most advanced special steel plant in the world€¦ · most advanced special steel plant in the...

1
MOST ADVANCED SPECIAL STEEL PLANT IN THE WORLD BÖHLER EDELSTAHL GMBH & CO KG, KAPFENBERG PROCESSES & FUNCTIONS AT THE SPECIAL STEEL PLANT PRODUCTS & APPLICATIONS Investment volume: up to EUR 350 million The most advanced plant of its type in the world New benchmarks in product quality, digitalization & environmental standards Secures the corporate location at Kapfenberg with over 3,000 employees Groundbreaking ceremony: 2018 Construction period: 3 years 1) Highly efficient electric arc furnace: » Core of the plant » Raw material (ultra-pure scrap) is melted down into steel » Capacity: 60 tons 2) Treatment furnaces: » Addition of high-quality alloys » Production of particularly tough, temperature and corrosion-resistant steel grades » Automated target-state analysis 3) Casting & solidifying: » Robots cast material into molds (= ingot molds) » Preparation for processing 4) Extraction & transport: » Extraction of the steel ingots from the ingot molds » Processing by voestalpine companies & external customers » Annual production capacity: ~ 205.000 tons of special steel One melting and two casting halls cover the entire special steel production process: Manufacture of high-performance steels as pre-material for the... Aerospace industry Automotive industry Oil & gas industry 1 2 3 4 Automation & digitalization: » Fully digitalized & automated production processes » Central control stand Delivery of the raw materials Finished ingots for processing companies Casting of ingots with required parameters Melting & treatment furnaces

Upload: others

Post on 05-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MOST ADVANCED SPECIAL STEEL PLANT IN THE WORLD€¦ · MOST ADVANCED SPECIAL STEEL PLANT IN THE WORLD BÖHLER EDELSTAHL GMBH & CO KG, ... » Extraction of the steel ingots from the

MOST ADVANCED SPECIAL STEEL PLANTIN THE WORLDBÖHLER EDELSTAHL GMBH & CO KG, KAPFENBERG

PROCESSES & FUNCTIONS AT THE SPECIAL STEEL PLANT

PRODUCTS & APPLICATIONS

Investment volume: up to EUR 350 million

The most advanced plant of its type in the world

New benchmarks in product quality, digitalization & environmental standards

Secures the corporate location at Kapfenberg with over 3,000 employees

Groundbreaking ceremony: 2018

Construction period: 3 years

1) Highly efficient electric arc furnace:» Core of the plant» Raw material (ultra-pure scrap) is melted down into steel » Capacity: 60 tons

2) Treatment furnaces:» Addition of high-quality alloys» Production of particularly tough, temperature and corrosion-resistant steel grades» Automated target-state analysis

3) Casting & solidifying:» Robots cast material into molds (= ingot molds) » Preparation for processing

4) Extraction & transport:» Extraction of the steel ingots from the ingot molds» Processing by voestalpine companies & external customers» Annual production capacity: ~ 205.000 tons of special steel

One melting and two casting halls cover the entire special steel production process:

Manufacture of high-performance steels as pre-material for the...

Aerospace industry Automotive industry Oil & gas industry

1

2

3

4

Automation & digitalization:» Fully digitalized & automated production processes» Central control stand

Delivery of the raw materials

Finished ingots for processing companies

Casting of ingots with required parameters

Melting & treatment furnaces