MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343 No.07-05/SG-9B-II/1663 Jabalpur, dated 06-09-2010 To As per distribution list Sub: Agenda of 21 st meeting of Operation and Coordination Committee of MP. Dear Sir, Please find enclosed herewith the Agenda of 21 st meeting of the Operation and Coordination Committee of MP scheduled on 15 th September 2010 at 11.00 AM at Omkareshwar Hydel Power Station, Sidhwarkut, Distt: Khandwa. The agenda is also available on the website of SLDC www.sldcmpindia.com. The OCC members are requested to intimate the names of the participants along with travel plan to coordinators directly under intimation to this office, so that the arrangement could be made by NHPC. The contact details of the coordinators are given hereunder. SN Name of coordinator Designation Contact number Email id 01 Shri Vanasnt Hurmade Manager (O&M) Mob : 9407403729 Tel/Fax 07280-271727 [email protected] 02 Shri Harish Sharma Dy. Manager (E) Mob : 9425735739 [email protected] It is also requested to please forward the information required for the meeting and the additional agenda points for inclusion, if any, to SLDC Jabalpur, so that the same could be included in the agenda for discussion in the meeting. Thanking you. Yours faithfully, ( P.A.R. Bende) Member Secretary, OCC S.E.(LD-OPN), SLDC MPPTCL, Jabalpur Encl : As above.

Upload: others

Post on 05-Nov-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008

Phone 0761-2702748 website: www.sldcmpindia.com Fax 0761-2664343

No.07-05/SG-9B-II/1663 Jabalpur, dated 06-09-2010

To

As per distribution list

Sub: Agenda of 21st meeting of Operation and Coordination Committee of MP.

Dear Sir,

Please find enclosed herewith the Agenda of 21st meeting of the Operation and Coordination

Committee of MP scheduled on 15th September 2010 at 11.00 AM at Omkareshwar Hydel Power

Station, Sidhwarkut, Distt: Khandwa. The agenda is also available on the website of SLDC

www.sldcmpindia.com.

The OCC members are requested to intimate the names of the participants along with travel plan to coordinators directly under intimation to this office, so that the arrangement could be made by NHPC. The contact details of the coordinators are given hereunder. SN Name of coordinator Designation Contact number Email id 01 Shri Vanasnt Hurmade Manager (O&M) Mob : 9407403729

Tel/Fax [email protected]

02 Shri Harish Sharma Dy. Manager (E) Mob : 9425735739 [email protected] It is also requested to please forward the information required for the meeting and the additional agenda points for inclusion, if any, to SLDC Jabalpur, so that the same could be included in the agenda for discussion in the meeting. Thanking you.

Yours faithfully,

( P.A.R. Bende) Member Secretary, OCC

S.E.(LD-OPN), SLDC MPPTCL, Jabalpur

Encl : As above.

Page 2: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Distribution List

The Officer on Special Duty (T&C), MP Power Transmission Co. Limited, Jabalpur.

The Superintending Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore.

The Chief Engineer (S/S), MP Power Transmission Co. Limited, Jabalpur.

The Executive Engineer (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur.

The Chief Engineer (Power System), MP Power Transmission Co. Limited, Jabalpur

The Additional General Manger (LM), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal.

The Executive Director (O&M:Gen.), MP Power Generating Co. Limited, Jabalpur.

The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013.

The Chief Engineer (O&M:Hydel), MP Power Generating Co. Limited, Jabalpur.

The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119.

The Chief General Manager (Comml.), MP Power Trading Company, Jabalpur.

The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554.

The Addl Superintending Engineer, Sub Load Despatch Centre, MPPTCL, Indore

The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal

Page 3: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

AGENDA FOR 21ST MEETING OF OPERATION & COORDINATION COMMITTEE OF MP TO BE HELD ON 15TH SEPTEMBER 2010 AT 11.00 AM AT OMKARESHWAR HYDEL POWER STATION, SIDHWARKUT, DISTT: KHANDWA.

ITEM NO. 1 : CONFIRMATION OF MINUTES : Minutes of 20th meeting of Operation & coordination committee of MP held on 26-07-2010 at SLDC, Jabalpur were forwarded to the committee members vide No. No.07-05/SG-9B-II/1618 dated 28-08-2010 and also uploaded on the SLDC website. No comments have been received from the members.

The committee may confirm the minutes. ITEM NO. 2 :REVIEW OF SYSTEM OPERATION DURING THE MONTHS JULY & AUGUST 2010. 2.1 Frequency Particulars : The average frequency during July & August 2010 was recorded as 49.83

Hz & 49.85 Hz. The system frequency was below 49.5 Hz for these months for 10.08 % & 8.19 % of time as compared to 5.84% time during June 2010. The frequency dipped below 48.8 Hz on 14 occasions in July 2010 & 16 occasions in August 10.

The detailed frequency particulars for the month of July 2010 and August 2010 are enclosed at

Annexure-2.1. The brief details of frequency profile is given hereunder :

Month Average frequency

minimum integrated frequency over an hour

maximum integrated frequency over an hour

instantaneous minimum frequency

Instantaneous maximum frequency

JULY 10 49.83 Hz 49.06 Hz 50.54 Hz 48.71 Hz 50.72 HzAUGUST 10 49.85 Hz 49.18 Hz 50.27 Hz 48.73 Hz 50.65 Hz

The Committee may like to note.

2.2 Operational Matters 2.2.1 Operational Discipline : System operated in terms of frequency profile for the months July &

August 2010 is as given below for discussion by the committee :

Month % of time Frequency Below 49.5 Hz

% of time Frequency above 50. 2 Hz

% of time frequency within the permissible range of 49.5-50.2 Hz

Average monthly frequency

No. of times frequency dipped below 48.8 Hz

JULY 10 10.08 5.15 84.77 49.83 14 AUGUST 10 8.19 4.20 87.61 49.85 16

The total number of instances of significant violation of IEGC by the DISCOMs by overdrawing at

frequency below 49.7 Hz or under drawing above 50.00 Hz is as given hereunder:

MONTH East Discom Central Discom West Discom Total JULY 10 58 85 61 204 AUGUST 10 83 103 78 264

1

Page 4: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

2.3.1 Voltage Profile : Date wise voltage profile at some of the important 400 KV and 220 KV substations during the months July & August 2010 is enclosed at Annexure -2.3. During the months July & August 2010, the deviation of voltage from the accepted limit on either

side was recorded at following location in MP Grid.

Sr.No.

Name of Substation

JULY 2010 AUGUST 2010 Max. Voltage

observed Min. Voltage

observed Max. Voltage

observed Min. Voltage observed

Voltage Date Voltage Date Voltage Date Voltage Date 1 Indore 430 09.07.10 - - 427 18.08.10 - -

2 Itarsi 431 04 &05.07.10

- - 434 31.08.10 - -

3 Bina 435 05.07.10 - - 431 24.08.10 - - 4 Gwalior 435 30.07.10 362 03.07.10 431 28.08.10 354 07.08.10 5 Nagda 431 04.07.10 - - 434 11.08.10 - -

The problem of overvoltage conditions at Indore 400 KV s/s and Nagda 400 KV s/s is primarily

due to low demand period/load shedding. The line reactors one of the 400 KV Nagda–Rajgarh line is being converted to Bus reactor to utilize the same for voltage control at Nagda 400 KV s/s.

During August 2010 high voltage situations coupled with high frequency profile continued for

longer periods, particularly between 06:00 to 09:00 Hrs and 15:00 to 18:00 hrs and during these periods the East DISCOMs remained under drawing from the grid even for the instances when complete load shedding from EHV substations was lifted. The demand pattern indicates that the demand met by East DISCOM during these periods dropped with no load restrictions. All three DISCOMs also took differential load shedding during this period ignoring the SLDC instructions to lift all type of load shedding during high frequency, high voltage and under drawal periods. This is resulting in serious threat to the system integrity and security and hence should be avoided. Committee may discuss.

2.3.2 Status of Capacitor Banks in sub-transmission system : SLDC had requested vide letter No.

07-05/RPC-27/1284 dated 07-07-2010 to submit the details of total capacitor banks of different capacities installed till 31st March 2010 and the details of capacitor banks in working conditions and the action plan to rectify the faulty capacitor banks. It was also requested to furnish the details of capacitor banks proposed for installation during 2010-11. However, only West DISCOM has furnished the information. As per the inputs given by the DISCOMs, the status is as indicated below.

DISCOM

Capacitor bank

installed in good

condition (No)

Capacitor bank

installed but

defective and are

repairable (No)

Requirement of

repair against

each unit (No)

Requirement

against non-

repairable

capacitor banks

Capacitor banks

already covered

under ADB T-V

Balance capacitor

banks to be

covered in other

schemes

600

KVAR

1200

KVAR

600

KVAR

1200

KVAR

No of 100 KVAR

Units required

600

KVAR

1200

KVAR

600

KVAR

1200

KVAR

600

KVAR

1200

KVAR

WZ 484 337 10 100 286 38 40 150 136 44 CZ Information not furnished EZ Information not furnished

2

Page 5: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

West DISCOM also furnished the following information :

(i) MVAR capacity of connected capacitors in good condition 694.80 MVAR (ii) MVAR capacity of connected capacitors in partially good condition 97.40 MVAR (iii) MVAR capacity of connected capacitors in good condition including partially good condition. 792.20 MVAR (iv) MVAR capacity of connected capacitors covered under ABT T-V Scheme. 253.20 MVAR (v) G. total MVAR of capacitors including that are proposed in ADB T-V scheme 1045.40 MVAR

The East and Central DISCOMs were requested to furnish the updated details in the similar format by 31st August 2010, however the information is still awaited. The information should be submitted by East and Central DISCOMs and West DISCOM may update the same.

[ACTION : DISCOMs]

2.4.1 Status of completion of on going Transmission Schemes being executed by MPPTCL : The updated status on various ongoing Transmission Schemes for the current financial year i.e. Year - 2010-2011 as submitted by MPPTCL in the 20th OCCM is enclosed as annexure 2.4.1. As requested the month of completion may also be indicated in the status report.

[Action: PS, Planning MPPTCL] 2.4.2 U/F and df/dt Relay Operation

(i) U/F and df/dt Relay Operation: During July and August 2010, the frequency touched 48.8 Hz on

& occasions. The frequency did not touch 48.6 and 48.2 Hz during the period. The details of under frequency and df/dt relay operation is given in annexure 2.4.2

Committee may like to note.

(ii) Defective u/f, df/dt relays : In the 20th OCC meeting, the CE(PS) had submitted the list of following EHV substations where u/f relays are to be installed.

SN Name of EHV Substation Name of T&C circle 01 220 KV s/s Rajgarh (Biora) Bhopal 02 220 KV s/s Hoshangabad Bhopal 03 220 KV s/s Pipariya Bhopal 04 220 KV s/s Ashta Bhopal 05 132 KV s/s Shyampur Bhopal 06 132 KV s/s Chanderi Gwalior 07 132 KV s/s Betma Indore 08 132 KV s/s Badgaon Indore 09 132 KV s/s Bagdi Indore 10 132 KV s/s Kasrawad Indore 11 132 KV s/s Petlawad Indore 12 220 KV s/s Badod Ujjain 13 132 KV s/s Zarda Ujjain 14 132 KV s/s Mazgawan Satna

3

Page 6: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

T&C, MPPTCL representative had informed in the meeting that if the relays are not available in the substation control panel, the same shall be procured and installed. The status in this regard may be submitted by T&C, MPPTCL.

It has been noticed that the under frequency relay operation does not take place in all the

districts as per revised Automatic Under Frequency Plan circulated by CE(PS), MPPTCL vide No. 04-02/PS/LM/292 dated 22-04-2010 and the operation takes place partially. The u/f relays which do not operate need to be checked for its healthiness. [ACTION : T&C, MPPTCL]

2.5 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group allocation

to 33 KV feeders :

(i) Details of Discom wise Power cuts and Regulatory measures during July & August 2010 are enclosed at Annexure 2.5. Committee may like to note

(ii) In the 20th OCC meeting EAST DISCOM was requested to offer the reasons with corrective

action regarding under drawal during 18:00 to 21:00 hrs from the grid when there is no load shedding and overdrawal during 21:00 to 24:00 hrs when there is load shedding of rural and Tahsil feeders. Now, with the revised plan the demand of East DISCOM reduces at 04:00 Hrs though supply to all groups is given during 00:00 to 05:00 Hrs. It is also observed that EAST DISCOM remain under drawing with no significant increase in demand pattern whenever load shedding is completely lifted by East DISCOM or on the instructions of SLDC as a system security measure during 06:00 to 18:00 hrs,. The EAST DISCOM may offer the reason for the same. [Action EAST DISCOM]

(iii) Differential load shedding at high frequency : It has been noticed from the daily data furnished

by DCCs that at high frequency the differential load shedding is done by all three DISCOMs despite written instructions of SLDC to avoid the differential load shedding as a system security measure. The reduction of demand by way of load shedding at high frequency (sometimes in the range 50.1 to 50.3) is undesirable and also exercising load shedding when the utility is already under drawing at high frequency is also undesirable from the system security point of view. The DISCOMs are requested to ensure system security of the integrated grid by adhering to grid discipline. [Action DISCOMs]

(iv) Group allocation to new feeders : Chief Engineer (PS) had explained the problems being faced

in allocation of groups to newly constructed feeders due to delay in receipt of required information from East and West DISCOM. It was agreed that the group allocation to new 33 KV feeders shall be taken up by West and East DISCOMs as being done by Central DISCOM. The progress in the matter may be informed to the committee. [Action : East & West DISCOMs]

ITEM NO. 3 : OPERATIONAL PLANNNING 3.1 Anticipated Power Supply Position for the Month of September 2010 to March 2011 and

Demand estimation : Details of Anticipated Demand and Source wise Availability for the period September 2010 to March-2011 is enclosed in Annexure-3.1. This has been worked out on the basis of Demand Estimation as furnished by the DISCOMs and availability as furnished by the respective authorities for 2010-11. [Committee may like to note]

4

Page 7: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

3.2 Month Ahead Availability & Demand Estimation : As per MP Electricity Grid Code, the DISCOMs have to provide daily demand on month ahead by 25th for the next month, also as instructed by Energy Department, GoMP, the month ahead availability, demand and shortage should be furnished by 15th of the preceding month. In the 20th OCC meeting the representatives of DISCOMs, MPPGCL and TRADECO had agreed to furnish the data on regular basis by 13th of preceding month. However, despite constant persuasion the data is not received in time. The availability of Hydel stations of MPPGCL for the month of September 2010 is not received so far. The concerned utilities should start furnishing the information promptly. The information for October 2010 should be furnished by 13th September. [Action : DISCOMs/GENCO/NHDC/TRADECO]

3.3. Load Generation Balance Report (LGBR) : The Load generation Balance Report for the period

October 2010 to March 2010 is being prepared. The MPPGCL and NHDC are requested to furnish the month wise Hydel availability, TRADECO should furnish the bilateral arrangement of power and DISCOMs their demand estimation for this period positively by 25th September 2010, so that the report could be released by 30th September 2010. If the demand estimation already given by DISCOMs for 2010-11 remain unchanged, a confirmation in this regard is required.

