mrn

1
MATERIAL REQUISITION NOTE DEPARTMENT: PRODUCT DETAILS Project: PURPOSE: Project Id: INDENT DATE: Indent No: S. No. Description of the Material UOM Make Remarks Indented by: Checked by: Aproved by: Name: Name: Name: Dept. Dept. Dept.: signatute: signatute: Signature: REQ.Q TY Availble Stocks

Upload: gangadhary

Post on 18-Nov-2015

220 views

Category:

Documents


2 download

DESCRIPTION

stores doc

TRANSCRIPT

For useMATERIAL REQUISITION NOTEDEPARTMENT:PRODUCT DETAILSProject:PURPOSE:Project Id:INDENT DATE:Indent No:S. No.Description of the MaterialUOMREQ.QTYAvailble StocksMakeRemarksIndented by:Checked by:Aproved by:Name:Name:Name:Dept.Dept.Dept.:signatute:signatute:Signature: