Providing Global Mineral Processing Solutions GR Engineering Services Limited www.gres.com.au | Perth | Brisbane GR Engineering designed, constructed and commissioned the Cosmic Boy concentrator plant for Western Areas in 2009. The concentrator was subsequently upgraded in capacity in 2011.The Mill Recovery Enhancement Project (MREP) Nickel Bio-Leach encompassed the addition of unit processes to the Cosmic Boy concentrator plant designed to extract nickel from partially oxidised ore types that exhibit poor flotation response in the main concentrator plant. Bio-oxidation of the nickel minerals renders the nickel amenable to leaching followed by sulphide precipitation and filtration to recover a saleable nickel concentrate. The process design for the project was undertaken by Western Areas Limited. GR Engineering performed the detailed engineering design, procurement, construction and commissioning for the project under an EPC contract. The project involves a novel approach to recovering nickel from mineralisation that is traditionally problematic with respect to recovery by mineral flotation. Future advancements by Western Areas may allow the production of high purity nickel sulphate hexahydrate for applications in the battery and chemicals industries. GR Engineering was pleased to assist Western Areas in the development and delivery of the MREP at Cosmic Boy. MREP NICKEL BIO-LEACH PROJECT SCOPE OF WORK Commodity: Nickel Bio-leach Region: Australia Location: Approximately 100 km south east of Hyden in Western Australia. Project type: Brownfields, lump sum contract, EPC Client: Western Areas Limited Award date: March 2016 Completion date: January 2018 Project manager: Richard van Zyl Process manager: Bill Gosling

Upload: others

Post on 30-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MREP NICKEL BIO-LEACH PROJECT - GR Engineering

Providing Global Mineral Processing Solutions

GR Engineering Services Limitedwww.gres.com.au | Perth | Brisbane

GR Engineering designed, constructed and commissioned the Cosmic Boy concentrator plant for Western Areas in 2009. The concentrator was subsequently upgraded in capacity in 2011.The Mill Recovery Enhancement Project (MREP) Nickel Bio-Leach encompassed the addition of unit processes to the Cosmic Boy concentrator plant designed to extract nickel from partially oxidised ore types that exhibit poor flotation response in the main concentrator plant.

Bio-oxidation of the nickel minerals renders the nickel amenable to leaching followed by sulphide precipitation and filtration to recover a saleable nickel concentrate. The process design for the project was undertaken by Western Areas Limited. GR Engineering performed the detailed engineering design, procurement, construction and commissioning for the project under an EPC contract. The project involves a novel approach to recovering nickel from mineralisation that is traditionally problematic with respect to recovery by mineral flotation. Future advancements by Western Areas may allow the production of high purity nickel sulphate hexahydrate for applications in the battery and chemicals industries.

GR Engineering was pleased to assist Western Areas in the development and delivery of the MREP at Cosmic Boy.

MREP NICKEL BIO-LEACH PROJECTSCOPE OF WORK

Commodity: Nickel Bio-leachRegion: AustraliaLocation: Approximately 100 km south east of Hyden in Western Australia.Project type: Brownfields, lump sum contract, EPC

Client: Western Areas LimitedAward date: March 2016Completion date: January 2018Project manager: Richard van ZylProcess manager: Bill Gosling