[Action : DISCOMs/GENCO/NHDC/TRADECO]

3.4 Generating Units under planned outage and proposed maintenance programme :The details of Actual/proposed maintenance programme for April 2010 to March 2011 (R-8) as furnished by MPPGCL is given in Annexure-3.4. [Committee May like to note]

3.5 Proposed shutdown programme of Transmission lines / Transformers : The proposed

maintenance programme for the period 16th September to 15th November-2010 is annexed at Annexure-3.5. [Committee May like to note]

3.6 Long Outages of transmission elements : The transmission elements as detailed below are under long outages.

SN

Line/Transformer/Breaker/ Reactor etc under long outage

Outage date Reason Expected date of restoration.

1 63 MVAR Bus-I Reactor at Satpura TPS.

24.05.2005 Damage of all three limbs along with reactor tank.

Order has been placed to BHEL. The delivery schedule is 15 months i.e. July 2011.

2 40 MVA 132/33 KV transformer at Amarkantak TPS.

19.04.2010 Damage due to fire.

It has been informed by MPPGCL that the process for procurement of new transformer has been initiated.

[Action MPPGCL]

ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF JULY & AUGUST 2010 : The details of actual generation, Schedule from Central Sector demand etc. are given in the following Annexure:

Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of

MPPGCL& NHDC Hydel Units. Annex. 4.2 Power Supply Position.

5

Page 8: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs. Annex. 4.5 Monthwise target of Thermal Generation of MPPGCL

[Committee may like to note]

ITEM NO. 5 : SYSTEM DISTURBANCE IN MP DURING JULY & AUGUST 2010 : There was no significant system disturbance reported during the period April to June 2010.

ITEM NO. 6.0 : ADDITIONAL OPERATIONAL ISSUES : 6.1 REPORTING OF TRIPPING DETAILS : In the 20th OCC meeting of MP it was informed that WRPC has informed that as per clause 5.9.6(c) of the new IEGC, a written report shall be sent to NLDC, RLDC, a User, STU, CTU, SLDC as the case may be, in the reporting formats as devised by the appropriate Load Despatch Centre and the concerned utility (Transco, Genco, NHDC) will confirm the oral notification together with the following details of the events:

I. Time & date of event II. Location: III. Plant and/or equipment directly involved:

IV. Description and cause of event: IV. Antecedent conditions of load and generation, including frequency, voltage and flow in the

affected area at the time of tripping including Weather Condition prior to the event VI. Duration of interruption and demand and /or generation(in MW and MWh) interrupted: VII. All relevant system data including copies of record of all recording instruments including

DR, ER, DAS etc: VIII. Sequence of trippings with time: IX. Details of relay flags: X. Remedial measure:

However, SLDC is not receiving the tripping reports with above mentioned information. A format for reporting tripping details is prepared by SLDC and enclosed as Annexure 6.1. As decided by WRPC the TRANCO, GENCO and NHDC shall submit the tripping report in the prescribed format to SLDC within 24 hrs of tripping occurrence. The filed units may be informed by the utilities accordingly.

[ACTION : MPPTCL/MPPGCL/NHDC]

6.2 Implementation of restricted governor mode of operation on all generating units installed : As

per CERC order all thermal units above 200 MW and all hydel units above 10 MW capacity are to run under restricted Governor mode wef 1st August 2010. All concern utilities were informed to ensure implementation of the provision as per stipulated schedule.

NHDC informed that Hydel units at Omkareshwar will not participate in RGMO as the

reservoir level to be maintained as per court order is below MDDL. NHDC has also furnished the RGMO report to SLDC for Indira Sagar Hydel Power Station. The RGMO report on weekly basis is required to be submitted to WRLDDC and SLDC by MPPGCL and NHDC. MPPGCL may also intimate details of the units participating under RGMO and the action taken for the units which are not participating in RGMO. [ACTION : MPPGCL]

6.3 Submission of Information by SLDC to WRLDC as per Revised Grid Code : As per clause

5.5.1(h) of IEGC and also as per directives of WRPC, “Non-compliance of instructions of SLDC by SEB/Distribution Licenses/Bulk Consumers to curtail drawal resulting in non-compliance if IEGC” is

6

Page 9: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

to be uploaded on WRLDC website on weekly basis and also to be forwarded to CERC. Accordingly SLDC is submitting the information to WRLDC on weekly basis with endorsement DISCOMs and Tradeco. In case action has been taken by DISCOMs to curtail drawal at low frequency and load relief is not realized, the same shall also be recorded in the report. The DISCOMs should ensure that proper load relief is obtained in the event of persistent overdrawal at low frequency.

[Action : DISCOMs] 6.4 Black-Start facilities and Schedule for Mock Exercise : In the 20th OCCC meeting NHDC and

MPPGCL had agreed to furnish the information of DG sets and black start trial runs for finalising the schedule of mock trial run on monthly basis. However, the information is not received so far. It is again requested that the information regarding DG sets available in various constituents may be furnished immediately for updating and submission to WRLDC.

It was also agreed that the schedule of mock trial run of their subsystems for next one year as per

the proforma as given below shall be prepared for submission to WRLDC.

Sr. No

.

Station Type Hy/Th/Gas

Capacity (MW)

Scheduled from

January to June, 2010 (First Half)

Scheduled from July to Dec, 2010 (Second

Half)

Actual for 2010 (First

Half)

Actual for 2010

(Second Half)

1

2

3

4 5

MPPGCL and NHDC may please furnish the information in the format as given above. MPPGCL and NHDC should also furnish the information of DG sets and black start trial runs

regularly on monthly basis to SLDC. The field units should be informed accordingly and flow of information should be ensured by NHDC/MPPGCL. ACTION : MPPGCL(Hydel)/NHDC

6.5 Preparation of contingency scheme by distribution companies:

It was informed in the 20th OCC meeting that CERC vide order dated 28.04.2010 in the Suo-motu petition no.246/2009, has directed, SLDC and Distribution Companies in the State to be prepared with contingency scheme to handle the unprecedented situations endangering the safety and security of the grid. The SLDC was further directed to ensure that such contingency schemes were placed in the control centers of all the Distribution Companies for their awareness and necessary action. Accordingly the DISCOMs were requested to prepare contingency scheme in their respective control areas and to ensure that such contingency schemes were placed in the Control Centers of all the Distribution Companies for their awareness and necessary action.

The East DISCOM has furnished a copy of the contingency scheme of East DISCOM and

confirmed that a copy is available in the DCC control room. The West DISCOM has also furnished the contingency scheme for West DISCOM mentioning the

priority wise action to trip group feeders in case of overdrawal. However, the list of 33 KV additional

7

Page 10: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

feeders identified for hand tripping from EHV substations is not available with the scheme. The West DISCOM should furnish the list and confirm that the copy of contingency scheme is available in the DCC control room.

The Central DISCOM has not furnished the contingency plan so far. The Central DISCOM should

furnish the same without further delay. [ACTION : West & Central DISCOM]

In order to prepare contingency scheme by SLDC, the list of 132 KV radial feeders which are not

tapped with industrial feeders was requested from T&C, MPPTCL. The contingency scheme of SLDC shall be prepared on receipt of the list of 132 KV radial feeders from T&C, MPPTCL.

[ACTION : T&C MPPTCL] ITEM NO 7 : SCADA/EMS RELATED ISSUES : 7.1 PROGRESS OF INSTALLATION OF NEW RTUS ALONG WITH PLCC DATA LINKS AT EHV S/S :

MPPTCL may submit the progress of providing new RTUs and required PLCC equipments at substations. [Action S/S Cell, MPPTCL]

7.2 MAINTENANCE OF TELEMETERING EQUIPMENTS AT EHV STATIONS AND POWER

STATIONS : SLDC has started action on behalf of MPPTCL for procurement of spares required for maintenance of RTUs by MPPTCL. The requirement is also received from MPPGCL for procurement of spares for by SLDC on their behalf. The funds for the same shall be arranged by respective companies.

7.3 DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S &

POWER STATIONS : The discrepancy in telemetered values from Power Stations & S/s was brought to the notice of the concerned officials from time to time. Though the action is taken for restoration of some of the parameters, many telemetered values are still not received correctly in SCADA system or are not extended / configured in the telemetry equipments in the field. The list of faulty telemetred values/process connections is detailed in annexure-7.3(i) & 7.3(ii).

[ACTION : T&C, MPPTCL & O&M :GEN,MPPGCL] 7.4 UPGRADATION OF EXISTING RTUS : The details of scope of work for upgradation of the existing

RTUs on account of commissioning of new feeders and transformers has been worked out by SLDC and forwarded to OSD (T&C) in April 2010. The representative from T&C had confirmed in the 20th OCC meeting that the matter is under process with the OEMs. The latest position may be updated by T&C. The extension scheme at STPS, Sarni and new feeders at power stations shall also have to be included for telemetry for which advance action is required by MPPGCL.

Action- T&C, MPPTCL & MPPGCL

ITEM NO. 8 : Any other issue with the permission of the chair: ITEM No 9 : DATE AND VENUE OF NEXT OCC MEETING : It is proposed to hold 22nd meeting of

Operation and Coordination Committee of MP on 20th November 2010 at SLDC, Jabalpur.

****

8

Page 11: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-2.1

Particulars

Maximum Frequency 50.54 HzBetween 03.00 hrs & 04.00 Hrs on 05.07.10

50.27 HzBetween 15.00 hrs & 16.00 Hrs on 22.08.10

Minimum Frequency 49.06 HzBetween 14.00 hrs & 15.00 Hrs on 16.07.10

49.18 HzBetween 00.00 hrs & 01.00 Hrs on 10.08.10

Average Frequency 49.83 Hz 49.847 Hz

Maximum Frequency 50.72 Hz AT 04.01 HRS ON 05.07.10 50.65 Hz AT 06.05 HRS ON

20.08.10

Minimum Frequency 48.71 Hz AT 21.18 HRS ON 16.07.10 48.73 Hz AT 20.52 HRS ON

10.08.10Percentage of time when frequency was :-

%age of time when frequency was Jul-10 Aug-10

Below 48.5 Hz 0.00 0

Between 48.50 Hz and 48.8 Hz 0.07 0.02

Between 48.80 Hz and 49.2 Hz 2.24 1.76

Aug-10

FREQUENCY PARTICULARS

INTEGRATED OVER AN-HOUR

INSTANTANEOUS FREQUENCY

Jul-10

Between 49.20 Hz and 49.5 Hz 7.77 6.41

Between 49.50 Hz and 49.8 Hz 16.29 14.22

Between 49.80 Hz and 50.2 Hz 68.48 73.39

Between 50.20 Hz and 50.3 Hz 4.05 3.45

Between 50.30 Hz and 51.0 Hz 1.10 0.75

Above 51.0 Hz 0.00 0

No. of times frquency touched 48.80 Hz 14 16

No. of times frquency touched 48.60 Hz 0 0

No. of times frquency touched 51.0 Hz 0 0

9

Page 12: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-2.3

Max Min Max Min Max Min Max Min Max Min1 416 403 426 410 433 401 433 374 423 4072 416 403 426 410 421 392 417 386 423 4073 427 408 430 413 418 398 417 382 431 4124 426 408 431 414 426 402 424 379 431 4155 427 400 431 407 435 404 435 398 430 4086 420 402 425 410 423 404 427 397 426 4097 417 404 424 411 423 404 425 393 424 4118 420 407 425 410 421 393 420 378 428 4119 430 412 429 417 425 396 424 378 431 412

10 423 409 428 413 425 398 425 382 428 41311 424 408 430 414 425 398 423 386 430 41112 421 403 430 411 426 403 427 397 429 41013 421 403 430 411 425 405 428 397 429 41014 421 404 427 414 420 396 413 390 430 41015 421 398 427 407 417 390 417 375 428 40216 424 400 429 407 421 393 418 382 430 40717 425 407 428 412 421 395 415 384 430 41318 426 410 430 416 424 403 419 394 431 41419 421 406 427 411 423 400 419 391 430 41120 420 407 427 408 429 407 429 402 427 41121 418 406 426 411 422 407 434 402 427 41022 421 406 428 413 428 406 426 400 429 41123 424 404 430 409 423 394 424 385 430 40624 423 406 428 409 421 391 420 380 428 40825 424 410 430 414 426 398 423 379 430 41126 423 405 429 407 423 392 415 371 427 41127 419 404 429 409 424 379 423 374 426 40728 421 407 427 413 417 395 417 377 429 40929 420 405 424 409 420 399 418 382 426 40630 424 407 427 410 422 399 419 409 431 40931 422 407 426 409 420 395 421 387 430 412

Max / Min 430 398 431 407 435 379 435 371 431 402

Max Min Max Min Max Min Max Min Max Min1 423 409 428 415 427 410 428 397 430 4162 424 404 428 407 424 393 421 376 430 4113 426 413 430 418 423 401 417 376 431 4164 426 410 430 414 418 400 418 381 430 4145 422 403 425 409 415 391 413 377 428 4076 421 406 423 405 413 398 416 365 427 4077 423 403 426 407 417 383 414 354 428 4038 425 406 429 411 423 389 419 368 431 4119 422 402 427 406 419 394 415 375 428 407

