FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion of PF Resin (240 MT /M to 750 MT /M), MF Resin (80 MT /M to 250 MT /M) & Existing: laminated Sheets – 250000 Nos /M OF M/S. AIROLAM LTD. S.No. 355, AT - Dalpur, Ta - Prantij, Dist – Sabarkantha, Gujarat. PREPARED BY BHAGWATI ENVIRO CARE PVT. LTD. [ISO 9001, ISO 14001 & OHSAS: 18001 CERTIFIED COMPANY] CORPORATE OFFICE 28, 29, 30, Parmeshwar Estate II, Opp. AMCO Bank, Phase I, GIDC Estate, Vatva, Ahmedabad – 382445. Gujarat, India Phone No: +91 79 29295043, 40083051/52 Fax: +91 79 40083053 , Email: [email protected] , [email protected] URL: www.bhagwatienviro.com

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

FINAL

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

FOR

EXPANSION IN EXISTING UNIT

Expansion of PF Resin (240 MT /M to 750 MT /M), MF Resin (80 MT /M to 250 MT /M) & Existing: laminated Sheets – 250000 Nos /M

OF

M/S. AIROLAM LTD.

S.No. 355, AT - Dalpur, Ta - Prantij, Dist – Sabark antha, Gujarat.

PREPARED BY

BHAGWATI ENVIRO CARE PVT. LTD . [ISO 9001, ISO 14001 & OHSAS: 18001 CERTIFIED COMPANY]

CORPORATE OFFICE

28, 29, 30, Parmeshwar Estate II, Opp. AMCO Bank, Phase I, GIDC Estate, Vatva, Ahmedabad – 382445. Gujarat, India Phone No: +91 79 29295043, 40083051/52 Fax: +91 79 40083053 , Email: [email protected] , [email protected]

URL: www.bhagwatienviro.com

Page 2: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

CONTENTS

CLAUSE NO

TOPIC PAGE NO

ANN - A Executive Summary in English…………………………………………………. --

ANN - B Executive Summary in Gujarati………………………………………………… --

ANN – C Accreditation Certificate ……………………………………………………….. --

CHAPTER-1 PREAMBLE

1 - 32

1.1 Preamble............................................................................. 1 1.2 Identification of Project and Project Proponent…………………. 2 1.3 Objective of EIA Study………………………………………………. 4 1.4 Location ……………………………………………………………….. 4 1.5 Study Area…………………………………………………………….. 15 1.6 Nearest Location from the Project Site…………………………… 15 1.7 Scope and methodology of EIA……………………………………. 16 1.8 Structure of EIA………………………………………………………. 18 1.9 Approved TOR for EIA study from MOEF, New Delhi………. 20 1.10 Compliance of TOR………………………………………………….. 25 1.11 Regulatory Frame work………………………………………………….. 31

CHAPTER – 2

PROJECT DESCRIPTION

33 - 62

2.1 Prelude………………………………………………………………………. 33 2.2 Location……………………………………………………………………… 34 2.3 Justification of Project site………………………………………………… 34 2.4 Promoters and their background 35 2.5 Infrastructure Facilities including Power Sources………………….. 35 2.6 Land Use Breakup for Total Plot Area……………………………… 36 2.7 Product Details 37 2.8 Packing & Final Application of Products………………………… 37 2.9 Raw material Requirements………………………………………… 37 2.10 Chemical name & Physical form of raw materials………………… 38 2.11 Physical & Chemical Properties of the Raw Material & Product 39 2.12 Manufacturing process details 40 2.13 Process Flow Diagram 41 2.14 Chemical Reaction 43 2.15 Plant water Requirement & Waste Water generation………………. 44 2.16 Characteristics of effluent………………………. 46 2.17 Details of Effluent Treatment Plant 46 2.18 Flue Gas Emission…………………………………………………………. 47 2.19 Process Gas Emission…………………………………………………….. 49

Page 3: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

2.20 Fuel Requirement…………………………………………………………... 49 2.21 Fugitive Emission Control…………………………………………………. 50 2.22 Hazardous waste management…………………………… 51 2.23 Noise Pollution…………………………………………………………….. 53 2.24 List of Hazardous Chemicals……………………………………………. 54 2.25 Safety & Occupational measure for storage & handling of the Raw

Material & product………………………………………………………… 55

2.26 Action Plan for Transportation of Raw Material & product including hazardous Chemicals…………………………………………………………

58

2.27 Details of Fire fighting system…………………………………………… 58 2.28 Cost of project…………………………………………………...... 59 2.29 Power Requirement……………………………………………………….. 60 2.30 Man Power Details………………………………………………………… 60 2.31 Green Belt Development………………………………………………..... 61 2.32 Scheme for Rain water Harvesting……………………………………… 62

CHAPTER – 3 BASELINE ENVIRONMENTAL STATUS

63 - 128

3.1 Introduction .................................................................... 63 3.2 Study Area........................................................................ 63 3.3 Environmental Standards of the Region................................ 68 3.4 Air Environment……………………………………………………….. 68 3.5 Meteorology…………………………………………………………… 77 3.6 Baseline Data………………………………………………………….. 78 3.7 Atmospheric Stability……………………………………………….. 84 3.8 Noise Environment ………………………………………………….. 84 3.9 Water Environment............................................................ 90

3.10 Land Environment……………………………………………………. 94 3.11 Types of Soil......................................................... 95 3.12 Land Use Pattern……………………………………………………… 98 3.13 Hydrogeology................................................................... 100 3.14 Ecology............................................................................ 104 3.15 Socio Economic Environment.............................................. 112 3.16 Economic Structure………………………………………………….. 114 3.17 Availability of Basic Amenities…………………………………….. 121

CHAPTER – 4

ENVIRONMENTAL IMPACTS ASSESMENTS

129 - 159

4.1 Impact Identification....................................................................... 129 4.2 Impact Prediction and assessment with mitigative

measures......................................................................... 134

4.3 Air Environment………………………………………………………. 135 4.4 Water Environment…………………………………………………… 155 4.5 Noise Environment…………………………………………………… 156 4.6 Land Environment……………………………………………………. 157 4.7 Ecology…………………………………………………………………. 157 4.8 Socio Economic Environment………………………………………. 158

Page 4: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

4.9 Health & Safety……………………………………………………….. 159

CHAPTER – 5 ENVIRONMENTAL MONITORING PROGRAM

160 - 162

5.1 Monitoring of Environment............................................ 160 5.2 Measures proposed to be taken for the work zone ambient air

quality monitoring as per Gujarat Factories Rules………………… 162

CHAPTER – 6

ENVIRONMENTAL MANAGEMENT PLAN

163 - 187

6.1 Introduction.................................................................. 163 6.2 The EMP………………………………………………………… 164 6.3 Objectives of EMP........................................................ 165 6.4 Brief Environmental management Plant......................... 166 6.5 Environmental Management Cell……………………………. 170 6.6 Health & Safety………………………………………………… 171 6.7 Occupational health Hazards……………………………….. 172 6.8 Greenbelt Development & Afforestation…………………… 179 6.9 Selection of Trees……………………………………………… 180

6.10 Expenditure on Enviromental Matters……………………… 182 6.11 Concept of waste minimization……………………………… 183 6.12 Checklist in the form of Do’s & Don’t………………………. 185 6.13 Socio Economic Development activity…………………….. 187

CHAPTER – 7

ADDITONAL STUDIES

188 - 195

7.1 Public Consultation....................................................... 188 7.2 Risk Assesment............................................................ 189 7.3 Social Impact Assesment…………………………………..... 195

CHAPTER – 8 PROJECT BENEFITS

196

-- Project Benefits.......................................................................... 196

CHAPTER –9 SUMMARY OF ENVIONMETAL IMPACTS AND CONCLUSION

197-199

Page 5: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

9.1 Air Environment……………………………………………….. 197 9.2 Water Environment……………………………………………. 197 9.3 Noise Environment……………………………………………. 198 9.4 Hazardous wastes…………………………………………….. 198 9.5 Ecology………………………………………………………….. 198 9.6 Socio Economic Environment………………………………. 199 9.7 Conclusion……………………………………………………… 199

CHAPTER – 10 PROFILE OF ENVIRONMENTAL CONSULTANTS

200-209

10.1 Introduction................................................................. 200 10.2 Expertise In ................................................................ 201 10.3 Laboratory Facility....................................................... 203 10.4 Treatability studies ...................................................... 203 10.5 Our Team of Highly Qualified Technocrats &

Scientists……………………………………………………….. 204

10.6 List of Valuable Clients in Gujarat................................. 205 10.7 List of Valuable Clients in Himachal Pradesh……………. 207 10.8 EC Application Applied by M/s. Bhagwati Enviro Care

Pvt.Ltd…………………………………………………………… 208

10.9 Schedule II Environmental Audit carried out by M/s. Bhagwati Enviro Care Pvt.Ltd…………………………….....

209

Page 6: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

FIGURES FIGURE NO TOPICS PAGE

NO.

CHAPTER - 1

1.1 Map of Gujarat State……................................................. 5

1.2 Map of Sabrakantha District.............................................. 6

1.3 10 KM radius Map of the project site…………………………….. 7

1.4 Plant Layout ……………………………………………………………. 8

1.5 Google Image of the Project site 9

1.6 Distance between Severely polluted area and the Project Site…………………………………………..

11

1.7 Photographs of the Project Site………………………………….. 12

1.8 Methodology of EIA study………………………………………. 17

CHAPTER-2

2.1. Water Balance Diagram................................................. 45

CHAPTER -3

3.1 Topography map of the study area…………………………………….. 66

3.2 Study Area Map of Base line Study for 5 KM Radius and 10 KM Radius …………………………………………………….

67

3.3 Wind Rose Diagram...................................................... 79

3.4 Wind class Frequency Distribution……………………………… 80

3.5 Geological Structure of Gujarat State............................. 94

3.6 Land use / land cover map of 10 km radius area around project site 99

3.7 Hydro chemistry level of ground water……………………………… 101

3.8 Status of depth to water level in Gujarat...................................... 102

3.9 Ground water Quality map of Gujarat………………………………. 103

3.10 Forest Vegetation map of Gujarat………………………………………. 110

3.11 National park and Sanctuaries of Gujarat……………………………….. 111

CHAPTER - 4

4.1 Isopleths of SPM............................................................ 152

4.2 Isopleths of SO2............................................................ 153

4.3 Isopleths of NOx………………………………………………….. 154

CHAPTER -6

6.1 Organization Chart………………………………………………. 170

Page 7: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

TABLES

TABLE NO. TOPICS PAGE

NO.

CHAPTER –1

1.1 Nearest locations from the Project Site............................ 15 1.2 Compliance of Terms of Reference………………………….. 25

CHAPTER –2

2.1 Location of the project site…………………………………………... 34 2.2 Details of Sources……………………………………………………. 36 2.3 Land use breakup for total Plot area……………………………….. 36 2.4 List of Product……………………………………………. 37

2.5 Packing & Final Application of Products………………………….. 37 2.6 Details of Raw Material …………………………………………….. 38 2.7 Details of water consumption & Effluent Generation……………… 44 2.8 Characteristics of Effluent……………………………………………. 46 2.9 Details of Effluent Treatment Plant Units…………………………… 46

2.10 Flue gas Stack details……………………………………………….. 47 2.11 Emission rate of Pollutants……………………………. 48 2.12 Fuel Details……………………………………………………… 49 2.13 Fuel Characteristics……………………………………………. 49 2.14 Details of Hazardous waste…………………………………… 51 2.15 Details of Hazardous waste storage facility 52 2.16 Typical Noise level of equipment…………………………….. 53 2.17 List of Hazardous chemicals………………………………….. 54 2.18 Antidotes of Chemicals…………………………………………. 57 2.19 Capital Cost & Recurring cost of the project……………………….. 59 2.20 Power Requirement…………………………………………….. 60 2.21 Details of Man Power…………………………………………… 60

CHAPTER – 3

3.1 Name of villages in the study area…………………………… 64 3.2 Location of ambient air quality monitoring stations………. 69 3.3 Ambient Air Quality Analysis Report ……………………………… 70 3.4 Details of Ambient Air quality monitoring and analysis

Procedure…………………………………………………………. 77

3.5 Wind Rose Frequency Count…………………………… 81 3.6 Wind Rose Frequency Distribution………………… 82 3.7 Relative Humidity – Project Site Meteorology data ………… 83 3.8 Hourly mixing depth over Indian Region…………………….. 84 3.9 Noise Level in the study area…………………………… 85

3.10 Location of water quality monitoring station………………... 91 3.11 Water quality Analysis………………………………………….. 94 3.12 Analysis Results of Soil Sample……………………………………. 96

Page 8: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

3.13 Land use distribution in study area (10 Km Radial Zone) ……. 100

3.14 Checklist of Floral Diversity……………………………………… 104 3.15 Checklist of Faunal Diversity ……………………………………………. 108 3.16 Identified villages for Socio Economic Study…………………… 112 3.17 Main and Total Workers………………………….. 114 3.18 Socio Economic Profile of the study Area……………………….. 115 3.19 Availability of the Basic Amenities of the study area………….. 122

CHAPTER -4

4.1 Impact identification matrix………………………………………… 131 4.2 Impact Prediction Matrix……………………………………………. 132 4.3 Basis of Emission Rate calculations…………………………….. 146 4.4 The 1st highest 24 Hr average Concentration values of

SPM………………………………………………………………… 147

4.5 The 1st highest 24 Hr average Concentration values of SOx……………………………………………………………………….

148

4.6 The 1st highest 24 Hr average Concentration values of NOx……………………………………………………………………….

149

4.7 Maximum Computed Ground Level Concentration……………. 150 CHAPTER – 5

5.1 Environmental Monitoring Plan........................................ 160 CHAPTER – 6

6.1 Budgetary Expenditure of Green Belt Development…………. 181 6.2 Expenditure on Enviromental matters……………………………. 182

Page 9: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

ANNEXURES

ANNEXURE

NO. Topics

Page No.

1. RISK ASSESMENT STUDY REPORT………………………………… 210 - 254

2. NATIONAL AMBIENT AIR QUALITY STANDARDS……………………….. 255 - 256

3. ICMR STANDARD FOR DRINKING WATER………………………………. 257

4. NATIONAL AMBIENT NOISE QUALITY STANDARDS AND OSHA’S PERMISSIBLE LIMIT FOR NOISE…………………………………………..

258

5. CGWA APPLICATION COPY 259 - 263

6. MEMBERSHIP CERTIFICATE……………………………………… 264

7. CCA COPY……………………………………………………………….. 265 - 269

8. CCA COMPLIANCE REPORT……………………………………………….. 270 - 274

9. LAND SUPPORTING DOCUMENTS 275 - 277

10. PUBLIC HEARING PROCEEDINGS 278

Page 10: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A

EXECUTIVE SUMMARY OF

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

FOR

EXPANSION IN EXISTING UNIT

OF

M/S. AIROLAM LTD.

(S. No. 355, Village – Dalpur, Nananpur Road, Ta – Prantij,

Dist – Sabarkantha, Gujarat.)

PREPARED BY

BHAGWATI ENVIRO CARE PVT. LTD. [ISO 9001, ISO 14001 & OHSAS: 18001 CERTIFIED COMPANY]

CORPORATE OFFICE

28, 29, 30, Parmeshwar Estate II, Opp. AMCO Bank,

Phase I, GIDC Estate, Vatva, Ahmedabad – 382445. Gujarat, India Phone No: +91 79 29295043, 40083051/52 Fax: +91 79 40083053 , Email: [email protected] , [email protected]

URL: www.bhagwatienviro.com

Page 11: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of

M/s. Airolam Ltd. At Survey no. 355,Villaget- Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

i Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

1. INTRODUCTION

M/s. Airolam Ltd. has proposed to expand their manufacturing of Existing unit at S No.

Survey no.355, Village- Dalpur, Nanapur Road, Ta –Prantij, Dist: Sabarkantha, Gujarat. In

existing unit they are manufacturing Laminated Sheets @ 2,50, 000 Sheets/M, PF Resin

@ 240 MT /M & MF Resin @ 80 MT /M. Now they are planning to manufacture resins:

Phenol formaldehyde resin from 240 MT /M to 750 MT/M and Melamine Formaldehyde

Resin from 80 MT /M to 250 MT/M.

The Proposed expansion activity falls under Category “A” of EIA Notification issued in

September – 2006. For that unit needs Environmental clearance from Ministry of

Environment & Forest.

The total plot area is 28689.46 Sq. meter. From that existing constructed area is ~ 1500

Sq. meter. For proposed expansion, ~ 5140 Sq. meter will be used for Installation of

plant machineries, storage of raw material and Products. So, after expansion remaining

open area will be 10,049.46 Sq. meters. From that 8000 Sq. meter area is used for

plantaion & Gardening purpose.

2. DETAILS OF PRODUCTS

Table: 01

Product Details

Sr. No. Name of Product Quantity

Existing Proposed Total

1. Laminated Sheets 2,50,000 Nos. /M 0 2,50,000 Nos. /M

2. P. F Resin 240 MT /M 510 MT /M 750 MT /M

3. M.F.Resin 80 MT /M 170 MT /M 250 MT /M

3. WATER CONSUMPTION & WASTEWATER GENERATION/ DISPOSAL

Table: 02

Water Consumption and Wastewater generation

Water Consumption (Lit/Day) Wastewater generation (Lit/Day)

Existing Proposed Total Existing Proposed Total

Domestic 6000 Nil 6000 Domestic 5000 Nil 5000

Gardening 20,000 Nil 20,000 Gardening Nil Nil Nil

Industrial Industrial

Process Nil Nil Nil Process 500 7000 7500

Cooling 7000 Nil 7000 Cooling 200 Nil 200

Boiler 24,000 Nil 24,000 Boiler 300 Nil 300

Page 12: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

ii  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

Washing Nil 500 500 Washing Nil 500 500 Total 57,000 500 57,500 Total 6000 7500 13,500

  

Table: 03 Mode of Disposal and Treatment 

Sr. No. 

Source  Quantity and mode of disposal 

1.  Domestic sewage  

Domestic  effluent @  5000  Liter  /  day will  be  disposed  off through septic tank / soak pit system. 

2.  Industrial wastewater  

1. The Industrial wastewater generated 8500 Liter / day will 

be  treated  in  Effluent  treatment  plant  having  primary 

treatment unit. 

2. Treated  effluent  will  be  evaporated  in  Thermic  Fluid 

Operated Evaporator.  

  

4. DETAILS OF AIR EMISSION   Table: 04 

Flue Gas Stack Details  

Sr. No. 

Stack attached To 

Stack Height (Meter) 

APC Measures  Pollutants SPM

mg/NM3 SO2 ppm 

NOX

ppm 

01   Steam Boiler 

35 m Common Stack 

Multi Cyclone Dust collector 

< 150 mg/NM3 

< 100 ppm 

< 50 ppm 

02   Thermic Fluid Heater‐1 ( 10 Lac Kcal/Hr) (Existing) 

Multi Cyclone Dust collector 

03   Thermic Fluid Heater‐2 (06Lac Kcal/Hr) (Existing)  

Multi Cyclone Dust collector 

04   D.G.Set  (125 KVA) (Existing)  

6 m Acoustic Enclosure 

 Note: D.G.Set will be used only in case of power failure. 

Page 13: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

iii  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

 Process Gas Stack Details:  There will be no process gas emission from our existing as well as proposed manufacturing 

activity. 

 Table: 05 

Fuel Details 

  

Sr.No  Name of Fuel  Quantity Total after expansion Existing  Proposed 

1  Lignite / Wood for Steam Boiler  

2.5MT /Day 

Nil 2.5  MT /Day  

2  Lignite / Wood  for TFH ‐ I  2.5 MT /Day

2.5  MT /Day 

3  White Coal / Lignite / Wood for TFH ‐II 

5.0 MT /Day 

5.0  MT /Day  

4  Diesel for DG Set   200Liter/Month 

200  Liter/Month  

Page 14: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

iv  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

5. DETAILS OF HAZARDOUS WASTE GENERATION & ITS MANAGEMENT  

TABLE: 06 DETAILS OF HAZARDOUS WASTE GENERATION & ITS MANAGEMENT 

 Sr. No 

Type of Waste with Category No. 

Quantity  Total After Expansion 

Source of Generation 

Collection  Treatment Storage  Disposal/ Management Existing  Proposed

1  Waste Residue (Resin) (Cat. No.23.1) 

3 MT/Year 

Nil  3 MT/Year 

Laminated sheets  cutting and  finishing section  

Discarded Containers/Bags 

‐‐‐   Solid  waste storage  Area with  proper bag packing.  

Collection, Storage, Transportation and  Incineration at CHWIF Site. 

2  ETP Sludge & evaporation residue (Cat. No. 34.3) 

3 MT/Year 

3 MT/Year 

Effluent Treatment Plant  

Sludge  Drying Bed  

Solar Drying  

Solid  waste storage  Area with  proper bag packing.  

Collection, Storage, Transportation and   disposal at TSDF Site. 

3  Discarded Containers (Cat. No. 33.3)  

3300 Nos./Year 

3300 Nos./Year 

Raw  material section  

‐‐‐   ‐‐‐   Solid  waste storage area  

Collection, Storage and use within  premises / sell to approve scrape vendor. 

4  Used Oil (Cat. No. 5.1)  

300 Lit/Year  

300 Lit/Year  

Lubrication  of plant machineries  

H.D.P.E.  Carboys  

‐‐‐   Solid waste  storage area  

Collection, Storage and use within  premises as  lubricant  / Sell  to registered  re  – refiners. 

Page 15: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

v  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

 1. ENVIRONMENTAL PARAMETER MONITORING STUDY AREA/ STUDY PERIOD 

 The  study area  for detailed  studies  is an area within a  radius of 10 Kms. Ambient air quality monitoring were carried out at 06 locations within the study area of 5 km aerial coverage  from  project  site  as  the  Center.  The  ground water monitoring,  noise  level monitoring, Soil analysis were carried out at 06 location for once in the study period. The monitoring  activities were  carried  out  at  06  sampling  sites  for  the Month  of  January 2015 – April 2015. 

 2. AIR ENVIRONMENT 

Baseline study  indicates that AAQ  in the surrounding study area with respect to PM2.5, PM10, SO2, NOX, and VOC are well within  the stipulated permissible  limits as prescribed by  the  latest National Ambient Air Quality  (NAAQ)  Standards  for the respective industrial residential rural areas.   

Maximum  evaluated  24  hourly  GLC  from  the  ISCST‐3,  when  added  to  the  98‐percentile  concentration  of  each  parameter monitored  during  January  2015  – April  2015  season  of  the  ambient  air  it  indicates  that  due  to  establishment  of proposed  expansion  project  of  M/s.  Airolam  Ltd..,  ambient  air  quality  of  the surrounding study area will be well within the NAAQ standards for the respective Industrial,  residential  rural areas. Company will use wood and  Lignite as a  fuel. There  will  be  no  process  gas  emission  from  the  existing  as  well  as  proposed manufacturing activity. 

 It  is  concluded  that  there  will  be  no  long  term  impacts  on  the  surrounding ambient air environment. 

       3. WATER ENVIRONMENT    

Existing Bore well is a main source of water for the project. Base line data reveal that,  the  ground water  quality  is meeting with  Drinking Water  standards.  The company  proposes  to  use  existing  Bore  well  as  source  of  water  for  both domestic as well as Industrial purpose.   After expansion  total water consumption will be 57.5 KL/Day. From  that  the Domestic water  consumption will be 6.0 KL/Day. The  Industrial water  consumption will be 51.5 KL/Day. After expansion total wastewater generation will be 13.5 KL/Day. From that 5.0 KL/Day  Domestic  wastewater  will  go  to  soak  pit  via  septic  tank.  The  Industrial wastewater  generated  8.5  KL/Day will  be  treated  in  Effluent  treatment  plant  having primary treatment unit. Treated effluent will be evaporated  in Thermic Fluid Operated Evaporator.     It  is concluded  that due  to zero discharge by Evaporation of  Industrial Effluent, there will be no significant impacts on the surrounding water environment. 

 

Page 16: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

vi  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

4. NOISE ENVIRONMENT  

Base  line  data  indicates  that  noise  levels  in  the  ambient  air  environment  are within  the  prescribed  norms.  The  industry will  provide  adequate  noise  control measures such as mufflers & silencers at  the air  inlet/outlet, anti vibration pad for  equipment with  have  extreme  vibration  etc.  Ear  plugs &  ear muffs will  be provided to the workers where noise level will remain extremely high.  Thus,  there will be short  term,  reversible  impact on  the noise environment due to the proposed expansion project.  

5. LAND ENVIRONMENT  

Air  pollution,  water  pollution  and  solid  waste  pollute  soil  and  causes direct/indirect effect on  soil. Since all necessary air pollution  control measures have  been  provided  and  based  on  the  results  of  the  dispersion model  for  the ground  level concentration of various pollutants after  the commissioning of the proposed  expansion  Project,  there  will  not  be  any  adverse  impact  of  air pollution on soil.   Industrial  effluent will  be  treated  into  ETP  and  finally  treated  effluent will  be evaporated  in Thermic  Fluid Operated  Evaporator.  Therefore no  impact on  soil environment is anticipated.  All  necessary  control measures will  be  provided  for  handling,  storage  and  safe disposal  of  solid/hazardous waste, which will  be  generated  from  the  proposed expansion project. Thus,  there will not be any  significant  impact of  solid waste on the soil Environment. 

 6. ECOLOGY  

Impacts  on  terrestrial  ecosystem  due  to  the  operation  of  plant  occur  mainly from air emissions.  Air pollutants can impact adversely on the biotic and abiotic components  of  the  ecosystem  and  may  include  injurious  effects  when concentration of these pollutants exceed from permissible limit.  Since  the  proposed  expansion  activity  will  be  carried  out  in  existing  unit,  so, there  will  be  no  adverse  impact  on  the  ecological  environment  of  the  study area.    The total plot area is 28689.46 Sq. meter. From that existing constructed area is ~ 1500 Sq. meter.  For  proposed  expansion,  ~  5140  Sq. meter will  be used  for  Installation  of plant machineries, storage of raw material and Products. So, after expansion remaining open  area will  be  10,049.46  Sq. meters.  From  that  8000  Sq. meter  area  is  used  for plantation & Gardening purpose.    

Page 17: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

vii  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

 The  company  will  also  develop  plantation  as  per  the MoEF  guidelines  all  along  the periphery  of  plant  so  that  these  trees  perform  as  natural  barrier  for  bring  down  the fugitive emission and also stop carryover of dust along with wind current.  

7. SOCIO‐ECONOMIC ENVIRONMENT  

The proposed expansion project will generate direct employment  for 22 persons. The indirect employment will also be generated by way of transportation, shopkeepers and other casual employment for many people. Thus, the proposed expansion project will have  long  term‐  irreversible positive  impact on  the employment pattern of  the study area. 

 8. ENVIRONMENTAL PARAMETER MONITORING   Environmental parameter monitoring facility of the proposed expansion project  is as given below: 

 

S. No.  

Aspect  Source of Impact  

Monitoring Method and it’s Parameters  

Frequency  Executing Agency  

Monitoring Agency  

1.0  Construction Phase (As the construction area is small so, steel structure will be used in the existing unit, hence the impact will be very less)  

1.1   Local  Manpower  Absorption  

Construction Work 

Contractor’s report  No. of people  working in the  project  

Daily Contractor   Airolam Ltd.

1.2  Air Quality   transportation of  construction  materials  

Survey &  observations;  Levels of SPM,  RSPM, SO2 and  NOx  

Weekly  Airolam Ltd.  GPCB/ Recognized Env. Agency  

1.3   Public Health   Dust, Noise,  Movement of  labours  

Regular medical  checkup  

Monthly  Contractors   Airolam Ltd. 

2.0   Operation Phase  

2.1   Water Quality  & Quantity  

Surface &  Ground water  quality within  the Project  Area  

Surveys, sample  collection & field  measurement;  

Quarterly   Airolam Ltd.  GPCB/ Recognized Env. Agency 

2.2   Effluent  Quality  

Quality of Treated effluent  and Zero Discharge by Evaporation.  

ETP sample  collection &  quality analysis  

Daily  (Internal);  Monthly  (Third  Party)  

Airolam Ltd.  GPCB/ Recognized Env. Agency 

Page 18: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

viii  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

    

S. No.  

Aspect  Source of Impact  

Monitoring Methods and Parameters  

Frequency  Executing Agency  

Monitoring Agency  

2.3   Air Quality   Emissions from utility and process  

Air quality monitoring at 2‐3 location within (SO2, NOx, SPM, RSPM, CO, HC, VOC) as well as stack monitoring. 

Ambient ‐Monthly (24 hourly); Stack – Monthly (third party) 

Airolam Ltd.  GPCB/ Recognized Env. Agency 

2.4   Noise Level   Noise level compliance with respect to industrial standards  

Ambient Equivalent Sound Pressure Levels (Leq) in day and Night time at 4 to 6 location. 

Monthly (Third Party) and fortnightly (internal)  

Airolam Ltd.  GPCB/ Recognized Env. Agency  

2.5   Biological Environment  

Horticulture/ Greenbelt Development  

Survival rate of plants and shrubs  

Quarterly  Airolam Ltd.  GPCB/ Recognized Env. Agency 

2.6   Solid Waste Management  

Disposal of waste  

Monitoring  of waste collection, segregation and disposal  

Fortnightly   Airolam Ltd.  GPCB/ Recognized Env. Agency  

2.7   Hazardous Waste Management  

Hazardous waste as required by hazardous waste authorization 

Monitoring of hazardous waste collection, segreg ation, storage and disposal  

Fortnightly   Airolam Ltd.  GPCB/ Recognized Env. Agency  

Generation  of used  drums, bags  and records  of their  dispatch to  approved vendors. 

Maintain Records   Daily   Airolam Ltd.  GPCB/ Recognized Env. Agency  

Generation  of waste  oil  and their treatment 

Maintain Records Daily Airolam Ltd.  GPCB/ Recognized Env. Agency  

     

Page 19: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

ix  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

 9. ADDITIONAL STUDIES  

 We  have  carried  out  socio‐economic  study  of  the  study  area  to  evaluate  impact  of proposed expansion project on them. Since the proposed expansion project  is a small scale unit so, it is beneficial to local people.   

10. ENVIRONMENTAL MANAGEMENT PLAN   

The  environmental  management  plan  is  the  plan  for  effective  environmental management prepared by project proponents. Environmental Management Plan of the company is given in the following table:    

                

Activity  Environmental Impacts

Mitigation measures   Remarks 

Construction Phase: Erection  of Plant Machineries 

• Air • Noise • Socio Economic 

• Well  maintained vehicles  will  be used. 

• Metalled  Road  for Vehicle Movement 

• Well  maintained equipment  will  be utilized  to  prevent noise generation. 

• Local  labour will be hired  for  the  work so  that  housing arrangement  will be avoided. 

Implementation responsibility: Airolam Ltd. 

Page 20: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

x  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

  OPERATIONAL PHASE: 

 M/s. Airolam Ltd. has planned all the necessary steps to control Water Pollution, Air Pollution, noise pollution as well as Hazardous Waste Pollution.  The detailed mitigation  measures  planned  during  operation  phase  of  the  project  are  as follows:   

Activity  EnvironmentalImpacts 

Mitigation measures Remarks

Manufacturing of Products   

• Air • Land • Water • Noise 

• Ensure proper handling of all  chemical  by introducing  spill  control procedures. 

• Ensure usages of PPE’s by workers. 

• Strictly  following  the appropriate  spill  control procedures. 

• The  charging  of  the hazardous  chemical  will be  done  through  very carefully.  

• MSDS  of  Raw material & products will be displayed at  storage  &  handling area. 

• Water  usage  will  be strictly  by  putting  water meter plant wise.  

• Monitored  data  will  be analyzed  and  reviewed time to time. 

• Contaminated solid waste will  be  sent  to  approve TSDF Facilities. 

• Storage  area  will  be designed  in  line with  the factory Act requirement. 

Implementationresponsibility: Airolam Ltd. 

Page 21: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

xi  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

 Environmental Management Plan: Operation Phase:   

Activity  Environmental Impacts 

Mitigation Measures  Remarks 

Operation of Boiler  

• Air • Noise • Water 

• Ensure  proper preventive  maintenance of  fuel  firing system and optimization  of  air  fuel ratio. 

• Ensure  proper maintenance  of  machinery  to  reduce noise level 

• After clean up of spillage ensure  that  disposed  it properly. 

• Provision  of  Adequate Stack Height.  

• Ensure usage of Personal Protective Equipments.

Implementationresponsibility: Airolam Ltd. 

Operation of Cooling Tower 

• Air • Water • Noise 

• Ensure  proper maintenance  of machinery  to  reduce noise level 

• Blow down  is being sent in  ETP  provided  within premises 

Page 22: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

xii  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

 Environmental Management Plan: Operation Phase 

 Storage, Handling & Transportation of Raw materials and Products 

• Air • Water • Land 

• Chemical  to  be  stored  in accordance with the rules and  regulations  of  the Safety Department.  

• Separate storage area for solid/liquid  raw materials.  

• Install proper  facilities  to prevent rain/storm water contamination during the storage  of  solid  raw materials. 

• Ensure  disposal  of  used drums,  bags  as  per  the rules/regulations. 

 

Transportation of all the raw materials, finished products & hazardous Wastes. 

Air • Water • Land 

• Work  will  be  given  to Trained/Approved Transports  for  the transportation of the raw materials/products. 

• TERMCARD  will  be followed. 

• Ensure  availability  of MSDS  of  all  the  raw materials  and  finished products  to  the  Off‐site Emergency team. 

Development and maintenance of green belt  

• Air • Land  

Ensure  development  and maintenance  of  proper  green belt as proposed. 

Direct / Indirect Employment  

• Socioeconomicissue  

Continue  policy  of  local employment  according  to  the skill  and  availability  of  the manpower 

Page 23: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: A Executive Summary for Draft Environmental Impact Study of  

M/s. Airolam Ltd. At Survey no. 355,Villaget‐ Dalpur, Nanapur Road, Ta –Prantij, Dist:Sabarkantha, Gujarat.

xiii  Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 

CONCLUSION   The study brings out the followings:  • The  proposed  expansion  project  will  have  easy  access  to  basic  infrastructure 

facilities,  availability  of  land,  fuel,  transportation  network,  power  availability, environmental compatibility and well developed pollution control systems. 

   • Environmental  Impact  Assessment  shows  that  proposed  expansion  project 

activity  will  not  have  any  significant  impact  on  existing  ambient  air  quality, ground water quality and noise level.   

 • Risk  to  flora,  fauna and  soil  is negligible due  to  location of project activity and 

proposed  effective  environmental  management  plan  for  management  and handling of air pollution, hazardous wastes and wastewater. 

 • Additional greenbelt on available open land area will be further more developed 

within  the  plant  premises;  there  will  be  positive  impact  on  the  ecological environment of the study area.   

 • There  will  be  Socio‐economic  benefits  due  to  creation  of  direct/indirect 

employment.  Thus, it is concluded that proposed expansion project of M/s. Airolam Ltd. Will have negligible  impact  on  environment  and will  become  beneficial  to  the  local  people after  implementation  of  the mitigation measures  and  environmental management plan.     

Page 24: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

D[PD[PD[PD[PV[ZM,[D V[ZM,[D V[ZM,[D V[ZM,[D llll,DL8[0,DL8[0,DL8[0,DL8[0PPPP GF GF GF GF ;}lRT;}lRT;}lRT;}lRT I]lG8GF SFZ6[ 5IF"JZ6 5Z YGFZL I]lG8GF SFZ6[ 5IF"JZ6 5Z YGFZL I]lG8GF SFZ6[ 5IF"JZ6 5Z YGFZL I]lG8GF SFZ6[ 5IF"JZ6 5Z YGFZL

V;ZM VV;ZM VV;ZM VV;ZM V\\\\U[GF U[GF U[GF U[GF VC[JF,GM DCtJ5}6" ;FZFVC[JF,GM DCtJ5}6" ;FZFVC[JF,GM DCtJ5}6" ;FZFVC[JF,GM DCtJ5}6" ;FZF\\\\XXXX

ssss;J[" G\P #554UFD N,5]Z4GFGG5]Z ZM04 TFP5|F\TL\H4 HLP;F\AZSF9F4 U]HZFTf

VC[JF, T{IFZ SZGFZVC[JF, T{IFZ SZGFZVC[JF, T{IFZ SZGFZVC[JF, T{IFZ SZGFZ EUJTL V[gJFIZM S[Z 5|FPl,PEUJTL V[gJFIZM S[Z 5|FPl,PEUJTL V[gJFIZM S[Z 5|FPl,PEUJTL V[gJFIZM S[Z 5|FPl,P

sVF.V[;VM )__!4 VF.V[;VMv!$__! VsVF.V[;VM )__!4 VF.V[;VMv!$__! VsVF.V[;VM )__!4 VF.V[;VMv!$__! VsVF.V[;VM )__!4 VF.V[;VMv!$__! VG[ G[ G[ G[ OHSASo !(__! YL 5|DFl6T So !(__! YL 5|DFl6T So !(__! YL 5|DFl6T So !(__! YL 5|DFl6T S\\\\5GLf5GLf5GLf5GLf

SM5M"Z[8 VMlO;SM5M"Z[8 VMlO;SM5M"Z[8 VMlO;SM5M"Z[8 VMlO;

Z(4Z)4#_ 5ZD[`JZ V[:8[8vZ4 V[dSM A[\S ;FD[4 TASSMv!4 HLVF.0L;L V[:8[84 J8JF4 VDNFJFN v #(Z$$5 U]HZFT4 EFZT

OMG G\P ´ )! *) Z)Z)5_$#4 $__(#_5! q 5Z O[S; o ´ )! *) $__(#_5#

.D[., o [email protected]

[email protected] URL : www.bhagwatienviro.com

Page 25: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

2

!!!! PPPP 5|:TFJGF o5|:TFJGF o5|:TFJGF o5|:TFJGF o D[PV[ZM,[D l,DL8[0P ;J[" G\P #554UFD N,5]Z4 GFGG5]Z ZM04 TFP5|F\TL\H4 HLP;F\AZSF9F4 U]HZFT BFT[GF T[VMGF CIFT I]lG8G]\ lJ:TZ6 SZJFG]\ lJRFZ[ K[P CIFT %,Fg8 DF \ T[VM ,[DLG[8[0 ;L8; Z45_4___ ;L8; 5|ltF DF; 45LPV[OP Z[hLG Z$_ D[P8G 5|ltF DF; 4 V[DPV[OP Z[hLG (_ D[P8G 5|ltF DF; G\] pt5FNG SZ[ K[P CJ[ T[VM CIFT %,Fg8 DF\ Z[hLGG]\ lJ:TZ6 CIFT 5LPV[OP Z[hLG Z$_ D[P8G 5|ltF DF;YL *5_ D[P8G 5|ltF DF; VG[ V[DPV[OP Z[hLG (_ D[P8G 5|ltF DF;YL Z5_ D[P8G 5|ltF DF; SZX[P VF ;}lRT lJ:TZ6 5|J'l¿4 ;%8[dAZ4 Z__&DF\ .:I] SZJFDF\ VFJ[,F EIA GMl8lOS[XGGL S1FFvccV[cc C[9/ VFJ[ K[P VF DF8[ VF V[SD[ cc5IF"JZ6 VG[ JG D\+F,Icc GL 5IF"JZ6 ;\A\WL D\H}ZL ,[JL H~ZL K[P%,M8G]\ S], 1F[+O/ Z(&()P$& RMPDLP K[4 T[ 5{SL CF,GM AF\WSFD SZ[,M lJ:TFZ ∼!5__ RMPDLP K[P ;}lRT lJ:TZ6 DF8[ ∼ 5!$_ RMPDLP GM lJ:TFZ %,Fg8GL I\+ ;FDU|L UM9JJF DF8[4 SFRL ;FDU|L VG[ pt5FNGMGM ;\U|C SZJF DF8[ p5IMUDF\ ,[JFDF\ VFJX[P T[YL4 lJ:TZ6 AFN !_4_$)P$& RMPDLPGM lJ:TFZ B]<,M ZC[X[[\P H[DFYL ∼(___ RMPDLPGF lJ:TFZDF\ T[VM J'1FFZM56 VG[ AFUSFD SZX[P ZPZPZPZP pt5FNGMGL lJUTM pt5FNGMGL lJUTM pt5FNGMGL lJUTM pt5FNGMGL lJUTM

SM9Mv_!SM9Mv_!SM9Mv_!SM9Mv_! pt5FNGGL lJUTMpt5FNGGL lJUTMpt5FNGGL lJUTMpt5FNGGL lJUTM

S|D S|D S|D S|D GGGG\\\\PPPP

pt5FNGG]pt5FNGG]pt5FNGG]pt5FNGG]\\ \\ GFDGFDGFDGFD pt5FNG pt5FNG pt5FNG pt5FNG 5|ltFDF;5|ltFDF;5|ltFDF;5|ltFDF; CF,G]CF,G]CF,G]CF,G]\\ \\ pt5FNGpt5FNGpt5FNGpt5FNG ;}lRT pt5FNG;}lRT pt5FNG;}lRT pt5FNG;}lRT pt5FNG lJ:TZ6 AFN S], lJ:TZ6 AFN S], lJ:TZ6 AFN S], lJ:TZ6 AFN S],

pt5FNGpt5FNGpt5FNGpt5FNG ! ,[DLG[8[0 ;L8; Z45_4___ ;L8; _ Z45_4___ ;L8; Z 5LPV[OP Z[hLG Z$_ D[P8G 5!_ D[P8G *5_ D[P8G # V[DPV[OP Z[hLG (_ D[P8G !*_ D[P8G Z5_ D[P8G #P#P#P#P5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ q lGSF,5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ q lGSF,5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ q lGSF,5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ q lGSF,

SM9Mv_ZSM9Mv_ZSM9Mv_ZSM9Mv_Z 5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ V5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ V5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ V5F6LGM J5ZFX VG[ 5|N}lQFT 5F6LGL pt5l¿ V\\\\U[GL lJUTMU[GL lJUTMU[GL lJUTMU[GL lJUTM

5F6LGM J5ZFX sN{lGS l,8Zf5F6LGM J5ZFX sN{lGS l,8Zf5F6LGM J5ZFX sN{lGS l,8Zf5F6LGM J5ZFX sN{lGS l,8Zf 5|N}lQFT 5F6LGL pt5l¿ sN{lGS 5|N}lQFT 5F6LGL pt5l¿ sN{lGS 5|N}lQFT 5F6LGL pt5l¿ sN{lGS 5|N}lQFT 5F6LGL pt5l¿ sN{lGS l,8Zfl,8Zfl,8Zfl,8Zf CF,GM CF,GM CF,GM CF,GM

J5ZFXJ5ZFXJ5ZFXJ5ZFX ;}lRT ;}lRT ;}lRT ;}lRT J5ZFXJ5ZFXJ5ZFXJ5ZFX

lJ:TZ6 lJ:TZ6 lJ:TZ6 lJ:TZ6 AFN S], AFN S], AFN S], AFN S], J5ZFXJ5ZFXJ5ZFXJ5ZFX

CF,GL CF,GL CF,GL CF,GL pt5l¿pt5l¿pt5l¿pt5l¿

;}lRT ;}lRT ;}lRT ;}lRT pt5l¿pt5l¿pt5l¿pt5l¿

lJ:TZ6 lJ:TZ6 lJ:TZ6 lJ:TZ6 AFN S], AFN S], AFN S], AFN S], pt5l¿pt5l¿pt5l¿pt5l¿

3ZUyY] &___ _ &___ 3ZUyY] 5___ _ 5___ J°1FFZM56 Z_4___ _ Z_4___ J°1FFZM56 _ _ _ VF{nMlUS VF{nMlUS 5|lS|IF _ _ _ 5|lS|IF 5__ *___ *5__ AM.,Z Z$4___ _ Z$4___ AM.,Z #__ _ #__ S],L\U *___ _ *___ S],L\U Z__ _ Z__ JF[XL\\\\\\U _ 5__ 5__ JF[XL\\\\\\U _ 5__ 5__ ;ZJF/M 5*4___ 5__ 5*45__ ;ZJF/M &___ *5__ !#45__

Page 26: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

3

SM9Mv_#SM9Mv_#SM9Mv_#SM9Mv_#

5F6LGM lGSF, VG[ X]wW SZJFGL 5wWlT5F6LGM lGSF, VG[ X]wW SZJFGL 5wWlT5F6LGM lGSF, VG[ X]wW SZJFGL 5wWlT5F6LGM lGSF, VG[ X]wW SZJFGL 5wWlT S|D GS|D GS|D GS|D G\\\\PPPP ;|MT;|MT;|MT;|MT lGSF,G]lGSF,G]lGSF,G]lGSF,G]\\ \\ 5|DF6 VG[ 5wWlT5|DF6 VG[ 5wWlT5|DF6 VG[ 5wWlT5|DF6 VG[ 5wWlT ! 3ZUyY]\ 5|N}lQFT 5F6L N{lGS 5___ lSPl,P H[8,F 3ZUyY]\

5|N}lQFT 5F6LGM XMQF BF0FDF\ lGSF, SZJFDF\ VFJX[P

Z VF{nMlUS 5|N}lQFT 5F6L !P N{lGS (5__ lSPl,P H[8,F VF{nMlUS 5|N}lQFT 5F6LG[ 5|FYlDS VG[ T°lTI X]lwWSZ6 I]lG8 WZFJTF %,Fg8DF\ X]wW SZJFDF\ VFJX[P

Z. X]wW SZJFDF\ VFJ[,F 5|N}lQFT 5F6LG[

YDL"S O<I].0 .JF5MZ[8Z DF\ AFQ5LEJG SZJFDF\ VFJX[P

$P ACFZ GLS/TL CJF sJFI]f V$P ACFZ GLS/TL CJF sJFI]f V$P ACFZ GLS/TL CJF sJFI]f V$P ACFZ GLS/TL CJF sJFI]f V\\\\U[GL lJUTMU[GL lJUTMU[GL lJUTMU[GL lJUTM

SM9Mv_$SM9Mv_$SM9Mv_$SM9Mv_$ O,] U[; :8[SGL lJUTMO,] U[; :8[SGL lJUTMO,] U[; :8[SGL lJUTMO,] U[; :8[SGL lJUTM

S|D S|D S|D S|D GGGG\\\\PPPP

:8[S GLR[GF ;FY[ :8[S GLR[GF ;FY[ :8[S GLR[GF ;FY[ :8[S GLR[GF ;FY[ HM0FI[,M K[HM0FI[,M K[HM0FI[,M K[HM0FI[,M K[

:8[SGL :8[SGL :8[SGL :8[SGL µµµµ\\\\RF. RF. RF. RF. sDLPfsDLPfsDLPfsDLPf

V[5L;L l;:8DV[5L;L l;:8DV[5L;L l;:8DV[5L;L l;:8D 5|N}QFSM5|N}QFSM5|N}QFSM5|N}QFSM

SPM Mg/NM3

SO2 Ppm

NOx ppm

! :8LD aFF[><FZ sCIFTf

#5 D<8L;FIS,MG 0:8 S,[S8Z

<!5_

Mg/NM3

<!__

ppm

<5_

ppm

Z YldFS O<iF]>0 CL8Z Z ,FBPlS,F[S[,ZL 5|lT S,FS sCIFTf

D<8L;FIS,MG 0:8 S,[S8Z

<!5_

Mg/NM3

<!__

ppm

<5_

ppm

#

CF[8 V[Z HGZ[8Z _P5 ,FB lS,F[S[,ZL 5|lT S,FS sCIFTf

D<8L;FIS,MG 0:8 S,[S8Z

<!5_

Mg/NM3

<!__

ppm

<5_

ppm

$ 0LPHLP;[8 !Z5 S[PJLPV[ sCIFTf

& V[SM:8LS V[GS,M;Z

5|M;[; U[; :8[SGL lJUTM 5|M;[; U[; :8[SGL lJUTM 5|M;[; U[; :8[SGL lJUTM 5|M;[; U[; :8[SGL lJUTM 0LPHLP;[8 GM p5IMU OST JLH/LGF VEFJ[H SZJFDF\ VFJX[P

Page 27: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

4

SM9Mv_SM9Mv_SM9Mv_SM9Mv_5 A/T6 ;A/T6 ;A/T6 ;A/T6 ;\\\\AAAA\\\\WL lJUTMWL lJUTMWL lJUTMWL lJUTM

S|D GS|D GS|D GS|D G\\\\PPPP A/T6GM 5|SFZA/T6GM 5|SFZA/T6GM 5|SFZA/T6GM 5|SFZ J5ZFTM DFl;J5ZFTM DFl;J5ZFTM DFl;J5ZFTM DFl;S HyYMS HyYMS HyYMS HyYM lJ:TZ6 AFNlJ:TZ6 AFNlJ:TZ6 AFNlJ:TZ6 AFN

CF,DFCF,DFCF,DFCF,DF\\\\ ;}lRT;}lRT;}lRT;}lRT _! ,LuGF.8q,FS0F

:8LD AM.,Z DF8[ ZP5 D[P8G 5|lTlNJ; _ ZP5 D[P8G 5|lTlNJ;

_Z ,LuGF.8q,FS0F 8LV[OPV[Rv! DF8[

ZP5 D[P8G 5|lTlNJ; _ ZP5 D[P8G 5|lTlNJ;

_# jCF.8 SM,q ,LuGF.8q,FS0F 8LV[OPV[RvZ DF8[

5P_ D[P8G 5|lTlNJ; _ 5P_ D[P8G 5|lTlNJ;

_$ 0LH, 0LPHLP;[8 DF8[ Z__ D[P8G 5|lTDF; _ Z__ D[P8G 5|lTDF;

