4020 Old Pineville Road
Charlotte, NC 28217 Tel: 704-529-3200 Fax: 704-529-3272
www.atcassociates.com N.C. Engineering License No. C-1598
November 19, 2012 Mr. Chip Smith, P.E. Project Director Woolpert 8731 Red Oak Blvd. Charlotte, North Carolina 28217 Re: Report of Findings of Geotechnical Investigation Morehead Storm Drainage Improvement Project
Charlotte, North Carolina ATC Project No. 089.12774.1383
Dear Mr. Smith:
ATC Associates of North Carolina, P.C. (ATC) has completed the geotechnical drilling and sampling investigation services for the site located at the intersection of East Morehead Street and South McDowell Street in Charlotte, North Carolina. The purpose of this investigation is to evaluate soil and rock conditions in the area of the proposed stormwater improvements. Field Exploration The soil test boring locations are shown on the Boring Location Plan in the Appendix. The borings were established in the field by an ATC engineer by measuring distances and estimating right angles from existing site features shown on the site plan provided us. The boring locations should be considered approximate. Borings SB-ATC-1, SB-ATC-1A, SB-ATC-4, and SB-ATC-5 were performed at the approximate locations designated on the attached Boring Location Plan. The borings were extended to depths ranging from 27 to 43 feet below the existing asphalt surface elevation. Each soil test boring included intermittent split-barrel samples and Standard Penetration Tests to evaluate soil composition and consistency. Descriptions of the materials and conditions encountered in the borings are shown on the Soil Test Boring Logs in the Appendix. In the laboratory, the rock cores were evaluated by the project engineer where rock type was determined and the percent recovery and rock quality designation (RQD) was measured. The percent recovery is the ratio of the sample length obtained to the total length of the core run expressed as a percent. The RQD is the percentage of the length of the core recovered in segments four or more inches in length compared to the total length of the core run. Care is taken during examination of the core to see that the fractures in the core lengths caused by drilling or handling are ignored for the purposes of the RQD determination. The percent recovery and RQD are related to rock soundness and continuity. The measured values are indicated on the Soil Test Boring Logs in the Appendix.
ATC Project No. 089.12774.1383 Page 2 of 3
Laboratory Testing
The soil samples were classified by a geotechnical engineer using the Unified Soil Classification System in general accordance with the American Society of Testing and Materials (ASTM) Test Designations D-2487 and D-2488. In order to establish the pertinent characteristics and the nature of the soils encountered, representative soil samples were selected for Atterberg Limit tests, soil fraction passing the no. 200 sieve, and moisture content testing. The following laboratory tests were performed on selected split-spoon samples. The laboratory test results are included in the Appendix. Classification Tests: Atterberg Limits Tests (ASTM D 4318) were performed on selected split spoon samples obtained during our field exploration. The test results were used to evaluate engineering properties of the materials and to aid in classifying and grouping soils. Soil grain size distribution tests were also performed on selected split spoon samples. Based on the results of these tests, the soils were classified in accordance with USCS standards. Natural Moisture Content Tests: Natural moisture content tests were performed on selected split spoon samples. The natural moisture content tests were to assess the suitability of the on-site soils for use as structural fill and to evaluate the variation of soil moisture content across the project site. Findings The results of the soil test drilling are presented on the Soil Test Boring Logs in the Appendix. The soil and rock description are based on the logging operations performed by on-site personnel during the drilling operations. The results of the laboratory testing are present in the table below. The laboratory data is also presented on the Soil Test Boring Logs at the applicable sample depth.
ATTERBERG LIMIT TEST AND USCS CLASSIFICATION
BORING DEPTH, ft
SOIL FRACTION PASSING THE No.
