Metrolinx invites you to view an updated presentation for the Mount Dennis Mobility Hub Workshop. The purpose for the presentation is to present a preliminary station design concept and a series of more refined concepts for how the lands around the station could develop over time. Have your say at thecrosstown.ca.

TRANSCRIPT

Page 1: Mount Dennis Mobility Hub Update and Station Design Review

1

Eglinton Crosstown Light Rail Transit April 10, 2013

Mount Dennis Mobility Hub Update + Station Design Directions

Page 2: Mount Dennis Mobility Hub Update and Station Design Review

2

Meeting Objectives • Present what we heard at the public meeting on December 12, 2012 • Present and get feedback on

• More refined concepts for the areas surrounding the new station that will form the basis of the Mobility Hub Plan

• Suggested station design directions (to inform tender documents)

Page 3: Mount Dennis Mobility Hub Update and Station Design Review

3

was created in 2006 for the purpose of providing residents and businesses in the Greater Toronto and Hamilton Area (GTHA) a transportation system that is modern, efficient and integrated.

Page 4: Mount Dennis Mobility Hub Update and Station Design Review

4

Metrolinx LRT Projects in Toronto

Page 5: Mount Dennis Mobility Hub Update and Station Design Review

5

Eglinton Crosstown

• Project $4.9 B (2010$), funded by the Province of Ontario

• 19 kilometres east-west LRT from Kennedy to Mt. Dennis, including 10 kilometres of tunnel

• New Transit Connections to Yonge, University-Spadina Subway, Scarborough RT and GO Stouffville and planning for a GO Kitchener connection

• Up to 25 stops and stations

Page 6: Mount Dennis Mobility Hub Update and Station Design Review

6

Project Schedule

• Delivered using a Public Private Partnership (PPP) approach, also known as Alternative Financing and Procurement (AFP)

Page 7: Mount Dennis Mobility Hub Update and Station Design Review

7

EGLINTION CROSSTOWN TIMELINE

Page 8: Mount Dennis Mobility Hub Update and Station Design Review

8

Project Schedule

EGLINTION CROSSTOWN TIMELINE

Page 9: Mount Dennis Mobility Hub Update and Station Design Review

9

Project Schedule

EGLINTION CROSSTOWN TIMELINE

Page 10: Mount Dennis Mobility Hub Update and Station Design Review

10

Project Schedule

EGLINTION CROSSTOWN TIMELINE

Page 11: Mount Dennis Mobility Hub Update and Station Design Review

11

Project Schedule

EGLINTION CROSSTOWN TIMELINE

Page 12: Mount Dennis Mobility Hub Update and Station Design Review

12

What is a Mobility Hub?

51 mobility hubs identified in The Big Move

Mobility hubs are major transit station areas within the GTHA that are particularly significant given the level of transit service planned for them and the development potential around them.

Page 13: Mount Dennis Mobility Hub Update and Station Design Review

13 Mount Dennis is a hub in the growing regional transit system

Terminal station of Phase 1 of the new Eglinton Crosstown LRT line

Page 14: Mount Dennis Mobility Hub Update and Station Design Review

14 Mount Dennis is a hub in the growing regional transit system

Future GO Transit connection

Page 15: Mount Dennis Mobility Hub Update and Station Design Review

15 Mount Dennis is a hub in the growing regional transit system

New and existing bus routes connecting through Mount Dennis

Page 16: Mount Dennis Mobility Hub Update and Station Design Review

16

Mt. Dennis Mobility Hub Study Objectives • A fully integrated transit station to

facilitate transfers between rail and bus services, and the surrounding area

• Re-purposing the Kodak building

• Improvements to the public realm including streetscaping

• Enhanced pedestrian/cyclist connectivity

• Potential uses of lands adjacent to Metrolinx property for transit oriented development

• Phasing of implementation of the mobility hub components

Page 17: Mount Dennis Mobility Hub Update and Station Design Review

17

How will the Mobility Hub Study be Implemented?