Page 28: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

SM9Mv_SM9Mv_SM9Mv_SM9Mv_&&&& 5P pt5gG YGFZF HMBDL SRZF VG[ T[GF jIJ:YF5G V5P pt5gG YGFZF HMBDL SRZF VG[ T[GF jIJ:YF5G V5P pt5gG YGFZF HMBDL SRZF VG[ T[GF jIJ:YF5G V5P pt5gG YGFZF HMBDL SRZF VG[ T[GF jIJ:YF5G V\\\\U[GL lJUTMU[GL lJUTMU[GL lJUTMU[GL lJUTM

S|D S|D S|D S|D GGGG\\\\PPPP

HMBDL SRZFGM HMBDL SRZFGM HMBDL SRZFGM HMBDL SRZFGM 5|SFZ VG[ T[GL 5|SFZ VG[ T[GL 5|SFZ VG[ T[GL 5|SFZ VG[ T[GL

S1FFS1FFS1FFS1FF

HMBDL SRZFG]HMBDL SRZFG]HMBDL SRZFG]HMBDL SRZFG]\\ \\ 5|DF65|DF65|DF65|DF6 pNEJG]pNEJG]pNEJG]pNEJG]\\ \\ SFZ6SFZ6SFZ6SFZ6

;;;;\\\\U|CG]U|CG]U|CG]U|CG]\\ \\5F+5F+5F+5F+ l8=8D[g8l8=8D[g8l8=8D[g8l8=8D[g8 ;;;;\\\\U|CU|CU|CU|C lGSF,lGSF,lGSF,lGSF, CF,DFCF,DFCF,DFCF,DF\\\\ ;}lRT;}lRT;}lRT;}lRT lJ:TZ6 lJ:TZ6 lJ:TZ6 lJ:TZ6

AFN S],AFN S],AFN S],AFN S], ! J[:8 Z[;L0I]

sS1FF G\P Z#P!f

# D[P8G q JFlQF"S

_ D[P8G q JFlQF"S

# D[P8G q JFlQF"S

,[DLG[8[0 ;L8;GL SF56L TYF OLGL;L\U lJEFU

lGSF, SZJFDF\ VFJTL SMY/LIMq 5F+M

vv 3G SRZF DF8[GM ;\U|C lJ:TFZ

V[S+ SZJM4 ;\U|C SZJM4 5lZJCG s:Y/F\TZf VG[ tIFZAFN ;LV[rF0A<I]VF>V[O ;F.8 BFT[ lGSF,P

Z J5ZFI[,]\ VM., sS1FF G\P 5P!f

#__ l,8Z q JFlQF"S

_ l,8Zq JFlQF"S

#__ l,8Zq JFlQF"S

%,Fg8GL I\+ ;FDU|LDF\ SZJFDF\ VFJT]\ µ\H6

V[RP0LP 5LP.P 5F+

v 3G SRZF DF8[GM ;\U|C lJ:TFZ

%,Fg8GL I\+ ;FDU|LDF\ µ\H6 DF8[ p5IMU YX[ VYJF GM\WFI[,F ZL;F.S,ZG[ J[RJFDF\ VFJX[P

# lGSF, SZJFDF\ VFJ[,L SMY/LVM q 5F+M sS1FF G\P ##P#f

##__ G\Uq JFlQF"S

_ G\Uq JFlQF"S

##__ G\Uq JFlQF"S

SFRL ;FDU|L lJEFU

v 0LSg8[DLG[XG 3G SRZF DF8[GM ;\U|C lJ:TFZ

lGSF, SZJFDF\ VFJ[,L SMY/LVM q 5F+M SFRL ;FDU|L 5}ZL 5F0GFZG[ 5ZT SZJFDF\ VFJX[ VYJF .8L5LDF\YL lGS/TF SRZFG[ 5[S SZJF DF8[ 5]Go p5IMUDF\ ,[JFDF\ VFJX[P

$ .8L5L J[:8 sS1FF TYF .JF5MZ[X Z[;L0LI] G\P #$P#f

# D[P8G q JFlQF"S

_ D[P8G q JFlQF"S

# D[P8G q JFlQF"S

5|N}lQFT 5F6LG]\ X]lwWSZ6

V[RP0LP 5LP.P A[u;

5|FS'lTS ;]SJ6L

3G SRZF DF8[GM ;\U|C lJ:TFZ

V[S+ SZJM4 ;\U|C SZJM4 5lZJCG s:Y/F\TZf VG[ tIFZAFN 8LV[;0LV[O ;F.8 BFT[ lGSF,P

Page 29: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

!P !P !P !P VeIF; C[9/GF lJ:TFZ q ;DIUF/F 5Z N[BZ[B ZFBJFGF ;VeIF; C[9/GF lJ:TFZ q ;DIUF/F 5Z N[BZ[B ZFBJFGF ;VeIF; C[9/GF lJ:TFZ q ;DIUF/F 5Z N[BZ[B ZFBJFGF ;VeIF; C[9/GF lJ:TFZ q ;DIUF/F 5Z N[BZ[B ZFBJFGF ;\\\\NE"DFNE"DFNE"DFNE"DF\\\\ 5IF"JZ6;5IF"JZ6;5IF"JZ6;5IF"JZ6;\\\\AAAA\\\\WL WMZ6M WL WMZ6M WL WMZ6M WL WMZ6M lJUTJFZ VeIF;M SZJF DF8[GM lJ:TFZ !_ lSPDLGL l+HIFDF\ O[,FI[,M K[P 5|MH[S8GF :Y/G[ S[g§DF\ ZFBLG[ 5 lSPDLPGF VeIF; 1F[+DF\ & :Y/MV[ JFTFJZ6DF\ CJFGL U]6J¿F T5F;JFDF\ VFJL CTLP VeIF;GF ;DIUF/FDF\ V[S JBT E}UE" H/GL T5F;4 VJFH s3M\3F8f GF\ 5|DF6GL T5F;4 HDLGG]\ 5'YSSZ6 & :Y/MV[ SZJFDF\ VFjIF\ CTF\P N[BZ[B ZFBJFGL SFDULZL HFgI]VFZL Z_!5v V[l5|,vZ_!5 DF;DF\ SZJFDF\ VFJL CTLP ZP ZP ZP ZP CJF;CJF;CJF;CJF;\\\\AAAA\\\\WL 5IF"JZ6WL 5IF"JZ6WL 5IF"JZ6WL 5IF"JZ6

5FIFGF :TZ[ SZJFDF\ VFJ[,M VeIF; NXF"J[ K[ S[ PM2.5, PM10, SO2, NOX VG[

VOC GF ;\NE"DF\4 VF;5F;GF VeIF;,1FL lJ:TFZDF\ AAQ G]\ 5|DF64 ;\A\lWT VF{nMlUS ZC[6FS U|FDL6 lJ:TFZM DF8[ ACFZ 5F0JFDF\ VFJ[,F\ K[<,FDF\ K[<,F\ G[XG, V[dALIg8 V[Z

SJM,L8L (NAAQ) WMZ6M sJFTFJZ6DF\GL CJFGL U]6J¿F GSSL SZJF DF8[GF\ ZFQ8=LI WMZ6Mf YSL lGlN"Q8 SZJFDF\ VFJ[,L DIF"NFGL V\NZ CT]\P

ISCST-3 DF\YL NZ Z$ S,FS[ T5F;JFDF\ VFJ[, GLC HIFZ [HFgI]VFZL Z_!5 v V[l5|,vZ_!5 NZlDIFG JFTFJZ6GL CJFGF T5F;JFDF\ VFJ[,F 5|tI[S lGWF"lZT WMZ6 s5[ZFDL8ZfGL )( 5;["g8F., ;F\§TFDF\ pD[ZJFDF\ VFJ[ tIFZ[ D/TF\ 5lZ6FDM ;}RJ[ K[ S[ D[PV[ZM,[D ,LDL8[0GF ;}lRT 5|MH[S8GL :YF5GFG[ SFZ6[4 VeIF; C[9/GF lJ:TFZGL VF;5F;GF JFTFJZ6GL CJFGL U]6J¿F ;\A\lWT VF{nMlUS4 ZC[6F\S U|FDL6 lJ:TFZ DF8[ GSSL SZJFDF\

VFJ[,F\ NAAQ WMZ6MGL DIF"NFDF\ CX[P S\5GL A/T6 TZLS[ ,FS0F VG[ l,uGF.8GM p5IMU SZX[P I]lG8DF\YL 5|lS|IF NZdIFG SM. U[; pt5gG YX[ GCLP V[J]\ TFZ6 SF-JFDF\ VFJ[ K[ S[ VF;5F;GF\ JFTFJZ6GL CJF 5Z ,F\AF UF/[ SM. V;Z 50X[ GCLP #P #P #P #P H/ 5IF"JZ6H/ 5IF"JZ6H/ 5IF"JZ6H/ 5IF"JZ6 5|MH[S8 DF8[ 5F6LGM D]bI ;|MT CIFT AMZJ[, K[ P VFWFZ Z[BF~5 0[8F NXF"J[ K[ S[ E}UE" H/GL U]6J¿F 5LJFGF 5F6LGF WMZ6MG[ ;\TMQF[ K[P S\5GL 3ZUyY] T[DH VF{nMlUS C[T] DF8 [CIFT AMZJ[, GF 5F6L 5]ZJ9FGM p5IMU SZJFG]\ lJRFZ[ K[P lJ:TZ6 5KL 5F6LGM S], J5ZFX 5*P5 lSPl,P q 5|lTlNG ZC[X[P T[ 5{SL 3ZUyY] 5F6LGM J5ZFX &P_ lSP,LP q 5|lTlNG ZC[X[P VF{nMlUS 5F6LGM J5ZFX 5!P5 lSP,LP q 5|lTlNG ZC[X[[P lJ:TZ6 5KL S], 5|N}lQFT 5F6L !#P5 lSPl,P q 5|lTlNG ZC[X[P N{lGS 5P_ lSPl,P H[8,F 3ZUyY]\ 5|N}lQFT 5F6LGM ;[l%8S 8[\S VG[ XMQF BF0FDF\ lGSF, SZJFDF\ VFJX[P N{lGS (P5 lSPl,P H[8,F VF{nMlUS 5|N}lQFT 5F6LG[ 5|FYlDS X]lwWSZ6 I]lG8 WZFJTF X]lwWSZ6 %,Fg8DF\ X]wW SZJFDF\ VFJX[P X]wW SZJFDF\ VFJ[,F 5|N}lQFT 5F6LG[ YDL"S O<I].0 RF,S .JF5MZ[8Z DF\ AFQ5LEJG SZJFDF\ VFJX[P V[J]\ TFZ6 SF-JFDF\ VFJ[ K[ S[ hLZM l0:RFH" CMJFGF SFZ6[ VF;5F;GF 5F6LGF 5IF"JZ6 p5Z VF I]lG8GL SM. DCtJGL V;ZM 50X[ GCLP

Page 30: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

7

$P $P $P $P wJlG 5|N}QF6wJlG 5|N}QF6wJlG 5|N}QF6wJlG 5|N}QF6 5FIFGF :TZMGM 0[8F ;}RJ[ K[ S[ VF;5F;GF JFTFJZ6DF\ VJFHG]\ :TZ lGlN"Q8 WMZ6MGL DIF"NFDF\ K[P VJFHG[ lGI\+6DF\ ZFBJFGF 5U,F\ ~5[4 CJF NFB, YJFGL VG[ ACFZ GLS/JFGL HuIFVMV[ DO,;" VG[ ;FI,g;;" TYF H[DF\ B}A H W|}HFZL YTL CMI T[JF\ ;FWGM DF8[ V[g8L JFIA|[XG 5[0 H[JF\ ;FWGM VF pnMU 5}ZF\ 5F0X[P HIF\ VJFHG]\ 5|DF6 JW] CX[ tIF\ TDFD SFDNFZMG[ .IZ %,uh VG[ .IZ DO; 5}ZF\ 5F0JFDF\ VFJX[P VFD4 ;}lRT 5|MH[S8 GF lJ:TZ6 G[ SFZ6[ wJlG 5IF"JZ6 5Z 8}\SFUF/FGL UF{6 V;ZM µEL YX[4 H[G[ N}Z SZL XSFX[P 5P 5P 5P 5P HDLG;HDLG;HDLG;HDLG;\\\\AAAA\\\\WL 5IF"JZ6WL 5IF"JZ6WL 5IF"JZ6WL 5IF"JZ6 CJF 5|N}QF64 5F6L 5|N}QF6 VG[ 3G SRZFGL V;ZYL HDLG 5|N}lQFT YFI K[ VG[ T[GL ;LWL q VF0V;Z HDLG 5Z 50[ K[P JFI] 5|N}QF6 lGI\+6 DF8[ H~ZL TDFD 5U,F\GL HMUJF. SZJFDF\ VFJL CMJFYL VG[ CIFT I]lG8 DF\ lJ:TZ6 YIF 5KL H]NF\ H]NF\ 5|N}QFSMGL ;F\§TF DF8[GF ccl0:5h"G DM0[,ccGF\ 5lZ6FDMG[ HMTF\4 HDLG p5Z JFI] 5|N}QF6GL DF9L V;Z 50X[ GCLP VF{nMlUS 5F6L ;}lRT V[O,]Vg8 8=L8D[g8 %,Fg8DF\ X]lwWSZ6 DF8[ HX[ VG[ VFBZ[X]wW SZJFDF\ VFJ[,F 5|N}lQFT 5F6LG[ .JF5MZ[8Z DF\ AFQ5LEJG SZJFDF\ VFJX[[P T[YL4 HDLGGF 5IF"JZ6 p5Z T[GL SM. V;Z YJFGL ;\EFJGF GYLP VF 5|MH[S8 YSL pt5gG YGFZF 3G q HMBDL SRZFGL C[ZO[Z4 ;\U|C VG[ ;]Zl\1FT lGSF, DF8[GF\ TDFD lGI\+S 5U,F\GL HMUJF. SZJFDF\ VFJL K[P VFYL4 HDLG;A\\WL 5IF"JZ6 5Z 3G SRZFGL SM. GM\W5F+ V;Z 50X[ GCLP &P &P &P &P 5lZl:YlT lJ7FG s.SM,MHLf5lZl:YlT lJ7FG s.SM,MHLf5lZl:YlT lJ7FG s.SM,MHLf5lZl:YlT lJ7FG s.SM,MHLf %,Fg8GL SFDULZLYL HDLG p5Z YGFZL 5FlZl:YlTS V;Z D]bItJ[ JFI]VMGF pt;H"GG[ SFZ6[ CMI K[P JFI] 5|N}QFSM 5IF"JZ6DF\ ZC[,F\ ;}1D HLJ H\T]VM 5Z DF9L V;Z SZL XS[ K[P VG[ HM VF 5|N}QFSMGL ;F\§TF :JLS'T WMZ6M SZTF\ JWL HFI tIFZ[ T[ 5IF"JZ6G[ G]S;FG SZL XS[ K[P;}lRT 5|J'l¿VM CIFT I]lG8 DF\ \ SZJFGL CMJFYL VeIF; C[9/GF lJ:TFZDF\ 5IF"JZ6 5Z SM. DF9L V;Z 50X[ GCLP

%,M8G]\ S], 1F[+O/ ∼ Z(&()P$& RMPDLP K[4 T[ 5{SL CF,GM AF\WSFD SZ[,M lJ:TFZ

∼!5__ RMPDLP K[P ;}lRT lJ:TZ6 DF8[ ∼ 5!$_ RMPDLP GM lJ:TFZ %,Fg8GL I\+ ;FDU|L UM9JJF DF8[4 SFRL ;FDU|L VG[ pt5FNGMGM ;\U|C SZJF DF8[ p5IMUDF\ ,[JFDF\ VFJX[P T[YL

lJ:TZ6 AFN !_4_$)P$& RMPDLPGM lJ:TFZ B]<,M ZC[X[P VF B]<,L HuIFDF\ ∼(___ RMPDLPGF lJ:TFZDF\ VD[ J'1FFZM56 VG[ AFUSFD SZX[P%,Fg8G[ OZTF ;DU| lJ:TFZDF\ S\5GL 5IF"JZ6 VG[ JGD\+F,IGL DFU"NX"S ;}RGFVM D]HA J'1FFZM56 SZX[P H[YL VF J'1FM JFI] 5|N]QF6 ;FD[ S]NZTL VJZMW µE]\ SZJFG]\ SFD SZX[ VG[ JFI] 5|N]QF6 T[DH 5JGYL O[,FTL W}/G]\ 5|DF6 38F0X[P *P *P *P *P ;FDFlHS v VFlY"S 5IF"JZ6;FDFlHS v VFlY"S 5IF"JZ6;FDFlHS v VFlY"S 5IF"JZ6;FDFlHS v VFlY"S 5IF"JZ6 ;}lRT 5|MH[S8 ZZ jIlSTVM DF8[ ;LWL ZMHUFZL µEL SZX[P ;}lRT 5|MH[S8GF SFZ6[ 5lZJCG4 N]SFGNFZL VG[ VgI K}8S ZMHUFZL~5[ VG[S ,MSM DF8[ 5ZM1F ZMHUFZ 56 µEM YX[P

Page 31: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

8

VFD4 VF ;}lRT 5|MH[S8G[ SFZ6[ VF lJ:TFZDF\ ,F\AF UF/[ ZMHUFZ µEM YJFGL SFIDL ;FZL V;Z µEL YX[P (P (P (P (P 5IF"JZ6GL HF/J6L 5Z N[BZ[B5IF"JZ6GL HF/J6L 5Z N[BZ[B5IF"JZ6GL HF/J6L 5Z N[BZ[B5IF"JZ6GL HF/J6L 5Z N[BZ[B VF ;}lRT 5|MH[S8 V\TU"T 5IF"JZ6GL HF/J6L 5Z GLR[ D]HA N[BZ[B ZFBJFDF\ VFJX[P

SD G\P

AFAT V;Z SZGFZ 5lZA/

N[BZ[B ZFBJFGL 5wWlT VG[ T[ DF8[GF\ WMZ6M

lGIT ;DI sVFJT"Gf

SFDULZL SZGFZ V[Hg;L

N[BZ[B ZFBGFZ V[Hg;L

!P_!P_!P_!P_ AFAFAFAF\\\\WSFDGM TASSM sAFWSFDGM TASSM sAFWSFDGM TASSM sAFWSFDGM TASSM sAF\\\\WSFDGM lJ:TFZ GFGM CMJFYL VG[ :8L,G]WSFDGM lJ:TFZ GFGM CMJFYL VG[ :8L,G]WSFDGM lJ:TFZ GFGM CMJFYL VG[ :8L,G]WSFDGM lJ:TFZ GFGM CMJFYL VG[ :8L,G]\\ \\ DF/B]DF/B]DF/B]DF/B]\\ \\ p5IMUDFp5IMUDFp5IMUDFp5IMUDF\\\\ ,[JFG],[JFG],[JFG],[JFG]\\ \\ CMJCMJCMJCMJFYL V;Z FYL V;Z FYL V;Z FYL V;Z B]A VMKL YX[PfB]A VMKL YX[PfB]A VMKL YX[PfB]A VMKL YX[Pf

!P! :YFlGS :Y/[ SFD[ ZFBJFDF\ VFJGFZ jIlSTVM

AF\WSFD SMg8=FS8ZGM VC[JF, 5|MH[S8DF\ SFD SZTF ,MSMGL ;\bIF

NZZMH SMg8=FS8Z

D[PV[ZM,[D ,LDL8[0

!PZ CJFGL U]6J¿F

AF\WSFD ;FDU|LGL C[ZOZ[

DMH6LVM VG[

VJ,MSGM4 SPM, RSPM, SO2

VG[ NOx GF\ :TZM

V9JFl0I[

D[PV[ZM,[D ,LDL8[0

GPCB/ DFgI 5IF"P ;\:YF

!P# HFC[Z VFZMuI

W}/4 VJFH DH}ZMGL VJZHJZ

lGIlDT TALAL T5F;

DFl;S SMg8=FS8ZM D[PV[ZM,[D ,LDL8[0

ZP_ZP_ZP_ZP_ SFDULZLGM TASSMSFDULZLGM TASSMSFDULZLGM TASSMSFDULZLGM TASSM ZP! 5F6LGM

HyYM VG[ U]6J¿F

5|MH[S8 lJ:TFZGL V\NZ ;5F8L VG[ E}UE" H/GL U]6J¿F

DMH6LVM4 GD}GF V[S9F SZJF VG[ lO<0DF\ DF5G slO<0 DLhZD[g8f

l+DFl;S D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"JZ6 ;\:YF

ZPZ 5|N}lQFT 5F6LGL l:YlT

X]wW SZJFDF\ VFJ[,F 5|N}lQFT 5F6LGL U]6J¿F VG[ AFQ5LEJG £FZF hLZM l0:RFH" SZJFDF VFJX[P

ETP GF GD}GF V[S9F SZJF VG[ U]6J¿F RSF;JL

NZZMH sVF\TlZSf DFl;S s+FlCT 51F £FZFf

D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

ZP# CJFGL U]6J¿F

p5IMUDF\ ,[JFTF\

Zv# HuIFV[ CJFGL U]6J¿F

DFl;S +FlCT 51F

D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P

Page 32: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

9

;FWGM VG[ SZJFDF\ VFJTL 5|lS|IFDF\YL GLS/TM W}DF0M q JFI] pt;H"G

T5F;JL (SO2, NOx, SPM, RSPM, CO, HC) T[DH :8[S N[BZ[B ZFBJLP

£FZF

;\:YF

ZP$ VJFH s3M\3F8fG]\ :TZ

VF{nMlUS WMZ6MGF ;\NE"DF\ VJFHGF 5|DF6G]\ VG]5F,G

lNJ;[ VG[ ZF+[ $ YL & HuIFV[ JFTFJZ6DF\ VJFHG]\ 5|DF6 T5F;J]\

DFl;S s+FlCT 51F £FZFf VG[ 5BJFl0S sVF\TlZSf

D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

ZP5 H{lJS 5IF"JZ6

AFUFIT q U|LG A[<8GM lJSF;

KM0JFVM VG[ VF{QFlWI KM0JFVMGM 8SL ZC[JFGM NZ

l+DFl;S D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

ZP& 3G SRZFGL lGSF, jIJ:YF

SRZFGM lGSF, SRZM V[S9M SZJF T[G[ V,U SZJF VG[ T[GF lGSF,GL SFDULZL 5Z N[BZ[B ZFBJL

5BJFl0S D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

ZP* HMBDL SRZFGL lGSF, jIJ:YF

HMBDL SRZF ;\A\WL ;¿FT\+ £FZF lGlN"Q8 SZJFDF\ VFJ[, HMBDL SRZM

HMBDL SRZM V[S9M SZJF T[G[ K}8M SZJF VG[ T[GF lGSF,GL SFDULZL 5Z N[BZ[B ZFBJL

5BJFl0S D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

J5ZFI[,F 5L50F q A[u; TYF DFgI J[g0;"G[ T[GF SZJFDF\ VFJ[,F lGSF, V\U[GM Z[S0"

Z[S0" HF/JJM N{lGS D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

N}lQFT VM., 5[NF YJF VG[ T[GL 8=L8D[g8 V\U[GF Z[S0"

Z[S0" HF/JJM N{lGS D[PV[ZM,[D ,LDL8[0

GPCB q DFgI 5IF"P ;\:YF

Page 33: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

10

)P )P )P )P JWFZFGF VeIF;MJWFZFGF VeIF;MJWFZFGF VeIF;MJWFZFGF VeIF;M ;}lRT 5|MH[S8GL ;FDFlHS VG[ VFlY"S V;ZM S[JL 50X[ T[ T5F;JF DF8[ VD[ VeIF; C[9/GF lJ:TFZDF\ ;FDFlHS VFlY"S VeIF; SIM" K[P ;}lRT 5|MH[S8 V[ V[S ,3] SNGM pnMU V[SD CMJFYL T[ :YFlGS ,MSM DF8[ ,FE5|N K[P !_P !_P !_P !_P 5IF"JZ6,1FL jIJ:YF5G IMHGF5IF"JZ6,1FL jIJ:YF5G IMHGF5IF"JZ6,1FL jIJ:YF5G IMHGF5IF"JZ6,1FL jIJ:YF5G IMHGF 5IF"JZ6,1FL jIJ:YF5G IMHGF V[ VF 5|MH[S8GF ;DY"SMV[ q jIJ:YF5SD\0/[ 5IF"JZ6GF V;ZSFZS jIJ:YF5G DF8[ T{IFZ SZ[,L IMHGF K[P S\5GLGL 5IF"JZ6,1FL jIJ:YF5G IMHGF GLR[GF SM9FDF\ NXF"JJFDF\ VFJL K[P AFAFAFAF\\\\WSFDGF TASS[WSFDGF TASS[WSFDGF TASS[WSFDGF TASS[ 5|J'l¿ 5IF"JZ6 5Z

V;ZM V;ZM 38F0JF DF8[GF\ 5U,F\ lJX[QF GM\W

AF\WSFDGF TASS[ %,Fg8 DF8[GF\ DXLGM UM9JJF\

v CJF v VJFH swJlGf v ;FDFlHSv VFlY"S

v ;FZL ZLT[ lGEFJJFDF\ VFJTF\ CMI T[JF\ JFCGMGM p5IMU SZJFDF\ VFJX[P v JFCGMGL VJZv HJZ DF8[ 5FSM Z:TMP v wJlG 5|N}QF6 ZMSJF ;FWGMGM IMuI lGEFJ v SFD DF8[ :YFlGS DH}ZM ZFBJFDF\ VFJX[ H[YL VFJF;MGL jIJ:YF SZJFG]\ lGJFZL XSFIP

VD,GL HJFANFZL v

D[PV[ZM,[D ,LDL8[0

pt5Fpt5Fpt5Fpt5FNGGM TASSMNGGM TASSMNGGM TASSMNGGM TASSM

D[PV[ZM,[D ,LDL8[0 V[ H/ 5|N}QF64 JFI] 5|N}QF64 wJlG 5|N}QF6 T[DH HMBDL SRZFYL YTF\

5|N}QF6GF lGI\+6 DF8[ H~ZL 5U,F\ ,LWF\ K[P ;}lRT 5|MH[S8GF pt5FNGGF TASSF NZlDIFG 5|N}QF6M VMKF\ SZJF DF8[ GLR[GF\ 5U,F\ ,[JFG]\ VFIMHG SZJFDF\ VFjI]\ K[P 5|J'l¿ 5IF"JZ6,1FL

V;ZM V;ZM 38F0JF DF8[GF\ 5U,F\ lJX[QF GM\W

AGFJ8MG]\ pt5FNG v CJF v HDLG v 5F6L v wJlG

v Z;FI6M K,SFI S[ -M/FI GCL T[JL 5wWlT V5GFJLG[4 Z;FI6MGL IMuI C[ZO[Z ;]lGl`RT SZJLP

v SFDNFZM £FZF PPEs GM p5IMU SZJFD\F VFJ[ T[ ;]lGl`RT SZJ]\ v Z;FI6M -M/FI S[ K,SFI GCL V[ ;]lGl`RT SZTL 5wWlT s:5L, Sg8=M, 5|M;LHZfGM R}:T

VD,GL HJFANFZL v

D[PV[ZM,[D ,LDL8[0

Page 34: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

11

VD, SZJMP v SFRL ;FDU|L TYF pt5FNGMGM ;\U|C SZJFGF VG[ R-FJJF q pTFZJFGF :Y/[ sC[g0,L\U

V[lZIFf T[DG]\ MSDS 5|NlX"T SZJFDF\ VFJX[P v NZ[S %,Fg8DF\ JM8ZDL8Z D}SLG[ H 5F6LGM p5IMU SZJFDF\ VFJX[P v v N[BZ[BGF VFWFZ[ µEF YI[,F sDMGL8ZL\Uf 0[8FG]\ 5'YSSZ6 SZL JBTMJBT T[GL ;DL1FF SZJFDF\ VFJX[P v N}lQFT 3G SRZM DFgI

TSDF ;]lJWFVMG[ DMS,JFDF\ VFJX[P v ;\U|CGL HuIF O[S8ZLh V[S8GL H~lZIFT D]HA T{IFZ SZJFDF\ VFJX[P

:8LD AM.,Z GL SFDULZL

v CJF sJFI]f v wJlG v 5F6L

v OI]V, OFIZL\U l;:8DDF\ BFDL µEL G YFI T[ DF8[GM IMuI lGEFJ ;]lGl`RT SZJM VG[ CJF VG[ A/T6GM z[Q9 U]6M¿Z CF\;, SZJM v DXLGM VMKM VJFH SZ[ T[ DF8[ T[DGM IMuI lGEFJ SZJM v-M/FJF S[ pEZFJFG[ SFZ6[ SZJFDF\ VFJ[,L ;OF. AFN IMuI lGSF, SZJM v RLDGLGL µ\RF. IMuI CMI T[ ;]lGl`RT SZJ]\ v jIlSTUT ;]Z1FF ;FWGMGM p5IMU ;]lGl`RT SZJMP

D[PV[ZM,[D ,LDL8[0

S},L\U 8FJZGL SFDULZL v JFI] v 5F6L v VJFH

v DXLGM VMKM VJFH SZ[ T[ DF8[ T[DGM lGEFJ SZJMP v a,M0FpG I]lG8GL CNDF\ 5}ZF\

5F0JFDF\ VFJ[,F\ ETPDF\ DMS,JFDF\ VFJ[ K[P

VD,GL HJFANFZL v

D[PV[ZM,[D ,LDL8[0 SFRL ;FDU|L VG[ v JFI] v ;]Z1FF lJEFUGF WFZFWMZ6M

Page 35: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

12

pt5FNGMGM ;\U|C4 T[ R-FJJL q pTFZJL sC[ZO[Zf VG[ T[DG]\ 5lZJCG

v 5F6L v VJFH

D]HA S[lDS<; GM ;\U|C SZJFDF\ VFJX[P v SFRL 3G q5|JFCL ;FDU|LGF ;\U|C DF8[GM V,U lJ:TFZ v SFRL 3G ;FDU|LGF ;\U|C NZlDIFG T[G[ JZ;FN q JZ;FNL 5F6LYL N}lQFT YTL lGJFZJF DF8[ IMuI ;]lJWF µEL SZJLP v WFZFWMZ6M D]HA 5L50F\4 SMY/LVMGM lGSF, SZJMP

TDFD SFRL ;FDU|L4 T{IFZ pt5FNGM VG[ HMBDL SRZFG]\ 5lZJCG

v JFI] v H/ v HDLG

v SFRL ;FDU|L q pt5FNGMGF 5lZJCG DF8[ TF,LDAwW q DFgITF 5|F%T 8=Fg;5M8";G[ SFD VF5JFDF\ VFJX[

- TERMCARD G[ VG];ZJFDF\ VFJX[ v VMO ;F.8 .DH"g;L 8LDG[ TDFD SFRL ;FDU|L VG[ T{IFZ

pt5FNGMGF\ MSDS p5,aW AGFJJF\P

lU|GA[<8 T{IFZ SZJM VG[ HF/JJM

v JFI] v HDLG

v ;}RJJFDF\ VFjI]\ K[ T[ D]HAGM IMuI lU|G A[<8 T{IFZ SZJFDF\ VFJ[ VG[ T[GM IMuI lGEFJ SZJFDF\ VFJ[ T[ ;]lGl`RT SZJ]\P

5|tI1F q 5ZM1F ZMHUFZ v;FDFlHS VFlY"S AFAT

v D[G5FJZ sSD"RFZLVMq SFDNFZMfGF\ SF{X,M VG[ p5,eITF D]HA :YFlGS jIlSTVMG[ SFD[ ZFBJFGL GLlT RF,] ZFBJLP

\\ \\

Page 36: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

13

TFZ6M oTFZ6M oTFZ6M oTFZ6M o VF VeIF;GFVF VeIF;GFVF VeIF;GFVF VeIF;GF\\\\ TFZ6M GLR[ D]HA K[P TFZ6M GLR[ D]HA K[P TFZ6M GLR[ D]HA K[P TFZ6M GLR[ D]HA K[P

� ;}lRT 5|MH[S8 DF8[ 5FIFGL VFWFZDF/BFSLI ;]lJWFVM4 HDLG4 A/T64 5lZJCGG]\ G[8JS"4 JLH/L4 5IF"JZ6,1FL VG]S}/TF VG[ ;]lJSl;T 5|N}QF6 lGI\+6 5wWlTVM ;],E K[P

� 5IF"JZ6,1FL V;ZMG]\ D}<IF\SG NXF"J[ K[ S[ ;]lRT 5|MH[S8 DF8[GL 5|J'l¿VMG[ SFZ6[ JFTFJZ6GL CJF VG[ E}UE" H/GL U]6J¿F 5Z SM. GM\W5F+ V;Z 50X[ GCL VG[ wJlGGF 5|DF6DF\ BF; JWFZM GCL YFIP

� 5|MH[S8 DF8[GL 5|J'l¿G]\ :Y/ HMTF\ T[DH JFI] 5|N}QF64 HMBDL SRZF T[DH J5ZFI[,F 5F6LGF jIJ:YF5G VG[ C[ZO[Z DF8[GL ;}lRT V;ZSFZS 5IF"JZ6,1FL jIJ:YF5G IMHGFG[ SFZ6[ JG:5lT4 H/ VG[ 5|F6L ;'lQ8G[ V;Z YX[ GCLP

� p5,aW B]<,L HDLG 5Z4 %,Fg8GF CN lJ:TFZDF\ JWFZFGM lU|GA[<8 µEM SZJFDF\ VFJX[P VeIF; C[9/GF lJ:TFZGF 5FlZl:YlTS 5IF"JZ6 5Z T[GL ;SFZFtDS V;Z µEL YX[P

� 5|tI1F q 5ZM1F ZMHUFZ µEM YJFYL ;FDFlHS v VFlY"S ,FEM 5|F%T YX[P

VFD4 VF VeIF; 5ZYL V[J]\ TFZ6 GLS/[ K[ S [D[PV[ZM,[D ,LDL8[0GF VF ;}lRT

5|MH[S8GL 5IF"JZ6 5Z GHLJL V;Z 50X[ VG[ T[ V;ZM VMKL SZJF DF8[GF\ TYF 5IF"JZ6,1FL jIJ:YF5G DF8[GF\ 5U,F\ ,LWF AFN VF 5|MH[S8YL :YFlGS ,MSMG[ ,FE YX[P

Page 37: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: C

Accreditation Certificate

Accreditation Certificate of M/s. Bhagwati Enviro Care Pvt Ltd.

Page 38: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: C

Accreditation Certificate

Accreditation Certificate of M/s. Bhagwati Enviro Care Pvt Ltd.

Page 39: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Scheme for Accreditation of EIA Consultant Organizations

List of Accredited Consultant Organizations (Alphabetically)/ Rev. 29/ April 07, 2015 Page 15 *denotes Provisionally Accredited Consultants

S. No.

Consultant Organization

Scope of Accreditation

As per NABET Scheme Project or Activity as per Schedule of MoEF Notification dated

September 14, 2006 and subsequent amendments

Sector Number

Name of Sector Category

chemical intermediates)

27

Oil & gas transportation pipeline (crude and refinery/ petrochemical products), passing through national parks/ sanctuaries/coral reefs /ecologically sensitive Areas including LNG terminal

A 6 (a)

31

Industrial estates/ parks/ complexes/ Areas, export processing zones(EPZs), Special economic zones (SEZs), Biotech parks, Leather complexes

A 7 (c)

33 Ports, harbours, jetties, marine terminals, break waters and dredging

A 7 (e)

38

Building and large construction projects including shopping malls, multiplexes, commercial complexes, housing estates, hospitals, institutions

B 8 (a)

15

Bhagwati Enviro Care Pvt. Ltd. *

Address: 28, 29, 30, Parmeshwar Estate – II, Phase I, GIDC Estate, Vatva, Ahmedabad – 382445

E-mail: [email protected]

21

Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates)

A 5 (f)

Page 40: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 41: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 42: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

1

CHAPTER 1

INTRODUCTION

1.1 PREAMBLE

M/s. Airolam Ltd. has proposed to expand their manufacturing of chemical unit at Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. In existing unit they are manufacturing Laminated Sheets @ 2,50, 000 Sheets/M, PF Resin @ 240 MT /M & MF Resin @ 80 MT /M. Now they are planning to manufacture resins: Phenol formaldehyde resin from 240 MT /M to 750 MT/M and Melamine Formaldehyde Resin from 80 MT /M to 250 MT/M. The manufacturing of organic chemical falls under Category “A” of EIA Notification issued in September – 2006. For this the unit needs Environmental clearance from Ministry of Environment & Forest, New Delhi.

The EIA studies are carried out as a part of process to obtain Environmental Clearance Certificate for the proposed expansion in existing project. Unit believes in sustainable development and equally concern about environment preservation and pollution control and proposes to provide adequate Environmental Management System to meet desired norms prescribed by statutory authority.

In order to assess the Environmental Impacts of the proposed expansion in existing project, M/s. Airolam Ltd. Entrusted Bhagwati Enviro Care Pvt Ltd, Ahmedabad (NABET Accredited) to undertake Draft Environmental Impact Assessment Study for various components of the Environment viz., Air, Water, Noise, Land and Socio-economics. This Report presents base line data collected for January - February – March – April 2015 for Air, Water, Noise, Land etc., for identification and assessment of the impacts.

Page 43: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

2

1.2 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

Environment Impact Assessment or EIA is a study to predict the effect of a proposed projection or its expansion activity on the environment. It is a management tool to facilitate appropriate decision; an EIA compares various alternatives for a project and seeks to identify the one, which represents the best combination of economic and environmental costs and benefits.

It helps to identify possible environmental effects of the proposed expansion in existing project, proposes measures to mitigate adverse effects and predicts whether there will be significant adverse environmental effects, even after the mitigation is implemented. By considering environmental effects and mitigation early in the project planning cycle, environmental assessment has many benefits, such as protection of environment, optimum utilization of resources and saves overall time and cost of the project.

On 27th January 1994, the Union Ministry of Environment and Forests (MoEF), Government of India, under the Environmental (Protection) Act 1986, promulgated EIA Notification making Environmental Clearance (EC) mandatory for expansion or modernization of any activity or for setting up new projects listed in Schedule of the notification and its subsequent amendments.

On 14th September 2006, a new legislation was passed, which has objectives such as “To formulate a transparent, decentralized and efficient regulatory mechanism; to incorporate necessary environmental safeguards at planning stage; to involve stakeholders in the public consultation process and to identify developmental projects based on impact potential instead of the investment criteria”

The developmental activities requiring Environmental Clearance (EC) are:

o All new projects/activities listed in Schedule;

o Expansion and modernization of existing projects or activities listed in the Schedule to this Notification with addition of capacity beyond the limits specified for the concerned sector, that is, projects or activities which cross the threshold limits given in the Schedule, after expansion or modernization;

Page 44: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

3

o Any change in product - mix in an existing manufacturing unit included in Schedule beyond the specified range.

The projects or activities shall require prior environmental clearance from the concerned regulatory authority, as the Central Government in the Ministry of Environment and Forests for matters falling under Category ‘A’ in the schedule and at State level the State Environment Impact Assessment Authority SEIAA) for matters falling under Category ‘B’ in the said Schedule, before any construction work, or preparation of land by the project management except for securing the land, is started on the project or activity.

As per the provisions of the new re-engineered EIA Notification of 2006, the company requires to obtain prior Environmental Clearance from the State Level Environmental Appraisal Authority or from the Ministry of Environment & Forests, New Delhi as stated in the said Notification. This expansion project falls under Synthetic organic Chemical Industry which is listed in Schedule and falls under Clause No. 5 (f) of Category “A” (Located outside notified industrial area / estate) of Schedule as stated in Environmental Impact Assessment Notification published on 14th September 2006.

As specified in sub paragraph (ii) of paragraph 2, of the stated Notification of the Government of India, expanded / Proposed project requires prior environmental clearance from the Ministry of Environment & Forests as, expansion project is located outside the notified industrial area [Clause No. 5 (f)] of Category “A”. For this the industry is required to submit an Environmental Impact Assessment Study report. In order to assess the Environmental Impacts arising due to the proposed expansion project, the company has appointed M/s. Bhagwati Enviro Care Pvt. Ltd., Ahmedabad to undertake the Environmental Impact Assessment for various components of the Environment.

The growing demand of the various kinds of Resins in the domestic as well as international markets has provided a strong basis to M/s. Airolam Ltd. for their proposed expansion in existing unit located at Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

The proposed expansion project will help in the following aspects.

o To earn a substantial amount of foreign exchange through business development, manufacturer & sales of Resins.

o To generate adequate employment for people in neighbouring areas. o To generate indirect employment.

Page 45: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

4

1.3 OBJECTIVES OF EIA STUDY The project activities are listed in serial No. 5 (f) of the schedule of EIA

Notification, 2006 (synthetic Organic Chemical industries). Since the proposed expansion project is coming up outside the notified industrial area, it is categorized as category ‘A’ and needs the Enviromental clearance from Ministry of Environment & Forests.

The Environmental study undertaken is aimed at identifying existing

Enviromental conditions, predicting Enviromental impacts associated with the proposed expansion in existing unit and suggesting mitigation measures to mitigate the adverse Enviromental impacts. The different activities that are likely to take place have been analyzed and proposed mitigation measures are assessed for their adequacy. Proposed mitigation measures have been considered where necessary.

The study also aims at reflecting the acceptability of the project to different stockholders and at incorporating the concerns raised by them into impact assesment and of the subsequent comprehensive Enviromental management Plan and suggest the preventive and mitigative measures to minimize the adverse impacts on the environment and to maximize the beneficial impacts.

1.4 LOCATION

The Project Site is located at Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Latitude : 23⁰ 30' 48.76’’ N (23.51354444) Longitude : 72⁰ 56' 05.28” E (72.93480000) Please refer Figure No. 1.1 for Map of Gujarat State. Please refer Figure No. 1.2 for Map of Sabarkantha District. Please refer Figure No. 1.3 for 10 km radius map of project site. Please refer Figure No. 1.4 for Plant Layout. Please refer Figure No. 1.5 for Google Image of M/s. Airolam Ltd. Please refer Figure No.1.6 for Distance between Severely Polluted Area (Vatva) and Project Site (M/s. Airolam Ltd.) Please refer Figure No.1.7 for Photographs of the Project site

Page 46: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

5

FIGURE NO.1.1 MAP OF GUJARAT STATE

SABARKANTHA

DISTRICT

Page 47: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

6

FIGURE NO. 1.2 MAP OF SABARKNTHA DISTRICT

Page 48: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

7

FIGURE NO. 1.3

10 KM RADIOUS MAP OF THE PROJECT SITE

Page 49: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

8

FIGURE NO.1.4

Page 50: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

9

FIGURE NO.1.5

GOOGLE IMAGE OF M/S. AIROLAM. LTD.

Page 51: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

10

GOOGLE IMAGE OF M/S. AIROLAM. LTD.

Latitude: 23 030’ 48.76”N (23.51354444) Longitude: 72 056’ 05.28”E (72.93480000)

Page 52: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

11

FIGURE NO.1.6

DISTANCE BETWEEN SEVERELY POLLUTED AREA (VATVA) AND PROJECT SITE (M/S. AIROLAM LTD.)

Distance Between: Airolam Ltd. To Vatva GIDC: 68.50 KM

Page 53: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

12

FIGURE NO.1.7

PHOTOGRAPHS OF THE PROJECT SITE

Page 54: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

13

Page 55: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

14

Page 56: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

15

1.5 STUDY AREA

To decide whether proposed (expansion in existing unit) action is likely to cause significant adverse environmental effects; the concept of EIA is practiced. Before preceding the baseline Environmental status, it is important to know the boundary limits and framework where data can be effectively utilized in impact assessment. In keeping with the nature and size of the industry, based on our submitted TOR and additional terms of Reference Issued by Ministry of environment & Forests, New Delhi the study area for detailed studies is an area within a radius of 10 Kms with the Project Site at the center. A Map of the Study Area is presented in Figure No. 1.3

1.6 NEAREST LOCATION FROM THE SITE

Table: 1.1

Nearest locations from the Site

Sr. No.

Features Description Direction Distance (Km)

1 Nearest village / Town Village : Dalpur W 0.7 2 Lake Village –

Nananpur E 1.65

3 River Hathmati NW 4.16 4 Airports Ahmedabad SW 58.91 5 Railway Station Salal SW 5.02 6 Highway N.H. 08 W 0.340

Page 57: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

16

1.7 SCOPE & METHODOLOGY OF EIA:

An attempt has been made to carry out a Draft Environmental Impact Assessment Study for M/s. AIROLM LTD. The Scope of EIA adopted for M/s. Airolam Ltd. is based on the TOR approved by MOEF. The copy of the same is attached here with. Under the scope of EIA, it covers: • A brief description of project site, its surrounding environment and

proposed expansion project facilities. • To endow with detail description of the raw materials and

manufacturing process for existing and proposed products. • Collection and Assessment of existing environmental baseline status

based on the project information, field survey relating to air quality, meteorology, water quality, socio-economic aspects, flora & fauna, existing land use pattern etc. within study area.

• Identification of Impacts due to the proposed expansion project. • Prediction and evaluation of the environmental impacts that may result

from project development. • Outline the Environmental Management Plan (EMP) to mitigate the

adverse impacts due to the proposed expansion project. • Preparation of Risk Assessment Report.

METHODOLOGY FOR EIA:

The methodology adopted for carrying out the Environmental Impact Assessment for the proposed expansion project has been based on the Guidelines issued by Ministry of Environment and Forest (MOEF). An effective EIA calls for identification of environmental parameters likely to be impacted, depending on the activities to be carried out during construction and operation phase of the project.

• Generation and collection of baseline data for valued Enviromental components as per approved TOR.

• Identification and quantification of significant Enviromental impacts due to the project and associated activities.

• Evaluation of impacts due to proposed expansion activities and preparation of an Enviromental impact statement.

• Preparation of appropriate Enviromental Management Plan (EMP) surrounding strategies for minimizing identified adverse impacts along with budgetary provisions to be made by the project authorities for implementation of mitigation measures.

Page 58: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

17

• Delineation of post Enviromental Quality Monitoring Programme (EQMP) along with organizational setup required for monitoring the effectiveness of mitigation measures.

Figure 1.8: Methodology of EIA Study

Page 59: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

18

1.8 STRUCTURE OF EIA:

This EIA report has been prepared on the basis of available on-site primary data (survey/ monitoring) and secondary/literature data. The EIA report contains project features, baseline environmental setup, assessment of environmental impacts, and formulation of mitigation measures, environmental management and monitoring plan with risk & assessment Report. The report includes 10 Chapters. The structure of the EIA Report with necessary tables, drawings and annexure is as follows:

Chapter 1: Introduction This chapter provides background information on need of project, need of EIA study and brief of the project. The scope and EIA methodology adopted in Preparations of EIA report have also been described in this Chapter. It also covers the identification of project & project proponent, brief description of nature, size, location of the project and its importance to the country and the region. Scope of the study details about the regulatory scoping carried out as per the generic structure given in the EIA Notification, 2006.

Chapter 2: Project Description This chapter deals with the project details of the existing and proposed products, with type of project, need for the project, location, size & magnitude of operation including associated activities required by and for the project, proposed schedule for approval and implementation, including technical details of raw material, quality and quantity etc.

Chapter 3: Baseline Environmental Conditions This chapter presents the existing environmental status of the study area around the existing project including topography, drainage pattern, water environment, geological, climate, transport system, land use, flora & fauna, socio-economic aspects, basic amenities etc. Environmental assessment of the project site in regard to its capability to receive the proposed new expansion is also discussed in this Chapter.

Page 60: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

19

Chapter 4: Anticipated Environmental Impacts and

Mitigation Measures This chapter describes the overall impacts of the proposed expansion project activities and underscores the areas of concern, which need mitigation measures. It predicts the overall impact of the proposed expansion project on different components of the environment viz. air, water, land, noise, biological, and socio-economic.

Chapter 5: Environmental Monitoring Program Technical aspects of monitoring the effectiveness of mitigation measures have been given in this Chapter.

Chapter 6: Environmental Management Plan This chapter details the inferences drawn from the environmental impact assessment exercise. It describes the overall impacts of the proposed expansion activities during construction and operation phases and underscores the areas of concern, which need mitigation measures. It also provides mitigation and control measures for environmental management plan (EMP) for minimizing the negative environmental impacts and to strengthen the positive environmental impacts of the proposed expansion project.

Chapter 7: Additional Studies This chapter deals with the Public consultation & Risk assessment carried out for the proposed expansion of existing manufacturing plant. Unit is not located in notified area so, public consultation is required.

Chapter 8: Project Benefits This chapter deals with the benefits to the local surrounding people due to proposed expansion in existing project. Chapter 9: Summary & Conclusion This chapter provides the summary and conclusions of the EIA study of the Proposed expansion project with overall justification for implementation of the project and also explanation of how, adverse effects will be mitigated.

Page 61: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

20

Chapter 10: Disclosure of Consultants Engaged This chapter provides the disclosure of consultants engaged to carryout the EIA study along with other additional studies.

1.9 APPROVED TOR FOR EIA STUDY FROM MOEF.

Page 62: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

21

Page 63: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

22

Page 64: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

23

Page 65: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

24

Page 66: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

25

1.10 COMPLIANCE OF TOR

Table: 1.2

Compliance of TOR

Sr. No.

TOR Compliance

A. Standard TOR

1. Executive Summary of the Project Enclosed herewith: please Refer Encloure No.: A

2. Justification of the project. Please Refer Chapter 2, Point No.2.3, Page No.34

3. Photographs of the proposed plant site Please Refer Chapter 1, Fig. No. 1.7, Page No.12 - 14

4. Promoters and their back ground. Please Refer Chapter 2, Point No.2.4, Page No.35

5. Regulatory framework. Please Refer Chapter 1, Point No.1.11, Page No.31

6. A map indicating location of the project and distance from severely polluted area.

Please Refer Chapter 1, Fig. No. 1.6, Page No.11

7. Project location and plant layout. Please Refer Chapter 1. For Project Location – Fig No.1.3 , Page No.07 For Plant Layout Plan - Fig No. 1.4 , Page No. 08

8. Infrastructure facilities including power sources.

Please Refer Chapter 2, Point No.2.5, Page No.35

9. Total cost of the project along with total capital cost and recurring cost/annum for environmental pollution control measures.