10 424 403 428 411 422 405 416 385 433 40611 426 404 432 414 422 410 422 391 434 40312 420 406 428 412 425 403 420 387 430 41213 423 407 431 413 420 402 419 389 430 41114 423 407 429 413 426 399 428 388 430 41115 424 404 430 411 430 405 429 393 430 40916 423 403 430 409 427 400 429 382 428 40417 422 408 427 412 421 396 422 383 429 41418 427 411 431 417 429 402 425 382 431 41619 423 408 428 414 419 404 418 398 429 41420 423 406 431 411 429 398 428 388 429 41021 426 407 430 409 424 390 416 374 431 41222 420 404 426 409 422 397 426 387 428 41123 419 402 426 406 425 391 423 389 426 40924 425 410 433 410 431 407 429 392 433 41525 423 400 426 406 426 400 426 390 430 40726 416 393 421 400 419 396 422 384 424 40127 420 401 420 402 417 393 417 384 427 40628 423 404 424 406 423 387 431 415 428 40529 421 411 428 411 427 386 425 371 429 41830 419 405 428 410 420 391 422 376 423 40731 426 410 434 414 423 393 424 377 431 411

Max 427 393 434 400 431 383 431 354 434 401

Voltage Profile During the Month of August 2010Date Indore Itarsi Bina Gwalior Nagda

NagdaVoltage Profile During the Month of July 2010

Date Indore Itarsi Bina Gwalior

10

Page 13: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure 2.4.1

S. No.

NAME OF THE TRANSMISSION LINE TYPE OF CIRCUITS

ROUTE LENGTH

CKT.KMS. PROGRESS IN %

A. 400 KV TRANSMISSION LINES

B. 220 KV TRANSMISSION LINES

1 Satna - Chhatarpur DCSS 160 160 93%2 LILO of one circuit of 220KV Amarkantak - Birsinghpur line at

400 kv S/s Sukha (PGCIL) (2x150 km). (DCDS)DCDS 150 300 91%

3 LILO of one Ckt of 220KV Bhopal-Bina DCDS line at Vidisha along with diversion work (2x23 Km)

DCDS 23 46 38%

4 Dewas - Ashta DCDS 73 146 63%

5 LILO of one ckt of 220kv Khandwa - Nepanagar DCDS line for 220KV S/s Chhegaon (2x17.51)

DCDS 17.51 35.02 61%

6 LILO of 220kv Satna - Bansagar Tons line for 220KV S/s Kotar (2x3.9)

DCDS 3.9 7.8 99%

7 Maheshwar - Pithampur line DCDS 54 108 69%

8 LILO of one ckt of 220kv Bina - Shivpuri line at 765KV S/s Bina of PGCIL (2x0.83)

DCDS 0.83 1.66 1%

Sub Total (B) 482.24 804.48

C. 132 KV TRANSMISSION LINES

1 Jatara 132 KV - Prithvipur 132 KV DCSS line DCSS 45 45 99%2 132KV Rajgarh (B) - Raghogarh DCSS DCSS 72.4 72.4 60%

3 Chhegaon (220kv) - Khargone line DCDS 72 144 91%

4 Nimrani (220 kv) - Manawar DCDS line (2x45). DCDS 45 90 99%

5 Shivpuri (220kv) - Kolaras DCSS line DCSS 34.47 34.47 99%

6 Sironj - Maksoodangarh DCSS line DCSS 60 60 60%

7 Nagda - Mahidpur 2nd ckt 2nd ckt 23 91%

8 Ashta - Polaikalan DCSS line DCSS 36 36 99%

9 Ashta - Ichhawar DCSS line DCSS 38 38 99%

10 Shahdol - Dindori DCSS line DCSS 65 65 54%

11 Second Circuiting of 132 KV Sabalgarh - Sheopurkalan line 2nd ckt 93.25 99%

12 Sabalgarh (220 kv) - Vijaypur DCSS line DCSS 33 33 59%

13 LILO of both ckts of 132 kV Betul - Multai line through Betul 220 kv S/s (2x3.75 + 2x3.55)

DCDS 7.3 14.6 28%

14 Rerouting of 132 kV Betul - Gudgaon line through Betul 220 kv S/s (1x11.5)

DCSS 11.5 11.5 99%

15 Betul (220kv) - Chicholi DCSS DCSS 26.55 26.55 52%

16 LILO of 132 KV Chhegaon - Khandwa line at 220kv Chhegaon S/s

DCDS 15.6 31.2 40%

17 Vidisha - Shamsabad DCSS line DCSS 57.84 57.84 30%

18 132kv line for 132kv S/s at Amrawadkhurd (Bhopal) DCSS 1.2 1.2 48%

Sub Total (C) 620.86 877.01

Grand Total (A+B+C) 1103.10 1681.49

EHV TRANSMISSION LINES UNDER PROGRESS DURING 2010-11 (AS ON 31.7.2010)

NIL

11

Page 14: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure 2.4.1

S.No. NAME OF THE SUBSTATION VOLTAGE RATIO

(KV)

No.OF X-mer &

Cap. (MVA)

EFFECTIVE CAPACITY

MVA

PROGRESS IN %

A. 400 KV SUBSTATIONS1 Indore (ADDL) (Distt. Indore) 400/220/33 1x315 315 45%

Sub Total (A) (400 kv) 315

B. 220 KV SUBSTATIONS1 Vidisha (NEW) (Distt. Vidisha) 220/132/33 1x160 160 80%2 Betul (NEW) (Distt. Betul) 220/132/33 1x160 160 99%3 Kotar (NEW) (Distt. Satna) 220/132/33 1x160 160 62%4 Mehgaon (ADDL) (Distt. Bhind) 220/132/33 1x160 160 40%

Sub Total (B) (220kv) 640

C. 132 KV SUBSTATIONS

(a) NEW SUBSTATIONS

1 Chicholi (Distt. Betul) 132/33 1x40 40 92%

2 Vijaypur (Distt. Sheopur) 132/33 1x40 40 38%3 Dindori (Distt. Dindori) 132/33 1x40 40 56%4 Kolaras (Distt. Shivpuri) 132/33 1x40 40 67%5 Pawai (Distt. Panna) 132/33 1x40 40 99%6 Shamsabad (Distt. Vidisha) 132/33 1x40 40 37%7 Mohna (Distt. Shivpuri) 132/33 1x40 40 8%8 Polaikalan (Distt. Shajapur) 132/33 1x40 40 94%9 Ichhawar (Distt. Sehore) 132/33 1x40 40 96%

10 Amrawadkhurd (Distt. Bhopal) 132/33 1x63 63 84%Sub Total (a) 423

C. 132 KV SUBSTATIONS(b) Additional/ Augmentation of Transformers

1 Bhonra (ADDL) (Distt. Guna) 132/33 1x20 20 50%

2 Sarni (Aug from 20 to 40 MVA) (Distt. Betul) 132/33 20 40%

3 Kurawar (Aug from 40 to 63 MVA) (Distt. Sehore) 132/33 23 30%

4 Pithampur (Aug from 40 to 63 MVA) (Distt. Dhar) 132/33 23 30%

Sub Total (b) 86Grand Total (a+b+c) (132 kv) 509

Grand Total (A+B+C) 146403.08.2010Total Cost of EHV Lines and Substations under progress

(A+B+C)

EHV SUB STATIONS UNDER PROGRESS DURING 2010-11 (AS ON 31.7.2010)

12

Page 15: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-2.4.2

No.of Occasion

MAX LOAD RELIEF IN

MWNo.of Occasion

MAX LOAD RELIEF IN

MW

No.of Occasion

MAX LOAD

RELIEF IN MW

No.of Occasion

MAX LOAD

RELIEF IN MW

1 0 0.0 0 0.0 0 0.0 0 0.02 0 0.0 0 0.0 0 0.0 0 0.03 0 0.0 0 0.0 0 0.0 0 0.04 0 0.0 0 0.0 0 0.0 0 0.05 0 0.0 0 0.0 0 0.0 0 0.06 0 0.0 0 0.0 0 0.0 0 0.07 0 0.0 0 0.0 0 0.0 0 0.08 0 0.0 0 0.0 0 0.0 0 0.09 0 0.0 0 0.0 4 62.8 0 0.0

10 0 0.0 0 0.0 4 79.9 0 0.011 0 0.0 0 0.0 0 0.0 0 0.012 0 0.0 0 0.0 1 38.2 0 0.013 2 35.2 0 0.0 0 0.0 0 0.014 1 15.0 0 0.0 0 0.0 0 0.015 0 0.0 0 0.0 0 0.0 0 0.016 2 54.1 0 0.0 1 15.0 0 0.017 4 92.6 0 0.0 0 0.0 0 0.018 0 0.0 0 0.0 0 0.0 0 0.019 2 24.7 0 0.0 0 0.0 0 0.020 0 0.0 0 0.0 0 0.0 0 0.021 0 0.0 0 0.0 0 0.0 0 0.022 0 0.0 0 0.0 0 0.0 0 0.023 0 0.0 0 0.0 0 0.0 0 0.024 0 0.0 0 0.0 0 0.0 0 0.025 0 0.0 0 0.0 0 0.0 0 0.026 1 0.3 0 0.0 2 42.0 0 0.027 0 0.0 0 0.0 0 0.0 0 0.028 3 77.2 0 0.0 0 0.0 0 0.029 5 64.4 0 0.0 0 0.0 0 0.030 0 0.0 0 0.0 0 0.0 0 0.031 0 0.0 0 0.0 0 0.0 0 0

TOTAL 20 92.60 0 0.00 12 79.90 0 0.00

DATE TIME Freq Setting ACTUAL

MAX LOAD

RELIEF IN MW

NIL NIL NIL NIL NILNOTE :- U/F 48.2 Hz Operation - NIL

Datewise Under Frequnecy (48.8 Hz & 48.6 Hz) & Df / Dt Operationin Madhya Pradesh

DF/DT OPERATION IN MP SYSTEM

Month : August 2010U/F 48.8 Hz 48.6 Hz

Month : July-2010

Date

U/F 48.8 Hz 48.6

13

Page 16: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-2.5

Jul-10 Aug-10 Jul-10 Aug-10

Commissinary HQ 23:19 23:45 23:54 23:45

District HQ 22:01 22:28 21:19 22:20

Tehsil HQ 14:59 15:51 14:33 15:04

Rural -3Phase 11:23 13:16 11:05 11:49

Rural -1Phase 0:00 0:00 0:00 0:00

Total Rural 11:23 13:16 11:05 11:49

Jul-10 Aug-10 Jul-10 Aug-10

Commissinary HQ 23:04 23:33 23:30 23:42

District HQ 19:31 21:06 20:58 22:00

Tehsil HQ 13:46 14:19 14:30 15:10

Rural -3Phase 9:55 11:14 10:52 12:13

Rural -1Phase 0:00 0:00 0:00 0:00

Total Rural 9:55 11:14 10:52 12:13

Discoms wise Average Supply Hours

PARTICULARS

PARTICULARS

MPWest Zone

Central ZoneEast Zone

14

Page 17: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Figures in MW

0 to 06 06 to 12 12 to 18 18 to 24 Energy in MU

Thermal (R-08) 1660 1660 1660 1660 1195

Hydel 180 100 90 360 131

CSS 1720 1720 1720 1720 1238

ISP 330 170 170 580 225

SSP 240 120 120 380 155

Omkareshwar 130 70 70 270 97

DVC 100 100 100 100 72

Rihand +Matatila 15 15 15 15 11

Total 4375 3955 3945 5085 3125

0 to 06 06 to 12 12 to 18 18 to 24 Energy in MU 0 to 06 06 to 12 12 to 18 18 to 24 Energy

in MU 0 to 06 06 to 12 12 to 18 18 to 24 Energy in MU

Thermal (R-08) 1840 1840 1840 1840 1369 2134 2134 2134 2134 1536 2134 2134 2134 2134 1588

Hydel 290 120 150 720 238 320 100 100 650 211 320 100 90 620 210

CSS 1740 1740 1740 1740 1295 1690 1690 1690 1690 1217 1610 1610 1610 1610 1198

ISP 210 0 150 830 221 350 170 290 650 263 350 170 290 650 272

SSP 100 60 100 400 123 250 110 100 400 155 250 150 150 400 177

Omkareshwar 100 80 50 300 99 150 140 100 300 124 150 140 100 300 128

DVC 100 100 100 100 74 100 100 100 100 72 100 100 100 100 74

Rihand +Matatila 15 15 15 15 11 15 15 15 15 11 15 15 15 15 11

Total 4395 3955 4145 5945 3430 5009 4459 4529 5939 3588 4929 4419 4489 5829 3658

0 to 06 06 to 12 12 to 18 18 to 24 Energy in MU 0 to 06 06 to 12 12 to 18 18 to 24 Energy

in MU 0 to 06 06 to 12 12 to 18 18 to 24 Energy in MU

Thermal (R-08) 2134 2134 2134 2134 1588 2165 2165 2165 2165 1455 2192 2192 2192 2192 1631

Hydel 320 110 100 670 223 60 0 30 510 101 90 0 30 420 100

CSS 1800 1800 1800 1800 1339 1860 1860 1860 1860 1250 1880 1880 1880 1880 1399

ISP 340 160 260 540 242 170 40 60 530 134 170 40 60 530 149

SSP 260 120 200 410 184 120 30 40 400 99 120 30 40 400 110

Omkareshwar 140 70 110 230 102 150 70 60 230 86 80 50 60 230 78

DVC 100 100 100 100 74 100 100 100 100 67 100 100 100 100 74

Rihand +Matatila 15 15 15 15 11 15 15 15 15 10 15 15 15 15 11

Total 5109 4509 4719 5899 3764 4640 4280 4330 5810 3202 4647 4307 4377 5767 3552

Basis of Anticipated Availability for 2010-2011

1

2

3

455 DVC : Considering Avaialability as furnished by MP Tradeco.

Maheshwar : not considered due to uncertainty.

Sep-10

Nov-10Oct-10

Hydel :- As furnished by O & M Hydel.

ISP,OSP and SSP : As furnished by Respective Athourity.

Jan-11 Feb-11

Thermal :- As furnished by O&M : Generation , MPPGCL (as per R-7). & excluding Aux. Cons.

Central Sector :- Availability from Central Sector as per Generation target of NTPC/NPC received from WRPC, Mumbai including 200 MW for drought prone area of Bundelkhand.

Mar-11Particulars

Particulars

Anticipated Average Availability at MP Periphery: 2010-11 Annexure-3.1

Particulars

Dec-10

15

Page 18: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-3.4

TENTATIVE MAINTENANCE PROGRAMME OF MPPGCL THERMAL UNITS FOR THE YEAR 2010-2011 R-08STATION UNIT

No. AOH START AOH COMP P APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MARNo of

DaysREMARKS

AMK -II 3 1-Oct-10 15-Feb 138 C.O.H.

