mpb court plan

7
FLORENCIA G. CORDOVA CHIEF, PLANNING & DESIGN SECTION BENCIO A AGUZAR SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: CHECKED BY: HERMINIO C. SIMBOL ARCHITECT ++ RODRIGO M. SUMANGA ENGINEER ++ DESIGNED BY: REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION IV-A BATANGAS + DISTRICT ENGINEERING OFFICE OFFICE OF THE DISTRICT ENGINEER BATANGAS CITY JULIANA D. VERGARA Officer - in - Charge OIC - ASSISTANT DISTRICT ENGINEER CONSTRUCTION AND REHABILITATION OF MULTI-PURPOSE BUILDING / STRUCTURE (COVERED COURT) BRGY. SAMBAT, BALAYAN, BATANGAS

Upload: quenie-balo

Post on 02-Sep-2015

212 views

Category:

Documents


0 download

DESCRIPTION

Plan

TRANSCRIPT

  • FLORENCIA G. CORDOVA

    CHIEF, PLANNING & DESIGN SECTION

    BENCIO A AGUZAR

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY:CHECKED BY:

    HERMINIO C. SIMBOL

    ARCHITECT ??

    RODRIGO M. SUMANGA

    ENGINEER ??

    DESIGNED BY:

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS ? DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY

    JULIANA D. VERGARA

    Officer - in - ChargeOIC - ASSISTANT DISTRICT ENGINEER

    CONSTRUCTION AND REHABILITATION OFMULTI-PURPOSE BUILDING / STRUCTURE

    (COVERED COURT)BRGY. SAMBAT, BALAYAN, BATANGAS

  • 1 6

    PROJECT NAME/ LOCATION: SHEET CONTENT:

    CHECKED BY:

    ARCHITECT II

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.

    CHIEF, PLANNING & DESIGN SECTION

    FLORENCIA G. CORDOVA

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS I DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY

    HERMINIO C. SIMBOL

    Officer - in - Charge

    JULIANA D. VERGARA

    DESIGNED BY:

    ELEVATIONSITE DEVELOPMENT PLANLOCATION MAPVICINITY MAP

    BENCIO A. AGUZAROIC - ASSISTANT DISTRICT ENGINEER

    DRAWN BY: J.I.M. DIO

    P E R S P E C T I V ENTS

    AA-1

    A-1

    L O C A T I O N M A PNTS

    CA-1

    S I T E D E V E L O P M E N T P L A NNTS

    BA-1

    V I C I N I T Y M A PNTS

    DA-1

    TO BALAY

    AN

    TO CALAT

    AGAN /

    LIAN ROA

    D

    BALIBAG

    O / BALAY

    AN ROAD

    34.00

    26.00

    34.00

    5.00

    26.00

    6.04

    12.79

    13.79

    4

    1 1

    2

    3

    45

    2

    3

    LOT 2289

    - B ( A -

    884 m )

    LOT 2289

    - A ( A -

    179 m )

    N

    CONSTRUCTION ANDREHABILITATION OF MULTI-PURPOSE

    BUILDING / STRUCTURE(COVERED COURT)

    BRGY. SAMBAT, BALAYAN, BATANGAS

    TO C

    ALAT

    AGAN?

    TO TUY?

    ?TO BALAYAN TOWN PROPER

    SCHOOL

    ?TO

    BA

    TAN

    GA

    S C

    ITY

    PA

    LIC

    O -

    BA

    LAY

    AN

    -BA

    TANG

    AS

    CITY R

    OAD

    BA

    LAY

    AN

    - B

    ALI

    BA

    GO

    RO

    AD

    SAMBATELEM.

    SCHOOL(COVERED COURT) BRGY.SAMBAT, BALAYAN, BATANGAS

    (COVERED COURT) BRGY.SAMBAT, BALAYAN, BATANGAS

    4.00

    PROPOS

    E COVER

    ED COUR

    T

    EXISTING

    BUILDING

    VIVIAN VIENNA B. CASTILLOENGINEER II

  • A-22 6

    PROJECT NAME/ LOCATION: SHEET CONTENTS:

    CHECKED BY:

    ARCHITECT II

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.