The project cost will be 250 lacs. Total capital and recurring cost towards Environmental protection Measures per annum will be 12.35 lacs & 4.5 lacs respectively.

10. Project site location along with site map of 10 km area and site details providing various industries, surface water bodies, forests etc.

Please Refer Chapter 1 Fig: 1.3 Page No.07

11. Present land use based on satellite imagery for the study area of 10 km radius. Details of land availability for the

Please Refer Chapter 3, Point No.3.12, Page No. 98 The supported documents for

Page 67: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

26

project along with supporting document.

land availability is enclosed in Enclosure: 09, Page No. 275

12. Location of National Park/Wild life sanctuary/Reserve forest within 10 km radius of the project.

There is no any national park, wild life sanctuary, Reserve forest within 10 km radius of the project.

13. Details of the total land and break-up of the land use for green belt and other uses.

Please Refer Chapter 2, Table No.2.3, Page No. 36

14. List of products along with the production capacities.

Please Refer Chapter 2, Table No.2.4, Page No.34

15. Detailed list of raw material required and source, mode of storage and Transportation.

Please Refer Chapter 2, Point No.2.9, Page No.37 For storage of Raw material Please Refer Chapter 2, Topic No. 2.10, Page No.38 The source of raw materials including will be from Traders, Manufactures in India as well as abroad.

16. Manufacturing process details along with the chemical reactions and process flow chart.

For manufacturing Process, Please Refer Chapter 2, Point No. 2.12, Page No.40 For Chemical Reaction, Please Refer Chapter 2, Point No. 2.14, Page No.43 For Mass Balance Please Refer Chapter2, Point No. 2.13, Page 41

17. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall is necessary.

Please Refer Chapter – 03, Point No. 3.6 , Page No.:78

18. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerial coverage from project site as per NAAQES notified on 16th September, 2009. Location of one AAQMS in downwind direction.

Please Refer Chapter – 03, Table No.3.3 , Page No.:70

19. One season site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and

Please Refer Chapter – 03, Point No. 3.6, Page No. : 78

Page 68: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

27

direction and rainfall and AAQ data (except monsoon) for PM10, PM2.5 SO2, NOx, including VOCs shall be collected. The monitoring stations shall take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved forests. Data for water and noise monitoring shall also be included.

For AAQ: Table No. 3.3, Page No.:70. For Water Monitoring: Table No. 3.11 , Page No.:92 For Noise Monitoring: Table No. 3.9, Page No.:85

20. Air pollution control measures viz. Multi cyclone and bag filter etc.Shall be proposed for the effective control of gaseous emissions with permissible limits.

Please Refer Chapter 2, Table No. 2.10, Page No. 47.

21. Control methanol emission from drying section.

We will use methanol for dilution purpose for manufacturing of PF resin and MF Resin.

22. Details of VOC monitoring system in the working zone environment, if any.

Please Refer Chapter 5, Table No. 5.1, Page No. 61.

23. Name of all the solvents to be used in the process and details of solvent recovery system.

We will use methanol only for dilution purpose. So no solvent recovery required.

24. Design details of ETP, incinerator, if any along with boiler, scrubbers /bag filters etc.

ETP Details is shown in Point No.: 2.17 , Chapter: 02, Page No.: 46

25. Details of water and air pollution and its mitigation plan

Please Refer Chapter: 04, Point No.4.3 & 4.4, Page No. 135 & 155

26. Action plan to control and monitor secondary fugitive emissions from all the sources.

Please Refer Chapter 2, Topic No. 2.21, and page No. 50.

27. Determination of atmospheric inversion level at the project site and assessment of ground level concentration of pollutants from the stack emission based on site-specific meteorological features. Air quality modelling for proposed plant.

Please Refer Chapter 4, Topic No.4.3.9, Page No.145 Air Quality modelling is shown in Chapter 4, Topic No. 4.3.12, Page No. 151

28. Permission for the drawl of ground water from CGWA. Water balance chart including quantity of effluent generated recycled, reused and discharged.

We have applied to CGWA for drawl the water from Borewell for additional qty. Of water. Please Refer Annexure 5. For Water balance diagram, please refer Fig No. 2.1 , Page no. 45

29. Action plan for zero discharge of effluent shall be included.

Please Refer Chapter 2, Topic No. 2.15, Page No. 44.

Page 69: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

28

30. Treatment of Phenol in Effluent if any. Please Refer Chapter 2, Point no. 2.17, Page No. 46,

31. Ground water quality monitoring minimum at 6 locations shall be carried out. Geological features and Geo-hydrological status of the study area and ecological status (Terrestrial and Aquatic).

For ground water monitoring results, Please Refer Chapter: 03, Table No.3.9 and 3.10 Page No. 90 & 94 For geological features: Please Refer Chapter: 03, Topic No. 3.10.1 and 3.11 Page No. 94 - 95 For Geohydrological features Please Refer Chapter: 03, Topic No.3.13, Page No. 100 For ecological Status Please Refer Chapter: 03, Topic No. 3.14, Page No. 104.

32. The details of solid and hazardous wastes generation, storage, utilization and disposal particularly related to the hazardous waste calorific value of hazardous waste and detailed characteristic of the hazardous waste. Action plan for the disposal of fly ash generated from boiler shall be included.

For details of Solid and Hazardous waste, Please Refer Chapter 2, Topic No. 2.22, Page No. 51

33. Precaution to be taken during storage and transportation of Hazardous chemicals shall be clearly mentioned and incorporated.

Please Refer Chapter -2 Topic No. 2.26, page No. Page No. 58

34. Authorization / Membership for the disposal of solid / Hazardous waste in TSDF.

Please Refer Annexure -06, Page no. 264.

35. List of hazardous chemicals (as per MSIHC Rules) with toxicity levels.

Please Refer Chapter 2, Table No. 2.17, Page 54.

36. A write up on safe practice followed for methanol handling, storage, transportation and unloading to be submitted.

Please Refer Chapter 2, Table No. 2.25, Page 55.

37. A write up on “Treatment of workers affected by accidental spillage of chemicals”

Please Refer Chapter 6, Page No. 174.

38. Locating the plant in open area instead of covered to be reviewed in view of safety consideration.

Unit will install plant machinery in existing open shed.

39. An action plan to develop green belt in 33 % area.

Please Refer Chapter 6, Topic No. 6.8, Page No. 179.

40. Action plan for rainwater harvesting Please Refer Chapter: 02, Topic

Page 70: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

29

measures at plant site shall be included to harvest rainwater from the roof tops and storm water drains to recharge the ground water.

No. 2.32, Page No. 62

41. Details of occupational health programme. 1. To which chemicals, workers are

exposed directly or indirectly. 2. Whether these chemicals are within

Threshold Limit Values (TLV)/permissible Exposures levels as per ACGIH recommendations.

3. What measures company have taken to keep these chemicals within PEL / TLV.

4. How the workers are evaluated concerning their exposures to chemicals during pre – placement and periodical medical monitoring.

5. What are onsite and offsite emergency plan during chemical disaster.

6. Liver function tests (LFT) during pre placement and periodical examination.

Please Refer Chapter:06 Topic No.6.7, Page No.172. For Onsite and offsite emergency Plan during chemical disaster : Please Refer Chapter 7, Topic No. 7.2, Page No. 189 & enclosure 01, Page No. 211.

42. Details of occupational health surveillance programme.

Please Refer Chapter:06 Topic No.6.7, Page No.172

43. Socio-economic development activities shall be in place.

Please Refer Chapter:06 Topic No: 6.13 Page No: 187

44. At least 5 % of the total cost of the project shall be earmarked towards the enterprise Social Commitment based on Public Hearing issues and item wise details along with time bound action plan shall be prepared and incorporated.

Company has given assurance to use 5% of the total project cost for social activities as per the requirement.

45. Detailed Environment management Plan (EMP) with specific reference to details of air pollution control system, water & wastewater management, monitoring frequency, responsibility and time bound implementation plan for mitigation measure shall be provided.

Detailed Environment Management Plan is shown in Chapter: 06, Topic No. 6.4, Page No. 166

46. EMP shall include the concept of waste-minimization, recycle / reuse / recover

Please Refer Chapter:06 Topic No: 6.11

Page 71: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

30

techniques, Energy conservation, and natural resource conservation.

Page No. 183

47. Corporate Environment Responsibility

1. Does the company have a well laid down Environment policy approved by its board of directors? If so, it may be detailed in the EIA Reports.

2. Does the Environmental policy

prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the Environmental or forest norms / conditions? If so, it may be detailed in EIA report.

3. What is hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions?

4. Does the company have a system of reporting of non compliance/violations of environmental norms to the board of directors of the company and shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA report.

No. At present company has no Environment Policy but they are giving assurance to make Environmental Policy approved by its Board of Directors. At present company has no Environment Policy. But they assure that they will include standard operating process / procedures to bring into focus any infringement / deviation/ violation of the environment of forests norms / conditions.

48. Any litigation pending against the project and/or any direction /order passed by any court of low against the project, if so, details thereof.

No any litigation pending against the project

B. Additional TOR Public hearing issues raised and commitments made by the project proponent on the same should be included separately in EIA/EMP report in the form of tabular chart with financial budget for complying with the commitments made.

We have incorporated Public hearing issues raised and commitments made by the project proponent on the same in our final EIA report: Please Refer Enclosure -10

Page 72: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

31

1.11 Regulatory Frame work

The proposed expansion project is yet at its technical investigation stage. Prior to its implementation, it will be necessary to acquire all the necessary clearance from the Government of India, as per the applicable national regulations. Key clearances include obtaining the No Objection Certificate from the Gujarat Pollution Control Board (GPCB) under The Water (Prevention and Control of Pollution) Act, 1974 and Rules, 1975; The Air (Prevention and Control of Pollution) Act, 1981 and Rules, 1982. In addition to that Manufacture, Storage and Import of Hazardous Chemicals (MSIHC) Rules, 1989 and amendments thereafter, Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008 will also be applicable to the industry. The purpose of the study is to comply with legal requirements as per Environmental Impact Assessment (EIA) Notification, 14th September 2006 (and subsequent amendments) of Ministry of Environment and Forests (MoEF) Since the proposed expansion project in existing unit involves manufacture of Synthetic organic chemical industry and site is located at Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat, the proposed expansion project falls under Category: 5(f) A. As per the Environmental Impact Assessment notification, dated September 14, 2006 the project requires prior environmental clearance from The Ministry of Environment & Forests, Delhi. As per the requirements of the notification, an application in Form 1 was submitted to Ministry of Environment and Forest on 02-08-2013. The Terms of Reference (TOR) were discussed during meeting of the 34th Reconstituted Expert Appraisal Committee (Industry) on 17th–19th February 2015 (Item No. 34.5.3) held at Conferemce Hall (Bhramputra), First Floor, Vayu Wing, Ministry of Environment, Forest and Climate Change, Indira Paryavaran Bhawan, Aliganj, Jorbagh Road, New Delhi-110 003 and the ‘TORs’ were issued on 29th April 2015 for preparation of EIA/EMP. A copy of the TOR is attached in this EIA Report. As per the requirements of the TOR and to estimate the environmental impacts arising due to its proposed expansion project, M/s. Airolam Ltd. Retain M/s. Bhagwati Enviro Care Pvt. Ltd., Ahmedabad, to carry out Environmental Impact Assessment study for various environmental components including air, noise, water, land and biological components along with parameters of human interest which may be affected and to

Page 73: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

32

prepare Environmental Management Plan (EMP) for mitigating adverse impacts. The environmental impact assessment report has been prepared for obtaining environmental clearance for the proposed expansion activity for M/s. Airolam Ltd.

Page 74: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

33 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

CHAPTER 2

PROJECT DESCRIPTION

2.1 PRELUDE

M/s. Airolam Ltd. has proposed to expand their manufacturing of chemical unit at Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. In existing unit they are manufacturing Laminated Sheets @ 2,50, 000 Sheets/M, PF Resin @ 240 MT /M & MF Resin @ 80 MT /M. Now they are planning to manufacture resins: Phenol formaldehyde resin from 240 MT /M to 750 MT/M and Melamine Formaldehyde Resin from 80 MT /M to 250 MT/M. The manufacturing of organic chemical falls under Category “A” of EIA Notification issued in September – 2006. For this the unit needs environmental clearance from Ministry of Environment and Forests. In order to assess the Environmental Impacts of the proposed expansion project, M/s.Airolam Ltd. Entrusted BhagwatiEnviro Care Pvt Ltd, Ahmedabad (NABET Accredited) to undertake Environmental Impact Assessment Study for various components of the Environment viz., Air, Water, Noise, Land and Socio-economics. This Report presents base line data collected for January – February-March - April 2015for Air, Water, Noise, Land etc., for identification and assessment of the impacts.

Page 75: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

34 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.2 LOCATION

The location of the Existing project is as shown here in Table 2.1.

TABLE 2.1 LOCATION OF THE PROJECT SITE

Sr. No. Description Information

1 Latitude 23⁰30’48.76” N (23.51354444)

2 Longitude 72⁰56’05.28”E (72.93480000) 3 S.No. 355

4 Village Dalpur

5 Ta Prantij

6 Dist Sabarkantha

7 State Gujarat

2.3 JUSTIFICATION OF PROPOSED PROJECT SITE

In existing unit M/s. Airolam Ltd. is manufacturingLaminated Sheets @ 2,50,000 Sheets/M. To save upon resin cost (Captive consumption) and also superior market in India as well as abroad they proposed for expansion in existing unit. To meet the current market requirement M/s.Airolam Ltd. has intended to do expansion in existing manufacturing activityatSurvey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. Specific site selection criteria of the unit have been given below.

• Plot size is suitable for proposed expansion. • Availability of the existing set up and the utility and support facilities within

the same premises. • Availability of infrastructure facility like power, water supply, road drainage,

manpower etc. • There are no ecological sensitive areas located within 10 km radius of the

project site. • No any national park or wild life sanctuary located within 10 km radius of

the project site. • Availability of good communication and transport facilities.

Page 76: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

35 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.4 PROMOTERS & THEIR BACKGROUND

Sr. No. Name of Partner Experience Role 1. Mr. Pravinbhai N Patel 07 Yrs Managing

Director 2. Mr.Sureshbhai R Patel 07 Yrs Director

3. Mr.Babulal D Patel 08 Yrs Director

4. Mr.Mahendrabhai N Patel 01 Yrs Director

5. Mr.Jasubhai A Patel 05 Yrs Director

6. Mr. Pravinbhai N Patel 05 Yrs Director

7. Mr.Prafulbhai D Patel 05 Yrs Director

2.5 INFRASTRUCTURE FACILITIES INCLUDING POWER

SOURCES

Because of availability of space for expansion in existing project in the premises itself it becomes easy for the unit. The other supporting factor for justifying the location is mentioned as under:

• Due to Sufficient land area and residential area is away from the site. • Availability of basic facilities like water, fuel, power, man power and raw

Materials. • Nearest town Himmatnagar is @ 15.0km away from the location, which is

having connectivity with other parts of the country by road and rail. • Availability of good communication and transportation facilities.

No national park, reserved forest or wild habitats as well as site of archeological significance or ecological importance fall within 10 km radius of the project site.

The details of resources are mentioned in Table No. 2.2:

Page 77: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

36 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

TABLE NO. 2.2 DETAILS OF SOURCES

2.6 LAND USE BREAKUP FOR TOTAL PLOT AREA

TABLE: 2.3 LAND USE BREAKUP FOR TOTAL PLOT AREA

Sr. no.

Project Requirements

Existing Proposed Total After Expansion

Source/Remarks

1. Total Water 57,000 Lit/Day

500 Lit/Day

57,500 Lit/Day

Ground water

2. Power 275 KVA 75 KVA 350 KVA Uttar Gujarat Vij Co. Ltd.

3. Fuel Requirement A Lignite/Wood 5

MT/Day

Nil

5 MT/Day Trader

B White Coal/ Lignite/ Wood

5 MT/Day

5 MT/Day Trader

D Diesel 200 Lit/M

200 Lit/M Trader

Sr. No. Particulars LAND AREA (Sq. m.)

% of Land Use (at ultimate)

1 Plant facilities 4500 15.68 2 Storage Area (Raw materials & Finished

goods) & Administrative, other buildings 1500

5.22 3 Utilities 300 1.04 4 ETP area 40 0.13 5 HW storage area 300 1.04 6 Roads, Parking 4000 13.94 7 Green Belt / space 8000 27.93 8 Open Area 10049.46 35.02

Total 28689.46 100

Page 78: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

37 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.7 PRODUCT DETAIL List of products & capacity are given in the Table No. 2.4

TABLE NO 2.4

LIST OF PRODUCTS

Sr. No.

Name of Product Quantity Existing Proposed Total

1. Laminated Sheets 2,50,000 Nos. /M 0 2,50,000 Nos. /M

2. P. F Resin 240 MT /M 510 MT /M 750 MT /M

3. M.F.Resin 80 MT /M 170 MT /M 250 MT /M

2.8 PACKING AND FINAL APPLICATION OF PRODUCTS

TABLE NO .2.5

PACKING AND FINAL APPLICATION OF PRODUCTS

2.9 RAW MATERIALS REQUIREMENT

List of Raw Materials, with consumption for manufacturing of Existing &Proposed Products, is given in Table No. 2.6

Name Of Proposed Product

Type Of Packing Final Application Of Product

Phenol Formaldehyde Resin

MS Storage Tank For laminated and decorative sheets, ply boards, flush doors, block board, As Adhesive.

Melamine Formaldehyde Resin

HDPE Tank

Page 79: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

38 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

TABLE NO.2.6 DETAILS OF RAW MATERIALS

2.10 CHEMICAL NAME & PHYSICAL FORM OF RAW

MATERIAL:

Name Of Product Raw material Quantity MT/MT MT/Month

Phenol Formaldehyde Resin Phenol 0.94 707 Formaldehyde 0.372 279 Caustic 0.005 3.7 Methanol 0.166 125

Melamine Formaldehyde Resin Melamine 0.4 100 Formaldehyde 0.6 150 Sodium Hydroxide 0.0013 0.325 Methanol 0.067 16.75

No. Name of Raw Material

Chemical Name Physical Form

Container Type MOC of container

1. Phenol Phenyl Hydroxide Liquid Tank- 20 KL MS 2. Formaldehyde Methyl Aldehyde Liquid Tank- 20 KL HDPE/MS 3. Caustic Sodium Hydroxide Solid Bags-50 kg each HDPE 4. Methanol Methyl Alcohol Liquid Tank-10 KL MS 5. Melamine 1,3,5Triazine2,4,6

triamine Solid Bags-50 kg each HDPE

Page 80: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

39 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.11 PHYSICAL AND CHEMICAL PROPERTIES OF THE RAW MATERIAL & PRODUCTS

Sr. No

Raw Material/ Product

Physical & Chemical Composition

B.P. oC

F.P. oC

LEL- UEL

TLV ppm or mg/nm3

LD50 mg/kg

Sp.Gr. (Water=1)

at

V.D. at

(air=1)

Odour Thre shold, ppm,

mg/Nm3

Solubility in Water

Chemical Formula

State MW

A PRODUCT

1 Melamine Formaldehyde

Melamine Formaldehyde Resin

Liquid -- NA NA NA NA NA 1-0.6-0.7 (Powder)

NA Slight Formaldehyde

Miscible in Water <0.1%

2 Phenol Formaldehyde

Phenol Formaldehyde

Liquid -- NA NA NA NA NA <1.0 NA --- <0.1 %

B RAW MATERIALS 1 Phenol Phenyl

hydroxide Liquid 84 181.9 --- 1.7

-8.6 19 mg/Nm3

NL 1.058 3.24 0.19 mg/Nm3

Soluble in water

2 Melamine 1,3,5-Triazine-2,4,6-triamine

Solid 126.13 NA NA NA NA NA NA NA NA Soluble in Water at 30oC

3 Formaldehyde (37%)

Methyl Aldehyde

Liquid 30 96 60 7-73 1.5 mg/Nm3

800 mg/kg

1.038 at 25 °C

NA 4 mg/Nm3

Soluble in Water at 30oC

4 Caustic Lye Sodium Hydroxide

Flakes - Solid

40 1390 NA NA 2 mg/m3

NA 2.12 at 24 °C

NA Odourless Soluble in Water at 30oC

5 Methanol Methyl Alcohol

Liquid 32.04 64.6 -97.8 6-36.5

260 mg/m3

5628 mg/kg

0.79 at 20°C

1.10 130.87 mg/m3

Miscible in water.

Page 81: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

40 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.12 MANUFACTURING PROCESS DETAILS (1) Phenol Formaldehyde:

• First of all raw materials like phenol, formaldehyde and caustic will be added into reaction vessel.

• Stirring and heating will up to 60° C. when it wil l reach up to 60° C maintain the temperature up to 1 hour.

• Reflux is done for 30 minutes up to 98° C. • Vacuum distillation will be started. • Water will be removed from the vessel and send for treatment into effluent

treatment plant. • Cooling will start up at 40° C. • Methanol will be added for dilution purpose. It will not use to manufacture resin.

It will help to let down the viscosity of resin so it can float on the lamination sheet while drying

• Phenol formaldehyde ready for use.

(2) Melamine Formaldehyde:

• Melamine, formaldehyde and caustic will be added into reaction vessel. • Stirring and heating will be done up to 95° C for 1 hour. • Cooling will start up at 40° C. • Methanol will be added for dilution purpose. It will not use to manufacture

resin. It will help to let down the viscosity of resin so it can float on the lamination sheet while drying

• Melamine formaldehyde resin ready for use.

Page 82: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

41 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.13PROCESS FLOW DIAGRAMS Phenol Formaldehyde:

Reaction Vessel - Phenol – 940 kg - Formaldehyde: 372 kg - Caustic flakes: 5 kg

Stirring & Heating Temp: 60°C, Time: 1 Hr

Reflux for 30 minutes Temp: 98°C,

Vacuum Distillation

Waste water: 250 Liter

Cooling

Dilution Methanol: 166 kg

Phenol Formaldehyde Resin 1000 Kg

Page 83: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

42 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

Melamine Formaldehyde:

Reaction Vessel - Melamine: 400 kg - Formaldehyde: 372kg - Caustic: 5 kg

Stirring & Heating Temp: 95°C, Time: 1 Hr

Cooling at 40°C

Melamine Formaldehyde Resin

1000 kg (67% Purity)

- Methanol: 67 kg Dilution

Page 84: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District:

Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.14CHEMICAL REACTION: Phenol Formaldehyde:

Melamine Formaldehyde

Formaldehyde

+ O = CH

OH

Phenol

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha

Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

REACTION:

Melamine Formaldehyde:

Phenol formaldehyde Formaldehyde

+ O = CH2

OH O

Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Sabarkantha, Gujarat. .

43

Phenol formaldehyde Resin

CH3

O

Page 85: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

44 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.15 PLANT WATER REQUIREMENT& WASTEWATER GENERATION

M/s.Airolam Ltd. is anexisting unit and the source of water for existing and proposedactivity will be Bore well. Water Balance Diagram is shown at Figure No. 2.1

TABLE NO. 2.7

DETAILS OF WATER CONSUMPTION & EFFLUENT GENERATION

Water Consumption (Lit/Day) Wastewater generation (Lit/Day)

Existing Proposed Total Existing Proposed Total

Domestic 6000 Nil 6000 Domestic 5000 Nil 5000

Gardening 20,000 Nil 20,000 Gardening Nil Nil Nil

Industrial Industrial

Process Nil Nil Nil Process 500 7000 7500

Cooling 7000 Nil 7000 Cooling 200 Nil 200

Boiler 24,000 Nil 24,000 Boiler 300 Nil 300

Washing Nil 500 500 Washing Nil 500 500

Total 57,000 500 57,500 Total 6000 7500 13,500

WASTEWATER MANAGEMENT .

• After expansion total water consumption will be 57,500 Liter/Day that is met from borewell.

• Domestic effluent @ 5000 Liter / day will be disposed off through septic tank / soak pit system.

• During manufacturing of Resin, at Vacuum distillation stage water will be distilled out @ 7500 Liter /Day.

• The process effluents transfer to ETP for treatment. • After giving primary treatment in proposed Effluent Treatment Plant the

treated effluent @ 8500 Liter/Day will be evaporated in Thermic Fluid operated Evaporator.

Page 86: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

45 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

Figure No. 2.1 WATER BALANCE DIAGRAM:

Total AfterExpansion

All the Values are in Lit /Day

Water Consumption 57500

Total Industrial 31500

Boiler 24000

Process Nil

Domestic 6000

Cooling 7000

Washing 500

Domestic Effluent 5000

Process Effluent 7500

Boiler Blow down

300

Cooling Blow Down

200

Effluent Treatment Plant and Evaporator System

Effluent 8500

Gardening 20000

Washing effluent

500

Page 87: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

46 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.16 CHARACTERISTICS OF EFFLUENT:

The characteristics of wastewater & final outlet would be as follows:

TABLE 2.8

CHARACTERISTICS OF EFFLUENT

Sr. No.

Parameter Character ist ics Unit Untreated

effluent Treated effluent

1. pH 6.5 – 7.5 7.0 – 8.0 -- 2. SS 300 < 100 mg /L 3. TDS 1500 1800 - 2000 mg /L 4. COD 700 <100 mg /L 5. Phenolic Compound 8 - 10 <1 mg /L

2.17 DETAILS OF EFFLUENT TREATMENT PLANT:

TABLE: 2.9 DETAILS OF EFFLUENT TREATMENT PLANT UNITS

Sr. No. Name of Unit No. Volume in KL

1 Collection Tank -I 1 15

2 Neutralization Tank 1 10

3 Photo Fenton Process Vessel 1 10

4 Primary Settling Tank 1 10

5 Thermic Fluid Evaporator 1 1000 Lit/Hr.

6 Sludge drying beds 4 3.375 m3

Page 88: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

47 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.18 FLUE GAS EMISSION :

The details regarding flue gas emission are given at Table No. 2.10.

TABLE NO.2.10 FLUE GAS STACKDETAILS

Sr. No.

Stack attached To

Stack Height (Meter)

APC Measures Pollutants SPM

mg/NM3 SO2 ppm

NOX ppm

01 Steam Boiler

35 m Common

Stack

Multi Cyclone Dust collector

< 150 mg/NM3

< 100 ppm

< 50 ppm

02 Thermic Fluid Heater-1 ( 10 Lac Kcal/Hr) (Existing)

Multi Cyclone Dust collector

03 Thermic Fluid Heater-2 (06Lac Kcal/Hr) (Existing)

Multi Cyclone Dust collector

04 D.G.Set (125 KVA) (Existing)

6 m Acoustic Enclosure

Note: D.G.Set will be used only in case of power failure.

Page 89: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

48 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

TABLE 2.11 EMISSION RATE OF THE POLLUTANTS

Sr. No.

Stack attached to Type of Fuel Fuel Consumption

Height (m) Exit Velocity (m/sec)

Exit Temp. (°°°° C)

Emission Rates (gm/s.)*

SPM** SO2 NOX(**)

1. Steam Boiler (4 MT)

Lignite/Wood

White Coal/Lignite/

Wood

5 MT/Day

5 MT/Day

Common Stack

35

6.0

160-170

0.119

0.207

0.074

2. Thermic Fluid Heater (10 Lacs kcal/hr)

3. Thermic Fluid Heater (6 Lacs kcal/hr)

Note: (*) Actual stack emissions will be well below the permissible stack emissions limits, as the unit will utilize Wood as Fuel. To consider worst case scenario the emission rates are considered on maximum Stack Emission Limit.

(**) Based on maximum expected concentration of SPM-150 mg/Nm3 (**) Based on maximum expected concentration of NOx-50 PPM (***) As the unit will be using Natural Gas and Wood as a fuel, there will be negligible emissions of SO2.

Page 90: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

49 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.19 PROCESS GAS EMISSION: There will be no process gas emission from our existing as well as proposed manufacturing activity.

2.20 FUEL REQUIREMENT

The details of fuels used for the project are given in Table No. 2.12 and Fuel characteristics are shown in Table No. 2.13.

TABLE 2.12

FUEL DETAILS

TABLE 2.13 FUEL CHARACTERISTICS

Sr.No Name of Fuel Quantity Total after

expansion Existing Proposed

1 Lignite / Wood for Steam Boiler 2.5 MT /Day

Nil

2.5 MT /Day

2 Lignite / Wood for TFH - I 2.5 MT /Day

2.5 MT /Day

3 White Coal / Lignite / Wood for TFH -II 5.0 MT /Day

5.0 MT /Day

4 Diesel for DG Set 200 Liter/Month

200 Liter/Month

Characteristics Fuel

Lignite Wood White Coal Diesel Gross Calorific Value Kcal/Kg 4500 3500 3500 10,800

Page 91: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

50 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.21FUGITIVE EMISSION CONTROL:

Fugitive emission could occur from the storage yard of raw materials and finished products. The storage quantity is low since only 6 days inventory will be maintained at site and proper handling methods will be adopted. Emissions from transport of vehicles would occur to a certain extent. The emissions from traffic movements will be controlled by proper planning of the transport of raw materials and finished products to and fro from the factory premises. All the roads inside the plant will be concreted to reduce any dust emissions. Proper planning and maintenance will control the extent of fugitive emissions. During the production, the industry will carry out regular monitoring of fugitive emissions as per the factories Act. Measures taken for fugitive emission control:

• Proper storage of raw materials, products and fuels. • Ensuring closed feeding and sampling. • Establishing SOPs for start-up, shut down and maintenance operational

procedures. • Regular work place monitoring and ambient air quality monitoring as per

post project monitoring plan.

Page 92: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

51 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.22 HAZARDOUS WASTE MANAGEMENT The hazardous wastes generated by the industry & Method of Management and Handling is given InTable No. 2.14.

TABLE NO. 2.14 DETAILS OF HAZARDOUS WASTES

Sr. No

Type of Waste with Category No.

Quantity Total After Expansion Existing Proposed

1 Waste Residue (Resin) (Cat. No.23.1)

3 MT/Year

Nil

3 MT/Year

2 ETP Sludge & evaporation residue (Cat. No. 34.3)

3 MT/Year

3 MT/Year

3 Discarded Containers (Cat. No. 33.3)

3300 Nos./Year

3300 Nos./Year

4 Used Oil (Cat. No. 5.1)

300 Lit/Year

300 Lit/Year

Page 93: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

52 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

TABLE NO. 2.15 MANAGEMENT OF HAZARDOUS WASTES

No Type of Waste Source of Generation

Collection Treatment Storage Disposal

1 Waste Residue (Resins)

Laminated sheets cutting and finishing section

Discarded Containers/Bags

--- Solid waste storage Area with proper bag packing.

Collection, Storage, Transportation and Incineration at CHWIF Site.

2 ETP Waste/ Evaporation Residue

Effluent Treatment Plant

Sludge Drying Bed

Solar Drying

Solid waste storage Area with proper bag packing.

Collection, Storage, Transportation and disposal at TSDF Site.

3 Discarded Containers /Bags

Raw material section

--- --- Solid waste storage area

Collection, Storage and use within premises / sell to approve scrape vendor.

4 Used Oil Lubrication of plant machineries

H.D.P.E. Carboys

--- Solid waste storage area

Collection, Storage and use within premises as lubricant / Sell to registered re – refiners.

Page 94: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

53 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.23NOISE POLLUTION

The various sources of noise in the Industry have been identified as under:

• Pumps • Boiler - Compressors • Reaction Vessels The typical Noise levels of equipment. As indicated by the Equipment manufacturers are given in Table No. 2.16

TABLE NO. 2.16 TYPICAL NOISE LEVELS OF EQUIPMENT

Sr. No.

Name of Machinery/Unit Noise level in Db

1. Pumps 60-65 2. Boilers 65-75 3. Compressors 65-70 4. Reaction Vessels 55-60

The following measures have been taken to reduce the noise levels to acceptable limits: i) Sound producing equipment are enclosed in the sound proofing

enclosure to give residual sound pressure level of 85 dB(A) and ii) Providing suitable ear protecting devices for working personnel.

Page 95: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

54 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.24 LIST OF HAZARDOUS CHEMICALS

The Raw Materials, which are termed as Hazardous Chemicals as per the "Manufacturing, Storage and Import of Hazardous Chemicals Rules, 1989", are as listed inTable No. 2.17

Table No. 2.17 LIST OF HAZARDOUS CHEMICALS

DETAILS OF HAZARDOUS CHEMICALS

Name of Hazardous Chemicals

Toxicity (LD50)

Hazardous Characteristics

Handling & Control Measures

Formaldehyde (solution)

800 mg/kg Oral-Rat

• In air it is slowly oxidize to formic acid • It is powerful reducing agent • Explosive reaction

Handling: • We will store it in MS storage tank. • We will charge it in Reaction vessel by closed pumping system. • We will place this raw material separately from other raw material and from process area. • We will avoid direct contact with the workers. During charging

Hazardous Chemicals

Reference The Manufacturer, storage & Import of Hazardous chemical

Rules 1989

Maximum Quantity to be

Stored at a time in MT

Threshold Storage quantity in MT as per

schedule 3 for application Rules 10-

12 Phenol Sr.No. 481 (part II, Sch

1 of MSIHCR, 1989

20 KL 5 MT

Formaldehyde (solution)

Sr.No. 285 (part II, Sch 1 of MSIHCR, 1989

20 KL 10 MT

Page 96: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

55 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

only two persons will be present. Personal Protective Equipment • We use chemical goggles, rubber or plastic gloves, protective over clothing.

Phenol Not listed

• Strong oxidizers • Violent reaction with Aluminium chloride • Emits toxic fumes on combustion

Handling: � It will be charged in reaction vessel by through closed pipeline, to avoid manual interaction. � There will be batch production, to minimize risk of transportation and storage. � We will avoid repeated exposure of workers. Personal Protective Equipment Rubber shoes and rubber hand gloves, protective over clothing.

2.25 SAFETY & OCCUPATIONAL MEASURE FOR STORAGE &HANDLING OF THE RAW MATERIAL & PRODUCT:

To prevent any spillage, accident and impacts of human health for safety measure will betaken while handling the raw material and products:

Occupational control measures for no health hazard to the worker and to keep the risk of accidents to a minimum from our manufacturing activities.

Mitigatory measures: For the expansionproject, company will make following arrangement within the factory premises for the different hazards:

Storage & Handling of Hazardous Chemicals: • Company will do planning to stock all the necessary material as

minimum as possible.

Page 97: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

56 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

• Al l containers with hazardous chemicals have labels indicating the contents and warning of the hazard.

• Necessary information on safe handling and f irst aid measures and antidotes of major hazardous material wi l l be available on the label.

• Workers dealing with hazardous chemicals wil l be trained on health r isks and safe handling.

• Exposure to hazardous chemicals wil l be minimized. • Liquid Hazardous chemicals wil l be transferred in closed

piping system. • Separate storage section wil l be provided for storage of

hazardous and non-hazardous raw materials.

Vessel and other Equipment related: • Checking of process vessels and equipment is carried out

regularly. • Records related to maintenance and its planning schedule

is maintained. Fire related:

• Overhead water storage tank with adequate capacity is provided to ensure 24 hr. supply.

• Fire water tank with suff icient capacity of 10 KL (02 Nos.)is provided with f ire pump (02 Nos.)

• Fire hydrant piping is provided. • Sprinkler system will be provided over hazardous area. • Fire ext inguisher is provided for existing production

capacity and more required qty. Will be provided for expansion quantity. Contact numbers of nearest f ire agency is provided.

Page 98: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

57 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

Electrical related:

• Al l electr ical f it t ing and motors in the storage areas are f lameproof.

• Checking of al l earthings, wiring & connection are carried out regularly.

• Proper earthing is provided at all equipments and wil l be provided for addit ional equipment. Adequate Nos. of earth pits is provided.

Safety related:

• Adequate types of personal protective equipment wil l be provided and also safety training wil l be provided to workers.

• Emergency showers and eye wash stations is available at the worksite.

• Arrangement for 24 hr. medical facil it ies by contact with nearest health care centre/ hospital.

• Pre-employment medical check-up and annual medical check-upis carried out and its records are maintained properly.

TABLE 2.18

ANTIDOTES OF CHEMICALS

Sr. No.

Name of Chemical Antidotes

1. Phenol • Take the patient in clean air, • Activated charcoal and 240ml milk, • Poly ethylene glycol for external use when eye or

skin is affected 2. Formaldehyde • Milk,

• Activated charcoal • Water

3. Methanol • Ethanol (30% solution through oral, 5% solution through injection),

• Epicake syrup, • If Acidosis than Sodium bicarbonate, • If effect of delirium than give 10mg diazepam through

injection.

Page 99: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

58 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.26ACTION PLAN FOR TRANSPORTATION OF RAW MATERIALS AND PRODUCTS INCLUDING HAZARDOUS CHEMICALS:

The current practice of transportation of raw materials and products as mentioned below will be continued for the proposed expansion project. The following safety precautions are suggested during transportation of hazardous chemicals in tankers / or other vehicles, while unloading, transportation and meeting the emergencies arising out of leakages and spillages of hazardous materials:

� Park the vehicle at designated place. � Stop the engine. � Checkup spark arrester. � Provide earthing to tanker securely. � Connect the piping properly �Before start unloading, check that, there should not be any leakage. � In case of leakage, immediately attend the leakages and rectify it. � After unloading is over, close the cover properly. � Vehicle to be started only after removal of all pipelines connected with tanker.

2.27DETAILS OF FIRE FIGHTING EQUIPMENTS:

The unit will provide fire extinguishers based on probability and type of fire hazards at strategic locations. The unit has installed 30 fire extinguishers (Dry powder type) to tackle the fire hazards of Class A, B & C at different levels of the plant and will install approximately 10more fire extinguishers (Dry powder type) to tackle the fire hazards of Class A, B & C at different levels of the plant. The unit has also provided fire protection arrangements in the form of fixed water spray system (1 No.) and fire hydrant systems (1 Nos.) to tackle any fire emergency arising due to storage of chemicals.

Page 100: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

59 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.28 COST OF THE PROJECT The total project cost after expansion will be 250 lacs. Total capital and recurring cost towards Environmental protection Measures per annum will be 12.35 lacs & 4.5 lacs respectively.

TABLE - 2.19

Capital Cost & Recurring Cost of the Project

Sr. No

System Approximate recurring cost per annum

(in Lacs)

Approximate capital cost (Rs. In Lacs)

Basis for cost estimates

1 Air pollution Control

5.0 --- ---

2 Water Pollution Control

5.0 1.5 Capital cost would include cost of up gradation in ETP & Recurring cost for operational phase.

3 Noise pollution Monitoring

0.10 0 Recurring cost would include cost of noise monitoring.

4 Solid and hazardous Waste management

0.25 1.0 Capital cost would include cost of providing storage space. Recurring cost would include cost of hazardous waste management.

5 Environment monitoring and management

1.0 0 The recurring cost would be incurred on hiring of consultants and payment of various statutory fees to regulatory agencies.

6 Green belt 1.0 2.0 -- Total 12.35 4.5

Page 101: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

60 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.29POWER REQUIREMENT

TABLE 2.20 POWER REQUIREMENT

2.30 MAN POWER

The requirement of personnel for the Plant is met with keeping in view the following:

• Technical support of Plant, including Process Control and Instrumentation

• Smooth and efficient operation of Plant

• Effective co-ordination between the various Departments within the Plant

• Optimum organization with well-defined and judicious job distribution

• Optimum utilization of different grades of workmen and supervisory staff and

• Maximum capacity utilization of facilities. Total Manpower at M/s. Airolam Ltd.will be summarized in Table No. 2.21

TABLE NO. 2.21

DETAILS OF MAN POWER

Status Total Men in all Shifts

Male Female Total

Existing 07 0 07

Proposed 13 02 15

Total 20 02 22

Electricity Required Load Source

Existing: 275KVA. Proposed: 50 KVA .

Total : 350KVA

The Uttar Gujarat Vij Co. Ltd

Page 102: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

61 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.31 GREEN BELT DEVELOPMENT

The development of Green Belt is an important aspect for any plant because:

• It acts as a 'Heat Sink'

• It improves the Ambient Air Quality by controlling SPM in air

• It helps in noise abatement for the surrounding area

• It helps in settlement of new birds and insects within itself and

• It increases the aesthetic value of Site.

The total plot area is 28689.46 Sq. meter. From that they had done gardening and plantation for 8000 Sq. Meter. For proposed expansion, they will do plantation and gardening for additional 500 Sq. meter area. The program will consist of the following elements: • Maintenance of greenbelt and vegetative zones within the plant where

possible. • Plantation of trees and vegetation around the plant. • Maintenance of greenbelt on the both sides of nearby roads. • To provide tree guards to the local villagers. • We will develop ~ 200 Trees in and around our premises. They will develop 50 Trees for 1st year, 50 Trees for 2nd Year, 100 Trees for 3rd Year. The tree species selected for the plantation will be pollutant tolerant, fast growing, wing firm, deep rooted, and ever green. The company will select pollutant tolerant plant species. They will also develop plantation as per the MoEF guidelines all along the periphery of plant so that these trees perform as natural barrier and bring down the fugitive emission and stop carryover of dust along with wind current.

Page 103: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s.Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. .

62 Prepared By M/s. BhagwatiEnviro Care Pvt Ltd.

2.32 SCHEME FOR RAIN WATER HARVESTING The source of water for the project isground water. The unit has also proposed to design & implement rain waterharvesting scheme within premises. The parameter considered for designing the Rain waterharvesting is as follows:

• The average rainfall of the area considered for the design is 800 mm/year.

• The paved area available in front. • The amount of watercollected from the run off. • The roof top area available. • The amount of water collected from the roof top. • Considering onehour of peak rainfall. • Total rain water to be collected.

Hence rain waterharvesting pit will be made to collect the rain water from roof top and paved area based on the above data consideration. � The Total land area is 28689.46 Sq.Meter. � The Average rain fall is 800 mm = 0.8 m � Water recharge = Area x Avg. Rain fall x Efficiency = 28689.46 m2x 0.8 m x 0.7 = 16066.09m3

Page 104: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

63

CHAPTER: 3 BASE LINE ENVIRONMENT QUALITY

3.1 INTRODUCTION Preparation of this study needs a datum on which the evaluation can be done. It is necessary to collect data about different environmental attributes that are being affected by the development of the region which, in turn, defines an existing environmental quality of the region to serve as the datum.

Base line data requirement is also necessary to identify environmentally significant issues as well as to enumerate the critical environmental changes that are occurred due to the industrial development of the region.

Here an attempt has been made to collect the information about an existing environment on the below mentioned eight major environmental attributes:

I - Air Environment

II - Meteorology

III - Water Environment

IV - Hydro-geomorphology

V - Noise

VI - Land Environment

VII - Ecology

VIII - Socio-economic

3.2 STUDY AREA

The study area for Baseline Environmental Quality is the area with a radius of 5Kms keeping project site as a centre. The same is shown in Figure No. 3.1 and the villages falls under the same is listed in Table No. 3.1.

Page 105: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

64

Table No. 3.1

Name of Villages in Study Area.

Sr. No. Name of village Taluka Direction

0 - 5 Kms

1. Dalpur Prantij W 2. NadriPethapur Himmatnagar N 3. Jitod Himmatnagar N 4. Katwad Himmatnagar NW 5. BoriyaKhurad Himmatnagar N 6. Hajipur Himmatnagar NE 7. Gadhoda Himmatnagar NE 8. Nananpur Prantij E 9. Amodra Prantij SE 10. Sonasan Prantij S 11. Salal Prantij SW

5 - 10Kms 12. Hapa Himmatnagar N 13. Polajpur Himmatnagar NW 14. Dedhrota Himmatnagar N 15. Navalpur Himmatnagar N 16. Tajpuri Himmatnagar NW 17. Navanagar Himmatnagar NW 18. Sayabapur Himmatnagar NW 19. Kudol Himmatngar NW 20. Mahadevpura (Tajpuri) Prantij NW 21. Ged Prantij W 22. Morwad Prantij W 23. Moyadvas Prantij W 24. Rupaji Ali Nat. Himmatnagar W 25. Sanpad Prantij W 26. Vaghpur Prantij W 27. Pilodara Prantij SW 28. Poglu Prantij SW 29. Rasulpur Prantij SW 30. Prantij Prantij SW 31. Pallachar Prantij S 32. Aminpur Prantij SW 33. Vadrad Prantij S 34. Zinzva Prantij S 35. Memadpur Prantij S 36. Lalpur Prantij S 37. Morali Prantij SW 38. Ghadi Prantij SE

Page 106: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

65

39. Kalipura Prantij SE 40. Ahmadpura Prantij SE 41. Mahadevpura Himmatnagar SE 42. Ambavada Prantij SE 43. Vaghrota Prantij SE 44. Mauchha Prantij SE 45. MotaFatepura Prantij E 46. Nikoda Himmatnagar SE 47. Nikodiya Prantij E 48. Arsoda Prantij E 49. Chhadarda Prantij E 50. Pural Himmatnagar SE 51. Akodara Himmatnagar NE 52. Dedasan Himmatnagar SE 53. Thumia Himmatnagar SE 54. Hadiyol Himmatnagar NE 55. Piplodi Himmatnagar N 56. Katwad Himmatnagar N 57. Parabda Himmatnagar N 58. Himmatnagar Himmatnagar N 59. Balvantpura Himmatnagar NE 60. Motipur Himmatnagar NE 61. Kanknol Himmatnagar NE

Page 107: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

66

Figure No. 3.1

Topography Map of Study Area

Page 108: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

67

Figure No. 3.2

Study Area Map of Base line Study for 5 KM Radius a nd 10 KM Radius.

Page 109: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

68

3.3 ENVIRONMENTAL STANDARDS OF THE REGION

• AMBIENT AIR QUALITY STANDARDS

National Ambient Air Quality Standards are reproduced in Annexure 3 . The State has not promulgated separate Ambient Air Quality Standards.

• WATER QUALITY STANDARDS

Standards prescribed by BIS (IS 10500-91) and Indian Council of Medical Research (ICMR) for drinking water are given in Annexure 4 .

• AMBIENT NOISE QUALITY STANDARDS

National Ambient Noise Quality Standards are presented in Annexure 5 . The State has not promulgated separate Ambient Noise Quality Standards.

3.4 AIR ENVIRONMENT 3.4.1 AMBIENT AIR QUALITY (AAQ) IN THE STUDY AREA

The collection of base line information for Air Environment includes identification of specific air pollutants being released into the atmosphere having significant impact on neighborhood. The Ambient Air Quality status, with respect to the identified air pollutants, has been studied atseven locations major locations. This has been done through Air Quality surveillance program and based on TOR.

The back-ground air quality for PM10, PM2.5, Sulphur Dioxide (SO2), Oxides of Nitrogen (NOx), CO, HC including VOCs was monitored. The monitoring for these parameters has been done at sites located in different directions and situated within the suspected impact zone, in and around the existing project site. We had considered minimum one monitoring station in the upwind direction and minimum one monitoring station in the pre dominant downwind direction ata location where maximum ground level concentration is likely to occur.

3.4.1.1 THE LOCATION OF AAQ STATIONS

The locations of the AAQ stations are based on prevailing meteorology, pollution source and available infrastructure facilities. One station has been particulary set-up in down wind direction.

Page 110: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

69

Thus, monitoring has been done at six sampling stations located in different directions and situated within the suspected impact zone in and around the existing project site.

The locations map of the AAQ monitoring station is shown in Figure No. 3.1 and tabulated in Table No. 3.2.

Table No.3.2

Locations of Ambient Air Quality Monitoring Station s

Sr. No. Locations Direction Arial Distance from Project Site

in Km 1 Project site --- -- 2 Hajipur NE 3.27 3 Salal SW 4.83

4 Sonasan S 3.23 5 Katwad NW 3.96

6 Amodra SE 4.76

3.4.1.2 BASE LINE DATA

At every sampling station, important parameters namely PM10, PM2.5, Sulphur Dioxide (SO2), Oxides of Nitrogen (NOx) including HC, CO and VOCs were monitored. The results are given in Table No.3.3.a to 3.3.c. The single minimum and maximum concentration of PM10 was 66.49µg/m3 and 79.227 µg/m3. The 98th percentile value of PM10 concentration was above 78.9286µg/m3 . The single minimum and maximum concentration of PM2.5 was 28.57µg/m3

and 40.70µg/m3. The 98th percentile value of PM2.5 concentration was above 39.1396µg/m3 . The single minimum and maximum concentration of SO2 was 10.87µg/m3 and 20.43µg/m3. The 98th percentile value of SO2 concentration was above 18.7306µg/m3. The single minimum and maximum concentration of NOx was 11.77µg/m3 and 41.40µg/m3. The 98th percentile value of NOx concentration was above 39.0174µg/m3.