• Metrolinx will: • Incorporate recommendations into the concepts for LRT

facilities and stations • Work with the City of Toronto to support Official Plan

and Zoning By-law updates that reflect the study recommendations

• Work with the City of Toronto to prioritize recommended infrastructure and public realm improvements

Page 18: Mount Dennis Mobility Hub Update and Station Design Review

18

What is being planned

Page 19: Mount Dennis Mobility Hub Update and Station Design Review

19

A New LRT Station With Two Entrances

• Western Terminus of Phase 1 of the Eglinton Crosstown LRT • Located beneath the Rail Corridor on North side of Eglinton Ave. • Entrance addressing Weston Road • Entrance east of the Rail Corridor

LRT Station

Page 20: Mount Dennis Mobility Hub Update and Station Design Review

20

A New Transit Overpass

• Span Black Creek Drive • Descend towards Weston Road to travel beneath the rail corridor

Transit Overpass

Page 21: Mount Dennis Mobility Hub Update and Station Design Review

21

A 15-Bay Bus Terminal

• Required to accommodate the substantial number of bus routes accessing the station

• Intended to be reduced in size following the extension of the LRT west

Bus Terminal

Page 22: Mount Dennis Mobility Hub Update and Station Design Review

22

A Future GO Transit Station

• Design of station is being coordinated with LRT facilities

GO Station

Page 23: Mount Dennis Mobility Hub Update and Station Design Review

23

A Passenger Pick-Up and Drop Off

• Designed to accommodate “kiss n’ ride” traffic for GO and LRT passengers • Will include parking for future uses in the Kodak Building

Passenger Pick-up and Drop-off

Page 24: Mount Dennis Mobility Hub Update and Station Design Review

24

A Maintenance and Storage Facility

• Designed to serve the Eglinton Crosstown LRT on opening day and over the long term once the line is extended west to the airport

• Required to accommodate 168 vehicles with facilities to service and maintain them

• Plans to comply with the Toronto Green Building Standard (LEED Silver equivalent)

Maintenance and Storage Facility

Page 25: Mount Dennis Mobility Hub Update and Station Design Review

25

The Mobility Hub Study focuses on five areas

Page 26: Mount Dennis Mobility Hub Update and Station Design Review

26

4. Black Creek Triangle

1. Kodak Lands

5. Black Creek Business Area

Page 27: Mount Dennis Mobility Hub Update and Station Design Review

27

Lands Metrolinx has control over

Metrolinx Lands (In White)

Page 28: Mount Dennis Mobility Hub Update and Station Design Review

28

Why are we looking at lands outside Metrolinx’s ownership?

• A Mobility Hub is not just a transit station, but the lands around the station that support use of public transit (within a 10 minute walk)

• Recommendations for lands outside the immediate station area should support broader community objectives

• It provides guidance to the City so that they can: • Proactively update their zoning and policy framework prior to

completion of the station • Prioritize investments in new infrastructure • Respond to development proposals with concrete

recommendations that support a wider vision for the station area

Page 29: Mount Dennis Mobility Hub Update and Station Design Review

29

What kind of development can we expect? • A weak market in comparison to other parts of the city makes it difficult

to attract investment of any kind

• Over time, improved transit access (LRT) and relatively low housing prices may lead to a gradual increase in existing housing demand and values

• Improved housing demand will help to improve the viability of retail on Weston Road which in turn will make it possible for higher density forms of residential development

• Office development may occur in the long term, however it will need to be economical to construct and require a supporting urban environment (streets, housing, retail)

Page 30: Mount Dennis Mobility Hub Update and Station Design Review

30

4. Black Creek Triangle

1. Kodak Lands

5. Black Creek Business Area

Page 31: Mount Dennis Mobility Hub Update and Station Design Review

31

What We Heard 1. Maintain and repurpose Kodak Building No. 9 2. Design the station as a connection 3. Provide for a future road connection 4. Design the MSF to face the street and preserve for new development 5. Explore other alignments so that development can address Eglinton