    CHIEF, PLANNING & DESIGN SECTION

    FLORENCIA G. CORDOVA

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS I DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY

    HERMINIO C. SIMBOL

    Officer - in - Charge

    JULIANA D. VERGARA

    DESIGNED BY:

    F L O O R P L A NSCALE 1:50 M.

    AA-2

    FLOOR PLANFRONT ELEVATIONREAR ELEVATIONRIGHT SIDE ELEVATIONLEFT SIDE ELEVATION

    BENCIO A. AGUZAR

    OIC - ASSISTANT DISTRICT ENGINEER

    RIGHT SIDE ELEVATIONSCALE 1:100 M.

    C

    FRONT ELEVATIONSCALE 1:100 M.

    B

    A-2

    A-2

    DRAWN BY: J.I.M. DIO

    CONSTRUCTION ANDREHABILITATION OF MULTI-PURPOSE

    BUILDING / STRUCTURE(COVERED COURT)

    BRGY. SAMBAT, BALAYAN, BATANGAS

    REAR ELEVATIONSCALE 1:100 M.

    BA-2

    LEFT SIDE ELEVATIONSCALE 1:100 M.

    CA-2

    VIVIAN VIENNA B. CASTILLOENGINEER II

    MULTI - PURPOSE BUILDING STRUCTUREBASKETBALL COURT PAVEMENT

    1.00 1.00

    EXISTING

    16.70M

    UPLINE OF ROOF EAVES ABOVE

    1.00

    6.00

    6.00

    6.00

    6.00

    5.85

    1.00

    29.8

    5 M

    .

    LI

    NE

    O

    F

    RO

    OF

    E

    AV

    ES

    A

    BO

    VE

    LI

    NE

    O

    F

    RO

    OF

    E

    AV

    ES

    A

    BO

    VE

    L I N E O F R O O F E A V E S A B O V E

    EX

    IST

    ING

    BU

    ILD

    ING

    2.00

    2.00

    0.50

    0.50

    4.00

    1.00

    4.00VERIFY

    1.00

    POWERHOUSE

    FINISH FLOOR LEVEL

    NATURAL GRADE LINE

    0.30

    6.00

    2.00

    8.00

    M.

    16.701.00 1.00

    0.60 4

    .34

    8.358.35

    0.95 0.95 0.95 0.95 0.95 0.95 0.950.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95

    0.87

    0.87

    0.87

    0.87

    0.87

    0.950.950.950.950.950.950.95 0.950.950.950.950.950.950.950.950.95

    1.47

    3.36

    16.701.00 1.008.358.35

    .30

    6.00

    2.00

    6.006.006.006.00 1.001.00

    .86

    2.40

    0.80

    0.80

    0.80

    5.85

    1.001.00

    1.001.001.001.00

    1.001.001.001.001.001.001.001.001.001.001.001.001.001.001.001.001.001.001.001.001.00

    1.000.85

    ????????????????????

    W/ STD. TURN BUCKLE

    G.A. # 26 PREPAINTEDG,I, LONG SPAN

    COLOR ROOF

    2 - 6mm x 63mm x 63mmANGLE BARS COLUMN

    FINISH FLOOR LEVEL

    NATURAL GRADE LINE

    TOP LEVEL OF PEDESTAL

    3.36

    2.64

    3.00

    2.75

    .30

    6.00

    2.00

    6.00 6.00 6.00 6.001.00 1.00

    .86

    2.40

    0.80

    0.80

    0.80

    5.85

    1.00 1.00

    1.001.00 1.00 1.00

    1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85????????????????????

    W/ STD. TURN BUCKLE

    G.A. # 26 PREPAINTEDG,I, LONG SPANCOLOR ROOF

    2 - 6mm x 63mm x 63mmANGLE BARS COLUMN

    FINISH FLOOR LEVEL

    NATURAL GRADE LINE

    TOP LEVEL OF PEDESTAL

    3.00

    2.75

    F

  • S-13 6

    PROJECT NAME/ LOCATION: SHEET CONTENT:

    CHECKED BY:

    ARCHITECT II

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.