Page 111: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

70

Table No.3.3.a

Ambient Air Quality Analysis Report for the Month o f January 2015

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 15/01/2015

73.21 34.75 16.23 15.80 13.48 35.31 32.87 31.66 2 Hajipur 16/01/2015 73.81 35.28 11.74 11.30 11.16 26.38 19.89 19.89 3 Salal 17/01/2015 70.08 30.09 11.59 11.01 10.87 26.79 27.60 26.79 4 Sonasan 18/01/2015 72.86 35.26 11.59 12.03 11.01 22.32 19.89 21.51 5 Katwad 19/01/2015 72.83 34.34 13.62 13.04 13.33 28.81 27.60 28.00 6 Amodra 20/01/2015

77.03 36.48 11.30 16.81 13.33 42.21 35.71 25.97

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 22/01/2015

77.71 37.00 11.01 9.56 13.19 26.79 21.92 16.64 2 Hajipur 23/01/2015 76.68 36.98 11.74 11.30 11.45 26.38 17.45 18.26 3 Salal 24/01/2015 76.68 36.03 12.61 12.32 12.17 28.00 27.19 26.79 4 Sonasan 25/01/2015 67.77 33.92 11.88 11.74 11.45 27.19 26.79 26.38 5 Katwad 26/01/2015 72.54 34.79 16.67 16.38 16.52 36.53 34.90 35.71 6 Amodra 27/01/2015 79.28 37.41 12.61 12.03 11.74 28.41 27.60 27.19

Page 112: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

71

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 29/01/2015

69.27 31.72 12.03 11.74 11.59 27.60 27.19 26.38 2 Hajipur 30/01/2015 72.28 28.57 15.94 13.77 13.62 29.63 28.41 27.60 3 Salal 31/01/2015 72.83 28.45 10.29 10.87 9.56 25.97 22.32 17.05 4 Sonasan 01/02/2015 73.14 36.12 13.19 12.61 11.30 24.76 22.32 14.20 5 Katwad 02/02/2015 66.12 27.96 11.30 11.30 11.01 22.73 19.48 20.29 6 Amodra 03/02/2015 72.58 31.23 11.74 11.30 11.45 27.60 26.38 26.79

No Location Date

of Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 05/02/2015

76.10 29.85 12.46 12.17 11.88 28.81 27.60 26.79 2 Hajipur 06/02/2015 78.01 36.56 12.32 11.74 11.45 30.84 28.81 29.63 3 Salal 07/02/2015 77.02 37.84 11.59 11.59 11.30 23.54 20.29 21.10 4 Sonasan 08/02/2015 67.62 35.81 12.03 11.59 11.74 28.41 27.19 27.60 5 Katwad 09/02/2015 68.58 35.89 11.74 12.03 11.59 28.81 29.63 28.00 6 Amodra 10/02/2015 72.97 35.09 13.91 13.77 13.19 26.79 23.94 23.13

Page 113: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

72

Table No.3.3.b

Ambient Air Quality Analysis Report for the Month o f February 2015

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 12/02/2015

72.45 38.62 11.74 12.32 13.19 34.09 25.16 21.92 2 Hajipur 13/02/2015 66.77 28.57 13.33 12.46 11.74 25.16 21.10 19.48 3 Salal 14/02/2015 73.90 31.38 11.59 16.38 13.33 30.03 24.76 21.92 4 Sonasan 15/02/2015 72.86 34.76 13.48 13.19 12.90 32.87 32.06 31.25 5 Katwad 16/02/2015 73.84 35.42 12.75 12.17 11.88 31.25 29.63 30.84 6 Amodra 17/02/2015

78.91 37.20 13.33 12.75 13.33 30.03 29.22 28.81

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 19/02/2015

70.30 29.86 15.80 13.48 13.19 29.22 28.00 27.19 2 Hajipur 20/02/2015 73.00 36.11 12.61 12.03 11.74 21.92 20.70 21.51 3 Salal 21/02/2015 76.67 36.50 13.19 12.61 12.32 32.06 30.44 31.66 4 Sonasan 22/02/2015 72.43 35.67 13.77 13.19 13.77 30.84 30.03 29.63 5 Katwad 23/02/2015 76.39 32.03 16.67 13.91 16.23 26.38 26.38 27.19 6 Amodra 24/02/2015 71.74 38.03 13.33 13.77 11.45 28.81 22.32 22.73

Page 114: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

73

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 26/02/2015

72.86 38.58 12.17 11.45 11.88 41.40 34.09 25.16 2 Hajipur 27/02/2015 69.27 34.56 15.51 14.20 13.33 38.96 31.66 21.10 3 Salal 28/02/2015 72.86 34.42 15.80 13.48 13.19 32.06 26.38 20.70 4 Sonasan 01/03/2015 66.49 28.81 11.30 10.72 11.45 24.76 19.48 13.80 5 Katwad 02/03/2015 74.88 35.19 13.48 13.19 12.90 26.38 23.13 17.05 6 Amodra 03/03/2015

76.68 40.70 12.32 13.48 11.74 23.94 19.48 14.20

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100

µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 05/03/2015

72.89 36.29 12.46 11.45 11.74 28.00 21.92 15.02 2 Hajipur 06/03/2015 76.68 36.14 11.88 11.45 11.74 22.73 19.48 11.77 3 Salal 07/03/2015 70.02 30.53 15.94 13.77 13.77 40.18 32.47 21.92 4 Sonasan 08/03/2015 77.08 37.73 13.19 12.61 12.90 37.34 34.90 26.79 5 Katwad 09/03/2015 72.52 37.84 11.74 11.74 11.59 30.84 23.94 19.89 6 Amodra 10/03/2015 76.62 35.43 12.03 12.03 11.74 30.03 27.60 19.89

Page 115: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

74

Table No.3.3.c

Ambient Air Quality Analysis Report for the Month o f March 2015

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100 µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 12/03/2015

73.44 36.72 11.88 11.01 10.87 22.73 19.89 17.86 2 Hajipur 13/03/2015 72.97 36.48 13.04 12.75 12.61 27.19 23.54 19.89 3 Salal 14/03/2015 72.45 35.18 13.33 13.04 12.90 25.16 22.32 22.73 4 Sonasan 15/03/2015 73.84 34.39 11.74 11.59 11.74 26.38 21.10 20.70 5 Katwad 16/03/2015 68.14 29.67 15.36 13.62 15.22 34.90 25.97 22.73 6 Amodra 17/03/2015

69.91 30.96 18.69 20.43 16.67 39.37 23.94 19.89

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100 µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 19/03/2015

76.79 38.22 16.09 14.78 15.94 31.25 21.10 32.87 2 Hajipur 20/03/2015 76.27 36.92 15.65 20.43 18.40 38.15 25.16 25.57 3 Salal 21/03/2015 72.08 33.13 12.32 12.17 11.74 33.69 25.97 21.10 4 Sonasan 22/03/2015 71.72 31.39 16.38 16.23 15.80 38.15 28.00 20.70 5 Katwad 23/03/2015 73.61 32.68 12.90 12.46 12.75 29.22 20.29 11.77 6 Amodra 24/03/2015 76.68 37.73 12.17 12.46 11.88 31.25 24.35 21.51

Page 116: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

75

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100 µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 26/03/2015 72.54 29.88 13.48 13.19 12.90 30.44 24.76 19.48 2 Hajipur 27/03/2015 69.96 31.15 12.46 12.17 11.74 36.93 25.97 21.10 3 Salal 28/03/2015 79.22 38.10 13.33 12.90 13.19 30.03 21.10 12.18 4 Sonasan 29/03/2015 74.68 37.30 12.61 12.90 12.32 32.06 25.16 22.32 5 Katwad 30/03/2015 74.65 35.82 13.91 13.62 13.33 31.25 25.57 19.89 6 Amodra 31/03/2015

68.11 31.83 12.90 12.61 12.03 38.15 26.79 21.92

Table No.3.3.c Ambient Air Quality Analysis Report for the Month o f April 2015

No Location Date of

Sample

PM10 PM2.5 SOx NOx

GPCB limit 100 µg/m3

GPCB limit 60 µg/m3

GPCB limit 80 µg /m3

GPCB limit 80 µg /m3

24 Hrs 24 Hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 8 hrs 1 Project site 02/04/2015

73.94 35.26 15.94 13.77 13.77 32.47 24.76 23.54 2 Hajipur 03/04/2015 73.90 36.07 16.09 14.78 15.80 28.81 21.92 32.87 3 Salal 04/04/2015 78.61 39.04 12.61 16.38 14.35 30.84 19.89 25.57 4 Sonasan 05/04/2015 77.82 38.22 12.17 18.98 14.20 22.73 26.79 27.19 5 Katwad 06/04/2015 71.70 33.55 11.59 11.30 13.19 34.50 19.89 24.76 6 Amodra 07/04/2015 77.31 32.69 11.88 11.45 11.74 28.00 23.94 32.87

Page 117: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

76

Table No.3.3.d

VOC Analysis Report

Sr. No.

Location Date of Sampling

Benzene (µg/m3)

Toluene (µg/m3)

Xylene (µg/m3)

Total Concentration

(µg/m3) 1.

Project site

15/01/2015 0.68 1.98 0.74 3.40 2. 22/01/2015 0.58 1.92 0.78 3.28 3. 29/01/2015 0.61 2.02 0.77 3.40 4. 05/02/2015 0.58 1.87 0.72 3.17 5. 12/02/2015 0.54 1.90 0.70 3.14 6. 19/02/2015 0.73 2.27 1.06 4.06 7. 26/02/2015 0.73 2.09 0.91 3.73 8. 05/03/2015 0.76 2.02 0.86 3.64 9. 12/03/2015 0.71 1.98 0.85 3.54 10. 19/03/2015 0.71 2.06 0.80 3.57 11. 26/03/2015 0.72 2.04 0.91 3.67 12. 02/04/2015 0.83 2.41 1.10 4.34

CO and HC Analysis Report Sr. No.

Location Date of Sampling

CO (µg/m3) HC (µg/m3)

13.

Project site

15/01/2015 139.66 2.77 1. 22/01/2015 129.89 3.04 2. 29/01/2015 161.30 2.64 3. 05/02/2015 162.49 2.77 4. 12/02/2015 123.68 2.38 5. 19/02/2015 134.11 2.51 6. 26/02/2015 137.68 2.24 7. 05/03/2015 162.36 2.28 8. 12/03/2015 156.12 2.52 9. 19/03/2015 135.96 2.51 10. 26/03/2015 128.44 2.38 11. 02/04/2015 118.67 2.77

Page 118: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

77

3.4.1.3 SAMPLE ANALYSIS Monitoring and testing of ambient air quality were carried out for various Parameters namely PM10,PM2.5, SO2, NOx, by using Respirable Dust Sampler (RDS). Twenty four -hourly samples were collected for PM10 ,PM2.5 and for SO2& NOx 8 hourly samples were collected for the month of January – February – March – April 2015. The sampling and testing of Ambient Air Quality Parameters were carried out as per relevant parts of IS: 5182. The brief details of testing procedures adopted are given in Table No.3.4.

Table No. 3.4

Details of Ambient Air Quality Monitoring & Analysi s Procedures

Parameter Ambient Air Quality Monitoring & Analysis Procedure

PM10 Gravimatric Method, IS:5182, 11255 & Operational Manual of Instrument

PM2.5 Gravimatric Method & Operational Manual of Instrument NOx Jacob &Hochheiser Method.

Absorption in dilute NaOH and then estimating colorimetric with Sulphanilamide N(1-Nepthyl) Ethylene DiamineDihydrochloride and Hydrogen Peroxide (IS : 5182 Part II : 1975)

SO2 Improved West &Gaeke Method. Absorption in Mercury Sodium Tetra Chloride followed by colorimetric estimation using P-Rosaniline Hydrochloride and Formaldehyde (IS : 5182 Part II : 1969)

VOC Adsorption and desorption followedby Gas Chromatography analysis

CO and HC Instrumental manual method

3.5 METEOROLOGY Meteorological conditions, of the site, regulates the transport and diffusion of air-pollutants released into the atmosphere. Ambient temperature, wind speed, wind direction and atmospheric stability are called primary or basic Meteorological Parameters because the dispersion and diffusion of pollutants depend mainly on these Parameters. Humidity, precipitation, pressure and visibility are secondary Meteorological Parameters as this control the dispersion of the pollutants indirectly by affecting primary Parameters.

Page 119: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

78

3.6 Baseline Data

Meteorological data were obtained from our own meteorological station kept at the project site for the parameters namely ambient temperature, wind speed, wind direction, relative humidity for the period January - February – March – April 2015. The Wind Rose diagram for the month of January - February – March 2015.is shown in Figure No. 3.3.

3.6.1 Ambient Temperature

The monthly variations of monthly highest and monthly lowest temperatures recorded are as follows:

Location – Project Site

Temperature, oC Jan -2015 Feb -2015 March - 2015

Minimum 11.4 14.2 14.1 Maximum 30.1 38.1 42.2

3.6.2 Wind Speed

Wind speed determines the rate of diffusion and travel time of air pollutants. The results of monitoring are as follows:

Location – Project Site

Wind Velocity, Km/hr Jan -2015 Feb -2015 March - 2015

Minimum 0 0 0 Maximum 13.8 16.0 14.9

3.6.3 Wind Direction

This is important in air pollution since it determines the direction of transport of air pollutants. The mean wind direction will be indicative of the direction of travel of the pollutants. The data for the same is shown in Table No. 3.5.

The meteorological parameters namely: ambient temperature, wind speed, wind direction and stability class were obtained from our own meteorological station kept at the project site for the Period ofJanuary – February – March – April 2015.As specific mixing heights were not available, mixing height based on CPCB publication “Spatial Distribution of Hourly Mixing Depth over Indian Region”, PROBES/88/2002-03 has been used.

Page 120: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

79

The windrose diagram for the Month of Janury – February – March 2015 isshown in Figure No. 3.3

Figure No. 3.3

Windrose Diagram FOR THE MONTH OF January – Februar y – March 2015

Page 121: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

80

Figure No. 3.4

Wind Class Frequency Distribution

Page 122: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

81

Table No.3.5

Wind Rose Frequency Count

Directions / Wind

Classes (m/s)

0.5 -

2.1

2.1 -

3.6

3.6 -

5.7

5.7 -

8.8

8.8 -

11.1

>=

11.1 Total

1 348.75 - 11.25 145 26 1 0 0 0 172

2 11.25 - 33.75 220 181 10 0 0 0 411

3 33.75 - 56.25 130 35 0 0 0 0 165

4 56.25 - 78.75 45 1 0 0 0 0 46

5 78.75 - 101.25 32 3 0 0 0 0 35

6 101.25 - 123.75 3 2 0 0 0 0 5

7 123.75 - 146.25 2 0 0 0 0 0 2

8 146.25 - 168.75 17 0 0 0 0 0 17

9 168.75 - 191.25 90 1 0 0 0 0 91

10 191.25 - 213.75 52 4 0 0 0 0 56

11 213.75 - 236.25 51 1 0 0 0 0 52

12 236.25 - 258.75 63 22 3 0 0 0 88

13 258.75 - 281.25 66 4 0 0 0 0 70

14 281.25 - 303.75 42 0 0 0 0 0 42

15 303.75 - 326.25 38 0 0 0 0 0 38

16 326.25 - 348.75 41 0 0 0 0 0 41

Sub-Total 1037 280 14 0 0 0 1331

Calms

827

Missing/Incomplete

2

Total

2160

Page 123: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

82

Table No.3.6 Wind Rose Frequancy Distribution

Directions / Wind

Classes (m/s)

0.5 -

2.1

2.1 -

3.6

3.6 -

5.7

5.7 -

8.8

8.8 -

11.1

>=

11.

1 Total

1 348.75 - 11.25 0.06719 0.01205 0.00046 0 0 0 0.07963

2 11.25 - 33.75 0.10195 0.08387 0.00463 0 0 0 0.19028

3 33.75 - 56.25 0.06024 0.01622 0 0 0 0 0.07639

4 56.25 - 78.75 0.02085 0.00046 0 0 0 0 0.0213

5 78.75 - 101.25 0.01483 0.00139 0 0 0 0 0.0162

6 101.25 - 123.75 0.00139 0.00093 0 0 0 0 0.00231

7 123.75 - 146.25 0.00093 0 0 0 0 0 0.00093

8 146.25 - 168.75 0.00788 0 0 0 0 0 0.00787

9 168.75 - 191.25 0.04171 0.00046 0 0 0 0 0.04213

10 191.25 - 213.75 0.0241 0.00185 0 0 0 0 0.02593

11 213.75 - 236.25 0.02363 0.00046 0 0 0 0 0.02407

12 236.25 - 258.75 0.02919 0.01019 0.00139 0 0 0 0.04074

13 258.75 - 281.25 0.03058 0.00185 0 0 0 0 0.03241

14 281.25 - 303.75 0.01946 0 0 0 0 0 0.01944

15 303.75 - 326.25 0.01761 0 0 0 0 0 0.01759

16 326.25 - 348.75 0.019 0 0 0 0 0 0.01898

Sub-Total 0.48009 0.12963 0.00648 0 0 0 0.6162

Calms

0.38287

Missing/Incomplete

0.00093

Total

1

Page 124: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

83

3.6.4 Relative Humidiy (RH)

Mean Monthly Relative Humidity for Meteorological station kept at the project site is given in Table No.3.7.

Table No.3.7

Relative Humidity Month Relative Humidity ( % )

Minimum Maximum January - 2015 0 86.5 February -2015 9 86.3 March - 2015 7.2 87

3.6.5 Climate &Rain Fall

The climate of the area is semi arid and is characterized by a hot ummer. May is the hottest month with mean daily maximum temperature of 430C. The area has semi arid climate with drought frequency of 34%. The annual average rainfall is about 800-850 mm.

3.6.6 Topography

There are wide plain, few slope region and basins in the north, southpart of project site. The majority of these medium slope and plateaus are formed from cultivation, uncultivated, waste to open land. There are few caves, water springs and such structures in the regions formed from the melting of mud flats area. The topographic variety of the region creates different environments in terms of climate change, agriculture land, demography, industry and waste land. The different areas can be distinguished as drainage and upland. The average elevation of the project sites range between 130 – 131 m, where as the elevation in upland regions range between 131-132 m. 3 Major canals flowing on north to south direction. The maximum elevation and higher slope is found near north east part of Hajipur village where a Nikoria village area is situated.

3.6.7 Mixing Height

As specific mixing heights were not available, mixing height based on CPCB publication “SPATIAL DISTRIBUTION OF HOURLY MIXING DEPTH OVER INDIAN REGION”, PROBES/88/2002-03 has been tabulated in Table No.3.8

Page 125: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

84

Table No.3.8 Hourly Mixing Depth over Indian Region

Hour of the Day Mixing Height

(mts.) 5 50 6 50 7 100 8 400 9 500 10 500 11 1000 12 1000 13 1000 14 1000 15 1000 16 1000 17 1000 18 500 19 500

3.7 ATMOSPHERIC STABILITY

The hourly occurrence of various stability classes at project site is determined by wind direction fluctuation method by employing on-line instrument.

The stability classification system based on wind direction fluctuation method is as follows. Relationship between σθ and stability class as suggested by Slade (1965) is given in Table:-

Stability Class σσσσθθθθ (degrees) A > 22.5 B 22.4 - 17.5 C 17.4 - 12.5 D 12.4 - 7.5 E 7.4 - 3.5 F < 3.5

3.8 NOISE ENVIRONMENT

Noise, often defined as unwanted sound, interferes with speech communication, causes annoyance, distracts from work and disturbs sleep thus deteriorating quality of human environment.

Page 126: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

85

The noise is generated from multiple sources such as medium and heavy industries, urban activities in the commercial and human settlements, and vehicular traffic in the region.

The noise level in the study area has been measured through Leutron sound level meter, for a period of one day for 30 minutesinterwalat each monitoring station. In the study area noise levels were monitored in seven locations at different locations for day and night time and are given Table No.3.9

Table No.3.9.

Noise Levels in the Study Areas in the Month of Jan uary 2015

Sampling Date 15/01/2015 Location Project site

Monitoring Time Result in dB (A)

Monitoring Time Result in dB (A)

Day Time Night Time

9.00 am 44 9.00 pm 44 9.30 am 48 9.30 pm 42 10.00 am 52 10.00 pm 46 10.30am 50 10.30 pm 41 11.00 am 57 11.00 pm 48 11.30 am 52 11.30 pm 42 12.00 pm 49 12.00 pm 42 12.30 pm 44 1.00 pm 42 1.30 pm 50 2.00 pm 52 2.30 pm 50 3.00 pm 54 3.30 pm 52 4.00 pm 48 4.30 pm 44 5.00 pm 49 5.30 pm 54 6.00 pm 52 6.30 pm 50 7.00 pm 44 7.30 pm 45 8.00 pm 46 8.30 pm 42

Page 127: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

86

Sampling Date 16/01/2015 Location Hajipur

Monitoring Time Result in dB (A) Monitoring

Time Result in dB (A)

Day Time Night Time

9.00 am 48 9.00 pm 45 9.30 am 51 9.30 pm 42 10.00 am 46 10.00 pm 44 10.30 am 58 10.30 pm 48 11.00 am 60 11.00 pm 44 11.30 am 54 11.30 pm 42 12.00 pm 48 12.00 pm 42 12.30 pm 47 1.00 pm 46 1.30 pm 44 2.00 pm 52 2.30 pm 48 3.00 pm 45 3.30 pm 42 4.00 pm 44 4.30 pm 42 5.00 pm 42 5.30 pm 50 6.00 pm 52 6.30 pm 58 7.00 pm 54 7.30 pm 50 8.00 pm 48 8.30 pm 46

Page 128: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

87

Sampling Date 17/01/2015 Location Salal

Monitoring Time Result in dB (A)

Monitoring Time Result in dB (A)

Day Time Night Time

9.00 am 52 9.00 pm 46 9.30 am 54 9.30 pm 44 10.00 am 53 10.00 pm 48 10.30 am 57 10.30 pm 42 11.00 am 56 11.00 pm 42 11.30 am 60 11.30 pm 41 12.00 pm 65 12.00 pm 42 12.30 pm 69 1.00 pm 70 1.30 pm 71 2.00 pm 65 2.30 pm 66 3.00 pm 67 3.30 pm 66 4.00 pm 67 4.30 pm 44 5.00 pm 42 5.30 pm 48 6.00 pm 45 6.30 pm 42 7.00 pm 48 7.30 pm 42 8.00 pm 44 8.30 pm 48

Page 129: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

88

Sampling Date 18/01/2015 Location Sonasan

Monitoring Time Result in dB (A)

Monitoring Time Result in dB (A)

Day Time Night Time

9.00 am 52 9.00 pm 67 9.30 am 53 9.30 pm 63 10.00 am 52 10.00 pm 61 10.30 am 54 10.30 pm 61 11.00 am 52 11.00 pm 56 11.30 am 55 11.30 pm 46 12.00 pm 58 12.00 pm 45 12.30 pm 60 1.00 pm 61 1.30 pm 64 2.00 pm 68 2.30 pm 65 3.00 pm 68 3.30 pm 65 4.00 pm 67 4.30 pm 67 5.00 pm 68 5.30 pm 70 6.00 pm 68 6.30 pm 66 7.00 pm 64 7.30 pm 67 8.00 pm 70 8.30 pm 67

Page 130: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

89

Sampling Date 19/01/2015 Location Katwad

Monitoring Time Result in dB (A)

Monitoring Time Result in dB (A)

Day Time Night Time

9.00 am 54 9.00 pm 63 9.30 am 55 9.30 pm 61 10.00 am 58 10.00 pm 59 10.30 am 60 10.30 pm 57 11.00 am 62 11.00 pm 54 11.30 am 63 11.30 pm 52 12.00 pm 65 12.00 pm 51 12.30 pm 65 1.00 pm 66 1.30 pm 68 2.00 pm 66 2.30 pm 65 3.00 pm 61 3.30 pm 60 4.00 pm 63 4.30 pm 64 5.00 pm 65 5.30 pm 69 6.00 pm 70 6.30 pm 71 7.00 pm 69 7.30 pm 65 8.00 pm 63 8.30 pm 62

Page 131: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

90

Sampling Date 20/01/2015 Location Amodra

Monitoring Time Result in dB (A) Monitoring

Time Result in dB (A)

Day Time Night Time

9.00 am 43 9.00 pm 55 9.30 am 47 9.30 pm 51 10.00 am 50 10.00 pm 50 10.30 am 45 10.30 pm 49 11.00 am 43 11.00 pm 45 11.30 am 45 11.30 pm 42 12.00 pm 41 12.00 pm 40 12.30 pm 42 1.00 pm 48 1.30 pm 46 2.00 pm 44 2.30 pm 42 3.00 pm 48 3.30 pm 52 4.00 pm 56 4.30 pm 66 5.00 pm 68 5.30 pm 67 6.00 pm 68 6.30 pm 65 7.00 pm 66 7.30 pm 67 8.00 pm 65 8.30 pm 61

3.9 WATER ENVIRONMENT

Water is the most vital resource for all kinds of life. It should not only be available in sufficient quantity but should be of good quality as well. Defilement of water, as a result of human activities, industrial activities and consequent pollution of water, cause deterioration of the water environment.

Page 132: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

91

3.9.1 BASELINE DATA COLLECTION GW & SW

Physico-chemical Parameters have been used for assessing the base line quality of ground water environment and identification of impacts due to the expansion in existing project. The Samples, under all categories, were analysed for various Parameters specified by the Department of Environment. For the collection, preservation and analysis, APHA/IS methods were followed. The requisite Procedures, laid down in APHA/IS methods, were adopted for preserving the Samples with suitable preservative chemicals. The Samples were analysed within the time limits prescribed for each Parameter.

The ground water qualityis presented in Table No. 3.11. The ground water quality in is acceptable as per IS: 10500 for domestic water supply.

Table No. 3.10

Locations of Water Quality Monitoring Stations

Sr. No.

Type of sample Water sample location

1 Borewell Project site 2 Borewell Hajipur 3 Borewell Salal 4 Borewell Sonasan 5 Borewell Katwad 6 Borewell Amodra 7 Borewell Dalpur 8 Surface water Village – Nananpur

Page 133: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

92

Table No.3.11

Water Quality Analysis for the month of January 201 5.

RESULTS OF WATER QUALITY IN THE STUDY AREA

No Parameter Concentration

Unit Permissible Limit Sampling

Location Project site

Hajipur Salal Sonasana

Date of sampling 20/01/15 20/01/15 20/01/15 20/01/15 1. pH 7.1 6.6 6.9 7.0 -- 6.5-8.5 2. Colour Colorless Colorless Colorless Colorless -- --

3. Odour UO UO UO UO -- UO =

Unobjectionable 4. Turbidity 1.0 1.2 1.4 1.5 NTU 10

5. Total Dissolved Solids 457 541 439 355 mg/l 2000

6. Total Hardness 214 318 234 130 mg/L as CaCO3

600

7. Calcium 32.9 54.1 42.9 27.7 mg/l -- 8. Magnesium 32.2 44.6 30.9 14.9 mg/l --

9. Total Alkalinity 182 316 154 104 mg/L as CaCO3

600

10. Residual Chlorine BDL BDL BDL BDL mg/l 1.0 11. Boron 0.1 BDL BDL BDL mg/l 1.0 12. Chloride 60.3 97.9 115 39.4 mg/l 1000 13. Sulphate 7.9 12.0 20.0 7.9 mg/l 400 14. Fluoride 0.5 0.3 0.59 0.8 mg/l 1.5 15. Nitrate 1.6 2.3 1.5 1.0 mg/l 45

16. Phenolic Compound 0.04 BDL BDL BDL mg/l 0.002

17. Cyanide BDL BDL BDL BDL mg/l 0.05 18. Anionic Detergent BDL BDL BDL BDL mg/l 1.0 19. Mineral Oil BDL BDL BDL BDL mg/l 0.03 20. Cadmium BDL BDL BDL BDL mg/l 0.01 21. Arsenic BDL BDL BDL BDL mg/l 0.01 22. Copper BDL BDL BDL BDL mg/l 1.5 23. Manganese BDL BDL BDL BDL mg/l 0.3 24. Iron 0.05 0.08 0.03 0.1 mg/l 1.0 25. Chromium BDL BDL BDL BDL mg/l 0.05 26. Zinc BDL BDL BDL BDL mg/l 15 27. Aluminum BDL BDL BDL BDL mg/l 0.2 28. Mercury BDL BDL BDL BDL mg/l 0.001 29. MPN < 2 < 2 < 2 < 2 No/100 ml 10/100ml

Page 134: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

93

Table No.3.11.a

Water Quality Analysis for the month of January 201 5. (Cont.)

No Parameter Concentration

Unit Permissible Limit Sampling

Location Katwad Amodra Dalpur SW1

Date of sampling 20/01/15 20/01/15 20/01/15 20/01/15 1. pH 6.4 6.5 7.0 7.1 -- 6.5-8.5 2. Colour Colorless Colorless Colorless Colorless -- --

3. Odour UO UO UO UO -- UO = Unobjectionable

4. Turbidity 1.0 1.2 1.1 2.5 NTU 10

5. Total Dissolved Solids 728 640 446 266 mg/l 2000

6. Total Hardness 382 241 230 148 mg/L as CaCO3

600

7. Calcium 64.9 40.1 52.1 28.0 mg/l -- 8. Magnesium 53.6 34.3 24.4 19.0 mg/l --

9. Total Alkalinity 294 326 176 -- mg/L as CaCO3

600

10. Residual Chlorine BDL BDL BDL -- mg/l 1.0 11. Boron BDL BDL BDL BDL mg/l 1.0 12. Chloride 169.7 246.4 110.0 44.0 mg/l 1000 13. Sulphate 25.0 27.8 11.6 12.0 mg/l 400 14. Fluoride 0.5 0.7 0.9 0.48 mg/l 1.5 15. Nitrate 1.4 2.8 1.4 2.2 mg/l 45

16. Phenolic Compound BDL BDL BDL BDL mg/l 0.002

17. Cyanide BDL BDL BDL BDL mg/l 0.05 18. Anionic Detergent BDL BDL BDL BDL mg/l 1.0 19. Mineral Oil BDL BDL BDL BDL mg/l 0.03 20. Cadmium BDL BDL BDL BDL mg/l 0.01 21. Arsenic BDL BDL BDL BDL mg/l 0.01 22. Copper BDL BDL BDL BDL mg/l 1.5 23. Manganese BDL BDL BDL BDL mg/l 0.3 24. Iron 0.04 0.06 0.14 3.5 mg/l 1.0 25. Chromium BDL BDL BDL BDL mg/l 0.05 26. Zinc BDL BDL BDL BDL mg/l 15 27. Aluminum BDL BDL BDL BDL mg/l 0.2 28. Mercury BDL BDL BDL BDL mg/l 0.001 29. MPN < 2 < 2 < 2 < 2 No/100 ml 10/100ml

Page 135: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

94

3.10 LAND ENVIRONMENT

3.10.1 GEOLOGY:

The area forms part of North Gujarat Alluvial Plain with elevations ranging from 40 to 50 m MSL. The area is under lain by post Miocene alluvium comprising sand, gravel, silt and clay. The alluvium is about 100 m thick under lain by tertiary formation. The alluvium mainly consists of palaeo deltaic, fluvial and Aeolian sediments, comprising alternate bands of fine to course grained sand, gravel and yellowish brownish sticky clay.

Geological Structure of Gujarat state and Figure no. 3.5 of Geology plan of Study Area.

Figure no. 3.5: Geological Structure of Gujarat Sta te

Source : Water Resources Deptfrom http://guj-nwrws.gujarat.gov.in/

Page 136: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

95

3.11 TYPE OF SOILS

From the Environmental point of view, soil can be considered as an important component of the ecosystem as urbanization, Industrialization etc., have a direct bearing on the land surface, which in turn is intimately linked to the soil of the region concerned.

Hence knowledge of soil characteristics, erosion aspects, soil fertility etc., is vital for planning and implementation of afforestation / green belt development measures as a part of maintaining ecological balance of the region. Location and operation of industries, generation and dumping of wastes materials / solid wastes etc. could directly or indirectly affect the soil quality of the surrounding area. Hence the study of soil characteristics in and around the proposed planned site becomes a necessary part of environmental impact assessment study. The sub soil condition below the existing ground level is almost uniform in nature. Sub soil is composed of Clay mixed with little fine grained silty sand, moram and Kankar with low resistivity due to clay and soil moisture. The area is covered with recent to sub recent alluvial deposits comprising of brownish clay mixed with little fine grained sand, silty sand. The Soil below ground level consist of top silty low plastic soil layer having no swelling nature. Blockish brown to yellowish brown clayey silt or sand silt layer extends to the depth of 2 to 3 mts.

3.11.1 CHARACTERISTICS OF SOILS BASE LINE DATA

The soil samples were collected from different places in the study area. The soil samples are taken from six villages.

At each sampling site, the samples were collected at random at a depth of 15 cms and mixed together to form a composite sample. Large stones, gravels and plant roots were removed from soil. The soil was then crushed and water suspension was prepared. The supernatant liquid was then subjected to Physico-Chemical analysis. Standard Procedures were followed for analysis. The results of soil analysis are tabulated in Table No. 3.10.

Page 137: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

96

Table No. 3.12

Analysis Results of Soil Samples

Sr. No .

Parameters Unit Project site Hajipur Salal

Date of Sampling 20/1/15 20/1/15 20/1/15 1 pH (5% - Solution) -- 7.8 7.5 8.0 2 Total Hardness 520 434 445 3 Calcium mg/Kg 123 127.8 133.5 4 Magnesium mg/Kg 51.9 46.0 44.9 5 Sodium mg/Kg 25 34 30 6 Potassium mg/Kg 86 95 102 7 Total Alkalinity mg/Kg 590 560 550 8 Chloride mg/Kg 447.3 433.1 426 9 Organic matter % 0.74 0.81 0.67 10 Organic Carbon % 0.43 0.47 0.39 11 Available Nitrogen % 105 47.9 54.9 12 Available Phosphorus mg/Kg 34.9 14.9 13.1 13 Boron mg/Kg BDL BDL BDL 14 Cadmium mg/Kg BDL BDL BDL 15 Chromium mg/Kg BDL BDL BDL 16 Cobalt mg/Kg BDL BDL BDL 17 Copper mg/Kg BDL BDL BDL 18 Nickel mg/Kg BDL BDL BDL 19 Zinc mg/Kg BDL BDL BDL 20 Lead mg/Kg BDL BDL BDL 21 Bulk Density g/cm3 1.42 1.4 1.36

Page 138: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

97

Sr. No .

Parameters Unit Sonasana Katwad Amodra Dalpur

Date of Sampling 20/1/15 20/1/15 20/1/15 20/1/15 1 pH (5% - Solution) -- 7.3 6.9 8.2 7.9 2 Total Hardness 479 462 464 531 3 Calcium mg/Kg 141 133.1 133.9 157.9 4 Magnesium mg/Kg 50.9 52.1 52.1 54.9 5 Sodium mg/Kg 28 26 20.0 28 6 Potassium mg/Kg 96 134 128 139 7 Total Alkalinity mg/Kg 560 540 540 610 8 Chloride mg/Kg 440.2 383.4 397.6 461.5 9 Organic matter % 0.6 0.55 0.62 0.41 10 Organic Carbon % 0.35 0.32 0.32 0.24 11 Available Nitrogen % 57.9 71.9 52.9 74.8 12 Available Phosphorus mg/Kg 16.0 22.0 20.4 24 13 Boron mg/Kg BDL BDL BDL BDL 14 Cadmium mg/Kg BDL BDL BDL BDL 15 Chromium mg/Kg BDL BDL BDL BDL 16 Cobalt mg/Kg BDL BDL BDL BDL 17 Copper mg/Kg BDL BDL BDL BDL 18 Nickel mg/Kg BDL BDL BDL BDL 19 Zinc mg/Kg BDL BDL BDL BDL 20 Lead mg/Kg BDL BDL BDL BDL 21 Bulk Density gm/cm3 1.5 1.45 1.48 1.42

Page 139: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

98

3.12 LAND USE PATTERN

Remote Sensing is a process of identification and demarcation of various

earths’ objects from a distance without directly coming into contact with them.

Remote sensing is largely concerned with the measurement of

electromagnetic radiation from the sun, which is reflected, scattered, and

emitted by the objects on the surface of the earth. Different objects on the

surface of the earth reflect different amounts of the electromagnetic spectrum.

The potential of remote sensing in natural resources mapping basically

depends on spatial, radiometric and temporal resolution of the sensor. Thus

the satellite remote sensing with its capability of repetitive coverage, multi-

spectral imaging, synoptic view and low cost can play an important role in the

delineation of various landuselandcover classes.

Land cover is a fundamental parameter describing the Earth’s surface. This

parameter is a considerable variable that impacts on and links many parts of

the human and physical environments. Remote sensing technique has ability

to represent of land cover categories by means of classification process. With

the availability of multispectral remotely sensed data in digital form and the

developments in digital processing, remote sensing supplies a new

prospective for landuse/landcover analysis. Geographical Information Systems

have already been used for assessing environmental problems, since they

provides a flexible environment and a powerful tool for the manipulation and

analysis of spatial information for land cover feature identification and the

maps of all variables were combined to extract information to better

understand analyzing. Satellite remote sensing, in conjunction with geographic

information systems, has been widely applied and been recognized as a

powerful and effective tool in analyzing land cover/use categories This study

made use of remotely sensed data and GIS technologies; to evaluate

qualitatively and quantitatively outcome of part of land cover/use distribution.

Obtained results were compared, visualized and analyzed, in Geographic

Information System.

Page 140: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

99

The Study Area up to 5kms radius from the existing project Site comprises of

11 villages of Prantij & HimmatnagarTalukas.The locations of these villages

are shown in Figure No. 3.1 .

The important land uses, as classified by the Census Records, are the Forest,

Land irrigated by different water sources, un-irrigated areas, Cultivable waste

land and areas not available for cultivation.

Fig: 3.6

Land Use / land cover map of 5 km &10 km radius are a around Project Site

Page 141: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

100

Table 3.13:

Land Use Distribution in Study Area (10 km Radial Z one)

Sr No.

Landuse/Landcover

Class Area (Ha) Area in %

1 Agriculture 22706.84 72.29

2 Builtup Area 1750.1 5.58

3 Vegetation 751.25 2.39

4 Waste Land 5411.35 17.22

5 Water Bodies 792.21 2.52

Total 31411.75 100.00

3.13 HYDROGEOLOGY

Hydrology is the science that deals with the depletion and replenishment of water resources. It deals with surface as well as ground water. The water below the water table is known as ground water and water above the water table is known as soil moisture. The water table map and water quality map of study area is attached as a Figure No. 3.7 & 3.8

The litho logical logs of exploratory bore holes, electrical logging results by govt. agencies in and around Prantij Taluka have been studied to understand the subsurface geology and the aquifer system. These bore holes have penetrated the thick sequence of post Miocene sediments down to 80 + m depth. The hydro geological cross sections have been prepared by CGWB to study the subsurface geology and aquifer system in the area. It is reveals that the existence of multilayered aquifer system, within a depth of 80 + m bgl. In general three distances confined aquifer with thickness varies from 12 to 30 m can be identified. TheHatmati River is passing through a study area of 5 km. Ground water is the main source of water in the study area. Ground water is utilized for almost all uses in the area.

Page 142: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

101

Figure No. 3.7

Hydro Chemistry Level of Ground water

Page 143: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

102

Figure No. 3.8 Status of depth to water level in Gujarat

Page 144: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

103

Figure No. 3.9

Ground water quality map of Gujarat

Page 145: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

104

3.14 ECOLOGY

Collection of comprehensive baseline information on flora and fauna is a

prerequisite for assessment of impacts of any developmental activitiesThe

biological environment is an important component of the environment of

any area. It covers flora & fauna in the region, details of forests and wildlife

sanctuaries in the region, with list of endangered species. These

components are addressed in details in the following sections:

Flora and fauna are important components of the environment. They are

organized into natural communities with natural dependencies among their

members and show various responses and sensitivities to anthropogenic

activities. Flora and fauna describes information on various species of

trees, plants, shrubs, crops and natural vegetation, animal, birds etc. and

endangered species.

. Though, the need of collecting ecological data is many fold more. In the

context of present study, where the time was a serious constraint for

seasonal data collection on different ecological parameters, the focus was,

therefore, on to collect data on current status of plants and animals as

baseline information for future comparisons. Following methodology was

adopted in order to collect scientific data.

We attempted to create baseline information through 1) review of literature,

2) consultation and 2) first hand data collection through field surveys.

Field Surveys

In order to get the first hand information on the project and surrounding

ecological status, field surveys were conducted. The field surveys were

conducted to assess baseline status of flora and fauna between January –

February – March – April 2015.

Page 146: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

105

Sampling Strategy

For assessment of flora and fauna, study team randomly sampled in 10.0

km radius of the project site. We collected the data on flora and fauna in

each sample plot of 10X10 mtr quadrate. Total 30 quadrates were laid in

the study area in order to rapidly study the fauna and flora of the region.

No national paik / Wildlife Sanctuary / Reserve Forest cover was found in

05 Km radius of the project area. A detailed survey report with the

methodology and study is as given in the following section.

The details of some major landuses are described below.

Some of the flora and fauna found in Sabarkantha District is given in the Table No. 3.14. There are no records of any rare or endangered flora as well as fauna recorded in the study area.

TABLE NO. 3.14

CHECK LIST OF FLORAL DIVERSITY

Sr. No. Scientific name Family Vernacular Name Trees

1. Acacia nilotica subsp. Indica

Mimosaceae Baval

2. Azardirchtaindica Meliaceae Limdo 3. Jacaranda

mimosaefolia Cesalpinaceae Gulmohar

4. Eucalyptus globulus Myrtaceae Nilgiri 5. Ficusvirens Moraceae Pipli 6. Parkinsoniaaculeata Cesalpiniaceae Ram Baval 7. Prosopisjuliflora Mimosaceae Khijado 8. Magniferaindica Magniferaceae Ambo 9. Terminaliacatappa Combretaceae Badam

10. Terminariaarjuna Combretaceae Arjun 11. Zizyphusmauritiana Rhamnaceae Bordi

Shrubs 12. Calotropisgigantea Asclepiadaceae Akado 13. Calotropisprocera Asclepiadaceae Akado 14. Capparissepiaria Capparidaceae Kerdo 15. Euphorbia nerifolia Euphorbiaceae Thor 16. Neriumindicum Apocynaceae Lal Karen

Page 147: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

106

17. Zizyphusrotundifolia Rhamnaceae ChaniBor 18. Bougainvillea

spectabilids Bougainvillea Boganvell

Herbs 19. Typhaangustata Typhaceae Ramban 20. Xanthium

strumarium Asteraceae Gokhru

Page 148: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

107

TABLE NO. 3.14

CHECK LIST OF FLORAL DIVERSITY

Sr. No. Scientific name Family Vernacular Name Agricultural Crops

21. Triticumaestivum Poaceae Wheat 22. Oryza sativa Poaceae Chokha 23. Sorghum vulgare Poaceae Bajra 24. Gossypiumherbaceum Malvaceae Kapas 25. Cuminumcyminum Apiaceae Jiru 26. Gossipiumhirsuitum Herbeaceae Cotton 27. Arachis Hypogea Papilionaceae Mug 28. PhaseolusMungo Papilionaceae Mug 29. Zea mays Poaceae Maize 30. Sorghum vulgare Poaceae Jowar 31. Phaseolusaureus Papilionaceae Udad 32. -- Papilionaceae Tuwar 33. -- Papilionaceae Aranda

Page 149: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

108

TABLE NO. 3.15 CHECKLIST OF FAUNAL DIVERSITY OF SABARKANTHA DISTRI CT

Sr. No.

Scientific name Local name Conservation status as per Wild Life Act-

1972 Vertebrates Amphibia

1. Euphlyctiscyanophlytis Skipper frog IV 2. Bufomelanostictus Common Indian

Toad IV

Reptilia 3. Hemidoctylusflaviviridis Wall lizard IV

Birds 4. Columba livia Blue Rock Pigeon IV 5. Meropsorientalis Small green bee-

eater --

6. Corvussplendens House Crow V 7. Pycnonotuscafer Red vented bulbul IV 8. Passardomesticus House Sparrow IV

Page 150: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

109

TABLE NO. 3.15

CHECKLIST OF FAUNAL DIVERSITY OF SABARKANTHA DISTRI CT

Sr. No.

Scientific name Local name Conservation status as per Wild Life Act-

1972 Mammals

9. Funambuluspennati Squirrel IV 10. Herpestesedwardsii Mongoose IV 11. Presbytis entellus Common Langur II

INVERTEBRATES ANNELIDA

12. Achetadomesticus House Cricket - - 13. Blattagermanica Cockroach - - 14. Muscadomestica House fly - - 15. Anopheles sp. Mosquito - - 16. Culex Sp. Mosquito - - 17. Pheidole sp. Black Ant - - 18. Qecophyllasmar Red Ant - - 19. Stegodyphussarasinorum Social Spider - -

Forests & Wildlife There are 4 National Parks and 21 Wildlife Sanctuaries in Gujarat; however, none of them are falling in the study area. The Forest Vegetation Map of Gujarat is shown in Figure 3.10 and National Parks with Wildlife Sanctuaries Map of Gujarat is shown in Figure 3.11 :

Page 151: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

110

Figure 3.10, Forest Vegetation Map of Gujarat

Page 152: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

111

Figure 3.11 - National Park and Sacturiesof Gujarat

Protected Areas:

There are no protected areas in the vicinity of the project area. There are alsono monuments of historical and archaeological importance within the studyarea.

Page 153: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

112

3.15 SOCIO-ECONOMIC ENVIRONMENT

This study was taken up to visualise and predict impacts on the Socio-economic profile. Base line data has been collected for 11 villages falling within 5Kms radius from the project site. Figure No. 1.1 depicts the location of the villages and Table No. 3.16 shows the name of villages.

TABLE NO. 3.16

IDENTIFIED VILLAGES FOR SOCIO-ECONOMIC STUDY

Sr.No Name of village Taluka Direction 1 Dalpur Prantij W 2 Nananpur Prantij E 3 Amodra Prantij SE 4 Sonasan Prantij S 5 Salal Prantij SW 6 Sanpad Prantij W 7 Vaghpur Prantij W 8 Pilodara Prantij SW 9 Ged Prantij SW 10 Poglu Prantij SW 11 Rasulpur Prantij SW 12 Prantij Prantij SE 13 Pallachar Prantij S 14 Aminpur Prantij SW 15 Vadrad Prantij W 16 Morwad Prantij W 17 Moyadvas Prantij W 18 Zinzva Prantij W 19 Memadpur Prantij W 20 Lalpur Prantij SW 21 Morali Prantij SW 22 Ghadi Prantij SE 23 Kalipura Prantij SE 24 Ahmadpura Prantij SE 25 Ambavada Prantij SE 26 Vaghrota Prantij SE 27 MotaFatepura Prantij E 28 Nikodiya Prantij E 29 Arsoda Prantij E 30 Chhadarda Prantij E 31 NadriPethapur Himmatnagar N 32 Jitod Himmatnagar N

Page 154: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

113

Source : District Census Handbook –SabarkanthaDistrict- 2011 . Todefine Socio-economic scenario, base line data for the following has been collected:

(a) Economic structure (b) Demographic structure and (c) Availability of basic amenities.

33 Katwad Himmatnagar NW 34 BoriyaKhurad Himmatnagar N 35 Hajipur Himmatnagar NE 36 Gadhoda Himmatnagar NE 37 Hapa Himmatnagar N 38 Polajpur Himmatnagar NW 39 Dedhrota Himmatnagar N 40 Navalpur Himmatnagar N 41 Tajpuri Himmatnagar NW 42 Navanagar Himmatnagar NW 43 Sayabapur Himmatnagar NW 44 Kudol Himmatnagar NW 45 Rupaji Ali Nat Himmatnagar W 46 Mahadevpura Himmatnagar SE 47 Nikoda Himmatnagar E 48 Pural Himmatnagar NE 49 Akodara Himmatnagar NE 50 Dedasan Himmatnagar NE 51 Thumia Himmatnagar NE 52 Mauchha Himmatnagar SE 53 Hajipur Himmatnagar N 54 Hadiyol Himmatnagar NE 55 Piplodi Himmatnagar N 56 Katwad Himmatnagar N 57 Parbada Himmatnagar N 58 Himmatnagar Himmatnagar N 59 Balvantpura Himmatnagar NE 60 Motipur Himmatnagar NE 61 Knaknol Himmatnagar NE

Page 155: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

114

3.16 ECONOMIC STRUCTURE

The main occupation and also the main source of income of the majority of the households in the area are agriculture and related activities. In a total of populations, the main workers and marginal workers and total workers of total population for 02 Talukas(for the study area) are shown in Table No. 3.17.