1 Kodak Lands

Page 32: Mount Dennis Mobility Hub Update and Station Design Review

32

1 Kodak Lands Key Moves

Page 33: Mount Dennis Mobility Hub Update and Station Design Review

33

Kodak Lands 1 Key Moves

Create an MSF to Service and Store LRT Vehicles

Page 34: Mount Dennis Mobility Hub Update and Station Design Review

34

Kodak Lands 1 Key Moves

Create a 15 Bay Bus Terminal

Page 35: Mount Dennis Mobility Hub Update and Station Design Review

35

Kodak Lands 1 Key Moves

Build a new GO Train Station

Page 36: Mount Dennis Mobility Hub Update and Station Design Review

36

Kodak Lands 1 Key Moves

Create A Passenger Pickup and Drop Off

Page 38: Mount Dennis Mobility Hub Update and Station Design Review

38

Kodak Lands 1 Key Moves

GO Station

Passenger Pick Up & Drop Off

Bus Terminal Kodak Building

Primary Entrance

Secondary Entrance

Kodak Parking

Page 39: Mount Dennis Mobility Hub Update and Station Design Review

39

Kodak Lands 1 Key Moves

Illustrative Section

Page 40: Mount Dennis Mobility Hub Update and Station Design Review

40

Kodak Lands 1 Key Moves

Illustrative Section

Page 41: Mount Dennis Mobility Hub Update and Station Design Review

41

Kodak Lands 1 Key Moves

Opening Day

Page 42: Mount Dennis Mobility Hub Update and Station Design Review

42

Kodak Lands 1 Key Moves

Opening Day

Page 43: Mount Dennis Mobility Hub Update and Station Design Review

43

Kodak Lands 1 Key Moves

Low-rise development using just the station lands

Page 44: Mount Dennis Mobility Hub Update and Station Design Review

44

Eglinton Corridor 2 What We Heard 1. Design the station as a destination 2. Improve the underpass 3. Improve the parks on either end 4. Extend the multi-use path 5. Improve the streetscape 6. Minimize traffic impacts

Page 45: Mount Dennis Mobility Hub Update and Station Design Review

45

Key Plan

Eglinton Corridor Key Moves 2

Page 46: Mount Dennis Mobility Hub Update and Station Design Review

46

Key Plan

Eglinton Corridor Key Moves 2

Create a Feature of the Station Wall

Page 47: Mount Dennis Mobility Hub Update and Station Design Review

47

Key Plan

Eglinton Corridor Key Moves 2 A Green Wall

Page 48: Mount Dennis Mobility Hub Update and Station Design Review

48

A Transparent Structure

Page 49: Mount Dennis Mobility Hub Update and Station Design Review

49

An Art Wall

Page 50: Mount Dennis Mobility Hub Update and Station Design Review

50

Key Plan

Eglinton Corridor Key Moves 2

Create a Light and Airy LRT Overpass

Page 51: Mount Dennis Mobility Hub Update and Station Design Review

51

Key Plan

Eglinton Corridor Key Moves 2

Renaturalise Black Creek Valley

Page 52: Mount Dennis Mobility Hub Update and Station Design Review

52

Key Plan

Eglinton Corridor Key Moves 2

Create An Accessible Secondary Entrance

Page 53: Mount Dennis Mobility Hub Update and Station Design Review

53

Key Plan

Eglinton Corridor Key Moves 2

Create an Eglinton Greenway

Page 54: Mount Dennis Mobility Hub Update and Station Design Review

54

Key Plan

Eglinton Corridor Eglinton Avenue today 2

Page 55: Mount Dennis Mobility Hub Update and Station Design Review

55

Eglinton Corridor Eglinton Avenue on opening day 2

Page 56: Mount Dennis Mobility Hub Update and Station Design Review

56

Key Plan

Eglinton Corridor Eglinton Avenue over the longer term 2

Page 57: Mount Dennis Mobility Hub Update and Station Design Review

57

Key Plan

Eglinton Corridor Eglinton Avenue over the longer term 2

Page 58: Mount Dennis Mobility Hub Update and Station Design Review

58

Key Plan

Eglinton Corridor Eglinton Avenue over the longer term 2

Page 59: Mount Dennis Mobility Hub Update and Station Design Review

59

Eglinton Corridor Eglinton Avenue Today 2

Page 60: Mount Dennis Mobility Hub Update and Station Design Review

60

Eglinton Corridor Eglinton Avenue Following Completion of the Station 2

Page 61: Mount Dennis Mobility Hub Update and Station Design Review

61

Eglinton Corridor Eglinton Avenue over the longer term 2

Page 62: Mount Dennis Mobility Hub Update and Station Design Review

62

Key Plan

Eglinton Corridor Key Moves 2

Extend the Eglinton Multi-use Path

Page 63: Mount Dennis Mobility Hub Update and Station Design Review

63

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Page 64: Mount Dennis Mobility Hub Update and Station Design Review

64

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

From the existing multi-use path

Page 65: Mount Dennis Mobility Hub Update and Station Design Review

65

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Across a dedicated bike crossing

Page 66: Mount Dennis Mobility Hub Update and Station Design Review

66

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Along the north side of Eglinton

Page 67: Mount Dennis Mobility Hub Update and Station Design Review

67

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Through Pearen Park

Page 68: Mount Dennis Mobility Hub Update and Station Design Review

68

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Along a reclaimed merging lane

Page 69: Mount Dennis Mobility Hub Update and Station Design Review

69

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Weston Road Station Entrance