    CHIEF, PLANNING & DESIGN SECTION

    FLORENCIA G. CORDOVA

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS I DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY

    HERMINIO C. SIMBOL

    Officer - in - Charge

    JULIANA D. VERGARA

    DESIGNED BY:FRONT ELEVATIONRIGHT SIDE ELEVATIONSCHEDULE OF DOOR & WINDOWFOUNDATION PLANROOF FRAMING PLANWALL FOOTING PLANSECTION PLANROOF BEAM DETAILCOLUMN DETAIL

    BENCIO A. AGUZAR

    OIC - ASSISTANT DISTRICT ENGINEERDRAWN BY: J.I.M. DIO

    FRONT ELEVATIONAA-2

    RIGHT SIDE ELEVATIONSCALE 1:50 M.

    BP-1SCALE 1:50 M.

    ROOF BEAM DETAILHA-2 SCALE 1:20 M.

    COLUMN DETA ILIA-2 SCALE 1:20 M.

    ROOF FRAMING PLANEA-2 SCALE 1 :50 M .

    SCHEDULE OF DOOR & WINDOWCA-2 S C A L E 1 : 5 0 M .

    WALL FOOTING PLANFA-2 SCALE 1:20 M.

    S E C T I O N P L A NGA-2 SCALE 1:50 M.

    FOUNDATION PLANDA-2 SCALE 1:50 M.

    CONSTRUCTION ANDREHABILITATION OF MULTI-PURPOSE

    BUILDING / STRUCTURE(COVERED COURT)

    BRGY. SAMBAT, BALAYAN, BATANGAS

    ITEM NO. D E S C R I P T I O N U N I T

    SUMMARY OF QUANTITIES

    Qty.

    SPL-1

    SPL-2

    SPL-3

    1014 Prepainted Metal Sheet

    Steel Works(Column and Trusses)

    Parapet Wall

    Plumbing Works

    set

    345.80

    3.00

    243.11

    ALL

    bays

    SPL-4

    SPL-5

    SPL-6

    SPL-7

    SPL-8

    SPL-9

    SPL-10

    Electrical Works

    Electrical Room(Power House)

    Fiberglass Board w/ Flexible Ring

    Mobilization/Demobilization

    Main Scoreboard

    Project Billboard

    Construction Safety & Health Program

    sq.m.

    sq.m.

    L.S.

    L.S.

    sq.m.

    mo.

    set

    pcs.

    L.S.

    ALL

    4.00

    2.00

    3.00

    1.00

    2.00

    ALL

    VIVIAN VIENNA B. CASTILLOENGINEER II

    2.70

    2.30

    .15

    .40 2.00

    .90

    F

    2.30

    .90

    .15

    3.00

    W1 D

    1

    .80

    .80

    .20

    .80

    ??????????????????????

    ?????????????????

    @ .15M.O.C

    .80

    ON FILL

    NGL

    ON FILL

    .20

    .15

    .20

    .20

    .40

    ?????????????????????

    BOTH WAYS

    ?????????????????????

    BOTH WAYS

    ??????????????????????

    ?????????????????

    @ .15M.O.C

    STP-1

    STP-1

    2.00

    2.00

    .50

    .50

    2.00

    3.00

    C1/F1

    C1/F1

    C1/F1

    C1/F1

    .40

    .20

    0.127

    ????????????????????

    ???????????????

    ?????????????????????????

    HORIZONTAL BARS @ 3RD LAYER????????????????????????

    BARS @ .60M.O.C

    FFL

    .40

    ON FILLON FILL

    .15

    .20

    L

    ?????????????????

    ????????????????????

    ????????????????????????

    @.15M.O.C

    RB RB

    RB

    RB

    RB

    5" thk. CHBFIREWALL

    F

    .80

    2.10

    .60

    1.20

    .90

    1 (SET)

    CLEAR GLASS ON STEELAWNING TYPE WINDOW

    W1

    1 (SET)

    D1

    METAL DOOR W/ 2"x5"METAL DOOR JAMB

    2.70

    2.30

    .90

    GA. 26 PREPAINTED LONG SPANRIB TYPE ON 2" x 6" C PURLINS

    2" X 12"FASCIA BOARD

    2" x 2" WEB MEMBERS

    .30

    5" thk. CHBFIREWALL

    GA.24 FLASHING

    .30

  • S-24 6

    PROJECT NAME/ LOCATION: SHEET CONTENT:

    CHECKED BY:

    ARCHITECT II

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.