TABLE NO. 3.17

MAIN AND TOTAL WORKERS

Taluka

Main Workers Marginal Workers

Total Workers

Total Population

Prantij 84814 6441 102008 223398 Himmatnagar 47846 6114 53373 31399

TOTAL 132660 12555 155381 254797

Source : District Census Handbook –SabrakanthaDistrict – 2 011

Page 156: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 115

Table No. 3.18

SOCIO-ECONOMIC PROFILE OF THE STUDY AREA

(ECONOMIC STRUCTURE) Part I

NAME of Villages No_HH TOT_P TOT_WORK_P MAINWORK_P MAIN_CL_P MAIN_CL_M MAIN_AL_M MAIN_AL_F

Marg Worker

1 Dalpur 695 3313 1334 1021 434 413 287 77 313 2 Nananpur 464 2078 935 743 167 157 94 26 142 3 Amodra 432 2150 914 751 216 210 128 15 163 4 Sonasan 1158 5371 2699 2539 527 509 648 225 160 5 Salal 1070 5235 1983 1800 248 199 418 132 183 6 Mahadevpura 129 717 446 222 83 82 128 74 16 7 Ged 333 1729 937 589 257 252 57 12 348 8 Morvad 154 811 339 272 198 108 51 5 283 9 Moyadvas 156 544 234 170 162 204 91 98 308 10 Nadri Pethapur 432 2279 869 848 378 274 106 95 452 11 Sanpad 493 2742 1608 1301 406 394 486 217 257 12 Vaghpur 121 600 307 293 132 119 24 135 151 13 Pilodara 730 3526 1649 1643 269 246 635 283 6 14 Poglu 618 2985 1307 822 257 255 144 22 485 15 Rasulpur 251 1282 656 653 46 43 253 216 201 16 Prantij 32503 161279 72617 60431 18260 17142 11855 4899 978 17 Pallachar 538 2733 1272 1269 322 297 132 69 3 18 Aminpur 326 1654 965 968 163 155 278 153 7 19 Vadrad 703 3263 1653 1585 324 314 336 138 68 20 Zinzva 577 2844 1343 1060 294 280 385 98 0 21 Memadpur 417 2149 1094 282 420 378 141 87 252 22 Lalpur 77 433 256 233 69 64 39 100 23 23 Morali 237 1191 613 437 205 191 118 45 176 24 Ghadi 232 1108 556 540 225 204 89 45 59 25 Kalipura 137 621 352 352 115 115 19 0 0

Page 157: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

116

26 Mauchha 397 1959 1009 617 383 357 50 11 392 27 Motafatepura 539 2555 1123 734 216 212 341 164 38 28 Arsoda 367 1952 1402 857 437 410 97 28 545 29 Chhadara 164 1624 358 964 225 154 163 146 283 30 Jitod 238 1224 338 268 72 70 123 35 70 31 Katwad 239 1281 685 530 226 219 103 62 155 32 Boriya Khurad 194 1001 450 324 144 136 11 8 126 33 Hajipur 605 2506 1018 943 175 173 107 13 75 34 Gadhoda 808 3630 1400 1319 377 376 245 30 81 35 Hapa 395 2110 625 606 250 246 233 13 19

36 Polajpur 292 1521 753 728 265 263 6 7 25

37 Dedhrota 729 3721 1410 1342 431 413 389 228 68

38 Navalpur 388 2005 579 561 273 267 161 8 18

39 Tajpuri 613 3082 1085 1017 328 301 154 31 68

40 Navanagar 98 635 225 222 181 181 12 2 3

41 Sayabapur 326 1667 800 535 166 183 127 85 265

42 Kudol 560 2636 1440 796 555 527 60 103 541

43 Rupaji Ali Nat 364 1549 521 163 194 412 225 183 95

44 Ahmadpura 199 1121 508 335 172 170 55 24 17345

45 Akodara 236 1101 40 395 115 112 86 32 646

46 Dedasan 208 990 475 429 142 122 89 71 8047

47 Thumia 163 773 375 226 146 139 13 23 14948

48 Arsoda 367 1952 1402 857 437 410 97 28 54549

49 Nikodya 232 1122 657 655 166 159 124 112 5450

50 Nikoda 636 3328 1550 524 1180 306 301 402 37051

Page 158: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

117

51 Motafatepura 539 2555 1123 734 216 212 341 164 3852

52 Mhadevpura 3 118 4 114 0 8 129 48 12953

53 Hadiyol 76 357 207 206 42 41 56 0 8054

54 Piplodi 160 850 311 285 164 168 14 33 26

55 Katwad 239 1381 685 580 226 219 103 14 307

56 Parabda 1256 6255 1936 1752 21 21 25 7 234

57 Himmatnagar 16728 81137 26061 24315 101 186 67 62 1746

58 Balvantpura 1841 8368 1894 2722 141 120 120 12 172

59 Motipur 152 880 505 239 204 201 23 110 266

60 Pural 317 1548 756 666 147 136 193 109 90

61 Kanknol 2480 11529 3981 3724 398 372 252 120 228

Source : District Census Handbook –Himmatnagar District - 2011

Page 159: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

118

SOCIO-ECONOMIC PROFILE OF THE STUDY AREA

(ECONOMIC STRUCTURE) Part II

NAME MARG_CL_P MARG_AL_P MARG_AL_M MARG_AL_F MARG_HH_P MARG_OT_P NON_WORK_P 1 Dalpur 71 62 20 42 2 178 313 2 Nadri Pethapur 9 5 2 3 0 7 21 3 Jitod 1 61 55 6 2 6 70 4 Katwad 18 4 0 4 0 133 155 5 Boriya Khurad 94 19 1 8 2 11 126 6 Hajipur 75 0 17 9 8 0 58 7 Gadhoda 1 1 1 0 0 59 81 8 Nananpur 2 159 50 109 1 30 192 9 Amodra 10 50 21 29 1 99 160 10 Sonasan 0 0 0 0 0 0 0 11 Salal 3 13 10 3 4 163 183 12 Hapa 2 16 8 8 0 1 19 13 Polajpur 0 12 5 7 0 0 25 14 Dedhrota 0 18 4 14 3 1 47 15 Navalpur 2 16 8 0 0 1 19 16 Tajpuri 9 10 4 6 0 49 68 17 Navanagar 2 0 0 0 0 1 3 18 Sayabapur 3 7 12 165 0 1 0 19 Kudol 4 173 64 109 12 352 541 20 Mahadevpura 3 118 4 114 0 8 129 21 Ged 41 121 38 83 127 59 348 22 Morwad 2 1 1 0 0 64 67

Page 160: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

119

23 Moyadvas 3 54 65 25 47 0 6 24 Rupaji Ali Nat. 5 64 41 39 64 55 179 25 Sanpad 74 29 10 19 1 153 257 26 Vaghpur 2 1 0 0 4 304 307 27 Pilodara 1 1 1 0 0 4 6 28 Poglu 14 109 74 35 2 360 485 29 Rasulpur 1 2 1 1 0 0 3 30 Prantij 789 4170 2189 1981 332 6895 12186 31 Pallachar 0 0 0 0 0 3 3 32 Aminpur 1 0 0 0 0 6 7 33 Vadrad 15 15 15 0 0 38 68 34 Zinzva 1 126 6 6 0 270 283 35 Memadpur 19 5 5 0 1 227 252 36 Lalpur 8 15 4 11 0 0 23 37 Morali 42 114 35 79 7 13 176 38 Ghadi 11 13 7 6 2 33 59 39 Kalipura 0 0 0 0 0 0 0 40 Ahmadpura 0 62 37 25 1 110 173 41 Mahadevpura 3 118 4 114 0 8 129 42 Ambavada 1 110 46 64 0 16 127 43 Vaghrota 1 13 3 10 0 6 20 44 Mauchha 50 138 97 41 231 22 392 45 MotaFatepura 1 0 0 0 1 3 5 46 Nikoda 5 225 70 155 0 140 370 47 Nikodiya 0 2 0 2 0 0 2 48 Arsoda 512 19 1 18 0 14 545 49 Chhadarda 25 46 84 164 267 45 56 50 Pural 4 79 11 68 0 7 90 51 Akodara 4 0 0 0 0 2 6 52 Dedasan 0 7 4 3 0 39 46

Page 161: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

120

Source : District Census Handbook –SabrakanthaDistrict - 2 011

53 Thumia 11 71 26 45 0 67 149 54 Hadiyol 0 0 0 0 0 1 1 55 Piplodi 2 6 2 4 0 18 26 56 Katwad 18 4 0 4 0 133 155 57 Parbada 1 17 4 13 6 160 184 58 Himmatnagar 26 27 15 12 75 1618 1746 59 Balvantpura 16 35 5 30 10 11 172 60 Motipur 3 255 16 239 0 8 266 61 Kanaknol 23 15 8 7 3 216 257

Page 162: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

3.17 AVAILABILITY OF BASIC AMENITIES

Almost all the villages in the study area are provided with Basic civic amenities. Water supply source in the villages within the study area is ground water, water in the form of Well Water, Tap Water, Tank Water, Tube well, River Water, Canal, Hand pumps, etc.

The study area has well connected road (Pucca Road) and Electricity supply network. Electricity is supplied to all main and remote places for various needs such as domestic utilities, industrial establishments and agricultural requirements by UGVCL. The entire region including Urban as well as rural area shows the sign of modernization and Development. The basic parameter like education, water, medicine, post and telegraph Communication road development and power supply are available which decide the Measure of this development. Education facilities are available to 100% of the population and the literacy rate is above 50% all the villages have minimum of one primary school. There are several colleges, industrial training school and other employment oriented training Centers. The information collected clearly in indicates that the area is highly developed industrial Complex. All The infrastructural facility is provided by respective government agencies For the development of this area the most important aspect is regarding the environment. There is no significant natural reserve, wild life or endangered species which may like to get affected or need special protection the industrial area and the residential area are well isolated and have a lot of open spaces in the surrounding to cope up with the eventualities of industrial expansion. There is no Scope of phenomenon of congestion due to proper and planned modern development.

Page 163: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd. 122

TABLE NO. 3.19 Availability of Basic Amenities of the Study area:

Sr. No. Village 1.

Education 2. Medical 3. Drinking Water

4. Post & Telegraph (Communication)

5. Trasporttaion facility (Bus etc.)

6. Approach to Village

7. Power Supply

1 Dalpur Primary School CHW Hand Pump, Tap

Water Telephone Connection Bus Services Road UGVCL

2 Nadri Pethapur

Secondary School CHW Tap Water,Tank

Water Telephone Connection Bus Services Road UGVCL

3 Jitod Senior

Secondary School

CHW Tank Water,Tap Water Post Office Bus Services

Road UGVCL

4 Katwad Secondary School CHW Tap Water,Tank

Water Telephone Connection Bus Services Road UGVCL

5 Boriya Khurad Secondary

School PHS Tank Water,Tap Water

Post Office Bus Services

Road UGVCL

6 Hajipur Primary chool RMP Well Water,Tap

Water Telephone Connection

Bus Services Road

UGVCL

7 Gadhoda

Primary chool RMP

Well Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

8 Nananpur Secondary

School RMP Tank Water,Tap Water

Post Office Bus Services

Road UGVCL

9 Amodra Senior

Secondary School

__ Tap Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

10

Sonasan Primary School __

Canal Water,Tank Water, Tap Water

__

Bus Services

Road

UGVCL

Page 164: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

123

11 Salal

Secondary School SMP

Well Water,Tank Water

__ Bus Services

Road UGVCL

12 Hapa Primary School CHW Tap Water,Tank

Water Post Office Bus Services

Road UGVCL

13 Polajpur Primary School CHW Tank Water Post Office Bus Services Road UGVCL

14 Dethrota

Primary School Chw

Lake Water,Tap Water,Tank Watter

Telephone Connection Bus SerVices

Road UGVCL

15 Navalpur Secondary School RMP Tap Water Post office Bus Services Road UGVCL

16 Tejpuri

Primary School CHW

Canal Water, Tap Water,Tank Water

Post Office Bus Services

Road UGVCL

17 Navanagar

Primary School CHW

Lake Water,Tap Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

18 Sayabpur Primary

chool __ Well Water, Tank Water

Post Office Bus Services

Road UGVCL

19 Kudol

- RMP Tap Water, Well Water

Telephone Connection

Bus Services Road

UGVCL

20 Mahadevpura

Primary School CHW

Lake Water,Tap Water, Tank Water

Post Office Bus Services

Road UGVCL

21

Ged Primary School __

Canal Water,Tap Water, Tank Water

__

Bus Services

Road

UGVCL

22 Morvad Secondary School Tank Water, Post Office Bus Services Road UGVCL

Page 165: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

124

Tap Water

23 Moyadvas

Primary School CHW

Lack Water,Tap Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

24 Rupaji Ali Nat Primary

School RMP Well Water,Tap Water

Telephone Connection

Bus Services Road

UGVCL

25 Sanpad Secondary School __ Tap Water,Tank

Water Post Office Bus Services

Road UGVCL

26 Vaghpur

Primary School CHW

Lack Water,Tap Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

27 Pilodra Secondary

School PHS Tap Water,Tank Water

Telephone Connection

Bus Services Road

UGVCL

28

Poglu

Secondary PHS

Lake Water,Tank Water,Tap Water

Post Office

Bus Services

Road

UGVCL

29 Rasulpur Primary

School __ Tank Water, Tap Water

Telephone Connection

Bus Services Road

UGVCL

30 Prantij Primary

School Other Facility Tap Water,Tank Water

Telephone Connection

Bus Services Road

UGVCL

31 Pallachar Secondary

School --- Tank Water, Tap Water

Telephone Connection

Bus Services Road

UGVCL

32 Aminpur

Primary School Other Facility

Well Water,Tank Water

__ Bus Services

Road UGVCL

33 Vadrad Primary

School CHW Well Water,Tap Water

Telephone Connection

Bus Services Road

UGVCL

34 Zinzva Primary

School CHW Lake Water,Tap Water,Tank

Telephone Connection

Bus Services Road

UGVCL

Page 166: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

125

Water

35 Memadpur Primary

School CHW Tank Water, Tap Water

Telephone Connection

Bus Services Road

UGVCL

36 Lalpur Primary

School __ Tap Water,Tank Water

Post Office Bus Services

Road UGVCL

37 Morali

Primary School Other Facility

Lake Water,Tap Water, Tank Water

Telephone Connection Bus Services

Road UGVCL

38

Ghadi Secondary School PHS

Well Water,Tank Water,Tap Water

Post Office

Bus Services

Road

UGVCL

39 Kalipura Primary School CHW Tap Water,Tank

Water Telephone Connection

Bus Services Road

UGVCL

40 Ahmadpura

Primary School RMP

Well Water,Tank Water,

Post Office Bus Services

Road UGVCL

41 Mahadevpura

Primary School CHW

Canal Water,Tap Water,

Post Office Bus Services

Road UGVCL

42

Ambavada Primary School RMP

Lake Water,Tank Water,Tap Water

Post Office

Bus Services

Road

UGVCL

43 Vaghrota

Primary School RMP

Lake WaterTap Water,Tank Water

Post Office Bus Services

Road UGVCL

44 Mauchha

Primary CHW Lake Water,Tap Water,Tank Water

Post Office Bus Services

Road UGVCL

Page 167: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

126

45 Mota Fatepura

Primary School CHW

Tap Water, Tank Water

Telephone Connection

Bus Services Road

UGVCL

46 Nikoda Primary

School PHS Tank Water, Well Water

Telephone Connection

Bus Services Road

UGVCL

47 Nikodiya Primary

School CHW Well Water,Tap Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

48 Arsoda Primary

School RMP Well Water,Tank Water

Telephone Connection Bus Services

Road UGVCL

49 Chhadra Primary

School CHW Well WaterTap Water

Telephone Connection

Bus Services Road

UGVCL

50 Pural Primary

School RMP Lake Water,Tap Water, Tank Water

Telephone Connection Bus Services

Road UGVCL

51 Akodara Senior

Secondary School

__ Tap Water, Well Water

Post Office Bus Services

Road UGVCL

52 Dedasan Primary

School Other Facility Tap Water,Tank Water

Telephone Connection

Bus Services Road

UGVCL

53 Thumia Primary

School CHW Tank Water, Tap Water

Telephone Connection

Bus Services Road

UGVCL

54 Hadiyol Primary

School CHW Tank Water,Tap Water

Post Office Bus Services

Road UGVCL

55 Piplodi Primary

School RMP Well Water,Tap Water

Post Office Bus Services

Road UGVCL

56 Kathvad Primary

School CHW Tap Water, Tank Water

Post OfficeTelephone Connection

Bus Services Road

UGVCL

57 Parbada Primary RMP Lake Telephone Bus Services Road UGVCL

Page 168: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

127

School Water,Tank Water,Tap Water

Connection

58 Himmatnagar Primary School RMP Well Water,Tap

Water Telephone Connection

Bus Services Road

UGVCL

59

Balvantpura Primary School Other

Facilities

Lake Water,Tank Water,Tap Water

Telephone Connection

Bus Services

Road

UGVCL

60 Motipur Primary

School CHW Tap Water,Tank Water

Telephone Connection

Bus Services Road

UGVCL

61 Kanaknol Primary School CHW Tank Water,Tap

Water Telephone Connection

Bus Services Road

UGVCL

Page 169: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

128

Abbreviations: Educational P - Primary School H - Matriculation/High School Ac - Adult Literacy Class/ Centre Medical Facility CHW - Community Health Worker PHC - Primary Health Centre RP - Registered Private Practitioner D - Dispensary FPC - Family Planning Centre Drinking Water T - Tap Water W - Well Water TW - Tube well Water TK - Tank water Post and Telegraph PO - Post Office PTO - Post & Telegraph Office P - Phone Transportation BS - Bus RS - Railway Station Approach to Village PR - Pucca Road KR - Kachcha Road Power Supply EA - Electricity for all Purposes

Page 170: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

129

CHAPTER 4

ENVIROMENTAL IMPACT ASSESSMENT

Environmental Impact Assessment (EIA) is an activity or an attempt to identify, predict, evaluate and communicate the likely environmental impacts of the expansion in existing project on the surrounding environment. ENVIRONMENTAL IMPACT ASSESSMENT STUDY INCLUDES: • Identification of all the probable impacts (be it positive or negative) of the various

activities involved in the completion of the project. • Classification of the probable impacts i.e. positive or negative, reversible or

irreversible, short term or long term.

• Evaluation of the probable impacts i.e. qualitative and quantitative assessment of the likely impacts.

• Communication to the general public, interested parties, controlling authorities

(Government or Municipality) through a Public Hearing process, revealing all the probable impacts, which are likely to occur due to the expansion in existing project, on the environment. It also includes the mitigation measures of those impacts, which are inevitable. This chapter presents the identification, prediction and evaluation of impacts with mitigation measures of the expansion in existing project of M/s. Airolam Ltd. effected in the baseline environmental status.

4.1 IMPACT IDENTIFICATION

Considering that identification of significant environmental impact is essential in the preparation of EIA report, an attempt has been made here through the use of “Activity Effect” Matrix .

4.1.1 IDENTIFICATION MATRIX

The impact identification matrix is shown in the Table No. 4.1 . For simplicity the entire project has been divided into two phases:

1. Construction Phase

2. Operation Phase

Page 171: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

130

Various activities belonging to each phase have been grouped separately and arranged in Columns. The environmental Factor or Parameter, which are anticipated to be impacted, has been arranged in Rows. A preliminary scrutiny has been done and the cells, which fall at the junction of the ‘Activity’ and ‘Factor’, that have possible interaction with each other, have been ‘marked’.

The matrix thus establishes the possible ‘cause-effect’ relationship and identifies the environmental factors likely to be impacted and activities responsible for the same. The impact identified may be positive and negative, short term and long term, reversible and irreversible, minor and major. This determination will be done at prediction stage.

4.1.1.1 Construction Phase

Unit needs to do construction activity for installation of additional plant machineries. The various activities involved in construction phase of a proposed expansionproject are listed below:

• Construction / foundation. • Erection/Installations of equipment and machinery • Transportation • Material handling • Employment of labour • Green belt development

4.1.1.2 Operational Phase

The activities involved in the operation phase of the expansion in existing project are listed below: • Raw material handling and Storage • Product Manufacturing • Utility Consumption • Product Handling & Storage • Effluent Generation • Gaseous Emissions • Hazardous Waste Generation • Employment • Green belt development

Page 172: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

- - Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

131

Table No. 4.1: Impact Identification Matrix

Activity

Env. Resource

Air Env. Water Env. Noise Env.

Land Env. Biological Env. Socio Economics

Fuel & Energy

Air Quality

Water Availability

Water Quality

Land Use Pattern

Soil Forest Eco- Logy

Demo-graphic

Eco. Structure

Basic Amenities

Health

PLANT CONSTRUCTION PHASE Construction / Foundation √ √ Erection of equipment and machinery √ √ √ Transportation Material handling √ √ √ √

Employment of labour √

GBD √ √ √ √ √ √ PLANT OPERATIONAL PHASE

Raw Mat. /Product Handling & Storage √ Manufacturing of Industrial Products √ √ √ √ √ √ √

√ √

Industrial Power Requirement √ √

Industrial Water Req. √ √

Industrial Air Emission √ √ √ √ √ √ √

Industrial Waste Water Generation √ √ √

Hazardous waste Generation √ √

Employment √ √ √ √

Green Belt Development √ √ √ √ Vehicular movement √ √ √ √ √ √

Page 173: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

132

Table No. 4.2. : Impact Prediction Matrix Activity

Env. Resource

Air Env. Water Env. Noise Env.

Land Env. Biological Env. Socio Economics

Fuel & Energy

Air Quality

Water Availability

Water Quality

Land Use Pattern

Soil Forest Eco- logy

Demo-graphic

Eco. Structure

Basic Amenities

Health

PLANT CONSTRUCTION PHASE Construction / Foundation

(-Ve), S.T. (-Ve), S.T.

Erection of equipment and machinery

(-Ve), S.T.

(-Ve), S.T. (-Ve), S.T.

Transportation Material handling

(-Ve), S.T.

(-Ve), S.T.

(-Ve), S.T. (-Ve), S.T.

Employment of labour (+Ve), S.T

GBD (+Ve), L.T.

(-Ve), S.T. (-Ve), S.T.

(-Ve), S.T. (-Ve), S.T.

(-Ve), S.T.

PLANT OPERATIONAL PHASE Raw Mat. /Product Handling & Storage

(-Ve), L.T.

Manufacturing of Industrial Products

(-Ve), L.T.

(-Ve), L.T. (-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T. (-Ve), L.T.

(-Ve), L.T.

Industrial Power Requirement

(-Ve), L.T.

(-Ve), L.T.

Industrial Water Req. (-Ve), L.T. (-Ve), L.T.

Industrial Air Emission (-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T. (-Ve), L.T.

(-Ve), L.T.

Industrial Waste Water Generation

(-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T. (-Ve), L.T.

(-Ve), L.T.

Hazardous waste Generation

(-Ve), L.T. (-Ve), L.T.

(-Ve), L.T.

Employment (+Ve), L.T.

(+Ve), L.T.

(+Ve), L.T.

(-Ve), L.T.

Page 174: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

133

Green Belt Development (+Ve), L.T.

(+Ve), L.T.

(+Ve), L.T.

(+Ve), L.T.

Vehicular movement (-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T.

(-Ve), L.T. (-Ve), L.T.

(-Ve), L.T.

Page 175: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

134

4.2 IMPACT PREDICTION AND ASSESSMENT WITH MITIGATIVE MEASURES:

This section is devoted to the prediction and assessment of impacts, which are the most important components of EIA. Such predictions are superimposed over the base-line status of the environmental quality to derive the ultimate environmental scenario. Prediction involves determination of the nature and extent of the probable impacts due to the expansion in existingproject. Here it is determined, whether the likely environmental impacts are: 1. Positive or Negative 2. Long term or Short term Prediction of impacts during the construction and operational phase is as Shown in Table No 4.2. Based on Environmental Impact Analysis, the Environmental Impacts under this step are quantitatively and qualitatively assessed. Quantitative assessment with the help of a mathematical model has been done wherever possible. In other cases, the impact assessment has been qualitative which is based on available scientific knowledge and judgment. The mathematical model used for prediction in the present study includes “Industrial Source Complex Short Term Dispersion” model for ambient air quality. For other cases i.e. Water, Noise, Land/Soil, Ecology, Socioeconomic etc., the available scientific knowledge and judgments have been used.

Page 176: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

135

4.3 AIR ENVIRONMENT 4.3.1 Construction Phase

The impacts during construction phase will be short-term impacts as they will be limited to the period of construction. Unit has to do Construction activity / foundation work for installation of additional plant machineries. These activities may result in temporary increase in SPM levels, primarily, in the working environment. Following mitigative measures during construction phase have been planned

Impacts Mitigation Measures

Dust • Green belt development and water sprinkling will be carried out during the construction phase for suppression of dust.

Air Pollution • Vehicles and machinery will be regularly maintained so that ambient air quality confirms to National Ambient Air Quality Standards.

Hence, the impacts on ambient air quality during construction phase will be marginal temporarily and reversible in nature (for short duration) and restricted to small plant area only.

4.3.2Operation Phase

Generally, the operational activities are expected to have long-term negligible impacts on the air quality. The operational activity from expansion in existing project is expected to have long term impact on the air quality. Major sources of air pollutants are flue gas stack.

Generally, the operational activities are expected to have long-term impacts on the air quality. Major source of air pollutant is flue gases generated from theSteam Boiler and Thermic Fluid heater. There will be no process gas emission from the unit.

All the suitable precautionary measures will be taken for the control of fugitive emissions.

Page 177: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

136

Based on the above stated facts, predictions related to the Ground Level Concentrations (GLCs) have taken into account the flue gas emissions from the SteamBoiler and Thermic Fluid heater stack. The concentration of pollutants at the ground level has been computed using computer model to assess the impact of source emissions from the Existing stack which is already installed. Air quality impact assessment is an important study; Mathematical modeling is an established and accepted technique to predict the air quality.

In this study, impact on environment due to the expansion in existing plant has been assessed with the help of Mathematical modeling following the Central Pollution Control Boards Guidelines. The mathematical model used for conducting the study is the latest version of Industrial Source Complex. Model developed by the Environment Protection Agency of United States (ISC-3, 1996), which is entirely in line with the requirements of Central Pollution Control Board, New Delhi. A mathematical model developed by the Environmental Protection Agency (EPA) is used for calculating GLCs. This is based, on the original Gaussian Plume Model equation but is defined in terms related to atmospheric phenomenon. The model used for assessment is an Industrial Source Complex Short Term (ISCST–3) Dispersion Model. The average and maximum Ground Level Concentrations (GLCs) have been determined for SPM, SO2 and NOx. The average 24hrs. concentrations have been determined in polar grid of 100 up to 3600 for a distance of 500m, 1000 m, 2000 m, 3000m, 5000m, 7000m, and 10000 m. has been calculated based on the micro-meteorological data collected from the meteorological station kept at the project site. The Dispersion modeling assumptions are considered as follows:

1. The receptor locations for 36 wind directions starting with 10 degrees

and incrementing with 10 degrees for radial distances viz. 50m, 100m, 200m, 300m, 500m, 1000m, 2000m, 3000m and 5000m has been taken for the Air Quality Modelling.

2. The impacts of the pollutants were identified up to 5000 meters. 3. The terrain of the study area was considered as FLAT. 4. Stability Class was evaluated based on Temperature Profile and Cloud

Cover. 5. The mathematical equations used for the dispersion modelling

assumes that the earth surface acts as a perfect reflector of plume and physic-chemical process, such as dry and wet deposition, and chemical transformation of pollutants are negligible.

6. The micro-meteorological data viz. Temperature, Wind Speed, Wind Direction and Cloud Cover has been collected from the meteorological station kept at the project site.

Page 178: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

137

4.3.3 MATHEMATICAL MODEL FOR POLLUTANTS DISPERSION

In the present case ISC-3 (Industrial Source Complex) model has been used to assess the air impacts. This ISC model for stack uses the steady state Gaussian plume equation for a continuous elevated source. The features of this model are:

♦ Simulates dispersion from single/multi/area/line/volume sources.

♦ Allows calculations to be made at a user specified regular rectangular

grids.

♦ Provides estimates of concentrations for any averaging time period for the entire period of input meteorology.

♦ Allows calculations to be underwriters for source group as selected by the uses.

♦ Uses the Briggs dispersion curves as selected by the user, to derive the plume spread parameters.

♦ Adjust dispersion curves to account for user specified information on aerodynamic roughness.

♦ Adjust for wind speed variation with height, using user specified default urban/rural power. Co-efficient.

♦ Simulâtes dispersion frombuoyant non buoyant Point sources, non buoyant area, non buoyant volume sources and non buoyant line sources.

♦ User Brigg’s plume rise algorithm to calculate plume height.

For a steady-state Gaussian plume, the hourly concentration at downwind distance x (meters) and crosswind distance y (meters) is given by:

Page 179: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

138

QKVD X (x,y,z) = ------------------ exp [-0.5 (y/2 σσσσy)2 ] ...................Equation 1.1 2 p u σσσσyσσσσz

Where: X = Concentration of pollutant at a point (x, y); (g/m3) Q = Source strength (Pollutant Release Rate); (g/s) u = Horizontal wind speed at the source level; (m/s) σy&σz = Vertical & Horizontal crosswind dispersion coefficients

respectively, which are a function of downwind distance 'x' and atmospheric stability; (m)

K = a scaling coefficient to convert calculated concentrations to desired units (default value of 1 x 106 for Q in g/sec and concentration in µg/m3)

V = Vertical Term, which includes the effects of source elevation, receptor elevation, plume rise, limited mixing in the vertical, and the gravitational settling and dry deposition of particulate (with diameter greater than 0.1 microns)

D = Decay Term

The ISC model uses either a Polar or a Cartesian receptor network. In this case Polar receptor network has been used.

4.3.4 VERTICAL TERM

The Vertical of the Gaussian plume. It includes the effects of source elevation, receptor elevation, plume rise, limited mixing in the vertical, and the gravitational settling and dry deposition of particulates. In addition to the plume height, receptor height and mixing height, the computation of the Vertical Term requires the vertical dispersion parameter (σz). The Vertical Term without Dry Deposition In general, the effects on ambient concentrations of gravitational settling and dry deposition can be neglected for gaseous pollutants and small particulates (less than about 0.1 microns in diameter). The Vertical Term without deposition effects is then given by:

V = exp[ -0.5((z r- he)/σσσσz )2 ] + exp [-0.5((z r+ he)/σσσσz )2 ] +

ΣΣΣΣ∞∞∞∞i = 1 { exp[-0.5(H 1 / σσσσz )2 ] + exp[ -0.5(H 2 / σσσσz )2 ] +

exp[ -0.5(H 3 / σσσσz )2 ] + exp [-0.5(H 4 / σσσσz )2 ] }..................Equation 1-2

Page 180: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

139

where: he = hs+ δh hs = stack height (mt) δh = Plume rise (mt) zr = receptor height above ground (flagpole) (mt) zi = mixing height (mt) H1 = zr - (2izi - he ) H2 = zr + (2izi - he ) H3 = zr - (2izi + he ) H4 = zr + (2izi + he )

The infinite series term in Equation 1- accounts for the effects of the restriction on vertical plume growth at the top of the mixing layer. The method of image sources is used to account for multiple reflections of the plume from the ground surface and at the top of the mixed layer. It should be noted that, if the effective stack height he, exceeds the mixing height, zi, the plume is assumed to fully penetrate the elevated inversion and the ground-level concentration is set equal to zero.

Equation 1-2 assumes that the mixing height in rural and urban areas is known for all stability categories. The meteorological preprocessor program uses mixing heights derived from twice-daily mixing heights calculated using the Holzworth procedures. The ISC models currently assume unlimited vertical mixing under stable conditions, and therefore delete the infinite series term in Equation 1-2 for the E and F stability categories.

The Vertical Term defined by Equation1-2 changes the form of the vertical concentration distribution from Guassian to rectangular (i.e., a uniform concentration within the surface mixing layer) at long downwind distances. Consequently, in order to reduce computational time without a loss of accuracy, Equation 1-2 is changed to the form: V = √√√√ 2ππππσσσσz /zi ...................................................Equation 1- 3 at downwind distances where the σz/zi ratio is greater than or equal to 1.6. The meteorological preprocessor program, RAMMET, used by the ISC Short Term model uses an interpolation scheme to assign hourly rural and urban mixing heights on the basis of the early morning and afternoon mixing heights calculated using the Holzworth procedures. The interpolation procedures are functions of the stability category for the hour before sunrise. Because of the uncertainties about the applicability of Holzworth mixing heights during periods of E and F stability, the ISC models ignore the interpolated mixing heights for E and F stability, and treat such cases as having unlimited vertical mixing.

Page 181: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

140

4.3.5 THE DECAY TERN (D)

The Decay Term in Equation 1-1 is a simple method of accounting for pollutant removal by physical or chemical processes. It is of the form: D = exp(- ΨΨΨΨ x/u s) for ΨΨΨΨ> 0.........................................Equatio n 1-4 or = 1 for Ψ = 0 where: Ψ = the decay coefficient (sec-1) ( a value of zero means decay is not

considered) x = downwind distance (m) For example, if T1/2 is the pollutant half life in seconds, the user can obtain Ψ from the relationship: ΨΨΨΨ = 0.693/T1/2...............................................................................................Equation 1-5 The default value of Ψ is zero. That is, decay is not considered in the model calculations unless Ψ is specified. However, a decay half life of 4 hours ( Ψ = 0.0000481 sec-1) is automatically assigned for SO2 when modeled in the urban mode.

4.3.6 WIND SPEED AT STACK HEIGHT

The wind power law is used to adjust the observed wind speed, uref, from a reference measurement height, zref, to the stack or release height, hs. The stack height wind speed, us, is used in the Gaussian plume equation (Equation 1-1 ), and in the plume rise formulas. The power law equation is of the form:

us = uref (hs/z ref)p ..................................................Equation 1-6

Stability Category

Rural Exponent Urban Exponent

A 0.07 0.15 B 0.07 0.15 C 0.1 0.20 D 0.15 0.25 E 0.35 0.30 F 0.55 0.30

Page 182: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

141

4.3.7 EFFECTIVE STACK HEIGHT

The effective stack, height, he to be used in Gaussian equation is given. He = Hs + Hpr Where, Hpr. = Plume rise due to thermal and momentum factors. He = Effective stack height (m) Hs = Physical stack height (m) In the present case plums rise has been calculated by Brigg’s formula (1975). The details of this equation are given below.

Plume Rise Under Unstable And Neutral Conditions

(a) Buoyancy dominated

Hpr = 1.6 F 1/3 (X) 2/3 / U ..................... ...............Equation 1-7

Where X ≤ 3.5 X* and X* = 14 F 5/8 if F< 55 m4/sec3

= 34 F 2/3 if F≥ 55 m4/sec3 ....................................Equation 1-8

In present computations X is taken equal to 3.5 X*. For this value of X maximum plume rise under unstable and neutral conditions is governed by the following simplified equations:

21.425 F 0.75

Hpr (max) = ; F < 55 m4/sec3 U

38.71 F 0.60 = ; F ≥ 55 m4/sec3 ............Equation 1-9

U

Here F = gVs (Ds/2)2 [(Ts - Ta)/Ts] ....................................Equation 1-10

Where,

g = 9.81 m/s2 Vs = Stack gas velocity (m/s) Ds = Stack Diameter at top (m) Ts = Stack gas temperature (deg.K) Ta = Ambient temperature (deg.K)

Page 183: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

142

(b) Momentum Dominated Plume Rise Under Unstable An d Neutral Conditions:

Hpr (max) = 3 Ds (Vs/U); Vs/U > 4 ........................Equation 1-11

Determination of dominance of buoyancy or momentum under unstable and neutral conditions

First ∆T and (∆T)c are calculated by following equations :

∆T = Ts - Ta

0.0297 Ts Vs 1/3 (∆T)c = ; F < 55 m 4/S3...........Equation 1-12 DS 2/3

0.05757 TsVs1/3 = ; F ≥ 55 m4/s3...............Equation 1-13 DS 2/3

If Ts> Ta and ∆T > (∆c assumed plume rise is buoyancy dominated and if Ts< Ta or ∆T < (∆T)c plume rise is assumed momentum dominated.

Plume rise under stable weather conditions

(a) Buoyancy dominated plume rise.

Hpr = 2.6 (F/US) 1/3 ...............................................Equation 1-14

Here

S = stability parameter

gδθ S = Ta δZ .....................................Equation 1-15

δθ Here = temperature gradient δZ

δθ = 0.02 for stability E δZ = 0.035 for stability F

U = wind velocity at stack level (m/s)

Page 184: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

143

(b) Momentum dominated plume rise:

Vs2 Ds2 Ta-1/3-1/6 Hpr = 1.5 [-------------------------] S ...............Equation 1-16 4 T U

(c) Determination of dominance of momentum or buoy ancy for plume rise under stable weather condition:

(∆∆∆∆T)c = 0.01958 Ta Vs S 1/2 ....................................Equation 1-17 Ts>Ta & (∆T) > (∆T)c plume rise is assumed buoyancy dominated ifTs< Ta or (∆T)< (∆T)c plume rise is assumed momentum dominated

Determination Of Plume Rise Under Calm Conditions ( Wind Velocity At 10 M Less Than 2 Kmph)

In case of calm winds plume rise is calculated by equation (13) and following equation and the lower value of two is taken as final plume rise.

Hpr = 4 F 1/4 S -3/8 ............................................................Equation 1-18

4.3.8 DISPERSION CO-EFFICIENT

In the present computations the dispersion coefficients proposed by PASQUILL and GIFFORD and reported by TURNER for Rural area have been used. The dispersion coefficients are valid up to 10 Kms. distances from pollution source. The equations are as follows: PARAMETERS USED TO CALCULATE PASQULL-GIFFORD σσσσy (m)

Pasquill Stability Category

σσσσy = 465.11628 (x) tan (TH) TH = 0.017453293 (c-d ln (x))

A 24.1670 2.53340 B 18.3330 1.80960 C 12.5000 1.08570 D 8.3330 0.72382 E 6.2500 0.54287 F 4.1667 0.36191

Page 185: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

144

PARAMETERS USED TO CALCULATE PASQULL-GIFFORD σσσσz(m)

Pasquill Stability Category

σσσσz = a(x) b ( x in km.)

A* X (km.) A b < 0.10 122.80 0.94470 0.10-0.15 158.080 1.05420 0.16-0.20 170.220 1.09320 0.21-0.25 179.520 1.12620 0.26-0.30 217.410 1.26440 0.31-0.40 258.890 1.40940

0.41-0.50 346.750 1.72830

0.51-3.11 453.850 2.11660

>3.11 ** **

B* <0.20 90.673 0.93198 0.21-0.40 98.483 >0.40 109.300

C* All 61.141 0.91465

D* <0.30 34.459 0.86974 0.31-1.00 32.093 0.81066 1.01-3.00 32.093 0.64403 3.01-10.00 33.504 0.60486 10.01-30.00 36.650 0.56589 >30.00 44.053 0.51179 E <0.10 24.260 0.83660 0.10-0.30 23.331 0.81956 0.31-1.00 21.628 0.75660 1.01-2.00 21.628 0.63077 2.01-4.00 22.534 0.57154 4.01-10.00 24.703 0.50527 10.01-20.00 26.970 0.46713 20.01-40.00 35.420 0.37615 >40.00 47.618 0.29592

F < 0.20 15.209 0.81558 0.21-0.70 14.457 0.78407 0.71-1.00 13.953 0.68465 1.01-2.00 13.953 0.63227 2.01-3.00 14.823 0.54503 3.01-7.00 16.187 0.46490 7.01-15.00 17.836 0.41507

Page 186: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

145

15.01-30.00 22.651 0.32681 30.01-60.00 27.074 0.27436 >60.00 34.219 0.21716

Note:

* If the calculated value of σz exceed 5000 m, σz is set to 5000 m.

** σz is equal to 5000 m. 4.3.9 ATMOSPHERIC STABILITY

The hourly occurrence of various stability classes at project site is determined by wind direction fluctuation method by employing on-line instrument.

The stability classification system based on wind direction fluctuation method is as follows.

Relationship between σθ and stability class as suggested by Slade (1965) is given in Table:-

Stability Class σσσσθθθθ (degrees) A > 22.5 B 22.4 - 17.5 C 17.4 - 12.5 D 12.4 - 7.5 E 7.4 - 3.5 F < 3.5

Data used for the evaluation of the Ground Level Concentration for the proposed expansionproject is given in the Table No. 4.3.

Page 187: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

146

TABLE NO.4.3 BASIS OF EMISSION RATE CALCULATIONS

Sr. No.

Stack attached to Type of Fuel Fuel Consumption

Height (m) Exit Velocity (m/sec)

Exit Temp. (°°°° C)

Emission Rates (gm/s.)*

SPM** SO2 NOX(**)

1. Steam Boiler (4 MT)

Lignite/Wood

White Coal/Lignite/

Wood

5 MT/Day

5 MT/Day

Common Stack

35

6.0

160-170

0.119

0.207

0.074

2. Thermic Fluid Heater (10 Lacs kcal/hr)

3. Thermic Fluid Heater (6 Lacs kcal/hr)

Note: (*) Actual stack emissions will be well below the permissible stack emissions limits, as the unit will utilize Wood as Fuel. To consider worst case scenario the emission rates are considered on maximum Stack Emission Limit.

(**) Based on maximum expected concentration of SPM-150 mg/Nm3 (**) Based on maximum expected concentration of NOx-50 PPM (***) As the unit will be using Natural Gas and Wood as a fuel, there will be negligible emissions of SO2.

Page 188: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

147

4.3.10RESULTS OF THE ISCST-3 MODEL

The overlapped ISO plathes on Google Image of the same is shown as at Figure No. 4.1 to 4.3 .

TABLE NO. 4.4 THE 1ST HIGHEST 24-HR AVERAGE

CONCENTRATION VALUES OF SPM IN MICROGRAMS/M3

RANK CONC RECEPTOR(XR,YR) TYPE RANK CONC RECEPTOR(XR,YR) TYPE

1 0.855 ( .00,-1000.00) GC 26 0.471 (3000.00, .00) GC

2 0.843 ( .00,-1000.00) GC 27 0.467 (1000.00, .00) GC

3 0.763 ( .00,-1000.00) GC 28 0.457 (-1000.00, .00) GC

4 0.689 ( .00,-2000.00) GC 29 0.456 ( .00,-3000.00) GC

5 0.686 ( .00,-2000.00) GC 30 0.454 ( .00,-4000.00) GC

6 0.686 ( .00,-1000.00) GC 31 0.453 ( .00,-4000.00) GC

7 0.668 ( .00,-2000.00) GC 32 0.450 (2000.00,2000.00) GC

8 0.660 (1000.00, .00) GC 33 0.448 ( .00,-4000.00) GC

9 0.646 ( .00,-1000.00) GC 34 0.448 ( .00,-2000.00) GC

10 0.602 ( .00,-1000.00) GC 35 0.443 ( .00,-1000.00) GC

11 0.595 (-1000.00, .00) GC 36 0.426 (-1000.00,-1000.00) GC

12 0.579 (1000.00,1000.00) GC 37 0.416 ( .00,-3000.00) GC

13 0.579 (2000.00, .00) GC 38 0.402 (-1000.00,-1000.00) GC

14 0.574 ( .00,-2000.00) GC 39 0.401 (-2000.00, .00) GC

15 0.562 (-1000.00, .00) GC 40 0.396 (-2000.00, .00) GC

16 0.558 ( .00,-3000.00) GC 41 0.392 (-2000.00,-2000.00) GC

17 0.556 ( .00,-3000.00) GC 42 0.389 ( .00,-3000.00) GC

18 0.549 ( .00,-3000.00) GC 43 0.388 (-1000.00,-1000.00) GC

19 0.529 ( .00,-2000.00) GC 44 0.387 (-2000.00, .00) GC

20 0.526 ( .00,-1000.00) GC 45 0.382 (4000.00, .00) GC

21 0.505 (-1000.00, .00) GC 46 0.375 ( .00,-5000.00) GC

22 0.499 (-1000.00,-1000.00) GC 47 0.374 ( .00,-5000.00) GC

23 0.493 ( .00,-2000.00) GC 48 0.373 (2000.00, .00) GC

24 0.491 (-1000.00,-1000.00) GC 49 0.371 (-2000.00,-2000.00) GC

25 0.484 (-1000.00,-1000.00) GC 50 0.370 ( .00,-5000.00) GC

Note: ReceptorTypes:GC=Gridcart,Concentrationinµg/m3

Page 189: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

148

TABLE NO. 4.5 THE 1ST HIGHEST 24-HR AVERAGE VALUES OF SO2 IN MICROGRAMS/M3

RANK CONC RECEPTOR(XR,YR) TYPE RANK CONC RECEPTOR(XR,YR) TYPE

1 0.321 ( .00,-1000.00) GC 26 0.177 ( 3000.00, .00) GC

2 0.316 ( .00,-1000.00) GC 27 0.175 ( 1000.00, .00) GC

3 0.286 ( .00,-1000.00) GC 28 0.171 ( -1000.00, .00) GC

4 0.258 ( .00,-2000.00) GC 29 0.171 ( .00, -3000.00) GC

5 0.257 ( .00,-2000.00) GC 30 0.170 ( .00, -4000.00) GC

6 0.257 ( .00,-1000.00) GC 31 0.170 ( .00, -4000.00) GC

7 0.251 ( .00,-2000.00) GC 32 0.169 (2000.00, 2000.00) GC

8 0.248 (1000.00, .00) GC 33 0.168 ( .00, -4000.00) GC

9 0.242 ( .00,-1000.00) GC 34 0.168 ( .00, -2000.00) GC

10 0.226 ( .00,-1000.00) GC 35 0.166 ( .00, -1000.00) GC

11 0.223 (-1000.00, .00) GC 36 0.160 (-1000.00,-1000.00) GC

12 0.217 (1000.00,1000.00) GC 37 0.156 ( .00, -3000.00) GC

13 0.217 (2000.00, .00) GC 38 0.151 (-1000.00,-1000.00) GC

14 0.215 ( .00, -2000.00) GC 39 0.150 (-2000.00, .00) GC

15 0.211 ( -1000.00, .00) GC 40 0.148 (-2000.00, .00) GC

16 0.209 ( .00, -3000.00) GC 41 0.147 (-2000.00,-2000.00) GC

17 0.209 ( .00, -3000.00) GC 42 0.146 ( .00,-3000.00) GC

18 0.206 ( .00, -3000.00) GC 43 0.145 (-1000.00,-1000.00) GC

19 0.199 ( .00, -2000.00) GC 44 0.145 ( -2000.00, .00) GC

20 0.197 ( .00, -1000.00) GC 45 0.143 ( 4000.00, .00) GC

21 0.189 ( -1000.00, .00) GC 46 0.141 ( .00, -5000.00) GC

22 0.187 (-1000.00,-1000.00) GC 47 0.140 ( .00, -5000.00) GC

23 0.185 ( .00,-2000.00) GC 48 0.140 ( 2000.00, .00) GC

24 0.184 (-1000.00,-1000.00) GC 49 0.139 (-2000.00,-2000.00) GC

25 0.181 (-1000.00,-1000.00) GC 50 0.139 ( .00, -5000.00) GC

Note: ReceptorTypes:GC=Gridcart,Concentrationinµg/m3

Page 190: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

149

TABLE NO. 4.6 THE 1ST HIGHEST 24-HR AVERAGE VALUES OF NOx IN MICROGRAMS/M3

RANK CONC RECEPTOR(XR,YR) TYPE RANK CONC RECEPTOR(XR,YR) TYPE

1 0.267 ( .00, -1000.00) GC 26 0.145 ( .00, -2000.00) GC

2 0.264 ( .00, -1000.00) GC 27 0.140 ( -1000.00, .00) GC

3 0.243 ( .00, -1000.00) GC 28 0.138 ( .00, -1000.00) GC

4 0.218 ( .00, -1000.00) GC 29 0.135 (3000.00, .00) GC

5 0.210 ( 1000.00, .00) GC 30 0.132 ( .00, -2000.00) GC

6 0.205 ( .00, -1000.00) GC 31 0.131 ( .00, -3000.00) GC

7 0.203 ( .00, -2000.00) GC 32 0.131 (-1000.00,-1000.00) GC

8 0.202 ( .00, -2000.00) GC 33 0.129 (2000.00, 2000.00) GC

9 0.198 ( .00, -2000.00) GC 34 0.127 ( .00, -4000.00) GC

10 0.190 ( .00, -1000.00) GC 35 0.127 ( .00, -4000.00) GC

11 0.179 ( -1000.00, .00) GC 36 0.126 ( .00, -4000.00) GC

12 0.178 (1000.00,1000.00) GC 37 0.125 (-1000.00,-1000.00) GC

13 0.171 ( 2000.00, .00) GC 38 0.121 (-1000.00,-1000.00) GC

14 0.170 ( .00, -2000.00) GC 39 0.120 ( 1000.00, .00) GC

15 0.168 ( -1000.00, .00) GC 40 0.119 ( .00, -3000.00) GC

16 0.166 ( .00, -1000.00) GC 41 0.117 ( -2000.00, .00) GC

17 0.159 ( .00, -3000.00) GC 42 0.116 ( -2000.00, .00) GC

18 0.159 ( .00, -3000.00) GC 43 0.116 (-2000.00, .00) GC

19 0.157 ( .00, -3000.00) GC 44 0.113 (-2000.00,-2000.00) GC

20 0.157 ( .00, -2000.00) GC 45 0.113 ( -1000.00, .00) GC

21 0.156 ( -1000.00, .00) GC 46 0.111 ( .00, -3000.00) GC

22 0.155 (-1000.00,-1000.00) GC 47 0.111 ( .00, 1000.00) GC

23 0.151 (-1000.00,-1000.00) GC 48 0.110 (2000.00, .00) GC

24 0.149 (-1000.00,-1000.00) GC 49 0.109 (-1000.00,-1000.00) GC

25 0.146 (1000.00, .00) GC 50 0.108 ( 2000.00, .00) GC

Note: ReceptorTypes:GC=Gridcart,Concentrationinµg/m3

Page 191: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

150

4.3.11GROUND LEVEL CONCENTRATION The result of the GLCs due to the flue gas stacks are given in the Table No. 4.7. When the above stated GLCs results are added in to the average ambient air parameters it gives overall AAQ of the surrounding study area. Air quality contours are shown in the Figure No. 4.1.a to 4.1.c.

TABLE NO.4.7

MAXIMUM COMPUTED GROUND LEVEL CONCENTRATION

Sr. No

Description 1st Highest Value Conc n * ( µg/m 3)

Co-ordinates X (m) Y (m)

A SPM 1 1st Highest 24 hr. Result

3.4234 492.40 86.82

B SO2 2 1st Highest 24 hr. Result

5.95593 492.40 86.82

B NOx 3 1st Highest 24 hr. Result

2.12917 492.40 86.82

Note:-(*) This predicted maximum Ground Level Concentration(GLC) is based on worst case scenario, considering maximum stack emission limit of SPM-150 mg/Nm3, and NOx-50 PPM.

Page 192: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

151

4.3.12 Assessment of Impact on Air Quality

Base line study reveals that the levels of various pollutants like PM, SO2

and NOx etc., in the ambient air of surrounding study area are well within the limits stipulated by National Ambient Air Quality (NAAQ) Standard for Residential, Rural and other areas. It can be seen from Table No. 4.7 that the maximum predicted 24 hours GLC(s) of all the pollutants i.e., PM, SO2 and NOx, and its incremental concentrations on baseline value is below the NAAQS. Thus, it can be concluded that, with proposed emissions from the Plant, the Ambient Air Quality within the industrial premises as well as in the surrounding study area will not exceed the NAAQ standards and hence there is no significant adverse impact on Ambient Air Quality.