200 SIEVE, % LIQUID LIMIT PLASTIC LIMIT
USCS CLASSIFICATION
SB‐ATC‐1 8 – 10 54.0 ‐ ‐ ‐
SB‐ATC‐1 10 – 12.5 55.4 ‐ ‐ ‐
SB‐ATC‐1 18 – 20 44.8 ‐ ‐ ‐
SB‐ATC‐1A 17 – 19 26.2 ‐ ‐ ‐
SB‐ATC‐1A 19 ‐ 21 39.1 33 31 SM
SB‐ATC‐1A 21 – 23 48.5 33 NP SM
SB‐ATC‐1A 23 – 25 43.1 29 28 SM
SB‐ATC‐1A 25 – 27 37.3 29 NP SM
SB‐ATC‐1A 27 ‐ 29 33.9 ‐ ‐ ‐
SB‐ATC‐1A 35 – 37 29.7 ‐ ‐ ‐
SB‐ATC‐4 18 – 20 37.8 ‐ ‐ ‐
SB‐ATC‐4 23 – 25 35.6 ‐ ‐ ‐
SB‐ATC‐5 15‐17 52.3 ‐ ‐ ‐
ATC Project No. 089.12774.1383 Page 3 of 3
The soil test borings were performed in general accordance with ASTM Designation D-1586, "Penetration Test and Split-Barrel Sampling of Soils.” A conventional hollow-stem drilling process was used to advance the borings. At regular intervals, the drilling tools were removed and soil samples were obtained with a standard 1.4-inch I.D., 2.0-inch O.D., split-tube sampler. The sampler was first seated six inches and then driven an additional foot with blows of a 140 pound hammer falling 30 inches. The number of hammer blows required to drive the sampler the final foot is designated the "Penetration Resistance.” The penetration resistance, when properly interpreted, is an indicator of the soils strength and density. Representative portions of the soil samples, obtained from the sampler, were placed in glass jars and transported to our laboratory for further evaluation and testing.
We appreciate the opportunity to provide this report. Please feel free to give us a call at (704) 529-3200 should you have any questions or comments regarding this data. Sincerely, ATC ASSOCIATES OF NORTH CAROLINA, P.C.
Joseph G. Schold, P.E. Senior Geotechnical Engineer Registered, North Carolina 21736
CITY OF CHARLOTTEMYRTLE/MOREHEAD STORM DRAINAGE
IMPROVEMENTS PROJECT
EEXF2200.01DATE:PROJECT NUMBER:
MULTISTORYBUILDING:
THE ADDISONBUILDING
McDOWELL ST.CONSTRUCTION SHAFT, BP2:PRECAST CONCRETE JUNCTION BOXRIM EL= 682.83INV EL= 651.58
ATC SB-3A
JOEL E WOOD BORING B-3(APPROX. LOCATION)
JOEL E WOOD BORING B-5(APPROX. LOCATION)
JOEL E WOOD BORING B-8(APPROX. LOCATION) ATC SB-8B
A
A'
THE ADDISON BUILDINGPARKING DECK
SINGLE STORYRESTAURANT
MOREHEAD ST. CROSSINGSEM TUNNEL
EXISTING 54" PCCP WATER MAIN
DRIVEWAY
PARKING LOT
PARKING LOT
CUT-AND-COVE
R OR
SEM TU
NNEL
LOW-RISECOMMERCIAL BUILDING
ATC SB-4A(APPROX. LOCATION)
JOEL E WOOD BORING B-4(APPROX. LOCATION)
ORIOLE ST.CONSTRUCTION SHAFT, BP3:PRECAST CONCRETE JUNCTION BOXRIM EL= 685.90INV EL= 652.37
SINGLE STORYCOMMERCIAL
BUILDING
ATC SB-8A
APRIL 2012
LEGEND:
BOREHOLE
REFERENCES:
STORM SEWER FLOW DIRECTION
NOTES:
SCALE: 1'=40'-0"
CUT-AND-COVE
R
~424'
LF O
F 8'X6
' RCBC
~165 LF OF 90" PIPE
~173'
LF OF 9
0" PIP
E
CUT-AND-COVER
OR SEM TU
NNEL
CITY OF CHARLOTTEMYRTLE/MOREHEAD STORM DRAINAGE
IMPROVEMENTS PROJECT
EEXF2200.01 APRIL 2012DATE:PROJECT NUMBER:
LEGEND:
BOREHOLE
STORM SEWER FLOW DIRECTION
MULTISTORYBUILDING:
THE ADDISONBUILDING
McDOWELL ST.CONSTRUCTION SHAFTBP2:PRECAST CONCRETEJUNCTION BOXRIM EL= 682.83INV EL= 651.58
ATC SB-3A
JOEL E WOOD BORING B-3(APPROX. LOCATION)
A
A'
THE ADDISON BUILDINGPARKING DECK
MOREHEAD ST. CROSSINGSEM TUNNEL
DRIVEWAY