AMK -II 4 1-Apr-10 26-Aug 148 C.O.H. R&M

AMK III 5 1-Sep-10 25-Sep 25 A.O.H.

STP-I 1 22-Jun-10 18-Jul 27 A.O.H.

STP-I 2 31-Jul-10 05-Sep 36 A.O.H.

STP-I 3 6-Sep-10 21-Sep 15 A.O.H.

STP-I 4 31-May-10 26-Jun 27 A.O.H.

STP-I 5 9-May-10 27-May 19 A.O.H.

STP-II 6 6-Aug-10 25-Aug 20 A.O.H.

STP-II 7 26-Sep-10 26-Oct 31 C.O.H.IP Rtr replace, HP blade & Gr.Tr.Replace

STP-III 8 25-Jun-10 22-Jul 28 A.O.H.

STP-III 9 1-Apr-10 12-Apr 12 A.O.H.

SGTPS - I 1 22-Sep-10 31-Oct 40 A.O.H.

HPH, HP Rotor,LP Last 2 Blade A/H Tube & Plate Replacement

SGTPS - I 2 28-Aug-10 21-Sep 25 A.O.H.ID FAN IMPELLER & A/H Tube replacement

SGTPS - II 3 16-Jul-10 04-Aug 20 A.O.H.

SGTPS - II 4 7-Jul-10 15-Sep 70 C.O.H.HPT repair, HPBP valve replace

SGTPS - III 5 12-Apr-10 30-Apr 18 A.O.H.

11 21 5 6 6 9 16 24 20 17 24 16 18 16 4 4 4 4 4 4 4 0 0 0

31-08-10

2393 2933

A.O.H C.O.H

1607 1375 1571 1725

693 462

2337

486

2933

2300

540 470 0120

28132813

120

2447

120

2463

120 00

28132813

120273

2300

293328132813 28132470 2232 22402750 2659

141 183 120701 596

2471

463 120330 620

PLANNED MAINTENANCE %

AVAILABLE CAPACITY ON BARS AFTER PLANNED MAINTENANCE 2313

1980 2300 2300 2300

183

THERMAL AVAILABLITYAFTER CONSIDERING FORCED & PARTIAL OUTAGES IN MW

INCLUDING AUX. CONSUMPTION1851 1884

275027922603

Capacity under Planned Maintenance

16

Page 19: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-3.5

From To

1 400 KV BHOPAL-BINA I 20.09.10 & 21.09.10 8.00 18.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

2 400 KV BHOPAL-BINA II 23.09.10 & 24.09.10 8.00 18.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

3 400 KV BIRSINGPUR-DAMOH 04.10.10 8.00 17.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

4 400 KV INDORE-NAGDA 04.10.10 7.00 17.00 ROUTINE MAINTANANCE

5 400 KV NAGDA-INDIRA SAGAR 11.10.10 8.00 17.00 POST-MANSOON MAINTANANCE

6 400 KV INDORE-INDIRA SAGAR I 20.09.10 7.00 17.00 MAINTENANCE & RELAY TESTING

7 400 KV INDORE-INDIRA SAGAR II 21.09.10 7.00 17.00 MAINTENANCE & RELAY TESTING

8 400 KV BIRSINGPUR-KATNI 05.10.09 8.00 17.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

9 25MVAr REACTOR -l 16.09.10 9.00 17.00 50MVAr Reactor-l,ll Bhopal,50MVAr Bus Reactor,25MVAr Reactor ll will be in service

10 25MVAr REACTOR -ll 17.09.10 9.00 17.00 50MVAr Reactor-l Bhopal,50MVAr Bus Reactor,25MVAr Reactor l will be in service

11 220KV BINA -SAGAR-II 18.09.10 9.00 17.00 Load will be managed through 220kv Damoh-l

11 220KV BUS TRANSFER BAY 27.09.10 9.00 17.00 No interption to any area

12 220KV AUXILLARY BUS 28.09.10 9.00 17.00 No interption to any area

13 50MVAr 400KV BUS REACTOR 29.09.10 9.00 17.00 50MVAr Reactor-l,ll Bhopal,25MVAr Reactor l,ll will be in service

14 400KV PGCIL-I 9.00 17.00 Load will be managed through 400kv PGCIL-ll &Bina Bhopal l,ll

15 400KV PGCIL-II 9.00 17.00 Load will be managed through 400kv PGCIL-l &Bina Bhopal l,ll

16 315MVA 400/220/33KV Xmer NO-I 1-10-10 & 4-10-10 9.00 17.00 Load will be managed through 315MVA transformer ll,lll & by keeping 200kv Bina IC-l,ll off

17 315MVA 400/220/33KV Xmer NO-II 5-10-10, 6-10-10 & 7-10-10 9.00 17.00 Load will be managed through 315MVA transformer l,lll & by keeping 220kv Bina IC-l,ll off

18 315MVA 400/220/33KV Xmer NO-III 8-10-10, 9-10-10 & 11-10-10 9.00 17.00 Load will be managed through 315MVA transformer l,ll & by keeping 220kv Bina IC-l,ll off

19 220KV MAIN BUS NO-I 12.10.10 9.00 17.00 Load will be managed through 220kv Main Bus-ll

20 220KV MAIN BUS NO-II 13.10.10 9.00 17.00 Load will be managed through 220kv Main bus-l

21 220KV BUS TIE 14.10.10 9.00 17.00 No interption to any area

22 400KV MAIN BUS-II 15-10-10 9.00 17.00 Load will be managed through 400kv Main Bus -l

23 400KV MAIN BUS-I 25-10-10 9.00 17.00 Load will be managed through 400kv Main Bus -ll

24 3x105 MVA 400/220 kV Xmer III 16.09.10 7.00 17.00 Maintenance &

25 3x105 MVA 400/220 kV Xmer III 17.09.10 7.00 17.00 Relay testing

26 3x105 MVA 400/220 kV Xmer III 18.09.10 7.00 17.00 Relay testing

27 400 kV ISP I 20.09.10 7.00 17.00 Relay testing

28 400 kV ISP II 21.09.10 7.00 17.00 Relay testing

29 400 kV Bus Transfer 01.10.10 7.00 17.00 Relay testing

30 400 kV Nagda 04.10.10 7.00 17.00 Relay testing

31 400 kV Bus Coupler 05.10.10 7.00 17.00 Relay testing

32 220 kV Cap.bank 06.10.10 7.00 17.00 Relay testing

33 220 kV Pithampur 08.10.10 7.00 17.00 Relay testing

34 220 kV Bus Transfer 11.10.10 7.00 17.00 Relay testing

35 220 kV Badnagar 13.10.10 7.00 17.00 POST-MANSOON MAINTANANCE

Programme will be given by PGCIL

Sr. No

NAME OF LINES / ICT's

CKT / ICT NO.

Outage Programme

Proposed Shut down of MPPTCL and PGCILPeriod : 15-09-10 to 16-10-10

REASONDATE

TIME

17

Page 20: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-3.5

From To

Sr. No

NAME OF LINES / ICT's

CKT / ICT NO.

Outage Programme

Proposed Shut down of MPPTCL and PGCILPeriod : 15-09-10 to 16-10-10

REASONDATE

TIME

36 220KV Bina No. 1 line and bay 16-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

37 220KV Bina No. 2 line and bay 17-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

38 220KV Shujalpur No. 1 line and bay 22-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

39 315MVA Transformer No. 3 27-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

40 400 KV main and tie CB of 315MVA Transformer No. 3& Itarsi 1 28-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

41 220 KV ICT No. 3 29-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

42 220 KV Bus Tie Bay 30-Sep-2010 9.00 17.00 POST-MANSOON MAINTANANCE

43 220 KV Bus 1 1-Oct-2010 9.00 17.00 POST-MANSOON MAINTANANCE

44 220 KV Bus 2 4-Oct-2010 9.00 17.00 POST-MANSOON MAINTANANCE

45 220KV Bholal I/C No. 1 line and bay 6-Oct-2010 9.00 17.00 POST-MANSOON MAINTANANCE

46 220KV Bholal I/C No. 2 line and bay 7-Oct-2010 9.00 17.00 POST-MANSOON MAINTANANCE

47 220KV ASHTA No. 1 line and bay 11-Oct-2010 9.00 17.00 POST-MANSOON MAINTANANCE

48 220KV ASHTA No. 2 line and bay 12-Oct-2010 9.00 17.00 POST-MANSOON MAINTANANCE

49 315MVA X-mer - II 14-Sep-10 8.00 17.00 Routine Maintenance

50 400 KV Main C.B. Bay – II ( of 315 MVA – X-mer – II) 16-Sep-10 8.00 17.00 Routine Maintenance

51 400 KV Tie Main C.B. Bay - II( of 315 MVA – X-mer – II) 18-Sep-10 8.00 17.00 Routine Maintenance

52 315MVA X-mer - III 21-Sep-10 8.00 17.00 Routine Maintenance

53 400 KV Main C.B. Bay – III ( of 315 MVA – X-mer – III) 23-Sep-10 8.00 17.00 Routine Maintenance

54 400 KV Tie Main C.B. Bay – III ( of 315 MVA – X-mer – III) 25-Sep-10 8.00 17.00 Routine Maintenance

55 400KV Indore 04-Oct-10 8.00 17.00 Post Monsoon Maintenance

56 400KV Indore Main Bay 05-Oct-10 8.00 17.00 Post Monsoon Maintenance

57 400KV Indore Tie Bay 06-Oct-10 8.00 17.00 Post Monsoon Maintenance

58 400KV Indira Sagar Project 11-Oct-10 8.00 17.00 Post Monsoon Maintenance

59 400KV ISP Main Bay 12-Oct-10 8.00 17.00 Post Monsoon Maintenance

60 400KV ISP Tie Main Bay 13-Oct-10 8.00 17.00 Post Monsoon Maintenance

1 220 KV KATNI-DAMOH 07.10.10 8.00 17.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

2 220KV OMKARESHWAR-KHANDWA I 05.10.10 9.00 18.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

3 220 KV PGCIL-MALANPUR 06.10.10 8.00 16.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

4 220 KV PGCIL-MALALGOAN 08.10.10 8.00 16.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

5 220 KV MALANPUR-AURAIYA NTPC 11.10.10 8.00 18.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

6 220KV MEHALGOAN-AURAIYA NTPC 13.10.10 8.00 18.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

7 220KV OMKARESHWAR-CHHEGAON 12.10.10 9.00 18.00 POST-MANSOON MAINTANANCE, JUMPER TIGHT

8 220kv Bina -Bhopal-l 16.09.10 9.00 17.00 Load will be managed through 220kv Bina-Bhopal-ll & 220kv Bina IC-l,ll

9 220kv Bina -Bhopal-ll 17.09.10 9.00 17.00 Load will be managed through 220kv Bina-Bhopal-l & 220kv Bina IC-l,ll

10 220kv Auxillary Bus 25.09.10 9.00 17.00 No interption to any area

220 KV LINES

18

Page 21: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-4.1

Stn. Name UNIT No. CapacityMW Jul-10 Aug-10

3 120 10.207 9.594 120 0 8.81

PH II 240 10.207 18.40PH III 210 110.63 112.19TOT 450 120.837 130.59

1 62.5 11.264 31.122 62.5 25.531 0.003 62.5 25.795 33.844 62.5 33.513 35.755 62.5 31.54 34.84

PH I 312.5 127.643 135.556 200 95.335 36.817 210 101.46 88.89

PH II 410 196.795 125.708 210 29.28 95.609 210 100.455 82.13

PH III 420 129.735 177.73TOT 1142.5 454.173 438.97

1 210 81.229 74.172 210 83.242 61.65

PH I 420 164.471 135.823 210 41.734 90.874 210 18.442 0.00

PH II 420 60.176 90.87PH III 500 223.112 325.24TOT 1340 447.76 551.93

2932.5 1022.77 1121.4946.88 51.40

AMARKANTAK POWER HOUSE-I RETIRED FROM SERVICE WEF 01.04.2009

CapacityMW Jul-10 Aug-10

115.0 1.23 0.16172.0 0.07 0.1399.0 3.06 1.28

386.0 4.35 1.57193.0 2.18 0.78160.0 5.83 5.54107.0 3.89 3.7090.0 19.79 19.42

315.0 62.53 59.2920.0 6.51 12.2960.0 0.22 0.0030.0 4.92 5.1345.0 0.00 0.0622.5 0.00 0.0020.0 0.00 0.6560.0 0.12 0.63

1186.0 114.68 110.63915.0 101.15 103.18917.5 100.15 101.89

Indira Sagar Hydel Project 1000 137.90 99.83Omkareshwar Hydel Project 520 80.27 63.90

PLF %

Unitwise / Stationwise Genration in MU

MPSEB HYDEL Share

B. Hydel

A. Thermal

M.P.RAJGHATB.SGR(JINHA)MADIKHEDATOTAL HYDEL

Station Name

RAJGHAT

R.P.SAGARJ.SAGARCHAMBALM.P.CHAMBAL

B.SGR(DEOLONDH)B.SGR(SILPARA)

TONSBIRSINGHPUR

C. NHDC

MPPGCL THERMAL

AM

AR

KA

NTA

KSA

TPU

RA

SAN

JAY

GA

ND

HI

PENCHM.P.PENCHBARGI

MPPGCL Hydel

GANDHISAGAR

19

Page 22: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-4.2

S.No. Particulars Jul-10 Aug-10

1 MPSEB Thermal Availability 866.60 960.88

2 MPSEB Hydel Availability 97.99 106.01

3 Indira Sagar 137.74 98.15

4 Omkareshwar 80.27 63.88

5 Schedule / Drawal From Central Sector 1303.44 1412.25

6 Schedule of DVC 57.64 77.63

7 Sardar Sarovar 136.82 209.01

8 Additional Power Purchase 0.00 0.00

9 Sale of Power -64.37 -46.47

10 Banking of Power -277.15 -375.71

11 Energy Exchange 8.21 5.74

12 Unschedule Interchange 65.83 -32.19

13 Other Imp / Exp 74.48 79.90

14 Total MPSEB Supply excl. Aux. Cons. 2487.50 2559.07

15 Average Supply per Day 80.24 82.55

16 Maximum Daily M.P. Supply 81.33 843.12

17 Minimum Daily M.P. Supply 71.06 749.63

18 Registered Demand : MW 4255 4467

24 Unrestricted Demand : MW 5585 5446

MP SUPPLY EXCLUDING AUXILIARY CONS. in Million Units

20

Page 23: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-4.3(i)