Page 193: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

152

Fig: 4.1: Isopleths of SPM

Page 194: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

153

Fig. 4.2: Isopleths of SO X

Page 195: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

154

Fig. 4.3: Isopleths of NO X

Page 196: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

155

4.4 WATER ENVIRONMENT

4.4.1 Construction Phase

Impact on water quality during construction phase / foundation work will be marginal and confined to use of water by workers only.

The sewage generated will be treated in the septic tank & soak pit. Airolam Ltd.will take all reasonable precautions for wastewater seepage. This will prevent soil contamination.

4.4.2 Operation Phase

Water Consumption:

The total fresh water requirement after expansion in existing project will be 57.5 KL/day. The water will be met through the bore well.

Wastewater Generation &Disposal:

• After expansion total water consumption will be 57,500 Liter/Day that is met from borewell.

• Domestic effluent @ 5000 Liter / day will be disposed off through septic tank / soak pit system.

• During manufacturing of Resin, at Vacuum distillation stage water will be distilled out @ 7500 Liter /Day.

• The process effluents transfer to ETP for treatment. • After giving primary treatment in proposed Effluent Treatment Plant the

treated effluent @ 8500 Liter/Day will be evaporated in Thermic Fluid operated Evaporator.

Thus, it can be concluded that negligible impact on surrounding water environment is caused. Further, it is emphasized that all precautionary measures have to be strictly adhered as mentioned in the Environmental Management Plan given in Chapter 6, to maintain ground water quality within norms in the future.

Page 197: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

156

Impacts Mitigation Measures

Effluent Treatment

� The Industrial wastewater generated 8.5 KL/Day will

be treated in Effluent treatment plant having primary

treatment unit.

� After giving primary treatment in proposed Effluent Treatment Plant the treated effluent @ 8500 Liter/Day will be evaporated in Thermic Fluid operated Evaporator.

Impact on ground water quality:

• Ground water was tested at six different locations in

the study area. The ground water norms were

compared to IS: 10500 (1991) for evaluation.

• The primary treated effluent will be evaporated in

Thermic Fluid Evaporator. So, due to proposed

expansion project there will be no any impact on

ground water quality.

4.5 NOISE ENVIRONMENT 4.5.1 Construction Phase

There will be slightly increase in noise level during construction phase due to erection and installation of machinery. But it is restricted to construction phase only and it will occur during daytime, when construction activities will be in progress.

4.5.2 Operation Phase

As per observations, the Ambient Noise Level is within norms of Industrial Area. With the implementation of the mitigation measures proposed, the noise levels at plant boundaries will be well below the limits specified for industrial areas.

The major sources contributing to Noise pollution during the plant operation will be Compressor, Boiler, Pumps, etc. The operation of the equipment will generate noise ranging between 70-80 dB (A). The occasional noise will be attenuated by the development of green belt in and around the industry, which will be taken up right from the construction

Page 198: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

157

phase. Also ear protecting devices will be provided for personnel working in high noise generating zone. Thus, there is practically no impact on surrounding environment.

4.6 LAND ENVIRONMENT

4.6.1 Construction Phase

In existing unit no needs to do Excavation for expansion activity. Unit will do only construction activity for foundation work.Hence there will be minor impact on the surrounding soil environment and there will be no change in Land Use Pattern.

4.6.2 Operation Phase

Source emission, wastewater and hazardous waste generation from any project activity affects the soil environment.

The impact due to air causes direct/indirect effect on soil. The emissions of SPM during operation will be effectively controlled. There will be practically no effect on the soil quality due to air emissions.

The sewage generated will be gone in the septic tank & soak pit. Airolam Ltd. will take all reasonable precautions for wastewater seepage.

Wastewater generated from the Industrial activity will be treated in primary Effluent Treatment Plant and treated effluent will be evaporated in Thermic Fluid Evaporator to achieve zero discharge.

As per the Hazardous Waste (Management & Handling) Amendment Rules, 2003, all necessary control steps for each type of Hazardous Wastes generated will be taken for the proposedexpansionproject.

Hence, due to the proposedexpansion project the, land use pattern; land cover and topography of the area will be changed only for the project premises.

4.7 ECOLOGY

4.7.1 Construction Phase Any construction activity brings changes in some components of the local Terrestrial ecosystem. These adverse impacts are restricted to the project Construction site and to some extent it's immediate surroundings.

Page 199: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

158

4.7.2 Operation Phase

Impacts on terrestrial ecosystem can occur due to operation of the any industrial project mainly from air emissions, liquid effluents as well as hazardous wastes generation, which can interfere with the biotic and abiotic components of the ecosystem and may induce injurious effects when concentrations exceed permissible standards.

The proposed expansionproject will be carried out on land within M/s.Airolam Ltd.without cutting of any trees. The proposed project does not alter the crop pattern and natural vegetation of the surrounding area.

Due to the safe control technology of air pollutants, liquid effluents and hazardous wastes disposal, no impact on the surrounding ecology is anticipated.

Development of additional greenbelt/green area will improve the ecological Environment of the surrounding areas.

4.8 SOCIO-ECONOMIC ENVIRONMENT Like any other project, the proposed expansionproject is also expected to have certain positive and negative impacts on socio-economic environment.

4.8.1 Construction Phase Local people involved as contract laborers will have benefits of getting employment. Proposed expansion project will generate temporary employment for personnel during operational phase.

4.8.2. Operation Phase

The proposed expansionproject will generate direct employment for additional to the existing employment for persons. The indirect employment will be generated by way of transportation, shopkeepers and other casual employment. Implementation of this plant will also reduce production loss due to shortage of power. Thus, the expansion project will have significant positive impactson the employment pattern of the study area.

Page 200: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

159

4.9 HEALTH AND SAFETY 4.9.1 Construction Phase

Health problems are also likely to be experienced in the area as a result of Immigrant labour being careless about personal hygiene and also mosquito and fly-borne infections usually prevalent in the rural areas. Such Problems will be minimized by provision of adequate sanitary and health services.

4.9.2 Operational Phase

The impact on health and safety hazard is due to Fire. The company will provide sufficient firefighting system. Therefore, no adverse impact is anticipated.

Page 201: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

160

CHAPTER 5

ENVIRONMENTAL MONITORING PROGRAMME 5.1 MONITORING OF ENVIRONMENT Based on the findings of the Environmental Impact Assessment study, various mitigation measures have been proposed, which have been detailed out in Environmental Management Plan (EMP). In order to monitor the impacts and efficacy of these plans monitoring of various environmental attributes have been proposed during and after the completion of the management plans. A well defined environmental monitoring programme would be employed with trained and qualified staff of Environmental Management Cell of the proposed expansion project to monitor the environmental attributes of the area with respect to EMP as well as the guidelines of the GPCB/CPCB. Environmental monitoring schedule proposed to be adopted by the project Authorities are as presented in Table 5.1:

Table 5.1: Environmental Monitoring Plan

Sr. No. Aspect Source of

Impact

Monitoring Methods and Parameters

Frequency Executing Agency

Monitoring Agency

1.0 Construction Phase 1.1 Local

Manpower Absorption

Construction Works

Contractor’s Report No. of people working in the project

Daily Contractor Airolam Ltd.

1.2 Air Quality Transportation of construction materials

Survey & observations; Levels of SPM, RSPM, SO2 and NOx

Weekly Airolam Ltd.

GPCB/ Recognized Env. Agency

1.3 Public Health Dust, Noise, Influx of labors

Regular medical checkups

Monthly Contractors Airolam Ltd.

2.0 Operation Phase

2.1 Water Quality & Quantity

Surface & Ground water quality within the Project Area

Surveys, sample collection & field measurement;

Quarterly Airolam Ltd.

GPCB/ Recognized Env. Agency

2.2 Effluent Quality

Quality of Treated Effluent for evaporation to achieve zero discharge.

ETP sample collection & quality analysis

Daily (Internal); Monthly (Third Party)

Airolam Ltd.

GPCB/ Recognized Env. Agency

Page 202: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

161

Sr. No. Aspect Source of

Impact

Monitoring Methods and Parameters

Frequency Executing Agency

Monitoring Agency

2.3 Air Quality Emission from utility and process

Air quality monitoring at 2-3 locations within (SO2, NOx, SPM, RSPM, CO, HC, VOC) as well as stack monitoring

Ambient -Monthly (24 hourly); Stack – Monthly (third party)

Airolam Ltd.

GPCB/ Recognized Env. Agency

2.4 Noise Levels Noise levels compliance with respect to industrial standards

Ambient Equivalent Sound Pressure Levels (Leq) at day and Night time at 4 to 6 locations

Monthly (Third Party) and fortnightly (internal)

Airolam Ltd.

GPCB/ Recognized Env. Agency

2.5 Biological Environment

Horticulture/ Greenbelt Development

Survival rate of plants and shrubs

Quarterly Airolam Ltd.

GPCB/ Recognized Env. Agency

2.6 Solid Waste Management

Disposal of waste

Tracking of waste collection, segregation and disposal

Fortnightly Airolam Ltd.

GPCB/ Recognized Env. Agency

2.7 Hazardous Waste Management

Hazardous wastes as required by hazardous waste authorization

Tracking of hazardous waste collection,segreg ation, storage and disposal

Fortnightly Airolam Ltd.

GPCB/ Recognized Env. Agency

Generation of used drums, bags and records of their dispatch to approved vendors.

Maintain Records

Daily Airolam Ltd.

GPCB/ Recognized Env. Agency

Generation of waste oils and their treatment

Maintain Records

Daily Airolam Ltd.

GPCB/ Recognized Env. Agency

Page 203: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

162

5.2 Measures proposed to be taken for the work zone ambient air quality

monitoring as per Gujarat Factories Rules.

Requirements Plan for Compliance

Gujarat Factories Rules want the occupier of the premises to carry out the required monitoring under Section 7A (2) e and Rule – 12B in Form 37 prescribed therein.

As seen from the foregone discussions it is clear that the airborne contaminants and their concentrations including the composition is likely to vary a lot. Hence, portable sampling equipment capable to sample different contaminants shall have to be procured.

Records for Location of operation, contaminant, sampling instrument, concentration of air borne contamination, method of analysis followed, and the number of workers exposed to the process are supposed to be maintained by the occupier.

The Drager make or similar equipment is best fitted for the purpose and will be arranged for with necessary absorbing media tubes for expected contaminants.

Page 204: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

163

CHAPTER 6 ENVIRONMENTAL MANAGEMENT PLAN 6.1 INTRODUCTION

Any industrial development is associated with certain positive impacts as well as some negative impacts on the environment. However, the negative or adverse impacts cannot possibly rule out scientific development. At the same time, adverse impacts cannot be neglected. An Environmental Management Plan has been formulated for mitigation of the adverse impacts and is based on the present environmental conditions and the environmental impact appraisal. This plan helps in formulating, implementing and in monitoring the environmental parameters during and after commissioning of the project.

The Environmental Management Plan describes, in brief, the management's plan for proper and adequate implementation of treatment and control system forair and liquid pollutants and for maintaining the environment. It also includes development of green belts around the Plant, proper safety of the workers, noise control, fire protection systems and measures. This chapter provides mitigation and control measures to attenuate or eliminate environmental impacts, which are likely to be caused by the proposed expansion of project. An Environmental Management Plan (EMP) has been developed to mitigate the potential adverse impacts and to strengthen the beneficial environmental impacts as well as to create positive environmental footprints during the construction and operation phases. The institutional capacity of Airolam Ltd. as the owner & facility developer and the reporting requirement to fully implement the mitigation measures have also been described in this chapter. In addition to that during the operation phase, the company will have an additional responsibility to comply with the statutory requirements as per the guidelines of Central/ State Government.

Page 205: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

164

6.2 The EMP

The Environmental Management Plan (EMP) consists of a set of mitigation, monitoring and institutional measures to be taken during the design, construction and operation (post construction) stages of the project. The plan also includes the actions needed for implementation of these measures. Overall objective of EMP:

• Prevention : Measures aimed at impeding the occurrence of negative

environmental impacts and/or preventing such an occurrence having harmful environmental impacts.

• Preservation : Preventing any future actions that might adversely affect an environmental resource or attribute.

• Minimization : Limiting or reducing the degree, extent, magnitude, or duration of adverse impacts.

The major components of the Environmental Management Plan are: • Mitigation of potentially adverse impacts. • Monitoring during project implementation and operation. • Implementation schedule and environmental cost estimates. • Integration of EMP with project planning, design, construction and operation. The EMP has been designed keeping in view the regulatory and other requirements to ensure the following:

• Minimum disturbance to the native flora and fauna. • Compliance with the air, water, soil and noise quality norms. • Conservation of water to the extent possible. • Encourage the socio-economic development.

Page 206: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

165

6.3 OBJECTIVES OF EMP

The main objectives in formulating this environmental management plan are:

� To treat all the pollutants viz., liquid and gaseous which contribute to the degradation of the environment, with appropriate technology.

� To comply with all regulations stipulated by the Central / State Pollution Control Boards related to air emissions and liquid effluents discharges as per air and water pollution control laws

� To handle hazardous wastes as per the Hazardous Waste (Management and Handling Rules, 1989 of the Environment (Protection) Act, 1986.

� To encourage support and conduct developmental work for the purpose of achieving environmental standards and to improve the methods of environmental management.

� To promote further afforestation in the surrounding areas of the Plant � To create good working conditions (devoid of air and noise pollution) for

employees � To reduce fire and accident hazards. � Perspective budgeting and allocation of funds for environment management

expenditure. � Dissemination of technological solutions on Commercial basis to interested

parties andContinuous Development and search for innovative technologies for a cleaner and better environment.

Page 207: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

166

6.4 BRIEF ENVIRONMENTAL MANAGEMENT PLAN

6.4.1 CONSTRUCTION PHASE :

Adequate and effective environment protection measures will be planned and designed to minimize the impacts due to activities related to preconstruction (preparatory phase) of the project, machinery installation and commissioning stages and end with the induction of manpower and start up. The impacts during the construction phase on the environment will basically be very insignificant as the project construction area is very small. Only foundation for RCC structure will be made. Ready mix Concrete will be used and therefore no possibility of fugitive emission due to material handling. In view of the above, the following measures are recommended to reduce the impact during this period:

• Due provision of necessary infrastructural services like water and power supply

etc., for the construction area. • All possible care will be taken to reduce the noise level due to construction

activity. As planned, no such noise generating machineries will be used. Also, noise prone activities shall be restricted to the extent possible during night particularly during the period 10 PM to 6 AM in order to have minimum environmental impact.

Activity Environmental Impacts

Mitigation Remarks

Construction Phase: Erection of Plant Machineries

• Air • Noise • Socio

Economic

• Well maintained vehicles will be used.

• Metalled Road for Vehicle Movement

• Well maintained equipment will be utilized to prevent noise generation.

• Local labour will be hired for the work so that housing arrangement will be avoided.

Implementation responsibility: Airolam Ltd.

Page 208: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

167

6.4.2 OPERATIONAL PHASE:

As discussed in the Chapter 2 showing pollution controls arrangement, M/s. Airolam Ltd. have planned all the necessary steps to control Water Pollution, Air Pollution, as well as Hazardous Waste Pollution and Noise Pollution. The detailed mitigation measures planned during operation phase of the project are as follows: Activity Environmental

Impacts Mitigation Remarks

Manufacturing of Proposed Expansion of Products

• Air • Land • Water • Noise

• Ensure proper handling of all chemical by introducing spill control procedures.

• Ensure usages of PPE’s by workers.

• Strictly following the appropriate spill control procedures.

• The charging of the hazardous chemical will be done through very carefully.

• MSDS of Raw material & products will be displayed at storage & handling area.

• Water usage will be strictly by putting water meter plant wise.

• Monitored data will be analyzed and reviewed time to time.

• Contaminated solid waste to be sent to approved TSDF Facilities.

• Storage area will be designed in line with the factories department requirement.

Implementation responsibility: Airolam Ltd.

Page 209: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

168

Environmental Management Plan: Operation Phase:

Activity Environmental Impacts

Mitigation Remarks

Operation of Steam Boiler

• Air • Noise • Water

• Ensure proper preventive maintenance of fuel firing system and optimization of air fuel ratio.

• Ensure proper maintenance of machinery to reduce noise level

• Ensure proper disposal of contamination due to spillage clean up.

• Provision of Adequate Stack Height.

• Ensure usage of Personal Protective Equipments.

Implementation responsibility: Airolam Ltd.

Operation of Cooling Tower

• Air • Water • Noise

• Ensure proper maintenance of machinery to reduce noise level

• Blow down is being sent in ETP provided within premises

Page 210: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

169

Environmental Management Plan: Operation Phase

Storage, Handling & Transportation of Raw materials and Products

• Air • Water • Land

• Chemical to be stored in accordance with the rules and regulations of the Safety Department.

• Separate storage area for Solid/Liquid raw materials.

• Install proper facilities to prevent rain/storm water contamination during the storage of solid raw materials.

• Ensure disposal of used drums, bags as per the rules/regulations.

Transportation of all the raw, materials, finishedproducts &hazardous wastes.

• Air • Water • Land

• Work will be given to Trained/Approved Transports for the transportation of the Raw materials/ Products.

• TERMCARD will be followed.

• Ensure availability of MSDS of all the raw materials and finished products to the Off-site Emergency team.

Development and maintenance of green belt

• Air. • Land

Ensure development and maintenance of proper green belt as proposed.

Direct / Indirect Employment

•Socio Economic issue

Continue policy of local employment according to the skill and availability of the manpower

Page 211: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

170

6.5ENVIRONMENTAL MANAGEMENT CELL

Apart from having an EMP, it is also necessary tohave a permanent organizational set up charged withthe task of ensuring its effective implementation. M/s. Airolam Ltd.has created a department for management and implementation of the environmental control measures. Organization chart of M/s. Airolam Ltd., including Environmental Management Cell for the proposed expansion is shown in the Figure No. 6.1.

FIGURE NO. 6.1

ORGANIZATION CHART

Director

Manager � Overall responsibility for production &environmental management and

decision making for all environmental issues

Supervisor (Production) � Overall in charge of operation of production &environmental management

facilities. � Ensuring legal compliance by properly undertaking activities as laid down

by various regulatory agencies from time to timeand interacting with the same.

Asst. Supervisor (Environment) � Secondary responsibility for environmental management and decision

making for all environmental issues and EMS operation. � To carry out periodical medical check-up and maintain health register of

workers. � To carry out regular maintenance of EMS and carry out EMS operations as

per standard procedure and requirements. � To submit daily reports to the Manager for environment, pollution and safety

related activities. � To look after proper control of pollution control system.

Chemist - 06 General

Role of Supervisor: Work as per guideline of Manager and submit daily Report to manager.

Page 212: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

171

Basically, supervisor pollution monitoring will undertakes to monitor the environmental pollution levels by measuring stack emissions, ambient air quality, noise level etc. either departmentally or by appointing external agencies wherever necessary. Constant monitoring of environmental parameters will be exercised to find out any deterioration in environmental quality. In case the monitored results of environmental pollution are found to exceed the allowable values, the General ManagerPollution monitoring will suggest remedial action and get these suggestions implemented through the concerned plant authorities. The actual operation and maintenance of pollution control equipment of each unit will be under the respective Engineers.

6.6 HEALTH AND SAFETY

Following measures will be adopted in the plant: • Inspection and maintenance of pollution control systems regularly. • All safety measures such as safety appliances, training, safety awards,

posters, slogans related to safety. • The workers exposed to noisy sources will be provided with ear muffs/plugs. • Adequate facilities for drinking water and sufficient numbers of toilets will be

provided to the employees. • Fire proof aprons and necessary personnel protective appliances and

equipment will be provided to the concerned personnel.

Page 213: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

172

6.7 OCCUPATIONAL HEALTH HAZARDS To prevent any spillage, accident and impacts of human health for safety measure will be taken while handling the raw material and products:

Occupational control measures for health hazard to the worker and to keep the risk of accidents to a minimum from our manufacturing activities.

Mitigatory measures: For the expansion project, company will make following arrangement within the factory premises for the different hazards:

Storage & Handling of Hazardous Chemicals:

• Company will do planning to stock all the necessary material as minimum as possible.

• All containers with hazardous chemicals have labels indicating the contents and warning of the hazard.

• Necessary information on safe handling and f irst aid measures and antidotes of major hazardous material wil l be available on the label.

• Workers dealing with hazardous chemicals wil l be trained on health r isks and safe handling.

• Exposure to hazardous chemicals will be minimized. • Liquid Hazardous chemicals wil l be transferred in closed piping

system. • Separate storage sect ion wil l be provided for storage of

hazardous and non-hazardous raw materials.

Vessel and other Equipment related: • Checking of process vessels and equipment is carried out

regularly. • Records related to maintenance and its planning schedule is

maintained.

Fire related • Overhead water storage tank with adequate capacity is provided

to ensure 24 hr. supply. • Fire water tank with suff icient capaci ty of 10 KL is provided with

f ire pump (02 Nos.) • Fire hydrant piping is provided. • Sprinkler system wil l be provided over hazardous area. • Fire extinguisher is provided for existing production capacity and

more required qty. W ill be provided for expansion quantity. Contact numbers of nearest f ire agency is provided.

Page 214: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

173

Electrical related • All electrical f i tt ing and motors in the storage areas are

f lameproof. • Checking of al l earthings, wiring & connect ion are carr ied out

regularly. • Proper earthing is provided at al l equipments and wil l be

provided for addit ional equipment. • Adequate Nos. of earth pits is provided.

Safety related • Adequate types of personal protect ive equipment wil l be

provided and also safety training wil l be provided to workers. • Emergency showers and eye wash stat ions is available at the

worksite. • Arrangement for 24 hr. medical faci l it ies by contact with nearest

health care centre/ hospital. • Pre-employment medical check-up and annual medical check up

is carried out and its records is maintained properly.

Page 215: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

174

TREATINGWORKMENAFFECTEDBYACCIDENTALPHENOLCONTACT:

HazardswithExposure • Very hazardous in case of Skin contact as its corrosive, irritant to skin, also

its skin sensitizer, permeator. Skin contact can produce inflammation or blistering. Skin inflammation is characterized by itching, scaling, reddening, or, occasionally, blistering.

• Eye contact can result on corneal damage or blindness. Inflammation of the eye is characterized by redness, watering, and itching.

• Inhalation of dust will produce irritation to gastro-intestinal or respiratory tract, characterized by burning, sneezing and coughing. Severe over-exposure can produce lung damage, choking, unconsciousness or death.

Special SafetyPrecautions

• Phenolshould beusedwithadequate ventilation tominimize inhalation.

• Keep refrigerated, store below 40 �C. • Keep container dry. Keep away from heat. Keep away from sources of

ignition. Keep away from direct sunlight or strongincandescent light. Keep away from incompatibles.

• Use process enclosures. • Ground all containing equipments. • Do not ingest. Do not breathe dust. • Never add water to this product. • Keep container in a cool, well-ventilated area. Keep container tightly closed

and sealed until ready for use. • Preventcontact with skinbywearinggloves,full suitandboots. • Wearsplash goggles orafaceshieldifsplashingmayoccur. • Keep vapor respirator as well as self-contained breathing apparatus ready

for emergencies.

First-aid measures: • Inhalation: If inhaled, remove to fresh air. If not breathing, give artificial

respiration. If breathing is difficult, give oxygen. Get medical attention immediately. In case of Serious Inhalation; Evacuate the victim to a safe area as soon as possible. Loosen tight clothing such as a collar, tie, belt or waistband. If breathing is difficult, administer oxygen. If the victim is not breathing, perform mouth-to-mouth resuscitation. WARNING: It may be hazardous to the person providing aid to give mouth-to-mouth resuscitation when the inhaled material is toxic, infectious or corrosive. Seek immediate medical attention.

• Skin contact: Flush skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes. Cover the irritated skin with an emollient. Cold water may be used. Wash clothing before reuse. Thoroughly clean shoes before reuse. Get medical attention immediately. In case of serious skin contact; Wash with a disinfectant soap and cover the

Page 216: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

175

contaminated skin with an anti-bacterial cream. Seek immediate medical attention.

• Eye contact: Check for and remove any contact lenses. Immediately flush

eyes with plenty of water for at least 15 minutes. Cold water may be used. Get medical attention.

• Ingestion: Do NOT induce vomiting unless directed to do so by medical personnel. Never give anything by mouth to an unconsciousperson. If large quantities of this material are swallowed, call a physician immediately. Loosen tight clothing such as a collar, tie, belt or waistband.

Antidotes forPhenol

• Activated Charcoal and 240 ml of milk • Polyethylene Glycol for skin

Page 217: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

176

TREATINGWORKMENAFFECTEDBYACCIDENTALMETHANOLCONTACT:

Hazards with Exposure

• Hazardous in case of Skin contact as its irritant to skin. It is skin sensitizer and permeator.

• Eye contact can cause irritation. It is toxic to eyes. • Inhalation and • Inhalation is hazardous too. • It is toxic to blood, kidney, liver, brain, peripheral nervous system, upper

respiratory tract, skin, central nervous system (CNS), optic nerve. Repeated pro longed exposure can result in general deterioration of health and also contact organ damage.

• Severe over exposure can result in death.

Special SafetyPrecautions

• Methanol should beusedwithadequate ventilation tominimize inhalation.

• Keep container dry. Keep away from heat. Keep away from sources of ignition. Keep away from direct sunlight or strong incandescent light. Keep away from incompatibles.

• Store in segregated and approved area. • Ground all containing equipments. • Do not ingest. Do not breathe dust. • Keep container in a cool, well-ventilated area. Keep container tightly closed

and sealed until ready for use. • Avoid contact with skin and eyes. • Preventcontact with skinbywearinggloves, full suit andboots. • Wear splash goggles orafaceshield, lab coat, gloves as personal protection. • Keep vapor respirator as well as self-contained breathing apparatus ready

for emergencies.

First-aid measures: • Inhalation: If inhaled, remove to fresh air. If not breathing, give artificial

respiration. If breathing is difficult, give oxygen. Get medical attention immediately. In case of Serious Inhalation; evacuate the victim to a safe area as soon as possible. Loosen tight clothing such as a collar, tie, belt or waistband. If breathing is difficult, administer oxygen. If the victim is not breathing, perform mouth-to-mouth resuscitation. WARNING: It may be hazardous to the person providing aid to give mouth-to-mouth resuscitation when the inhaled material is toxic, infectious or corrosive. Seek immediate medical attention.

• Skin contact: Flush skin with plenty of water for at least 15 minutes while removing contaminated clothing and shoes. Cover the irritated skin with an emollient. Cold water may be used. Wash clothing before reuse. Thoroughly

Page 218: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

177

clean shoes before reuse. Get medical attention immediately. In case of serious skin contact; Wash with a disinfectant soap and cover the contaminated skin with an anti-bacterial cream. Seek immediate medical attention.

• Eye contact: Check for and remove any contact lenses. Immediately flush eyes with plenty of water for at least 15 minutes. Cold water may be used. Get medical attention.

• Ingestion: If swallowed,Do NOT induce vomiting unless directed to do so by medical personnel. Never give anything by mouth to an unconscious person. Loosen tight clothing such as a collar, tie, belt or waistband. Get medical attention immediately.

Antidotes forMethanol

• Ethanol (30% solution through oral, 5% solution through injection), • Polyethylene Glycol for skin • If Acidosis than Sodium bicarbonate • If effect of delirium than give 10mg diazepam through injection

DETAILSOFOCCUPATIONALHEALTHPROGRAMME:

• Workercanbedirectlyorindirectlyexposedbychemicallike Phenol, Formaldehyde, Caustic, Methanol, etc. during process or material handling.

• TLVofchemical like Phenol: 19 mg/m3 TWA, Formaldehyde: 1.5 mg/m3, Caustic: 2 mg/m3, Methanol: 260mg/m3, etc.

Page 219: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

178

COMAPANYHAVETAKENFOLLOWINGACTIONTOKEEPCHEMICALSWITH INPEL/TLV:

• Process shouldbecarriedout in isolatedarea or closed system. • Dilution ventilation/local exhaust ventilation systemshouldbe provided. • Chemicalhandledbycompetentperson. • MSDS of hazardoussubstancemust bemaintained by company. • Quantity of substanceshouldkepttoabsoluteminimize. • Flame proofelectric fittingshouldbe provided. • Safety devices like temp.Controlandpressurecontrolmustbe provided

tovessel. • Labeling andsignboardshould beprovided. • Firefighting,sprinklingsystemandemergency exitshould beprovided. • PPE must beusedduring handlingofchemicals.

EVALUATION OFEXPOSUREOFCHEMICALDURINGREPLACEMENTANDPERIODICALMEDICALMONITORING.

• Emergency/exposureexaminationandtestshouldbecarriedout.Examinationi

sbasedon irritation, sensitization of skin,respiratorysystem, eye,shortness ofbreath

• Test must becarried out asperhandlingofchemicals asperOSHAguideline. • Check the previous medicalopinionofworker/employee as well as history.

LIVERFUNCTIONTESTS(LFT)DURINGPRE-PLACEMENTANDPERIOD ICAL EXAMINATION:

Therearesomany testscoveredin LFT. They are asbelow withtheirnormalvalues.

AST(aspartateminotransferase):5-40 IU/L ALT(alaninieaminotransferase):5-35 IU/L ALP(alkalinephosphatase):30-85ImU/ml GGT(gamma-glutamylanspepdiase):5-27U/L Total Serum:6-8g/dl Protein: 3.2 – 4.5 gm/dl Albumin:0.1 -1.0mg/dl

Interpretation and follow up of the test isvaryingwithclinicalcontext and results. If thereare minor abnormalities inthe test, therepetitionsof the test mayconduct after1weekof test result. If test valuesarewithintherange,therepetitionsofthetestmayconductaftertheoneyearofthetest result.Iftherearechronicabnormalitiesseenintheresults,therepetitionsofthetestmay conduct twiceinaweek andalsoconsultwith the doctors.

Page 220: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

179

DETAILSOFOCCUPATIONALHEALTHSURVEILANCEPROGRAMME: Aim:

• Workplaceinjuries, illnesscan bepreventedand hazardshould be identified. • Evaluations of accident analysis due to unsafe

actandconditionaswellasidentifiedthehealth and safety problems in workplace.

• Effective Preventive measures strategies can be prepared. • New technologies, educational activities, public awareness

andregulatoryand policy changes can be achieved.

TheoverallmissionoftheOccupationalHealthSurveillanceProgramistopromotethehealth, safetyandquality of life ofworkingpeople will be achieved:

Surveillanceprogram canbe improvedbyfollowingaction .

• Pre-placement examination andperiodic examinationmustbecarried out atWorkplace.

• Maintain thework profile andmedicalhistory of employee/workers. • Pulmonary function test must be carriedout in case handlingofhazardous

chemicals. • Written medicalopinionmust be maintainedbyindustry. • Examinationmustbe certify by qualifiedmedical practitioners

6.8 GREEN BELT DEVELOPMENT AND AFFORESTATION

Tree plantation is one of the effective remedial measures whichcontrol the Air Pollution. It also causes aesthetic and climatologically improvements of an area as well as sustains and supports the biosphere.

It is a well-established fact that trees and vegetation act as a vast natural sink for the gaseous as well as particulate air pollutants due to enormous surface areaof leaves. Plantation around the air pollution sources controls the air pollution by filtering particulatematter and interacting with gaseous pollutants before it reaches the earth. Tree plantation also acts as buffers and absorbers against accidental release of pollutants.

Page 221: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

180

6.9 SELECTION OF TREES

The choice of trees species, suitable for plantation at the Industry Site, hasbeen governed by the following guiding factors:

1. As per guidelines issued by Ministry of Environment & Forests for greenbelt

development. 2. As per the study carried out by ourFAE in Ecological & Biodiversity. 3. The tree must be tolerant to all the pollutants present in the area.

The tree should be able to grow and thrive on soil of the areas, be evergreen, in habitat, having minimum of leaf fall.

4. The tree must be tall in peripheral curtain plantation and with large and spreading canopy in the primary and secondary attenuation zones.

5. The tree should possess extensive foliar area to provide maximum impinge surface for continued efficient adsorption and absorption of pollutants.

6. The tree should be fast growing and indigenous. 7. The tree should maintainecological, land and hydrological balance of the

region. The total plot area is 28,689.46 Sq. meter. The existing area will be used for Installation of plant machineries, storage of raw material and Products, plantation and others. Companyshall develop an effective green belt within the factory and on periphery of the factory. In addition to this, majority of the vacant land shall be planted with trees, shrubs and grasses. The program will consists of following elements:

• Maintenance of greenbelt and vegetative zones within the plant where

possible. • Plantation of trees and vegetation around the plant. • Maintenance of greenbelt around plant. • Maintenance of greenbelt both side nearby roads. • To provide tree guards to local villagers. • Unit will develop 50 trees for 1st year, 50 trees for 2nd year, and 50 trees for

3rdyear in our premises as well as in the open space of Dalpur Village. The company will also develop plantation as per the MoEF guidelines all along the periphery of plant so that these trees perform as natural barrier and bring down the fugitive emission and stop carryover of dust along with wind current.The company will also develop plantation as per the MoEF guidelines all along the periphery of plant so that these trees perform as natural barrier and bring down the fugitive emission and stop carryover of dust along with wind current. . Budgetary expenditure for the greenbelt development has been depicted in the Table No. 6.1

Page 222: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

181

TABLE 6.1

BUDGETARY EXPENDITURE FOR GBD

Sr. No. Parameter Amount in Rs.

1 Site Development 100000.00

2 Plants/ Seeds 25000.00

3 Plant Care & Reg. 100000.00

TOTAL 225000.00

Page 223: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

182

6.10 EXPENDITURE ON ENVIRONMENTAL MATTERS

The Table No. 6.2 table gives the expenditure to be incurred by Airolam Ltd. onenvironmental matters.

Table No.6.2

Expenditure on Environmental Matters Sr. No

System Approximate recurring cost per annum

(in Lacs)

Approximate capital cost (Rs. In Lacs)

Basis for cost Estimates

1 Air pollution Control

5.0 1.5 The recurring Cost would Include Cost of Operating Multi Cyclone Dust Collector and its maintenance work includes cost of monitoring of air environment.

2 Water Pollution Control

5.0 1.5 Capital cost would include cost for ETP( cost civil work, mechanical work , Electrical work and piping work) Recurring cost would include cost for Operation phase.

3 Noise pollution Monitoring

0.10 0 The recurring cost would include cost of noise monitoring.

4 Solid and hazardous Waste management

0.25 1.0 Capital cost would include cost of providing storage space for hazardous waste and membership of TSDF Fee. Recurring cost would include cost of land filling and transportation.

5 Environment monitoring and management

1.0 0 The recurring cost would be incurred on Hiring of consultants and payment of various statutory fees to regulatory agencies.

6 Green belt 1.0 2.0 ---

Total 12.35 6.0

Page 224: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

183

6.11 CONCEPT OF WASTE MINIMIZATION, RECYCLE / REUSE / RECOVER TECHNIQUES, ENERGY CONSERVATION AND NATURAL RESOURC ES CONSERVATION.

WASTE MINIMIZATION, RECYCLE / REUSE / RECOVER TECHN IQUES:

� Unit shallto do moping in their unit instead of washing of water. � Unit should try to minimize the excess raw material in batch, so it will reduces the

unreacted raw material in effluent generation. Ultimately, it will reduce the concentration of effluent.

� We shall provide fix pipeline in their unit to minimize the leakages. ENERGY CONSERVATION: Energy Conservation and Energy Efficiency are separate, but related concepts. Energy conservation is achieved when growth of energy consumption is reduced, measured in physical terms. Energy Conservation can, therefore, be the result of several processes or developments, such as productivity increase or technological progress. On the other hand Energy efficiency is achieved when energy intensity in a specific product, process or area of production or consumption is reduced without affecting output, consumption or comfort levels. Promotion of energy efficiency will contribute to energy conservation and is therefore an integral part of energy conservation promotional policies. Energy efficiency is often viewed as a resource option like coal, oil or natural gas. It provides additional economic value by preserving the resource base and reducing pollution. For example, replacing traditional light bulbs with Compact Fluorescent Lamps (CFLs) means you will use only 1/4th of the energy to light a room. Pollution levels also reduce by the same amount nature sets some basic limits on how efficiently energy can be used, but in most cases our products and manufacturing processes are still a long way from operating at this theoretical limit. Very simply, energy efficiency means using less energy to perform the same function.

� Inadequate control of steam supply wastes energy. So, we will investigate the possibility of installing automatic controls.

� Monitoring drying operations enables energy consumption to be assessed and possibly reduced. Monitor parameters by us

� Heat losses from dryers by radiation and convection will be minimized. And we will improve the insulation of dryers to save energy costs.

� Routine cleaning and maintenance programme for the combustion system will improve efficiency and reduce energy costs.

� Investigate the possibility of changing any upstream processes in order to decrease the water content before drying operations. Relatively minor modifications of upstream operating procedures may significantly reduce energy costs.

� We will check, if it is possible to use heat recovered from the dryer exhausts in the drying process.

Page 225: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

184

Waste Heat Recovery System Understanding the process is essential for development of Waste Heat Recovery system. This can be accomplished by reviewing the process flow sheets, layout diagrams, piping isometrics, electrical and instrumentation cable ducting etc. Detail review of these documents will help us in identifying: a) Sources and uses of waste heat b) Upset conditions occurring in the plant due to heat recovery c) Availability of space d) Any other constraint, such as dew point occurring in an equipments etc. After identifying source of waste heat and the possible use of it, our next step is to select suitable heat recovery system and equipments to recover and utilize the same. Economic Evaluation of Waste Heat Recovery System It is necessary to evaluate the selected waste heat recovery system for our unit on the basis of financial analysis such as investment, depreciation, payback period, rate of return etc. In addition the advice of experienced consultants and suppliers must be obtained for rational decision. Natural Resources Conservation: Renewable energy is energy obtained from sources that are essentially inexhaustible. Examples of renewable resources include wind power, solar power, geothermal energy, tidal power and hydroelectric power. The most important feature of renewable energy is that it can be harnessed without the release of harmful pollutants. Non-renewable energy is the conventional fossil fuels such as coal, oil and gas, which are likely to deplete with time.

Page 226: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

185

6.12 CHECKLIST IN THE FORM OF DO’S AND DON’T. The checklist in the form of Do’s and don’t of preventive maintenance, strengthening of HSE, manufacturing utility staff for safety related measures are as follows. DO’S

1) Check the raw material availability as per the job on hand required for all stages. 2) Check the vessels expected to be used in the process for good physical condition. 3) Check the availability of utilities required till the end of the batch / job. 4) Check for proper manpower available till the entire operation in over. 5) All equipments including the stand-by should be in operable condition. 6) Verify the test certificates of materials being taken for process. 7) Prepare time schedule of material flow on basis of the process. 8) Monitor the temperature and pressure wherever possible during the process. 9) Use pumps for transferring the liquids to the reactor tank. 10) Familiarize the worker about what is the job on hand. 11) Ensure the worker / operator is having sufficient knowledge of the materials

handled. 12) Ensure proper display of visual instructions for characteristics of the chemicals. 13) Ensure proper training of personnel. 14) Ensure sufficient numbers of safety devices are available. 15) In view of the chemicals handled, whether required or not, please ensure availability

of SCBA apparatus near every use and storage area of chemical. 16) Ensure the workers wear proper PPE of adequate grade. 17) Demarcation of the chemical storage area for chemical in test. 18) Ensure removal of used containers from workspaces. 19) Prepare and follow the safe work instruction. 20) Record every incident that led to an accident irrespective of the seriousness of the

accident and analyze the same to improvise the system continuously. 21) Always check the fire water tank to be filled up to the brim to ensure availability of

fire water in sufficient quantity at all times. The design of other water to be used shall be from the overflow of the fire water tank to ensure this system.

22) Never work bare foot or without safety shoes. 23) Never use mobile phones in work zones. 24) In case of any confusion try to acquire correct information before any action. 25) Use only proper grade PPEs and use them properly. 26) Before disconnecting any electrical installation, neutralize the static charge in a safe

manner. 27) Open or use containers only on written instruction. 28) Verify the label with the instruction before use. 29) Maintain your attendance at the time-office. 30) Participate wholeheartedly in all safety related exercises an keep yourself updated.

Page 227: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

186

Don’ts: 1) Don’t use the raw material without checking as per the job on hand required for

all stages. 2) Don’t use the vessels expected to be used in the process without checking. 3) Don’t fail to check the availability of utilities required till the end of the batch / job 4) Don’t work without enough and proper man power. 5) Don’t use the equipments which are not in operable condition. 6) Don’t use the materials for process without verify the test certificates. 7) Don’t use the material without Prepare time schedule of material flow on basis of

the process. 8) Don’t perform without Monitoring the temperature and pressure during process. 9) Don’t handle chemicals with open hands where manual handling is a must. 10) Don’t keep the workers under wraps about what is the job on hand. 11) Don’t let the worker / operator do the work having lack of sufficient knowledge of

the materials handled. 12) Don’t use the chemical with unknown characteristics or having unreadable label. 13) Don’t let the personnel do the work without giving proper training. 14) Don’t work without sufficient numbers of safety devices. 15) In view of the chemicals handled, whether required or not, don’t work without

ensuring availability of SCBA apparatus near every use and storage area of chemical.

16) Don’t let the workers do work without wearing proper PPE of adequate grade. 17) Don’t use material that is under testing for production. 18) Don’t store used containers at workspaces. 19) Don’t breach the safe work instruction. 20) Don’t try to conceal information regarding missed accidents or small injuries.

Remember every and any mishap can be fatal if not for yourself for others. 21) After any shutdown never start operation without having ensured the fire water

tank filled up. 22) Don’t work bare foot or without safety shoes. 23) Don’t use mobile phones in work zones. 24) Never undertake any operation without work permit. 25) Do not use PPEs which are not relevant to the operational aspect that has been

identified. 26) Never remove any electrical equipment without neutralization of static charge

after written permission only. 27) Don’t open or use containers on which instruction are not written. 28) Don’t work without Verifying the label with the instruction before use. 29) Don’t enter the workplace without registering your attendance. 30) Don’t ever even thinking of evading safety instructions.

Page 228: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

187

6.13SOCIO ECONOMIC DEVELOPMENT ACTIVITY:

Unit has done various kinds of socio economic development activities including community welfare programme. At present unit is doing following socio Economic Development Activities.

1. All the Directors are becoming helpful to various trusts in Sabarkantha as well as outside Sabarkantha.

2. They are interested to donate in schools, hospitals and where ever actual needed.

Page 229: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

188

CHAPTER-7

ADDITIONAL STUDIES

7.1 PUBLIC CONSULTATION As per the EIA notif icat ion 2006 and its subsequent amendments, “Public Consultation” refers to the process by which the concerns of local affected persons and others who have plausible stake in the environmental impacts of the project or activity are ascertained with a view to taking into account all the material concerns in the project or act iv ity design as appropriate. All Category ‘A’ and Category B1 projects or activit ies shall undertake Public Consultation, except the following:-

(a) Modernizat ion of irr igation projects (i tem 1(c) ( i i) of the Schedule). (b) All projects or activit ies located within industr ial estates or parks

(i tem 7(c) of the Schedule) approved by the concerned authorit ies, and which are not disal lowed in such approvals.

(c) Expansion of Roads and Highways (item 7 (f) of the Schedule), which

do not involve any further acquisit ion of land. (d) All Building / Construction projects / Area Development projects. (e) Al l Category ‘B2’ projects and act iv it ies. (f) Al l projects or activit ies concerning nat ional defense and security or

involving other strategic considerations as determined by the Central Government. M/s. Airolam Ltd. is not located in notif ied GIDC Estate. So, proposed expansion Project is fal l under category A and act ivity 5 (f). So, as per notif ication, Public Consultat ion is required for proposed expansion project.

Page 230: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

189

7.2 RISK ASSESSMENT

Risk assessment may be broadly categorized as under: Design and Pre-modification review : Improper layout l ike locat ion of plant in downwind side of tank farm, f ire station near process area, process area very close to publ ic road and wrong material of selection can cause severe damages to the work and outside environment. Chemical Risk Assessment: I t is being assessed for chemicals from the point of view of compatibil ity, storage, f ire protection, toxicity, hazard index rat ing, f ire and explosion hazards. Process Safety Management: Before effecting major process changes, lack of Management of Change procedure (MOC) like rel iabi lity assessment of process equipment, incorporat ing safety t ips and interlocks, scrubbing system, etc. Electrical Safety: Ignorance of hazardous area classif icat ion, protection against static electricity, improper maintenance of special ized equipment like f lameproof etc. Safety Audits: Lack of Periodical assessment of safety procedures and pract ices, performance of safety systems and implementation of the same along with follow up measures. Emergency Planning: Lack of comprehensive risk analysis indicating the impact of consequences and specif ic writ ten down and pract iced emergency procedures along with suitable faci l it ies had increased the severi ty of the emergency situations. Training: Lack of safety induction and periodical refresher training for the regular employees and contract workmen.

Page 231: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

190

Risk Management & Insurance Planning: Lack of ident if ication and analysis of all r isks and insurance planning so that interrupt ion risks and public l iabil ity risks could also be managed effectively.

To assess f ire r isk assessment in the industr ial unit following steps shall be considered and measures shal l be taken.

FIRE RISK ASSESSMENT o Ident if ication & assessment of f ire r isks during operat ions in receipt,

storage, transfer and handling of chemicals (raw materials and f inished products).

o Ident if ication & control of igni t ion sources in areas where f lammable chemicals wil l be stored/handled/transferred.

o Review of chemical compatibi l i ty in storage areas and to suggest appropriate f ire loss control measures.

o Review of f ire detect ion measures adopted in the plant & to suggest suitable improvement measures.

o Review of the various act ive (f ire hydrant, sprinkler, portable f ire ext inguishers) and passive f ire protect ion requirements for chemical storage and handling areas and to suggest improvements as necessary.

o Review of contractor safety awareness (chemical spi l l , f ire f ight ing, emergency communication, knowledge of plant hazards & safety regulat ions) and to recommend suitable improvement measures to enhance contractor safety.

o Review of safety awareness and safety training requirements (training identif ication and eff icacy) of plant employees with respect to hazards present in the plant.

RISK ANALYSIS & EMERGENCY PLAN o Ident if ication of scenarios of potent ial disasters/emergencies leading to

loss of l ife, property damage etc. and qualitat ive assessment of their l ikel ihood.

o Recommendations for risk control measures wherever applicable. o Preparat ion of onsite emergency preparedness plan.

RISK MANAGEMENT & INSURANCE PLANNING • Ident if ication of al l major internal and external pure risks including the

natural r isks and analysis of the impact of above risks. • Scrutiny of all exist ing major insurance polic ies in respect of:

1. Rationalization of basic rate of premium and widening of covers. 2. Appl icabil i ty/el igibi l ity of discounts in premium. 3. Appl icat ion of suitable clauses, warranties and condit ions.

• Ident if ication of possible areas for refund of premium and suggestions regarding procedure for the same.

Page 232: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

191

• Select ion of insurance coverage on the basis of risk analysis. • Evaluation of business interruption exposure due to ident if ied risks. • Providing guidel ines on documentat ion requirements, procedures for

claims under various policies, evaluat ion of insurers. • Risk Assessment including prediction of the worst case scenario and maximum

credible accident scenario should be carried out. The worst case scenario has been taken into account the maximum inventory of storage at site at any point in time. The risk contours should be plotted on the map clearly showing which of the facilities and surrounding units would be affected in case of an accident taking place.

• The Risk Assessment report is enclosed herewith. Please Refer Enclosure : 02

DISASTER MANAGEMENT PLAN OF THE INDUSTRY Risk leads to disasters & disasters have great impact on the prof itability, stabil i ty & reputat ion of an industry. Disaster occurs when a hazard or a threat rises in vulnerable condit ion and the trend ref lects an increase in both. To uphold righteous image of an organization, Disaster Management is of prime importance. For tackling the major consequences inside the port and in the vic inity of port DMP has to be formulated and this planned emergency document is cal led ‘DISASTER MANAGEMENT PLAN’. Indian industry of late has begun to be aware of the necessity to apply more systematic approaches to safety part icular ly in plant design. Primari ly, safety in the design of plant extends to the applicat ion of various codes of pract ice or design codes, which are based on the wide experience and knowledge of professional experts and specialists in the industry. Such applicat ion is backed by the experience of local plant managers and engineers who have been involved in simi lar plants and who have direct experience in their operation over a number of years. The main objective of evolving this emergency and disaster control plan is to create a procedure and infrastructure based on combined resources of the factory and the outside services with a view to minimize emergencies and disaster. This may arise as a result of usage, handling and storage of certain toxic, corrosive, inf lammable and explosive materials used in the manufacturing process and any other emergencies which may direct ly or indirect ly affect the employees, property and local community.

