

    considered. It is only because of relying on this assurance that the appellants had

    continued the supply inspite of the fact that they were incurring heavy extra

    expenditure for the same. Also, the Principal Secretary of U.P. Government, who had

    been duly authorized in that behalf, had given repeated verbal assurances to the firm that

    their demands would be satisfied and had requested them to continue supplies for the sake

    of successfully conducting Kumbh Mela.

    Thus, by their conduct, the respondent had impliedly accepted to bring about a variation

    in the terms of the agreement dated June 20, 2003. In the case ofBrogden v. Metropolitan

    Railway Co.6:

    B had been supplying coal to a railway company without any formal agreement. B

    suggested that a formal agreement should be drawn up. The agents of both the parties met

    and drew up a draft agreement. It had some blanks when it was sent to B for his approval.

    He filled up the blanks including the name of an arbitrator and then returned it to the

    company. The agent of the company put the draft in his drawer and it remained there

    without final approval having been signified. B kept up his supply of coals but on the new

    terms. A dispute having arisen B refused to be bound by the agreement.

    The final acceptance was clearly given, said Lord Cairns LC when the company

    commenced a course of dealing which is referable only to the contract and when that

    5The Indian Evidence Act1882, s. 92, proviso 4.

    6(1877) 2 App Cas 666, HL.

  • 8/10/2019 Moot Court Competition Memorial

    10/13

    10

    course of dealing was accepted and acted upon by B in the supply of coals.This is a

    classic example of acceptance by conduct. In the present case, the assurances given to the

    appellants from time to time and no refusal of the demands made by them clearly led to

    implied form of alteration in the terms of the earlier agreement. This led the appellants

    into believing that their claim has been accepted by the respondents which will be duly

    honoured. The performance of the contract based on the terms of the agreement dated

    June 20, 2003 had become impossible due to the drastic prise rise in the turn of the events

    which were never in the contemplation of the parties.

    Hence, it is submitted that a contract by implied form of variation had come into

    existence based on the representations made by the appellants on July 6, 2003 and the

    conduct of both the parties thereafter.

    B. With the coming into force of the new agreement on the representations made on

    July 6, 2003, the agreement dated June 20, 2003 was dischrged.

    As per Section 62 of the Indian Contract Act, 1872:

    62. Ef fect of novation, recission and alteration of contract: If the parties to a

    contract agree to substitute a new contract for it, or to rescind or alter it, the

    original contract need not be performed.

    Thus, in respect of the alteration made impliedly based on the representations made by

    the appellants via letter dated July 6, 2003, the agreement entered into on June 20, 2003 is

    no more binding on the appellants. The consideration for the variation if it has to be found

    lies in the mutual abandonment of existing rights or conferring new benefits by each party

    on the other; or in the assumption of additional obligations or incurring additional

    liabilities or increased detriment.7 The courts have also recognised a practical benefit

    arising to a party undertaking an additional detriment, as sufficient consideration.8

    It is humbly submitted before the Court that in the present set of facts and circumstances,

    it can be seen that earlier the appellants had been undertaking additional detriment due

    to the unexpected drastic price rise because of the communal riots, and this was changed

    when a practical benefitarose to them by implied acceptance, made to them by the State

    7

    Pollock & Mulla, Indian Contract & Specific Relief Acts, Thirteenth Edition, Vol. I, (ed R. G. Padia),LexisNexis Butterworths, New Delhi, p. 1242.8Williams v. Roffey Bros & Nicholls (Contractors) Ltd. [1990] 1 All ER 512.

  • 8/10/2019 Moot Court Competition Memorial

    11/13

    11

    of U.P., of the representations made by the appellants on July 6, 2003. Thus, there was

    sufficient consideration for the variation to occur.

    This alteration, thus led to the changing in the terms of the earlier contract dated June 20,

    2003, because of which it was discharged as soon as the new agreement came into

    existence and hence, the earlier agreement is not binding on the appellants.