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.85 1378 1254 189 444 225 14 2126 1663 73 73 10 -446 -80 0 79 -14 2 1360 3486 1621 260 0 3746 440 30 469 3797 4236

2:00 49.91 1364 1241 159 336 175 14 1924 1666 73 73 10 -424 -72 0 126 -14 2 1439 3363 1749 310 0 3673 433 23 456 3709 4142

3:00 49.94 1358 1236 131 228 122 14 1732 1666 73 73 10 -402 -68 0 170 -14 2 1510 3242 1862 352 0 3594 395 23 418 3625 4020

4:00 50.00 1370 1247 107 111 91 13 1569 1668 73 73 10 -405 -61 0 177 -13 2 1523 3092 1817 294 0 3386 419 40 460 3426 3846

5:00 49.80 1373 1250 86 74 69 12 1492 1671 73 64 10 -405 -65 0 177 -12 2 1515 3007 1693 178 0 3185 579 1 580 3214 3793

6:00 49.79 1400 1274 66 26 73 12 1450 1670 73 56 10 -407 -66 0 177 -12 2 1504 2954 1562 58 0 3013 597 7 604 3049 3646

7:00 49.89 1395 1270 41 6 58 14 1389 1658 73 39 10 -248 -57 0 42 -14 2 1506 2894 1528 23 0 2917 433 11 444 2943 3376

8:00 49.95 1371 1248 40 6 50 15 1359 1660 73 34 10 -248 -65 0 32 -15 2 1483 2841 1498 16 0 2857 483 13 496 2877 3361

9:00 49.82 1367 1244 46 6 49 16 1361 1662 73 52 10 -251 -75 0 21 -16 2 1479 2839 1450 -28 0 2811 596 15 610 2851 3447

10:00 49.85 1367 1244 59 9 55 15 1382 1669 75 207 10 -364 -82 0 -64 -15 2 1438 2820 1414 -23 0 2796 729 29 758 2846 3575

11:00 49.82 1356 1234 81 58 60 18 1451 1659 75 214 10 -365 -98 0 -64 -18 2 1415 2867 1557 141 0 3008 781 40 820 3073 3854

12:00 49.82 1364 1241 78 92 64 19 1493 1660 74 211 10 -392 -83 0 -64 -19 2 1399 2893 1509 109 0 3002 911 21 932 3049 3960

13:00 49.84 1357 1234 87 82 65 18 1486 1654 74 183 10 -397 -82 0 -64 -18 2 1363 2849 1539 176 0 3025 865 13 877 3060 3924

14:00 49.72 1364 1241 88 84 63 18 1496 1654 74 178 10 -396 -83 0 -64 -18 2 1357 2852 1449 93 0 2945 870 19 888 3003 3872

15:00 49.79 1352 1230 123 81 66 17 1517 1662 74 122 10 -402 -89 0 -64 -17 2 1299 2816 1373 74 0 2890 902 50 952 2970 3872

16:00 49.79 1339 1218 123 76 64 15 1496 1669 74 105 10 -410 -86 0 -64 -15 2 1286 2782 1386 101 0 2882 814 41 855 2953 3767

17:00 49.81 1355 1233 109 73 60 16 1491 1664 74 105 10 -424 -83 0 -64 -16 2 1269 2760 1323 54 0 2814 684 49 733 2890 3574

18:00 49.90 1360 1238 97 98 60 16 1509 1662 74 105 10 -347 -81 0 -64 -16 2 1346 2855 1514 168 0 3024 484 46 530 3083 3567

19:00 49.78 1384 1260 199 292 109 16 1875 1650 74 413 10 -329 -119 0 -55 -16 2 1630 3505 1751 121 0 3626 552 11 563 3668 4220

20:00 49.64 1381 1257 268 420 174 23 2143 1674 74 508 10 -329 -119 0 -55 -23 2 1742 3885 1744 1 0 3886 648 149 797 4086 4735

21:00 49.70 1401 1275 263 459 199 23 2219 1668 74 511 10 -329 -119 0 -55 -23 2 1740 3959 1591 -149 0 3810 935 143 1077 3995 4930

22:00 49.76 1391 1266 270 502 229 23 2289 1665 74 483 10 -329 -119 0 -55 -23 2 1709 3998 1696 -12 0 3986 1075 25 1100 4045 5119

23:00 49.80 1382 1258 259 525 245 23 2309 1676 74 268 10 -464 -150 0 0 -23 2 1393 3702 1541 148 0 3851 1066 23 1089 3902 4968

24:00 49.87 1374 1250 214 501 241 17 2224 1675 74 100 10 -449 -75 0 0 -17 2 1320 3543 1536 216 0 3760 791 61 852 3839 4630

Avg. 49.83 1371 1248 133 191 111 17 1699 1664 73 177 10 -373 -87 0 9 -17 2 1457 3159 1571 112 0 3270 687 37 723 3331 4018

00 TO 06 HRS. 49.88 1374 1250 123 203 126 13 1715 1667 73 68 10 -415 -69 0 151 -13 2 1475 3191 1717 242 0 3433 477 21 498 3470 3947

06 TO 12 HRS. 49.86 1370 1247 58 29 56 16 1406 1661 74 126 10 -312 -77 0 -16 -16 2 1453 2859 1493 39 0 2899 655 21 677 2940 3595

12 TO 18 HRS. 49.81 1354 1233 104 82 63 17 1499 1661 74 133 10 -396 -84 0 -64 -17 2 1320 2819 1431 111 0 2930 770 36 806 2993 3763

06TO 18 HRS. 49.83 1362 1240 81 56 60 16 1452 1661 74 130 10 -354 -80 0 -40 -16 2 1387 2839 1462 75 0 2914 713 29 741 2967 3679

18 TO 24 HRS. 49.76 1386 1261 246 450 200 21 2177 1668 74 380 10 -371 -117 0 -37 -21 2 1589 3765 1643 54 0 3820 845 69 913 3923 4767

DEMAND

MET

Load SheddingREST. DEMA

ND

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- July 2010

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule fromTotAvl.

Act.Drl UI

Other

Imp/ Exp

21

Page 24: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-4.3(ii)

THER.Incl Aux

THER. Excl Aux

HYD. ISP OSPInjection from STOA

Total CSS DVC ER SSP SEZ Bankin

g Sale Pur Exchange

STOA

Rihand+

Matatila

Total SCH UNSCH TOTAL

1:00 49.87 1495 1360 223 207 134 7 1931 1855 99 186 11 -493 -40 0 24 -7 5 1640 3571 1909 269 0 3840 348 30 377 3889 4236

2:00 49.92 1492 1358 183 132 98 7 1778 1848 99 186 11 -493 -40 0 95 -7 5 1704 3482 1993 289 0 3771 355 61 416 3843 4198

3:00 49.92 1484 1350 140 44 65 7 1605 1850 98 186 11 -479 -40 0 143 -7 5 1766 3372 2049 282 0 3654 345 61 405 3725 4070

4:00 49.91 1484 1350 89 18 45 6 1509 1847 98 189 11 -479 -40 0 190 -6 5 1815 3324 1870 55 0 3379 483 110 592 3501 3983

5:00 49.84 1488 1354 68 16 45 6 1488 1846 98 189 11 -479 -40 0 190 -6 5 1813 3301 1731 -82 0 3219 563 9 572 3251 3814

6:00 49.87 1506 1370 39 15 56 8 1488 1841 98 189 11 -479 -40 0 190 -8 5 1807 3295 1607 -201 0 3094 516 24 540 3136 3652

7:00 49.96 1504 1369 45 15 68 6 1503 1838 96 183 11 -387 -40 0 0 -6 5 1698 3202 1550 -148 0 3053 388 46 434 3106 3494

8:00 50.02 1506 1370 45 19 74 7 1515 1834 97 170 11 -387 -40 0 0 -7 5 1683 3198 1482 -201 0 2997 468 41 509 3035 3503

9:00 49.87 1491 1357 45 26 69 9 1506 1834 98 166 11 -387 -44 0 0 -9 5 1673 3179 1503 -170 0 3009 496 24 521 3052 3549

10:00 49.86 1484 1350 49 29 63 10 1502 1842 98 280 11 -541 -45 0 -60 -10 5 1580 3083 1415 -165 0 2917 520 95 614 3031 3551

11:00 49.83 1485 1351 66 39 63 10 1530 1822 100 305 11 -555 -50 0 -60 -10 5 1569 3098 1574 5 0 3104 585 190 775 3318 3903

12:00 49.86 1484 1351 85 50 65 11 1562 1820 100 305 11 -555 -51 0 -60 -11 5 1565 3126 1478 -86 0 3040 875 31 906 3090 3966

13:00 49.83 1495 1360 95 47 62 11 1576 1821 100 287 11 -584 -49 0 -60 -11 5 1520 3095 1472 -47 0 3048 776 29 805 3101 3877

14:00 49.81 1502 1367 97 43 60 11 1579 1823 100 274 11 -584 -46 0 -60 -11 5 1511 3090 1393 -118 0 2972 787 42 829 3041 3828

15:00 49.84 1502 1366 95 44 57 11 1573 1830 100 211 11 -584 -54 0 -60 -11 5 1447 3020 1367 -80 0 2940 813 31 844 2993 3806

16:00 49.91 1514 1377 72 22 52 11 1534 1834 100 183 11 -584 -52 0 -60 -11 5 1425 2959 1434 9 0 2968 698 46 744 3027 3725

17:00 49.94 1502 1367 55 19 49 9 1499 1837 100 170 11 -584 -41 0 -60 -9 5 1428 2927 1466 38 0 2965 493 42 536 3015 3509

18:00 49.89 1520 1383 67 106 52 9 1616 1836 100 170 11 -488 -41 0 -60 -9 5 1523 3140 1491 -32 0 3108 342 109 452 3232 3575

19:00 49.75 1543 1404 218 362 78 14 2076 1818 100 477 11 -488 -120 0 -50 -14 5 1739 3815 1606 -133 0 3682 450 66 516 3782 4233

20:00 49.68 1545 1406 295 459 135 33 2328 1820 100 547 11 -488 -132 0 -50 -33 5 1780 4108 1636 -145 0 3963 431 176 607 4184 4615

21:00 49.70 1555 1415 290 479 171 33 2389 1820 100 544 10 -488 -132 0 -50 -33 5 1777 4165 1597 -180 0 3985 566 243 809 4271 4836

22:00 49.86 1554 1414 322 463 188 33 2421 1822 100 477 11 -488 -132 0 0 -33 5 1762 4183 1698 -64 0 4119 953 50 1003 4189 5142

23:00 49.82 1531 1393 311 361 188 31 2285 1844 100 319 11 -523 -145 0 0 -31 5 1580 3865 1634 54 0 3919 950 10 959 3953 4903

24:00 49.91 1520 1384 242 257 178 19 2080 1850 100 247 11 -523 -45 0 0 -19 5 1625 3706 1751 125 0 3831 781 21 802 3864 4645

Avg. 49.86 1508 1372 135 136 88 13 1745 1835 99 268 11 -505 -62 0 6 -13 5 1638 3388 1613 -30 0 3357 583 66 649 3443 4026

00 TO 06 HRS. 49.89 1491 1357 124 72 74 7 1633 1848 98 188 11 -484 -40 0 139 -7 5 1758 3391 1860 102 0 3493 435 49 484 3558 3992

06 TO 12 HRS. 49.90 1492 1358 56 30 67 9 1520 1832 98 235 11 -469 -45 0 -30 -9 5 1628 3148 1500 -128 0 3020 555 71 627 3105 3661

12 TO 18 HRS. 49.87 1506 1370 80 47 55 10 1563 1830 100 216 11 -568 -47 0 -60 -10 5 1476 3039 1437 -39 0 3000 652 50 702 3068 3720

06TO 18 HRS. 49.88 1499 1364 68 38 61 10 1541 1831 99 225 11 -518 -46 0 -45 -10 5 1552 3093 1469 -83 0 3010 604 61 664 3087 3690

18 TO 24 HRS. 49.79 1541 1403 280 397 156 27 2263 1829 100 435 11 -500 -118 0 -25 -27 5 1711 3974 1653 -57 0 3916 688 94 783 4041 4729

DEMAND

MET

Load SheddingREST. DEMA

ND

UNREST.

DEMAND

Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- August 2010

FIGURES IN MW

Hrs. FREQ.

Own Generation Schedule fromTotAvl.