    CHIEF, PLANNING & DESIGN SECTION

    FLORENCIA G. CORDOVA

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS I DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY

    HERMINIO C. SIMBOL

    Officer - in - Charge

    JULIANA D. VERGARA

    DESIGNED BY:ROOF FRAMING PLANSCHEMATIC TRUSS DIAGRAMSECTION DETAILEDCENTER STRUT DETAILSIDE STRUT DETAILSECTION DETAIL C/S-1SECTION DETAIL F/S-1SECTION DETAIL G/S-1

    BENCIO A. AGUZAR

    OIC - ASSISTANT DISTRICT ENGINEER

    S E C T I O N D E T A I L E DS C A L E 1 : 2 0 M .

    GS-2

    S E C T I O N D E T A I L E DS C A L E 1 : 2 0 M .

    FS-2

    SC H E M A T I C T R U S S D I A G R A MS C A L E 1 : 1 0 0 M .

    BS-2

    S E C T I O N D E T A I L E DS C A L E 1 : 2 0 M .

    CS-2

    C E N T E R S T R U T D E T A I LDS-2

    DRAWN BY: J.I.M. DIO

    R O O F F R A M I N G P L A NS C A L E 1 : 5 0 M .

    AS-2

    S I D E S T R U T D E T A I LS C A L E 1 : 2 0 M .

    ES-2

    CONSTRUCTION ANDREHABILITATION OF MULTI-PURPOSE

    BUILDING / STRUCTURE(COVERED COURT)

    BRGY. SAMBAT, BALAYAN, BATANGAS VIVIAN VIENNA B. CASTILLOENGINEER II

    S C A L E 1 : 2 0 M .

    6.00

    .30

    .25 .25 .25

    2 - 50mm X 50mm X 5mmANGULAR BARS(WEB MEMBERS)

    0.30

    7 E

    QU

    AL

    PA

    RTS

    @.8

    6M =

    6.0

    0M2.

    00

    8.00

    M.

    16.70 1.00

    0.84 0.84 0.84

    SEE DETAIL FS-1

    SEE DETAIL CS-1

    SEE DETAIL GS-1

    1.20

    3.85

    3.00

    2.75

    .30

    .30

    2" x 6 C PURLINSSPACED @ 1.00 M.O.C

    2" x 2" 316"ANGLE CLEATS

    G.A 26 PRE-PAINTED LONGSPAN G.I ROOF SHEETS??????????????

    G.A. 26 PRE-PAINTED GUTTER ON2 PCS 2"x4" C-PURLINS FASCIA BOARD

    ?????????????????

    .30

    .86

    1.00

    .30

    38'' THK. X 4'' WIDE STEEL PLATECENTER JOINT SUPPORT (FULLY WELDED)

    2 - 6mm X 63mm X 63mmBOTTOM & TOP CHORD2 - 5mm X 63mm 63mm

    WEB MEMBERS

    ????????????????????????

    W/ NUT & WASHERS

    .30 .30

    .30

    .30 1

    4" THK. x 5" WIDESTEEL PLATEFULLY WELD

    2 - 6mm x 63mm x 63mmANGLE BARS COLUMN

    1.00

    29.8

    5

    ??????????????

    ??????????????????????

    ???????????????????

    TURN BUCKLE

    2" x 6" x 15mm C - PURLINSSPACED @ 1.00 M.

    6.00

    6.00

    5.85

    6.00

    6.00

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    DS

    T-1

    T-1

    T-1

    T-1

    T-1

    1.00

    1.00

    G.A. 26 PRE-PAINTED GUTTER

    EXISTING

    16.701.00 1.00

    RB

    RB

    RB

    2 - 50mm X 50mm X 5mmANGULAR BARS(WEB MEMBERS)

    .60

    6.00

    .50 .50

  • E-15 6

    PROJECT NAME/ LOCATION: SHEET CONTENT:

    CHECKED BY:

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.

    CHIEF, PLANNING & DESIGN SECTION

    FLORENCIA G. CORDOVA

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS I DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY GINA B. GUINTO

    Officer - in - Charge

    JULIANA D. VERGARA

    DESIGNED BY:

    ELECTRICAL LAYOUTRISER DIAGRAMLEGENDGENERAL NOTESLOADS & COMPUTATION BENCIO A. AGUZAR

    OIC - ASSISTANT DISTRICT ENGINEERDRAWN BY: J.I.M. DIO

    GENERAL NOTES (ELECTRICAL)

    1. THE ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. THE ELECTRICAL WORKS SHALL BE UNDER IMMEDIATE SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.