LOW-RISECOMMERCIAL BUILDING
NOTES:
SCALE: 1'=40'-0"
ATC SB-4A(APPROX. LOCATION)
JOEL E WOOD BORING B-4(APPROX. LOCATION)
JOEL E WOOD BORING B-2(APPROX. LOCATION)
ATC SB-2A(APPROX. LOCATION)
CUT-AND-COVE
R OR
SEM TU
NNEL
CUT-AND-COVE
R
~424'
LF O
F 8'X6
' RCBC
LOW-RISECOMMERCIAL BUILDING
NEW 8'X6' RCBC
SHORED EXCAVATION FORBOX CULVERT AND BP1
REFERENCES:
EXISTNG 9'X6' RCBC
LOW-RISECOMMERCIAL BUILDING
LOW-RISECOMMERCIAL BUILDING
BP1:PRECAST JUNCTION BOXRIM EL= 666.6INV EL=651.11
EXISTING 9'X6' RCBC
CONNECTION
NEW 9'X6' RCBC
8-10': 54%passing No. 200sieve
10.5-12.5': 55.4passing No. 200sieve
18-20': 44.8%passing No. 200sieve
5
4
5
5
14
13
S-1
S-2
S-3
S-4
S-5
S-6
Asphalt Pavement and Base Course
AUGER DRILLING - NO SAMPLING
SOIL ZONE: RESIDUUM - Soft to firm reddishbrown and brown sandy SILT (ML)
RESIDUUM - Loose brown and tan silty SAND (SM)
@ approximately 17 feet becomes medium dense
Medium dense tan silty SAND
SS
SS
SS
SS
SS
SS
1.0
8.0
13.0
23.0
27.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
23.1NANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-1089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/20/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
3 daysNA
hourshours
SURFACE ELEVATION
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
Switched to NQ2coring at 35 ft.b.g.s. due toauger refusalRun No. 1: Rec.= 60 percentRQD = 13percentRun No. 2: Rec.= 50 percentRQD = 14percent
50/2"
50/3"
S-7
S-8
S-9
TRANSITION ZONE: Sampled as very dense tansilty SAND with rock fragments
BEDROCK ZONE: Medium-grained light blue-graygranite with weak foliation dipping 20-30 degrees.
BORING TERMINATED
SS
SS
RC35.0
43.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
23.1NANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-1089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/20/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
3 daysNA
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
30
35
40
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
33
33
29
29
16.8
21.6
29.9
21.5
16.3
LaboratoryResults17-19': 26.2%passing No. 200sieve19-21': 39.1%passing No. 200sieve
21-23': 48.5%Passing No. 200sieve
23-25': 43.1%passing No. 200sieve
25-27': 37.3%passing No. 200sieve
7
10
13
11
14
17
31
NP
28
NP
S-1
S-2
S-3
S-4
S-5
S-6
Asphalt Pavement and Base Course
AUGER DRILLING - NO SAMPLING
SOIL ZONE: RESIDUUM: Loose to mediumdense, moist light brown silty SAND (SM)
@ 18 ft. Thin (1/8 inch) bonds of white clay
@ 20 ft. Tan, very thin dark bands indicating relictfoliations, approx. 20 degree dip
SS
SS
SS
SS
SS
SS
1.0
15.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANANANANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-1A089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/20/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
NANA
hourshours
SURFACE ELEVATION
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
27-29': 33.9%passing No. 200sieve
35-37': 29.7%passing No. 200sieve
33
50/5"
50/5"
50/4"
50/5"
50/3"
S-7
S-8
S-9
S-10
S-11
S-12
TRANSITION ZONE: Sampled as very dense tansilty SAND with rock fragments.
@ 33 ft. gravel-sized fragments of weathered granitein sampler
BORING TERMINATED:
SS
SS
SS
SS
SS
SS
29.5
37.4
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANANANANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-1A089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/20/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
NANA
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
30
35
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
18-20': 37.8%passing No. 200sieve
23-25': 35.6%passing No. 200sieve
5
5
5
6
12
18
39
S-1
S-2
S-3
S-4
S-5
S-6
S-7
Asphalt Pavement and Base Course
AUGER DRILLING - NO SAMPLING
SOIL ZONE: Residuum: Firm orangish brownsandy SILT
Firm to very stiff orangish brown, tan, and whitesandy SILT
Hard tan and brown sandy SILT
SS
SS
SS
SS
SS
SS
SS
1.0
7.0
10.0
23.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
12.2NANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-4089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/19/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
3 daysNA
hourshours
SURFACE ELEVATION
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
67
47
S-8
S-9Dense tan silty coarse SAND
BORING TERMINATED
SS
SS33.0
35.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
12.2NANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-4089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/19/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
3 daysNA
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
30
35
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
15-17': 52.3passing No. 200sieve
9
5
18
23
50/5.5"
S-1
S-2
S-3
S-4
S-5
Asphalt Pavement and Base Course
AUGER DRILLING - NO SAMPLING
SOIL ZONE: Fill: Stiff reddish brown sandy SILT
Firm brown and reddish brown sandy clayey SILT
RESIDUUM: Medium dense orangish brown andtan silty SAND
Medium dense to very dense gray and tan siltySAND
SS
SS
SS
SS
SS
1.0
12.0
15.0
18.0
20.0
27.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
14.2NANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-5089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/20/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
3 daysNA
hourshours
SURFACE ELEVATION
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
BORING TERMINATED
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
14.2NANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-ATC-5089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/20/12
9/20/12
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
3 daysNA
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
33.1
3
4
3
4
12
21
42
S-1
S-2
S-3
S-4
S-5
S-6
S-7
Asphalt Pavement and Base Course
AUGER DRILLING - NO SAMPLING
SOIL ZONE: FILL - Very soft and soft brown andlight tan fine sandy clayey SILT (ML)
Very loose and loose grayish brown sandy CLAY toclayey SAND (CL to SC)
RESIDUUM - Firm to hard dark brown and brownfine sandy SILT (ML)
BORING TERMINATED
SS
SS
SS
SS
SS
SS
SS
1.5
5.0
12.0
15.0
25.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANANANANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-2A089.12774.1383JGSJGS
1 1Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/14/11
9/14/11
Fishburne
J. Hamela
HSA
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
NANA
hourshours
SURFACE ELEVATION
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
38
32
17.6
32.0
32.9
31.6
33.9
28.6
8
8
13
8
15
31
41
NP
NP
S-1
S-2
S-3
S-4
S-5
S-6
S-7
Asphalt Pavement and Base Course
Auger Drilling - No Sampling
SOIL ZONE- Residuum: Loose to medium densesilty SAND (SM) slightly moist, firm, mottled red anddark yellowish orange with thin brownish blackstreaks.
@ 17' becomes very stiff SANDY SILT (ML) withtraces of clay present as thin (<1 mm) bands,brownish black streaks more common.
@19' becomes mottled yellow gray and darkyellowish orange.
@ 24' becomes hard dark yellowish orange withtraces of fine sand
SS
SS
SS
SS
SS
SS
SS
1.5
5.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
20.520.2NA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-3A (32190)089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/13/11
9/13/11
Fishburne
J. Hamela
HSA
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
6 day10 day
hourshours
SURFACE ELEVATION 679.9
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
23
8667
16.8
@ 38.5': switch torock coring
Run No. 1: RQD= 0%, Rec. = 23%
Run No. 2: RQD= 0%, Rec. = 0%
Run No. 3 RQD =0%, Rec. = 55%
Run No. 4: RQD= 47%, Rec. =100%
Lifter malfunctionduring runs 3 and4. Core may havebeen damagedremoving fromcore barrelRun No. 5: RQD= 100%, Rec. =100%170 pcf
80/9"
50/4"
50/2"
NP
S-8
S-9
S-10
R-1
R-2
R-3
R-4
R-5
TRANSITION ZONE: Saprolite of granite with relicthigh angle joints. Sampled as very dense silty fineSAND (SM) firm and dry, dark yellowish orange.