Page 233: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

192

Objectives are further classified as under: • Rescue operation and treatment of persons affected by the emergency. • Safeguard of other persons not affected by the emergency. • Keep the damage to property and environment at a minimum level. • Init ially contain the impact of incident and ult imately bring the incident

under control. • Provide authentic information to outsiders and media. • Rehabil itat ion of affected person. • Preservat ion of relevant records. • Inquiry into the cause of emergency situat ions and then analysis to

prevent recurrence. PURPOSE OF PLAN: • To save lives and injur ies, • To prevent or reduce property losses, • For protection of environment, • For protection of instal lation & restoration of production, • To provide help for quick continuat ion of normal situat ion or operat ion. More specif ically the elements that will form the backbone of the emergency preparedness organization are: o Availabil ity organizat ion and ut i l izat ion of resources for facil ity

emergencies. o Accident evaluation procedures. o The command, coordinat ion and responsible organization structure. o Notif icat ion and communicat ion mechanism. o Training exercises and plans maintenance. Emergencies and disasters can happen at any moment - and, they usually occur without warning. When an emergency strikes, immediate safety and prompt recovery are depends on the exist ing levels of preparedness among workers and management. Emergency incidents that may occur, including • Earthquakes • Fires or Explosions • Hazardous Materials Releases • Extended Power or Uti l i ty Outages • Floods • Mass Casualty Events As discussed in earl ier chapters, emergencies are classif ied as minor or major, according to their severity and potential impact. The Disaster management of any f i rm mainly covers steps l ike PREPAREDNESS, RESPONSE and RECOVERY

Page 234: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

193

PREPAREDNESS is a f irst step to assemble appropriate human and physical resources before any emergency occurs, So the industry shal l have a designated an “Emergency Coordinator” with the management experience and f inancial authority to deal with the Disaster plan. The person shall arrange related staff safety educat ion and training; Purchase department emergency supplies and equipment and give quick response on occurrence of any emergency- disaster. The company wil l have the fol lowing essentials in an accessible location: • First aid supplies, with instructions • Flashlights/batteries, approved power str ips and extension cords,

emergency power supply • Portable AM/FM radios/batteries • Laboratory spi l l kits • Portable emergency water supply • Eyeglasses, medicat ions and personnel protective measures • Personal’s emergency contact numbers. The company wil l be in direct contact with the offsite Disaster plan of District Disaster Management authori ty. The important telephone numbers including Protective Services i.e Fire stat ion, Hospital, Police department, factory inspector etc. shall be made readily available and in updated forms. A brief onsite emergency plan shal l be readily available to al l.

FIRE PREVENTION The fire accident may take place because of the electrical spark or static electricity. All the precautionary measures will be taken by the industry to prevent fire in any part of the plant as per the followings: • The company will identify the sources of accidents. • Adequate fire extinguishers is provided and additional will be provided as

per requirement. • Mechanical rooms or utility rooms will not be used for storage. • All the chemicals will be stored with recommendation storage and handling

practice. • Storage and process area will be posted with “No Smoking” signs. • All the Personnel Protective equipment will be easily available to all the

workers. • The company will provide firewater reservoir, fixed water monitors/foam

monitor, foam trolley, sand bucket, eye wash shower, flame arrester and fire extinguisher to prevent from any causalities.

LABORATORY SAFETY & PREPAREDNESS The company will maintain clean work environment; post laboratory safety work rules, train all personnel; carry out inventory and label chemicals; not purchasing excess

Page 235: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

194

quantities of chemicals; segregates incompatible chemicals; keeps flammables in flammable storage cabinets with copies of Material Safety Data Sheets; installs seismic restraints on chemical storage tanks and reactors and disposed off chemical waste properly. In case of occurrence of disaster, the company gives training to all workers and personnel to react as under: MINOR release in the laboratory. • Follow laboratory eyewash, rinse or shower procedures • Flush affected area continuously for 15 minutes • Vacate persons in immediate area if necessary • Clean spill • Wear protective equipment • Use appropriate kit to contain, neutralize and absorb • Collect, containerize, and label waste MAJOR release in the industry and vicinity area • Report factory name, location, phone number, the material spilled, possible

injuries to concerned department for emergency help and measures. • Assist injured persons. • Isolate contaminated persons and area. • Avoid contamination or chemical exposure further. • Close doors or control access to spill site MATERIAL SAFETY DATA SHEETS As part of quality for Hazard Communication Standard, all company is required to have Material Safety Data Sheets (MSDS) available to al l employees working with hazardous chemicals. The concept is “that employees have both a need and a right to know the hazards and ident it ies of the chemicals they are exposed to when working. They also need to know what protect ive measures are available to prevent adverse effects from occurr ing.” Information that can be found in a MSDS includes: • The ident ity of the chemical substance • Physical and chemical characteristics • Physical and health hazards • Primary routes of entry • Permissible Exposure Limits (PELs) • Carcinogenic status

Page 236: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

195

• Precautions for safe handling and use ( including personal protect ive equipment)

• Spil l response • Emergency and f irst aid procedures • Date of the MSDS • Although not required, it is highly recommended for the company to

maintain a f i le of MSDS sheets for al l of the chemicals used in lab/work area. A central f i le is maintained at the off ice.

7.3 SOCIAL IMPACT ASSESSMENT

Operational phase of the expansion in exist ing unit cover the ent ire l i fe span of the project. The proposed expansion project wil l generate direct employment for local persons. The indirect employment wil l also be generated by way of transportat ion, shopkeepers and other casual employment for many people.

Local people wil l be given training and preference for almost al l the jobs in the plant, direct as well as indirect. Economic status of the local people wil l be improved due to the increased business opportunit ies, thereby, making a posit ive impact. Educational, medical and housing faci lit ies in the study area wil l considerably improve.

Thus, the proposed expansion project wil l have long term-irreversible posit ive impact on the employment pattern of the study area.

Page 237: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. at

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat..

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

196

CHAPTER - 8

PROJECT BENIFITS

Due to the expansion in existing project, 20 nos. of local peoples and outside peoples will get employment during the construction phase and additional 22 peoples will be employed during the operation phase. Local people will be given preference for almost all the jobs in the Plant, direct as well as indirect. Economic status of the local people will be improved due to the increased business opportunities, thereby, making a positive impact. Educational, medical and housing facilities in the study area will considerably improve. Therefore, social infrastructure of the study area will be improved. The company will also do following developmental activities in the area: The proposed Project does not involve any displacement of villages; however it will lead to development of the region and increase in infrastructure facility. During the operation phases of the project a work force will be needed which will include both skilled and unskilled people. Due to the proposed project direct employment for local employees will be generated. Existing ancillary as well as auxiliary industries would be benefited by way of getting additional work. In addition to direct employment, indirect employment will generate ancillary business to some extent for the local population. Due to the proposed Project, facilities are likely to grow with the development. There is a positive effect due to improved communication and health services, which have lead to economic prosperity, better educational opportunities and access to better health and family welfare facilities. There will be beneficial effect on human settlement due to employment opportunities from the industry. Local quality of life will be improved. This factor combined with all other mitigation measures like proper treatment and disposal of wastewater, hazardous waste and gaseous emission has minimized the adverse impact on ecology and had a beneficial impact on human settlement and employment opportunities. There has been a beneficial impact on the local socio-economic environment. The increasing industrial activity will boost the commercial and economical status of the locality up to some extent.

Page 238: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of

Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

197

CHAPTER 9

SUMMARY OF ENV. IMPACTS & CONCLUSION The environmental impacts of projects or actions generally encompass a broad range of impact from Air and Noise pollution to affect on employment and neighborhood as well as on social structure. All of these impacts vary in magnitude as well as in their beneficial or adverse classification. As a result, a natural question arises as to what is the “collective” or “overall” environmental impact of the project or action taken. Is the project beneficial or is it adverse? To answer such a question requires a comparison of these impacts and to some extent subjective evaluation of those impacts which are more important than others. Environment Impact Assessment as detailed in previous chapter can now be concise to impact statement given below.

9.1 AIR ENVIRONMENT

Meteorological data collected during the study period confirms that climatic Status of the study area is consistent with the regional meteorology. Average concentration of ambient air quality parameters such as PM10, PM 2.5, SO2 and NOx in the surrounding study area are well within the permissible limits as prescribed in the National Ambient Air Quality (NAAQ) Standards for respective residential rural areas and industrial areas. Evaluated GLCs due to the proposed air pollution load in existing stack. When added to the monitored existing ambient air quality, provides the expected ambient air quality when the fuel qty will not be increased in existing utility and the same indicates that expected AAQ are well within the permissible limit of National Ambient Air Quality Standards for residential rural areas as well as industrial areas. It is concluded from the above that there will be a minor impact on the AAQ of the surrounding environment due to operation of the proposed expansion project.

9.2 WATER ENVIRONMENT

The total fresh water requirement after expansion in existing project will be 57.5 KL/day. The water will be met through the bore well.

The quality of the water was tested at six locations in the study area. The ground water norms were compared to IS: 10500 (1991) for evaluation. The Industry generates process effluent apart from process, washing, Cooling Tower blow down and domestic effluent.

Page 239: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of

Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

198

Wastewater Generation & Disposal:

• After expansion total water consumption will be 57,500 Liter/Day that is met from borewell.

• Domestic effluent @ 5000 Liter / day will be disposed off through septic tank / soak pit system.

• During manufacturing of Resin, at Vacuum distillation stage water will be distilled out @ 7500 Liter /Day.

• The process effluent transfer to ETP for treatment. • After giving primary treatment in proposed Effluent Treatment Plant the

treated effluent @ 8500 Liter/Day will be evaporated in Thermic Fluid operated Evaporator.

Thus, it can be concluded that negligible impact on surrounding water environment is caused. Further, it is emphasized that all precautionary measures have to be strictly adhered as mentioned in the Environmental Management Plan given in Chapter 6, to maintain ground water quality within norms in the future.

9.3 NOISE ENVIRONMENT

Base line data indicates that noise levels in the study area are not on higher sides. Noise level in and around plant site were measured. Measured noise levels within premises indicate that overall noise levels are within the Damage Risk Criteria. The company will provide ear-protecting devices/ earplugs for working personnel exposed to high noise level. It can be concluded that there will be no impact on the noise level of the surrounding environment.

9.4 HAZARDOUS WASTES

As per the Hazardous Waste (Management & Handling) Amendment Rules, 2003, all necessary control steps for each type of Hazardous Wastes generated from the proposed project will be taken. Therefore, no impact of hazardous wastes generation on surrounding soil environment is anticipated.

9.5 ECOLOGY

The proposed expansion project will be carried out on land within their premises without cutting of any trees. Also, the project site is located in Industrial Estate and non-agricultural land devoid of any permanent eco-system. So it does not alter the crop pattern and natural vegetation of the surrounding area. Due to the safe control technology of air pollutants, liquid effluents and solid/hazardous wastes disposal, no impact on the surrounding ecology is anticipated.

Page 240: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of

Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

199

9.6 SOCIO - ECONOMIC ENVIRONMENT

The proposed expansion project will generate direct employment for employment persons. Theindirect employment will be generated by way of transportation, shopkeepers and other casual employment. Implementation of this plant will also reduce production loss due to shortage of power. Thus, the proposed expansion project will have significant positive impacts on the employment pattern of the study area.

9.7 CONCLUSION

As such the Environmental Impact Statement recommends the implementation of the proposed with the proposed environmental protection measures.

Page 241: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

200

CHAPTER 10

ENVIRONMENTAL CONSULTANTS PROFILE

We are one of the leading Environmental Consultant based at Ahmedabad, Gujarat. India. The group of companies have successfully completed more than 1200 projects in the field of pollution control i.e. Design, Installation and commissioning of wastewater treatment plants and air pollution control equipments, during last 20 years. We are also dealing in the projects of waste minimization and cleaner production technology. We are having a strong team of Technocrats and Scientists. We have well equipped analytical laboratory facility including facilities to analyze physical, chemical and biological parameters as per the requirements of the State Pollution Control Board and our clients. Our team of technocrats and scientists are well experienced to deal with the Design, Installation and Commissioning of wastewater treatment plants and air pollution control equipments and also well conversant to the projects of Waste Minimization and Cleaner Production Technology. We, BHAGWATI ENVIRO CARE PVT. LTD, are a registered with Gujarat Pollution Control Board, Gandhinagar as an ENVIRONMENTAL CONSULTANT. We are also registered with Himachal Pradesh Pollution Control Board, Simala as an ENVIRONMENTAL CONSULTANT.

10.1. INTRODUCTION

THE COMPANY

BHAGWATI ENVIRO CARE PVT. LTD.

Corporate Office: -

28,29,30, Parmeshwar Estate II, Opp. AMCO Bank, Phase I, G.I.D.C. Estate, Vatva, Ahmedabad - 382445, Gujarat, India. Mobile No.: +91 98240 51541 Telephone No. : +91 79 40083051,40083052, 25834567, Fax No : +91 79 40083053 URL : www.bhagwatienviro.com Email : [email protected] [email protected]

Page 242: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

201

a) Field Studies and Surveys

� Assessment of Pollution Load.

� Guidance to get water consent, Air consent and Solid Waste Authorization.

� O & M contracts for ETP, STP and CETP.

� Collection of Samples at site for the characterization of waste.

b) Project Execution

� Execution of construction work of ETP as per design.

� Manufacturing of mechanical equipments like Agitators, Aerators, Clarifiers, etc.

� Manufacturing of filtration equipments like Carbon Filter, Sand Filter, Dual Media Filter etc.

� Manufacturing of other equipments like Oil Skimmer, dosing tanks etc.

� Design and Fabrication of Air Pollution Control Equipments like HDPE & FRP Packed column, Water / Alkali scrubber, Dust Collectors, Cyclone Separators, Multi cyclone etc.

� Erection and commissioning of all the above-mentioned equipments/system.

c) Commissioning Services

� Commissioning of Primary /Secondary/Tertiary Effluent Treatment Plants and Sewage Treatment Plant.

d) Up Gradation / Modification of existing Effluent Treatment Plant

� After careful study of the existing effluent treatment plant if required we suggest suitable addition/up gradation/modification in existing Effluent Treatment Plant so as to meet with the standards as specified by the state pollution control board as per the mode of disposal.

e) Consultation work with State Pollution Control Board

� Preparation of application form to get NOC for Establishment and NOC

for Operation of the state pollution control board for Air Consent, Water Consent and Solid waste authorization with all the required technical details And documents.

10.2. EXPERTISE IN

Page 243: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

202

� Providing technical guidance to the clients to do the technical correspondence and also consulting work with state pollution control board.

Page 244: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

203

a) Analysis of water and waste water � Analysis of various parameters like pH, Hardness, Sulphate, Chloride,

COD, BOD, TDS, TSS, O&G, Ammonical Nitrogen and other specific parameters as per the requirement of clients.

b) Analysis of Air Emissions

c) Analytical and Laboratory services

� Specialized in measurement of flow.

� Collection of sample to check the concentration of pollutants like SPM and other gaseous pollutants like SO2, NOx, HCl, Cl2, Co, H2S, Hydrocarbons, NH3, from the process and flue gas stacks.

� Ambient Air quality monitoring to determine the concentration of RSPM, SPM and other gaseous pollutants like SO2, NOx, HCl, Cl2, Co, H2S, in the Environment.

d) Analysis of Solid / Hazardous waste

� Analysis of various parameters and other specific parameters as per

the requirement of clients.

e) Noise Monitoring

� We are having a Digital Noise Meter to measure the noise level at a particular location to check the intensity of noise in db.

� Physico – Chemical Treatment

� Biological Treatment

� Tertiary / Advanced Treatment

10.3 LABORATORY FACILITY

10.4. TREATABILITY STUDIES

Page 245: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

204

SR. NO. NAME

QULIFICATION EXPERIENCE DESIGNATION

1. Mr. Shailesh Patel M.Sc. Chemistry 20 years Managing Director

2. Mr. Amar Mehta Management 15 years Director

3. Dr. Upendra Patel Ph.D in Environment Engg.

18 Years Technical Director

4. Dr. Bharat D Jethava Ph. D in Forest Ecology & Env.

14 years Empanelled FAEs

5. Mr. Jayendrasinh Parmar B.E. Chemical 12 years Chemical Engineer

6. Mr. Maheshbhai Oza M.Sc. Chemistry 20 years H.O.D. Lab

7. Mr. Rajesh Chauhan M.Sc. Chemistry 20 years Lab Incharge

8. Mr. Nilesh V. Patel B.Sc. Chemistry 16 years Chief Environment Chemist

9. Mr. Gopalbhai M Kathiria M.Sc. Chemistry Dip.In Environment

20 Years Env. Chemist

10. Mr. Prashnnjeet Solanki B.E. Chemical 2 Years Chemical Engineer

11. Miss. Taral Dhanani MSc. Env.Science 3 Years Env. Chemist

12. Mr. Rohan Goswami B.E Environment 5 Years Environmental Engg.

13. Miss Mansi Patel B.Sc. Chemistry 3 Year Lab Chemist

14. Ms. Sangita Mankani B.E Environment 2 Years Environmental Engg.

15. Mr. Hardevsingh Chauhan B.E. Chemical 1 Year Chemical Engineer

16. Mr. Mehul Mistry B.E. Chemical 1 Year Chemical Engineer 17. Mr. Vamanray Mehta Dip. Mech &

Electrical 35 Years Mechanical / Electrical

Engg. 18. Mr. Himanshu Patel Structure Engineer 8 Years Civil Engineer 19. Mr. Vijay Rajput B.Com. 20 Years Site Supervisor 20. Mr. Bhaumik Patel B.Com 3 Year Site Supervisor 21. Mr. Paresh Patel Metric 2 Year Assistant for laboratory 22. Mr. Dipak Patel Metric 3 Year Assistant for laboratory 23. Mr. Rashmikant Khamar M.Com LLB 20 Years HRD Manager 24. Mr. Ishwarbhai Prajapati B.Com. 20 Years Sr. Accountant

25. Mr. Chetan Chauhan B.Com 1 year Accountant

26. Mr. Ramesh Goswami B.Com 4 Year Clerical Work

10.5 OUR TEAM OF HIGHLY QUALIFIED TECHNOCRAT & SCIENTISTS

Page 246: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

205

Sr. No. Name of the Client Address 01. Tata Motors Ltd (Nano Project) Sanand, Gujarat. 02. Sheela Woodbridge Pvt Ltd. Sanand, Gujarat 03. ONGC, Ankleshwar & Mehsana Asset Ankleshwar & Mehsana 04. Camphor & Allied products Limited Nandesari, Baroda 05. Common Effluent treatment plant (CETP) GIDC, Kalol, N.G. 06. Common Effluent treatment plant (CETP) GIDC, Odhav. 07. Panoli Enviro technology Limited Panoli 08. Sterling Auxiliaries Pvt ltd. Dahej

09. Paras Pharmaceutical Limited Kalol (Gujarat) & Baddi 10. Timber Association Gandhidham Gandhidham, Kutch 11. Ashapura Group of Industries Gandhidham , Kutch 12. Banas Oil Processing Plant Palanpur 13. Matangi Industries GIDC, Vatva, Ahmedabad 14. Alembic Glass Limited Vadodara 15. Banaskantha Dist. Co -Op. Milk Producers Union Ltd. Banaskantha 16. Schutz Carbon Electrodes Pvt. Ltd. Kalol, Dist: Mehasana 17. Galaxy Group of Industries (Reputed Construction

Company) Ahmedabad

18. Halewood Laboratory (Unit of Rasna) Vatva GIDC, A’bad 19. Maheshwari Paper Mills Limited Palanpur 20. Kemrij Paper industries Palanpur 21. Amee Castor & Derivatives Pvt. Ltd. Palanpur 22. Star Clay Tech Pvt. Ltd. Mandvi, Kutch 23. Daywell Pharmaceuticals Pvt. Ltd. Chhatral, Dist: Mehasana 24. Mahalaxmi Industries Chhatral, Dist: Mehasana 25. SBF Pharma Pvt. Ltd., Santej, Dist: Mehasana 26. Charbhuja Metals Pvt. Ltd. Chhatral, Dist: Mehasana 27. Cupro Recycling Pvt Ltd. (EOU) Sachin GIDC, Surat 28. Manglam Alloys Limited Chhatral 29. Unision Metal Limited Ahmedabad 30. Duggad Aluminum Pvt. Ltd. Talod, Dist: Sabarkantha 31. S. Kumar Aluminium Industries Talod, Dist: Sabarkantha 32. Jeshree Metals Industries Talod, Dist: Sabarkantha 33. Rajkumar Metals Industries Talod, Dist: Sabarkantha 34. Maheshwari Steel Rolling Mills Vijapur 35. Gujarat Krushi Rasayan Ltd. Naroda GIDC, A’ bad

36. Maheshwari Paper Ltd. Palanpur, Gujarat 37. Samir Synthetics Ltd. Odhav, GIDC, A’ bad 38. Neptune Textile Mills Ltd. Odhav, GIDC, A’ bad 39. Dharmentdra Textile Ltd. Narol, A’bad 40. Murlidhar Textile Industries Narol, A’bad 41. View Laboratory Vatva GIDC, A’ bad 42. Suchem Laboratory Vatva GIDC, A’ bad 43. Apex Dyestuff Industries Vatva GIDC, A’bad 44. Denim Industries Vatva GIDC, A’bad 45. Varahi Industries Vatva GIDC, A’bad

10.6 LIST OF VALUABLE CLIENTS IN GUJARAT

Page 247: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

206

46. Nilkanth Organics Ltd. Ankleshwer, Dist: Bharuch 47. Surya Organics Pvt. Ltd. Ankleshwer, Dist: Bharuch 48. Avni Dye Chem Industries Vatva GIDC, A’bad 49. BLG Electronics Ltd. Gandhinagar 50. Raja Industries Limited Kadi, Dist: Mehsana 51. Atlas Pharma Chem Pvt. Ltd. GIDC, Vatva, A’Bad 52. Nikishu Fab. Pvt Ltd. Ahmedabad 53. Maheshwari Global Ind. Palanpur 54. Vaishnodevi Refoils & Solvex Ltd. GIDC, Chandisar, Palanpur 55 Shakti Refoils Pvt. Ltd/. Himmatnagar 56. Pooja Protein Limited Nandasan, Dist: Mehsana 54. Changodar Metal P. Ltd Changodar 55. Harambha Steel P. Ltd Visnagar 56. Nahar Granites P. Ltd Kalol 57. PTC India P. Ltd Chhatral 58. Cupro Recycling P. Ltd Surat 59. Hindustan Impex Jamnagar 60. Sabar Dairy Himmatnagar, Gujarat 61. Banas Dairy Palanpur 62. Madhur Dairy Gandhinagar 63. Dudhsagar dairy Mehsana 64. Kapoor Dairy Visnagar 65. Sanjay Milk Products Gozaria

* We are dealing with more than 1000 Companies in the field of Environment in Gujarat state.

Page 248: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

207

Sr. No.

Name of The Client Address Services Provided

1. Paras Pharmaceuticals Ltd. (Mfg. of Moov, Borosoft, Itch Guard and Pharma Product)

Vill: - Sandholi, Teh: - Nalagar

Design, Construction, erection& commissioning of ETP, Preparation of Application for approval of NOC to Established & NOC to Operation.

2. Cachet Pharmaceuticals Ltd. Vill: - Thana Baddi Nalagarh

Road,

Design, erection & commissioning of ETP, Internal pipeline of HDPE

3. Zeiss Pharmaceuticals Ltd. 72,Jharmajri, Baddi Design, Construction, erection& commissioning of ETP, Internal pipeline of HDPE

4. H.R.Personal Care Pvt.Ltd (A company of Olima Cosmetics)

Vill: - Malpur, Teh: - Nalagar

Design, erection & commissioning of ETP, Internal pipeline of HDPE

5. Asian Aerosol India Ltd. (Mfg.of Premium Room Freshener, Deodorant)

Vill: - Kisanpura, Teh: - Nalagarh

Design, & commissioning of ETP, Preparation of Application for approval of NOC to Established & NOC to Operation.

6. Acme Remedies (Mfg of Sugar Free medicines)

HPSIDC, Baddi Design of ETP & Carbon filter as a part of ETP

7. Acme Formulation Pvt. Ltd(Pharma Formulation) Nalagarh

Design of ETP erection & commissioning

8. S.K. Industries. (A Mahak Group Company)

P.No.10, Sector-II, Parwanoo

Design of ETP with internal pipeline of HDPE & Instillation of Evaporator.

9. Shri Nivas Laboratory

Sai Road, Baddi Design of ETP, erection & commissioning of ETP, Mech. Equipment, Internal pipeline of HDPE

10. GMH Laboratory Baddi-Nalagarh Road, Nalagarh.

Design of ETP, erection & commissioning of ETP, Mech. Equipment, Internal pipeline of HDPE

11 Cosmos Pharmacals Baddi. Design of Modular ETP, erection & commissioning of ETP, Mech. Equipment, Internal pipeline of HDPE

12 Rachet Pharmaceuticals Ltd Baddi-Nalagarh Road, Nalagarh.

Design of ETP, erection & commissioning of ETP, Mech. Equipment, Internal pipeline of HDPE

10.7 LIST OF VALUABLE CLIENTS IN HIMACHALPRADESH

Page 249: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

208

** Many Project under process

SR.NO. NAME OF INDUSTRY LOCATION CAPACITY IN MT/M 1. Ashapura Volclay Limited

(Ashapura group) Gandhidham 3850

2. Gujarat Ambuja Export Ltd. Himmatnagar 6106 3. Matangi Industries Dahej 3000 4. Ishan Dyes & Chemicals Ltd. Vatva, Ahmedabad 5. Aries Colour Chem Pvt. Ltd Dahej 1950 6. Neel Pigment Pvt.Ltd. Ankleshwar 350 7. Karnavati Chemicals Ankleshwar 350 8. Dhruv Intermediates Pvt.Ltd. Jaghdia 50 9. Samip Chemicals Ankleshwar 50 10. Arunachal Chemicals Sachin, Surat 150 11. Gopinath Chem Tech Pvt.Ltd. Chhatral 600 12. Bhagwati Organics Pvt.Ltd. Vatva, Ahmedabad 45 13. Printex Industries Vatva, Ahmedabad 45 14. Vidhi Industries Vatva, Ahmedabad 40 15. Vibfast Pigments Pvt.Ltd. Vatva, Ahmedabad 45 16. Bhagwati Dyes & Chemicals Vatva, Ahmedabad 30 17. Bhavin Industries Vatva, Ahmedabad 45 18. S.M.Dye Chem Vatva, Ahmedabad 25 19. Tulsi Intermediates Pvt.Ltd. Khambhat 30 20. S, V. Dye Chem Pvt.Ltd. Khambhat 30 21. Patel Industries Vatva, Ahmedabad 500 22. Yashka Polymers Pvt.Ltd. Moraiya, Ahmedabad 600 23. Vardhman Chemicals Vatva, Ahmedabad 500 24. Shri Hari dyes & Chemicals Vatva, Ahmedabad 50 25. Mahak Dye Chem Industries Vatva, Ahmedabad 50 26. Arihant Chemical Pvt.Ltd. Vatva, Ahmedabad 25 27. Bansari Industries Vatva, Ahmedabad 50 28. Gayatri Dye Stuff Vatva, Ahmedabad 50 29. Arbuda Industries Vatva, Ahmedabad 50 30. Nepa Overseas Vatva, Ahmedabad 50 31. Appex Dyestuff Vatva, Ahmedabad 60 32. Aadi Cement Idar 1.0 Lakh TPA 33. Lion Cement Ranasan 18,000 TPA 34. Kangaroo Industry (Unit - 1) Ankleshwar 60 35. Kangaroo Industry (Unit - 2) Ankleshwar 60 36. Chhatariya Dyestuff Pvt.Ltd. Mahuva 30 37. Manish Chemical Vatva 500 38. Ishan Dyes & Chemicals Ltd. Vatva 250 39. Ushanti Colorchem Pvt.Ltd Vatva 100 40. Sulpho Chem Ind. Vatva, Ahmedabad 50 41. Appex Engg. & Consultants

(Construction Company) Ahmedabad 2 Project under

progress 42. Galaxy Group of Industries

(Construction Company) Ahmedabad 3 Project under

progress 43. Cedar Décor Pvt. Ltd (Resin

Plant) Kadi Road, Kadi 800

44. A. k. Formaline Pvt. Ltd. Gandhidham 1000 45. Vallora Plyboard Gandhidham 500 46. Super crop Safe Ltd. – Bilodra, Dist - Mehsana 500 47. Kundan Pesticides Pvt Ltd. Ahmedabad 700

10.8 EC APPLICATION APPLIED BY M/S. BHAGWATI ENVIROCARE PVT.LTD. AFTER EFFECTIVE NOTIFICATION DATED 14/09/2006

Page 250: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Final Environmental Impact Assessment of Expansion in Existing Manufacturing unit by M/s. Airolam Ltd. At

Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

209

SR.NO. NAME OF INDUSTRY LOCATION

01 M/s .Torrent Research Center Limited Bhat, Gandhinagar

02 M/s. Gujarat Spices & oilseeds Growers Co

– Op. Union Ltd (Vimal Oil)

Gandhidham, Dist – Kutch.

03 M/s. Dharmendra Textile Processors Narol, Ahmedabad

04 M/s. Madhur Dairy Gandhinagar

05 M/s. Laakoonaa Reactions Vatva, Ahmedabad.

06 M/s. Dye-Fab Textiles Vatva, Ahmedabad.

07 M/s. Atul Corporation Pvt. Ltd. Bavla, Dist – Ahmedabad.

08 M/s. Unison Metals Ltd. Vatva, Ahmedabad.

09 M/s. Ishan Dyes & Chemicals Ltd Vatva, Ahmedabad

10 M/s. Manglam Alloys Ltd. Chhatral, Dist: Gandhinagar.

11 M/s. Gopinath Chem Tech Ltd. Kundal, Ta. Kadi, Dist: Mehsana

12 M/s. Vasudev Dye Chem Kalol, Dist - Gandhinagar.

13 M/s. Larson Color Chem Modasa, Dist – Sabarkantha.

14 M/s. Murlidhar Textile Narol, Ahmedabad

15 M/s. Blue Star Industries GIDC, Kalol

16 M/s. Shakti Intermediate Pvt. Ltd. Sanand

17 M/s. Ashapura Volclay Ltd. Gandhidham

18 M/s. Ikon Orgo Chem Kadi

19 ONGC, Ankleshwar Asset 29 Unit, Ankleshwar

20 ONGC, Mehsana Asset 7 Unit, Ankleshwar

21 Camphor & Allied products Limited Nandesari

22 M s Ar i es Col orchemPvt Lt d/ . . . Dahej

10.9 SCHEDULE - II ENVIRONMENTAL AUDIT CARRIED OUT BY M/S. BHAGWATI ENVIROCARE PVT.LTD.

Page 251: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

RRIISSKK AASSSSEESSSSMMEENNTT SSTTUUDDYY RREEPPOORRTT

FOR

M/S. AIROLAM LTD. Survey No.:355, Village: Dalpur, Nananpur Road, Taluka:

Prantij, District: Sabarkantha, Gujarat.

PREPARED BY

BHAGWATI ENVIRO CARE PVT. LTD. [ISO 9001, ISO 14001 & OHSAS: 18001 CERTIFIED COMPANY]

CORPORATE OFFICE

28, 29, 30, Parmeshwar Estate II, Opp. AMCO Bank,

Phase I, GIDC Estate, Vatva, Ahmedabad – 382445. Gujarat, India

Phone No: +91 79 29295043, 40083051/52 Fax: +91 79 40083053

, Email: [email protected] , [email protected]

URL: www.bhagwatienviro.com

Page 252: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

2  

  

 INDEX 

 Sr. No.  Chapter  Page No. 1.   Introduction  3 2.   Risk Assessment Process  5 3.   Basic Environment  10 4.   Storage & Handling of Hazardous Chemicals  13 5.   Health & safety measures  17 6.   Occupational health scheme for the workers  18 7.   Risk Reduction Measures   19 8.   Fire Fighting system  21 9.   Hazards Identification, major hazards & 

Damage criteria 22 

10.   Risk Analysis & Consequence analysis  35                  

Page 253: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

3  

CHAPTER: 1  

INTRODUCTION  

M/s.  Airolam  Ltd.  has  proposed  expansion  in  manufacturingactivity  of  Organic ChemicalUnit at Survey No.:355, Village: Dalpur, Nananpur Road, Taluka: Prantij, District: Sabarkantha, Gujarat. 

As  a  manufacturer,  the  management’s  objective  is  to  build  confidence  among  their customers  by  regular  and  reliable  supplies  at  competitive  prices  and  consistent  quality, complying with their technical requirements.  Company’s  purpose  is  to  start  production  activity  for  range  of  products  to meet  supply demand of specific market segment with the objective to be the most reliable manufacturer in the market.  The  company  is  intending  to  do  expansion  in  existing manufacturing  facility which  falls under Category “A” of Project Activity 5(f) – ‘Synthetic Organic Chemicals Industry’ of EIA Notification issued in September – 2006. For this the unit needs environmental clearance from Ministry of Environment & Forest, New Delhi.  The Risk Assessment with following emphasis is required to be carried out:  

Purpose 

The  purpose  of  this  risk  assessment  is  to  evaluate  the  adequacy  of  the  expansion  in existingunit  for  production  of  products  and  usage  of  raw  materials.  Products  have application  as  raw  material  to  laminated  sheets,  Decorative  Laminates  and  Insulation Board industries. This risk assessment provides a structured qualitative assessment of the operational  environment.  It  addresses  sensitivity,  threats,  vulnerabilities,  risks  and safeguards. The assessment recommends cost‐effective safeguards to mitigate threats and associated exploitable vulnerabilities. 

Scope 

The  scope  of  this  risk  assessment  assessed  the  system’s  use  of  resources  and  controls (implemented  or  planned)  to  eliminate  and/or  manage  vulnerabilities  exploitable.  This Risk  Assessment  Report  evaluates  the  confidentiality  (protection  from  unauthorized disclosure  of  system  and  data  information),  integrity  (protection  from  improper 

Page 254: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

4  

modification  of  information),  and  availability  (loss  of  system  access)  of  the  system. Recommended  security  safeguards  will  allow  management  to  make  decisions  about security‐related initiatives. 

Geographical Information of Project Site  

Sr. No.  Description  Information 

1  Latitude  23⁰30’48.76” N (23.51354444) 

2  Longitude  72⁰56’05.28” E (72.93480000) 

3  S.No.  355 

4  Village   Dalpur 

5  Ta  Prantij 

6  Dist   Sabarkantha 

7  State  Gujarat 

                   

Page 255: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

5  

 Layout Plan 

   

Page 256: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

6  

Location Map: 

    

Page 257: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

7  

CHAPTER: 2  

RISK ASSESSMENT PROCESS  

RISK ASSESSMENT 

Identification  analysis  and  assessment  of  hazard  and  risk  are  very  useful  in  providing information to risk management. It provides basis for what should be type and capacity of its  on‐site  and  off‐site  emergency  plan  also what  types  of  safety measures  are  required. Risk and consequence analysis  is carried out considering storage and handling of various hazardous raw materials, intermediates and product as well as manufacturing process. 

This section details the risk assessment process performed during this effort. The process is divided into pre‐assessment, assessment, and post assessment phases. 

PHASE I – PRE­ASSESSMENT 

Step 1: Define the Nature of the Risk Assessment 

This  initial  risk  assessment  provides  an  independent  review  to  help  Centers  for Disease Control and Prevention (CDC) determine the appropriate level of security required for the system  to  support  the  development  of  a  System  Security  Plan  for  intermediate  chemical resin plant. The risk assessment is based on interviews, documentation and, as necessary, some automated technical review. 

Step 2: Data Collection 

The data collection phase  included identifying and interviewing key personnel within the organization  and  conducting  document  reviews.  Interviews  focused  on  the  operating environment.  Document  reviews  provided  the  risk  assessment  team  with  the  basis  on which to evaluate compliance with policy and procedure. 

Step 3: Templates 

The following templates were used by the risk assessment team and are 

Included in the appendices: 

• Security Baseline Worksheet:  Completed  by  the  analysts  using  information  extracted  from  questionnaires  and interviews. 

Page 258: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

8  

• Risk Calculation Worksheet:  Converts the raw vulnerabilities into risks based on the following methodology: 

• Risk Mitigation Worksheet:  Lists the risks and the associated recommended controls to mitigate these risks for the Business Steward to review. 

PHASE II – ASSESSMENT 

Step 1: Document Review 

The assessment phase began with  the  review of documents provided by  the members of the  various  Resin manufacturing  system  team.  Detailed  interviews with members  of  the CDC Resins manufacturing  system  team allowed  completion  of  the  system questionnaire and  identification  of  specific  threats  inadequately  identified  in  the  Enterprise  Threat Statement. 

Step 2: System Characterization 

In this step, the analyst defined the boundaries of the IT system, along with the resources that constitute the system,  its connectivity, and any other elements necessary to describe the system. Dependencies were clarified. Sensitivity of the system and data was discussed in the final section of the characterization. 

Step 3: Threat Identification   

Through the interview process, it also identified “most likely” system and location‐specific threats.  

Step 4: Vulnerability Identification 

In  this step,  the risk assessment team developed a  list of system vulnerabilities  (flaws or weaknesses) that could be exploited by the potential threat vectors. 

Step 5: Risk Determination (Calculation/Valuation) 

In this step, the risk assessment team determined the degree of risk to the system. In some cases,  a  series  of  vulnerabilities  combined  to  create  the  risk.  In  other  cases,  a  single vulnerability created the risk. The determination of risk for a particular threat source was expressed as a function of the following: 

   

Page 259: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

9  

• Likelihood Determination:  • The following governing factors were considered when calculating the likelihood of the 

probability  that  a  potential  vulnerability  might  be  exploited  in  the  context  of  the associated threat environment: 

• Threat source motivation and capability • Nature of the vulnerability • Existence and effectiveness of current controls  

The following table defines the likelihood determinations. 

Table1. Likelihood Definition 

Level  Likelihood Definition 

High   The  threat  source  is  highly  motivated  and  sufficiently  capable,  and controls  to  prevent  the  vulnerability  from  being  exercised  are ineffective.  

Moderate   The threat source is motivated and capable, but controls are place that may impede successful exercise of the vulnerability.   

Low   The  threat  source  lacks  motivation  or  capability,  or  controls  are  in place to prevent, or at least significantly impede, the vulnerability from being exercised.  

 

Impact Analysis:  

The  next  major  step  in  measuring  level  of  risk  was  to  determine  the  adverse  impact resulting  from  successful  exploitation  of  vulnerability.  The  adverse  impact  of  a  security event can be described in terms of loss or degradation of any, or a combination of any, of the following three security goals: 

• Loss of Confidentiality – Impact of unauthorized disclosure of sensitive information (e.g., Privacy Act). 

• Loss of Integrity – Impact if system or data integrity is lost by unauthorized changes to the data or system. 

• Loss of Availability – Impact to system functionality and operational effectiveness.  

Page 260: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

10  

Table 2. Impact Definition 

Magnitude of Impact  Impact Definition 

High   Exercise  of  the  vulnerability  (1) may  result  in  the  highly  costly  loss  of major tangible assets or resources; (2) may significantly violate, harm, or impede  an  organization’s  mission,  reputation,  or  interest;  or  (3)  may result in human death or serious injury.  

Moderate   Exercise of the vulnerability (1) may result in the costly loss of tangible assets or resources; (2) may violate, harm or impeded an organization’s mission, reputation, or interest; or (3) may result in human injury.  

Low   Exercise of the vulnerability (1) may result tangible assets or resources; (2) may organization’s mission, reputation, or interest.  in the loss of some noticeably affect an  

 

• Risk Determination:  The following were used to assess the level of risk to the IT system: • The likelihood of a given threat source’s attempting to exercise a given vulnerability. • The  magnitude  of  the  impact  should  a  threat‐source  successfully  exercise  the 

vulnerability. • The  adequacy  of  planned or  existing  security  controls  for  reducing or  eliminating 

risk.  

The  following  table  provides  a  definition  for  the  risk  levels.  These  levels  represent  the degree or  level of risk to which an IT system,  facility, or procedure might be exposed if a given vulnerability were exercised. 

   

Page 261: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

11  

Table 3. Risk Level Definition 

Magnitude of Impact 

Risk Level Definition 

High   There  is  a  strong  need  for  corrective measures.  An  existing  system may continue  to  operate,  but  a  corrective  action plan must  be put  in place  as soon as possible.  

Moderate   Corrective actions are needed and a plan must be developed to incorporate these actions within a reasonable period of time.  

Low   The  system’s  Authorizing  Official  must  determine  whether  corrective actions are still required or decide to accept the risk.  

 

Step 6:Risk Mitigation Recommendations: 

During  this  step  of  the  process,  controls  that  could  mitigate  or  eliminate  the  identified risks,  as  appropriate  to  the  organization’s  operations,  were  provided.  The  goal  of  the recommended  controls  is  to  reduce  the  level  of  risk  to  the  IT  system  and  its  data  to  an acceptable  level.  The  risk  assessment  team  considered  the  following  factors  when recommending controls and alternative solutions to minimize or eliminate identified risks: 

• Sensitivity of the data and the system • Effectiveness of recommended options • Legislation and regulations • Organizational policy • Operational impact • Safety and reliability 

 

PHASE III – POST ASSESSMENT 

Risk Mitigation 

The elimination of all risk is usually impractical, senior management and business stewards should  assess  control  recommendations,  determine  the  acceptable  level  of  residual  risk, and implement those mitigations with the most appropriate, effective, and highest payback. 

 

Page 262: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

12  

CHAPTER: 3  BASIC ENVIRONMENT Details of Products: 

 No.  Name of Product  Quantity (MT/Month) 

01  Phenol Formaldehyde Resin  750 

02  Melamine Formaldehyde Resin 250 

Total:  1000 

  

PACKING AND FINAL APPLICATION OF PRODUCTS       

NAME AND QUANTITY OF RAW MATERIAL CONSUMPTION  

DETAILS OF RAW MATERIALS   

   

Name Of Proposed Product

Type Of Packing Final Application Of Product

Phenol Formaldehyde Resin 

MS Storage Tank For  laminated  and  decorative sheets, ply boards, flush doors, block board, As Adhesive. 

Melamine Formaldehyde Resin  HDPE Tank 

Name Of Product  Raw material  Quantity MT/MT  MT/Month 

Phenol Formaldehyde Resin  Phenol  0.94  707 Formaldehyde  0.372  279 Caustic  0.005  3.7 Methanol  0.166  125 

Melamine Formaldehyde Resin Melamine  0.4  100 Formaldehyde  0.6  150 Sodium Hydroxide  0.0013   0.325  Methanol   0.067   16.75  

Page 263: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

13  

CHEMICAL NAME & PHYSICAL FORM OF RAW MATERIAL: 

 

No.  Name of Raw Material 

Chemical Name  Physical Form 

Container Type  MOC of container 

1.  Phenol  Phenyl Hydroxide  Liquid  Tank‐ 20 KL  MS 2.  Formaldehyde  Methyl Aldehyde  Liquid  Tank‐20 KL  HDPE/MS 3.  Caustic  Sodium Hydroxide  Solid  Bags‐50 kg each  HDPE 4.  Methanol  Methyl Alcohol  Liquid  Tank‐10  KL  MS 5.  Melamine  1,3,5Triazine2,4,6 

triamine Solid  Bags‐50 kg each  HDPE 

Page 264: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

14  

CHAPTER: 4 

STORAGE AND HANDLING OF HAZARDOUS CHEMICALS 

The safety precautions to be taken to prevent an accident are detailed  in  ‘Material Safety Data Sheets’.  The details of  storage of Hazardous chemicals along with measures  taken during storage are given in Table.  

HAZARDOUS CHEMICALS  Details  of  raw material,  which  are  termed  as  Hazardous  Chemicals  as  per  Manufacture, Storage  and  Import  of  Hazardous  Chemical  (Amendment)  Rules  2000  are  given  in  the below table  Toxicity details of raw materials are given in the below Table. 

  

TABLE  DETAILS OF HAZARDOUS CHEMICALS 

Hazardous Chemicals

 

Reference

The Manufacturer, storage & Import of 

Hazardous chemical Rules 1989 

Threshold Quantity 

Phenol   Sr.No. 481 (part II, Sch 1 of MSIHCR, 1989 

5 MT 

Formaldehyde  (solution) Sr.No. 285 (part II, Sch 1 of MSIHCR, 1989 

10 MT 

Methanol  Sr.No. 377 (part II, Sch 1 of MSIHCR, 1989 

‐‐‐ 

Caustic (Sodium Hydroxide) Sr.No. 571 (part II, Sch 1 of MSIHCR, 1989 

‐‐‐ 

 

Page 265: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

15  

SAFETY PRECAUTIONS DURING STORAGE OF CHEMICALS 

Storage  &  Handling  of  Hazardous  Chemicals:   • Company  will  do  planning  to  stock  all  the  necessary  material  as   minimum  as possible.  

• All  containers  with  hazardous  chemicals  have  labels  indicating  the contents and warning of the hazard. 

• Necessary  information  on  safe  handling  and  first  aid  measures  and antidotes of major hazardous material will  be available on the  label.  

• Workers  dealing  with  hazardous  chemicals  will   be  trained  on  hea lth risks and safe handling. 

• Exposure to hazardous chemicals will  be minimized. • Liquid  Hazardous  chemicals  will   be  transferred  in  closed  piping  system. 

• Separate  storage  section will   be  provided  for  storage  of  hazardous  and non‐hazardous raw materials.  

• Flame arrestors are provided to all  hazardous storage equipment .   

 Vessel  and  other  Equipment  related:  • Checking  of  process  vessels  and  equipment  will  be  carried  out regularly. 

• Records  related  to  maintenance  and  its  planning  schedule  will   be maintained. 

     Fire related 

 

• Overhead  water  storage  tank  with  adequate  capacity  will   be  provided to ensure 24 hr. supply. 

• Fire water  tank with  sufficient  capacity  of  10 KL will   be  provided with fire pump (01 Nos.)   

• Fire hydrant piping will  be provided. • Adequate hydrant points will be provided at specific locations.  • Sprinkler system will  be provided over hazardous area. • Emergency  power  supply  to  EMS  and  also  for  storage  tanks  will   be 

ensured. • Fire  extinguisher  will   be  provided.  Contact  numbers  of  nearest  fire 

agency will  be provided. 

Page 266: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

16  

             Electrical related 

• All  electrical  fitting  and  motors  in  the  tank  farm  areas  will  be flameproof.  

• Checking  of  all   earthings,  wiring  &  connection  will  be  carried  out regularly. 

• Proper earthing will  be provided at all  equipments.  • Adequate Nos. of earth pits will  be provided. • Lighting arrestors will  be provided at peak points.       Safety related 

• Adequate  types of personal protective equipment will  be provided.  and also safety training will  be provided to workers.  

• Emergency  showers  and  eye  wash  stations  will   be  available  at  the worksite.    

• Arrangement  for  24  hr.   medical  facilities  by  contact  with  nearest health care centre/ hospital .      

• Pre‐employment medical  check‐up  and  annual medical  checkup will   be carried out and its records will  also properly maintained. 

• Monitoring  of  occupational  hazards  like  noise,   ventilation,  chemical exposure  etc.   will   be  carried  out  regularly  and  its  records  wil l   be maintained. 

     

Page 267: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

17  

CHAPTER:5  

HEALTH & SAFETY MEASURES 

For  handling  hazardous  chemicals  and  to  take  care  of  employees’  health,  M/s.  Airolam Ltd.,shall adopt a practice of preventive and predictive maintenance looking to the nature of  hazardous  chemicals  being  handled/processed.  All  the  equipments  in  the  plant  areas shall be inspected/ tested by an outside agency.  

The  various  safety  equipments  like  breathing  apparatus  and  critical  instrumentation provided  on  various  equipments will  be  inspected  and  tested  frequently  to  ensure  their operability all the time. Besides, all the first aid, fire fighting devices shall also be inspected, tested  and maintained  by  a  competent  third  party  and  kept  all  the  time  in  ready  to  use condition. 

Health of all the employees in plant area shall regularly monitor by outside physician. If any abnormality  shall  found  necessary  treatment  shall  be  given.  Necessary  history  cards, records will be maintained and up‐dated time to time.   

Some  of  the  safety measures  shall  carry  out  by M/sAirolam  Ltd.to  ensure  prevention  of occupational hazards is delineated below. 

Flameproof  equipments  and  fittings  will  be  provided  for  handling  of  hazardous chemicals. 

Tanks and all pump motors shall be earthed.  Road tanker earthing lines shall provide near the unloading pumps.  Independent dykes will provide for hazardous chemicals storage to contain leakages. Floors of the dyke area shall of impervious finish. 

Housekeeping  of  the  plant  shall  as  per  prescribed  norms.  Floors,  platforms, staircases, passages will be kept free of any obstruction. 

All hazardous operations shall explain to the workers. They will periodically trained on the hazardous processes. 

Dedicated supply of firewater shall available in the plant.  Only authorized persons shall be allowed inside the plant.  All instrument and safety devices will be checked and calibrated during installation. They will also be calibrated, checked at a frequent interval. Calibration records shall maintain. 

All electrical equipments will be installed as per prescribed standards.  All the equipments of the plant shall periodically tested as per standard and results shall documented. All equipments undergo preventive maintenance schedule. 

Page 268: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

18  

The area will fence to isolate the same from all other departments.  Proper Earthing will  be provided  to  each  tank. Also  earthing would be  taken  care during solvent transfer from tanker into the underground vessel.  

Flame arrestors shall provide on each tank.  Flameproof pumps & motors shall provide for solvent transfer.  D.G. Set will be available which can supply power in case of grid power failure.  In  addition  to  fire  hydrant  system,  nos.  of  fire  extinguishers  will  be  installed  at different locations within premises. 

Adequate ventilation arrangement shall provide for safe and better working in the plant as per the standard. 

Process,  equipments,  plant  involving  serious  fire  hazards  are  designed  as  per prescribed guideline. 

Sufficient access for firefighting shall provide in the plant.  Protection against lightning will be taken care in the plant.  Precautions against ignition will be taken. 

 

 

        

Page 269: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

19  

CHAPTER: 6  

OCCUPATIONAL HEALTH SCHEME FOR THE WORKERS  M/s. Airolam Ltd.shall carry out following occupational health scheme for workers;  

• Personal  protective  equipment  such  as  safety  shoes,  safety  goggles,  hand  gloves, gum boots, safety helmet, air line mask, Breathing Apparatus set kit have been given to each workers & staff and additional  PPE’s are kept in all related area,Fire fighting facilities, etc. 

• Safety  awareness  training  programmers  are  arranged  regularly  for  staff  & contractor workers working in the factory premises. 

• On site – Off site emergency plan shall be available. • Medical Examination as per GFR guidelines  • Work Permit system procedure shall be adopted. 