Page 70: Mount Dennis Mobility Hub Update and Station Design Review

70

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Secondary Station Entrance

Page 71: Mount Dennis Mobility Hub Update and Station Design Review

71

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Along The Eglinton Promenade

Page 72: Mount Dennis Mobility Hub Update and Station Design Review

72

Key Plan

Eglinton Corridor Traveling along the Eglinton Greenway 2

Along The North Side of Eglinton

Page 73: Mount Dennis Mobility Hub Update and Station Design Review

73

Weston Road 3 What We Heard 1. Preserve Weston’s main street function 2. Enhance the public realm 3. Design the station park as a destination 4. Enhance pedestrian crossings 5. Incorporate lighting into the station to improve safety 6. Explore opportunities to preserve the Scotia building

Page 74: Mount Dennis Mobility Hub Update and Station Design Review

74

Weston Road Key Moves 3

Create a New Mount Dennis Transit Park

Page 75: Mount Dennis Mobility Hub Update and Station Design Review

75

Weston Road Key Moves 3

Anchor the Station With New Development

Page 76: Mount Dennis Mobility Hub Update and Station Design Review

76 Low-rise development using just the station lands

Page 77: Mount Dennis Mobility Hub Update and Station Design Review

77 Mid-rise development

Page 78: Mount Dennis Mobility Hub Update and Station Design Review

78 High-rise development integrated with the station

Page 79: Mount Dennis Mobility Hub Update and Station Design Review

79

Weston Road Key Moves 3

Preserve for New Retail Uses on Weston

Page 80: Mount Dennis Mobility Hub Update and Station Design Review

80

Weston Road Key Moves 3

Encourage Mid-rise Development

Page 81: Mount Dennis Mobility Hub Update and Station Design Review

81

Weston Road Key Moves 3 Improve Streetscaping and Sidewalks

Page 82: Mount Dennis Mobility Hub Update and Station Design Review

82

Weston Road Key Moves 3

Page 83: Mount Dennis Mobility Hub Update and Station Design Review

83

Weston Road Key Moves 3

Page 84: Mount Dennis Mobility Hub Update and Station Design Review

84

Weston Road Key Moves 3

Page 85: Mount Dennis Mobility Hub Update and Station Design Review

85

Weston Road Key Moves 3

Create a Series of Small Open Spaces

Page 86: Mount Dennis Mobility Hub Update and Station Design Review

86

Weston Road Key Moves 3 Transform the Southern Entrance to the

Community

Page 87: Mount Dennis Mobility Hub Update and Station Design Review

87

Black Creek Drive Triangle 4

What We Heard 1. Provide safe pedestrian connections 2. Encourage new mixed use development 3. Improve the crossing to the new Community Centre 4. Provide a mix of housing types 5. Ensure new buildings address the street 6. Protect for a grocery store in this area in the future 7. Do not impact existing retail on Weston Road 8. Create new streets and a new open space

Page 88: Mount Dennis Mobility Hub Update and Station Design Review

88

Black Creek Drive Triangle 4 Primarily Retail

Retail

Existing No Frills

Retail

Apartments Apartments

Apartments

Parking

Parking Apartments

Page 89: Mount Dennis Mobility Hub Update and Station Design Review

89

Black Creek Drive Triangle 4 Mix of Residential and Some Retail Development

Retail

Retail

Town Houses

Apartments

Apartments

Apartments

Apartments

Apartments

Page 90: Mount Dennis Mobility Hub Update and Station Design Review

90

Black Creek Drive Triangle 4 Higher Density Residential Development

Apartments

Apartments

Apartments

Apartments

Apartments Retail

Page 91: Mount Dennis Mobility Hub Update and Station Design Review

91

Black Creek Drive Triangle 4 Higher Density Residential Development

New Street and Block Pattern

Page 92: Mount Dennis Mobility Hub Update and Station Design Review

92

Black Creek Drive Triangle 4 Higher Density Residential Development

A Neighbourhood Open Space

Page 93: Mount Dennis Mobility Hub Update and Station Design Review

93

Black Creek Drive Triangle 4 Key Moves

Buildings That Address The Street

Page 94: Mount Dennis Mobility Hub Update and Station Design Review

94

Black Creek Drive Triangle 4 Key Moves

Buildings That Address The Street

Page 95: Mount Dennis Mobility Hub Update and Station Design Review

95

Black Creek Drive Triangle 4 Key Moves

Below Grade or Structured Parking

Page 96: Mount Dennis Mobility Hub Update and Station Design Review

96

Black Creek Drive Triangle 4 Key Moves

Minimize Impacts of Convenience Parking

Page 97: Mount Dennis Mobility Hub Update and Station Design Review

97

Black Creek Drive Triangle 4 Key Moves

Preserve for a Secondary GO Transit Entrance

Page 98: Mount Dennis Mobility Hub Update and Station Design Review

98

Page 99: Mount Dennis Mobility Hub Update and Station Design Review

99

Black Creek Business Area

5

What We Heard 1. Maintain existing employment uses 2. Provide shops and cafés for employees 3. Add bike lanes to protect cyclists 4. Add sidewalks and improve the streetscape 5. Development should face the street 6. Animate the area through new uses