Act.Drl UI

Other

Imp/ Exp

22

Page 25: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure -4.4(I)

SCH ACTUAL O/U DRL SCH ACTUAL O/U DRL SCH ACTUAL O/U DRL

1:00 49.87 1093 1211 118 1150 1307 157 1235 1196 -39

2:00 49.94 1052 1202 150 1112 1266 154 1189 1173 -16

3:00 49.95 1015 1188 173 1078 1204 126 1147 1172 25

4:00 50.03 967 1178 212 1033 977 -56 1092 1201 109

5:00 49.81 943 1118 175 1010 864 -146 1065 1194 129

6:00 49.98 925 1009 83 994 760 -233 1046 1232 186

7:00 49.93 907 1013 107 976 702 -274 1024 1190 165

8:00 50.02 888 1003 115 959 665 -294 1003 1158 155

9:00 49.85 882 958 76 954 699 -255 997 1124 127

10:00 49.92 881 975 94 952 714 -238 995 1080 85

11:00 49.85 887 1048 162 958 874 -84 1002 1058 56

12:00 49.93 905 1009 104 975 922 -53 1023 1036 13

13:00 50.00 890 1002 112 960 946 -15 1005 1045 40

14:00 49.79 889 966 78 960 896 -63 1004 1049 45

15:00 49.87 877 908 31 948 960 12 990 992 2

16:00 49.87 863 909 46 936 918 -18 975 1027 52

17:00 49.86 854 929 75 927 806 -121 965 1062 97

18:00 50.01 881 1064 183 953 796 -157 996 1114 118

19:00 49.82 1082 1199 117 1140 1086 -55 1223 1260 38

20:00 49.72 1225 1261 36 1274 1286 12 1385 1307 -77

21:00 49.71 1243 1236 -7 1290 1274 -16 1404 1263 -141

22:00 49.80 1256 1326 70 1302 1309 7 1419 1336 -83

23:00 49.85 1163 1266 103 1215 1270 55 1314 1281 -33

24:00 49.85 1114 1225 111 1170 1305 136 1254 1175 -79

Avg. 49.88 987 1092 105 1051 992 -59 1115 1155 41

00 TO 06 HRS. 49.93 999 1151 152 1063 1063 0 1129 1195 66

06 TO 12 HRS. 49.92 892 1001 110 962 763 -199 1007 1108 100

12 TO 18 HRS. 49.90 876 963 88 947 887 -60 989 1048 59

06TO 18 HRS. 49.91 884 982 99 955 825 -130 998 1078 80

18 TO 24 HRS. 49.79 1180 1252 72 1232 1255 23 1333 1270 -63

Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal of DISCOMsMonth :- July 2010

FIGURES IN MW

Hrs. FREQ.CZONE EZONE WZONE

23

Page 26: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-4.4(ii)

SCH ACTUAL O/U DRL SCH ACTUAL O/U DRL SCH ACTUAL O/U DRL

1:00 49.86 1159 1289 130 1254 1453 193 1168 1113 -55

2:00 49.92 1140 1263 123 1242 1402 153 1115 1102 -13

3:00 49.92 1112 1240 128 1223 1358 127 1041 1095 54

4:00 49.92 1104 1196 92 1217 1051 -174 1002 1157 155

5:00 49.83 1099 1169 70 1212 918 -303 990 1151 161

6:00 49.86 1095 1064 -31 1209 818 -401 979 1205 225

7:00 49.95 1062 1112 49 1175 735 -451 948 1221 272

8:00 50.02 1064 1096 32 1177 720 -465 954 1165 210

9:00 49.87 1052 1064 12 1165 750 -423 940 1174 233

10:00 49.87 1007 1022 15 1147 787 -365 906 1093 188

11:00 49.83 1009 1061 51 1150 946 -214 915 1085 170

12:00 49.86 1018 1028 10 1159 991 -174 932 1020 87

13:00 49.83 1011 1024 13 1149 1025 -129 927 1011 85

14:00 49.81 1010 1007 -3 1147 974 -178 924 999 75

15:00 49.84 992 968 -24 1124 1028 -98 896 966 70

16:00 49.91 981 978 -3 1106 987 -122 866 989 122

17:00 49.94 979 1050 71 1103 845 -261 852 1047 195

18:00 49.89 1020 1121 100 1138 813 -330 905 1080 175

19:00 49.76 1176 1215 39 1321 1105 -216 1196 1206 9

20:00 49.68 1271 1287 16 1407 1349 -62 1376 1290 -85

21:00 49.71 1290 1288 -2 1422 1377 -49 1414 1248 -166

22:00 49.85 1305 1373 68 1418 1439 15 1423 1293 -130

23:00 49.82 1233 1332 99 1322 1395 63 1302 1191 -112

24:00 49.90 1197 1298 101 1286 1432 134 1232 1078 -153

Avg. 49.86 1100 1148 48 1220 1071 -155 1050 1124 74

00 TO 06 HRS. 49.88 1118 1203 85 1226 1167 -68 1049 1137 88

06 TO 12 HRS. 49.90 1036 1064 28 1162 822 -349 933 1126 193

12 TO 18 HRS. 49.87 999 1025 26 1128 945 -186 895 1015 120

06TO 18 HRS. 49.88 1017 1044 27 1145 883 -268 914 1071 157

18 TO 24 HRS. 49.79 1245 1299 53 1363 1350 -19 1324 1218 -106

Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) DrawalMonth :- August 2010

FIGURES IN MW

Hrs. FREQ.CZONE EZONE WZONE

24

Page 27: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure-4.5

APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR TOTALAMK #3 34 24 0 10 10 0 0 0 0 0 21 47 147AMK #4 0 0 0 0 8 66 68 66 68 68 61 68 472AMK PH II 34 24 0 10 17 66 68 66 68 68 83 115 619AMK PH III 130 127 121 111 115 23 143 138 143 143 129 143 1466AMK COMP. 164 151 121 121 132 89 211 204 211 211 212 258 2085STP #1 35 34 23 11 31 35 36 35 36 36 33 36 382STP #2 38 38 32 26 0 29 36 35 36 36 32 36 372STP #3 34 33 25 26 34 12 36 35 36 36 33 36 375STP #4 31 33 6 34 36 36 37 36 37 37 33 37 390STP #5 30 11 33 32 35 35 37 35 37 37 33 37 390STP PH I 167 149 118 128 136 146 181 175 181 181 164 181 1909STP #6 127 105 81 95 39 114 118 114 118 118 106 118 1253STP #7 119 91 83 101 100 106 22 128 132 132 119 132 1265STP PH II 247 195 164 197 139 220 140 242 250 250 226 250 2518STP #8 113 100 57 29 98 127 131 127 131 131 119 131 1294STP #9 65 100 81 100 90 124 128 124 128 128 116 128 1313STP PH III 178 200 137 130 188 251 259 251 259 259 234 259 2607STP COMP. 592 545 419 454 463 618 581 668 691 691 624 691 7035SGTPS#1 97 91 78 81 75 73 0 114 118 118 107 118 1072SGTPS#2 82 76 79 83 65 14 119 115 119 119 107 119 1096SGTPS PH I 179 167 157 164 140 88 119 229 237 237 214 237 2168SGTPS#3 123 115 91 42 100 129 133 129 133 133 120 133 1380SGTPS#4 132 115 88 18 0 68 140 135 140 140 126 140 1241SGTPS PH II 255 230 179 60 100 196 273 264 273 273 246 273 2621SGTPS EXT 143 309 280 223 334 323 334 323 334 334 301 334 3571SGTPS COMP. 577 706 616 448 574 607 725 816 843 843 762 843 8360

TOTAL 1332 1402 1157 1023 1169 1314 1516 1688 1745 1745 1597 1792 17480

TENTATIVE UNITWISE GENERATION TARGETS IN MUs YEAR 2010-11 R- 08POWER

STATIONACTUAL ANTICIPATED

25

Page 28: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

Annexure 6.1 REPORTING OF OPERATIONAL EVENT /ACCIDENT

SN Details of tripping incident Description i Time & date of event

ii Location iii Plant and/or equipment directly involved iv Description and cause of event v Antecedent conditions of load and

generation, including frequency, voltage and flow in the affected area at the time of tripping including Weather Condition prior to the event

vi Damage to equipment, if any

vii Supply Interrupted (MW & MWh) and duration, if applicable.

viii Amount of Generation lost (MW & MWh), if applicable

ix Possibility of alternate supply arrangement

x Estimate of time to return service

xi All relevant system data including copies of record of all recording instruments including DR, ER, DAS etc:

xii Sequence of trippings with time:

xiii Details of relay flags:

ivx Remedial measure:

xi Recommendations for future improvement/repeat incident

xii Any other information

Name & Designation of the officer Reporting the incident

26

Page 29: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S Annexure-7.3(i)

Sr.No DESCRIPTION Status telemetry value at SLDC

actual value at site

RTU name BHOPAL 400 KV S/S

1 400 KV Bhopal-Damoh I CB

Not Available at SLDC as process connections

for CB and SOE for these feeders is not extended. Further

transducers for Bhopal-Bina feeders are not yet

installed.

2 400 KV Bhopal-Damoh I SOE 3 400 KV Bhopal-Damoh II CB 4 400 KV Bhopal-Damoh II SOE 5 220 KB Bhopal-Bina 1 MW 6 220 KB Bhopal-Bina 1 MVAR 7 220 KB Bhopal-Bina 2 MW 8 220 KB Bhopal-Bina 2 MVAR 9 220 KB Bhopal-Bina 1 CB

10 220 KB Bhopal-Bina 1 SOE 11 220 KB Bhopal-Bina 2 CB 12 220 KB Bhopal-Bina 2 SOE 13 400KV BHOPAL-DAMOH-2 MW

NOT AVAILABLE TO SLDC 14 400KV BHOPAL-DAMOH-2 MVAR 15 220KV BHOPAL-SHUJALPUR CB FAULTY CLOSE 16 400/220 KV TRANSFORMER 3 OLTC N/C 5 17 400 KV BUS1 & BUS 2 KV KV There is around 7 KV

difference between BUS1 & BUS 2KV displayed at SLDC which need to be corrected.

RTU name BHOPAL 220 KV S/S

1 BHOPAL132 KV-CHAMBLE I CB FAULTY CLOSE 2 BHOPAL132 KV- CHAMBLE II CB FAULTY CLOSE 3 220 KV TRB CB FAULTY OPEN 4 220KV BHOPAL-MANDIDEEP SOE

NOT RECEIVED AT SLDC 5 220KV BHOPAL-HOSHANGABAD SOE 6 220/132KV TRANSFORMER1 SOE 7 220/132KV TRANSFORMER-2 MW

PROVISION OF THESE TELEMETRY NOT

AVAILABLE IN RTU

8 220/132KV TRANSFORMER-2 MVAR 9 220/132KV TRANSFORMER-2 CB

10 220/132 TRANSFORMER-2 SOE

RTU name BAIRAGARH 220 KV S/S

1 220 KV BUS 1 VOLTAGE 127 225 2 220 KV BUS 1 FREQUENCY N/C 49.78 3 220 KV TRB CB FAULTY OPEN 4 BAIRAGRAH 220KV-LALGHATI II CB FAULTY CLOSE 5 220/132 KV TRANSFORMER 1 CB FAULTY CLOSE 6 132/33 XMER OLTC 17 10 7 132KV BAIRAGRAH - BHOPAL NEW CB

PROVISION OF THESE TELEMETRY NOT

AVAILABLE IN RTU

8 132KV BAIRAGRAH - BHOPAL NEW MW 9 132KV BAIRAGRAH -BHOPAL NEW MVAR

10 220/132 XMER (160MVA) NEW CB 11 220/132 XMER (160MVA) NEW MW 12 220/132 XMER (160MVA) NEW MVAR 13 132/33 XMER (20 MVA) NEW CB 14 132/33 XMER (20 MVA) NEW MW 15 132/33 XMER (20 MVA) NEW MVAR

27

Page 30: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

RTU name PIPARIA 132 KV S/S

DATA VALIDATION NOT DONE AS RTU IS BEING SHIFTED & COMMISSIONED AT PIPARIYA 220KV S/S

RTU Name HANDIA 220 KV S/S

1 220KV BUS VOLTAGE KV N/A 223 2 220KV BUS FREQUENCY HZ N/A 49.9 3 220KV HANDIA –ITARSI MW 0 20 4 220KV HANDIA –ITARSI MVAR 0 10 5 220KV HANDIA –BARWAHA MW 2 15 6 220KV HANDIA –BARWAHA MVAR 0 10 7 220KV HANDIA –ITARSI CB FAULTY CLOSE 8 220KV HANDIA –BURWAHA CB FAULTY CLOSE 9 220KV HANDIA-ITARSI SOE NOT RECEIVED ACTED

10 220KV HANDIA-BURWAHA SOE NOT RECEIVED ACTED 11 220/132 KV TRANSFORMER-1 SOE NOT RECEIVED ACTED 12 220 KV TRB CB FAULTY CLOSE 13 132KV HANDIA-KANNOD CB FAULTY CLOSE 14 132 KV HANDIA-HARDA CB TRANSIT OPEN 15 132 /33KV TRANSFORMER-2 CB FAULTY CLOSE 16 220/132KV TRANSFORMER-2 CB PROVISION FOR THIS NOT

AVAILABLE IN RTU 17 220/132KV TRANSFORMER-2 MW 18 220/132KV TRANSFORMER-2 MVAR

RTU name SARNI 220 KV S/S

1 SARNI-SATPURA TPS 220 KV CB FAULTY CLOSE 2 SARNI 220 KV TRB CB FAULTY CLOSE

Sr.No DESCRIPTION status telemetry value at SLDC

actual value at site

MALANPUR 220 KV S/S 1 MLNPR-AURIYA NR FRQ HZ NON CURRENT 49.78 1 132/33 KV TRANSFORMER 4 CB FAULTY CLOSE 2 220 KV BUS COUPLER I CB FAULTY CLOSE 3 220 KV BUS COUPLER II CB FAULTY CLOSE

MEHGAON 220 KV S/S 1 220 KV BUS TRANSFER CB FAULTY OPEN 2 220 KV BUS TRANSFER SOE NOT AVALABLE ACTED 3 220/132 KV TRANSFERMER-1 CB FAULTY CLOSE 4 220/132 KV TRANSFERMER-1 SOE NOT AVALABLE ACTED 5 220kV MEHGAON – MALANPUR CB FAULTY CLOSE 6 220kV MEHGAON – MALANPUR SOE NOT AVALABLE ACTED 7 220KV MEHGAON – AURIYA CB FAULTY CLOSE 8 220KV MEHGAON – AURIYA SOE NOT AVALABLE ACTED 9 220/132 KV TRANSFERMER (132 KVSIDE) CB FAULTY CLOSE

10 220/132 KV TRANSFERMER (132 KVSIDE) SOE NOT AVALABLE ACTED 11 132KV MEHGAON - RON CB FAULTY CLOSE 12 132KV MEHGAON – RON SOE NOT AVALABLE ACTED 13 132 KV BUS TRANSFER CB FAULTY OPEN 14 132 KV BUS TRANSFER SOE NOT AVALABLE ACTED 15 132 KV INTERCONNECTOR CB FAULTY CLOSE 16 132 KV INTERCONNECTOR SOE NOT AVALABLE ACTED

GWALIOR 220 KV S/S 1 220KV GWALIOR-BINA2 MW 128 118 2 132/33 KV TRANSFORMER 4 OLTC N/C 9 3 132/33 KV TRANSFORMER 5 OLTC N/C 9 4 132KV GWALIOR -BANMORE CB FAULTY CLOSE

28

Page 31: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

4 132 KV TRB CB FAULTY OPEN 5 132KV GWALIOR -TRACTION I CB FAULTY CLOSE 6 132KV GWALIOR -TRACTION II CB FAULTY CLOSE 7 220/132 XMER I(132KV SIDE) CB FAULTY CLOSE 8 220KV GWL-MALANPUR SOE NOT AVALABLE ACTED 9 220KV GWL-PGCIL1 SOE NOT AVALABLE ACTED

10 220KV GWL-PGCIL GWL-2 SOE NOT AVALABLE ACTED 11 220KV GWl-BINA1 SOE NOT AVALABLE ACTED 12 220KV GWL-BINA2 SOE NOT AVALABLE ACTED 13 220/132KV TRANSFORMER1 SOE NOT AVALABLE ACTED

GUNA 220 KV S/S 1 220KV GUNA-BINA2 MW NOT AVAILABLE. Need to be

extended by utilizing transducer provided for transfer bus MW.

2 220KV GUNA-BINA2 MW

3 220KV GUNA-BINA1 SOE NOT AVALABLE ACTED 4 220/132KV TRANSFORMER- 1 SOE NOT AVALABLE ACTED 1 220/132 KV TRANSFORMER OLTC N/C 3 2 220 KV BUS 2 VOLTAGE N/C 227 3 220 KV TRB CB FAULTY OPEN 4 220/132KV TRANSFORMER-2 CB PROVISION FOR TELEMETRY

NOT AVAILABLE 5 220/132 KV TRANSFORMER-2 MW 6 220/132 KV TRANSFORMER-2 MVAR

Sr.No DESCRIPTION status telemetry value at SLDC

actual value at site

RTU name -Indore 400 KV S/S 1 400KV INDORE –ITS II CB OPEN CLOSE 2 220KV TRANSFER BUS CB OPEN CLOSE 3 I220KV NDORE –BURWAHA 1 CB OPEN CLOSE 4 400 INDORE-ASOJ 1 SOE 5 400KV INDORE-BARWAHA 220KV 1 6 400KV INDORE-ISP 1 SOE 7 400KV INDORE-ITARSI 2 SOE 8 400KV INDORE-JETPURA 220 9 400KV INDORE MBUS1 BP SOE

10 400KV INDORE MBUS1 220 SOE 11 I400KV NDORE-NAGDA SOE 12 400KV INDORE-OMKARESHWAR 220 SOE 13 400KV INDORE-PITHAMPUR 220 SOE

RTU Name INDORE NZ 220 KV S/S 1 220 KV BUS 2 VOLTAGE 0 227 2 160 MVA XMER 1 OLTC 6 8 3 40 MVA XMER OLTC 4 5 4 220 KV TRB CB FAULTY OPEN 5 220 KV BUS COUPLER CB FAULTY OPEN 6 220/132 XMER NEW CB

Provision for these telemetry not available in rtu.need to be arranged.

7 220/132 XMER NEW MW 8 220/132 XMER NEW MVAR 9 220KV INDNZ-UJJAIN1 MW

10 220KV INDNZ-UJJAIN1 MVAR 11 220KV INDNZ-UJJAIN1 CB 12 220KV INDNZ-UJJAIN1 SOE 13 220KV INDNZ-UJJAIN 2 MW 14 220KV INDNZ-UJJAIN 2 MVAR 15 220KV INDNZ-UJJAIN 2 CB 16 220KV INDNZ-UJJAIN2 SOE 17 132/33 XMER NEW CB 18 132/33 XMER NEW MW 19 132/33 XMER NEW MVAR

29

Page 32: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

RTU Name INDORE CHAMBLE132 KV S/S 1 20 MVA XMER CB FAULTY CLOSE 2 CHAMBLE132 KV-INDORE N.ZONE II CB FAULTY CLOSE 3 4 5

RTU name -Indore S.ZONE 220 KV S/S

1 160 MVA TRANSFORMER OLTC 17 11 2 3X40 MVA TRANSFORMER I OLTC 1 16 3 3X40 MVA TRANSFORMER II OLTC 15 16 4 40 MVA TRANSFORMER I OLTC 9# 11 5 40 MVA TRANSFORMER II OLTC 17 4 6 160 MVA TRANSFORMER CB OPEN CLOSE 7 IND S/Z TO CAT -1 CB OPEN CLOSE 8 220KV SZ-JETPURA CB FAULTY CLOSE 8 IND S/Z TO CHAMBLE CB OPEN CLOSE 9 3X40 MVA TRANSFORMER II(132KV SIDE) CB OPEN CLOSE

10 IND S/Z TO UJJAIN CB FAULTY CLOSE 220/132 XMER NEW CB TELEMETRY MAY BE PROVIDE

BY UTILISING TRANSDUCERS OF INTERCONNCECTER

FEEDER

220/132 XMER NEW MW 220/132 XMER NEW MVAR

RTU name Pitampur 220 KV S/S 1 220 KV TRB CB FAULTY OPEN 2 PITAMPUR 220 KV-RATLAM CB FAULTY CLOSE 3 220 KV BUS COUPLER CB FAULTY OPEN 3 132/33 KV TRANSFORMER 2 OLTC N/C 8 4 132/33 KV TRANSFORMER 3 OLTC N/C 11 5 PITAMPUR 132 KV-HML CB FAULTY OPEN 6 132 KV TRB CB FAULTY OPEN 7 132 KV BUS COUPLE CB FAULTY OPEN 8 132/33 KV TRANSFORMER 1 CB OPEN CLOSE 9 132/33 KV TRANSFORMER 2 CB OPEN CLOSE

10 132/33 KV TRANSFORMER 3 CB OPEN CLOSE 11 132/33 KV TRANSFORMER NEW PROVISON FOR TELEMETRY NOT AVAILABLE

RTU name Burwaha 220 KV S/S

1 160 MVA XMER OLTC 17 3 2 3X40 MVA XMER OLTC 17 3 3 63 MVA XMER OLTC 17 4 4 220 KV BUS COUPLER CB FAULTY OPEN 5 220 /132 KV TRANSFORMER 1 CB FAULTY CLOSE 6 220 /132 KV TRANSFORMER 2 (132 KV SIDE) CB FAULTY CLOSE 7 220 /132 KV TRANSFORMER2 (132 KV SIDE) CB FAULTY CLOSE 8 BURWAHA 132KV-CHEGAON CB FAULTY CLOSE 9 BURWAHA 220 KV NIMRANI CB FAULTY CLOSE

RTU name Nepanagar 220 KV S/S 1 160 MVA XMER OLTC 1 9 2 3X40 MVA XMER OLTC 17 15 3 63 MVA XMER OLTC 17 5 4 220 KV TRB CB FAULTY OPEN 5 NEPA –CHEGAON 132 KV CB FAULTY CLOSE 6 132/33 XMER (20 MVA) NEW CB NOT AVAILABLE CLOSE 7 132/33 XMER (20 MVA) NEW MW NOT AVAILABLE 15 8 132/33 XMER (20 MVA) NEW MVAR NOT AVAILABLE 5

Sr.No DESCRIPTION status telemetry value at SLDC

actual value at site

30

Page 33: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

RTU name -NAGDA 400 KV S/S

1 400/220 KV ICT II OLTC N/C 7 2 400/220 KV ICT III OLTC N/C 7 3 NGD –BINA 400 I & II CB PROVISION FOR THESE

TELEMETRY NOT AVAILABLE. RTU NEED TO BE UPGRADED FOR

PROVIDING THESE TELEMETRIES.

4 NGD –BINA 400 I & II SOE 5 NGD –RAJGRAH 400 I & II CB 6 NGD –RAJGRAH 400 I & II SOE 7 NGD –DEHGAON 400 I & II CB 8 NGD –DEHGAON 400 I & II SOE 9 400/220 KV XMER 3 CB

10 400/220 KV XMER 3 SOE 11 220KV NAGDA-RATLAM 1 & II MW 12 220KV NAGDA-RATLAM 1 & II MVAR 13 220KV NAGDA-RATLAM 1 & II CB

RTU name NAGDA 220 KV S/S

1 125 MVA TRANSFORMER OLTC 9# 8 2 160 MVA TRANSFORMER OLTC 17 12 3 40 MVA TRANSFORMER -II OLTC 17 5 4 125 MVA TRANSFORMER (132KV) CB FAULTY CLOSE 5 125 MVA TRANSFORMER CB OPEN CLOSE 6 220 KV BUS COUPLER CB FAULTY OPEN

18 220/132 XMER (132 SIDE) CB FAULTY CLOSE 8 160 MVA TRANSFORMER-2 CB FAULTY CLOSE 9 220/132 XMER -3 NEW CB

PROVISION FOR THESE

TELEMETRY NOT AVAILABLE. RTU NEED TO BE UPGRADED

FOR PROVIDING THESE TELEMETRIES

10 220/132 XMER -3 NEW MW 11 220/132 XMER -3 NEW MVAR 12 220/33 XMER -4 NEW CB 13 220/33 XMER -4 NEW MW 14 220/33 XMER -4 NEW MVAR 15 NAGDA 132 KV GRASIM CB 16 NAGDA 132 KV GRASIM MW 17 NAGDA 132 KV GRASIM MVAR 19 NAGDA132KV RATADIYA CB FAULTY CLOSE

RTU name DEWAS 220 KV S/S

1 BUS COUPLER 132 KV CB FAULTY OPEN 2 DEWAS IC II CB FAULTY OPEN 3 132 /33 KV TRANSFORMER 1 OLTC N/C 8 4 132/33 KV TRANSFORMER 2 OLTC N/C 7 5 220/132 KV TRANSFORMER 1 OLTC N/C 7 6 220/132 KV TRANSFORMER 2 OLTC N/C 7 7 DEWAS 220 KV -INDORE EAST CB FAULTY CLOSE 8 DEWAS 220 KV -INDORE 400KV S/S CB FAULTY CLOSE 9 DEWAS 132 KV -CHAPDA CB FAULTY CLOSE

10 220/132 XMER NEW CB NOT AVAILABLE CLOSE 11 220/132 XMER NEW MW NOT AVAILABLE 55 12 220/132 XMER NEW MVAR NOT AVAILABLE 10 13 132/33 XMER NEW CB NOT AVAILABLE CLOSE 14 132/33 XMER NEW MW NOT AVAILABLE 25 15 132/33 XMER NEW MVAR NOT AVAILABLE 5

31

Page 34: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

RTU name UJJAIN 220 KV S/S 1 3X40 MVA TRANSFORMER OLTC 5 11 2 220/132 KV TRANSFORMER 4 OLTC N/C 6 3 160 MVA TRANSFORMER OLTC N/C 9 4 UJJAIN220 KV –JETPURA II CB FAULTY CLOSE 5 63 MVA TRANSFORMER CB FAULTY CLOSE 6 3X40 MVA TRANSFORMER (132 KV SIDE) CB FAULTY CLOSE 7 UJJAIN220 KV –NAGDA 2 CB FAULTY CLOSE 8 UJJAIN220 KV –BADOD 1 CB FAULTY CLOSE 9 UJJAIN 132 KV -GHOSLA CB FAULTY CLOSE

RTU name SHUJALPUR 220 KV S/S 1 160 MVA TRANSFORMER -I OLTC 2 10 2 20 MVA TRANSFORMER OLTC 10 5 3 160 MVA TRANSFORMER II CB FAULTY CLOSE 4 160 MVA TRANSFORMER II (132 KV SIDE) CB FAULTY CLOSE 5 20 MVA TRANSFORMER CB OPEN CLOSE6 132 KV BUS COUPLE CB FAULTY OPEN7 2X33 MVAR CAPACITOR BANK CB FAULTY CLOSE8 SHUJALPUR 220 KV-BHOPAL 2 CB FAULTY CLOSE9 220/132 XMER NEW CB NOT AVAILABLE CLOSE

10 220/132 XMER NEW MW NOT AVAILABLE 30 11 220/132 XMER NEW MVAR NOT AVAILABLE 5

RTU name SHAJAPUR132 KV S/S 1 132/33 KV TRANSFORMER 1 OLTC N/C 9 2 SHAJAPUR 132 KV-PANWADI CB FAULTY OPEN 3 132 KV BUS VOLTAGE 0 130 4 132 KV BUS COUPLE CB FAULTY OPEN

RTU name RATLAM 220 KV S/S 1 132/33 KV TRANSFORMER 2 OLTC N/C 7 2 RATLAM 132 KV-MEGHNAGAR MW 26 36 3 220 KV TRB CB FAULTY OPEN 4 RATLAM 132 KV-TRACTION 2 CB FAULTY CLOSE 5 RATLAM –BADNAGAR CB FAULTY CLOSE 6 RATLAM - NAGDA 2 NEW CB NOT AVAILABLE CLOSE 7 RATLAM - NAGDA 2 NEW MW NOT AVAILABLE 10 8 RATLAM - NAGDA 2 NEW MVAR NOT AVAILABLE 5 9 RATLAM - SAILANA NEW CB NOT AVAILABLE CLOSE

10 RATLAM - SAILANA NEW MW NOT AVAILABLE 8 11 RATLAM - SAILANA NEW MVAR NOT AVAILABLE 5 12 RATLAM 132 KV-KHACHROD CB FAULTY CLOSE

RTU name NEEMUCH 220 KV S/S 1 220/132 KV TRANSFORMER 1 OLTC N/C 7 2 220/132 KV TRANSFORMER 2 OLTC N/C 8 3 NEEMUCH 132 KV INTER CONNECTOR II CB FAULTY CLOSE 4 220 KV MAIN BUS VOLTAGE 97 230 5 NEEMUCH 132 KV UDEYPUR CB FAULTY CLOSE 6 132 KV BUS COUPLER CB FAULTY CLOSE

Sr.No DESCRIPTION status telemetry value at SLDC

actual value at site

RTU Name-BINA 400KV S/S

1 220KV BINA –GWALIOR 1 MW 93 83 2 220KV BINA –BINA 1 MW 53 60 3 220KV BINA –BINA 2 MW 57 62 4 220KV BINA –GUNA-1 CB FAULTY OPEN5 BINA 220 KV-GWALIOR 2 CB OPEN CLOSE6 SOE OF 400KV MAINBUS-1&2,220KV MAINBUS-1&2,BHOPAL-1(L), 220KV SHIVPURI-1,XMER-1,2,3(SEC)

