• Safety performance remains excellenty p– Over 15.2 million hours worked since start of
construction– Currently have worked >6 million hours without a lost
time accident– Total Recordable Case Rate - 0 57Total Recordable Case Rate 0.57– Total Lost Work Day Case Rate - 0.00
• Over 50 active environmental permits being managed p g gwith no violations to date
MOX Safety Fuels the FutureMOX Safety Fuels the Future
FY2011 A li h tFY2011 Accomplishments
• BMF structure is 76% complete p– First process building roof placement– 67 tanks have been installed– Concrete coatings 36% complete
• Began construction of gabion wall – 37% complete• Permanent underground utility installation – 72%
complete
MOX Safety Fuels the FutureMOX Safety Fuels the Future
FY2011 A li h tFY2011 Accomplishments
• Continued construction of Technical Support Building (ahead of schedule)
• Completed in advance testing of 5 process units• Completed in advance testing of 5 process units• Received 22 process units from vendors• Completed sintering furnace designCompleted sintering furnace design• Awarded all sintering furnace contracts
MOX Safety Fuels the FutureMOX Safety Fuels the Future
P f O i htP f O i htPerformance OversightPerformance Oversight
• Multiple layers of MOX Services oversightMultiple layers of MOX Services oversight– Quality Assurance/Quality Control
• >380 internal audits/surveillances – Design, construction, fabrication, integration, and procurement
activities– Compliance with codes & standards and QA requirements
• >540 vendor audits/surveillances/evaluations/shop• >540 vendor audits/surveillances/evaluations/shop inspections
–– Audits of new vendorsAudits of new vendors–– Maintenance of approved vendorsMaintenance of approved vendorsMaintenance of approved vendorsMaintenance of approved vendors–– Surveillances of ongoing vendor QA program activitiesSurveillances of ongoing vendor QA program activities–– Inspection of inInspection of in--progress and completed items for compliance progress and completed items for compliance
with specificationswith specifications
MOX Safety Fuels the FutureMOX Safety Fuels the Future
P f O i htP f O i htPerformance OversightPerformance Oversight
• Multiple layers of MOX Services oversight (con’t)Multiple layers of MOX Services oversight (con t)– Construction engineering
• Provides engineering oversight of onsite construction activities
– Subcontract Technical Representatives• Provide technical oversight for vendor contracts• Compliance with specification requirementsp p q
– Department of Energy• Onsite oversight• External team assessments• External team assessments
MOX Safety Fuels the FutureMOX Safety Fuels the Future
August 2007August 2007
MOX Safety Fuels the FutureMOX Safety Fuels the FutureStart of Construction
October 2011October 2011
MOX Safety Fuels the FutureMOX Safety Fuels the FutureCurrent Construction
Technical Support Building
MOX Safety Fuels the FutureMOX Safety Fuels the Future
MFFF O h dMFFF Overheads
MOX Safety Fuels the FutureMOX Safety Fuels the Future
R b I ll iRebar Installation
MOX Safety Fuels the FutureMOX Safety Fuels the Future
Glove Box Assembly and TestGlove Box Assembly and Test
MOX Safety Fuels the FutureMOX Safety Fuels the Future
Process Piping Welding
MOX Safety Fuels the FutureMOX Safety Fuels the Future
First HVAC Components Installation
MOX Safety Fuels the FutureMOX Safety Fuels the Future
Tanks in MFFF
MOX Safety Fuels the FutureMOX Safety Fuels the Future
Electrical Installation
MOX Safety Fuels the FutureMOX Safety Fuels the Future
Electrical InstallationElectrical Installation
MOX Safety Fuels the FutureMOX Safety Fuels the Future
Ah d i 2012Ahead in 2012• Complete Technical Support Building
St t t ti f BEG (Di l G t• Start construction of BEG (Diesel Generator Building)
• Start construction of UEF (Emergency Fuel Storage Vault)Storage Vault)
• Vendor testing of emergency diesel generators
• Receipt of first Safety Programmable Logic• Receipt of first Safety Programmable Logic Controller
• Continue installationo HVACo Process pipingo Supports
• Start installationo Fire dampers
MOX Safety Fuels the FutureMOX Safety Fuels the Future
po Tornado dampers