37 - 40' - Rock lenses
No sample recovery
BEDROCK ZONE: Medium grained light bluishgray granite with weak foliation dipping 20-30degrees
@45.5 - 46' - Foliation fracture zone, brown staining
BORING TERMINATED
SS
SS
SSRC
RC
RC
RC
RC
32.0
36.0
40.0
44.0
50.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
20.520.2NA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-3A (32190)089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/13/11
9/13/11
Fishburne
J. Hamela
HSA
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
6 day10 day
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
30
35
40
45
50
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
34.3
44.5
42.3
107 pcf (wet)
6
4
5
6
5
4
5
S-1
S-2
S-3
S-4
S-5
S-6
S-7
Asphalt Pavement and Base Course
AUGER DRILLING - NO SAMPLING
SOIL ZONE: RESIDUUM - Loose brown fine siltySAND (SM)
Firm brown and light tan fine sandy SILT (ML)
Soft and firm tan and light tan fine sandy SILT (ML)
BORING TERMINATED
SS
SS
SS
SS
SS
SS
SS
1.5
5.0
12.0
22.0
25.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANANANANA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-4A089.12774.1383JGSJGS
1 1Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/14/11
9/14/11
Fishburne
J. Hamela
HSA
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
NANA
hourshours
SURFACE ELEVATION
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
47
20
32
15180
27.0
24.3
26.7
18.2
29.9
18.7
101 pcf
101 pcf
109 pcf
@ 23.5': AugerRefusal
Run No. 1: RQD= 100% and Rec.= 100%Run No. 2: RQD= 85% and Rec. =100%
20
30
21
39
36
14
31
50/1'
25
NP
NP
S-1
S-2
S-3
S-4
S-5
S-6
S-7
R-1
R-2
Asphalt Pavement and Base Course
Auger Drilling - No Sampling
SOIL ZONE: FILL - Very stiff sandy CLAY (CL) withfew pieces of iron-stained subgranular quartz gravel,dark yellowish orange with 65% very thin streaks ofyellowish gray.
RESIDUUM - Medium dense silty SAND (SM)verigated with yellowish brown, dusky brown, anddark yellow orange streaks of clay
@ 13' becomes medium yellowish brown with verythin olive brown streaks
@ 16.5' becomes medium dense with traces of finesand
@ 18.5' becomes saprolite of granite sampled asdense silty SAND (SM) with relict grain structuresand foliation. Firm, moist, moderate yellowish brownwith splotches of yellowish gray and a few fine micaflakes.
BEDROCK ZONE: Medium grained light bluishgray granite with weak foliation and amphibolite-richinclusions 20-40 mm across. Foliation dips 20-30degrees. Some plagioclase grains are altered [email protected] - 30.0' - High angle joints (approx. 85
SS
SS
SS
SS
SS
SS
SS
RC
RC
1.5
5.0
7.5
23.5
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
16.817.3NA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-8A (32192)089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/12/11
9/12/11
Fishburne
J. Hamela
HSA / NQ-3
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
7 day11 day
hourshours
SURFACE ELEVATION 684.6
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
8980
14830
Run No. 3: RQD= 48% and Rec. =100%
Run No. 4: RQD= 76% and Rec. =100%171 pcf
Run No. 5: RQD= 85% and Rec. =100%
Run No. 6: RQD= 65% and Rec. =95%Run No. 7: RQD= 94% and Rec. =100%
Run No. 8: RQD= 88% and Rec. =100%
171 pcf
R-3
R-4
R-5
R-6
R-7
R-8
degrees) and closely spaced foliation with brownstaining and sandy coatings
@38.9' - 0.5 feet of closely spaced foliation fractureswith brown staining
@48.2 - 49.5' - High angle joint (85 degrees) withpatchy brown sandy coatings
BORING TERMINATED
RC
RC
RC
RC
RC
RC
50.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
16.817.3NA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-8A (32192)089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/12/11
