mountain phoenix community school · • security upgrades, replace/repair heating & air...

1
2018 BOND IMPROVEMENTS * *Subject to project scope. Age of Facility: 3-118 years (built in 1900s, 2003, 2007, 2015) Square Footage: 38,000 Enrollment: 596 Some original structures date back to the 1900s. Primary building built in 2003. Temporary buildings (cottages) built in 2011. Middle school building completed in 2015. Security improvements made between 2015 & 2016. Complete third phase of middle school project, theatre/multi-use building. Add cafeteria & update kitchen. Replace play structure, resurface & install proper drainage on playing field. Security upgrades, replace/repair heating & air conditioning system & replace old windows. Replace ECE play structure. History of Work Mountain Phoenix Community School

Upload: others

Post on 02-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mountain Phoenix Community School · • Security upgrades, replace/repair heating & air conditioning system & replace old windows. • Replace ECE play structure. History of Work

2018 BOND IMPROVEMENTS*

*Subject to project scope.

Age of Facility: 3-118 years (built in 1900s, 2003, 2007, 2015)Square Footage: 38,000

Enrollment: 596

Some original structures date back to the 1900s. Primary building built in 2003. Temporary buildings (cottages) built in 2011. Middle school building completed in 2015. Security improvements made between 2015 & 2016.

• Complete third phase of middle school project, theatre/multi-use building.• Add cafeteria & update kitchen.• Replace play structure, resurface & install proper drainage on playing field.• Security upgrades, replace/repair heating & air conditioning system & replace old windows.• Replace ECE play structure.

History of Work

Mountain Phoenix Community School