    Both, the question of the extent to which a substituted contract operates as a discharge of

    a prior claim and the number of antecedent claims within the scope of the substituted

    contract, are questions of construction and interpretation of the agreement.9 The two

    contracts must be construed together. Insofar as they are consistent, the later one

    prevails.10Thus, it is humbly submitted before the Court that the agreement dated June

    20, 2013 is not enforceable as far as the prices are concerned, which have been altered by

    the new agreement.

    IIIrd

    Issue: Ex- gratia compensation to be awarded to the appellants

    The counsel, representing the appellant, pleads before the Hon'ble court to consider the claim

    for damages made by firm to be analogized with the claims made by a single personal entity.

    Henceforth the counsel requests the court to apart from other damages claimed by the

    appellant the court must contemplate gratingEx gratia compensation to them.

    Ex gratiapayment can be defined as "Out of grace; as a matter of grace, favor, or indulgence;

    gratuitous. A term applied to anything accorded as a favor; as distinguished from that which

    may he demanded ex debito, as a matter of right"11. Basically Ex gratia is a Latin for "by

    favour", it is a payment made voluntarily, out of kindness of law. The person or authority

    making a payment Ex gratia is not legally at fault but by the virtue of moral defect in its

    conduct can be made liable for the above mentioned payment.

    Hon'ble Supreme Court of India in Rajanna v Union of India12, - appellant claimed ex-gratia

    payment due to suffering of permanent partial disablement of injuries received while

    performing duty - Apex Court found that appellant sustained injuries on VIP security duty -

    9Louis Dreyfus Negoce S.A. v. Blystad Shipping & Trading Inc. 252 F.3d 218. (2d Cir. 2001).

    10Sarah Howard Jenkins, Corbin on Contracts,Vol. XIII, (ed Joseph M. Perillo), LexisNexis Mathew Bender,

    San Francisco, 2003, p.413.11According toBlack's Law Dictionary, Sixth Edition.

    12AIR [1995] SC 1966

  • 8/10/2019 Moot Court Competition Memorial

    12/13

    12

    employment in workmen's Compensation Act is for liability to pay 1000, employee was held

    to be entitled for amount.

    Similarly in Yagar Muang v. State of Arunachal Pradesh13, in which petitioner's husband was

    serving as Assistant Engineer and he was killed by the terrorists/extremists NSCN while he

    was on official duty, and Commissioner accorded sanction of a meagre amount not exceeding

    Rs. 3,000 only being ex-gratia payment to the Petitioner-widow - It was held that it would be

    just and proper on the part of the State Respondents to afford a sum of Rs. 2,00,000 to the

    bereaved family of late Tajom Muang, Ex- Assistant Engineer as ex-gratia

    payment/compensation and, accordingly, the Court hereby determined to afford ex-gratia

    compensation/payment to the tune of Rs. 2 lakhs payable by the Respondents/authorities

    concerned to the bereaved family of late Tajom Muang, the then Assistant Engineer as

    financial help to secure the ends of justice, not Rs. 5 lakhs as claimed by the petitioner herein.

    Hence under the light of the above mentioned cases the counsel pleads the Hon'ble court to

    consider the appellant's claim for anEx gratiacompensation from the respondents and hence

    direct them towards commotion of this compensation.

    13MANU/GH/0184/2002

  • 8/10/2019 Moot Court Competition Memorial

    13/13

    13

    PRAYER

    Wherefore, in the lights of facts stated, issues raised, arguments advanced and authorities

    cited, it is most humbly prayed and submitted before the High Court of Judicature at

    Allahabad that it may be graciously pleased to exercise jurisdiction over the matter, and

    adjudge and declare that:

    a)

    The contract dated June 20, 2003 had got frustrated and that the appellants are not

    liable for breach of contract.

    b) The communication of the firm dated July 6, 2003 and the conduct of the respondents

    thereafter led to the implied form of variation in the terms of the earlier contract.

    c)

    The State of U.P. is liable to remunerate the appellants for the services provided by

    them.

    And pass any other order that it may deem fit against the defendant in ends of equity, justice

    & good conscience.

    All of which is most humbly and respectfully submitted.

    Place: High Court of Judicature at Allahabad S/d

    Date: -- /-- /20-- COUNSEL FOR THE APPELLANTS