9/12/11
Fishburne
J. Hamela
HSA / NQ-3
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
7 day11 day
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
30
35
40
45
50
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
36
39
9
10
7
30
49
75/10"
50/5"
22
25
S-1
S-2
S-3
S-4
S-5
S-6
S-7
ASPHALT PAVEMENT AND BASE COURSE
AUGER DRILLING - NO SAMPLING
SOIL ZONE: FILL - CLAY (CL) with trace ofsubgranular gravel, stiff, brown, and slightly moist
RESIDUUM - Firm to stiff sandy CLAY (CL) darkyellowish orange with streaks of brown iron oxidestaining, slightly moist, trace mica
Saprolite of granite sampled as silty SAND (SM) withtrace of clay, dense, moderate yellowish brown,slightly moist
@17': discontinuous 1/4" inch thick dark brownbands
@19'.5: some orange-brown soil partings; weakcementation between sandy particles
TRANSITION ZONE: Sampled as silty SAND (SM)with trace clay and fine gravel, coarsely mottledbrown and cream with rusty brown zones and relictmineral grains approximately 1/8-inch diameter,slightly moist, trace mica@24': relict rock structure notably more district
@26': as previous, with finer mottling, and palerbrown coloration
SS
SS
SS
SS
SS
SS
SS
1.5
5.0
8.0
14.0
21.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
16.318.8NA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-8B (32188)089.12774.1383JGSJGS
1 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/14/11
9/14/11
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
5 day12 day
hourshours
SURFACE ELEVATION 685.2
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
5
10
15
20
25
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272
8840
6080
@39' : Switch toNQ coringRun No. 1: RQD= 42%, Rec. =67%Run No. 2: RQD= 0%, Rec.= 70%Run No. 3: RQD= 56%, Rec. =86%
Run No. 4: RQD= 96%, Rec. =100%
172 pcf
50/5"
50/6"
50/4"
S-8
S-9
S-10R-1
R-2
R-3
R-4
@31': zone of hard drilling approx. 6-inches thick
@33': as at 26 ft but with increasing clay fraction:some clay
@39': could not recover sample, hard drilling.Switched to NQ-3 coring
BEDROCK ZONE: Medium grained, light bluishgray metamorphosed granite
@46': high angle (70 degree dip) joint
@48': high angle joint (70 degree dip) joint
BORING TERMINATED
SS
SS
SSRC
RC
RC
RC
39.0
43.0
50.0
Liqu
id L
imit
(LL)
Qu
-psi
Un
con
fine
dC
om
pre
ssiv
e S
tre
ng
th
Mo
istu
re C
on
ten
t %
Re
ma
rks
Po
cke
t P
en
etr
om
ete
r, t
sf
Gro
un
dw
ate
r
Pla
stic
Lim
it (P
L)
Sta
nd
ard
Pe
ne
tra
tion
Te
st,
N -
blo
ws/
foo
t
NANANA
16.318.8NA
HSACFADCMD
- Hollow Stem Augers- Continuous Flight Augers- Driving Casing- Mud Drilling
CLIENT
PROJECT NAME
PROJECT LOCATION
Woolpert
Myrtle/Morehead Storm Drainage Improvement Project
East Morehead Street and South McDowell Street
Charlotte, North Carolina
Date Started
Date Completed
Drill Foreman
Inspector
Boring Method
Hammer Wt.
Hammer Drop
Spoon Sampler OD
Rock Core Dia.
Shelby Tube OD
140
30
2
1-7/8" NQ-2
NA
lbs.
in.
in.
in.
in.
BORING #
JOB #
DRAWN BY
APPROVED BY
SB-8B (32188)089.12774.1383JGSJGS
2 2Page
TEST BORING LOG
DRILLING and SAMPLING INFORMATION TEST DATA
Sample Type
9/14/11
9/14/11
Fishburne
J. Hamela
HSA / NQ-2
Noted on Drilling ToolsAt Completion (in augers)At Completion (open hole)AfterAfter
5 day12 day
hourshours
(continued)
ofCave Depth
ft.ft.ft.ft.ft.ft.
Str
atu
mD
ep
th
De
pth
Sca
le
Sa
mp
leN
o.
Sa
mp
ler
Gra
ph
ics
Re
cove
ry G
rap
hic
s
Sa
mp
le T
ype
SSSTCARCCUCT
- Driven Split Spoon- Pressed Shelby Tube- Continuous Flight Auger- Rock Core- Cuttings- Continuous Tube
Depth to Groundwater Boring Method
SOIL CLASSIFICATION
30
35
40
45
50
4020 Old Pineville RoadCharlotte, NC 28217
704-529-3200Fax 704-529-3272