    2. THE ELECTRICAL SERVICE POWER IS 1-PHASE , 2-WIRE 230 V AC, 60 Hz.

    3. WIRING METHOD SHALL BE AS FOLLOW: a. FEEDERS AND RISERS - INTERMEDIATE METALLIC CONDUIT

    b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT

    4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE "THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM SIZE OF THE WIRE FOR POWER AND LIGHTING CIRCUIT HOME RUN SHALL BE????????????????????????????????????????????????????????????????????

    15mm TRADE/NOMINAL SIZE.

    5. ALL OUTLET BOXES SHALL BE GALVANIZED GAUGE NO. 16 DEEP TYPE WITH FACTORY KNOCKOUTS.

    6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.

    7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENTS.

    8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOW:

    a. LIGHT SWITCH - 1.20 m. ABOVE FINISH FLOOR

    b. CONVENIENCE OUTLET - 0.30 m. ABOVE FINISH FLOOR

    c. PANEL BOARD - 1.50 m. ABOVE FINISH FLOOR

    2

    4

    1

    3

    SERVICE ENTRANCE??????????????????????????????????

    ??????????????????????

    TYPE "F" CONDUIT

    LIGHTING OUTLET(LEFT WING)

    5

    LIGHTING OUTLET(RIGHT WING)

    CEE OUTLET(LEFT LOWER WING)

    CEE OUTLET(LEFT UPPER WING)

    E L E C T R I C A L L A Y O U TS C A L E 1 : 1 0 0 M .E-1

    A

    INCANDESCENT BULB

    S1

    SW

    SINGLE POLE SWITCH

    ELECTRICAL LEGEND250W METAL HALLIDE HIGH BAYLUMINAIRE

    WEATHER-PROOF,FLUSHED MOUNTEDSWITCH

    PANEL BOARD

    16 AMP. 2P + E, CEEOUTLET

    6CEE OUTLET(RIGHT LOWER WING)CEE OUTLET

    (RIGHT UPPER WING)

    7 8SPARE SPARE

    MCB 90AT

    20AT

    30AT 30AT

    30AT 30AT

    20AT

    UNDERGROUND OR UNDERFLOOR CONDUIT

    CONCEALED OR EMBEDDEDCONDUIT RUN

    CONSTRUCTION ANDREHABILITATION OF MULTI-PURPOSE

    BUILDING / STRUCTURE(COVERED COURT)

    BRGY. SAMBAT, BALAYAN, BATANGASENGINEER II

    LOADS & COMPUTATIONS

    CKT DESCRIPTION

    NO. OF OUTLET

    VOLTS WATTSAMPERE

    PERCIRCUIT

    AMPEREPROTECT

    SIZE OFWIRE

    1

    23

    4

    CEE @16 Amp.

    LIGHTING @ 250W/ OUTLET

    LO SW

    220

    220

    1750 7.95 20 ???????????

    NOTE: VOLTAGE = 220V AC MAIN CB = 90 Amp.

    220

    16

    20

    ?????????????????220 30

    7 1

    1

    1 16 ?????????????????

    5

    6

    7 1 1750 ???????????

    30

    REMARKS

    ??????????????????????

    ROYAL CORD

    ??????????????????????

    ROYAL CORD

    ??????????????????????

    ROYAL CORD

    ?????????????????????

    ROYAL CORD

    SPARE

    7

    8

    SPARE

    LIGHTING OUTLET (LEFT WING)

    LIGHTING OUTLET (RIGHT WING)

    CEE OUTLET (LEFT LOWER WING)

    CEE OUTLET (LEFT UPPER WING)

    CEE OUTLET (RIGHT LOWER WING)

    CEE OUTLET (RIGHT UPPER WING)

    1

    1

    7.95

    220

    16220

    16

    30

    30

    ?????????????????

    ?????????????????

    ?????????????????????

    ROYAL CORD

    ?????????????????????

    ROYAL CORD

    R I S E R D I A G R A MN T SE-1

    B

    ARCHITECT IIHERMINIO C. SIMBOL

    1.00 1.0016.70M

    1.00

    6.00

    6.00

    6.00

    5.85

    6.00

    1.00

    29.8

    5 M

    .