 

 

 

 

 

 

 

 

 

 

 

 

   

Page 270: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

20  

CHAPTER: 7  

RISK REDUCTION MEASURES  TRAINING AND EDUCATION OF EMPLOYEES: Safety  awareness  training  programmers  are  arranged  regularly  and  safety‐training programme are also arranged for workers & staff working in the factory premises.  M/s. Airolam Ltd.shall give training on the following subjects;  

Accident Prevention Technique   Basic fire fighting   Use of Respiration PPE   Handling of Hazardous chemicals   First Aid program  Breathing Apparatus practical programme   General safety regulation  Work Permit system   Electrical safety   On site emergency plan training  MSDS Awareness 

Once  in a month workmen  shall  be  grouped  together & practical  classes  shall be held  to train  them  how  to  operate  various  types  of  fire  extinguisher  to  wear  the  mask,  SCBA apparatus,  use  of  cylinder  handling  kits.  Fire  drill  is  also  conducted  regularly.  Personal protective equipment such as safety shoes, safety goggles, hand gloves, gum boots, safety helmet have been given to each workers & staff. 

 RISK REDUCTION MEASURES: Design: 

• Plant operator and staffs shall be selected well experience and qualified for chemical plant operation. 

• All key personals  shall be  trained  for emergency handling procedures and regular Mock Drills will be conducted on various scenarios. 

• At  design  stage  adequate  care  shall  betaken  for  design,  selection,  fabrication, erection and commissioning of  facilities and other equipment piping, pipe  fittings, electrical equipment etc. 

  

Page 271: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

21  

 Safety Devices at Storage Tanks: 

• Level gauge on storage tank. • Static bonding of pipeline flanges. • Dyke wall shall be provided above ground storage tank. • Safety valve rupture and other venting system will be provided on pressure storage 

vessels. • All pumps shall be provided flame proof type and double mechanical seal type. • All pipeline and tanks shall be painted as per IS color code. • Caution  note  and material  identification,  capacity will  be  displayed  on  all  storage 

tanks.  Safety at Pumps: 

• Required outlet valve and NRV provided on pump outlet. • Modular fire extinguisher shall be provided near of most of pumps. • FLP  type  and  mechanical  seal  type  pump  will  be  installed  for  flammable 

chemicals.  Safety at Pipelines: 

• Jumper connections on flanges to prevent build up of static electricity charge. • Proper supports and clamping are provided. • Double earthing provided to all electrical motors. • Color code as per IS standard will be maintained. 

 Safety during Operation & maintenance: 

• Periodic testing of hoses for leakages and continuity. • Earthing of all plant equipment and earthing of all vehicles of vehicles under 

unloading operation. • Annual testing of all safety relief valves. • Planned preventive maintenance of  different  equipment of  their  safety  and 

reliable operations. • Strict compliance of safety work permits system. • Proper maintenance of earth pits. 

• Periodic training and refresher courses to train the staff  in safety, fire fighting and first aid. 

 

Page 272: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

22  

 

CHAPTER: 8  

FIRE FIGHTING SYSTEM  M/s. Airolam Ltd.will take into consideration fire prevention measures during the project expansion planning to avoid any outbreak of fire. But looking to the hazardous nature of process and the chemicals that are handled and processed, the chances of outbreak of fire cannot be totally ignored. Hence to tackle such a situation a good well laid fire protection system will be provided in the factory.   

The unit will provide  fire extinguishers based on probability and  type of  fire hazards at strategic locations. The unit will install approximately 15 fire extinguishers (CO2 type and Dry powder type) to tackle the fire hazards of Class A, B & C at different levels of the plant. 

 

The unit will also provide  fire protection arrangements  in  the  form of  fixed water spray system (1 No.) and fire hydrant systems (1 Nos.) to tackle any fire emergency arising due to storage of chemicals. 

 

 

 

 

 

 

 

 

 

 

 

Page 273: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

23  

CHAPTER: 9  

HAZARDS IDENTIFICATION, MAJOR HAZARDS & DAMAGE CRITERIA  

HAZARDS IDENTIFICATION: 

Hazard is defined as a chemical or physical condition that has a potential of causing damage to the people, property or the environment. Hazard identification is the first step in the risk analysis and entails the process of collecting information on: 

• The types and quantities of hazardous substances stored and handled, • The location of storage tanks & other facilities, • potential hazards associated with the spillage and release of hazardous • Chemicals. 

 

Hazard is the associated term with material, which  is a measure or the  likely hood of the damage to human working with, or studying the material in question. The potential hazard and  major  risks  associated  with  the  plant  will  be  identified  using  Hazard  &  operability study (HAZOP). 

MAJOR HAZARDS: 

A brief description of the following hazards generally encountered in handling hazardous chemicals is given in the section.  

• Pool Evaporation • Vapor Cloud Explosion • Vapor Cloud Dispersion • Pool Fire • Jet Fire • BLEVE • Toxic Release 

      

Page 274: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

24  

Pool Evaporation  If  the  fluid,  which  escapes  from  containment,  is  a  liquid,  then  vaporization  must  occur before a vapor cloud is formed. The rate at which vaporization takes place determines the formation of such a vapor clouds.  Vaporization scenarios    Vaporization can occur when there is a leak in any of the following situations:  a) A liquid at atmospheric temperature and pressure.    b) A liquid under pressure and above normal boiling point. The rates of vaporization of the liquid are different for each of the two cases. In the case   

• The  liquid  after  spillage  is  approximately  at  equilibrium and  evaporates  relativity slowly. 

• In  the  case,  the  liquid  flashes  off  when  released,  and  the  liquid  remaining  then undergoes slow evaporation.   

(I) Evaporation of a liquid at atmospheric temperature and pressure.  Evaporation from a pool of liquid is essentially a mass transfer process that depends on the vapor  pressure  of  the  liquid,  wind  velocity  across  the  surface  of  the  pool  and  ambient weather condition.  A spillage of  this kind constitutes a steady continuous source of vapor. Unless  the rate of evaporation due to the combination of vapor pressure and wind velocity is high enough, it is  usually  assumed  that  the  heat  transfer  from  the  air  and  the  ground  is  sufficient  to provide the latent heat of vaporization.  (II) Evaporation of a liquid under pressure and above normal boiling point  When a pressurized liquid is released from containment a portion flashes off. This heat is obtained  by  cooling  the  remaining  liquid  to  its  boiling  point  thus  reaching  a  state  of equilibrium from the high in equilibrium prevalent immediately on loss of containment. In practice, it frequently happens that there is a significant amount of spray formation caused 

Page 275: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

25  

by  the  sudden  release  of  pressure  and  the  violent  boiling  of  liquid.  This  spray  vaporizes rapidly by taking heat for vaporization from air. This spray liquid formation is assumed to equal  to  the  gas  fraction  generated  by  flash.  The  proportion  of  liquid  airborne  is  thus considerably high. Following flashing, the residual liquid is at its boiling point. Vaporization then continuous by gaining heat  from surrounding as an essentially heat or mass transfer limited process. This secondary stage of rate limited vaporization is usually relatively less important compared with the flash off, particularly with respect to formation of flammable gas clouds.   Vapor Cloud dispersion  Following  a  continuous  leak  and  formation  of  gas  cloud,  if  cloud  does  not  ignite  it undergoes atmospheric dispersion in accordance with the prevalent wind direction, speed and stability category. The objective of carrying out analysis of cloud dispersion is two fold. First,  it  provides  the  distance  (from  the  leak)  at  which  the  concentration  of  flammable material  falls  below  the  lower  flammability  limit  (LEL).  Second  it  provides  the concentration  of  the  toxic  substance  to which  people may  be  exposed  for  short  time,  at varying distance (from the leak).  Vapor cloud Explosion  Release  of  energy  in  a  rapid  and  uncontrolled manner  gives  rise  to  explosion.  Identified locations having explosion hazards shall in tank farm and storage area (warehouse). Extra care  shall  be  taken  by  providing  rupture  disc,  Pressure  release  valve,  and  temperature controller.  In  addition  to  that  Fire  and  explosion  hazard  will  identified  as  catastrophic failure of storage tanks in solvent storage yard.  Explosion is a sudden and violent‐ release of energy which may be in the form of physical energy or chemical energy. In case where a major leak continues from some time without ignition a substantial mass of  the gas  from a vapor of cloud which on  finding a source of ignition  may  result  in  an  vapor  cloud  explosion  (VCE)  before  a  cloud  is  diluted  to  the concentration below the lower explosion limit in air. The explosion will cause overpressure resulting in to damage to the surrounding area.     

Page 276: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

26  

Pool fire  Since  the  Stone  Age  term  'fire'  is  associated  with  fear.  It  is  very  dangerous  if  occurs  in uncontrolled manner.  It  should  be  clearly  understood  that when  a  liquid  is  used  having flash  point  below  the  normal  ambient  temperature,  it  could,  in  suitable  circumstances, liberate a sufficient quantity of vapour to give rise to flammable mixtures with air.  Following an accidental release, chemicals will form either a confined pool within the bund area or an unconfined pool. Should the vapor above the pool ignite, the liquid will burn as a pool fire. The pool fire will result in thermal radiation. It cloud also damage all the storage tanks  within  the  confined  area  of  the  dyke.  In  the  present  study,  impact  distances  for various scenarios have been calculated.  Jet fire   After a minor or major loss of containment following hardware failure, chemicals which are stored  under  high  pressure  would  escape  as  liquid/  gas  spray  or  jet  which  undergoes flashing evaporation and  forms a dense  flammable gas could  in  the air. The cloud, which initially moves  forward  in  the spatial direction of  the spray  till  the kinetic energy,  is  lost and gravity slumping of cloud occurs if the gas is heavier than the air. Should the flammable jet ignite very soon after development of leak? A jet fire will commence. The jet fire could damage  the neighboring  tanks by direct  flame  impingement.  It would also cause  thermal radiation in the surrounding area.  Fire Ball / BLEVE  Any  fire  in  the  vicinity  of  storage  tank  containing  a  liquefied  gas  may  cause  Boiling Expanding Vapor Explosion (BLEVE). Due to simultaneous increase of pressure as well as weakening of the material of the vessel because of a fire in the vicinity the tank. It may fail resulting  in  release  of  the  entire  inventory  suddenly  and  result  in  a  BLEVE  and  fireball. BLEVE  results  in  serious  thermal  radiation  to  the  plant  equipment  and  surroundings. Damage may also result to the debris of the shattered vessel being thrown about.  

The major hazards in the M/s. Airolam Ltd.are described below. • Toxic hazard due to leakage of hazardous chemicals. • Fire hazard due to leakage of flammable chemicals. • Electrical  hazards  due  to  the  electrical  major  equipment/  machinery,  operations, 

Page 277: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

27  

welding,  motors,  heavy  lift  devices,  cabling,  human  intervention  (short  circuit possibility),  maintenance  work  (due  to  machinery  breakdown  etc.),  plant  lighting related electrical hazards. 

• Possibility of human injury due to working with mechanical machines, manual handling etc. 

• Possibility  of  injury  during  chemicals  handled,  during  operations  and  due  to intoxication.  

• Major  dropped  objects  hazard  due  to  large  number  of  physical  handling  steps  / operations involved with crane/ overhead lifting/ hoisting equipment.  

• Fires in any part of the plant working areas – there is a possibility of rapid escalation if it is not brought under control quickly.   

Toxic hazards 

Toxic  substances  affect  in  three  ways  by  ingestion,  absorption  &  inhalation.  Adequate provision  of  safety  along  with  personal  protective  equipment  will  be  made,  breathing apparatus and emergency kit shall be provided at various locations of the installation.  

Corrosion hazards 

Corrosion  is a chemical reaction‐taking place at the surface of metal. Corrosive chemicals have  their  typical  hazard  when  it  comes  in  contact  with  human  tissues.  Most  corrosive substances will produce chemical burns, while certain chemical produce deep ulceration. Other has detailing effect on skin and may cause dermatitis. This has also adverse effects on weakening the strength of material in contact. 

M/s. Airolam Ltd.shall take due care to overcome the hazard. The complete structure of the manufacturing area shall be painted with special type of anticorrosive paint. Good quality materials will be used for transferring corrosives. Regular thickness testing of equipment, pipelines etc. shall carry out to have the exact picture of effect of corrosion. 

Biological hazards 

Effluent treatment process involves the biological activities so biological hazard’scan not be eliminated.  The  way  of  biological  hazards  is  by  hand  to  mouth  contact  during  eating, drinking or by wiping    the face with contaminated hands or gloves or by  licking splashes from  the  skin  or  by  breathing  them  in,  as  dust,  aerosol  or  mist.  The  major  source  of biological  hazard  on  site  is  biological  sludge  drying  bed,  filter  press,  biological  storage 

Page 278: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

28  

sump etc. Practically,  complete  elimination of biological  hazard  cannot be possible but  it will be reduce by adopting the safe practice guards. 

DAMAGE CRITERIA: 

Damage  estimates  due  to  thermal  radiations  and  overpressure  have  been  arrived  at  by taking  in  to  consideration  the published  literature  on  the  subject.  The  consequences  can then be visualized by the superimposing the damage effects zones on the existing plan site and  identifying  the  elements  within  the  project  site  as  well  as  in  the  neighboring environment, which might be adversely affected, should one or more hazards materialize in real life.  In  consequence  analysis,  use  is made  of  a  number  of  calculation models  to  estimate  the physical  effects  of  an  accident  (spill  of  hazardous  material)  and  to  predict  the  damage (lethality,  injury,  material  destruction)  of  the  effects.  The  calculations  can  roughly  be divided in three major groups: 

  a)  Determination of the source strength parameters; 

  b)  Determination of the consequential effects; 

  c)  Determination of the damage or damage distances. 

The basic physical effect models consist of the following. 

Source strength parameters 

* Calculation of the outflow of liquid, vapour or gas out of a vessel or a pipe, in case of rupture. Also two‐phase outflow can be calculated.   

* Calculation, in case of liquid outflow, of the instantaneous flash evaporation and of the dimensions of the remaining liquid pool. 

* Calculation of  the evaporation rate,  as a  function of volatility of  the material, pool dimensions and wind velocity. 

* Source strength equals pump capacities, etc. in some cases.  

 

 

 

Page 279: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

29  

Consequential effects 

* Dispersion of gaseous material  in the atmosphere as a function of source strength, relative  density  of  the  gas, weather  conditions  and  topographical  situation  of  the surrounding area.  

* Intensity of heat radiation [in kW/ m2] due to a fire or a BLEVE, as a function of the distance to the source.  

* Energy  of  vapour  cloud  explosions  [in N/m2],  as  a  function  of  the  distance  to  the distance of the exploding cloud.  

* Concentration  of  gaseous  material  in  the  atmosphere,  due  to  the  dispersion  of evaporated chemical.  The latter can be either explosive or toxic.  

It  may  be  obvious,  that  the  types  of  models  that  must  be  used  in  a  specific  risk  study strongly depend upon the type of material involved:                 

‐    Gas, vapour, liquid, solid     

‐    Inflammable, explosive, toxic, toxic combustion products 

‐    Stored at high/low temperatures or pressure 

‐    Controlled outflow (pump capacity) or catastrophic failure? 

Selection of Damage Criteria 

The damage criteria give the relation between extent of the physical effects (exposure) and the  percentage  of  the  people  that  will  be  killed  or  injured  due  to  those  effects.  The knowledge  about  these  relations  depends  strongly  on  the  nature  of  the  exposure.  For instance, much more is known about the damage caused by heat radiation, than about the damage due  to  toxic exposure, and  for  these  toxic effects,  the  knowledge differs  strongly between different materials.  

In Consequence Analysis studies, in principle three types of exposure to hazardous effects are distinguished:  

1. Heat radiation, from a jet, pool fire, a flash fire or a BLEVE.  2. Explosion 3. Toxic effects, from toxic materials or toxic combustion products.       

In the next three paragraphs, the chosen damage criteria are given and explained.  

 

 

Page 280: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

30  

Heat Radiation 

The consequence caused by exposure to heat radiation is a function of:  

• The radiation energy onto the human body [kW/m2];      • The exposure duration [sec];                • The protection of the skin tissue (clothed or naked body).                 • The  limits  for  1% of  the  exposed  people  to  be  killed  due  to  heat  radiation,  and  for 

second‐degree burns are given in the table herein: Damages to Human Life Due to Heat Radiation 

Exposure Duration 

Radiation  for 1%  lethality (kW/m2) 

Radiation  for 2nd  degree burns 

(kW/m2) 

Radiation  for  first  degree burns, (kW/m2) 

10 Sec  21.2  16  12.5 

30 Sec  9.3  7.0  4.0 

 

Since in practical situations, only the own employees will be exposed to heat radiation in case of a fire, it is reasonable to assume the protection by clothing. It can be assumed that people would be able to find a cover or a shield against thermal radiation in 10 sec. time. Furthermore, 100% lethality may be assumed for all people suffering from direct contact with  flames,  such as  the pool  fire,  a  flash  fire or a  jet  flame. The effects due  to  relatively lesser incident radiation intensity are given below. 

Effects Due To Incident Radiation Intensity 

RADIATION KW/m2 

DAMAGE TO EQUIPMENT 

DAMAGE TO PEOPLE 

0.7    Equivalent to Solar Radiation 

1.2  Solar heat at noon    

1.6  ***   No discomfort for long exposure , Minimum level of pain threshold  

2.0  PVC insulated  ***  

Page 281: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

31  

cables damaged  

4.0  ***   Causes pain if duration is longer than 20 secs. But blistering is unlikely.  

6.4  ***   Pain threshold reached after 8 secs.  Second degree burns after 20 secs.  

9.5  Minimum energy to ignite wood  

Minimum energy required for piloted ignition of wood, melting plastic tubing etc. Pain threshold reached after 8 sec. second degree burns after 20 sec. 1% lethality in one minute.  

12.5  With a flame; Melts plastic tubing.  

First degree burns in 10 secs.  

16.0  ***   Severe burns after 5 secs.  

25.0  Minimum energy to ignite wood at  identifying long exposure without a  flame.  

100% lethality in 1 minute.  Significant injury in 10 secs.  

37.5  Severe damage to plant  

100% lethality in 1 minute.  50% lethality in 20 secs.  1% lethality in 10 secs.  

Explosion 

In case of vapour cloud explosion, two physical effects may occur:  

* a flash fire over the whole length of the explosive gas cloud;  * a blast wave, with typical peak overpressures circular around ignition source.  

As explained above, 100% lethality  is assumed  for all people who are present within  the cloud proper.  

For the blast wave, the lethality criterion is based on: 

* A  peak  overpressure  of  0.1  bar  will  cause  serious  damage  to  10%  of  the housing/structures. 

* Falling fragments will kill one of each eight persons in the destroyed buildings.   

The following damage criteria may be distinguished with respect to the peak overpressures resulting from a blast wave: 

Page 282: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

32  

 

FATAL RADIATION EXPOSURE LEVELS:             

Damage Due To Overpressures 

Peak Overpressure  Damage Type 

0.83 bar  Total Destruction 

0.30 bar  Heavy Damage 

0.10 bar 

0.03 bar 

Moderate Damage 

Significant Damage 

0.01 bar  Minor Damage 

           

RADIATION   FATALITY  

LEVEL        

kW/m2   1%   50%   99%  

  EXPOSURE IN SECONDS  

4.0   150   370   930  

12.5  30   80   200  

37.5  8   20   50  

Page 283: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

33  

 OVER 

PRESSURE mbar 

MECHANICAL DAMAGE TO EQUIPMENTS 

DAMAGE TO PEOPLE 

300 

Heavy damage to plant & structure 

1% death from lung damage  >50% eardrum damage   >50% serious wounds from  flying objects  

100 

Repairable damage  

>1% eardrum damage   >1% serious wounds flying objects from  

30  Major glass damage   Slight injury from flying glass  

10  10% glass damage   ***  

 From this  it may be concluded that p = 0.17 E+5 pa corresponds  approximately with 1% lethality.  Furthermore  it  is  assumed  that  everyone  inside  an  area  in  which  the  peak overpressure is greater than 0.17 E+5 pa will be wounded by mechanical damage. For the gas cloud explosion this will be inside a circle with the ignition source as its centre.  

Intoxication 

The consequences from inhalation of a toxic vapour/gas are determined by the toxic dose.   

This dose D is basically determined by: 

  ‐    Concentration of the vapour in air; 

  ‐    Exposure duration. 

Furthermore,  of  course,  the  breathing  rates  of  the  victim,  as  well  as  the  specific  toxic mechanism unto the metabolism play an important role.  

The dose is defined as D = Cn.t, with: 

Page 284: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

34  

C    =   concentration of the toxic vapour, in [ppm] or [mg/m3]; 

t     =   Exposure duration, in [sec] or [min]; 

n    =  exponent, mostly > 1.0; this exponent takes into account the fact that a high concentration over a short period results  in more serious  injury than a  low concentration  over  a  relatively  longer  period  of  exposure.  The  value  of  n should be greater than zero but less than 5. 

The given definition for D only holds if the concentration is more or less constant over the exposure  time;  this  may  be  the  case  for  a  (semi)  continuous  source.    In  case  of  an instantaneous  source,  the  concentration  varies with  time;  the dose D must be  calculated with an integral equation:  

  D =  ∫Cn.dt 

For  a  number  of  toxic  materials,  so‐called  Vulnerability  Models  (V.M.)  have  been developed.  The general equation for a V.M. (probit function) is: 

  Pr = a + b.ln (Cn.t), with 

  Pr   =   probit number, being a representation of the percentage of people suffering a certain kind of damage, for instance lethality  

    Pr =   2.67 means 1% of the population; 

    Pr =   5.00 means 50% of the population; 

    a and b   material dependent numbers; 

  Cn.t  =   dose D, as explained above. 

The  values  for  a  and  b  are mostly  derived  from  experiments with  animals;  occasionally, however, also human toxicity factors have been derived from accidents in past. In case only animal  experiments  are  available,  the  inhalation  experiments with  rats  seem  to  be  best applicable  for  predicting  the  damage  to  people  from  acute  intoxication.  Although  much research in this  field have been done over the past decades, only for a  limited number of toxic  materials  consequence  models  have  been  developed.  Often  only  quite  scarce information  is  available  to  predict  the  damage  from  an  acute  toxic  exposition.  Data transformation  from  oral  intoxication  data  to  inhalation  toxicity  criteria  is  sometimes necessary.  Generally,  in  safety  evaluations  pessimistic  assumptions  are  applied  in  these transformation  calculations.  The  calculated  damage  (distance)  may  be  regarded  as  a 

Page 285: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

35  

maximum.  For  the  purposes  of  a  response  to  a major  incident,  the  IDLH  value  level  has been chosen for the ‘wounded’ criteria. This type of injury will require medical attention. 

 Toxic Effects:  The effect of exposure to a toxic substance depends upon the duration of exposure and the concentration  of  the  toxic  substance.  Short‐term  exposures  to  high  concentration  give Acute Effects while long term exposures to low concentrations result in Chronic Effects.  Only  Acute  Effects  are  considered  under  hazard  analysis,  since  they  are  likely  credible scenarios. These effects are:  

a) Irritation (respiratory system skin, eyes) b) Narcosis (nervous system) c) Asphyxiation (oxygen deficiency) d) System damage (blood organs)  

Following are some of the common terms used to express toxicity of materials:  TLV: Threshold  Limit  Value  –  is  the  permitted  level  of  exposure  for  a  given period  on  a 

weighted average basis (usually 8 hrs.for 5 days in a week).  STEL: it is permitted Short Time Exposure Limit usually for a 15‐minute exposure.  IDLH: Immediately Dangerous To Life & Health  LCLo: Lethal Concentration Low  TCLo: Toxic Concentration Low         

Page 286: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

36  

CHAPTER: 10  

CONSEQUENCE ANALYSIS & RISK ANALYSIS  CONSEQUENCE ANALYSIS  In a plant handling hazardous chemicals, the main hazard arises due to storage, handling & use of these chemicals. If these chemicals are released into the atmosphere, they may cause damage  due  to  resulting  fires  or  vapour  clouds.  Blast  Overpressures  depend  upon  the reactivity class of material between two explosive limits.  

Operating Parameters 

Potential  vapour  release  for  the  same  material  depends  significantly  on  the  operating conditions.  Especially  for  any  liquefied  gas,  the  operating  conditions  are  very  critical  to assess the damage potential. If we take up an example of ammonia, if it is stored at ambient temperature,  say  about  28oC,  and  then  the  vapour  release  potential  of  the  inventory  is much higher as compared to the case if it is stored at 0oC. 

Inventory 

Inventory  Analysis  is  commonly  used  in  understanding  the  relative  hazards  and  short listing  of  release  scenarios.  Inventory  plays  an  important  role  in  regard  to  the  potential hazard. Larger the inventory of a vessel or a system, larger the quantity of potential release. The potential vapour release (source strength) depends upon the quantity of liquid release, the properties of the materials and the operating conditions (pressure, temperature).  If all these  influencing  parameters  are  combined  into  a  matrix  and  vapour  source  strength estimated for each release case, a ranking should become a credible exercise. 

Loss of Containment 

Plant  inventory  can  get  discharged  to  Environment  due  to  Loss  of  Containment.  Certain features of materials to be handled at the plant need to the clearly understood to firstly list out  all  significant  release  cases  and  then  to  short  list  release  scenarios  for  a  detailed examination. Liquid release can be either instantaneous or continuous. Failure of a vessel leading to an instantaneous outflow assumes the sudden appearance of such a major crack that practically all of  the contents above  the crack shall be  released  in a very short  time. The more  likely event  is  the case of  liquid release  from a hole  in a pipe connected  to  the vessel. The flow rate is depending on the size of the hole as well as on the pressure, which was present, in front of the hole, prior to the accident. Such pressure is basically dependent 

Page 287: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

37  

on  the pressure  in  the vessel. The vaporisation of  released  liquid depends on  the vapour pressure and weather  conditions.  Such consideration and others  have been kept  in mind both  during  the  initial  listing  as well  as  during  the  short  listing  procedure.  In  the  study, Maximum Credible Loss accident methodology is to be used, therefore, the largest potential hazard inventories have been considered for consequence estimation.  MAXIMUM CREDIBLE LOSS ACCIDENT SCENARIOS 

A Maximum Credible Accident (MCA) can be characterised as the worst credible accident. In other words: an accident in an activity, resulting in the maximum consequence distance that is still believed to be possible. A MCA‐analysis does not include a quantification of the probability  of  occurrence  of  the  accident.  Another  aspect,  in  which  the  pessimistic approach of MCA studies appears, is the atmospheric condition that is used for dispersion calculations.  

The Maximum  Credible  Loss  (MCL)  scenarios  have  been  developed  for  the  Facility.  The MCL cases considered, attempt to include the worst “Credible” incidents‐ what constitutes a  credible  incident  is  always  subjective.  Nevertheless,  guidelines  have  evolved  over  the years and based on basic engineering judgement, the cases have been found to be credible and modelling for assessing vulnerability zones is prepared accordingly. Only catastrophic cases have been considered and not partial or small failures (as is the case in Quantitative Risk Assessment where contributions from low frequency ‐ high outcome effect as well as high  frequency  ‐  low  outcome  events  are  distinguished).  The  objective  of  the  study  is emergency planning, hence only holistic & conservative assumptions are used for obvious reasons.  Hence  though  the  outcomes  may  look  pessimistic,  the  planning  for  emergency concept should be borne in mind whilst interpreting the results.  

CONSEQUENCE ANALYSIS CALCULATIONS 

The Consequence Analysis  has  been  done  for  selected  scenarios.  This  has  been  done  for weather conditions having wind speed 1.667 m/s.  In Consequence Analysis, geographical location of the source of potential release plays an important role. Consideration of a large number of scenarios in the same geographical location serves little purpose if the dominant scenario has been identified and duly considered. 

6.7.3.1 SOFTWARE USED FOR CALCULATIONS 

Aloha  5.1.1.2  is  the  most  comprehensive  software  available  for  performing  Process Hazard  Analysis  (PHA),  Quantitative  Risk  Assessment  (QRA)  and  Financial  Risk  Analysis (FRA).  Our  extensively  validated  software  for  consequence  and  risk  analysis  is  used  by 

Page 288: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

38  

governments  and  industry helping  them  to  comply with  local  safety  regulation and  their own  corporate  best  practice. Aloha 5.1.1.2contains  all  the  discharge,  dispersion,  effects and risk models you will need to accurately assess all your major hazards and associated risks. Aloha 5.1.1.2Consequence provides you with comprehensive hazard analysis facilities to examine the progress of a potential incident from the initial release to its far‐field effects. 

6.7.4  SCENARIOS 

TABLE ­ 6.5 

POSSIBLE ACCIDENT SCENARIOS AT M/S. AIROLAM LTD. Scenario  MCL Scenario  Pressure & Temp.  Stored qty in MT  

1  Release of Phenol from Tank  Thick Liq. At Room Temperature, 

hence, warmed up before use 

20 

2  Release of Formaldehyde  from Tank 

Normal Liq. At Room 

Temperature 

20 

3  Release of Methanol  from Tank  Normal Liq. At Room 

Temperature 

10 

 

   

Page 289: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

39  

1. Release / Leakage  Release of Phenolfrom Tank: SITE DATA:    Location: AIROLAM LTD., GUJARAT, INDIA    Building Air Exchanges Per Hour: 0.49 (unsheltered single storied)    Time: April 18, 2015  1420 hours ST (using computer's clock)   CHEMICAL DATA:    Chemical Name: PHENOL                  Molecular Weight: 94.11 g/mol    AEGL‐1 (60 min): 15 ppm   AEGL‐2 (60 min): 23 ppm   AEGL‐3 (60 min): N/A    IDLH: 250 ppm      LEL: 1700 ppm       UEL: 8600 ppm    Ambient Boiling Point: 178.5° C    Freezing Point: 42.8° C   ATMOSPHERIC DATA: (MANUAL INPUT OF DATA)     Wind: 1.38 meters/second from ne at 3 meters    Ground Roughness: open country         Cloud Cover: 5 tenths    Air Temperature: 40° F                 Stability Class: B    No Inversion Height                    Relative Humidity: 20%   SOURCE STRENGTH:    Direct Source: 20000 liters            Source Height: 0.1 meters    Source State: Liquid    Source Temperature: 45° C    Release Duration: 1 minute    Release Rate: 411 kilograms/sec    Total Amount Released: 24,651 kilograms   THREAT ZONE:     Model Run: Gaussian    Red   : no recommended LOC value ‐‐‐ (N/A = AEGL‐3 (60 min))    Orange: 2.6 kilometers ‐‐‐ (23 ppm = AEGL‐2 (60 min)) 

Page 290: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

40  

   Yellow:  3.0  kilometers  ‐‐‐  (15  ppm  =  AEGL‐1  (60  min))

 

   

Page 291: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

41  

2. Release / Leakage  Release of Formaldehyde from Tank:  SITE DATA:    Location: AIROLAM LTD., GUJARAT, INDIA    Building Air Exchanges Per Hour: 0.49 (unsheltered single storied)    Time: April 18, 2015  1425 hours ST (using computer's clock)   CHEMICAL DATA:    Chemical Name: FORMALDEHYDE            Molecular Weight: 30.02 g/mol    AEGL‐1 (60 min): 0.9 ppm   AEGL‐2 (60 min): 14 ppm   AEGL‐3 (60 min): 56 ppm    IDLH: 20 ppm       LEL: 7000 ppm       UEL: 73000 ppm    Ambient Boiling Point: 95.7° C    Vapor Pressure at Ambient Temperature: 0.0023 atm    Ambient Saturation Concentration: 2,552 ppm or 0.26%    Note: Not enough chemical data to use Heavy Gas option   ATMOSPHERIC DATA: (MANUAL INPUT OF DATA)     Wind: 1.38 meters/second from ne at 3 meters    Ground Roughness: open country         Cloud Cover: 5 tenths    Air Temperature: 40° F                 Stability Class: B    No Inversion Height                    Relative Humidity: 20%   SOURCE STRENGTH:    Direct Source: 20000 liters            Source Height: 0.1 meters    Source State: Liquid    Source Temperature: equal to ambient    Release Duration: 1 minute    Release Rate: 243 kilograms/sec    Total Amount Released: 14,610 kilograms   THREAT ZONE:     Model Run: Gaussian    Red   : 2.4 kilometers ‐‐‐ (56 ppm = AEGL‐3 (60 min))    Orange: 3.7 kilometers ‐‐‐ (14 ppm = AEGL‐2 (60 min))    Yellow: 9.1 kilometers ‐‐‐ (0.9 ppm = AEGL‐1 (60 min)) 

Page 292: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

42  

 

   

Page 293: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

43  

3. Release / Leakage  Release of Methanolfrom Tank:  SITE DATA:    Location: AIROLAM LTD., GUJARAT, INDIA    Building Air Exchanges Per Hour: 0.49 (unsheltered single storied)    Time: April 18, 2015  1420 hours ST (using computer's clock)   CHEMICAL DATA:    Chemical Name: METHANOL                Molecular Weight: 32.04 g/mol    AEGL‐1  (60 min): 530 ppm     AEGL‐2  (60 min): 2100 ppm     AEGL‐3  (60 min): 7200 ppm    IDLH: 6000 ppm     LEL: 71800 ppm      UEL: 365000 ppm    Ambient Boiling Point: 61.9° C    Vapor Pressure at Ambient Temperature: 0.35 atm    Ambient Saturation Concentration: 387,251 ppm or 38.7%   ATMOSPHERIC DATA: (MANUAL INPUT OF DATA)     Wind: 1.38 meters/second from ne at 3 meters    Ground Roughness: open country         Cloud Cover: 5 tenths    Air Temperature: 40° C                 Stability Class: B    No Inversion Height                    Relative Humidity: 20%   SOURCE STRENGTH:    Direct Source: 10000 liters            Source Height: 0.1 meters    Source State: Liquid    Source Temperature: equal to ambient    Release Duration: 1 minute    Release Rate: 129 kilograms/sec    Total Amount Released: 7,750 kilograms   THREAT ZONE:     Model Run: Heavy Gas     Red   : 692 meters ‐‐‐ (7200 ppm = AEGL‐3 [60 min])    Orange: 1.1 kilometers ‐‐‐ (2100 ppm = AEGL‐2 [60 min])    Yellow: 1.9 kilometers ‐‐‐ (530 ppm = AEGL‐1 [60 min])   THREAT AT POINT: 

Page 294: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

44  

   Concentration Estimates at the point:    Downwind: 1 kilometers                 Off Centerline: 1 kilometers    Max Concentration:       Outdoor: 0.106 ppm       Indoor:  0.00217 ppm  

 

Page 295: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Risk Assessment Study Report of M/s. Airolam Ltd.located at

Survey No.:355, Village: Dalpur, Taluka: Prantij, District: Sabarkantha, Gujarat.

Prepared By M/s. Bhagwati Enviro Care Pvt Ltd.

45  

 

Page 296: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 02

National Ambient Air Quality Standards

Annexure 02 of M/s. Airolam Ltd. 255

Page 297: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 02

National Ambient Air Quality Standards

Annexure 02 of M/s. Airolam Ltd. 256

Page 298: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 03

Drinking Water Quality Standards

Annexure 03 of M/s. Airolam Ltd. 257

DRINKING WATER QUALITY STANDARDS AS PER IS NO. 10500 (1991)

Substance or characteristics Permissible Limit Colour Hazen units 25 Odour Unobjectionable Taste Agreeable Turbidity NTU, Maximum 10 PH 6.5-8.5 Total Hardness (as CaCO3) mg/l 600 Iron (as Fe) mg/l 1 Chlorides (as Cl) mg/l 1000 Residual Free Chlorine, mg/l 0.2 Dissolved Solids, mg/l 2000 Calcium (as Ca) mg/l 200 Magnesium (as Mg), mg/l 100 Copper (as Cu), mg/l 1.5 Manganese (as Mn), mg/l 0.3 Sulphate (as SO4), mg/l 400 Nitrate (as NO2 mg/l) 100 Fluoride (as F), mg/l 1.5 Phenolic Compound, mg/l 0.002 Mercury, mg/l 0.001 Cadmium, mg/l 0.01 Selenium, mg/l 0.01 Arsenic, mg/l 0.05 Cyanide, mg/l 0.05 Lead, mg/l 0.05 Zinc, mg/l 5 Anionic detergent, mg/l 0.2 Chromium (as Cr+6), mg/l 0.05 Polynuclear Aromatic Hydrocarbons, mg/l -- Mineral Oil, mg/l 0.03 Pesticides, mg/l 0.001 Radioactive materials 1 Alpha emitters Bq/l 2. Beta emitters Bq/l

0.1 1

Alkalinity, mg/l 600 Aluminum, mg/l 0.2 Boron , , mg/l 5

Page 299: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 04

National Ambient Noise Quality standards

Annexure 04 of M/s. Airolam Ltd. 258

NATIONAL AMBIENT NOISE QUALITY STANDARDS (CENTRAL POLLUTION CONTROL BOARD, INDIA)

Area code Category of areas Leq in db(A) Day time Night Time

A Industrial Area 75 70 B Commercial Area 65 55 C Residential Area 55 45 D Silence zone 50 40

Note:

1) Daytime is reckoned in between 6 am and 10 pm

2) Night time is reckoned in between 10 pm and 6 am

3) Silence zone is defined as areas upto 100 meters around such premises

as hospitals, educational institutes and courts. The silence zones are to

be declared by the competent authority.

4) Mixed categories of areas should be declared as one of the four

above mentioned categories by the competent authority and the

corresponding standards shall apply.

Page 300: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 5

CGWA Application Copy   

259  

CENTRAL GROUND WATER AUTHORITY

Page 301: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 5

CGWA Application Copy   

260  

(Constituted under section 3 (3) of the Environment (Protection) Act, 1986)

APPLICATION FOR PERMISSION TO ABSTRACT GROUNDWATER FOR INDUSTRIAL USE  

1. General Information

(i) Name of the Industry: M/s. Airolam Ltd. (ii) Location details of the Industrial unit:

Plot No.355 Village: Dalpur Tal: Prantij District: Sabarkantha

State: Gujarat, Pin: 383120

(Attach site plan and location map)

(iii) Communication address: Plot No.355, (iv) Salient features of the Industrial activity: Unit is manufacturing Laminated Sheets:

2,50,000 Nos./Month, Proposed product Phenol Formaldehyde Resin: 750 MT/Month and Melamine Formaldehyde Resin: 250 MT/Month

(v) Land use details of the existing/proposed Industrial unit premises

Total land area: 28689.46 sq.m

Roof area of buildings/sheds: 6640 sq.m

Road/paved area: 4000 sq.m

Green belt area: 8000 sq.m

Open land: 10,049.46 sq.m

(vi) Drainage in the area (River.nala, etc): will be discharge into: Not Applicable. (vii) Source of availability of surface water for Industrial use, if any – furnish details – --- (viii) Average Annual rainfall in the area : 800 mm (ix) Township/village within 0.7 km radius of the Industrial unit : Dalpur (x) Whether groundwater utilization for:

(a) Expansion programme of existing industry: --- Yes (b) New Industry:

2. Details of water requirement/recycled water usage: (Please enclose flow chart of activities

and requirement of water at each stage:

(i) Net water requirement; -- 57.5 m3/day

Ground Water utilization: -- 57.5 m3/day

Surface Water utilization: -- m3/day

Proposed/existing water supply from any agency: No.

Total –    57.5 m3/day 

Page 302: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 5

CGWA Application Copy   

261  

(ii) Breakup of water requirement and usage:

Activity Existing

Requirement

(m3/day)

Proposed

Requirement

(m3/day)

Total

Requirement

(m3/day)

No. of

Operational

Days in a

year

Annual

Requirement

(m3/year)

Industrial activity 31 0.5 31.5 300 9450

Residential/

Domestic

6 0 6 300 1800

Greenbelt

Development/

Environment

Maintenance

20 0 20 300 6000

Other use

Grand total 57.0 0.5 57.5 300 17,250

(iii) Breakup of Recycle water usage : Nil (m3/day) (M3/year)

(a) Quantity of treated water available: -- -- (b) Reuse in Industrial activity: -- -- (c) Reuse for green belt development: -- -- (d) Other use: -- --

Total: -- --

3. Details of existing/proposed groundwater abstraction structures:

Details Existing structure Proposed structure

Numbers of structure 1 ---

Type of structure (dug well, tube well, bore well, Bore Well ---

Page 303: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 5

CGWA Application Copy   

262  

dug cum bore well)

Year of construction 2004 ----

Depth (meter) 150 ----

Diameter (mm) 20.32 ----

Depth to water level (meters below ground

Level)

120 -----

Discharge (m3/hour) 3 -----

Operational hours/day 2 4

Operational days/year 300 300

Mode of lift and Horse Power of pump 7.5HP ------

Whether fitted with water meter or not No No

Whether permission/registered with CGWA, if so details thereof

No No

4. Groundwater availability (please enclose a comprehensive report/note on groundwater condition/groundwater quality in and around the area) Not Applicable

5. Details of rainwater harvesting/artificial recharge measures for groundwater recharge in the area. If the firm has proposed to take up rainwater harvesting/recharge outside the industrial unit premises, then provide NOC from the concern authority/agency where the harvesting measures are proposed, if already implemented, details may be furnished. (attach report on comprehensive & feasible rainwater harvesting/recharge proposal).

We have not done any rainwater-harvesting programme.

6. Copy of referral letter from State Pollution Control Board/Bureau of Indian Standards/Ministry of Environment and Forests/other statutory agencies may be annexed in case referred or obtained, if not, reason thereof. No.

7. Have you applied earlier for groundwater clearance from CGWA/Stage Government Agency, if so, gives details thereof with status. No.

Page 304: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 5

CGWA Application Copy   

263  

Undertaking  

If is to certify that the data and information furnished above are true to the best of my Knowledge and belief and I am aware that if any part of the data/information submitted is found to be false of misleading at any stage the application will be rejected out rightly.

Date: 02-04-2015 Signature of the applicant Place: Dalpur (With official seal)

* Application induplicate should be submitted to the Member Secretary, Central Ground Water Authority, A-s, W-3, Curzon Road Barracks, Kasturba Gandhi Marg, New Delhi –11001 or to the Regional Director, Central Ground Water Board of concerned state. ** Application Profroma is subject to modification from time to time.  

Page 305: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 06

Membership Certificate Copy

Annexure 6 of M/s.Airolam Ltd. 264

Page 306: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 07

CCA Copy

Annexure 7 of M/s.Airolam Ltd. 265

Page 307: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 07

CCA Copy

Annexure 7 of M/s.Airolam Ltd. 266

Page 308: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 07

CCA Copy

Annexure 7 of M/s.Airolam Ltd. 267

Page 309: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 07

CCA Copy

Annexure 7 of M/s.Airolam Ltd. 268

Page 310: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 07

CCA Copy

Annexure 7 of M/s.Airolam Ltd. 269

Page 311: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 8

CCA Compliance Report

270

Annexure: 08  

Compliance Report

Compliance Report of : M/s. Airolam Ltd. Address of the Company : Plot No. 355, Village: Dalpur,

Nanapur Road, Ta: Prantij, Dist: Sabarkantha, Gujarat

Consent Order No. : AWH-60142

Date of Issue : 30/01/2014

Valid up to : 30/12/2018

Product List Sr. No. Name of Product Capacity

(Nos./Month) 1. Laminated Sheets 2,50,000

Page 312: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 8

CCA Compliance Report

271

Specific Condition

Sr. No. Condition under water act - 1974 Status of compliance

1. Unit Shall strictly adhere submitted notarize UNT dated 11/02/2013 and 18/10/2013 stating that your unit is not manufacturing the resin for captive use for propose expansion activity and shall purchase from open market by job work & maintain the record.

Complied

Condition under the water act – 1974:

Sr. No. Condition under water act - 1974 Status of compliance

2.1. The quantity of trade effluent from the industrial plant shall not exceed 1 KLPD.

Complied

2.2. There shall be no discharge of industrial effluent from manufacturing process and other ancillary operations as the generated effluent shall be completely evaporated in the provided evaporator (i.e. Zero discharge)

Complied

2.3. The quantity of sewage effluent from the industrial plant shall not exceed 5 KLPD

2.4. Domestic effluent shall be disposed off through soak pit system.

Complied

2.5. The consent shall be lapsed automatically at any time if the discharge of trade effluent from your industrial plant had been observed by the Board, and in the case you have to close down your industrial plant immediately with intimation to the Board.

Complied

2.6. In order to achieve zero discharge the applicant shall operate efficiently the system consisting of: Sr. No. E.T.P units 1 Steam jacketed evaporator capacity

1000 Lit/Day

Complied

2.7. In order to enable the Board the perform it functions ascertaining the compliance of condition laid down for the total destruction of the concentrated effluent under the condition no. 2.2 of this order the applicant shall have to submit every month the report of the daily quantity of the concentrated effluent being

Complied

Page 313: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 8

CCA Compliance Report

272

destructed. 2.8. Separate meter for the record of consumption of

power supply for the area of effluent treatment plant and evaporator shall be provided.

Complied

2.9. The internal connection between various units of effluent treatment plant & evaporator shall be of fixed pipeline.

Complied

2.10. Adequate lightening arrangement shall be made all round the area of effluent treatment plant.

Complied

2.11. Treated effluent shall be evaporated on day-to-day basis.

Complied

Condition under the air act – 1981:

Sr. No. Condition under the air act – 1981

Status of Complianc

e 3.1. The following shall be used as fuel in boiler/TFH/DG respectively:

Sr. No. Fuel Quantity 1 Lignite/Wood for Boiler 2.5 MT/Day 2 Lignite/Wood for old TFH 2.5 MT/Day 3 White Coal/Lignite/Wood for new TFH 15 MT/Day 4 Diesel for D.G.Set 200 Lit/Month

Complied

3.2. As per the CCA, the industry should install and operate air pollution control system in order to achieve norms prescribed below.

Complied

3.3. As par the CCA, the flue gas emission through stack attached to Boiler/TFH/DG shall conform to the following standards: Stack No.

Stack attached to

Stack height

Air Pollution Control System

Parameter Permissible Limit

1 Steam Boiler

35 m common stack

Multi Cyclone separator

Particulate matter: 150 mg/Nm3 SO2: 100 ppm, NOx: 50 ppm

2 Thermic Fluid Heater-10 Lacs kcal/hr

Multi Cyclone separator

3 Thermic Fluid

Dust collector

Complied

Page 314: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 8

CCA Compliance Report

273

Heater-6 Lacs kcal/hr

& Multi Cyclone

4 D.G.Set 6 m Acoustic enclosure

3.4. There shall be no process emission. Complied 3.5. The concentration of the prescribed parameters in the ambient air

within the premises of the industry shall not exceed the prescribed norms.

Complied

3.6. The applicant shall provide portholes, ladder, platform etc at chimney (s) for monitoring the air emission and the same shall be open for inspection to/and for use of board’s staff. The chimney (s) vents attached to various sources of emission shall be painted/displayed to facilitate identification.

Complied

3.7. The industry shall take adequate measures for control of noise levels from its own sources within the premises so as to maintain ambient air quality standards in respect of noise to less than 75dB (a)during day time and 70 dB (A)during night time. Daytime is reckoned between 10 p. m. and 6 a. m.

Complied

Condition under the hazardous waste (Handling & Management) rules – 1986 and amendment rules – 2003

• As per the Authorization Order, the industry has been granted Authorization Order the following quantity of hazardous wastes form-2 (see rule 3(c) & 5 (5))

Sr. No. Condition under the authorization order Status of

Compliance1. Number of authorization: AWH-60142, date of issue:

30/01/2014 Complied

2. M/s. Airolam Ltd. Hereby granted an authorization to operate facility for following hazardous wastes on the premises situated at Plot No. 355, Village: Dalpu, Nananpur Road, Ta: Prantij, Dist-Sabarkantha, Gujarat. Sr. no.

Type of waste

Quantity Schedules Facility

1 Waste 3 23.1 Collection,

Complied

Page 315: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 8

CCA Compliance Report

274

Residue (Resins)

MT/Year storage, incineration and disposal at CWIHF site

2 ETP Sludge

3 MT/Year

34.3 Collection, storage, incineration and disposal at TSDF site

3 Discarded containers

3300 nos./Year

33.3 Collection, storage and use within permises/sell to approved scrap vendor

4 Used Oil 300 Lit/Year

5.1 Collection, storage and use within premises as lubricant/sell to registered re-refiners

3. The authorization is granted to operate a facility for collection, storage, within factory premise, transportation and ultimate disposal of hazardous wastes as mentioned in column 5 of above mentioned table.

Complied

4. The authorization shall be in force for a period up to 30/12/2018

Complied

5. The authorization is subject to the conditions stated below and such other conditions as may be specified in the rules form time to time under the Environment (Protection) Act-1986.

Complied

 

Page 316: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 09

Land Supporting Documents

Annexure 09of M/s. Airolam Ltd. 275

Page 317: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 09

Land Supporting Documents

Annexure 09of M/s. Airolam Ltd. 276

Page 318: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion

Annexure: 09

Land Supporting Documents

Annexure 09of M/s. Airolam Ltd. 277

Page 319: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 320: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 321: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 322: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 323: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 324: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 325: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 326: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 327: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 328: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 329: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 330: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 331: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 332: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 333: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 334: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 335: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 336: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 337: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 338: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 339: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 340: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 341: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 342: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 343: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 344: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 345: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 346: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 347: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 348: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 349: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 350: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 351: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 352: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 353: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 354: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 355: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 356: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 357: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 358: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 359: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 360: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 361: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 362: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 363: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 364: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 365: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 366: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 367: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 368: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 369: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 370: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 371: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 372: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 373: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 374: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 375: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 376: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 377: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 378: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 379: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 380: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 381: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 382: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion
Page 383: M/S. AIROLAM LTD.environmentclearance.nic.in/writereaddata/EIA/30062015A6... · 2015-06-30 · FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR EXPANSION IN EXISTING UNIT Expansion