1 Moving from Risk Management to Risk Elimination TJ Lyons, OHST CSP CRIS Regional SHE Manager Total Facility Solutions Prevention through Design Workshop March 11 of 2020, Tempe, AZ NIOSH Award #1 R13OH011707-01-00 1 PtD in Practice - stories and solutions Threats Designed by Professionals Accepted “Killing Conditions” Focus on Efficiency not Safety The Power of Additional Provisions Prevention through Design Workshop March 11 of 2020, Tempe, AZ 2

Upload: others

Post on 08-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Moving from Risk Management to Risk Elimination

1

Moving from Risk Management to Risk Elimination TJ Lyons, OHST CSP CRIS

Regional SHE ManagerTotal Facility SolutionsPrevention through Design Workshop

March 11 of 2020, Tempe, AZ

NIOSH Award #1 R13OH011707-01-00

1

PtD in Practice - stories and solutions

• Threats Designed by Professionals

• Accepted “Killing Conditions”

• Focus on Efficiency not Safety

• The Power of Additional Provisions

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

2

Page 2: Moving from Risk Management to Risk Elimination

2

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

ALBANY TIMES-UNIONOBITUARY

Hanson, John J. Sr., 82, of Castleton, NY “….passed away suddenly Friday, October 7, 2011”

3

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

Williamstown, MA – A construction accident at the Sterling and Francine Clark Art Institute left a New York man dead, after he was run over by a piece of construction equipment.

4

Page 3: Moving from Risk Management to Risk Elimination

3

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

Williamstown, MA – A construction accident at the Sterling and Francine Clark Art Institute left a New York man dead, after he was run over by a piece of construction equipment.

5

Designing for FailurePrevention through Design Workshop

March 11 of 2020, Tempe, AZ

§ Designed by professionals § Owner risk – that they

paid for…§ Lifetime Threats – If it was

dangerous during construction

6

Page 4: Moving from Risk Management to Risk Elimination

4

Designing for FailurePrevention through Design Workshop

March 11 of 2020, Tempe, AZ

7

Designing for FailurePrevention through Design Workshop

March 11 of 2020, Tempe, AZ

8

Page 5: Moving from Risk Management to Risk Elimination

5

Designing for Failure – listen for “that’s not what we do here…”

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

9

Avoiding the “must trust” OptionsDesign in the Prevention

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

10

Page 6: Moving from Risk Management to Risk Elimination

6

Our Professional Barriers Educating Future Designers

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

11

“Armed Hazards” David Macollum

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

12

Page 7: Moving from Risk Management to Risk Elimination

7

“Armed Hazards” David Macollum

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

Only 3-4% of skylights in the US will support the weight of a person…” Nigel Ellis

13

Listen for “but we have always done it this way”Prevention through Design Workshop

March 11 of 2020, Tempe, AZ

14

Page 8: Moving from Risk Management to Risk Elimination

8

PTD - driven by litigation $1.5 Million Award in Table Saw Injury Lawsuit

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

ADPROV – Contractor must utilize the SawStop© table saw or similar technology.”

WORKER – FINGER AMPUTATIONS BY TABLE SAW COST

Direct Cost to Business Region $504,846.00

Total Profit for Project $3,309.00

Cost of one SawStop© Table Saw $1,779.00

Additional Sales Needed to Recover Injury Cost $16.8 Million

15

The Power ofAdditional Contract Provisions

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

16

Page 9: Moving from Risk Management to Risk Elimination

9

Prevention in PracticePrevention through Design Workshop

March 11 of 2020, Tempe, AZ

17

Prevention in PracticeFrom Telling to Understanding

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

18

Page 10: Moving from Risk Management to Risk Elimination

10

Prevention in PracticeFrom Telling to Understanding

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

ADPROV – Exterior scaffolding will exceed the highest point of any roofline or final parapet/peak height by one level.

19

Eric BlackPrevention through Design Workshop

March 11 of 2020, Tempe, AZ

20

Page 11: Moving from Risk Management to Risk Elimination

11

Engineering in PreventionWe must answer…what's in this for me?

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

This marks 416% increase since a 2009 survey.

21

Prevention through Material Design – modular receptacles

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

22

Page 12: Moving from Risk Management to Risk Elimination

12

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

General Contractor– Safer installations– Mistake-proof wiring– Value-add to the owner– Timelines are met– Coordination with prefab

Modular Receptacles (Legrand)

23

ü We need to publically recognize design failures in the US – our line in the sand

ü Focus on the next generation of designersü Drive PtD incentives including insurersü Listen for “…but the guys need the work”ü We must answer to industry…what’s in this

for me and highlight the firms that found out

Prevention through Design WorkshopMarch 11 of 2020, Tempe, AZ

Our Next Steps

24

Page 13: Moving from Risk Management to Risk Elimination

13

Thanks!https://ptd.engineering.asu.edu/

NIOSH Award #1 R13OH011707-01-00

25