    Ckt#5 16 Amp.CEE

    Ckt#6 16 Amp.CEE

    Ckt#3 16 Amp.CEE

    Ckt#4 16 Amp.CEE

    1

    2

    2.00

    2.00

    0.50

    0.50

    1.00

    SW1 (WEATHER-PROOF,FLUSHED MOUNTED)

    SW2 (WEATHER-PROOF,FLUSHED MOUNTED)

    S1 LO-Ckt#1

    HO

    ME

    RU

    N C

    AB

    LEB

    UR

    IED

    IN P

    VC

    PIP

    E

  • PLUMBING LAYOUT PLANSCALE 1:100 M.

    AP-1

    I S O M E T R I C V I E WSCALE 1:100 M.

    CP-1

    GENERAL NOTES (PLUMBING)

    1. GRADES OF HORIZONTAL PIPINGS RUN ALL HORIZONTAL PIPING IN PERFECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2%)

    2. CHANGE IN DIRECTION??????????????????????????????????????????????????????????????????????????????????????????????

    WYES, LONG SWEEP QUARTER BEND, SIXTH - EIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A SINGLE 18 BEND COMBINATION MAYBE USED ON VERTICAL STACK AND SHORT QUARTER BENDS MAYBE USED ON WASTE LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES.

    3. PROHIBITED FITTINGS NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES OF SADDLE HUB AND BEND PROHIBITED.

    4. PIPE CLEAN - OUTS CLEAN - OUTS ARE REQUIRED UNDER FOLLOWING CONDITIONS: a) EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWO AND ONE HALF (22 12) b) ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION. c) EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES d) AT THE END OF ANY HORIZONTAL PIPE LINES.

    5. THE DIGESTION CHAMBER OF SEPTIC VAULT MUST BE WATERPROOFED.

    6. NOT LESS THAN 0.30 METER OF AIR SPACE MUST BE LEFT BETWEEN THE TOP OF THE SEWAGE AND THE UNDER PART OF VAULT ROOF SLAB.

    7. NO SEPTIC VAULT SHALL BE CONSTRUCTED UNDER THE BUILDING.

    8. ALL PLUMBING WORKS SHALL BE UNDER THE SUPERVISION OF A LICENSED MASTER PLUMBING AND LICENSED PLUMBING CONTRACTOR.

    P-16 6

    PROJECT NAME/ LOCATION: SHEET CONTENT:

    CHECKED BY:

    ARCHITECT II

    SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET NO. SHEET NO.

    CHIEF, PLANNING & DESIGN SECTION

    FLORENCIA G. CORDOVA

    REPUBLIC OF THE PHILIPPINES

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYSREGION IV-A

    BATANGAS I DISTRICT ENGINEERING OFFICE

    OFFICE OF THE DISTRICT ENGINEERBATANGAS CITY

    HERMINIO C. SIMBOL

    Officer - in - Charge

    JULIANA D. VERGARA

    DESIGNED BY:

    PLUMBING LAYOUT PLANCATCH BASINISOMETRIC VIEWPLUMBING LEGENDGENERAL NOTES

    BENCIO A. AGUZAR

    OIC - ASSISTANT DISTRICT ENGINEERDRAWN BY: J.I.M. DIO

    C A T C H B A S I NSCALE 1:100 M.

    BP-1

    PLUMBING LEGEND:

    CB - CATCH BASINDS - DOWNSPOUTSD - STORM DRAINAGE

    CONSTRUCTION ANDREHABILITATION OF MULTI-PURPOSE

    BUILDING / STRUCTURE(COVERED COURT)

    BRGY. SAMBAT, BALAYAN, BATANGAS VIVIAN VIENNA B. CASTILLOENGINEER II

    MULTI - PURPOSE BUILDING STRUCTUREBASKETBALL COURT PAVEMENT

    EXISTING

    16.70M

    UP

    6.00

    6.00

    6.00

    6.00

    5.85

    29.8

    5 M

    .

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    CB

    TO STREETDRAINAGE

    CB

    CB

    POWERHOUSE

    0.10 0.100.60

    0.10

    0.40

    0.10

    0.60

    0.10

    VA

    R.

    0.10

    ??????????

    ?????????

    ??????????

    ??????????????????????????????????????

    .40

    PLAN SECTION