NOT RECEIPT, NEED TO BE VERIFIED FOR CONNECTION AT SITE 32

Page 35: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

RTU name Bina 220 KV S/S

1 BINA 132 KV-CAPACITOR BANK CB FAULTY CLOSE 2 BINA 132 KV-GANGBASODA CB FAULTY CLOSE 3 BINA 132 KV- BORL 1 &2 CB NOT AVAILABLE 4 BINA 132 KV- BORL 1 &2 MW NOT AVAILABLE 5 BINA 132 KV- BORL 1 &2 MVAR NOT AVAILABLE 6 SOE OF 220KV MAINBUS-1&2, XMER-1,2,3 & 4, BORL 1&2 NOT RECEIPT , NEED TO BE VERIFIED FOR

CONNECTION AT SITE RTU name –DAMOH 220 KV S/S

1 220KV DAMOH - SAGAR MW 123 80 TIAKMAGARH 220 KV S/S

DATA VALIDATION COULD NOT BE DONE AS RTU IS OUT DUE TO PROBLEM IN COMMUNICATION CHANNEL/CPU

SAGAR 132KV S/s

DATA VALIDATION COULD NOT BE DONE AS RTU IS OUT DUE TO PROBLEM IN COMMUNICATION CHANNEL/CPU

Sr.No DESCRIPTION status telemetry value at SLDC

actual value at site

SATNA 220 KV S/S 1 220KV SATNA -SATNA PGCIL 2 CB OPEN CLOSE 2 132 KV SATNA -PANNA CB FAULTY CLOSE 3 132 KV SATNA INTERCONNECTOR 2 CB FAULTY CLOSE 4 SATNA 132 KV BUS 2 VOLTAGE 0 134 5 SATNA 132 KV-PRISM CEMENT CB PROVISION FOR TELEMETRY

NOT AVAILABLE 6 SATNA 132 KV –PRISM CEMENT MW 7 SATNA 132 KV-PRISM CEMENT MVAR 8 220 KV SATNA –CHATARPUR 1 & 2 CB 9 220KV SATNA –CHATARPUR 1 & 2 MW

10 220KV SATNA –CHATARPUR 1 & 2 MVAR 11 220/132 KV TRANSFORMER 2 OLTC N/C 7 12 132/33 KV TRANSFORMER 1 OLTC N/C 7 13 132/33 KV TRANSFORMER 2 OLTC N/C 7 14 SOE OF ALL FEEDERS/TRANSFORMERS EXCEPT TRANSFORMER-1 AND TONS-2 IS NOT CONNECTED

NEED TO BE CONNECTED ON PRIORITY BASIS

SATNA 132 KV S/S 1 132/33 KV TRANSFORMER 1 OLTC N/C 6 2 132 KV TRB CB FAULTY OPEN

MORWA 132 KV S/S 1 MORWA 132KV-WAIDHAN CB FAULTY CLOSE 2 132/33 KV TRANSFORMER 1 OLTC N/C 7 3 132/33 KV TRANSFORMER 2 OLTC N/C 7 4 132/33 KV TRANSFORMER 3 CB Provision for telemetry not

available in RTU

5 132/33 KV TRANSFORMER 3 MW 6 132/33 KV TRANSFORMER 3 MVAR 7 ALL SOES NOT CONNECTED NEED TO BE CONNECTED

Sr.No DESCRIPTION status telemetry value

at SLDC actual value at site

KATNI 400 KV S/S

1 400/220 KV ICT CB

NOT EXTENDED TO RTU NEED TO BE EXTENDED TILL

RTU

2 400/220 KV ICT SOE 3 400 KV KATNI -BIRSINGHPUR CB 4 400 KV KATNI-BIRSINGPUR SOE

5 400 KV BUSCOUPLER CB 6 400 KV BUSCOUPLER SOE

33

Page 36: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

JABALPUR 220 KV S/S

1 220/132 KV TRANSFORMER 1 CB FAULTY CLOSE 2 220/132 KV TRANSFORMER 2 CB FAULTY CLOSE 3 220 KV TRANSFER BUS CB FAULTY OPEN 4 132 KV TRANSFER BUS CB FAULTY OPEN 5 132 KV JABALPUR - MADHOTAL CB FAULTY CLOSE 6 132/33 KV TRANSFORMER 2 CB FAULTY CLOSE 7 220KV JABALPUR-BIRSINGHPUR 1 CB NOT EXTENDED TO RTU NEED TO BE

EXTENDED TILL RTU AS DETAILED HEREUDNER;- TB2 173,174 –BIRSINGPUR1 CB TB2 175 – BIRSINGPUR 1 SOE TB2 176,177- BIRSINGPUR 2 CB TB2 178-BIRSINGPUR 2 SOE

8 220KV JABALPUR-BIRSINGPUR 1 SOE 9 220KV JABALPUR –BIRSINGHPUR 2 CB

10 220KV JABALPUR –BIRSINGHPUR 2 SOE

11 220/132 KV TRANSFORMER 2 MW 206 70

12 ALL SOE’S EXCEPT NTPC-1,2 AND DAMOH 132 ARE NOT CONNECTED AND NEED TO BE CONNECTED

NARSINGPUR 220 KV S/S

1 220KV NARSINGPUR- PIPARIYA CB

Process connections for these not extended at S/s

2 220KV NARSINGPUR- PIPARIYA SOE 3 220/132 KV TRANSFORMER 2 CB 4 220/132 KV TRANSFORMER 2 SOE 5 220 KV NARSINGPUR-SUKHA 1 SOE 6 220 KV NARSINGPUR-SUKHA 2 SOE 7 220/132 KV TRANSFORMER 2 MW 8 220/132 KV TRANSFORMER 2 MVAR 9 220 KV TRANSFER BUS CB FAULTY OPEN

10 132/33 KV TRANSFORMER 2 MW NOT AVAILABLE 11 132/33 KV TRANSFORMER 2 MVAR NOT AVAILABLE 12 132/33 KV TRANSFORMER 2 CB NOT AVAILABLE 13 NARSINGPUR132 KV-BARMAN 2 MW NOT AVAILABLE 14 NARSINGPUR132 KV-BARMAN 2 MVAR NOT AVAILABLE 15 220/132 KV TRANSFORMER 1 OLTC N/C 7 16 220/132 KV TRANSFORMER 2 OLTC N/C 5 17 132/33 KV TRANSFORMER 1 OLTC N/C 6

KATNI 220 KV S/S

1 220 KV BUS COUPLER CB FAULTY CLOSE 2 220 KV TRANSFER BUS CB FAULTY OPEN 3 220/132 KV TRANSFORMER 2 MW NOT AVAILABLE May be provided by

utilization of transducers provided for 220KV Katni-Birsingpur line

4 220/132 KV TRANSFORMER 2 MVAR NOT AVAILABLE

5 220/132 KV TRANSFORMER 2 CB NOT AVAILABLE 6 132KV KYMORE-1 CB FAULTY CLOSE 7 132KV KYMORE-2 CB FAULTY OPEN 8 132/33 TRANSFORMER-1 CB FAULTY CLOSE 9 132KV BUS TRANSFER CB FAULTY OPEN

10 132 KV IC1 CB FAULTY CLOSE

34

Page 37: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

PANDURNA 220 KV S/S 01 220/132 KV TRANSFORMER OLTC N/C 4

CHNDWARA 132 KV S/S

1 132 KV TRB CB FAULTY OPEN 2 132/33 KV TRANSFORMER 2 OLTC 17 5 3 132/33 KV TRANSFORMER 2 CB FAULTY CLOSE 4 132/33 KV TRANSFORMER 3 MW 0 6 5 132KV KHAPASWAMI FEEDER SOE NOT CONNECETD 6 132KV SEONI 1 FEEDER SOE NOT CONNECETD 7 132KV SEONI 2 FEEDER SOE NOT CONNECETD 8 132 KV TRANSFER BUS SOE NOT CONNECETD 9 132/33KV TRANSFORMER 3 SOE NOT CONNECETD

35

Page 38: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT POWER STATIONS RTU NAME- Amarkanatak Thermal Power Station Annexure 7.3(ii)

S.N Description Telemetred value at site

Telemetred value at SLDC

OLD ISSUES- 24 NEW ISSUES- 2 ATTENDED- 2 1 ATPS 220 KV- Jabalpur CB CLOSE FAULTY 2 ATPS 220/6.6 KV Stn Xmer II CB CLOSE FAULTY 3 ATPS 220/132 KV Xmer 1(132kv) CB CLOSE OPEN 4 ATPS 220/132KV Xmer 4 (132KV) CB CLOSE OPEN 5 ATPS220KV-SIDHI MW 89 MW 75 MW 6 ATPS220KV-SIDHI MVAR 10 MVAR 29 MVAR 7 ATPS220KV-BRS220 III MW 20 MW 29 MW 8 GENERATOR 5 CB CLOSE N/C 9 ATPS220KV-Rewa CB CLOSE N/C 10 ATPS220KV-BRS220 III CB CLOSE N/C 11 ATPS 220/6.6 KV Stn Xmer A CB CLOSE N/C 12 ATPS 220/6.6 KV Stn Xmer B CB CLOSE N/C 13 ATPS 220/6.6 KV Stn Xmer A MW 10 75 14 ATPS 220/6.6 KV Stn Xmer A MVAR 5 0 15 ATPS 220/6.6 KV Stn Xmer B MW 10 75 16 ATPS 220/6.6 KV Stn Xmer B MVAR 5 0 17 ATPS132/33 KV ICT 5 CB CLOSE FAULTY 18 ATPS132 KV 220/132 KV ICT -I MW 30 MW 22 MW 19 ATPS 132 KV Bus -1 VOLTAGE 134 KV 127 KV 20 ATPS132 KV-Waidhan CB close FAULTY 21 132/33 KV TRANSFORMER 4 OLTC 6 N/C 22 132/33 KV TRANSFORMER 5 OLTC 6 N/C 23 GENERATOR 5 GT MW N/C 24 GENERATOR 5 GT MVAR N/C RTU NAME- Birsingpur Thermal Power Station OLD ISSUES- 6 NEW ISSUES-8 ATTENDED- 3 1 BRS220 GEN 1 CB CLOSE FAULTY 2 BRS 220KV TRB CB OPEN FAULTY 3 BRS220 KV IC 1 MW 117 MW 2 MW 4 BRS220 KV IC 1 MVAR 10 MVAR 0 MVAr 5 BRS 400 GENERATOR#5 CB CLOSE FAULTY 6 BRS 400/220 KV ICT CB CLOSE FAULTY 7 BRS 400 BUS COUPLER CB CLOSE FAULTY 8 BRS 400 BUS CUM TIE BKR. CB OPEN FAULTY 9 BRS 400 DAMOH (PG) LINE-1 CB CLOSE FAULTY 10 BRS 400 MAIN BUS 1 VOLTS VOLTS N/C 11 BRS 400 MAIN BUS 1 FREQ HZ N/C 12 BRS 400 DAHOH -1 MW 14 0

RTU NAME- Satpura Thermal Power Station -I OLD ISSUES- 19 NEW ISSUES- 0 ATTENDED- 9 1 STPS PH I Stn Xmer I I I CB CLOSE FAULTY 2 STPS PH I BUSCOUPLER I CB OPEN FAULTY 3 STPS PH I TRB I CB OPEN FAULTY 4 STPS PH I TRB II CB OPEN FAULTY 5 STPS PH 2 GENERATOR 6 (GT) MVAR 20 N/C 6 STPS PH 2 GENERATOR 7 (GT) MVAR 15 N/C 7 STPS PH 2 MAIN BUS 1 VOLTAGE 229 N/C 8 STPS PH 2 MAIN BUS 1 FREQ. 49.46 N/C 9 STPS PH 2 MAIN BUS 2 VOLTAGE 228 N/C 10 STPS PH 2 MAIN BUS 2 FREQ. 49.44 N/C

RTU NAME- Madhikheda hydel Power Station 36

Page 39: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

OLD ISSUES- 9 NEW ISSUES- 0 ATTENDED- 0 1 GENERATOR 1 CB OPEN FAULTY 2 GENERATOR 2 CB OPEN FAULTY 3 GENERATOR 3 CB OPEN FAULTY 4 Madhikheda 132 Kv- Karera I CB OPEN FAULTY 5 Madhikheda 132 Kv- Karera I I CB OPEN N/C 6 Madhikheda 132 Kv- Karera I MW 10 0 7 Madhikheda 132 Kv- Karera I MVAR 5 0 8 Madhikheda 132 Kv- Karera II MW 10 0 9 Madhikheda 132 Kv- Karera II MVAR 5 0 RTU NAME- Tons hydel Power Station OLD ISSUES- 4 NEW ISSUES- 1 ATTENDED- 0 1 STN. XMER MW 2 0 2 STN. XMER MVAR 10 0 3 GENERATOR 2 CB OPEN faulty 4 GENERATOR 3 CB OPEN faulty 5 BUSCOUPLER CB OPEN faulty RTU NAME- Bargi hydel Power Station OLD ISSUES- 3 NEW ISSUES- 0 ATTENDED- 0 1 BARGI 132 KV –JABALPUR 2 CB Close faulty 2 GENERATOR 1 CB OPEN transit 3 STN. XMER CB. OPEN Faulty

RTU NAME- Pench hydel Power Station OLD ISSUES- 1 NEW ISSUES- 0 ATTENDED- 0 1 GENERATOR 2 CB open transit

RTU NAME- Gandhi sagar hydel Power Station OLD ISSUES- 7 NEW ISSUES- 2 ATTENDED- 4

1 132 KV BUS COUPLER CB OPEN CLOSE 2 GENERATOR I CB OPEN CLOSE 3 GENERATOR V CB OPEN FAULTY 4 132/33 KV XMER OLTC 9 6 5 132/33 KV XMER CB CLOSE FAULTY

RTU NAME- Rajghat hydel Power Station

OLD ISSUES- 7 NEW ISSUES- 0 ATTENDED- 0 RAJGHAT132 KV-LALITPUR MW N/C 5 RAJGHAT132 KV-LALITPUR MVAR N/C 5 RAJGHAT132 KV-LALITPUR CB FAULTY OPEN GENERATOR I CB FAULTY OPEN GENERATOR I I CB FAULTY OPEN GENERATOR I I I CB FAULTY OPEN 132 KV BUS VOLTAGE N/C 129

37

Page 40: MP POWER TRANSMISSION COMPANY LIMITED STATE LOAD … · STATE LOAD DESPATCH CENTRE, NAYAGAON, JABALPUR 482 008 Phone 0761-2702748 website: Fax 0761-2664343 No.07-05/SG-9B-II/1663

38