Page 100: Mount Dennis Mobility Hub Update and Station Design Review

100

Key Moves

Black Creek Business Area 5

Page 101: Mount Dennis Mobility Hub Update and Station Design Review

101

Key Moves

Black Creek Business Area 5

Ensure New Buildings Address the Street

Page 102: Mount Dennis Mobility Hub Update and Station Design Review

102

Key Moves

Black Creek Business Area 5

Secure A New Open Space for Area Employees

Page 103: Mount Dennis Mobility Hub Update and Station Design Review

103

Key Moves

Black Creek Business Area 5

Provide Infrastructure to Support Cyclists

Page 104: Mount Dennis Mobility Hub Update and Station Design Review

104

Key Moves

Black Creek Business Area 5

Encourage Amenities for Area Employees

Page 105: Mount Dennis Mobility Hub Update and Station Design Review

105

Key Moves

Black Creek Business Area 5

Provide New and Enhanced Sidewalks

Page 106: Mount Dennis Mobility Hub Update and Station Design Review

106

The Long Term Vision Bringing It All Together – Today

Page 107: Mount Dennis Mobility Hub Update and Station Design Review

107

GO Station

Passenger Pick Up & Drop Off & Kodak Parking

Bus Terminal

Kodak Building

Primary Entrance

Secondary Entrance

MSF Relocated Retaining Wall With Special Treatment

New Photography Drive Bridge

Rebuilt Streetscape (Multi-use path Weston to Black Creek)

Rebuilt Intersection With Improved Crossings

Bringing It All Together – Opening Day

Station Park

Page 108: Mount Dennis Mobility Hub Update and Station Design Review

108

The Long Term Vision Bringing It All Together – Opening Day

Designing the MSF and station facility to be a true mobility hub with seamless transit connections, a re-purposed Kodak Building and the preservation for long-term development

Page 109: Mount Dennis Mobility Hub Update and Station Design Review

109

The Long Term Vision Bringing It All Together – Over Time

Transforming Eglinton into a “greenway” connecting the two valleys and extending the Humber trail network east to the new community centre and beyond

Page 110: Mount Dennis Mobility Hub Update and Station Design Review

110

The Long Term Vision Bringing It All Together – Over Time

Encouraging the revitalization of Weston Road as the principal community and retail spine, centred upon a new station and green plaza space and supported by new development

Page 111: Mount Dennis Mobility Hub Update and Station Design Review

111

The Long Term Vision Bringing It All Together – Over Time Encouraging new mixed-use development on Black Creek Triangle which relates positively to Keelesdale Park and the Station and preserves for a new GO entrance and connection between Weston Road and the community centre

Page 112: Mount Dennis Mobility Hub Update and Station Design Review

112

The Long Term Vision Bringing It All Together – Over Time

Enhancing the image of the Black Creek Business Area and improving access for pedestrians, cyclists and transit users

Page 113: Mount Dennis Mobility Hub Update and Station Design Review

113

The Long Term Vision Bringing It All Together – Long Term Vision

Page 114: Mount Dennis Mobility Hub Update and Station Design Review

114

How does the long term vision get realized? • Metrolinx will be implementing transit-related infrastructure + public realm

improvements • Transit investment alone is unlikely to result in significantly more private real estate

development in the neighbourhood • Achieving the Mobility Hub vision will require investment and coordination from a

range of stakeholders to improve public realm and attract development

Metrolinx Community Groups /

Members Businesses / BIAs City of Toronto, Metrolinx, and other public agencies

Private Development

Page 115: Mount Dennis Mobility Hub Update and Station Design Review

115

Next Steps Spring / Summer 2013

• Completion of Draft Mobility Hub Plan • Finalize Mobility Hub Plan • Community Economic Development meetings (City of Toronto)

Late 2014 Successful project bidder selected 2014 / 2015 Final public consultation 2020 Opening Day

Page 116: Mount Dennis Mobility Hub Update and Station Design Review

116

Thank you!